BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 1 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

- DAILY PROGRESS REPORT -


20th Jul 2023

Remarks:

1.0 20-Jul-23 IFR Issued for Information M. Bliss N. Uche N. Shidda Henry O.
Approved by Approved by
Rev. Rev. date Status Description Issued by Reviewed by
(BRNL) (SNL)
BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 2 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

TABLE OF CONTENTS

TABLE OF CONTENTS
1. EXECUTIVE SUMMARY .................................................................................................................... 3

2. HSE ................................................................................................................................................. 4

3. AREAS OF CONCERN ....................................................................................................................... 5

4. POB ................................................................................................................................................. 5

5. MAN-HOURS ................................................................................................................................... 6

6. SCHEDULE IMPACT ......................................................................................................................... 6

7. WELD SUMMARY............................................................................................................................. 6

8. FABRICATION PROGRESS .............................................................................................................. 7

9. FORECAST FOR NEXT DAY ACTIVITIES .......................................................................................... 8

10. PICTURES ....................................................................................................................................... 9


BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 3 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

1. EXECUTIVE SUMMARY
1.1 Key Achievements:

Work
Activity Description Start Date End Date Remark
Completion

WQT 17/07/2023 22/07/2023 Ongoing Ongoing


Material Reconciliation by Client Rep. 18/07/2023 22/08/2023 Ongoing Ongoing
Cutting of Stiffener, base & Saddle Plates for
20/07/2023 09/08/2023 Ongoing Ongoing
Pipe Support

1.2 Overall Progress S-Curve

P5 - BUILDERS- SMR 15/VGRB P5 TOP DECK STRUCTURE EXT


FABRICATION (Builders)
100.00%

90.00%

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%

Cum Plan Cum Actual

1.3 Global Cumulative vs. Planned Progress

1. Assigned Overall Weight 100%

2. Cumulative Plan/Forecast 22.63%

3. Cumulative Actual 15.31%

4. Variance -7.32%
The reason for the negation on the variance was because the day’s
5. Reason for Variance actual input as compared to the day before was less than the day’s
forecast.
BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 4 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

6. HSE

2.1. HSE STATISTICAL REPORT

HSE STATISITICAL REPORT -Date:20/07/2023


Month To Date Project To Date
HSE Statistics Description Today
(MTD) (PTD)
Client's Man‐hours 9 167 199

Contractor's Man‐ hours 63 795 953

Permit to work 1 7 7

JSA 0 2 2

Daily safety meeting (tool box) 1 18 22

Weekly safety meeting 0 4 7

SSHE Induction 0 4 9

Safety Inspection 0 4 7

Environmental/hygiene Inspection 0 1 2

Audits/Assessment 0 0 0

Unsafe Acts/Conditions 0 20 28

Safe Acts/Conditions 0 9 11

Safety/Quality walkthrough 0 2 4

Safety/Management Walkthrough/Tours 0 0 0

Hazard Hunt 0 3 5

Emergency drills 0 0 0

Loss Prevention Observations 0 0 0

Safety Sharing 0 0 0

Life Saving Action 0 0 0

Fatality (FAT) 0 0 0

First Aid Case(FAC) 0 0 0


BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 5 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

Medical Treatment Case (MTC) 0 0 0

Work Day Lost Time 0 0 0

Lost Time Injury (LTI) 0 0 0

FIRE Incident 0 0 0
Remark:

Tool-box Topic:
The Effects of dust during House-keeping.

6.1 There has been no safety or security incident as of today. No First Aid and no Lost Time Injury.
6.2 All Fitters are properly and adequately kitted-up with their PPE(s)

7. Areas of Concern
7.1 HEA 180 Beams needed ASAP to be delivered to our fabrication yard to proceed/conclude with the
Deck Extension Pre-Fabrication works.
7.2 The 4 sheets of 990 x 6m Gratings supplied to BRNL is not enough for cut-out as per the approved
drawing for fabrication of module P5 New Deck Extension and Access platform, (9+2 = 11) sheets of
same length (990 x 6000mm) still needed for the gratings. We are expecting to see the remaining
(5+2 = 11) sheets of the gratings ASAP, to facilitate the next day’s activities.
7.3 Delay in supply of other materials (such as Pipes, Angle Irons, RHS, Gratings, Wire mesh, etc) for
Deck Extension, Access Platform and Radiation Shield fabrication is resulting to an unproductive
man-hours which is having a negative impact on the schedule.
7.4 Awaiting response to the Review of Issued Fabrication Procedure from SNL.

8. POB
Project personnel as on date include the following:

Name Position POB

M. Bliss Project Engineer 1


Innocent Okedi QA/QC 1
Stanley Chinda HSE Manager 1
Patrick Sunday Supervisor 1
Needum Elijah Fitter 1

Hanson Peters Fitter 1


Engr. Henry Odinukwe (Client Rep) PE 1
Emma Akpan Forklift Operator 1
BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 6 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

TOTAL 8

9. MAN-HOURS

DATE START TIME FINISH TIME HOUR DIFF. POB TOTAL HOURS

20/07/2023 8:00 AM 12:00 PM 4 8 32.00


20/07/2023 1:00 PM 5:00 PM 5 8 40.00
TOTAL MAN HOURS (TODAY) 72.00

PREV. CUML. M.HOURS 1080.00

CURRENT CUML M-HOURS 1152.00

10. Schedule impact


The Project work is currently on schedule? YES NO

If NO, please explain briefly below why the Project work is not on schedule?
[The project Schedule is being revised and will be submitted soon]

11. WELD SUMMARY

VGRB WELD SUMMARY


SHOP FABRICATION STR SHOP FABRICATION PVV
DATE
SHOP SHOP WELD
S/N ISO# OF COUNT ISO# COUNT REMARK
WELD# WELD# COMPLETED/DATE
WELD
1
2
TOTAL STR WELDED AS OF TOTAL STR WELDED AS OF
DATE: DATE:
BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 7 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

12. FABRICATION PROGRESS


BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 8 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

13. FORECAST FOR NEXT DAY ACTIVITIES

• CUTTING & PROFILING OF THE AVAILABLE GRATINGS (Pending on material supply)


• Fit-Up & Welding (Pending on WQT Result)
• CUTTING AND PROFILING OF STRUCTURAL MEMEBERS FOR ACCESS PLATFORM (Pending on material
supply)
• CUTTING & PROFILING OF 10MM PLATES FOR PIPE SUPPORT
• DOCUMENT REVIEW
BUILDERS RESOURCES NIG. LTD.

This project is currently under the supervision/leadership of…


☑ ENGINEERING TEAM ☐ SURVEY TEAM ☑ PROJECT TEAM
The document relates to AKPO FPSO 2023 Full Field Shutdown Project
[ NG-AKP-13-SPIE-BUILDERS-000101] DAILY PROGRESS REPORT FOR
Document Title Page 9 of 9
MODULE-P5. STR. FABRICATION (ONSHORE PRE-FAB)
Document Reference BRNL-0014 Rev. Rev. Date St.
NG-AKP-13-SPIE- Sector 13 Discipline MGT
Document ID 20-07-2023
BUILDERS-000101

Fabrication Site BUILDERS RESOURCES FAB. YARD, PORT HARCOURT Syst./Unit SS Doc.Type REP

14. PICTURES

CUTTING AND PROFILING OF


10MM PLATES FOR PIPE
SUPPORT
PROCUREMENT, DETAIL ENGINEERING DESIGN & FABRICATION OF PLATFORM EXTENSION PROJECT

Date: Thursday, July 20, 2023


Qualifications & Fabrication Readiness

WBS Code Description Total QTY QTY Done

1.1.6 Qualifications
Conduct WPS/PQR Qualification Test 1 60.00%
Welders Qualification & Certification 1 62.00%
Painting Procedure Qualification (Pull Test) 1 100.00%
Document Review 1 55.00%
Blasters/Painters Qualification & Certification 1 0.00%
1.2 Fabrication Readiness
Pre-Mob Inspection/Meeting 1 100.00%
Receipt of CPY Approval to Commence Fabrication 1 80.00%

Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
P5- VGRB PRE-FAB OVERALL PROGRESS 13,140.62 6,003.75 6,003.75 5,171.76 5,171.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.65% -0.18% 10.47%

NEW PLATFORM EXTENSION FABRICATION 3,648.96 2,024.05 2,024.05 1,614.97 1,614.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.60% 2.58% 12.19%
1.2.1 NG-APK-13-000314-P5-NPE-CLD-001 3 HEA 200 BEAM CLASS 5.00 680.52 680.52 680.52 680.52 680.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A01 HEA 200 BEAM CLASS 4290mm 2 362.93 362.93 362.93 362.93 362.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 60.00% 85.00%
"" A02 HEA 200 BEAM CLASS 2410mm 2 203.89 203.89 203.89 203.89 203.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 60.00% 85.00%
"" A08 HEA 200 BEAM CLASS 2688mm 1 113.70 113.70 113.70 113.70 113.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.2.1 NG-APK-13-000314-P5-NPE-CLD-001 3 IPE 180 BEAM CLASS 18.00 525.38 525.38 525.38 525.38 525.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A03 IPE 180 BEAM CLASS 2410mm 1 45.39 45.39 45.39 45.39 45.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A06 IPE 180 BEAM CLASS 1174mm 2 44.14 44.14 44.14 44.14 44.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 60.00% 85.00%
"" A07 IPE 180 BEAM CLASS 1307mm 2 49.14 49.14 49.14 49.14 49.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A04 IPE 180 BEAM CLASS 4290mm 1 80.65 80.65 80.65 80.65 80.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A05 IPE 180 BEAM CLASS 1788mm 2 67.23 67.23 67.23 67.23 67.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A09 IPE 180 BEAM CLASS 1642mm 1 30.87 30.87 30.87 30.87 30.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A10 IPE 180 BEAM CLASS 1567mm 1 29.46 29.46 29.46 29.46 29.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A11 IPE 180 BEAM CLASS 697mm 1 13.10 13.10 13.10 13.10 13.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A12 IPE 180 BEAM CLASS 845mm 2 31.77 31.77 31.77 31.77 31.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A13 IPE 180 BEAM CLASS 1529mm 4 114.98 114.98 114.98 114.98 114.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" A14 IPE 180 BEAM CLASS 992mm 1 18.65 18.65 18.65 18.65 18.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.2.1 NG-APK-13-000314-P5-NPE-CLD-001 3 HEA 180 BEAM CLASS 4.00 114.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A15 HEA 180 BEAM CLASS 837mm 1 29.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A16 HEA 180 BEAM CLASS 992mm 1 35.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A17 HEA 180 BEAM CLASS 1394mm 2 49.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.1 NG-APK-13-000314-P5SHR-PMD-001 2 PIPES 69.00 297.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B01-1 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 5480mm 3 66.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B01-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 6 36.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B01-3 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 3 15.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B03-1 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 24.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B03-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 2 12.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B03-3 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 2 10.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B05-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 20.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B05-3 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 2 10.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B07-1 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 19.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B07-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 14.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B09-1 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 7.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B09-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 16.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B11-1 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 12.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B11-2 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 2.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B11-3 PIPE Ø48.3 X3.68mm (1.5" SCH 40) 1 5.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B13 PIPE Ø60.4 X 4mm (2" SCH 40) HANDRAIL PIPE SOCKET 3675mm 21 19.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B16 PIPE Ø60.3 X 4mm (2" SCH 40) HANDRAIL PIPE SLEEVE 25mm 21 2.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.1 NG-APK-13-000314-P5SHR-PMD-001 2 PLATES 54.00 163.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B02-1 PLATE KICK 3090 X 150 X 6mm THK 3 65.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B04-1 PLATE KICK 3515 X 150 X 6mm THK 1 24.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B06-1 PLATE KICK 2740 X 150 X 6mm THK 1 5.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B08-1 PLATE KICK 1110 X 150 X 6mm THK 1 4.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B10-1 PLATE KICK 1725 X 150 X 6mm THK 1 6.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B12-1 PLATE KICK 1102 X 150 X 6mm THK 1 7.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B14 PLATE Ø50 X 12mm THK CLOSURE PLT 21 4.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B15-1 PLATE 200 X 145 X 12mm THK STIFF. PLT. 11 30.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B15-2 PLATE 210 X 90 X 12mm THK STIFF. PLT. 4 7.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B15-3 PLATE 270 X 97 X 12mm THK STIFF. PLT. 2 3.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B15-4 PLATE 138 X 35 X 12mm THK STIFF. PLT. 2 0.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B18 PLATE 320 X 50 X 4mm THK FLAT BAR 6 3.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.1 NG-APK-13-000314-P5SHR-PMD-001 2 BOLT & NUTS 48.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
Bolt & Nuts to be Procured Expected Received
"" B17 BOLT & NUT M10 BOLTS, NUTS & WASHER -HDG 42 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" B19 BOLT & NUT H- M12 X 40 + WASHER (CADMIUM PLATED) 6 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.1 NG-AKP-13-000314-P5GRT-PMD-001 3 GRATINGS 14.00 1,776.67 818.15 818.15 409.07 409.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.06% 0.00% 8.06%
" B20-1 GRAT'G 5230 x 900 x 32 x 5mm GRATING 3 613.61 613.61 613.61 306.80 306.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.50% 0.00% 17.50%
" B20-2 GRAT'G 3280 x 900 x 32 x 5mm GRATING 1 128.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" B20-3 GRAT'G 4970 x 900 x 32 x 5mm GRATING 1 194.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" B20-4 GRAT'G 4970 x 525 x 32 x 5mm GRATING 1 113.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" B20-5 GRAT'G 1030 x 900 x 32 x 5mm GRATING 5 201.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

Page 1 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
" B20-6 GRAT'G 2980 x 900 x 32 x 5mm GRATING 1 116.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" B20-7 GRAT'G 5230 x 900 x 32 x 5mm GRATING 1 204.54 204.54 204.54 102.27 102.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.50% 0.00% 17.50%
" B20-8 GRAT'G 5230 x 900 x 32 x 5mm GRATING 1 204.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.1 NG-AKP-13-000314-P5GRT-PMD-001 3 GRATING (PLATES) 3.00 42.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" GG01 PLATE 630 x 192 x 6mmTHK PLT 1 5.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" GG02 PLATE 542 x 192 x 6mmTHK PLT 1 4.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
" GG03 PLATE 3570 x 192 x 6mmTHK PLT 1 32.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.2 RADIATION SHIELD PRE-FAB WORKS 4,606.11 1,849.30 1,849.30 1,426.39 1,426.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.66% 0.00% 8.66%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 C-CHANNEL 38 1,758.56 1,618.44 1,618.44 1,195.53 1,195.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.40% 0.00% 19.40%
" RSS-Z-1-1 CHANNEL C200 X 75 X 23 10 353.34 353.34 353.34 353.34 353.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-1-2 CHANNEL C200 X 75 X 23 2 188.37 188.37 188.37 94.19 94.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.50% 0.00% 17.50%
"" RSS-Z-1-3 CHANNEL C200 X 75 X 23 6 420.36 280.24 280.24 140.12 140.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.67% 0.00% 11.67%
"" RSS-Z-1-4 CHANNEL C200 X 75 X 23 4 377.21 377.21 377.21 188.60 188.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.50% 0.00% 17.50%
"" RSS-YY-2 CHANNEL C200 X 75 X 23 6 56.58 56.58 56.58 56.58 56.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-1-K CHANNEL C200 X 75 X 23 2 65.52 65.52 65.52 65.52 65.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-1-M CHANNEL C200 X 75 X 23 2 56.16 56.16 56.16 56.16 56.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-1-5 CHANNEL C200 X 75 X 23 4 86.11 86.11 86.11 86.11 86.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
RSS-Z-1-6 CHANNEL C200 X 75 X 23 2 154.91 154.91 154.91 154.91 154.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 ANGLE IRON 50 X 50 X 6 25 192.86 192.86 192.86 192.86 192.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-1 ANGLE L 50 X 50 X 6 1 11.16 11.16 11.16 11.16 11.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-2 ANGLE L 50 X 50 X 6 9 54.23 54.23 54.23 54.23 54.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-3 ANGLE L 50 X 50 X 6 1 9.83 9.83 9.83 9.83 9.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-4 ANGLE L 50 X 50 X 6 1 9.44 9.44 9.44 9.44 9.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-5 ANGLE L 50 X 50 X 6 1 8.60 8.60 8.60 8.60 8.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-6 ANGLE L 50 X 50 X 6 2 20.52 20.52 20.52 20.52 20.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-7 ANGLE L 50 X 50 X 6 1 5.52 5.52 5.52 5.52 5.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-8 ANGLE L 50 X 50 X 6 2 20.52 20.52 20.52 20.52 20.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-9 ANGLE L 50 X 50 X 6 1 5.52 5.52 5.52 5.52 5.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-10 ANGLE L 50 X 50 X 6 1 5.29 5.29 5.29 5.29 5.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-11 ANGLE L 50 X 50 X 6 1 5.29 5.29 5.29 5.29 5.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-12 ANGLE L 50 X 50 X 6 1 8.60 8.60 8.60 8.60 8.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-13 ANGLE L 50 X 50 X 6 1 8.79 8.79 8.79 8.79 8.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-14 ANGLE L 50 X 50 X 6 1 10.95 10.95 10.95 10.95 10.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" RSS-Z-2-12 ANGLE L 50 X 50 X 6 1 8.60 8.60 8.60 8.60 8.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 PLATE FOR RADIATION SHIELD 56 74 38 38 38 38 0 0 0 0 0 0 0 0 0 0 12.76% 0.00% 12.76%
"" RSS-YY-3 PLATE 90 X 85 X 6 4 1.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-4 PLATE 519 X 240 X 10mm 2 18.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-Z-YY-5 PLATE 500 X 200 X 10mm 2 15.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-1 PLATE 110 X 110 X 10mm 48 38.00 38.00 38.00 38.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 PIPES FOR RADIATION SHIELD 28 1274 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00%
RSS-Z-3 PIPE (DIA 3 " X 2500) 24 677.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
RSS-Z-3 PIPE (DIA 3 " X 3085) 4 596.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 RECTANGULAR HOLLOW PIPE FOR RADIATION SHIELD 36 397.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-1 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 24.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-2 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 14.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-3 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 20 270.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-4 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-5 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 14.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-6 RHS RECTANGLE HOLLOW TUBE (60X 40 X 4) 4 25.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-7 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 26.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-1-8 RHS RECTANGLE HOLLOW TUBE (60 X 40 X 4) 2 10.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.2.2 NG-AKP-13-000314-P5RSS-LCD-001 2 WIRE MESH FOR RADIATION SHIELD 18 909.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7 WIRE MESH 4205 X 3938 1 470.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-1 WIRE MESH 2162 X 1392 1 27.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-2 WIRE MESH 2142 X 1392 9 274.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-3 WIRE MESH 1392 X 1392 2 27.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-4 WIRE MESH 1282 X 1392 2 31.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-5 WIRE MESH 2142 X 1392 1 30.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-6 WIRE MESH 2342 X 1392 1 33.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" RSS-YY-7-7 WIRE MESH 1392 X 919 1 13.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
ACCESS PLATFORM FABRICATION 2,787.76 1,544.08 1,544.08 1,544.08 1,544.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.75% -1.90% 13.85%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 HEA 200 BEAM CLASS 16.00 1,298.48 1,298.48 1,298.48 1,298.48 1,298.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P01 HEA200 6 649.22 649.22 649.22 649.22 649.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P02 HEA200 2 253.72 253.72 253.72 253.72 253.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P03 HEA200 1 90.69 90.69 90.69 90.69 90.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P04 HEA200 1 55.37 55.37 55.37 55.37 55.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P04A HEA200 1 39.42 39.42 39.42 39.42 39.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P05 HEA200 1 24.62 24.62 24.62 24.62 24.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P06 HEA200 2 98.98 98.98 98.98 98.98 98.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P07 HEA200 1 29.18 29.18 29.18 29.18 29.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P16 HEA200 1 57.27 57.27 57.27 57.27 57.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
3.3 NG-APK-13-000318-P5AP-PMD-001 2 IPE 160 BEAM CLASS 8.00 204.78 204.78 204.78 204.78 204.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P08 IPE 160 2 80.83 80.83 80.83 80.83 80.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P09 IPE 160 1 23.31 23.31 23.31 23.31 23.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P10 IPE 160 1 14.14 14.14 14.14 14.14 14.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P11 IPE 160 1 14.54 14.54 14.54 14.54 14.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P14 IPE 160 1 22.82 22.82 22.82 22.82 22.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P15 IPE 160 1 24.40 24.40 24.40 24.40 24.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" P17 IPE 160 1 24.76 24.76 24.76 24.76 24.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 ANGLE IRON 8.00 166.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" P12 L 100 X 100 X 10 2 81.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" P18 L 100 X 100 X 10 2 80.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S02-1 L75 x 75 X 6mm ANGLE 1 1.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S02-2 L75 x 75 X 6mm ANGLE 1 1.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

Page 2 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
"" PSACL-S04-1 L75 x 75 X 6mm ANGLE 2 1.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 PLATE 105.00 167.91 40.81 40.81 40.81 40.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.08% 0.00% 6.08%
"" P13 10mm THK 8 40.81 40.81 40.81 40.81 40.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00% 0.00% 25.00%
"" PSASHR-R02-1 KICK PLATE 3165 x 150 X 6mm THK 1 22.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R04-1 KICK PLATE 3300 x 150 X 6mm THK 1 23.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R06-1 KICK PLATE 2450 x 150 X 6mm THK 1 17.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R08-1 KICK PLATE 1500 x 150 X 6mm THK 1 10.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R010-1 KICK PLATE 1360 x 150 X 6mm THK 1 9.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R012-1 KICK PLATE 760 x 150 X 6mm THK 1 5.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R014-1 KICK PLATE 1060x 150 X 6mm THK 1 7.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R016-1 KICK PLATE 450 x 150 X 6mm THK 1 3.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R18 KICK PLATE 450 x 150 X 6mm THK 21 2.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R19-1 170 x 97 X 12mm THK STIFF. PLT. 17 12.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R19-2 145 x39 X 12mm THK STIFF. PLT. 4 1.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R22-1 129 x64 X 6mm THK STIFF. PLT. 2 0.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R23-1 64 x 58 X 6mm THK STIFF. PLT. 1 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R25-1 50 x 40 X 6mm THK STIFF. PLT. 2 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R26-1 ∅42 x 6mm THK STIFF. PLT. 2 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R30-1 ∅42 x 6mm THK STIFF. PLT. 2 0.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R31 145 x 32 x 6mm THK STIFF. PLT. 36 8.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S05-1 100 x 100 x 6mm THK PLATE 2 0.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 GRATINGS 9.00 376.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-1 980 x 570 x 32x 5mm THK GRATINGS 1 24.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-2 980 x 900 x 32x 5mm THK GRATINGS 1 38.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-3 1560 x 900 x 32x 5mm THK GRATINGS 3 183.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-4 1560 x 480 x 32x 5mm THK GRATINGS 1 32.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-5 880 x 900 x 32x 5mm THK GRATINGS 2 68.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSAGRT-R21-6 880 x 769 x 32x 5mm THK GRATINGS 1 29.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 PIPES 70.00 237.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R01-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 18.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R01-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 5.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R01-3 ∅48 x 3.68mm (1.5" x SCH 40) 1 4.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R01-4 ∅48 x 3.68mm (1.5" x SCH 40) 3 15.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R03-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 20.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R03-2 ∅48 x 3.68mm (1.5" x SCH 40) 2 12.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R03-3 ∅48 x 3.68mm (1.5" x SCH 40) 2 10.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R05-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 17.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R05-2 ∅48 x 3.68mm (1.5" x SCH 40) 2 8.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R05-3 ∅48 x 3.68mm (1.5" x SCH 40) 2 10.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R07-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 16.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R07-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 6.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R09-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 15.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R09-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 5.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R011-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 13.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R011-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 3.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R013-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 15.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R013-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 4.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R015-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 11.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R015-2 ∅48 x 3.68mm (1.5" x SCH 40) 1 1.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R17 ∅60.3 x 4mm (2" x SCH 40) 21 14.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R27 CUT FROM ∅60.3 x 4mm (1.5" x SCH 40) 21 0.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R28 ∅48 x 3.68mm (1.5" x SCH 40) 1 0.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R29-1 ∅48 x 3.68mm (1.5" x SCH 40) 1 4.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 FLAT BARS 30.00 291.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S01-1 3528 x 75 X 12mm FLAT BAR 2 24.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S07-1 2650 x 50 X 6mm FLAT BAR 2 10.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S08-1 1000 x 25 X 5mm FLAT BAR 2 1.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S08-2 1578 x 25 X 5mm FLAT BAR 5 7.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S08-3 450x 25 X 5mm FLAT BAR 4 3.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S09-1 1750 x 100 X 10mm FLAT BAR 2 27.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S09-2 265 x 100 X 10mm FLAT BAR 1 2.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSACL-S03-1 22 x 22mm SQUARE RUNGSS 12 213.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
1.4.3 NG-APK-13-000318-P5AP-PMD-001 2 BOT & NUT 45.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
Bolt & Nuts to be Procured Expected Received
"" PSACL-S06-1 M12 BOLTS WITH NUTS AND SASHERS (75mmLong)-HDG 2 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R20 M10 BOLTS WITH NUTS AND SASHERS (75mmLong) 42 42.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" PSASHR-R24-1 PIN+KCLIP 1 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
PIPE SUPPORT FABRICATION 2,097.78 586.32 586.32 586.32 586.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 6.99% 6.99%
NG-APK-13-SPIE-000317 3 BEAMS (HEB 100,HEA200,220 & IPE 200,100) 65.00 867.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A03 BEAM IPE 100 2 4.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A04 BEAM IPE 100 2 11.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A06 BEAM IPE 200 1 11.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" A07 BEAM IPE 200 1 29.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U02 BEAM HEA200 3 231.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U03 BEAM HEA200 3 38.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U05 BEAM IPE 100 1 7.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U06 BEAM IPE 100 1 1.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L01 BEAM IPE 200 1 16.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L05 BEAM IPE 200 1 14.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L06 BEAM IPE 200 1 15.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L07 BEAM IPE 200 1 3.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L08 BEAM IPE 200 1 1.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DD01 BEAM IPE100 1 5.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DD02 BEAM IPE 100 2 3.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DD04 BEAM IPE 100 1 5.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T01-1 BEAM HEB 100 1 33.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T01-2 BEAM HEB 100 1 33.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

Page 3 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
"" T02 BEAM HEB 100 2 10.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T03 BEAM HEB 100 1 6.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T04 BEAM HEB 100 1 9.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T05 BEAM HEB 100 1 2.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T06 BEAM HEB 100 1 8.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T07 BEAM HEB 100 1 9.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T08 BEAM HEB 100 1 11.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T09 BEAM IPE 100 1 1.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T10 BEAM IPE 100 1 2.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T12 BEAM HEB 100 1 38.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T13 BEAM IPE 100 1 3.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T16 BEAM IPE 100 1 9.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T17 BEAM IPE 100 1 1.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D01 BEAM IPE 100 8 19.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D02 BEAM IPE 100 3 11.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D02A BEAM IPE 100 2 2.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D02B BEAM IPE 100 1 9.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D02C BEAM IPE 100 2 3.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D04 BEAM HEA 200 1 36.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D05-1 BEAM HEA 200 3 68.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D05-2 BEAM HEA 220 2 45.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D08 BEAM HEB 100 2 80.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D09 BEAM IPE 100 2 4.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
NG-APK-13-SPIE-000317 3 10 PLATES (SADDLE, RIB BASE,STANCHNION) FOR PIPE SUPPORT 284.00 1,214.49 586.32 586.32 586.32 586.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 12.07% 12.07%
"" A02 BASE PLATE 250x150x10 1 3.14 3.14 3.14 3.14 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" A05 BASE PLATE 151 x 105 x 10mm 2 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" APS-1 PIPE SHOE-SADDLE 8" 350x250x10mm 5 35.33 35.33 35.33 35.33 35.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ARP-1 RIB PLATE 119x70x10mm 20 15.70 15.70 15.70 15.70 15.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ABP-1 BASE PLATE 300x250x10mm 5 31.40 31.40 31.40 31.40 31.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ASP-1 STANCHION PLATE 300x80x10mm 5 7.85 7.85 7.85 7.85 7.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" APS-2 PIPE SHOE-SADDLE 14" 411x350x10mm 13 370.44 370.44 370.44 370.44 370.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ARP-2 RIB PLATE 117x112x10mm 52 40.82 40.82 40.82 40.82 40.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ABP-2 BASE PLATE 300x250x10mm 13 81.64 81.64 81.64 81.64 81.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 25.00% 25.00%
"" ASP-2 STANCHION PLATE 300x80x10mm 13 20.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U04 BASE PLATE 250 X 250 X 10mm 3 14.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" U07 BASE PLATE 150 x 105 x 10mm 1 1.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L03 DOUBLER PLATE 250 x 150 x 10mm 3 9.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L04 BASE PLATE 150 x 105 x 10mm 1 1.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" L09 BASE PLATE 150 x 105 x 10mm 1 1.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" LPS-1 PIPE SHOE-SADDLE 8" 350 x 253 x 10mm 3 25.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" LRP-1 RIB PLATE 119 x 70 x 10mm 12 94.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" LBP-1 BASE PLATE 300 x 250 x 10mm 3 18.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" LSP-1 STANCHNION PLATE 300 x 80 x 10mm 3 7.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DD03 BASE PLATE 150 X 105 X 10mm 2 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T11 END PLATE 150 x 150 x 10mm 1 14.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TPS-1 PIPE SHOE-SADDLE 8" 350 x 250 x 10mm 2 14.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TRP-1 RIB PLATE 119 x 70 x 10mm 8 6.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TBP-1 BASE PLATE 300 x 250 x 10mm 2 12.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TSP-1 STANCHION PLATE 300 x 250 x 10mm 2 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TPS-2 PIPE SHOE-SADDLE 6" 350 x 197 x 10mm 1 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TRP-2 RIB PLATE 112 x 60 x 10mm 4 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TBP-2 BASE PLATE 300x 150 x 10mm 1 3.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TSP-2 STANCHION PLATE 300 x 80 x 10mm 1 2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" T14 END PLATE 250x240x10mm 1 4.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TPS-3 PIPE SHOE-SADDLE 8" 350x219x10mm 2 15.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TRP-3 RIB PLATE 119x70x10mm 8 6.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TBP-3 BASE PLATE 300x250x10mm 2 12.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" TSP-3 SANCHION PLATE 300x90x10mm 2 4.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D03-1 BASE PLATE 150x80x10mm 8 2.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DPS-1 PIPE SHOE-SADDLE 3" 350x100x10mm 5 15.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DRP-1 RIB PLATE 123x35x10mm 20 125.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DBP-1 BASE PLATE 300x100x10mm 5 11.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DSP-1 STANCHNION PLATE 300x90x10mm 5 11.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DPS-2 PIPE SHOE-SADDLE 14" 350x411x10mm 1 10.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DRP-2 RIB PLATE 117x112x10mm 4 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DBP-2 BASE PLATE 300x250x10mm 1 6.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DSP-2 STANCHNION PLATE 300x80x10mm 1 2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D06 BASE PLATE 410x160x10mm 3 16.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D07 STFFENER PLATE 332x230x10mm 3 18.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DPS-3 PIPE SHOE-SADDLE 14" 350x411x10mm 3 32.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DRP-3 RIB PLATE 117x112x10mm 12 9.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DBP-3 BASE PLATE 300x250x10mm 3 18.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DSP-3 STANCHION PLATE 300x80x10mm 3 4.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" D03-2 BASE PLATE 150x150x10mm 2 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DPS-4 PIPE SHOE-SADDLE 14" 350x393x10mm 1 10.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DRP-4 RIB PLATE 110x128x10mm 4 3.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DBP-4 BASE PLATE 300x250x10mm 1 6.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
"" DSP-4 STANCHNION PLATE 300x90x10mm 1 2.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
NG-APK-13-SPIE-000317 3 ANGLE IRON FOR PIPE SUPPORT 1.00 15.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%
L02 ANGLE IRON EA 100 x 100 x 10mm 1 15.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00%

Page 4 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%

Weight Assigned Earned %


OVERALL PROGRESS 888.00 117.75 13.26%
WBS Code DWG No. Rev. BOM NO Description Total Qty. to Do Total Qty. Done Progress
DECK EXTENSION PRE-FABRICATION WORKS 192.50 12.50 6.49%
1.2.1 Pre-Fab Works 30 12 38.98%
BEAMS HEA 200, HEA180 & IPE 180 17 12 1
Cutting 27 23 85.19%
Chamfering/Coping 27 23 85.19%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
NDT on Assembly Welds 7 0 0.00%
HAND RAILS 126.50 0 0.00%
Bolts & Nuts 48.00 0 0.00%
Pre-Fab Works 64.5 0 0.00%
Cutting 123 0 0.00%
Chamfering/Coping 123 0 0.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
NDT on Assembly Welds 8 0 0.00%
GRATING & PLATE 17.5 1 5.71%
Pre-Fab Works 11.5 1 8.70%
Cutting 17 4 23.53%
Chamfering/Coping 17 0 0.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
INSPECTION & HANDOVER (BY CPY) 18 0 0.00%
Inspection by CPY 6 0 0.00%
Loading & Transportation of Fabricated Single Parts 6 0 0.00%
Loading & Transportation of Fabricated Assembly Parts 6 0 0.00%
RECONCILIATION OF FINAL DOCUMENTATION/ AS-BUILT 1 0 0.00%
WBS Code DWG No. Rev. BOM NO Description Total Qty. to Do Total Qty. Done Progress
RADIATION SHIELD PRE-FABRICATION WORKS 179 59.5 33.24%
1.4.2 C- CHANNEL FRAMES Pre-Fab Works 22 19 86.36%
Cutting 38 38 100.00%
Chamfering/Coping 38 38 100.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
NDT on Assembly Welds 7 0 0.00%
ANGLE IRON FOR THE RADIATION SHIELD 26 12.5 48.08%
Pre-Fab Works 15.5 12.5 80.65%
Cutting 25 25 100.00%
Chamfering/Coping 25 25 100.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 4.5 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 0 #VALUE!
NDT on Assembly Welds 6 0 0.00%
PLATE FOR RADIATION SHIELD 42 28 66.67%
Pre-Fab Works 31 28 90.32%
Cutting 56 56 100.00%

Page 5 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
Chamfering/Coping 56 56 100.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
PIPES FOR RADIATION SHIELD 28 0 0.00%
Pre-Fab Works 17 0 0.00%
Cutting 28 0 0.00%
Profiling 28 0 0.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
RECTANGULAR HOLLOW SECTION FOR RADIATION SHIELD 23.5 0 0.00%
Pre-Fab Works 12.5 0 0.00%
Cutting 36 0 0.00%
Chamfering/Coping 2 0 0.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
WIRE MESH FOR RADIATION SHIELD 18.5 0 0.00%
Pre-Fab Works 7.5 0 0.00%
Cutting 18 0 0.00%
Fit-Up/Tacking 6 0 0.00%
Welding 6 0 0.00%
Corrosion Protection 6 0 0.00%
Tagging 6 0 0.00%
Blasting & Priming 6 0 0.00%
2nd Coating 6 0 0.00%
Paint Curing & Other finishing Activities 6 0 0.00%
INSPECTION & HANDOVER (BY CPY) 18 0 0.00%
Inspection by CPY 6 0 0.00%
Loading & Transportation of Fabricated Single Parts 6 0 0.00%
Loading & Transportation of Fabricated Assembly Parts 6 0 0.00%
RECONCILIATION OF FINAL DOCUMENTATION/ AS-BUILT 1 0 0.00%
WBS Code DWG No. Rev. BOM NO Description Total Qty. to Do Total Qty. Done Progress
ACCESS PLATFORM-FABRICATION WORKS 251 14 5.58%
1.4.3 Pre-Fab Works HEA 200/ IPE 160 BEAMS 14.5 12 82.76%
Cutting 24 24 100.00%
Chamfering/Coping 24 24 100.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%
NDT on Assembly Welds 7 0 0.00%
ANGLE IRON FOR THE ACCESS PLATFORM 19.5 0 0.00%
Pre-Fab Works 6.5 0 0.00%
Cutting 8 0 0.00%
Chamfering/Coping 8 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%
NDT on Assembly Welds 8 0 0.00%
PLATE FOR ACCESS PLATFORM 91 2 2.20%
Pre-Fab Works 55 2 3.64%
Cutting 105 8 7.62%
Chamfering/Coping 105 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%

Page 6 of 7
Fabrication Progress Report for Thursday, July 20, 2023

Material Drawn, Cutting, Chamfering/Coping Welding/Bolting


Fit-up &Tack NDT Completed
Total Checked/Marked (kg) & Surface Preparation (kg) - Completed (Kg) - Blasting & Painting - 15% Cum. % Actual Cum. %
Rev. Qty Welded (kg) - 20% (No.) - 5%
WBS Drawing Number Part No. Item Description Weight - 10% 15% 35% Progress Progress Progress Remarks
No. (nos)
(kg) (Previous) Today (Current)
Cum. Cum. Cum. Total Cum. Blasting & 2nd Coat - 3rd/Final
Today Today Cum. Prog. Today Today Today
Prog. Prog. Prog. no. Prog. Priming - 7% 3% Coat -5%
PIPES FOR ACCESS PLATFORM 43.5 0 0.00%
Pre-Fab Works 37.5 0 0.00%
Cutting 70 0 0.00%
Profiling 70 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%
FLAT BARS FOR ACCESS PLATFORM 23.5 0 0.00%
Pre-Fab Works 17.5 0 0.00%
Cutting 30 0 0.00%
Chamfering/Coping 30 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%
GRATINGS FOR ACCESS PLATFORM 43 0 0.00%
Pre-Fab Works 7 0 0.00%
Cutting 9 0 0.00%
Chamfering/Coping 9 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 5 0 0.00%
Tagging 5 0 0.00%
Blasting & Priming 5 0 0.00%
2nd Coating 5 0 0.00%
Paint Curing & Other finishing Activities 5 0 0.00%
INSPECTION & HANDOVER (BY CPY) 15 0 0.00%
Inspection by CPY 5 0 0.00%
Loading & Transportation of Fabricated Single Parts 5 0 0.00%
Loading & Transportation of Fabricated Assembly Parts 5 0 0.00%
RECONCILIATION OF FINAL DOCUMENTATION/ AS-BUILT 1 0 0.00%
WBS Code DWG No. Rev. BOM NO Description Total Qty. to Do Total Qty. Done Progress
PIPE SUPPORT-FABRICATION WORKS 265.5 31.75 12%
1.4.3 BEAMS (HEB 100,HEA200,220 & IPE 200,100) 35 0 0.00%
Cutting 65 0 0.00%
Chamfering/Coping 65 0 0.00%
Fit-Up/Tacking 5 0 0.00%
Welding 5 0 0.00%
Corrosion Protection 31 0 0.00%
Tagging 31 0 0.00%
Blasting & Priming 31 0 0.00%
2nd Coating 31 0 0.00%
Paint Curing & Other finishing Activities 31 0 0.00%
NDT on Assembly Welds 7 0 0.00%
ANGLE IRON FOR THE ACCESS PLATFORM 10 0 0.00%
Pre-Fab Works 1 0 0.00%
Cutting 1 0 0.00%
Fit-Up/Tacking 1 0 0.00%
Welding 1 0 0.00%
Corrosion Protection 1 0 0.00%
Tagging 1 0 0.00%
Blasting & Priming 1 0 0.00%
2nd Coating 1 0 0.00%
Paint Curing & Other finishing Activities 1 0 0.00%
NDT on Assembly Welds 8 0 0.00%
PLATE FOR ACCESS PLATFORM 188.5 31.75 16.84%
Pre-Fab Works 157.5 31.75 20.16%
Cutting 284 127 44.72%
Chamfering/Coping 284 0 0.00%
Fit-Up/Tacking 31 0 0.00%
Welding 31 0 0.00%
Corrosion Protection 31 0 0.00%
Tagging 31 0 0.00%
Blasting & Priming 31 0 0.00%
2nd Coating 31 0 0.00%
Paint Curing & Other finishing Activities 31 0 0.00%
INSPECTION & HANDOVER (BY CPY) 31 0 0.00%
Inspection by CPY 31 0 0.00%
Loading & Transportation of Fabricated Single Parts 31 0 0.00%
Loading & Transportation of Fabricated Assembly Parts 31 0 0.00%
RECONCILIATION OF FINAL DOCUMENTATION/ AS-BUILT 1 0 0.00%

Page 7 of 7