You are on page 1of 2

WDP RENEWAL ONLINE APPLICATION WDP NEW ONLINE APPLICATION

(www.emb.gov.ph) (www.emb.gov.ph)

Requirements: Requirements:

(Registration/ Creation of Account) (Registration/ Creation of Account)


 Any Valid Government ID  Any Valid Government ID
 Company ID (If Available/Optional)  Company ID (If Available/Optional)
 SEC Registration/ DTI (If  SEC Registration/ DTI (If
Available/Optional) Available/Optional)

(WDP Renewal Online Application Attachments) (WDP New Online Application Attachments)
 Notarized WDP Application Form  Duly accomplished/ notarized application form
(Computer Generated) (computer generated)
 Copy of Valid PCO Accreditation/ Letter  Engineer’s report
Designation as PCO from the Managing 1. vicinity map identifying the street address,
Head location or plant premise;
 Copy of Latest Self-Monitoring Report 2. the nature of project or business;
 Copy of ECC/ CNC (As Applicable) 3. production capacity; quantity or volume and
 Copy of Results of Laboratory Analysis the generic name(s) of products(s);
 Copy of Latest Issued Wastewater 4. the nature and character of the applicant’s
Discharge Permit wastewater and its physical and chemical
 Payment of Fees – Computer Generated composition;
(Filing Fee and Load Based Fee) 5. total daily volume of discharge of raw
wastewater;
6. treatment process and estimated treatment
efficiency;
7. the total daily volume of water consumption
and discharge of final treated wastewater or
effluent;
8. Pollution Prevention / Environmental
Management System;
9. DENR ID Number as hazardous waste
generator (if applicable).
10. Statement of the cost incurred in the
installation and maintenance of wastewater
treatment facility, if any.
11. Quality and quantity of abstracted water;
12. Copy of ECC or CNC, as applicable
13. Payment of Fees – Computer Generated
(Filing Fee and Load Based Fee)
 
 Plant and drainage layout indicating the sources
of wastewater discharge and point of disposal
 Detailed plans and elevations of each stages of
treatment system in a standard format of 50 cm
by 90 cm duly signed by sanitary or chemical
engineer
 A copy of the Certificate of Accreditation of the
Pollution Control Officer duly issued by the
Department, or appointment/designation as such
by the Managing Head

You might also like