You are on page 1of 1

WASTEWATER DISCHARGE PERMIT REQUIREMENTS

MIMAROPA REGION

Frontline Service: Application for WWDP – RENEWAL APPLICATION (ONLINE)


Schedule of Availability of Service: 24 hours a day, 7 days a week
How to Avail of the Service: Online Application
Site: https://opms.emb.gov.ph/

REQUIREMENTS FOR WWDP RENEWAL APPLICATION


❶ Duly accomplished and notarized application form (downloaded from OPMS site).

❷ Copy of Certificate of PCO Accreditation


❸ Latest Result of Analysis of Effluent collected and analyzed by a third party EMB Recognized
Laboratory or Affidavit of No Discharge
❹ Self Monitoring Reports submission with attached laboratory results of effluent (1st, 2nd, 3rd and
4th Quarter) Compliance Monitoring Report (CMR) and CMVR (if applicable)

❺ Registration Certificate as Hazardous Waste Generator/s

❻ Recent Discharge Permit issued by this Office.


• Issued with NOV/Order
• Proof of Completion/undertaking commitments made during technical meeting/s
❼ Penalties/fines and/or arrears paid (if any)

❽ Proof of compliance with DP conditions


❾ Proof of Compliance with RA 9003 (ESWM ACT), any of the following:
• Photo of designated temporary storage area/MRF for recyclables, electronic wastes, BFLs,
batteries and other special wastes.
• Photo of backyard composting area/ facility (if applicable) or proof of collection of
compostable/biodegradable wastes.
• Copy of Contract/MOA with the LGU as hauler and with Contract/MOA with accredited
Sanitary Landfill (SLF)/Co-Processing/TSD Facility operators for disposal of residual wastes.
• Copy of Certificate of Disposal/Treatment issued by accredited SLF and TSD Facility operators

❿ Proof of Compliance with RA 9275 (Clean Water Act) and/or Supreme Court Mandamus to
Rehabilitate Manila Bay
• Copy of Certificate of siphoning/desludging of septic tanks, hauling, and transport and
treatment of wastewater/septage by an accredited service provider
⓫ Water billing statement for the whole year and/or National Water Resources Board (NWRB) permit
for deep well or free flowing (direct connection) source of water or proof of application.
⓬ Certification from the LGU – Engineering/Sanitation Office that they inspected your Septic Tank
and that it is in accordance to the requirements of the Code of Sanitation of the Philippines (PD856)
and its IRR. (if not submitted in the previous application)
⓭ Copy of official receipt of the required fees (Order of payment will be downloaded from the OPMS
site)
1. Application Fee (Filing Fee, PD1856 & Documentary Stamp Tax) (Step 5)
2. Load Based Fee (Permit Fee and Waste Water Discharge Fee)
Note:
• Always check your OPMS account for updates/additional information/payments needed for
your DP application.
• Once the Permit is Approved, you can download it from the OPMS site (My Applications)

28 September 2021

You might also like