Summary of Electrical/Technical Requirements - With Element and Classic Units
Project 246431 Proposal 246431V8
Layout 246431H3 (Ph1 & 2) Date 2021-01-15 Incubators and Hatchers Peak Power Actual Power QTY Type of System Heating Rated Voltage Phases Amps Conusmption (kW) Consumption (kW) Each Total Each Total 12 P120 Water 440 3 6.32 3.0 35.4 1.6 19.5 6 P40 Water 440 3 3.25 1.5 9.2 1.1 6.4 44.6 25.9 Ventilation Equipment Peak Power Consumption (kW) Actual Power Consumption (kW) QTY Type of System Power Source Rated Voltage Phases Amps Each Total Each Total Air Handling Units 2 M11 ELECTRIC 400 3 13 7.5 15.0 5.0 9.9 15.0 9.9 Ventilation Equipment Peak Power Consumption (kW) Actual Power Consumption (kW) QTY Type of System Power Source Rated Voltage Phases Amps Each Total Each Total Pump Modules 1 MCWP5 ELECTRIC 400 3 45 25.0 25.0 20.0 20.0 1 MHW8 ELECTRIC 400 3 11 6.0 6.0 4.8 4.8 25.0 20.0 Supporting Equipment 3 Cooler Units ELECTRIC 200 1 - 1.5 4.5 1.2 3.6 1 Heater Units ELECTRIC 200 1 - 1.5 1.5 1.2 1.2 12 Exhaust Fan ELECTRIC 200 1 - 1.5 18.0 0.9 10.8 24.0 15.6 Humidifiers 4 EIIA - 3 USGPH ELECTRIC 230 1 2.8 0.6 2.6 0.2 0.8 3 HR - 8 USGPH ELECTRIC 230 1 3.2 0.7 2.2 0.2 0.7 4.8 1.4
Summation of all the equipments Total (kw) 113.4 Total (kW) 72.8