You are on page 1of 12

PT .

TELKOM INDONESIA Tbk

As Built Drawing
Site : TTC BELANTI (PE.1)

Disiapkan oleh:

PT. SISINDOKOM LINTAS BUANA


TABLE OF CONTENTS
Remarks

NO DESCRIPTION NO. DRAWING

1 COVER 1
2 CONTENTS 2
3 TOPOLOGY NETWORK 3
AS-BUILT DRAWING
4 SITE LOCATION 4 APPROVED By: PREPARED By:

5 EQUIPMENT PLACEMENT 5
6 WIRING DIAGRAM 6 (……………………….) (……………………….)

7 DOCUMENTATION 7 PROJECT NAME:

8 DOCUMENTATION 8 DRAWING TITLE:

9 DOCUMENTATION 9 CONTENTS

10 10
SITE ID LOCATION

DOCUMENTATION
TTC BELANTI

11 DOCUMENTATION 11 SCALA REVISION


NO DATE REF

12 DOCUMENTATION 12 NSC

No. DRAWING SHEET

2 2
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

TOPOLOGY NETWORK

SITE ID LOCATION

TTC BELANTI

SCALA REVISION

NO DATE REF

NSC

No. DRAWING SHEET

3 3
A4
Remarks

1. Nama Lokasi : TTC BELANTI


Alamat Lokasi Installasi : Lolong Belanti, Kec. Padang Utara,
Kota Padang

2. Alamat Pengiriman barang : Lolong Belanti, Kec. Padang Utara,


Kota Padang

3. Jam Operasi lokasi : Senin s/d Jumat


AS-BUILT DRAWING
08.00 s/d 17.00 WIB APPROVED By: PREPARED By:

4. Koordinator Lokasi
Nama : Ali Rachman Ritonga
(0811-780-707)
(……………………….) (……………………….)
-0.916598, 100.359183
5. Lokasi instalasi perangkat PROJECT NAME:

Lantai :2
Ruangan : R. VAS
DRAWING TITLE:

6.Suhu Ruangan : Baik


SITE LOCATION
Kebutuhan : 20º ± 10%
SITE ID LOCATION

7. Titik Koordinat : A. Longitude : 100.359183


TTC BELANTI
B. Latitude : -0.916598
SCALA REVISION
NO DATE REF

NSC

No. DRAWING SHEET

4 4
A4
To R.Battery/Recti

Remarks
GRND

DCPDB

To R.Operataor
(+)
A.3 A.1

DCPDB
RACK CORE RAN2

(-)
B.3 B.1

DCPDB
SHAFT RACK R1.BLN.PE-MOBILE.1

(+)
SR.1 RAN1
Cable
C.2

DCPDB
ASR

(-)
RACK RAN.3
1002X

To PDU Standing D.2


R. Transmisi LT.3 RACK
CPS1 RAN.4
APC

CPS2
ODF AS-BUILT DRAWING
OTB
APPROVED By: PREPARED By:
Patch
panel
DCPDB
SR.I (+)

Patch
panel
DCPDB
SR.I (-)

OAM
R.VAS LT.2
(……………………….) (……………………….)
IPDU
PROJECT NAME:
DCPDB
ASR B
1002X

DCPDB
RAN A
RACK RACK RACK PABX Switch

DRAWING TITLE:

EQUIPMENT PLACEMENT
DCPDB
ASR A
1002X

LOCATION

AC1 AC2 AC3


TTC BELANTI
PDB

PDB

PDB

PDB
DC

DC

AC

AC

SCALA REVISION
NO DATE REF

NSC

No. DRAWING SHEET

5.1 5
A4
Remarks

To R.VAS
DCPDB

SHAFT
AS-BUILT DRAWING
APPROVED By: PREPARED By:

R.OPERATOR LT.2
To PDU Standing
R. Transmisi LT.3

R.SWITCHING (……………………….) (……………………….)

DALAM LT.2 PROJECT NAME:

DRAWING TITLE:

EQUIPMENT PLACEMENT

LOCATION

TTC BELANTI

SCALA REVISION
NO DATE REF

NSC

No. DRAWING SHEET

5.2 6
A4
1 Pairs NYAF 50mm
New DCPDB - DCPDB Rackmount (A) 1 Pairs NYAF 50mm
New DCPDB - DCPDB Rackmount (A)

Remarks

2 Pairs NYAF 150mm


New DCPDB - Rectifier 42 42 42 42

41 41 41 41
scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide
scheider scheider
r r r r r r r r r r r r r r r r

250A 250A 125A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 125A

40 40 40 40

39 39 39 39

38 38 38 38

37 37 37 37

36 36 36 36

35 35
- DCPDB Rackmount 19inc 3U 1 Unit
35 35

34 34
- MCB Main Source 2x125A per source
34 34

33 33
- MCB Perangkat 16x63A
33 33
250 250 250 250 250 250 250 250
A A A A A A A A
32 32
32 32

31 31
31 31

30 30
30 30

29 29
29 29
AS-BUILT DRAWING
28 28
28 28

27 27
APPROVED By: PREPARED By:
27 27

26 26
26 26

25 25
25 25

24 24
R1.BLN.PE-MOBILE.1
24 24

23 23

23 23
ASR 9000 Series

22 22

22 22
OPEN

21 21

21 21

20 20

20 20
2 0 2 0 CLASS 1
CLASS 1 CLASS 1 LASER
LASER LASER

19 19

MGT LAN 0

MGT LAN 0

0
(……………………….)

1
(……………………….)
19 19

MGT LAN 1

MGT LAN 1
2

3
125 125 125 125 125 125 125 125 125 125 125 125 125 125 125

5
18 18

CONSOLE

CONSOLE

1
A A A A A A A A A A A A A A A

7
18 18

AUX

AUX
8

9
PROJECT NAME:

SYNC 0

SYNC 0
10

11
17 17

2
MCB SHELVE.1

A/L
0
12

13
17 17

SYNC 1

SYNC 1
SOURCE A

14

15
16

17
16 16

3
ALARM OUT

ALARM OUT
18

19
16 16

50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A

A/L
20

21
15 15

4
22

23
4

A/L
15 15

1
24

25
A/L
26

27
14 14

5
MCB SHELVE.2

5
28

29
SOURCE A 14 14

A/L
30

31
ACO ACO

LAMP LAMP
TEST TEST

6
13 13

32

33

6
FAIL SYNC FAIL SYNC

CRIT HDD CRIT HDD

34

35
A/L
13 MAJ CF MAJ CF
13
MIN ACO MIN ACO

36

37

A9K-8X100GE-L-SE
7
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A

38

39
12 12

7
A/L

A/L
A9K-RSP-4G A9K-RSP-4G

DRAWING TITLE:
A9K-40GE-B A9K-2X100GE-SE
1 1
12 STATUS STATUS STATUS 12

11 11
MCB SHELVE.3
SOURCE A 11 11

FAN STATUS HIGH SPEED MOVING BLADES ASR-9010-FAN


10 10 !

125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 10 10

09
A A A A A A A A A A A A A A A 09

09
FAN STATUS
! HIGH SPEED MOVING BLADES ASR-9010-FAN

09 WIRING DIAGRAM
08 MCB SHELVE.1 08

SOURCE B
08 08

07 07

50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 07 07

06 06
LOCATION
06 06

05
MCB SHELVE.2 05
SOURCE B
05 05

04 04

03
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A
03
04 04
TTC BELANTI
03 03
MCB SHELVE.3
02 02
SOURCE B

02 02

01 01

01 01
SCALA REVISION

NO DATE REF

8 Pairs NYAF 25mm DCPDB Rackmount NSC


– Perangkat Source A

8 Pairs NYAF 25mm DCPDB Rackmount No. DRAWING SHEET


– Perangkat Source B
6 7
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

DOCUMENTATION

SITE ID LOCATION

TTC BELANTI

SCALA REVISION
NO DATE REF

TAMPAK DEPAN GEDUNG TAMPAK PINTU MASUK NSC

TTC BELANTI R.VAS LT.2


No. DRAWING SHEET

7 8
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

DOCUMENTATION

SITE ID LOCATION

TTC BELANTI
TAMPAK RUANG VAS LT.2 TAMPAK RUANG VAS LT.2 TAMPAK RUANG VAS LT.2
SCALA REVISION
NO DATE REF

NSC

No. DRAWING SHEET

8 9
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

DOCUMENTATION

SITE ID LOCATION

TTC BELANTI
PENEMPATAN R1.BLN.PE- PENEMPATAN R1.BLN.PE-
MOBILE.1 MOBILE.1 SCALA REVISION
NO DATE REF

NSC

No. DRAWING SHEET

9 10
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:

B
MCB DCPDB R1.BLN.PE-
MOBILE.1 SOURCE (A)

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

DOCUMENTATION

SITE ID LOCATION

TTC BELANTI

SCALA REVISION

DCPDU LT.2 NO DATE REF

MCB R1.BLN.PE-MOBILE.1 NSC


SOURCE (B)

No. DRAWING SHEET

10 11
A4
Remarks

AS-BUILT DRAWING
APPROVED By: PREPARED By:
DCPDB RACKMOUNT
PSU R1.BLN.PE-MOBILE.1
R1.BLN.PE-MOBILE.1

(……………………….) (……………………….)

PROJECT NAME:

DRAWING TITLE:

DOCUMENTATION

SITE ID LOCATION

TTC BELANTI

SCALA REVISION
NO DATE REF

NSC

GROUNDING R1.BLN.PE-MOBILE.1 GROUNDING R1.BLN.PE-MOBILE.1


No. DRAWING SHEET
DI SISI PERANGKAT DI SISI BUSBAR
11 12
A4

You might also like