Professional Documents
Culture Documents
Abd R1.BLN - Pe-Mobile.1 - TTC Belanti
Abd R1.BLN - Pe-Mobile.1 - TTC Belanti
As Built Drawing
Site : TTC BELANTI (PE.1)
Disiapkan oleh:
1 COVER 1
2 CONTENTS 2
3 TOPOLOGY NETWORK 3
AS-BUILT DRAWING
4 SITE LOCATION 4 APPROVED By: PREPARED By:
5 EQUIPMENT PLACEMENT 5
6 WIRING DIAGRAM 6 (……………………….) (……………………….)
9 DOCUMENTATION 9 CONTENTS
10 10
SITE ID LOCATION
DOCUMENTATION
TTC BELANTI
12 DOCUMENTATION 12 NSC
2 2
A4
Remarks
AS-BUILT DRAWING
APPROVED By: PREPARED By:
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
TOPOLOGY NETWORK
SITE ID LOCATION
TTC BELANTI
SCALA REVISION
NO DATE REF
NSC
3 3
A4
Remarks
4. Koordinator Lokasi
Nama : Ali Rachman Ritonga
(0811-780-707)
(……………………….) (……………………….)
-0.916598, 100.359183
5. Lokasi instalasi perangkat PROJECT NAME:
Lantai :2
Ruangan : R. VAS
DRAWING TITLE:
NSC
4 4
A4
To R.Battery/Recti
Remarks
GRND
DCPDB
To R.Operataor
(+)
A.3 A.1
DCPDB
RACK CORE RAN2
(-)
B.3 B.1
DCPDB
SHAFT RACK R1.BLN.PE-MOBILE.1
(+)
SR.1 RAN1
Cable
C.2
DCPDB
ASR
(-)
RACK RAN.3
1002X
CPS2
ODF AS-BUILT DRAWING
OTB
APPROVED By: PREPARED By:
Patch
panel
DCPDB
SR.I (+)
Patch
panel
DCPDB
SR.I (-)
OAM
R.VAS LT.2
(……………………….) (……………………….)
IPDU
PROJECT NAME:
DCPDB
ASR B
1002X
DCPDB
RAN A
RACK RACK RACK PABX Switch
DRAWING TITLE:
EQUIPMENT PLACEMENT
DCPDB
ASR A
1002X
LOCATION
PDB
PDB
PDB
DC
DC
AC
AC
SCALA REVISION
NO DATE REF
NSC
5.1 5
A4
Remarks
To R.VAS
DCPDB
SHAFT
AS-BUILT DRAWING
APPROVED By: PREPARED By:
R.OPERATOR LT.2
To PDU Standing
R. Transmisi LT.3
DRAWING TITLE:
EQUIPMENT PLACEMENT
LOCATION
TTC BELANTI
SCALA REVISION
NO DATE REF
NSC
5.2 6
A4
1 Pairs NYAF 50mm
New DCPDB - DCPDB Rackmount (A) 1 Pairs NYAF 50mm
New DCPDB - DCPDB Rackmount (A)
Remarks
41 41 41 41
scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide scheide
scheider scheider
r r r r r r r r r r r r r r r r
250A 250A 125A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 125A
40 40 40 40
39 39 39 39
38 38 38 38
37 37 37 37
36 36 36 36
35 35
- DCPDB Rackmount 19inc 3U 1 Unit
35 35
34 34
- MCB Main Source 2x125A per source
34 34
33 33
- MCB Perangkat 16x63A
33 33
250 250 250 250 250 250 250 250
A A A A A A A A
32 32
32 32
31 31
31 31
30 30
30 30
29 29
29 29
AS-BUILT DRAWING
28 28
28 28
27 27
APPROVED By: PREPARED By:
27 27
26 26
26 26
25 25
25 25
24 24
R1.BLN.PE-MOBILE.1
24 24
23 23
23 23
ASR 9000 Series
22 22
22 22
OPEN
21 21
21 21
20 20
20 20
2 0 2 0 CLASS 1
CLASS 1 CLASS 1 LASER
LASER LASER
19 19
MGT LAN 0
MGT LAN 0
0
(……………………….)
1
(……………………….)
19 19
MGT LAN 1
MGT LAN 1
2
3
125 125 125 125 125 125 125 125 125 125 125 125 125 125 125
5
18 18
CONSOLE
CONSOLE
1
A A A A A A A A A A A A A A A
7
18 18
AUX
AUX
8
9
PROJECT NAME:
SYNC 0
SYNC 0
10
11
17 17
2
MCB SHELVE.1
A/L
0
12
13
17 17
SYNC 1
SYNC 1
SOURCE A
14
15
16
17
16 16
3
ALARM OUT
ALARM OUT
18
19
16 16
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A
A/L
20
21
15 15
4
22
23
4
A/L
15 15
1
24
25
A/L
26
27
14 14
5
MCB SHELVE.2
5
28
29
SOURCE A 14 14
A/L
30
31
ACO ACO
LAMP LAMP
TEST TEST
6
13 13
32
33
6
FAIL SYNC FAIL SYNC
34
35
A/L
13 MAJ CF MAJ CF
13
MIN ACO MIN ACO
36
37
A9K-8X100GE-L-SE
7
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A
38
39
12 12
7
A/L
A/L
A9K-RSP-4G A9K-RSP-4G
DRAWING TITLE:
A9K-40GE-B A9K-2X100GE-SE
1 1
12 STATUS STATUS STATUS 12
11 11
MCB SHELVE.3
SOURCE A 11 11
125 125 125 125 125 125 125 125 125 125 125 125 125 125 125 10 10
09
A A A A A A A A A A A A A A A 09
09
FAN STATUS
! HIGH SPEED MOVING BLADES ASR-9010-FAN
09 WIRING DIAGRAM
08 MCB SHELVE.1 08
SOURCE B
08 08
07 07
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 07 07
06 06
LOCATION
06 06
05
MCB SHELVE.2 05
SOURCE B
05 05
04 04
03
50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A 50A
03
04 04
TTC BELANTI
03 03
MCB SHELVE.3
02 02
SOURCE B
02 02
01 01
01 01
SCALA REVISION
NO DATE REF
AS-BUILT DRAWING
APPROVED By: PREPARED By:
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
DOCUMENTATION
SITE ID LOCATION
TTC BELANTI
SCALA REVISION
NO DATE REF
7 8
A4
Remarks
AS-BUILT DRAWING
APPROVED By: PREPARED By:
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
DOCUMENTATION
SITE ID LOCATION
TTC BELANTI
TAMPAK RUANG VAS LT.2 TAMPAK RUANG VAS LT.2 TAMPAK RUANG VAS LT.2
SCALA REVISION
NO DATE REF
NSC
8 9
A4
Remarks
AS-BUILT DRAWING
APPROVED By: PREPARED By:
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
DOCUMENTATION
SITE ID LOCATION
TTC BELANTI
PENEMPATAN R1.BLN.PE- PENEMPATAN R1.BLN.PE-
MOBILE.1 MOBILE.1 SCALA REVISION
NO DATE REF
NSC
9 10
A4
Remarks
AS-BUILT DRAWING
APPROVED By: PREPARED By:
B
MCB DCPDB R1.BLN.PE-
MOBILE.1 SOURCE (A)
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
DOCUMENTATION
SITE ID LOCATION
TTC BELANTI
SCALA REVISION
10 11
A4
Remarks
AS-BUILT DRAWING
APPROVED By: PREPARED By:
DCPDB RACKMOUNT
PSU R1.BLN.PE-MOBILE.1
R1.BLN.PE-MOBILE.1
(……………………….) (……………………….)
PROJECT NAME:
DRAWING TITLE:
DOCUMENTATION
SITE ID LOCATION
TTC BELANTI
SCALA REVISION
NO DATE REF
NSC