Flammanville-3 Progress report

Contents
Contents ............................................................................................................ 1
Current Progress: ............................................................................................... 2
Overall progress .............................................................................................. 2
Modeling progress .......................................................................................... 2
GUI progress ................................................................................................ 2
Scripting progress ........................................................................................... 2

Cleared for release:


28/06/2022 22:14 CEST Lennert De Groote Huysentruyt VEO
Current Progress:
The first point of discussion is the current progress of completion. This
section will include:

• Overall progress
• Modeling progress
• Scripting progress

Overall progress
Concerning overall progress of the game. Some advancements have been
made towards completion. Mainly progressing around the reactor hall and
auxiliary plant buildings. These main points are:
• Implementation of the Siemens turbine
• Implementation of the building floors
• Implementation of the automated lighting system in the respective
floors

Modeling progress
During the modeling progress that has been made, mainly around the
control room and entrance areas some difficulties have been faced due to
the limitations of the Roblox studio client:
• Upper polygon limit of 5000
• Upper triangle limit of 10 000
Great care has been taken to preserve model details with these
restrictions. This however added considerable amounts of time to the
modeling phases of development.
Rebuilding of some old assets is in progress as well.

GUI progress
Regarding GUI’s some advancements have taken place. The development
of the UPS GUI is now complete development of the control GUI’s has
started this is expected to last at least 2-3 months.

Scripting progress
Implementation of certain scripts have been completed. Biggest of these
are:
• UPS coding
• Door control
• Security connections