AF HUBCO
THAR ENERGY LT
Plant
BETWEEN
CENTRAL POWER PURCHASING AGENCY (GUARANTEE) LIMITED
AND
THAR ENERGY LIMITED
AW
AF HUBCOT AR ENERGY LT
Voltage phasing checks will be carried out between the sub-station of the
This test procedure is prepared and released by CMEC for the use of PPA related test to be carried
Date:
fl9~
Accepted for use by EPC:
I. CONCERNING
II. OBJECTIVE
The test will demonstrate the correct/same Phase Sequence between Sub-Station and Grid system
III. Stage
The test is part of commissioning tests prior to synchronization of TEL 330 MW Coal-Fired Power Plant
Section 8.2(f) Voltage phasing checks will be carried out between the sub-station of
Position of three phases on both sides of the CBs will be the same. Direction of rotation will be
clockwise.
1. The phase sequence of the Grid System and the Steam Turbine Generators shall be checked
and matching of phases shall be performed.
2. Checking of phase sequence from the PTs on Phase Angle Meter with secondary connected
in marshalling cabinet.
The measuring equipment/data logging devices used shall consist of the following:
1. Phase rotation tester for direction of rotation. (Digital phase volt-ampere tester)
#
AF
AF HUBCO
THAR ENERGY LTO
a. Test Coordination
The coordination of the test shall be done by CMEC. The Independent Engineer shall be informed on a
b. Pre-conditions
1. The existing phase sequence of Grid is R-Y-B and similarly the phase sequence of the Power
c. During Test
1) Ensure all the 500 kV bus bar 1 breaker of transmission lines are open.
2) Ensure all the disconnects switches connected to bus bar 1 directly is open and their
3) Ensure grounding switch are open and their control power supply have been cut off.
6) Adjust the parameters in excitation control system to ensure the safety of test.
7) Close the main transformer high voltage side disconnection switch manually after that,
9) Raise excitation reference gradually until generator voltage reach 100% rated voltage.
Check all the relative PTs phase, phase sequence and amplitude of synchronization device for
d. End of Test
The end of each test will be the point at which all readings have been taken.
#e
AP
AF HUBCO TAR ENERGY LTD.
e. Results
After the test is finished, all relevant documents will be copied and signed by all parties involved. This
means that only these documents may be used for determination of the results. In case of electronic
recording, it is required to create printouts as far as possible or copies of files will be handed over
IX. PROTOCOL
The protocol shall contain all relevant calculations, calculation procedures, and used printouts and
plant data information. It shall be clear if the test is in compliance with the requirements of the
Connectivity Protocol.
please put initials of all involved party representatives on each separate page of the Procedure
Date. Time.
Definitioy
Ar
AF HUBCOTAR ENERGY LIO.
Date. Time: _
Phase sequence
'please put initials of all involved party representatives on each separate page of the Procedur