Name of Bidder: Receiving Store:

Address: Unit 605 FMSG Bldg, Balete Drive, New Manila , Quezon City Address: Km. 43 National Highway Barrio Sala, Cabuyao Laguna
Contact Number: (02)638-54-23 Contact Number:
E-mail: avidproinc@ gmail.com E-mail:
Contact Person: ALEXANDER D. GALERA Contact Person: Mr. Melvin Lester Y. Tan

PROJECT TITLE: Dismantling of Husky Index250 and Piping Installation of New Husky Hypet300
PR NUMBER: WR-MP-19-000
DATE: April 12, 2019

4/22/2019

4/23/2019

4/24/2019

4/25/2019

4/26/2019

4/27/2019

4/28/2019

4/29/2019

4/30/2019

5/10/2019

5/11/2019

5/12/2019

5/13/2019

5/14/2019

5/15/2019

5/16/2019

5/17/2019

5/18/2019

5/19/2019

5/20/2019

5/21/2019

5/22/2019
5/1/2019

5/2/2019

5/3/2019

5/4/2019

5/5/2019

5/6/2019

5/7/2019

5/8/2019

5/9/2019
ITEM No. DESCRIPTION DURATION START FINISH

1 Mobilization 3 04/22/2019 04/24/2019 X X X


Disconnection of power supply & utility supply of Husky Index250 including
2 5 04/24/2019 04/28/2019 X X X X X
auxilliary equipment
3 Supply of Heavy equipment ( crane & forklift) and rigging equipment 2 04/28/2019 04/29/2019 X X
Dismantling and transferring of Husky Index250 and auxiliary equipment to
4 7 04/30/2019 05/06/2019 X X X X X X X
Nuggets Plant
5 Restoration of any civil works during the dismantling of Husky Index 250 3 05/06/2019 05/08/2019 X X X
Unloading, decarting, hauling and positioning in place of new Husky Hypet 300
6 8 05/07/2019 05/14/2019 X X X X X X X X
and auxilliary equipment

Procurement of supply of piping materials, fittings (elbow, valves and etc) and
7 2 04/22/2019 04/23/2019 X X
accessories (Temp. gauge, pressure gauge and etc)
8 Piping Installation
8.1 Cooling Water Supply & Return to dryer 1 05/14/2019 05/14/2019 X
8.2 Cooling Water Supply & Return to chiller 2 05/14/2019 05/15/2019 X X
8.3 Cooling Water Supply & Return to Hypet 300 1 05/15/2019 05/15/2019 X
8.4 Air Supply to dryer 2 05/15/2019 05/16/2019 X X
8.5 Air Supply to Hypet300 1 05/16/2019 05/16/2019 X
8.6 Drain Line (dryer, dehumidifier, chiller & Hypet300) 2 05/16/2019 05/17/2019 X X
16 Supply and painting of piping 2 05/17/2019 05/18/2019 X X
17 Provision of labels/ markings and directional flow 1 05/19/2019 05/19/2019 X
18 Supply and installation of 7.5 tons electric hoist with wires and breaker 2 05/20/2019 05/21/2019 X X
19 Adjust of existing electric chain hoist 1 05/21/2019 05/21/2019 X
20 Supply and installation of booster water pump 2 05/20/2019 05/21/2019 X X
21 Testing & Commisioning 1 05/21/2019 05/21/2019 X
22 Demobilization 1 05/22/2019 05/22/2019 X

Prepared & submitted by:

ALEXANDER GALERA
Operations Manager