The Head (MMG)


MRT Circle, TPCODL, BBSR

Sub: Submission of final Inception report of LT cable of 30nos of drums (4x25mmsq,


4x10sqmm, 2x10sqmm, all are A2XWY, PVC Type ST2 FRLSH, each are 10 drums) at the
works of M/S Gupta Power Infrastructure Ltd, Khurda, Odisha.

Ref: 1. Authorization for inspection by mail dtd.23.08.21.


2. P.O No- 3200001037 dtd.03.06.2021 Head MMG, TPCODL.
Sir,
In obedient to subject cited above & letter under reference the acceptance test was
carried out on dtd.27.08.2021 at the works of M/S GPIL for 6 nos of drums sample taken out
of total offered jobs (30 nos) and the test reports details are attached herewith. The test
reports details are attached herewith. The tests were conducted on samples as per IS 7098,
1988(part-I), approved GTP, drawing & TS are found as per order.
1. No type test certificates was provided by M/S GPIL.

Enclosed:
1. Joint Inception report
2. Inception offered list
3. Routine test reports
4. Acceptance test reports
5. Calibration standard
6. Certificate of instruments used during acceptance test
7. Test certificate of materials used in cables.

Yours Faithfully Yours Faithfully

Gurudas Swain Bibhuti Bhusan Sahoo


DM (Elect.), MRT DM (Elect.), MRT