Professional Documents
Culture Documents
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 1 of 8
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 2 of 7
CARGO
LOADING SUPERVISION AT PLANT
After verifying the empty container, the merchandise verification was carried out prior to shipment,
then the beginning and end of the inspection and information regarding the merchandise the
merchandise are detailed. (Después de la verificación del contenedor vacío se procedió a realizar la
verificación de mercadería previo al embarque, a continuación, se detalla inicio y fin de inspección,
e información referente a la mercadería.)
STARTING DATE (Fecha de inicio) JUNE 28 - 2022 – 16:38
FINISHING DATE (Fecha de fin) JUNE 28 - 2022 – 17:57
Shipment Supervision
1. LOADING SUPERSION (Supervisión de Embarque)
All the above cargoes were loaded into the container under TCIS inspector's supervision.
(Toda la información anterior se cargó en el contenedor bajo la supervisión del inspector de
TCIS.)
The TCIS inspector proceeds to supervise the loading of the previously verified merchandise,
supervisar la carga
through random sampling. (El inspector de TCIS procede a supervisor el cargue de la
mercadería previamente verificada, mediante muestreo aleatorio.)
The TCIS inspector verifies and controls the quantities and / or pallets to be shipped in the
container. (El inspector de TCIS verifica y controla las cantidades y / o pallets a embarcar en
el contenedor.)
The stowage verification is carried out by rows and we take picture during supervision. (Se
realiza la verificación de estiba por filas y realizamos la toma de fotografía durante la
supervisión.)
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 4 of 8
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 5 of 8
FILA 1 FILA 2
FILA 3 FILA 4
FILA 5 FILA 6
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 6 of 8
FILA 7 FILA 8
FILA 9 FILA 10
DISTRIBUCIÓN 1 DISTRIBUCIÓN 2
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
Report #TCISEC1230
Date of Issue: JUNE 28, 2022
Page 7 of 8
Container closing stage
ANNEX 3 – STAGE OF CLOSING THE CONTAINER
ANEXO 3 - ETAPA DEL CERRADO DEL CONTENEDOR
The issuance of this inspection Report does release the contractual parties from ther own responsabilities and and the fulfilment of their obligations.
The above inspection has been carried out according to the 2020 Commercial Terms and Conditions. (http://tcisinspect.com/downloads/TCIS__uae.pdf)
The titles and titles of this certificate / report are for reference only and the conclusions contained in this document prevail as indicated.
ORIGINAL
ORDEN / LOTE: 100/939 FECHA: 28/06/2022 INICIO Report #TCISEC1230
Date of Issue: JUNE 28, 2022
ORDEN SAP: 93026 P.O: 722051957 16:38 Page 8 of 8
NAVIERA: Evergreen, Xin Fong Cheng, Shanghái I