Professional Documents
Culture Documents
DOCUMENTS STATUS
NO.
NAMES OF DOCUMENT REMARKS
FILE ORIGINAL COPY ATTACHMENT
DOCUMENT DOCUMENT DOCUMENT
14 Request of Works
15 Interim Payment Certificate (IPC) including √
- Quantity Data √
- Quality Data √
16 Monthly Progress Report √
17 Shop Drawings √
18 Notice/Instruction from Engineer √
19 Minutes of Show Cause Meeting (if any) √
20 Notice for Test on Completion by GS √
21 Request for Taking Over of the Works by GS
22 Taking Over Certificate by Engineer
23 Calculation of Price Adjustment √
24 List of Defect and Deficiencis
25 No Objection Letter (NOL) from IDB
26 Approved As Built Drawings by the Engineer
27 Photograph Documentation (0%, 50%, 100%)
28 Recomendation of BPK Audit
29 Evidance payment for delay damages (if any)
30 Insurance Policy
31 Guarantee for Secend Half Retention Money (if any)
32 Others
Page 01/03
CHECKLIST AS BUILT DOCUMENTS CIVIL WORKS PACKAGE
ISLAMIC DEVELOPMENT BANK (IDB)
Development of Trans South - South Java Road Project (TRSS)
LOT 1 TAMBAKREJA - BANTARSARI
STATUS
HARDCOPY
NO. DESCRIPTION Remarks
B DOCUMENT QUALITY
1 Materials Test (Quarry)
- Selected Embankment √
- Common Embankment -
- Stone for Aggregate
- Sand
2 Materials Test (Fabricant)
- Reinforcing Steel
- Precast Concrete
- Elastomeric Bearing
3 Job Mix Formula
- Aggregate Class A √
- Aggregate Class S √
- AC - Base √
- AC - Binder Course √
- AC - Wearing Course √
- Structural Concrete √ fc.30, 25, 15, 10
- Mortared √
Routine Material Quality Control Testing Reports for Every of
4
Material Produced
- Common Embankment (Every 1000 m3) -
- Selected Embankment (Every 1000 m3) -
- Stone for Aggregate (Every 1000 m3) -
Page 02/03
STATUS
HARDCOPY
NO. DESCRIPTION Remarks
C DOCUMENTS
1 Monthly Environmental Management Plan Report √
2 Traffic Management Report √
3 Health and Safety Plan Report √
4 Road Safety Audit Findings Report (if any) √
5 Follow up Road Safety Audit Findings Report (if any) √
6 LARAP Report (Social impact)
7 Contactor Claims (if any) -
8 Other Issues -
1. 2.
Co Team Leader/Ass.CSE Site Supervision Engineer
4. 5.
Quality Assurance Engineer Quality Engineer
7.
Quantity Engineer
Page 03/03
A.01 A.02 A.03 A.04
PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK
KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG
PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK
KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG
REQUEST
OF WORKS
C.01 C.02 C.03 C.04
PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK
KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG
ADM & KEU ADM & KEU ADM & KEU ADM & KEU
DOKUMEN PROGRESS
JAMINAN PAYMENT
D.01 D.02 D.03 D.04
PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK
KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG
PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK PEMBANGUNAN FLY OVER CISAUK
KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG KABUPATEN TANGERANG