OSBP FACILITIES AT SUAM. Drawing No: ST-01


Sheet No: 5
Job No: STR-045 Revision: R00
Section: MAIN TERMINAL BUILDING Prepared By: ak. Date: 7/14/2022
Location: Substructure Works. Checked By: FM Last Revised: N/A

Length
Type No. of
Bar No. of Total of each Shape A* B* C* D* E* F* R* Weight
Member and bars in Rev.
mark Mbrs No. bar † code [mm] [mm] [mm] [mm] [mm] [mm] [mm] [kg]
size each
[mm]

FOOTING, F19 48 T 12 8 20 160 1975 21 300 1400 (300) 280.5

49 T 16 8 6 48 2475 11 300 (2200) 187.5

50 T8 8 6 48 925 52 130 230 (115) (115) 17.5

50a T8 8 6 48 350 21 115 130 (115) 6.6

FOOTING, F20 51 T 16 5 34 170 3150 21 400 2400 (400) 845.2

52 T 16 5 8 40 2475 11 300 (2200) 156.3

53 T8 5 6 30 1225 52 180 330 (115) (115) 14.5

53a T8 5 6 30 400 21 115 180 (115) 4.7

This schedule conforms to BS 8666:2020 Total weight on this page [kg] = 1512.894
* Specified in multiples of 5mm
Status: P - Preliminary; T - Tender; C - Construction
† Specified in multiples of 25mm