SCHEDULE FOR SECOND SLAB BEAM

REINFORCEMENT STIRRUPS
TYPE SIZE IN MM EXTRA AT IN END SPAN IN MID SPAN
BOTTOM BOTTOM TOP STRAIGTH SIZE IN MM L/4 FROM FACE IN MIDDLE
STRAIGHT 2L/3 AT CENTER OF SUPPORT LENGTH

SB1 230 X 300 3 - 12 ------ 4 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB2 230 X 400 4 - 12 ------ 6 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB3 230 X 450 4 - 16 2 - 12 4 - 16 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB4 150 X 300 3 - 12 ------ 3 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB1 C4 SB2 C4 SB1 C4 SB1

C2

SB4

SB3

SB3

SB3

SB1
C3

SB1 SB2 C2 SB1 C2 SB1 C1


SB1

SB1

SB1
SB3
SB1

C2 SB2 C2 SB3 SB3 C1


SB2

SB2

SB2
SB3
SB4

SB1 C2 SB2 C3 SB1 C2 SB1 C1


SB1

SB1

SB1

SB1
SB4

SB4 SB4 SB4 SB4