SCHEDULE FOR SECOND SLAB BEAM

REINFORCEMENT STIRRUPS
TYPE SIZE IN MM EXTRA AT L/4 TOP
STRAIGHT IN END SPAN IN MID SPAN
BOTTOM BOTTOM TOP STRAIGTH L/4 FROM FACE IN MIDDLE
2L/3 AT CENTER FROM IN END
STRAIGHT OF SUPPORT LENGTH
OF SPAN
SB1 230 X 300 3 - 12 ------ 4 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB2 230 X 400 4 - 12 ------ 6 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB3 230 X 450 4 - 16 2 - 12 4 - 16 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB4 150 X 400 3 - 12 ------ 3 - 12 2 - 12 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB5 150 X 400 4 - 16 ------ 4 - 16 2 - 16 8 TOR @ 100 C/C 8 TOR @ 150 C/C

SB5 C4 SB2 C4 SB1 C4 SB1

2.669 2.635
3.505 C2
SB4

SB3

SB3

SB3
4.31

SB1
C3

SB5 SB2 C2 SB1 C2 SB1 C1


SB1

SB1

SB1
SB3
2.4
SB5 C2 SB2 C2 SB3 SB3 C1
SB2

SB2

SB2
3.219

SB3
SB4

SB5 C2 SB2 C3 SB1 C2 SB1 C1


1.6
SB4

SB5
SB5
SB5

SB5

SB4 SB4 SB4 SB4