You are on page 1of 1

NOTES:

SOUTH ELEVATION conc.


DO NOT Scale drawing

16,594 parapet height +3.742


coping
WINDOWS LIST (ALUMINIUM FRAMED WINDOWS) DO NOT Expose copies to direct
sunlight
Where dimensions are not tallying or
questionable, consult the designer
PLAN FRAME AND DO NOT cut corners (no unauthorised
230 1,379 230 2,850 230 2,317 230 2,415 230 6,267 230 QTY SIZE ELEVATION GLAZING NOTES shortcucts)

clerestory
REFERENCE FINISH
wall plate level +2.877 clerestory clerestory
W01

SECTION X
windows windows windows

GENERAL NOTES

230
lintel level +2.100

L L The design of this drawing is copyright


natural anodised exact dimesions to be protected & remains the property of The
4mm clear glass
aluminium frame verified on site
1 1,802×1,552 Architect. The project notes are to be read
in conjunction with all relevant technical
specifications.

2,070
2,298

All work is to be carried out strictly in


accordance with the National Building
plaster and paint
Regulations, "good building practices" and
glass sliding door W02 the relevant Municipal Regulations.
plaster and paint Quality of all materials & workmanship to
ffl ±0.000 comply with the relevant S.A.B.S. and

230
S.A.Z specification standards. The trade
W02 aluminium slidding door to specialist ngl contractor shall provide finished mock-ups
ab NDS6 -0.235 and samples as noted or required by the
natural anodised exact dimesions to be contract documents for approval by the
mm clear glass
1 2,581×951 aluminium frame verified on site
Architect prior to fabrication.
230

230

230

W04
This drawing is not to be scaled, figured
SOUTH front ELEVATION

1,253
ab Scale 1:100
dimensions to be used at all times. Unless
noted otherwise, all dimensions are given
494 in millimetres.

W04
115
Contractor is responsible for the correct
3,273

W03
3,040

setting out of the buildings, all external &


all internal walls with particular reference to

W01

3,022
3,040

115 676
boundaries, building lines, etc.
Contractors are to locate and identify, if
LOUNGE conc. conc. any, existing services on site, and to
(Tiles) coping coping protect these from damage throughout the
parapet height +3.742
natural anodised
mm clear glass
exact dimesions to be duration of the works.
+00.00 1 1,802×951 aluminium frame verified on site
230

Refer to the relevant consultants drawings

3,312
W02 for coordination of work. The work of all

WEST ELEVATION
disciplines shall be carefully co-ordinated
head of drain 450 wall plate level +2.877
with the overall aesthetic appearance of
rw

2,291
the building.
below n.g.l

230
230
All relevant details, levels & dimensions to
W04
959

be checked on site prior to


lintel level +2.100 commencement of work. Any queries are
to be forwarded timeously to the Architects.
g

14,289
DINING
3,065

Discrepancies existing between the


(Tiles) drawings of the various trades shall be
230

KITCHEN natural anodised exact dimesions to be brought to the immediate attention of the

115
3,388
3,370

W04
+00.00 mm clear glass
(C. Tiles) 11 388×1,890 aluminium frame verified on site project manager and the Architect.
03

1,373
W

sink +00.00
Drawings & details show design intent and
EAST ELEVATION

are meant to be indicative of the profiles


230 2,850 230 3,184 3,916 115 1,130 115 3,020 230

W04
2,056

and detailing required for the work.


Build-in, only approved d.p.c.'s, whether or
plaster and paint
rw not these are shown on drawings, to all
ffl ±0.000
W05 external walls at each floor, beam or

115
W04 W04 g i.e g i.e parapet level & to all windows, doors,
115

115
stove LINEN ngl
grilles or other opening in external walls.
-0.235
g dia. 100 sewer drain pipe at 1:60 fall torwards municipal pipe line Stepped brickgrip dpc to all external cavity
420

walls with weepholes at max 900c/c if not


ENSUITE
230

stated differently. Dpc to be min 150mm

1,801
W05
1,100

1,100
(C. Tiles) natural anodised
mm clear glass
exact dimesions to be above n.g.l.

dia. 100 sewer drain pipe at 1:60 fall


NORTH (back) ELEVATION 1 1,022×951 aluminium frame verified on site

ROAD
W04

Scale 1:100
FLD +00.00 Any queries arising from all the above
115

svp must be reported to the designer for

torwards municipal pipe line


FLD clarification before any work is put in hand.

115
FLD Airbricks to local authority requirements, if
385

LINEN not stated otherwise.


115

115

115
W04

600
8 M BOUNDARY LINE
3,070

848
BIC
115
1,845

115
W04
5,235

natural anodised exact dimesions to be


mm clear glass
3 1,000×951 aluminium frame verified on site
1,500

W06
PASSAGE
3,560

3,560
BATH RM FOUNDATIONS
+00.00
(Tiles)

(C. Tiles) hwb Minimum footings trench depth: 700min


115

1,600 115

hwb
STORE
2,597

+00.00 700X230 conc strip footings for 230 walls


(C. Tiles)
W06 500X230 conc strip footings for 115 walls
W05

tub
tub
+00.00
WALLS:
W/C Walls to be brickforced as per engineer's
specifications

NE
Selected facebricks where specified by
BIC

LI
natural anodised exact dimesions to be designer or project owner

RY
2 1,802×951 aluminium frame
mm clear glass
verified on site

DA
FLOOR SLAB
230

230

230

230
W05 W06 W05 W07 W04 W04

UN
to engineer's design and detail

20 M BOUNDARY LINE
g i.e g i.e rw

BO
dia. 100 sewer drain pipe at 1:60 fall torwards municipal pipe line

M
115 SKIRTING
STD 9870 W07

28
230 4,459 230 3,069 115 1,502 115 1,115 1,198 115 4,115 230 Skirting to specialist detail (minimum
skirting :100X19) in hardwood or
SECTION X

selected softwood
16,609 WINDOW SILLS
natural anodised
mm clear glass
exact dimesions to be Selected window sills on dpc laid at slope
1 600×1,000 aluminium frame verified on site to drain
PROPOSED RESIDENTIAL LINTELS, BEAMS
NORTH ELEVATION HOUSE ON STAND N0. 9871 Lintels, beams and columns to engineer's
rw design and detail
STD 9872
AIRVENTS

dia. 100 sewer drain pipe at 1:60 fall torwards

dia. 100 sewer drain pipe at 1:60 fall torwards


Minimum of two airvents per room above
lintel level (external vents to be gauzed)
N FLOOR PLAN DOOR FRAMES

municipal pipe line

municipal pipe line


Total floor area 182m2
N Pressed steel section door frames to
owner specifications

Scale 1:100 DOORS


To project owner's specifications

SEWER DISPOSAL
110dia rigid pvc sewer pipes
110dia pvc vent pipes
50dia waste water pipes
ie g ie P-trap gullies

2100

2100
g
connection
dia. 100 sewer drain pipe at 1:60 fall torwards municipal pipe line
point
municipal sewer line

parapet height +3.742


conc.
coping
conc. 27 M BOUNDARY LINE conc.
coping SITE PLAN coping
wall plate level +2.877 plaster and paint
Scale 1:100
lintel level +2.100 G.I.
parapet height +3.742 flashing pitch 30
chromadeck
roofing sheets
wall plate
plaster and paint
plaster and paint plaster and paint
wall plate level +2.877
ffl

ngl
±0.000
brandered ceiling
-0.235 r.w g
dia. 100 sewer drain pipe at 1:60 fall torwards municipal pipe line
brandered ceiling
EAST (side) ELEVATION
Scale 1:100
+2.100
lintel level
i.e

230 X 230 X
3,557

3,146
230conc. 230conc.

2,794
lintol lintol
LOUNGE
conc. conc. plaster and paint PASSAGE
parapet height +3.742
coping coping
plaster and paint
BEDROOM dpc at 150mm above
wall plate level +2.877
plaster and paint the ground placed
lintel level +2.100
ffl ±0.000 d.p.c. d.p.c. d.p.c. overlaping dpm
ngl Engineer:

-0.235
Cells:
plaster and paint
E-mail :
svp

Irkane Design Group


plaster and paint Design & Draughting Services

specified floor finish on floor


ffl ±0.000 49Central Avenue
g i.e r.w Harare
0774 450 946
ngl 0772 5727 85
0772 230 975
-0.235

screed, total 30mm on 100mm


IDG DDS
Always striving for excellance

dia. 100 sewer drain pipe at 1:60 fall torwards municipal pipe line
E-mail: irkanedesign@yahoo.com

conc. floor slab on black


Design & Draughting Services in :
WEST(side) ELEVATION Architecture

690X230mm 690X230mm 690X230mm


Scale 1:100
345X230mm 345X230mm
Mechanical
Electrical
Survey / Geological
Civil Work Drawings

polythene dpm on sand blinding


Steel Structurers Detailing
3D Modeling

concrete footing concrete footing concrete footing concrete footing concrete footing
on well compacted hardcore
NAME: ...................................................................

DATE: ........................................................................

SIG: ..................................................................................

IDG
C
dds
Copyright reserved
SECTION X-X IAZ Reg. No. : A12/004
PS
A2
Scale 1:50
December 2018

Contractor : On this sheet : Rev Date By Description Designed W.S FEB 2021 Drawing No. Sheet 01 Of 01
PROJECT
Proposed residential house Floorplan
Drawn T.M. FEB 2021
Section IDG-02 SM 2021/2-2
LOCATION
Stand No 9871 WAREN PARK Elevations
Checked
Cells:
Copies Window and Door Scale(s)
CLIENT
Chosen. Chamburuka issued
Schedule as shown IDG Revision number

You might also like