You are on page 1of 11

PIPIT GROUP

PT.PIPIT MUTIARA JAYA (PMJ) : Bebatu Project

BEBATU Coal model’s Updating Handbook


Step of importing and processing data

25 January 2012
Step of updating
1. Save drill-hole data from excel format to text file format.

Save as/Projects/Project’s name/ Data

Survey page
Text Format

Save as/Projects/Project’s name/ Data

Litho page
Text Format
2. Import Drill-hole data to Mincom’s project

Project’s Name

Stratmodel

Drill Holes/Import/Import Drill Hole


Full fill Current Model if program ask for

Select ( One model have one Schema )

Select survey as we save text format in Data file

Select Litho as we save Key


textin the Column
format in Data file
number as sample

1 2 3 4 5
Right click and Create
Just Key in
Just Key in
Right click and Create
Key in the Column
number as sample

Right click and Create

1 2 3 4 5
Click OK

Design file Drill Hole

Result
3. Process Data from Drill-Hole (Updating Coal Model)

Schema/Process/Click Build Table

Full Fill as sample and click OK


Schema/Process/Click Build Grid

Full Fill as sample and click OK


4. Result of updating model ( Create coal floor from updated model)

Graphics/Contour/model
(Use for generate Roof or Floor
contour from Model)

Click

Select Seam

It’s mean the contour interval is


1 m and will show the elevation
Select Roof or
number every 2 m
Floor

Select Design file for output and key


in layer names for output
If need to fix the boundary of
generating contour do Right
click/and Pick (then double click
at polygon which we need to be
boundary)

Select Sheet Spec


Select Color for major and minor
contour

Select Design file

Result
Select Layer