You are on page 1of 353

GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH

ROADS AND HIGHWAYS DEPARTMENT


ROAD TRANSPORT AND HIGHWAYS DIVISION
MINISTRY OF ROAD TRANSPORT AND BRIDGES

Maintenance and Rehabilitation Needs Report


of 2021- 2022 for RHD Paved Roads

HDM Circle
June, 2021
PREFACE

This is the 2021-2022 edition of Maintenance and Rehabilitation Needs Report prepared from
the output of HDM-4 Analysis. The RMMS database and the HDM-4 model have been utilized
to derive yearly maintenance demand for RHD. During 2020-21 HDM Circle conducted
Roughness Survey to acquire IRI data in 18473.67km of paved roads in RHD Road Network.
This year Roughometer-3 (ARRB) was mostly used to obtain Roughness Data. Apart from this
equipment Laser Crack Measuring System (LCMS) was used to determine IRI and various road
distresses in few National and Regional Highways. The RMMS Database was updated
accordingly and was used as an input for this year’s HDM Analysis.

By the HDM Analysis, the time and location of maintenance requirement for the RHD Road
network has been identified and prioritized in accordance with NPV/Cost ratio. Socio-economic
and political factors, not considered in this analysis, are extremely important in prioritizing
maintenance treatments. It is expected that this approach will be adopted in future years. The list
of on-going projects and Periodic Maintenance Program (Road-Major) have been prepared after
collecting data from Division Offices and Project Offices. Projects and Periodic Maintenance
Program (Road-Major), which are in progress and not completed before the start of Roughness
Survey have been kept out of the HDM analysis to avoid duplication in the maintenance program
and to find out actual immediate demands. The Roads which handed over recently to RHD from
different organization are also excluded from the analysis. However, few segments already
completed or ongoing may appear in the HDM output because those were not reported by the
field offices before the HDM run and hence were not excluded. Finally, the Officers and the
Individual Consultants of HDM Circle must be appreciated for their relentless effort specifically
during data collection, input into the RMMS Database, Analysis and finally publishing this
report. I would also like to extend heartfelt appreciation to the Officers of RHD Field Divisions
for their cooperation during the data collection phase.

Superintending Engineer
HDM Circle
Roads & Highways Department
Sarak Bhaban, Tejgaon, Dhaka-1208
Executive Summary

The Highway Development and Management (HDM-4) Model (HDM-4 software), mainly an
economic tool, has been used to project the total maintenance need of RHD Road network and
also to select and prioritize maintenance work on the basis of NPV/Cost ratio. For this purpose,
the analysis has been carried out in the two sequences. Firstly, all roads have been analyzed to
assess the overall long-term maintenance needs of the RHD road network. The overall
maintenance needs has been found to be 156066.13 million taka for the year 2021-22, 34586.51
million taka for 2022-23, 26128.67 million taka for 2023-24, 23797.59 million taka for 2024-25
and 18705.67 million taka for the year 2025-26. It is evident from the analysis that, investment
needs tend to decrease considerably provided that the 1st year’s requirements are met
completely. So, efforts should be given to maximize the 1st year’s maintenance works in order to
minimize backlogs.

Secondly ongoing projects and Periodic Maintenance Program (Road-Major), which are in
progress and were not completed before the start of Roughness survey, have been excluded from
the HDM run to project the immediate maintenance requirement and it has been projected to be
77124.28 million taka. Since the prioritization of projects and Periodic Maintenance Program
(Road-Major) using NPV/Cost favors the more highly trafficked roads, they will not have
priority for Zilla Road for maintenance and rehabilitation works due to their low traffic volume.
So, a separate prioritization process is adopted for the recovery of Zilla roads as suggested by the
Road Master Plan.
Table of Content
Sl. No. Content Page no.

CHAPTER 1: INTRODUCTION 1
1.1 Overview 1
1.2 Objectives of the analysis: 1
1.3 Methodology: 1
1.3.1 The Data of RMMS Database: 2
1.3.2 Road User Cost Data: 2
1.3.3 Unit Cost of Work and Maintenance Standard: 2
1.3.4 HDM 4 Export Tool: 3
1.3.5 Analysis and Presentation: 3
1.4 Scope and Limitation: 3
1.5 Road and Bridge Asset Management System: 3
1.6 Needs Report Output: 3

CHAPTER 2: CURRENT NETWORK CONDITION 5


2.1 The RHD Road Network: 5

CHAPTER 3: HDM-4 PROGRAMME ANALYSIS 17


3.1 Principles of Life Cycle Analysis. 17
3.2 Description of Treatments: 17
3.3 Maintenance Strategies: 19
3.4 Unit Costs. 24

CHAPTER 4: RESULTS OF HDM-4 ANALYSIS. 26


4.1 Analysis Procedure: 26
4.2 Network Results (Unconstrained) 26
4.3 Demand Excluding Ongoing Projects and Periodic Maintenance Programme (Road-Major) 29
4.4 Overall Needs 32
4.5 Field Validation of Results 33

CHAPTER 5: FINDING AND RECOMMENDATIONS 34


5.1 Major Findings: 34
5.2 Recommendations: 34
Appendix A 1-233
Appendix B 1-3
Appendix C 1-65
Appendix D 1-2
Appendix E 1-2

i
List of Table
Table 2.1 : Zonewise TotalRoad Network Lengths
Table 2.2 : Road Network Lengths Surveyed for Roughness (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)
Table 2.3 : Qualitative descriptors of IRI values
Table 2.4 : Overall RHD Road Network Condition based on Roughness (Survey Year
2020 Conducted from November, 2020 – March, 2021)
Table 2.5 : Overall RHD Road Network Condition in percentage comparison between
Survey Year 2019 and Survey Year 2020 based on Roughness
Table 2.6 : Road Condition of National Highways based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021) (data in km)
Table 2.7 : Road Condition of Regional Highways based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021) (data in km)
Table 2.8 : Road Condition of Zilla Roads based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021) (data in km)
Table 3.1 : Maintenance and Rehabilitation Treatments and Assumptions used in HDM
Table 3.2 : Compound Maintenance Standards for HDM-4 Programme Analysis in
2021-22
Table 3.3 : Unit costs of Treatment.
Table 4.1 : Total Capital Woks Demand for the Next Five Years (in Million Taka)
Table 4.2 : Periodic Maintenance Demand (in Million Taka) for the Next Five Years
Table 4.3 : Partial Reconstruction Demand (in Million Taka) for the Next Five Years
Table 4.4 : Full Reconstruction Demand (in Million Taka) for the Next Five Years
Table 4.5 : Routine Maintenance Demand for the Next Five Years (in Million Taka)
Table 4.6 : Length of Different Work Category in All Classes of Roads (Km)
Table 4.7 : Capital Demand of National and Regional Roads 2021 (Excluding On-going
Projects) (Million taka)
Table 4.8 : Funding Needs of Zilla Roads 2021 (Excluding Ongoing Projects) (Million
Taka)
Table 4.9 : Required Length of Different Road Classes for Capital Works in Next Five
Years (Excluding Ongoing Projects) (In Km)
Table 4.10 : Overall Maintenance Needs by Work Category (Million Taka)
Table 4.11 : Overall Maintenance Needs by Work Category for National and Regional
Roads (Million Taka)
Table 4.12 : Overall Maintenance Needs by Work Category for Zilla Roads (Million Taka)
Table 5.1 : Overall Maintenance Needs 2021-26 (Million Taka)
Table 5.2 : Immediate Maintenance Needs 2021-22(Million Taka)

ii
List of Figure
Figure 2.1 : Network Condition of All Roads
Figure 2.2 : Zone wise Network Condition of All Roads.
Figure 2.3 : Road Condition of National Highways based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021)
Figure 2.4 : Road Condition of Regional Highways based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021).
Figure 2.5 : Road Condition of Zilla Road based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)
Figure 2.6 : Road Condition of Barishal Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 2.7 : Road Condition of Chattrogram Zone based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021
Figure 2.8 : Road Condition of CumillaZone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 2.9 : Road Condition of Dhaka based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021
Figure 2.10 : Road Condition of Gopalgonj Zone based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021
Figure 2.11 : Road Condition of Khulna Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 2.12 : Road Condition of Mymensingh Zone based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021
Figure 2.13 : Road Condition of Rajshahi Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 2.14 : Road Condition of Rangpur Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 2.15 : Road Condition of Sylhet Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021
Figure 4.1 : Total Unconstrained and Average Demand of Capital Works (2021-2026)
Figure 4.2 : Zone wise Capital Needs (Million Taka) of National and Regional Highways in
the Year 2020.
Figure 4.3 : Trend of Lengths of Roads Requiring Treatments (in Km)

iii
CHAPTER 1: INTRODUCTION

1.1 Overview
Roads and Highways Department (RHD) under the Ministry of Road Transport and Bridges is
responsible for the management of major road network in Bangladesh that includes National
Highways, Regional Highways and Zilla Roads. Proper maintenance and management of these assets
is a fundamental requirement which is vital to the national economy. For optimization of the fund
disbursement RHD has been using the Highway Development and Management Model
(HDM-4 Software) an economic tool since 1999-2000. Since then, a Road Maintenance and
Rehabilitation Needs Report (RMRNR) is published every year to asses 5-year investment plan to
meet acceptable levels of service provision for the RHD road network. The current Maintenance and
Rehabilitation Needs Report of 2021-22 is a continuation of the process.

RHD 2021-2022 paved roads have been analysed to assess the overall long-term maintenance needs
of the RHD road network. Ongoing projects and Periodic Maintenance Programs (Road-Major) have
been excluded from the HDM analysis to project the immediate maintenance requirement. However
few segments either completed or ongoing may appear in the HDM outputs. The outputs from
HDM-4 are based on the Road Maintenance and Management System (RMMS) database of RHD.
This report provides recommendations for Engineers in RHD to improve the road network in a cost
effective manner.

1.2 Objectives of the analysis:


The main objectives of this analysis are:

 To project the total maintenance need of RHD Road network.

 To select and prioritize the maintenance works based on NPV over financial cost ratio.

 To develop a 5-year investment plan to meet acceptable levels of service provision for the
RHD network.

 To provide recommendations for Engineers in RHD to improve the road network in a cost ef-
fective manner.

1.3 Methodology:
Data required for the analysis are mainly primary in nature and obtained from field survey method.

1
1.3.1 The Data of RMMS Database:
The data of RMMS database is the fundamental input to HDM 4 analysis.

In 2004 RHD undertook a major survey of its network covering around 15,000 km of roads. The sur-
vey was comprehensive and included a full inventory, current condition (including deflection meas-
urements), pavement structure and traffic flows. In 2006 further surveys were undertaken, originally
intended to complete the remaining 5,000 kilometres that were not surveyed in 2004. Only around
2,000 km of Zilla Roads omitted in 2004 were surveyed and around 1,500 km of National Roads were
re-surveyed.In late 2007 further road condition surveys commenced and were completed in May
2008.In 2013 a comprehensive Road Condition Assessment Survey were conducted by the HDM Cir-
cle. These surveys covered Pavement Inventory Survey in full RHD Road Network, Road Condition
Survey, Traffic Survey and Test Pit Survey. In 2016 HDM Circle again conducted comprehensive
survey by the appointment of Consultantswhich included Pavement Inventory in two major highways
which were upgraded to 4-Lane (N1 and N3), Road Condition Survey in full road network. In 2019
video Traffic Count Survey has been conducted in 1167 stations. This year’s HDM run was conducted
with this updated database.

As like previous year the Roughness Survey was conducted by HDM Circle with its own manpower
during November 2020- March 2021. This roughness data is one of the major inputs of HDM-4 analy-
sis. This year HDM Circle used newly procured Laser Profilometer and Laser Crack Measuring Sys-
tem (LCMS) for measuring Roughness. However, it is worth mentioning that the stated equipment is
not recommended to operate on roads where IRI value is typically more than 8. Considering the fact
ARRB manufactured Roughometer-III was also used apart from these survey vehicles to obtain data
on roads of relatively deteriorated condition (typically IRI>8).

1.3.2 Road User Cost Data:


The Road User Cost (RUC) data were provided by the Economic Circle of RHD. The data has been
updated in 2017.

1.3.3 Unit Cost of Work and Maintenance Standard:


The same maintenance standard set previously was used in the analysis. The unit cost of work was
obtained from RHD Schedule of Rates, 2019.

2
1.3.4 HDM 4 Export Tool:

The HDM 4 export tool is mainly software used to make the data of RMMS database useable by the
Highway Development and Management Software (HDM 4).

1.3.5 Analysis and Presentation:


After analysis of data by HDM 4 software, the result obtained is presented in tabular and graphical
form.

1.4 Scope and Limitation:


All the unpaved roads were excluded from the analysis. Besides, the present version of the HDM-4
software that RHD has been using for a long time (Version- 1.3) is not capable of doing the socio-
economic analysis and hence the socio-economic variables are excluded from the analysis.

1.5 Road and Bridge Asset Management System:


In order tosupport RHD’s responsibility to actively manage the nation’s network of roads and bridges
and subsequently streamlining the planning of its maintenance and rehabilitation works a system was
introduced in 2005-06. Each year this system is being further developed to improve the selection and
prioritisation of maintenance works. The system is known as “RAMS”, short for Road and Bridge
Asset Management System; it brings together all RHD’s current databases and analytical procedures.
The final output of RAMS is the RAMS Map: a single GIS-based map for each Division which com-
bines all relevant information and shows decision makers where they can most effectively allocate
funds for maintenance and rehabilitation within the stipulated budgetary framework. The division
wise RAMS Maps are presented in Appendix-C.

The strength of the RAMS Map is its simplicity. It presents information in a highly visual, graphical
format and uses a minimal set of symbols and colours. It should be noted that this Maintenance Needs
Report deals only with the needs of pavements and does not address needs for bridges and structures.

1.6 Needs Report Output:


This report presents the results of HDM-4 analysis for National, Regional and Zilla road networks.
None of this work refers improvement or development work – it is simply the work required to restore
the existing road network to its original condition. It should therefore be classified as maintenance
work and funded 100% through the Revenue Budget.

3
Rehabilitation is referred to as “backlog maintenance” as it is the result of under-investment in main-
tenance in the past. The road network maintenance and rehabilitation needs of the year 2021-2022 for
National, Regional and Zilla Road Networks are presented in Appendix-A. Recurrent costs of the
whole road network have been shown in Appendix-B.

It must be stressed, however, that HDM-4 is not a design tool. The Road Asset Management System
(RAMS) approach emphasizes that the nominal treatment recommended in the output must be con-
firmed and detailed through a more comprehensive survey, investigation and design process.

4
CHAPTER 2: CURRENT NETWORK CONDITION
2.1 The RHD Road Network:
As of June, 2021, the Total Road Length of Roads and Highways Departmentis 22,499.605 km. A
comprehensive Road validation was done during this survey Year. There are 108 numbers of National
highway and total length of National Highway is 3,979.80 Kilometre. The total number of Regional
highway is 148 and Total length of Regional Highway is 4,897.70 Kilometre. Total number of Zilla
Highway is 731 and their total length is 13541.50 Kilometres. A Zonewise Road Length is presented
in in Table 2.1 and Division wise detailed road name, number and corresponding lengths are stated in
Appendix-D.

Table 2.2 shows the extent of the roads covered by the roughness surveys carried during 2020-2021.
It is worth mentioning that Roughness Survey is conducted only on paved roads. This year a signifi-
cant length of roads Rehabilitation/Reconstruction works are going on under the Annual Development
Programme. Due to such ongoing development activities, it was not feasible to operate the survey ve-
hicles on those roads. The roads handed over recently to RHD from different Organization do not
have inventory in RMMS Database and they are excluded from the analysis. There are some roads in
RHD Road Network which is not accessible with the vehicle-mount survey equipment i.e.
Haor Region, disconnected parts in Hill Tracts, Islands (Hatiya, Sandwip, Kutubdia etc).

Table 2.1: Zonewise TotalRoad Network Lengths

Road Zone National (km) Regional (km) Zilla (km) Total (km)

Barishal 127.942 290.088 1185.914 1603.944


Chattogram 459.461 457.386 1749.507 2666.354
Cumilla 388.148 368.015 1839.099 2595.262
Dhaka 467.128 689.562 711.475 1868.165
Gopalganj 263.794 256.016 626.759 1146.569
Khulna 478.771 643.479 1712.835 2835.085
Mymensingh 285.826 579.115 1745.176 2610.117
Rajshahi 493.929 593.547 1375.909 2463.385
Rangpur 667.352 542.487 1810.696 3020.535
Sylhet 356.897 478.013 784.128 1619.038
Total 3989.248 4897.708 13541.498 22428.45

5
Table 2.2: Road Network Lengths Surveyed for Roughness (Survey Year 2020: Conducted from
November, 2020 – March, 2021)
Road Zone National Regional Zilla Roads (km) Total (km)
Highways (km) Highways(km)
Barisal 116.91 261.87 983.91 1362.69
Chattogram 375.82 405.02 1019.01 1799.85
Cumilla 361.28 276.56 1521.96 2159.8
Dhaka 373.6 538.72 521.93 1434.25
Gopalganj 256.12 242.51 568.98 1067.61
Khulna 450.35 575.2 1453.37 2478.92
Mymensingh 277.02 506.93 1330.61 2114.56
Rajshahi 463.34 539.57 1093.53 2096.44
Rangpur 613.72 449.23 1616.97 2679.92
Sylhet 348.68 408.41 522.54 1279.63
Total 3636.84 4204.02 10632.81 18473.67

The road condition can be grossly categorized into descriptive bands based on roughness. These
categories are shown in table 2.2. Different ranges are adopted for each road class to reflect their rela-
tive importance and the level of service that should be expected from each road class.

Table 2.3: Qualitative descriptors of IRI values

Ca Category National Highway Regional Highway Zilla Road

IRI Values

Good 0 – 3.9 0 – 4.9 0 – 5.9

Fair 4.0 – 5.9 5.0 – 6.9 6.0 – 7.9

Poor 6.0 – 7.9 7.0 – 8.9 8.0 – 9.9

Bad 8.0 – 9.9 9.0 – 10.9 10.0 – 11.9

Very Bad ≥10.0 ≥11.0 ≥12.0

6
Based on the above categories, following tables and figures show the network condition by Zone and
road classes.

Table 2.4: Overall RHD Road Network Condition based on Roughness (Survey Year 2020:
Conducted from November, 2020 – March, 2021)

Good Fair Poor Bad Very Bad

Road Length Length Length Length Length


(km) % (km) % (km) % (km) % (km) %

National 2512.85 69.09 636.73 17.51 219.89 6.05 135.25 3.72 132.12 3.63

Regional 2948.06 70.12 765.18 18.20 238.88 5.68 141.15 3.36 110.75 2.63

Zilla 6541.84 61.53 2063.29 19.40 1065.52 10.02 513.2 4.83 448.96 4.22

Total 12002.75 64.97 3465.2 18.76 1524.29 8.25 789.6 4.27 691.83 3.74

Figure 2.1: Network Condition of All Roads.

Overall Roads Condition

Bad Very Bad


Poor 4.27% 3.74%
8.25%

Fair
18.76%

Good
64.97%

7
Figure 2.2: Zonewise Network Condition of All Roads.

80.00
70.00
60.00
50.00 Good
40.00
30.00 Fair
20.00 Poor
10.00
Bad
0.00
Very Bad

Table 2.5: Overall RHD Road Network Condition in percentage comparison between Survey
Year 2019 and Survey Year 2020 based on Roughness

Good Fair Poor Bad Very Bad


Road
2019- 2020- 2020-
Year 2019-20 2020-21 2019-20 2020-21 2019-20 2020-21 2019-20
20 21 21

National 64.98 69.09 16.86 17.51 9.07 6.05 4.51 3.72 4.58 3.63

Regional 69.96 70.12 14.10 18.20 7.51 5.68 3.97 3.36 4.46 2.63

Zilla 65.03 61.53 15.12 19.40 9.40 10.02 5.27 4.83 5.17 4.22

Total 66.16 64.97 15.22 18.76 8.90 8.25 4.82 4.27 4.89 3.74

8
Table 2.6: Road Condition of National Highways based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021) (data in km)

Zone Good Fair Poor Bad Very Bad


Barisal 78.00 29.83 6.30 1.50 1.28
Chattogram 214.41 132.53 19.18 6.40 3.3
Cumilla 229.48 53.51 22.23 17.89 38.17
Dhaka 245.17 46.79 25.76 18.54 37.34
Gopalganj 212.87 31.72 7.63 2.50 1.4
Khulna 320.91 93.68 23.37 7.30 5.09
Mymensingh 198.58 47.99 18.81 7.00 4.64
Rajshahi 324.28 73.01 35.31 26.04 4.7
Rangpur 429.24 87.80 43.95 35.28 17.45
Sylhet 259.91 39.87 17.35 12.80 18.75

Figure 2.3: Road Condition of National Highways based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

90

80

70

60

50 Good
40 Fair
Poor
30
Bad
20
V.Bad
10

9
Table 2.7: Road Condition of Regional Highways based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021) (data in km)

Zone Good Fair Poor Bad Very Bad


Barisal 200.87 45.6 9.6 4.1 1.7

Chattogram 242.25 125.53 21.5 10.21 5.53

Cumilla 164.71 55.46 21.09 13.54 21.76

Dhaka 352.48 82.82 34.94 23.19 45.29

Gopalganj 164.3 50.52 18.26 6.63 2.8

Khulna 424.22 109.65 28.43 8.87 4.03

Mymensingh 398.65 82.12 15.62 7.4 3.14

Rajshahi 386.96 75.37 40.55 35.69 1

Rangpur 348.81 69.63 18.69 12.1 0

Sylhet 264.81 68.48 30.2 19.42 25.5

Figure 2.4: Road Condition of Regional Highways based on IRI Data (Survey Year 2020:
Conducted from November, 2020 – March, 2021)

90.00
80.00
70.00
60.00
50.00 Good
40.00 Fair
30.00 Poor
20.00 Bad
10.00 V.Bad
0.00

10
Table 2.8: Road Condition of Zilla Roads based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021) (data in km)

Zone Good Fair Poor Bad Very Bad


Barisal 637.82 192.38 91.89 39.21 22.61

Chattogram 451.26 269.91 167.39 79 51.45

Cumilla 847.88 270.01 147.85 96.03 160.19

Dhaka 303.08 80.46 44.19 31.19 63.01

Gopalganj 417.47 102.67 30.6 12.8 5.44

Khulna 842.36 340.61 157.6 67.7 45.1

Mymensingh 872.67 277.77 108.14 47.76 24.27

Rajshahi 702.43 200.54 131.69 57.67 1.2

Rangpur 1204.43 244.48 121.53 46.33 0.2

Sylhet 262.44 84.46 64.64 35.51 75.49

Figure 2.5: Road Condition of Zilla Roads based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

80.00

70.00

60.00

50.00
Good
40.00
Fair
30.00
Poor
20.00 Bad
10.00 V.Bad
0.00

11
Figure 2.6: Road Condition of Barishal Zone based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

Figure 2.7: Road Condition of Chattrogram Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

12
Figure 2.8: Road Condition of Cumilla Zone based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

Figure 2.9: Road Condition of Dhaka Zone based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

13
Figure 2.10: Road Condition of Gopalganj Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

Figure 2.11: Road Condition of Khulna Zone based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

14
Figure 2.12: Road Condition of Mymensingh Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

Figure 2.13: Road Condition of Rajshahi Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

Figure 2.14: Road Condition of Rangpur Zone based on IRI Data (Survey Year 2020: Con-
ducted from November, 2020 – March, 2021)

15
Figure 2.15: Road Condition of Sylhet Zone based on IRI Data (Survey Year 2020: Conducted
from November, 2020 – March, 2021)

16
CHAPTER 3: HDM-4 PROGRAMME ANALYSIS

3.1 Principles of Life Cycle Analysis


The life cycle analysis in HDM-4 predicts the pavement conditions (performance), the required treat-
ments and costs and benefits over a specified period (in this case 20 years) under a user-defined main-
tenance strategy. The costs used in this analysis include cost of capital investment, maintenance costs
and vehicle operating costs.

The costs of two scenarios are compared:

- The “do minimum maintenance” scenario (either routine maintenance or a “holding strategy”).

- The “with maintenance” scenario.

Details of treatments considered in Bangladesh can be seen in Table 3.1. Maintenance strategies were
set for these treatments based on road condition, traffic and roughness data for different classes of
roads (see Table 3.2). Holding strategy has been included (see Table 3.2), which means that DBST /
carpeting has to be provided instead of going for higher treatment if there is shortage of funds to keep
the roads at maintainable condition.

The benefits and costs of the above scenarios are compared for a HDM-4 life cycle analysis of 20
years. The Net Present Value (NPV)/costs were utilized to prioritize treatment options at a 12% dis-
count rate. NPV/cost was chosen to obtain maximum benefits as it produces highest benefits when
there is crisis in funding.

3.2 Description of Treatments:


The HDM analysis considers a number of treatments representing the most commonly used types of
maintenance work items in Bangladesh. Table 3.1 provides details of these treatments and the as-
sumptions made for HDM.

Table 3.1: Maintenance and Rehabilitation Treatments and Assumptions used in HDM

Routine Main- Off-pavement works: Includes all regular works along a road such as main-
tenance: taining shoulders, roadside vegetation control, cleaning
side drains and pipe culverts, maintenance of signs and
signals.
Patching Repair of potholes based on a standard pothole unit of
0.01m3 per pothole. The quantity of pothole repairing
shall not be more than 1% of the total surface.

17
Crack Sealing Sealing to cracks using Seal Coat/Fog Seal. It assumes
a maximum in any one kilometre of 5% area affected.

Periodic Main- Preparatory Patching Patching potholes and regulating surface irregularities
tenance: prior undertaking the treatments like DBST or DBS
Overlay. Should not be more than 2% of the total quan-
tity of overlay for National roads and maximum of 5%
for Regional roads.

Preparatory Edge Re- Allows for restoring pavement edges that have been
pair damaged by vehicles leaving the road to drive onto the
shoulder prior undertaking the treatments like DBST or
DBS Overlay.
DBST Applying two layers of surface treatments on the pre-
pared road surface. This is applied in medium to highly
trafficked road. Life expectancy assumed to be 3 years.
Overlay Machine laid premixed dense bituminous surfacing
overlay 40 – 80 mm thick used in medium to highly
trafficked roads. Carefully controlled overlay may be
applied in response to badly damaged road surface or
high roughness so as to obtain a predefined roughness
level (2.5 to 3 IRI). Life expectancy assumed to be 5
years.
Rehabilitation Partial Reconstruction Reconstruction of the upper pavement layers following
scarification of the existing damaged surface and re-
compaction. Normally a 150-200 mm crushed aggre-
gate base with a dense bituminous surfacing between
75 and 195mm, depending on traffic level. This is a
treatment to overcome higher roughness or higher lev-
els of surface cracking resulting from delayed mainte-
nance. Life expectancy should be 10 years prior to ma-
jor periodic maintenance. Full design of the pavement
must be undertaken prior to treatment. Shoulder reha-
bilitation would also be provided where necessary.

18
Complete Reconstruc- A major reconstruction on the existing alignment and
tion within the same overall dimension limits. The road is
not widened. The pavement must be fully designed
prior to construction and shoulder rehabilitation pro-
vided where necessary. Life expectancy should be 10
years before major periodic maintenance. Applied
where there are extremely high levels of roughness and
extensive cracking.
Holding As Budget constraints do not permit the preferred
Treatment treatment, DBST is triggered when rehabilitation is
required. Life expectancy assumed to be 3 years.

3.3 Maintenance Strategies:


Table 3.2 shows the compound maintenance standards adopted for HDM analysis for the different
classes of roads. These standards are based on experience and analysis of road conditions in Bangla-
desh, and considered to be a reliable basis for HDM-4 to estimate economic performance of the net-
work. Final treatment designs must be separately established.

Compound maintenance standards have been modified slightly, but are similar to the previous years’
standards. The slight modification relates to the introduction of a DBST in the holding strategy of Na-
tional and Regional roads when the roughness will exceed 12 IRI. Similarly Overlay was introduced
in the holding strategy of Zilla roads for roughness greater than 12 IRI.

Corridor roads (N1, N2, N3, N4, N5, N6, N7 and N8) were given high priority and hence they were
analyzed separately as they cover the major traffic and will be the part of the Asian Highway Network
in the near future. Hence, periodic maintenance was considered at 4 IRI. The other National high-
ways, Regional highways and Zilla roads were considered for periodic maintenance at 5, 5.5 and 6 IRI
respectively. “Holding maintenance strategy” was considered to maintain roads using DBST when
funding is limited and higher treatments cannot be provided. Application of DBST can then delay fur-
ther road deterioration.

19
Table 3.2: Compound Maintenance Standards for HDM-4 Programme Analysis in 2021-22
Holding Standard without Reconstruction for National and Regional Roads

Traffic Range (MT-AADT)


Roughness All Dam-
6000 -
Range (IRI) age (%) 100 - 1999 2000 - 3999 4000 - 5999 > 10000
9999

<5% Routine

5 - 10% Routine

<12 10 - 20% Routine


DBST
20 - 30% Routine DBST
DBST
> 30% DBST

> 12.00 All DBST

Holding Standard with Reconstruction for National and Regional Roads

Traffic Range (MT-AADT)


Roughness All Dam-
6000 -
Range (IRI) age (%) 100 - 1999 2000 - 3999 4000 - 5999 > 10000
9999

<5% Routine

5 - 10% Routine

<12 10 - 20% Routine


DBST
20 - 30% Routine DBST
DBST
> 30% DBST

Full Re- Full Re-


Full Recon Full Recon Full Recon
> 12.00 All con con
110mm 135mm 150mm
180mm 195mm

20
Holding Standard without Reconstruction for Zilla Roads

Traffic Range (MT-AADT)


Roughness All Dam-
3000-
Range (IRI) age (%) 100 - 999 1000-1999 2000-2999 >4000
3999

0 -10% Routine

10-20% Routine

<12 20-30% Routine


Overlay Overlay 40mm
Overlay
>30% 40mm
40mm

> 12.00 All Overlay 40mm

Holding Standard with Reconstruction for Zilla Roads

Traffic Range (MT-AADT)


Roughness All Dam-
3000-
Range (IRI) age (%) 100 - 999 1000-1999 2000-2999 >4000
3999

0 -10% Routine

10-20% Routine

<12 20-30% Routine


Overlay Overlay 40mm
Overlay
>30% 40mm
40mm

> 12.00 All Full Recon 75mm

21
Compound Maintenance Standards for National Corridor Roads

Roughness Cracking Traffic Range (MT-AADT)


Range Range 4000 -
100 - 1999 2000 - 3999 6000 - 9999 > 10000
(IRI) (%) 5999
< 25% Routine
< 4.0 Overlay
>= 25% DBST
50mm
4.00 - < Overlay
All
7.00 50mm Overlay
Overlay 50mm
7.00 - < Overlay 80mm
All
9.00 60mm
9.00 - < Rehab Rehab Rehab
All Rehab 180 Rehab 195mm
12.00 120mm 140mm 150mm
Full Recon Full Recon Full Recon Full Recon Full Recon
> 12.00 All
120mm 140mm 150mm 180mm 195mm

Compound Maintenance Standards for Other National Roads

Cracking Traffic Range (MT-AADT)


Roughness
Range 4000 - 6000 -
Range (IRI) 100 - 1999 2000 - 3999 > 10000
(%) 5999 9999
< 25% Routine
< 5.0 Overlay
>= 25% DBST
50mm
Overlay
5.00 - < 7.00 All
50mm Overlay
Overlay 50mm
Overlay 80mm
7.00 - < 9.00 All
60mm
Rehab Rehab Rehab Rehab 180 Rehab
All
9.00 - < 12.00 110mm 135mm 150mm mm 195mm
Full Re-
Full Recon Full Recon Full Recon Full Recon
> 12.00 All con
110mm 135mm 180mm 195mm
150mm

22
Compound Maintenance Standards for Regional Roads

Cracking Traffic Range (MT-AADT)


Roughness
Range 3000-
Range (IRI) 100 - 1999 2000 - 2999 4000-4999 >5000
(%) 3999

< 25% Routine


< 5.50
>= 25% DBST

5.50 - < 7.00 All Overlay 50mm


Overlay
Overlay
7.00 - < 9.00 All Overlay 50mm 60mm
60mm

9.00 - < Rehab


All Rehab 135mm Rehab 150 mm
12.00 110mm

Full Recon
> 12.00 All Full Recon 135mm Full Recon 150mm
110mm

Compound Maintenance Standards for Zilla Roads

Cracking Traffic Range (MT-AADT)


Roughness
Range 2000-
Range (IRI) 100 - 1999 1000-1999 3000-3999 > 4000
(%) 2999

< 25% Routine

< 6.0 Overlay Overlay


>= 25% Seal 15mm
40mm 50mm

6.00 - < 7.00 All Overlay


Overlay 40mm
7.00 - < 9.00 All 50mm

9.00 - <
All Rehab 75 mm
12.00

> 12.00 All Full Recon 75mm

23
3.4 Unit Costs
Table 3.3 shows the unit cost of different work prepared in accordance with the RHD Schedule of
Rates 2019.

Table 3.3 Unit costs of Treatment.

Financial
Work Type Work Class Work Description Unit
Costs (Tk.)

Routine 80,000 Per Km

Patching 1,573 Per m2


Routine Routine Maintenance
Edge Repair 1,573 Per m2

Crack Sealing 252 Per m2

Seal Coat 252 Per m2


Resurfacing
Periodic DBST 494 Per m2

Overlay 40mm 849 Per m2

Overlay 50mm 1,050 Per m2

Asphalt Mix Resurfac- Overlay 60mm 1,251 Per m2


ing Overlay 80mm 1,653 Per m2

Overlay 100mm 2,056 Per m2

Overlay 120mm 2,458 Per m2

Partial Recon 75mm 2,993 Per m2

Partial Recon 100mm 3,496 Per m2

Partial Recon 110mm 3,697 Per m2

Partial Recon 120mm 3,898 Per m2


Rehabilitation Partial Reconstruction Partial Recon 135mm 4,528 Per m2

Partial Recon 140mm 4,629 Per m2

Partial Recon 150mm 4,830 Per m2

Partial Recon 180mm 5,762 Per m2

Partial Recon 195mm 6,064 Per m2

24
Financial
Work Type Work Class Work Description Unit
Costs (Tk.)
Full Recon 75mm 4,347 Per m2

Full Recon 100mm 4,733 Per m2

Full Recon 110mm 4,934 Per m2

Full Recon 120mm 5,136 Per m2


Reconstruction Full Reconstruction Full Recon 135mm 5,464 Per m2

Full Recon 140mm 5,866 Per m2

Full Recon 150mm 6,068 Per m2

Full Recon 180mm 6,999 Per m2

Full Recon 195mm 7,301 Per m2

25
CHAPTER 4: RESULTS OF HDM-4 ANALYSIS

4.1 Analysis Procedure:


The analysis was carried out in the following sequences.

 Run all roads to obtain the overall funding needs. This will also allow a comparison between
last year’s results to get a picture of overall changes in network condition.
 Remove all segments currently ongoing and run HDM-4 to get the immediate funding needs
for the year 2021.

4.2 Network Results (Unconstrained):


Like the previous years, HDM-4 analysis was carried out for all road networks to get the overall pic-
ture of needs. This has produced a detailed work programme for the full 20-years analysis period.
However, only the first five years should be considered when estimating the future funding needs due
to the uncertainty about future conditions and availability of funds.

The unconstrained capital cost of initial 5 years for all analyzed road lengths are given in Table 4.1
and Figure 4.1 below. Here, the total five years cost for capital works; i.e. periodic maintenance, par-
tial and full reconstruction, is 2,01,494.20 million taka wherein the average demand per year is around
40,298.84 million taka. The figure depicts that if major portion (1,49,023.32 out of 2,01,494.20 mil-
lion taka) of the Total Capital Works demand is fulfilled in the 1st year then this demand will be sub-
stantially below the average demand per year in the subsequent years.

Table 4.1: Total Capital Woks Demand for the Next Five Years (in Million Taka)

2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total


Road Class
72372.69 6958.45 1400.22 665.97 410.69 81808.02
National
30924.86 7605.89 4892.28 6315.53 3029.93 52768.50
Regional
45725.77 8281.94 7553.98 3866.54 1489.44 66917.68
Zilla
Grand Total 149023.32 22846.28 13846.49 10848.04 4930.06 201494.20

26
Figure 4:1-Total Unconstrained and Average Demand of Capital Works (2021-2026)

160000.00
140000.00
120000.00
100000.00
80000.00 Average Capital Cost= 40298.84 Million Tk.
60000.00
40000.00
20000.00
0.00
2021-22 2022-23 2023-24 2024-25 2025-26

Table 4.2: Periodic Maintenance Demand (in Million Taka) for the Next Five Years

2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total


Road Class
National 26023.83 6657.15 1393.99 661.56 373.36 35109.89

Regional 14415.65 7187.45 4476.84 5495.47 2728.18 34303.60

Zilla 24264.61 5855.53 6316.13 2763.99 959.48 40159.73

Grand Total 64704.09 19700.14 12186.95 8921.02 4061.02 109573.22

Table 4.3: Partial Reconstruction Demand (in Million Taka) for the Next Five Years

2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total


Road Class
National 19997.06 301.30 4.84 4.41 37.33 20344.94

Regional 6813.21 415.11 415.42 547.60 301.75 8493.11

Zilla 10461.40 2345.09 1204.67 1102.54 529.96 15643.67

Grand Total 37271.67 3061.50 1624.95 1654.56 869.04 44481.71

27
Table 4.4: Full Reconstruction Demand (in Million Taka) for the Next Five Years

Road Class 2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total

National 26351.80 0.00 1.40 0.00 0.00 26353.19

Regional 9696.00 3.33 0.00 272.47 0.00 9971.80

Zilla 10999.76 81.32 33.19 0.00 0.00 11114.27

Grand Total 47047.56 84.65 34.59 272.47 0.00 47439.26

Table 4.5 : Routine Maintenance Demand for the Next Five Years (in Million Taka)

Road Class 2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total

National 730.43 1159.00 1218.96 1334.39 1433.03 5875.81

Regional 2306.18 3697.74 3800.43 4029.74 4334.91 18169.00

Zilla 4006.20 6883.49 7262.79 7585.42 8007.67 33745.57

Grand Total 7042.81 11740.23 12282.18 12949.54 13775.61 57790.37

Tables 4.2 to 4.6 shows the class wise (Capital works and Routine Maintenance cost) demand re-
quired for the first five years of analysis. Table 4.6 demonstrates the length of different work
categories for the next five year cycle.

Table 4.6: Length of Different Work Category in All Classes of Roads (Km)

Road
Class Treatment 2021-22 2022-23 2023-24 2024-25 2025-26
Full Reconstruction 484.46 8.18 8.22 8.18 8.18
Partial Reconstruction 441.60 6.84 0.20 0.18 0.82
National
Periodic Maintenance 2778.15 758.83 184.75 95.16 46.85
Total(National) 3704.21 773.85 193.17 103.52 55.85
Full Reconstruction 262.95 1.90 1.80 8.90 1.80
Partial Reconstruction 249.37 15.15 15.09 20.69 11.09
Regional
Periodic Maintenance 3213.62 1020.76 713.56 946.98 507.14
Total(Regional) 3725.94 1037.81 730.45 976.57 520.03

28
Road
Class Treatment 2021-22 2022-23 2023-24 2024-25 2025-26
Full Reconstruction 539.72 6.88 5.95 3.85 3.85
Partial Reconstruction 802.91 194.51 104.32 81.82 37.00
Zilla
Periodic Maintenance 5978.64 1384.49 1500.35 759.39 337.43
Total(Zilla) 7321.27 1585.88 1610.62 845.06 378.28
Grand Total 14751.42 3397.54 2534.24 1925.15 954.16

4.3 Demand Excluding Ongoing Projects and Periodic Maintenance Pro-


gramme (Road-Major)
List of ongoing projects and Periodic Maintenance Programme (Road-Major) were collected from
various projects and fields and also the list of ongoing works of the previous year was collected. On-
going segments were then excluded from HDM run and remaining sections were analysed separately.
This was done to avoid duplication of the current year’s maintenance programme and to ascertain the
actual immediate need of capital budget.

Table 4.7: Capital Demand of National and Regional Roads 2021 (Excluding On-going Projects)
(Million taka)

Partial Reconstruction/
Zone Periodic Full Reconstruction Total
Rehabilitation
Barisal 1036.96 350.92 83.44 1471.33
Chattogram 2859.15 3185.11 322.71 6366.96
Cumilla 1832.33 1378.14 1278.03 4488.50
Dhaka 4234.50 3314.00 3660.51 11209.01
Gopalganj 2167.10 915.02 109.60 3191.73
Khulna 3752.24 1114.84 304.08 5171.16
Mymensingh 1892.36 392.50 170.40 2455.26
Rajshahi 3520.16 1333.75 416.38 5270.29
Rangpur 1246.97 1123.50 221.41 2591.89
Sylhet 1552.30 561.81 837.94 2952.06
Total 24094.07 13669.60 7404.51 45168.18

29
Figure 4.2-Zonewise Capital Needs (Million Taka) of National and Regional Highways in the
Year 2021

12000.00

10000.00

8000.00

Full Reconstruction
6000.00

4000.00 Partial Reconstruction/


Rehabilitation
2000.00 Periodic

0.00

Table 4.8: Capital Demand of Zilla Roads 2021 (Excluding Ongoing Projects) (Million Taka)

Partial Reconstruction/
Zone Periodic Full Reconstruction Total
Rehabilitation
Barisal 2051.22 258.72 261.05 2570.99
Chattogram 1221.38 1310.40 224.93 2756.71
Cumilla 1992.45 1576.21 2339.93 5908.59
Dhaka 849.51 665.26 986.74 2501.51
Gopalganj 791.16 47.04 17.71 855.91
Khulna 2325.24 582.99 213.23 3121.46
Mymensingh 1670.21 696.88 181.22 2548.31
Rajshahi 1898.60 723.41 25.58 2647.59
Rangpur 2378.44 750.82 48.01 3177.27
Sylhet 582.57 529.32 630.72 1742.62
Total 15760.78 7141.05 4929.12 27830.95

30
Table 4.9: Required Length of Different Road Classes for Capital Works in Next Five Years
(Excluding Ongoing Projects) (In km)

Road Class Treatment Type 2021-22 2022-23 2023-24 2024-25 2025-26


Periodic Maintenance 1748.36 515.85 144.52 55.21 38.66
National Partial Reconstruction 216.71 6.64 0.2 0.08
Full Reconstruction 81.38 0.1 0.14 0.1 0.1
Total (National) 2046.45 522.59 144.86 55.39 38.76

Periodic Maintenance 1662.83 615.69 454.82 540.97 229.7

Regional Partial Reconstruction 135.45 5.62 1.67 4.11 1.34


Full Reconstruction 85.44 1 0.9 0.9 0.9
Total (Regional) 1883.72 622.31 457.39 545.98 231.94

Periodic Maintenance 3901.64 957.51 1141.93 581.44 244.88

Zilla Roads Partial Reconstruction 562.7 119.08 69.09 46.71 4.02


Full Reconstruction 250.98 0.03
Total (Zilla Roads) 4715.32 1076.62 1211.02 628.15 248.9

Grand Total 8645.49 2221.52 1813.27 1229.52 519.6

Figure 4.3-Trend of Lengths of Roads Requiring Treatments (in Km)

5000
4500
4000
3500
3000
National
2500
Regional
2000
Zilla
1500
1000
500
0
2021-22 2022-23 2023-24 2024-25 2025-26

31
4.4 Overall Needs

The initial run of HDM-4 including ongoing projects was the purpose to assess the longer-term needs
of the network. Roads excluded from the run on the ground of works over those are currently in pro-
gress or recently completed, will require periodic maintenance before the end of the five-year period
and thus the five-year plan should be based on the “All Roads” HDM Output.

Table 4.10: Overall Maintenance Needs by Work Category (Million Taka)

Grand
Work Type 2021-22 2022-23 2023-24 2024-25 2025-26 Total
Routine Maintenance 7042.81 11740.23 12282.18 12949.54 13775.61 57790.37
Periodic Maintenance 64704.09 19700.14 12186.95 8921.02 4061.02 109573.22
Partial Reconstruction 37271.67 3061.49 1624.95 1654.56 869.04 44481.71
Full Reconstruction 47047.56 84.65 34.59 272.47 0.00 47439.26
Grand Total 156066.13 34586.51 26128.67 23797.59 18705.67 259284.57

It can be seen from Table 4.11 and 4.12 that the need of Partial and Full Reconstruction for National,
Regional Highways and Zilla Roads are substantial. Due to insufficient budgetary provision it was not
possible to undertake maintenance programme as per the recommendation of HDM-4 Analysis, which
created the backlog. Last year the budget allocation for PMP was62.08%of the total needs of Routine
and Periodic Maintenance. Moreover, NPV/C favours more heavily trafficked roads, hence some less
trafficked Zilla road with poor road condition does not get the priority or not considered for the rec-
ommended maintenance need over the years. It is thus important that separate prioritization process
and budget provision is made for Zilla Roads for the next five years.

32
Table 4.11 Overall Maintenance Needs by Work Category for National and Regional Roads
(Million Taka)

Grand
Work Type 2021-22 2022-23 2023-24 2024-25 2025-26 Total

Routine Maintenance 3036.61 4856.74 5019.39 5364.13 5767.95 24044.81

Periodic Maintenance 40439.48 13844.60 5870.83 6157.03 3101.54 69413.49

Partial Reconstruction 26810.27 716.41 420.28 552.00 339.08 28838.04

Full Reconstruction 36047.80 3.33 1.40 272.47 0.00 36324.99

Grand Total 106334.16 19421.09 11311.89 12345.63 9208.56 158621.33

Table 4.12 Overall Maintenance Needs by Work Category for Zilla Roads (Million Taka)

Grand
Work Type 2021-22 2022-23 2023-24 2024-25 2025-26 Total

Routine Maintenance 4006.20 6883.49 7262.79 7585.42 8007.67 33745.57

Periodic Maintenance 24264.61 5855.53 6316.12 2763.99 959.48 40159.74

Partial Reconstruction 10461.39 2345.09 1204.67 1102.56 529.96 15643.67

Full Reconstruction 10999.76 81.32 33.19 0.00 0.00 11114.27

Grand Total 49731.97 15165.42 14816.78 11451.96 9497.11 100663.25

4.5 Field Validation of Results


This year during Roughness Survey the HDM Officials engaged in survey also performed visual rat-
ing of the road surface distress. Video camera was also installed in front of the survey vehicle to cap-
ture the road condition. The assessment from the visual rating and the video image was compared
with the output of HDM-4 Analysis for validation of recommendation. Apart from that after the
HDM-4 Analysis the HDM team also conducted random field verification to investigate whether these
results reflect the field conditions (Appendix-E). However, it is recommended that treatment need to
be finalized after design verification from the Road Design unit of RHD.

33
CHAPTER 5: FINDING AND RECOMMENDATIONS

5.1 Major Findings:


The overall maintenance needs for the coming five years and the immediate maintenance needs for
the year 2021-22 are presented in Table 5.1 and Table5.2 respectively:

Table 5.1: Overall Maintenance Needs 2021-26 (Million Taka)

Year 2021-22 2022-23 2023-24 2024-25 2025-26 Grand Total

Total 156066.13 34586.51 26128.67 23797.59 18705.67 259284.57

Table 5.2: Immediate Maintenance Needs 2021-22 (Million Taka)

Routine Periodic Maintenance Backlog Total


Maintenance Maintenance Partial Reconstruction Full Reconstruction Needs
4125.14 39854.86 20810.64 12333.64 77124.28

5.2 Recommendations:
• Selection for PMP (Major ) works can be based on NPV/cost ratio in Appendix-A.
• Since the prioritisation of project using NPV/Cost favours the more highly trafficked roads,
adoption of a separate prioritisation process for Zilla Road is recommended.
• Since HDM-4 is basically an economic tool for selection and prioritisation of road mainte-
nance option, field visit and design verification must be undertaken before finalising treat-
ment option.
• To address backlog Maintenance (partial reconstruction + full reconstruction), there may be a
separate operational budget provision or Programme for clearing this Backlog Maintenance.
• Improvement of National Highway/Regional Highway from Good to Fair condition needs to
be accelerated due to High NPV/Cost.
• There should be also an increase in the budget of Periodic maintenance work to improve fur-
ther in total Road Condition early.

34
• Increase in demand of Partial Reconstruction Work indicates that strength of the roads has
been reduced or Traffic load has been increased. Therefore, Axle loads on those roads should
be controlled urgently.

(Amir Hossain) (Mohammed Abul Kalam Azad)


Executive Engineer (c.c) Superintending Engineer
HDM Database Division HDM Circle

35
Appendix A
1st Year Unconstrained Periodic Works
for National, Regional and Zilla Roads.
(Excluding Ongoing Projects)
INDEX

Name Page No Name Page No.


Barishal Zone Khulna Division 138
Barguna Division 1 Kushtia Division 141
Barisal Division 2 Magura Division 144
Bhola Division 5 Meherpur Division 146
Jalokati Division 6 Narail Division 147
Patuakhali Division 7 Satkhira Division 147
Pirojpur Division 9 Mymensingh Zone
Chittagong Zone Jamalpur Division 150
Bandarban Division 12 Kishoreganj Division 151
Chattogram Division 15 Mymensingh Division 154
Cox’s Bazar Division 19 Netrokona Division 157
Dohazari Division 21 Sherpur Division 158
Khagrachari Division 24 Tangail Division 159
Rangamati Division 30 Rajshahi Zone
Brahmanbaria
Division 32 Naogaon Division 164
Cumilla Zone Natore Division 168
Chandpur Division 39 Nawabganj Division 172
Cumilla Division 50 Pabna Division 174
Feni Division 66 Rajshahi Division 181
Laxmipur Division 72 Sirajganj Division 184
Noakhali Division 78 Rangpur Zone
Dhaka Zone Bogura Division 189
Dhaka Division 82 Dinajpur Division 192
Gazipur Division 88 Gaibanda Division 195
Manikganj Division 94 Joypurhat Division 197
Munshiganj Division 97 Kurigram Division 200
Narayanganj Division 103 Lalmonirhat Division 201
Narsingdi Division 109 Nilphamari Division 203
Gopalganj Zone Panchagarh Division 206
Faridpur Division 120 Rangpur Division 207
Gopalganj Division 122 Thakurgaon Division 211
Madaripur Division 125 Sylhet Zone
Rajbari Division 126 Habiganj Division 213
Sariatpur Division 126 Moulavi Bazar Division 218
Khulna Zone Sunamganj Division 221
Bagerhat Division 128 Sylhet Division 227
Chuadanga Division 130
Jassore Division 131
Jhenaidah Division 134
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Barishal Zone
Barguna Division
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 043.04‐043.40 L 0.36 2266 Regional DBST @ 25% Crk 2021 1.005 0.050
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 043.54‐045.03 L 1.50 2266 Regional DBST @ 25% Crk 2021 4.210 0.015
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 043.54‐045.03 R 1.50 2266 Regional DBST @ 25% Crk 2021 4.210 0.015
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 045.14‐045.24 S 0.10 2266 Regional DBST @ Traff 2000‐4000 2021 0.342 0.103
Z8052  Binapani‐Kachua‐Patuakhali Road Km 006.00‐007.24 S 1.24 5641 Zilla Full Recon 75mm @ IRI>12 2021 28.052 0.441
Z8052  Binapani‐Kachua‐Patuakhali Road Km 007.24‐007.74 S 0.50 5641 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z8052  Binapani‐Kachua‐Patuakhali Road Km 007.74‐007.84 S 0.10 5641 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.441
Z8052  Binapani‐Kachua‐Patuakhali Road Km 008.04‐009.54 S 1.50 5641 Zilla Full Recon 75mm @ IRI>12 2021 24.126 0.300
Z8052  Binapani‐Kachua‐Patuakhali Road Km 009.54‐010.34 S 0.80 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 3.448 0.827
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 012.14‐013.10 S 0.96 2850 Zilla Overlay 40mm @ Traff >=2000 2021 3.250 0.065
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 013.10‐013.40 S 0.30 2850 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.667
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 014.60‐014.70 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.477
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 014.70‐014.90 S 0.20 2850 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.330
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 014.90‐015.00 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.570
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 015.00‐029.71 S 14.71 2850 Zilla Overlay 40mm @ Traff >=2000 2021 49.942 0.274
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 029.71‐029.81 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.537
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 029.81‐031.91 S 2.10 2850 Zilla Overlay 40mm @ Traff >=2000 2021 7.132 0.246
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 031.91‐032.01 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.764
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 033.91‐034.01 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.839
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 034.01‐036.21 S 2.20 2850 Zilla Overlay 40mm @ Traff >=2000 2021 7.471 0.343
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 036.51‐038.11 S 1.60 2850 Zilla Overlay 40mm @ Traff >=2000 2021 5.434 0.327
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 038.11‐038.31 S 0.20 2850 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.542
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 038.31‐038.61 S 0.30 2850 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.219
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 038.61‐038.71 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.524
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 038.71‐040.21 S 1.50 2850 Zilla Overlay 40mm @ Traff >=2000 2021 5.097 0.548
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 040.21‐040.61 S 0.40 2850 Zilla Overlay 40mm @ Traff >=2000 2021 1.358 0.760
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 040.61‐041.41 S 0.80 2850 Zilla Overlay 40mm @ Traff >=2000 2021 2.717 0.852
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 041.41‐055.01 S 13.60 2850 Zilla Overlay 40mm @ Traff >=2000 2021 47.935 0.271
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 002.00‐002.10 S 0.10 1390 Zilla Seal Coat 2021 0.139 1.039
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 002.10‐005.80 S 3.70 1390 Zilla Overlay 40mm @ 1000‐2000 2021 14.953 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 005.80‐005.90 S 0.10 1390 Zilla Overlay 40mm @ IRI>12 2021 0.331 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 005.90‐006.00 S 0.10 1390 Zilla Seal Coat 2021 0.098 0.656
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.00‐006.30 S 0.30 1390 Zilla Overlay 40mm @ IRI>12 2021 0.993 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.30‐006.40 S 0.10 1390 Zilla Seal Coat 2021 0.098 1.088
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.40‐006.50 S 0.10 1390 Zilla Overlay 40mm @ IRI>12 2021 0.331 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.50‐006.60 S 0.10 1390 Zilla Seal Coat 2021 0.098 1.064
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.60‐006.70 S 0.10 1390 Zilla Overlay 40mm @ IRI>12 2021 0.331 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 006.70‐007.10 S 0.40 1390 Zilla Overlay 40mm @ 1000‐2000 2021 1.324 0.042
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 007.10‐008.00 S 0.90 1390 Zilla Overlay 40mm @ IRI>12 2021 2.980 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 008.00‐008.30 S 0.30 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.993 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 008.30‐008.40 S 0.10 1390 Zilla Overlay 40mm @ IRI>12 2021 0.331 0.000
Page 1 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 008.40‐008.60 S 0.20 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.662 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 008.60‐013.50 S 4.90 1390 Zilla Overlay 40mm @ 1000‐2000 2021 16.224 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 013.50‐013.70 S 0.20 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.662 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 013.70‐014.00 S 0.30 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.993 0.000
Barguna Total 251.031
Barishal Division
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 115.04‐123.06 S 8.02 8353 National Overlay 50mm @ IRI 4‐7 2021 47.079 10.526
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 123.06‐123.36 S 0.30 8353 National Full Recon 180mm @ IRI 12 2021 11.548 4.308
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 123.36‐133.56 S 10.20 8519 National Overlay 50mm @ IRI 4‐7 2021 59.012 10.896
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 133.56‐133.95 S 0.39 8596 National Rehab 180mm @ IRI 9‐12 2021 14.393 4.870
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 133.95‐134.25 S 0.30 8596 National Full Recon 180mm @ IRI 12 2021 11.548 4.407
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 134.25‐135.75 S 1.50 8596 National Overlay 60mm @ IRI 7‐9 2021 10.321 11.900
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 135.75‐135.85 S 0.10 8596 National Full Recon 180mm 2021 3.849 4.983
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 135.85‐138.15 S 2.30 8596 National Overlay 50mm @ IRI 4‐7 2021 13.283 11.712
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 138.15‐138.65 S 0.50 8596 National Overlay 60mm @ IRI 7‐9 2021 3.440 8.393
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 138.65‐140.35 S 1.70 8596 National Overlay 50mm @ IRI 4‐7 2021 11.977 10.478
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 140.35‐140.45 S 0.10 8596 National Rehab 180mm @ IRI 9‐12 2021 5.207 5.228
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 140.55‐141.15 S 0.60 8596 National Rehab 180mm @ IRI 9‐12 2021 31.240 4.647
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 141.15‐141.85 S 0.70 8596 National Overlay 60mm @ IRI 7‐9 2021 6.743 12.631
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 141.85‐142.15 S 0.30 8596 National Rehab 180mm @ IRI 9‐12 2021 15.620 4.826
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 142.15‐142.95 S 0.80 8596 National Overlay 50mm @ IRI 4‐7 2021 6.468 12.728
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 142.95‐143.15 S 0.20 8596 National Rehab 180mm @ IRI 9‐12 2021 10.413 5.316
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 143.15‐161.05 S 17.90 8772 National Overlay 50mm @ IRI 4‐7 2021 122.362 14.374
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 161.05‐161.15 S 0.10 8596 National Full Recon 180mm @ IRI 12 2021 4.206 6.122
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 161.15‐161.80 S 0.65 8596 National Overlay 50mm @ IRI 4‐7 2021 3.958 15.977
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 161.80‐161.85 S 0.05 8596 National Overlay 60mm @ IRI 7‐9 2021 0.343 18.344
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 161.91‐164.50 S 2.59 8596 National Overlay 60mm @ IRI 7‐9 2021 18.368 16.519
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 164.50‐164.65 L 0.15 8596 National Overlay 50mm @ IRI 4‐7 2021 1.260 11.163
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 164.50‐164.65 R 0.15 8596 National Overlay 50mm @ IRI 4‐7 2021 1.260 11.167
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 164.65‐167.09 S 2.44 8589 National Overlay 50mm @ IRI 4‐7 2021 14.339 8.108
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 167.09‐167.11 L 0.02 8584 National Overlay 50mm @ IRI 4‐7 2021 0.129 11.626
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 167.09‐167.11 R 0.02 8584 National Overlay 50mm @ IRI 4‐7 2021 0.129 11.641
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 167.11‐169.57 S 2.46 8584 National Overlay 50mm @ IRI 4‐7 2021 22.822 3.638
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 169.36‐169.57 S 0.21 8584 National Overlay 50mm @ IRI 4‐7 2021 2.227 2.714
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 169.85‐172.85 S 3.01 8584 National Overlay 50mm @ IRI 4‐7 2021 31.879 2.524
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 172.85‐172.94 S 0.08 8584 National Rehab 180mm @ IRI 9‐12 2021 5.600 1.192
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 172.94‐173.09 S 0.15 8584 National Overlay 50mm @ IRI 4‐7 2021 1.623 2.712
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 173.09‐173.12 R 0.03 8584 National Overlay 50mm @ IRI 4‐7 2021 0.169 11.003
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 173.09‐173.12 R 0.03 8584 National Overlay 50mm @ IRI 4‐7 2021 0.169 11.003
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 173.12‐176.54 S 3.42 9296 National Overlay 50mm @ IRI 4‐7 2021 20.086 14.508
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 176.54‐176.64 S 0.10 9296 National Rehab 180mm @ IRI 9‐12 2021 3.719 6.772
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 176.54‐176.68 S 0.14 9296 National Rehab 180mm @ IRI 9‐12 2021 5.393 6.371
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 176.64‐176.84 S 0.20 6928 National Overlay 50mm @ IRI 4‐7 2021 1.155 7.802
Page 2 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 176.84‐177.34 S 0.50 6928 National Overlay 60mm @ IRI 7‐9 2021 3.440 8.566
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 177.34‐178.04 S 0.70 6928 National Overlay 60mm @ IRI 7‐9 2021 4.816 8.184
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 178.04‐178.94 S 0.90 6928 National Full Recon 180mm @ IRI 12 2021 34.645 1.887
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 178.94‐191.75 S 12.82 7937 National Overlay 50mm @ IRI 4‐7 2021 74.024 6.905
N809 Barishal‐Bhola‐Illisha‐Lakshmipur Road Km 000.00‐002.49 L 2.49 3839 National DBST @ Traff 2000‐4000 2021 7.749 0.468
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 000.00‐001.90 S 1.90 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.691 16.568
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 001.90‐002.00 S 0.10 7698 Regional Full Recon 180mm 2021 3.849 6.646
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 002.00‐005.40 S 3.40 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.394 17.272
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 005.40‐005.50 S 0.10 7698 Regional Full Recon 180mm 2021 3.849 6.646
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 005.50‐006.50 S 1.00 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.881 13.763
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 006.50‐009.50 S 3.00 3515 Regional Overlay 50mm @ IRI 7‐9 2021 11.939 4.885
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 009.50‐016.84 S 7.34 7698 Regional Rehab 150mm @ IRI 9‐12 2021 189.012 7.637
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 000.00‐000.50 S 0.50 5228 Regional Rehab 150mm @ IRI 9‐12 2021 14.297 1.589
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 000.50‐003.00 S 2.50 5228 Regional Overlay 60mm @ IRI 5.5‐9 2021 17.514 4.026
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 003.00‐003.20 S 0.20 5228 Regional DBST @ Traff 4000‐6000 2021 0.543 5.518
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 003.20‐003.47 S 0.27 5228 Regional DBST @ Traff 4000‐6000 2021 0.736 4.081
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 002.42‐002.62 S 0.20 2358 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 002.72‐003.02 S 0.30 2358 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.101
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 000.00‐000.20 S 0.20 5338 Zilla Overlay 50mm @ Cracking >25% 2021 1.355 0.065
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 000.20‐000.30 S 0.10 5338 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.536
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 000.30‐011.90 S 11.60 5338 Zilla Overlay 50mm @ Cracking >25% 2021 66.990 0.491
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 012.00‐012.30 S 0.30 5338 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 0.117
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 012.30‐012.40 S 0.10 5338 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.510
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 012.40‐014.40 S 2.00 5338 Zilla Overlay 50mm @ Cracking >25% 2021 11.556 0.300
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 014.40‐014.46 S 0.06 5338 Zilla Full Recon 75mm @ IRI>12 2021 1.458 1.139
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 014.46‐014.56 S 0.10 4253 Zilla Overlay 40mm @ Traff >=2000 2021 0.476 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 014.56‐014.66 S 0.10 3936 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.029
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 014.66‐020.78 S 6.12 4453 Zilla Overlay 50mm @ Cracking >25% 2021 35.331 0.086
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 020.78‐021.08 S 0.30 3936 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.139
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 000.00‐000.30 S 0.30 5748 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.399
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 000.30‐000.90 S 0.60 5748 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 1.400
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 005.02‐007.50 S 2.48 5748 Zilla Overlay 40mm @ Traff >=2000 2021 12.254 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 008.02‐008.97 S 0.95 4672 Zilla Overlay 40mm @ IRI>12 2021 4.436 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 009.05‐009.07 S 0.02 4672 Zilla Overlay 40mm @ IRI>12 2021 0.093 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 009.07‐017.07 S 8.00 4672 Zilla Overlay 40mm @ IRI>12 2021 37.356 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 017.07‐017.17 S 0.10 4672 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 017.17‐020.77 S 3.60 4672 Zilla Overlay 40mm @ IRI>12 2021 16.810 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 020.88‐021.37 S 0.49 4672 Zilla Overlay 40mm @ IRI>12 2021 2.288 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 021.37‐021.47 S 0.10 4672 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 021.47‐022.27 S 0.80 4672 Zilla Overlay 40mm @ IRI>12 2021 3.736 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 022.27‐022.47 S 0.20 4672 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 023.27‐023.47 S 0.20 4672 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 023.47‐023.67 S 0.20 4672 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Page 3 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 025.67‐025.77 S 0.10 5748 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.321
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 028.27‐028.37 S 0.10 5748 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.779
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 028.37‐029.27 S 0.90 5748 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 1.288
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 029.27‐029.47 S 0.20 5748 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 2.305
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 029.47‐032.27 S 2.80 5748 Zilla Overlay 50mm @ Cracking >25% 2021 16.170 1.960
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 033.00‐033.67 S 0.67 5748 Zilla Overlay 50mm @ Cracking >25% 2021 3.875 1.708
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 033.67‐033.77 S 0.10 5748 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.176
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 033.77‐034.97 S 1.20 5748 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 2.100
Z8034 Rahamatpur‐Babuganj‐Muladi‐Hizla Road Km 035.00‐035.83 S 0.83 5748 Zilla Overlay 40mm @ Traff >=2000 2021 3.876 1.274
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 001.50‐001.70 S 0.20 6570 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 0.945
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 001.80‐002.00 S 0.20 6570 Zilla Full Recon 75mm @ IRI>12 2021 5.216 0.352
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 002.00‐002.40 S 0.40 6570 Zilla Overlay 50mm @ Cracking >25% 2021 2.520 0.203
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 002.40‐002.80 S 0.40 6570 Zilla Rehab 75mm @ IRI 9‐12 2021 7.183 0.670
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 002.80‐005.20 S 2.40 6570 Zilla Overlay 40mm @ Traff >=2000 2021 10.005 0.529
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 006.40‐007.90 S 1.50 5212 Zilla Overlay 50mm @ Cracking >25% 2021 5.765 0.436
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 007.90‐008.00 S 0.10 5212 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 1.772
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 008.00‐008.80 S 0.80 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 3.067 0.712
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 000.00‐000.50 S 0.50 5243 Zilla Overlay 50mm @ IRI 6‐9 2021 2.893 1.046
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 000.50‐000.90 S 0.40 5243 Zilla Overlay 50mm @ Cracking >25% 2021 1.743 0.638
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 000.90‐001.20 S 0.30 5243 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 0.839
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 002.40‐002.50 S 0.10 5243 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.648
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 002.50‐005.60 S 3.10 5243 Zilla Overlay 50mm @ IRI 6‐9 2021 12.044 0.514
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 005.60‐006.00 S 0.40 5243 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.600
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 006.00‐006.90 S 0.90 5243 Zilla Overlay 50mm @ IRI 6‐9 2021 3.497 1.552
Z8040 Barishal (Beltala)‐Shaistabad‐Fakirbari Road Km 027.75‐030.00 S 2.25 5243 Zilla Overlay 50mm @ Cracking >25% 2021 8.733 0.342
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 000.00‐031.61 S 31.61 5390 Zilla Overlay 50mm @ Cracking >25% 2021 121.141 1.603
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 032.71‐040.61 S 7.90 4825 Zilla Overlay 50mm @ Cracking >25% 2021 30.692 1.247
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 040.61‐040.71 S 0.10 4825 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.248
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 040.71‐041.53 S 0.82 4825 Zilla Overlay 50mm @ IRI 6‐9 2021 3.205 1.487
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 041.53‐041.63 S 0.10 4825 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.104
Z8043 Hizla‐Mehindiganj‐Barishal Road Km 041.63‐041.87 S 0.23 4825 Zilla Overlay 50mm @ Cracking >25% 2021 0.905 0.853
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 000.00‐000.10 S 0.10 2414 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.106
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 002.10‐002.20 S 0.10 2414 Zilla Overlay 40mm @ Traff >=2000 2021 0.311 0.321
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 005.70‐005.80 S 0.10 2414 Zilla Overlay 40mm @ Traff >=2000 2021 0.311 0.000
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 015.01‐020.21 S 5.20 2414 Zilla Overlay 40mm @ Traff >=2000 2021 16.158 0.000
Z8048 Chakhar‐Banaripara Road Km 002.02‐002.60 S 0.58 1394 Zilla Overlay 40mm @ 1000‐2000 2021 1.790 0.000
Z8049 Agailjhara By‐Pass Road Km 000.00‐000.10 S 0.10 3781 Zilla Overlay 40mm @ Cracks >25% 2021 0.443 0.075
Z8049 Agailjhara By‐Pass Road Km 000.10‐000.20 S 0.10 3781 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.268
Z8049 Agailjhara By‐Pass Road Km 000.20‐003.70 S 3.50 3781 Zilla Overlay 40mm @ Cracks >25% 2021 15.477 0.077
Z8049 Agailjhara By‐Pass Road Km 003.70‐003.77 S 0.07 3781 Zilla Overlay 40mm @ Traff >=2000 2021 0.318 0.000
Z8603 Madaripur‐Pathariar Par‐Agailjhara Road Km 013.51‐013.90 S 0.40 2755 Zilla Overlay 40mm @ Traff >=2000 2021 1.341 0.082
Z8603 Madaripur‐Pathariar Par‐Agailjhara Road Km 013.90‐014.50 S 0.60 2755 Zilla Overlay 40mm @ Traff >=2000 2021 2.038 0.012
Z8603 Madaripur‐Pathariar Par‐Agailjhara Road Km 019.60‐019.70 S 0.10 2755 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.513
Page 4 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8603 Madaripur‐Pathariar Par‐Agailjhara Road Km 019.70‐025.96 S 6.26 2755 Zilla Overlay 40mm @ Traff >=2000 2021 21.245 0.000
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 001.50‐001.60 S 0.10 5090 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.178
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 001.60‐002.10 S 0.50 5090 Zilla Overlay 40mm @ Traff >=2000 2021 1.698 0.054
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 002.10‐002.20 S 0.10 5090 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.159
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 002.20‐004.31 S 2.11 5090 Zilla Overlay 40mm @ Traff >=2000 2021 7.162 0.204
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 004.31‐007.60 S 3.29 2850 Zilla Overlay 40mm @ Traff >=2000 2021 11.176 0.212
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 007.60‐007.70 S 0.10 2850 Zilla Full Recon 75mm @ IRI>12 2021 1.739 0.951
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 008.30‐008.40 S 0.10 2850 Zilla Full Recon 75mm @ IRI>12 2021 1.739 0.624
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 009.70‐009.80 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 1.247
Z8810 Bakerganj‐Padrishibpur‐Barguna Road Km 011.00‐011.10 S 0.10 2850 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.376
Barishal Total 1515.441
Bhola Division
R891 Bhola (Illisha Junction)‐Illisha Road Km 000.00‐000.62 S 0.62 3670 Regional Overlay 50mm @ IRI 7‐9 2021 3.552 2.390
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 000.00‐002.50 S 2.50 2839 Zilla Overlay 40mm @ Traff >=2000 2021 9.339 0.250
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 002.50‐002.60 S 0.10 2839 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 002.60‐002.88 S 0.28 2839 Zilla Overlay 40mm @ Traff >=2000 2021 1.273 0.000
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 010.36‐010.56 S 0.20 2839 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.285
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 010.56‐010.96 S 0.40 2839 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 0.321
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 010.96‐012.06 S 1.10 2839 Zilla Overlay 40mm @ Traff >=2000 2021 4.996 0.000
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 012.06‐012.46 S 0.40 2839 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z8905 Borhanuddin‐Tazumauddin‐Sikdarhat Road Km 012.46‐013.18 S 0.71 2839 Zilla Overlay 40mm @ Traff >=2000 2021 3.329 0.053
Z8909 Charfession‐Betua Road Km 000.00‐000.50 S 0.50 5123 Zilla Overlay 50mm @ IRI 6‐9 2021 2.903 1.111
Z8909 Charfession‐Betua Road Km 000.50‐000.70 S 0.20 5123 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.776
Z8909 Charfession‐Betua Road Km 000.70‐003.10 S 2.40 5123 Zilla Overlay 40mm @ Traff >=2000 2021 11.207 0.066
Z8909 Charfession‐Betua Road Km 003.10‐003.20 S 0.10 5123 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.380
Z8909 Charfession‐Betua Road Km 006.40‐007.00 S 0.60 5123 Zilla Overlay 50mm @ IRI 6‐9 2021 3.477 0.744
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 000.00‐003.00 S 3.00 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 12.002 0.575
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 003.00‐003.10 S 0.10 5139 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.503
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 003.10‐004.00 S 0.90 5139 Zilla Overlay 40mm @ Traff >=2000 2021 2.827 0.194
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 004.00‐004.40 S 0.40 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 1.039
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 004.40‐007.40 S 3.00 5139 Zilla Overlay 50mm @ Cracking >25% 2021 11.970 0.419
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 007.40‐007.90 S 0.50 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 1.943 1.075
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 007.90‐008.40 S 0.50 5139 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.119
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 008.40‐009.50 S 1.10 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 4.274 1.124
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 009.50‐010.00 S 0.50 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 1.943 0.813
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 010.00‐010.30 S 0.30 5139 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.132
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 010.30‐013.60 S 3.30 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 13.726 0.779
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 013.60‐014.00 S 0.40 5139 Zilla Rehab 75mm @ IRI 9‐12 2021 4.190 0.938
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 014.00‐017.40 S 3.40 12509 Zilla Overlay 50mm @ IRI 6‐9 2021 17.707 3.154
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 017.40‐020.60 S 3.20 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 15.658 0.749
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 020.60‐022.70 S 2.10 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 8.158 0.933
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 022.70‐022.99 S 0.29 5139 Zilla Full Recon 75mm @ IRI>12 2021 4.616 0.702
Z8913 Debirchar‐Nazirpur‐Lalmohon‐Tazumuddin Road Km 022.99‐027.88 S 4.89 5139 Zilla Overlay 50mm @ IRI 6‐9 2021 19.002 1.090
Page 5 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 005.10‐005.30 S 0.20 3267 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.199
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 005.30‐005.50 S 0.20 3267 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.095
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 005.50‐005.80 S 0.30 3267 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.285
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 005.80‐012.20 S 6.40 3267 Zilla Overlay 40mm @ Traff >=2000 2021 29.885 0.009
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 012.20‐013.28 S 1.08 3267 Zilla Overlay 40mm @ Traff >=2000 2021 3.512 0.980
Z8915 Baghmara‐Banglabazar‐Daulatkhan Road Km 013.41‐015.66 S 2.25 3267 Zilla Overlay 40mm @ Traff >=2000 2021 9.265 0.536
Z8916 Guingerhat‐Dalil Khar Hat‐Daulatkhan Bazar Road Km 000.00‐007.80 S 7.80 2178 Zilla Overlay 40mm @ Traff >=2000 2021 24.635 0.000
Z8916 Guingerhat‐Dalil Khar Hat‐Daulatkhan Bazar Road Km 007.80‐008.10 S 0.30 2178 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z8916 Guingerhat‐Dalil Khar Hat‐Daulatkhan Bazar Road Km 008.10‐009.80 S 1.70 2178 Zilla Overlay 40mm @ Traff >=2000 2021 5.340 0.000
Z8916 Guingerhat‐Dalil Khar Hat‐Daulatkhan Bazar Road Km 009.80‐010.20 S 0.40 2178 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z8916 Guingerhat‐Dalil Khar Hat‐Daulatkhan Bazar Road Km 010.20‐011.59 S 1.39 2178 Zilla Overlay 40mm @ Traff >=2000 2021 4.370 0.000
Z8948 Fakirhat‐Khasherhat Road Km 000.00‐006.10 S 6.10 3737 Zilla Overlay 40mm @ Cracks >25% 2021 18.146 0.230
Z8948 Fakirhat‐Khasherhat Road Km 006.10‐006.20 S 0.10 3737 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.396
Z8948 Fakirhat‐Khasherhat Road Km 006.20‐006.32 S 0.12 3737 Zilla Overlay 40mm @ Traff >=2000 2021 0.371 0.466
Bhola Total 279.223
Jhalokati Division
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 008.80‐011.80 S 3.00 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 11.537 1.227
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 011.80‐012.00 S 0.20 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 1.038
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 012.00‐012.20 S 0.20 5212 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 1.480
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 012.20‐013.50 S 1.30 5212 Zilla Overlay 40mm @ Traff >=2000 2021 4.043 0.219
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 013.50‐013.90 S 0.40 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 1.537 0.920
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 013.90‐016.00 S 2.10 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 8.070 1.309
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 016.00‐016.10 S 0.10 5212 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.227
Z8037 Barishal‐Karapur‐Nabagram‐Swarupkathi Road Km 016.10‐019.22 S 3.12 5212 Zilla Overlay 50mm @ IRI 6‐9 2021 12.363 1.307
Z8047 Bakerkati‐Nalchity Road Km 000.00‐001.40 S 1.40 4348 Zilla Overlay 50mm @ Cracking >25% 2021 5.645 0.261
Z8047 Bakerkati‐Nalchity Road Km 001.40‐001.50 S 0.10 4348 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.975
Z8047 Bakerkati‐Nalchity Road Km 002.10‐002.50 S 0.40 4348 Zilla Overlay 50mm @ IRI 6‐9 2021 1.596 1.110
Z8047 Bakerkati‐Nalchity Road Km 005.70‐009.10 S 3.40 4348 Zilla Overlay 50mm @ IRI 6‐9 2021 13.209 0.411
Z8047 Bakerkati‐Nalchity Road Km 009.10‐009.20 S 0.10 4348 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.786
Z8047 Bakerkati‐Nalchity Road Km 009.20‐009.49 S 0.29 4348 Zilla Overlay 40mm @ Traff >=2000 2021 0.905 0.000
Z8051 College Kheyaghat Road Km 000.00‐000.56 S 0.56 1707 Zilla Overlay 40mm @ IRI>12 2021 1.775 0.000
Z8052  Binapani‐Kachua‐Patuakhali Road Km 000.00‐000.40 S 0.40 709 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.284 0.000
Z8054 Nalchity‐Ponabalia‐Jhalokati Road Km 000.00‐000.30 S 0.30 2084 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.000
Z8054 Nalchity‐Ponabalia‐Jhalokati Road Km 000.30‐000.50 S 0.20 2084 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.000
Z8054 Nalchity‐Ponabalia‐Jhalokati Road Km 000.50‐010.03 S 9.53 2084 Zilla Overlay 40mm @ Traff >=2000 2021 30.095 0.012
Z8055 Sultan Khan Road  Km 000.00‐000.10 S 0.10 3636 Zilla Overlay 40mm @ Traff >=2000 2021 0.338 0.262
Z8055 Sultan Khan Road  Km 000.10‐000.20 S 0.10 3636 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.407
Z8055 Sultan Khan Road  Km 000.20‐000.80 S 0.60 3636 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.931
Z8055 Sultan Khan Road  Km 000.80‐000.90 S 0.10 3636 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.279
Z8055 Sultan Khan Road  Km 000.90‐001.30 S 0.40 3636 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.583
Z8056 Dapdapia‐Mollaherhat Road  Km 000.00‐004.40 S 4.40 3400 Zilla Full Recon 75mm @ IRI>12 2021 74.786 0.114
Z8056 Dapdapia‐Mollaherhat Road  Km 004.40‐004.50 S 0.10 3400 Zilla Overlay 40mm @ Traff >=2000 2021 0.331 0.000
Z8056 Dapdapia‐Mollaherhat Road  Km 004.50‐006.80 S 2.30 3400 Zilla Full Recon 75mm @ IRI>12 2021 38.993 0.077
Page 6 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8056 Dapdapia‐Mollaherhat Road  Km 006.80‐009.30 S 2.50 3400 Zilla Overlay 40mm @ Traff >=2000 2021 8.320 0.142
Z8056 Dapdapia‐Mollaherhat Road  Km 009.30‐009.40 S 0.10 3400 Zilla Full Recon 75mm @ IRI>12 2021 1.695 0.366
Z8056 Dapdapia‐Mollaherhat Road  Km 009.40‐012.30 S 2.90 3400 Zilla Overlay 40mm @ Traff >=2000 2021 9.602 0.409
Z8056 Dapdapia‐Mollaherhat Road  Km 012.30‐012.90 S 0.60 3400 Zilla Full Recon 75mm @ IRI>12 2021 10.189 0.092
Z8056 Dapdapia‐Mollaherhat Road  Km 012.90‐013.00 S 0.10 3400 Zilla Overlay 40mm @ Traff >=2000 2021 0.331 0.000
Z8056 Dapdapia‐Mollaherhat Road  Km 013.00‐016.20 S 3.20 3400 Zilla Rehab 75mm @ IRI 9‐12 2021 37.161 0.461
Z8056 Dapdapia‐Mollaherhat Road  Km 016.20‐019.20 S 3.00 3400 Zilla Overlay 40mm @ Traff >=2000 2021 9.424 0.635
Z8056 Dapdapia‐Mollaherhat Road  Km 019.20‐021.10 S 1.90 3400 Zilla Overlay 40mm @ Traff >=2000 2021 5.968 0.014
Z8056 Dapdapia‐Mollaherhat Road  Km 021.10‐021.40 S 0.30 3400 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.503
Z8056 Dapdapia‐Mollaherhat Road  Km 021.40‐022.20 S 0.80 3400 Zilla Overlay 40mm @ Traff >=2000 2021 2.513 0.431
Z8056 Dapdapia‐Mollaherhat Road  Km 022.20‐022.40 S 0.20 3400 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.765
Z8056 Dapdapia‐Mollaherhat Road  Km 022.40‐023.90 S 1.50 3400 Zilla Overlay 40mm @ Traff >=2000 2021 4.712 0.646
Z8056 Dapdapia‐Mollaherhat Road  Km 023.90‐024.60 S 0.70 3400 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.724
Z8056 Dapdapia‐Mollaherhat Road  Km 024.60‐025.20 S 0.60 3400 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.658
Z8056 Dapdapia‐Mollaherhat Road  Km 025.20‐025.41 S 0.20 3400 Zilla Full Recon 75mm @ IRI>12 2021 3.281 0.205
Z8057 Nalchity Bypass Road Km 000.00‐000.10 S 0.10 1067 Zilla Overlay 40mm @ 1000‐2000 2021 0.440 0.000
Z8057 Nalchity Bypass Road Km 001.00‐001.37 S 0.37 1067 Zilla Overlay 40mm @ IRI>12 2021 1.571 0.000
Z8059 Hadua‐Mollarhat Road Km 000.40‐000.60 S 0.20 952 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z8059 Hadua‐Mollarhat Road Km 000.70‐000.90 S 0.20 952 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z8062 Pir Moazzem Hossain‐ Rajapur (Mirerhat) Road Km 000.00‐000.10 S 0.10 772 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.328 0.322
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 001.40‐008.59 S 7.19 8694 Zilla Overlay 40mm @ Traff >=2000 2021 34.372 1.659
Z8703 Jhalokati (Dhanshiri)‐Kawkhali Road Km 004.60‐004.70 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z8703 Jhalokati (Dhanshiri)‐Kawkhali Road Km 004.70‐007.18 S 2.48 1712 Zilla Overlay 40mm @ 1000‐2000 2021 7.706 0.005
Z8705  Bhandaria‐Paikhkhali‐Kathalia Road Km 005.97‐011.89 S 5.91 2332 Zilla Overlay 40mm @ Traff >=2000 2021 27.601 0.000
Z8709 Satpakhia‐Nalcity Road Km 000.40‐003.41 S 3.01 1961 Zilla Overlay 40mm @ 1000‐2000 2021 9.468 0.000
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 000.00‐000.10 S 0.10 2730 Zilla Overlay 40mm @ Traff >=2000 2021 0.382 0.000
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 000.10‐000.30 S 0.20 2730 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.152
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 000.30‐000.50 S 0.20 2730 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 000.50‐001.40 S 0.90 2730 Zilla Overlay 40mm @ Traff >=2000 2021 2.827 0.514
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 001.40‐001.50 S 0.10 2730 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 001.50‐001.60 S 0.10 2730 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.489
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 001.60‐003.90 S 2.30 2730 Zilla Overlay 40mm @ Traff >=2000 2021 7.225 0.323
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 004.30‐005.00 S 0.70 2730 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.026
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 005.00‐006.25 S 1.25 2730 Zilla Overlay 40mm @ Traff >=2000 2021 3.927 0.548
Z8717 Naikati‐Bhandaria Road Km 003.70‐004.20 S 0.50 1315 Zilla Overlay 40mm @ 1000‐2000 2021 1.554 0.000
Z8740  Kathalia (Bandaghata)‐Kaikhali‐Banaihat Road Km 004.60‐004.70 S 0.10 818 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z8815 Amua‐Mirukhali‐Safa Road Km 000.00‐000.90 S 0.90 2133 Zilla Overlay 40mm @ Traff >=2000 2021 2.827 0.008
Z8815 Amua‐Mirukhali‐Safa Road Km 000.90‐001.00 S 0.10 2133 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z8815 Amua‐Mirukhali‐Safa Road Km 001.00‐002.34 S 1.34 2133 Zilla Overlay 40mm @ Traff >=2000 2021 4.219 0.000
Jhalokati Total 435.402
Patuakhali Division
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 191.75‐195.24 S 3.48 9281 National Overlay 50mm @ IRI 4‐7 2021 22.345 25.420
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 195.24‐205.13 S 9.89 10832 National Overlay 80mm @ IRI 4‐9 2021 122.297 21.023
Page 7 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 000.00‐006.20 S 6.20 13335 Regional Overlay 60mm @ IRI 5.5‐9 2021 59.955 3.177
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 006.20‐012.30 S 6.10 13191 Regional Overlay 60mm @ IRI 5.5‐9 2021 57.996 5.209
R880 Patuakhali‐Amtali‐Barguna‐Kakchira Road Km 012.30‐015.80 S 3.50 10957 Regional Overlay 60mm @ IRI 5.5‐9 2021 33.286 3.594
R881 Amtali‐Khepupara‐Kuakata Road Km 000.00‐018.00 S 18.00 10957 Regional DBST @ 25% Crk 2021 57.890 3.096
R881 Amtali‐Khepupara‐Kuakata Road Km 023.80‐026.90 S 3.10 10957 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.330 5.176
R881 Amtali‐Khepupara‐Kuakata Road Km 026.90‐027.00 S 0.10 10957 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.577
R881 Amtali‐Khepupara‐Kuakata Road Km 027.00‐033.20 S 6.20 10957 Regional DBST @ Traff >6000 2021 16.845 4.490
R881 Amtali‐Khepupara‐Kuakata Road Km 033.20‐035.20 S 2.00 10957 Regional Rehab 150mm @ IRI 9‐12 2021 53.130 1.676
R881 Amtali‐Khepupara‐Kuakata Road Km 035.20‐036.00 S 0.80 10957 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.624 4.748
R881 Amtali‐Khepupara‐Kuakata Road Km 036.00‐036.10 S 0.10 10957 Regional Rehab 150mm @ IRI 9‐12 2021 2.898 2.492
R881 Amtali‐Khepupara‐Kuakata Road Km 039.53‐040.65 S 1.12 10957 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.407 5.446
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 030.13‐030.23 S 0.10 2414 Zilla Overlay 40mm @ Traff >=2000 2021 0.382 0.071
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 030.23‐030.33 S 0.10 2414 Zilla Overlay 40mm @ Traff >=2000 2021 0.382 0.000
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 030.33‐030.43 S 0.10 2414 Zilla Overlay 40mm @ Traff >=2000 2021 0.382 0.059
Z8044 Barishal (Dinerpool)‐Laxmipasha‐Dumki Road Km 030.43‐031.89 S 1.46 2414 Zilla Overlay 40mm @ Traff >=2000 2021 5.589 0.000
Z8052  Binapani‐Kachua‐Patuakhali Road Km 010.34‐012.94 S 2.60 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 10.460 0.653
Z8052  Binapani‐Kachua‐Patuakhali Road Km 013.00‐015.24 S 2.24 5641 Zilla Rehab 75mm @ IRI 9‐12 2021 27.232 0.669
Z8052  Binapani‐Kachua‐Patuakhali Road Km 015.64‐015.94 S 0.30 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 1.561
Z8052  Binapani‐Kachua‐Patuakhali Road Km 015.94‐016.34 S 0.40 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 1.352
Z8052  Binapani‐Kachua‐Patuakhali Road Km 016.34‐016.54 S 0.20 5641 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.153
Z8052  Binapani‐Kachua‐Patuakhali Road Km 017.04‐017.24 S 0.20 5641 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.082
Z8052  Binapani‐Kachua‐Patuakhali Road Km 017.24‐018.94 S 1.70 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 6.605 1.113
Z8052  Binapani‐Kachua‐Patuakhali Road Km 018.94‐019.51 S 0.57 5641 Zilla Rehab 75mm @ IRI 9‐12 2021 6.334 0.496
Z8052  Binapani‐Kachua‐Patuakhali Road Km 023.30‐023.40 S 0.10 5641 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 0.563
Z8052  Binapani‐Kachua‐Patuakhali Road Km 023.60‐026.79 S 3.19 5641 Zilla Overlay 40mm @ Traff >=2000 2021 16.558 0.040
Z8804 Galachipa (Haridebpur)‐Bhadura‐Shakharia Road Km 000.00‐000.20 S 0.20 2070 Zilla Overlay 40mm @ Traff >=2000 2021 0.985 0.000
Z8804 Galachipa (Haridebpur)‐Bhadura‐Shakharia Road Km 000.20‐014.20 S 14.00 2070 Zilla Overlay 40mm @ Traff >=2000 2021 65.497 0.077
Z8804 Galachipa (Haridebpur)‐Bhadura‐Shakharia Road Km 014.20‐014.60 S 0.40 2070 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z8804 Galachipa (Haridebpur)‐Bhadura‐Shakharia Road Km 014.60‐014.70 S 0.10 2070 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8804 Galachipa (Haridebpur)‐Bhadura‐Shakharia Road Km 014.70‐016.53 S 1.83 2070 Zilla Overlay 40mm @ Traff >=2000 2021 8.821 0.000
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 000.10‐000.30 S 0.20 4146 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.725
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 000.30‐003.30 S 3.00 4146 Zilla Overlay 50mm @ IRI 6‐9 2021 11.750 1.661
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 003.30‐015.89 S 12.59 4146 Zilla Overlay 40mm @ Traff >=2000 2021 58.166 0.000
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 015.89‐015.99 S 0.10 4146 Zilla Full Recon 75mm @ IRI>12 2021 2.521 0.270
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 016.00‐022.29 S 6.29 4146 Zilla Overlay 40mm @ Traff >=2000 2021 30.993 0.008
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 022.29‐024.31 S 2.02 4146 Zilla Overlay 50mm @ IRI 6‐9 2021 12.290 0.363
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 024.31‐028.66 S 4.34 2242 Zilla Overlay 40mm @ Traff >=2000 2021 21.391 0.133
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 028.66‐028.71 S 0.05 9601 Zilla Overlay 50mm @ Cracking >25% 2021 0.323 5.135
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 028.71‐028.91 S 0.20 9601 Zilla Full Recon 75mm @ IRI>12 2021 5.043 3.308
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 028.91‐032.71 S 3.80 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 16.439 1.302
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 032.71‐035.91 S 3.20 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 12.768 2.332
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 035.91‐036.31 S 0.40 4563 Zilla Full Recon 75mm @ IRI>12 2021 6.607 1.290
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 036.31‐036.61 S 0.30 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 3.683
Page 8 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 036.61‐036.91 S 0.30 4563 Zilla Full Recon 75mm @ IRI>12 2021 4.956 1.218
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 036.91‐038.81 S 1.90 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 7.581 2.281
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 038.81‐039.31 S 0.50 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 5.687 1.911
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 039.31‐039.61 S 0.30 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 2.783
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 039.61‐040.31 S 0.70 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 7.961 2.197
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 040.31‐040.51 S 0.20 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 0.798 1.942
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 040.51‐040.91 S 0.40 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 1.523
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 041.01‐041.11 S 0.10 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 3.076
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 041.11‐041.31 S 0.20 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 0.802 2.024
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 041.31‐043.01 S 1.70 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 19.335 1.380
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 043.01‐043.41 S 0.40 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 1.596 4.085
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 043.41‐045.11 S 1.70 4563 Zilla Overlay 50mm @ IRI 6‐9 2021 6.783 3.631
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 045.11‐046.61 S 1.50 4563 Zilla Rehab 75mm @ IRI 9‐12 2021 17.060 1.697
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 058.79‐063.19 S 4.40 9601 Zilla Overlay 40mm @ Traff >=2000 2021 20.546 3.833
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 063.19‐069.81 S 6.62 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 38.213 4.716
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 069.81‐069.91 S 0.10 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 5.369
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 069.91‐070.01 S 0.10 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 4.492
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 070.01‐070.21 S 0.20 9601 Zilla Full Recon 75mm @ IRI>12 2021 4.782 3.073
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 070.21‐070.91 S 0.70 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 6.649
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 070.98‐071.71 S 0.72 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 4.175 4.668
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 071.71‐071.81 S 0.10 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 5.050
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 071.81‐074.01 S 2.20 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 12.705 7.457
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 074.01‐074.21 S 0.20 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 4.570
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 074.21‐077.05 S 2.84 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 16.413 5.424
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 077.05‐077.44 S 0.39 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 6.354 4.592
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 077.44‐078.74 S 1.30 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 7.507 5.720
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 078.74‐079.94 S 1.20 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 19.754 3.370
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 079.94‐080.84 S 0.90 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 5.198 4.807
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 080.84‐081.04 S 0.20 9601 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 4.559
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 081.04‐082.24 S 1.20 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 5.449
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 082.24‐082.34 S 0.10 9601 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.563
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 082.34‐082.94 S 0.60 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 4.676
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 082.94‐086.14 S 3.20 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 18.480 4.715
Z8806 Lebukhali‐Dumki‐Galachipa‐Amragachhia Road Km 086.14‐086.38 S 0.24 9601 Zilla Overlay 50mm @ IRI 6‐9 2021 1.398 4.682
Patuakhali Total 1068.460
Pirojpur Division
R770 Noapara‐Bagerhat‐Pirojpur Road Km 039.56‐042.78 S 3.22 8842 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.887 5.540
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 042.28‐043.81 S 1.52 4991 Regional DBST @ Traff 4000‐6000 2021 4.409 0.965
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 043.81‐044.00 S 0.20 7143 Regional Full Recon 150mm @ IRI 12 2021 6.608 1.498
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 044.00‐051.52 S 7.52 7143 Regional DBST @ 25% Crk 2021 20.435 2.059
R870 Barishal‐Jhalokati‐Bhandaria‐Pirojpur Road Km 062.92‐064.25 S 1.33 7965 Regional DBST @ 25% Crk 2021 3.608 0.667
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 000.00‐000.20 S 0.20 5805 Zilla Overlay 50mm @ IRI 6‐9 2021 1.157 1.154
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 000.20‐000.40 S 0.20 5805 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.232
Page 9 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 000.40‐006.60 S 6.20 5805 Zilla Overlay 50mm @ IRI 6‐9 2021 48.565 0.201
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 012.00‐012.20 S 0.20 5805 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.619
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 013.00‐013.20 S 0.20 5805 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 2.040
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 016.10‐016.20 S 0.10 3419 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.345
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 017.40‐017.50 S 0.10 3419 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.205
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 018.30‐020.50 S 2.20 3419 Zilla Overlay 40mm @ Traff >=2000 2021 10.273 0.893
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 020.50‐021.10 S 0.60 3419 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.000
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 021.10‐021.30 S 0.20 3419 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.994
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 021.30‐022.80 S 1.50 3419 Zilla Overlay 40mm @ Traff >=2000 2021 7.004 0.540
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 022.80‐022.90 S 0.10 3419 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.859
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 024.40‐024.60 S 0.20 3419 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.738
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 024.60‐025.90 S 1.30 3419 Zilla Overlay 40mm @ Cracks >25% 2021 5.749 0.071
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 025.90‐026.00 S 0.10 3419 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.607
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 026.00‐028.86 S 2.86 3419 Zilla Overlay 40mm @ Cracks >25% 2021 12.656 0.017
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 022.92‐026.02 S 3.10 2358 Zilla Overlay 40mm @ Traff >=2000 2021 9.606 0.109
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 031.92‐034.82 S 2.90 2358 Zilla Overlay 40mm @ Traff >=2000 2021 9.110 0.097
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 037.12‐037.42 S 0.30 2358 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.133
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 037.42‐037.52 S 0.10 2358 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.162
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 037.52‐038.22 S 0.70 2358 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.110
Z7710 Banaripara (Danduat)‐Nazirpur Road Km 039.42‐040.00 S 0.58 2358 Zilla Overlay 40mm @ Traff >=2000 2021 1.825 0.014
Z7711 Togra‐Zianagar‐Balipara‐Kalaron‐Synashi Road Km 000.00‐005.10 S 5.10 2195 Zilla Overlay 40mm @ Traff >=2000 2021 23.295 0.061
Z7711 Togra‐Zianagar‐Balipara‐Kalaron‐Synashi Road Km 005.30‐015.80 S 10.50 2195 Zilla Overlay 40mm @ Traff >=2000 2021 37.712 0.000
Z7711 Togra‐Zianagar‐Balipara‐Kalaron‐Synashi Road Km 015.80‐015.90 S 0.10 2195 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.053
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 022.31‐024.18 S 1.87 3936 Zilla Overlay 40mm @ Traff >=2000 2021 8.727 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 025.78‐026.82 S 1.04 3936 Zilla Overlay 40mm @ Traff >=2000 2021 4.768 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 026.91‐029.22 S 2.31 3936 Zilla Overlay 40mm @ Traff >=2000 2021 7.322 0.689
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 029.22‐029.32 S 0.10 3936 Zilla Overlay 40mm @ Traff >=2000 2021 0.311 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 029.32‐030.12 S 0.80 3936 Zilla Overlay 40mm @ Traff >=2000 2021 2.486 0.576
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 030.12‐030.32 S 0.20 3936 Zilla Overlay 40mm @ Traff >=2000 2021 0.621 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 030.32‐030.62 S 0.30 3936 Zilla Rehab 75mm @ IRI 9‐12 2021 3.286 0.479
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 036.02‐036.12 S 0.10 3936 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.954
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 042.41‐042.81 S 0.40 3936 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.073
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 046.11‐046.71 S 0.60 3936 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.269
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 046.71‐047.21 S 0.50 3936 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 047.21‐048.21 S 1.00 3936 Zilla Rehab 75mm @ IRI 9‐12 2021 16.462 0.110
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 048.21‐048.41 S 0.20 3936 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 048.41‐048.71 S 0.30 3936 Zilla Overlay 40mm @ IRI>12 2021 1.401 0.000
Z8033 Gariarpar‐Banaripara‐Kawkhali‐Naikati Road Km 048.71‐049.36 S 0.65 3936 Zilla Overlay 40mm @ Traff >=2000 2021 3.054 0.180
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 000.00‐000.03 L 0.03 2525 Zilla Overlay 40mm @ Traff >=2000 2021 0.183 0.000
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 000.00‐000.03 R 0.03 2525 Zilla Overlay 40mm @ Traff >=2000 2021 0.183 0.000
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 000.03‐003.60 S 3.57 2525 Zilla Overlay 40mm @ Traff >=2000 2021 16.731 0.036
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 003.60‐003.90 S 0.30 2525 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 003.90‐004.90 S 1.00 2525 Zilla Overlay 40mm @ Traff >=2000 2021 4.670 0.058
Page 10 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 004.90‐005.10 S 0.20 2525 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z8701 Charkhali‐Tushkhali‐Mathbaria‐Patharghata Road Km 005.10‐007.10 S 2.00 2525 Zilla Overlay 40mm @ Traff >=2000 2021 9.339 0.052
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 008.59‐009.00 S 0.41 8694 Zilla Overlay 50mm @ IRI 6‐9 2021 2.362 3.523
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 009.00‐009.10 S 0.10 8694 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.255
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 009.10‐010.50 S 1.40 8694 Zilla Overlay 50mm @ IRI 6‐9 2021 8.085 3.356
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 010.50‐010.90 S 0.40 8694 Zilla Overlay 50mm @ IRI 6‐9 2021 2.310 3.269
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 010.90‐011.10 S 0.20 8694 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 3.157
Z8702 Rajapur‐Naikathi‐Bekutia‐Pirojpur Road Km 014.59‐014.65 S 0.05 8694 Zilla Rehab 75mm @ IRI 9‐12 2021 0.922 4.304
Z8703 Jhalokati (Dhanshiri)‐Kawkhali Road Km 007.18‐010.20 S 3.02 1712 Zilla Overlay 40mm @ 1000‐2000 2021 9.384 0.000
Z8705  Bhandaria‐Paikhkhali‐Kathalia Road Km 000.40‐005.97 S 5.57 2332 Zilla Overlay 40mm @ Traff >=2000 2021 26.028 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 000.00‐003.30 S 3.30 1829 Zilla Overlay 40mm @ 1000‐2000 2021 10.254 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 006.30‐006.40 S 0.10 1829 Zilla Rehab 75mm @ IRI 9‐12 2021 0.943 0.110
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 006.70‐007.60 S 0.90 1829 Zilla Overlay 40mm @ 1000‐2000 2021 2.797 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 007.60‐008.90 S 1.30 1829 Zilla Overlay 40mm @ 1000‐2000 2021 4.040 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 012.30‐012.80 S 0.50 1829 Zilla Overlay 40mm @ 1000‐2000 2021 1.557 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 012.80‐013.00 S 0.20 1829 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 013.00‐013.10 S 0.10 1829 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z8713 Kawkhali‐Chirapara‐Bhandaria Road Km 013.10‐014.20 S 1.10 1829 Zilla Overlay 40mm @ 1000‐2000 2021 3.418 0.000
Z8716 Jhalokathi‐Kirtipasha‐Swarupkathi Road Km 010.50‐015.53 S 5.03 2730 Zilla Overlay 40mm @ Traff >=2000 2021 15.801 0.245
Z8750 Shekerhat Connecting Road Km 000.00‐004.95 S 4.95 324 Zilla Seal Coat 2021 4.630 0.638
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 016.20‐016.40 S 0.20 1390 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 016.40‐017.90 S 1.50 1390 Zilla Overlay 40mm @ 1000‐2000 2021 4.712 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 017.90‐018.70 S 0.80 1390 Zilla Overlay 40mm @ 1000‐2000 2021 2.513 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 018.70‐018.80 S 0.10 1390 Zilla Seal Coat 2021 0.093 1.080
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 018.80‐019.80 S 1.00 1390 Zilla Overlay 40mm @ 1000‐2000 2021 3.141 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 019.80‐019.90 S 0.10 1390 Zilla Seal Coat 2021 0.093 0.425
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 019.90‐021.00 S 1.10 1390 Zilla Overlay 40mm @ 1000‐2000 2021 3.455 0.043
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 021.00‐021.30 S 0.30 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 021.30‐021.60 S 0.30 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.038
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 021.60‐024.40 S 2.80 1390 Zilla Overlay 40mm @ 1000‐2000 2021 9.580 0.017
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 024.40‐024.50 S 0.10 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 024.50‐025.70 S 1.20 1390 Zilla Overlay 40mm @ 1000‐2000 2021 3.770 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 025.70‐025.80 S 0.10 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 025.80‐025.90 S 0.10 1390 Zilla Seal Coat 2021 0.093 0.345
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 025.90‐028.00 S 2.10 1390 Zilla Overlay 40mm @ 1000‐2000 2021 6.600 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 028.00‐028.10 S 0.10 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.159
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 028.10‐029.00 S 0.90 1390 Zilla Overlay 40mm @ 1000‐2000 2021 2.827 0.000
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 029.00‐030.70 S 1.70 1390 Zilla Overlay 40mm @ 1000‐2000 2021 5.340 0.050
Z8814  Barguna‐Dewatala‐Mathbaria‐Baramasua Road Km 030.70‐030.91 S 0.21 1390 Zilla Overlay 40mm @ 1000‐2000 2021 0.672 0.000
Z8815 Amua‐Mirukhali‐Safa Road Km 008.60‐008.61 S 0.01 2133 Zilla Full Recon 75mm @ IRI>12 2021 0.177 1.625
Z8815 Amua‐Mirukhali‐Safa Road Km 008.61‐009.14 S 0.53 2133 Zilla Overlay 40mm @ Traff >=2000 2021 1.671 0.000
Z8815 Amua‐Mirukhali‐Safa Road Km 009.14‐009.24 S 0.10 2133 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.139
Z8815 Amua‐Mirukhali‐Safa Road Km 009.24‐009.64 S 0.40 2133 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Page 11 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8815 Amua‐Mirukhali‐Safa Road Km 012.64‐013.06 S 0.41 2133 Zilla Overlay 40mm @ Traff >=2000 2021 1.300 0.000
Pirojpur Total 492.760
Barishal Zone Total 4042.316

Chattogram Zone
Bandarban Division
R161 Rangamati‐Chandragona‐Bandarban Road Km 059.82‐061.12 S 1.30 6386 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.400 1.697
Z1001 Ramu‐Naikhongchhari Road Km 000.00‐001.20 S 1.20 3785 Zilla Overlay 40mm @ Traff >=2000 2021 3.973 0.726
Z1001 Ramu‐Naikhongchhari Road Km 001.20‐001.90 S 0.70 3785 Zilla Overlay 40mm @ Cracks >25% 2021 2.195 0.266
Z1001 Ramu‐Naikhongchhari Road Km 001.90‐004.00 S 2.10 3785 Zilla Overlay 40mm @ Traff >=2000 2021 6.953 0.762
Z1001 Ramu‐Naikhongchhari Road Km 004.60‐005.20 S 0.60 3785 Zilla Overlay 40mm @ Traff >=2000 2021 1.987 0.588
Z1001 Ramu‐Naikhongchhari Road Km 005.20‐005.60 S 0.40 3785 Zilla Overlay 40mm @ Traff >=2000 2021 1.324 0.196
Z1001 Ramu‐Naikhongchhari Road Km 006.30‐006.80 S 0.50 3785 Zilla Overlay 40mm @ Traff >=2000 2021 1.656 0.521
Z1001 Ramu‐Naikhongchhari Road Km 006.80‐008.00 S 1.20 3785 Zilla Rehab 75mm @ IRI 9‐12 2021 14.007 0.532
Z1001 Ramu‐Naikhongchhari Road Km 008.00‐008.20 S 0.20 3785 Zilla Overlay 40mm @ Traff >=2000 2021 0.662 0.000
Z1001 Ramu‐Naikhongchhari Road Km 008.20‐008.60 S 0.40 3785 Zilla Rehab 75mm @ IRI 9‐12 2021 4.669 0.748
Z1001 Ramu‐Naikhongchhari Road Km 008.60‐008.90 S 0.30 3785 Zilla Overlay 40mm @ Traff >=2000 2021 0.993 0.000
Z1001 Ramu‐Naikhongchhari Road Km 008.90‐010.70 S 1.80 3785 Zilla Rehab 75mm @ IRI 9‐12 2021 21.011 0.600
Z1001 Ramu‐Naikhongchhari Road Km 010.70‐011.17 S 0.47 3785 Zilla Overlay 40mm @ Traff >=2000 2021 1.540 0.216
Z1005 Chiringa‐Lama‐Alikadam Road Km 003.00‐003.10 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 1.623
Z1005 Chiringa‐Lama‐Alikadam Road Km 006.60‐006.70 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 0.769
Z1005 Chiringa‐Lama‐Alikadam Road Km 007.70‐007.90 S 0.20 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 2.197 0.715
Z1005 Chiringa‐Lama‐Alikadam Road Km 008.18‐011.90 S 3.72 1814 Zilla Overlay 40mm @ 1000‐2000 2021 11.591 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 013.90‐014.00 S 0.10 1814 Zilla Full Recon 75mm @ IRI>12 2021 1.595 1.206
Z1005 Chiringa‐Lama‐Alikadam Road Km 015.40‐015.80 S 0.40 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 4.382 0.384
Z1005 Chiringa‐Lama‐Alikadam Road Km 015.80‐016.70 S 0.90 1814 Zilla Overlay 40mm @ 1000‐2000 2021 2.797 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 016.70‐016.80 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 0.980
Z1005 Chiringa‐Lama‐Alikadam Road Km 018.10‐018.40 S 0.30 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 3.286 1.535
Z1005 Chiringa‐Lama‐Alikadam Road Km 018.40‐018.70 S 0.30 1814 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 018.70‐019.90 S 1.20 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 13.145 0.249
Z1005 Chiringa‐Lama‐Alikadam Road Km 019.90‐020.21 S 0.31 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 3.341 0.454
Z1005 Chiringa‐Lama‐Alikadam Road Km 020.51‐020.61 S 0.10 1814 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.611
Z1005 Chiringa‐Lama‐Alikadam Road Km 020.71‐020.81 S 0.10 1814 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.512
Z1005 Chiringa‐Lama‐Alikadam Road Km 021.51‐021.71 S 0.20 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 0.484
Z1005 Chiringa‐Lama‐Alikadam Road Km 021.71‐021.81 S 0.10 1814 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 021.81‐022.51 S 0.70 1814 Zilla Overlay 40mm @ 1000‐2000 2021 2.175 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 022.51‐022.81 S 0.30 1814 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 022.81‐022.91 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 1.596
Z1005 Chiringa‐Lama‐Alikadam Road Km 024.51‐024.61 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.757
Z1005 Chiringa‐Lama‐Alikadam Road Km 025.11‐025.21 S 0.10 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.660
Z1005 Chiringa‐Lama‐Alikadam Road Km 027.31‐027.41 S 0.10 1814 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.803
Z1005 Chiringa‐Lama‐Alikadam Road Km 031.91‐032.91 S 1.00 1814 Zilla Overlay 40mm @ 1000‐2000 2021 3.116 0.000
Z1005 Chiringa‐Lama‐Alikadam Road Km 034.11‐034.31 S 0.20 1814 Zilla Rehab 75mm @ IRI 9‐12 2021 2.203 1.289

Page 12 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1007 Aziznagar‐Lama (Gazalia) Road Km 001.90‐002.00 S 0.10 1949 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.027
Z1013 Tonkabati‐Baro Aulia Road Km 005.70‐007.70 S 2.00 4345 Zilla Overlay 50mm @ IRI 6‐9 2021 7.560 1.811
Z1013 Tonkabati‐Baro Aulia Road Km 007.70‐008.10 S 0.40 4345 Zilla Rehab 75mm @ IRI 9‐12 2021 4.310 1.058
Z1013 Tonkabati‐Baro Aulia Road Km 009.40‐009.50 S 0.10 4345 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.633
Z1013 Tonkabati‐Baro Aulia Road Km 009.60‐012.60 S 3.00 4345 Zilla Overlay 50mm @ IRI 6‐9 2021 11.407 1.988
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 013.51‐013.71 S 0.20 1712 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.043
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 016.11‐017.51 S 1.40 1712 Zilla Overlay 40mm @ 1000‐2000 2021 4.338 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 017.51‐017.81 S 0.30 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 017.81‐018.11 S 0.30 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 018.11‐019.72 S 1.61 1712 Zilla Overlay 40mm @ 1000‐2000 2021 4.993 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 000.30‐000.50 S 0.20 244 Zilla Overlay 40mm @ IRI>12 2021 0.917 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 000.50‐000.60 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.458 0.016
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 000.60‐000.80 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.917 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 000.80‐001.10 S 0.30 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.375 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 001.10‐001.30 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.917 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 001.30‐001.80 S 0.50 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.698 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 001.80‐001.90 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 001.90‐002.10 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 002.10‐002.50 S 0.40 244 Zilla Overlay 40mm @ IRI>12 2021 1.240 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 002.50‐002.70 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.020
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 002.70‐003.50 S 0.80 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.479 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 003.50‐003.60 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.036
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 003.60‐003.70 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 003.70‐003.90 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 003.90‐004.10 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 004.10‐004.30 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 004.30‐004.40 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 004.40‐007.50 S 3.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 9.606 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 007.50‐007.60 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 007.60‐008.00 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.240 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 008.00‐008.10 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 008.19‐008.80 S 0.61 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.878 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 008.80‐008.90 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 008.90‐009.50 S 0.60 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.859 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 009.50‐009.70 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 009.70‐009.90 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.021
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 009.90‐010.50 S 0.60 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.859 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 010.50‐010.80 S 0.30 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.930 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 010.80‐011.20 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.240 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 011.20‐011.30 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.029
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 011.30‐011.50 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 011.50‐013.60 S 2.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 6.511 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 013.60‐013.80 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.627 0.000
Page 13 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 013.80‐014.70 S 0.90 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.820 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 014.70‐015.10 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.253 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 015.10‐015.20 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.313 0.034
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 015.20‐016.00 S 0.80 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.506 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 016.00‐016.20 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.627 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 016.20‐016.40 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.627 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 016.40‐017.40 S 1.00 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.133 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 017.40‐017.90 S 0.50 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.566 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 017.90‐018.60 S 0.70 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.178 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 018.60‐018.90 S 0.30 244 Zilla Overlay 40mm @ IRI>12 2021 0.932 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 018.90‐019.00 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.311 0.029
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 019.00‐019.40 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.243 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 019.40‐019.50 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.311 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 019.50‐023.00 S 3.50 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 10.876 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 023.00‐028.09 S 5.09 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 15.644 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 028.09‐028.59 S 0.50 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.528 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 028.59‐032.49 S 3.90 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 11.920 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 046.95‐047.05 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.309 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 047.05‐047.35 S 0.30 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.927 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 047.35‐047.44 S 0.09 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.275 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 047.44‐049.34 S 1.90 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.872 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 049.34‐051.04 S 1.70 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.210 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 052.14‐052.54 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.240 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 052.54‐052.94 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.240 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 052.94‐053.54 S 0.60 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.859 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 053.54‐054.64 S 1.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.409 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 055.84‐057.04 S 1.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.719 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 057.04‐057.64 S 0.60 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.859 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 057.64‐057.66 S 0.02 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.065 0.079
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 057.66‐058.16 S 0.50 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.549 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 058.16‐059.16 S 1.00 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.099 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 070.86‐071.26 S 0.40 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.226 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 072.86‐073.46 S 0.60 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.839 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 073.46‐073.66 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.613 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 073.94‐074.64 S 0.70 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.145 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 187.17‐187.27 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 187.27‐187.37 S 0.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 187.37‐187.47 S 0.10 244 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 189.27‐190.07 S 0.80 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.459 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 190.07‐192.17 S 2.10 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 6.454 0.000
Z1811 Bandarban‐Thanchi‐Alikadam‐Gundum Road Km 192.17‐192.87 S 0.70 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.151 0.000
Z1812 Chimbuk‐Ruma Road Km 000.00‐003.00 S 3.00 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 10.010 0.000
Z1812 Chimbuk‐Ruma Road Km 005.40‐005.90 S 0.50 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.571 0.000
Page 14 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1812 Chimbuk‐Ruma Road Km 005.90‐006.50 S 0.60 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.880 0.000
Z1812 Chimbuk‐Ruma Road Km 006.50‐008.10 S 1.60 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.012 0.000
Z1812 Chimbuk‐Ruma Road Km 008.10‐008.20 S 0.10 311 Zilla Overlay 40mm @ IRI>12 2021 0.313 0.000
Z1812 Chimbuk‐Ruma Road Km 008.20‐011.20 S 3.00 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 9.475 0.000
Z1812 Chimbuk‐Ruma Road Km 013.40‐013.60 S 0.20 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.625 0.000
Z1812 Chimbuk‐Ruma Road Km 013.60‐014.70 S 1.10 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.437 0.000
Z1812 Chimbuk‐Ruma Road Km 014.70‐015.10 S 0.40 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.250 0.000
Z1812 Chimbuk‐Ruma Road Km 016.40‐016.60 S 0.20 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.623 0.000
Z1812 Chimbuk‐Ruma Road Km 016.60‐017.40 S 0.80 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.493 0.000
Z1812 Chimbuk‐Ruma Road Km 017.40‐017.50 S 0.10 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.312 0.000
Z1812 Chimbuk‐Ruma Road Km 017.50‐018.20 S 0.70 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.181 0.000
Z1812 Chimbuk‐Ruma Road Km 018.80‐019.20 S 0.40 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.246 0.000
Z1812 Chimbuk‐Ruma Road Km 020.50‐020.80 S 0.30 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.937 0.000
Z1812 Chimbuk‐Ruma Road Km 020.80‐021.50 S 0.70 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.187 0.000
Z1812 Chimbuk‐Ruma Road Km 021.50‐021.60 S 0.10 311 Zilla Overlay 40mm @ IRI>12 2021 0.312 0.000
Z1812 Chimbuk‐Ruma Road Km 021.60‐022.20 S 0.60 311 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.875 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 000.00‐003.00 S 3.00 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 9.169 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 003.14‐007.30 S 4.16 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 12.721 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 007.30‐007.50 S 0.20 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.611 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 007.50‐008.30 S 0.80 549 Zilla Overlay 40mm @ IRI>12 2021 2.445 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 008.30‐011.20 S 2.90 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 8.864 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 011.20‐011.40 S 0.20 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.611 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 016.50‐017.10 S 0.60 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.789 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 017.10‐017.90 S 0.80 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.377 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 017.90‐018.10 S 0.20 549 Zilla Overlay 40mm @ IRI>12 2021 0.594 0.000
Z1813 Bandarban‐Rowangchhari‐Ruma Road Km 018.10‐019.50 S 1.40 549 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.160 0.079
Bandarban Total 413.736
Chattogram Division
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 231.80‐232.00 L 0.20 16578 National Rehab 195mm @ IRI 9‐12 2021 11.279 9.757
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 231.80‐232.00 R 0.20 16578 National Rehab 195mm @ IRI 9‐12 2021 11.279 9.757
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 232.00‐232.75 L 0.75 16578 National Rehab 195mm @ IRI 9‐12 2021 42.466 10.337
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 232.00‐232.75 R 0.75 16578 National Rehab 195mm @ IRI 9‐12 2021 42.466 10.337
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 233.80‐241.16 S 7.36 16578 National Overlay 80mm @ IRI 4‐9 2021 86.403 20.492
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 241.16‐241.36 S 0.20 16578 National Full Recon 195mm @ IRI 12 2021 10.367 9.429
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 241.36‐241.86 S 0.50 16578 National Overlay 80mm @ IRI 4‐9 2021 5.868 24.925
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 241.86‐241.96 S 0.10 16578 National Full Recon 195mm @ IRI 12 2021 5.184 9.409
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 241.96‐242.56 S 0.59 16578 National Overlay 80mm @ IRI 4‐9 2021 6.989 24.244
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 242.56‐245.16 L 2.59 16578 National Rehab 195mm @ IRI 9‐12 2021 117.930 9.651
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 242.56‐245.16 R 2.59 16578 National Rehab 195mm @ IRI 9‐12 2021 117.930 9.651
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 245.16‐247.89 S 2.74 16578 National Overlay 80mm @ IRI 4‐9 2021 33.796 16.258
N106 Chattogram‐Hathazari‐Rangamati Km 000.00‐001.00 S 1.00 15962 National Overlay 80mm @ IRI 5‐9 2021 13.654 6.460
N106 Chattogram‐Hathazari‐Rangamati Km 001.00‐001.10 S 0.10 15962 National Full Recon 195mm @ IRI 12 2021 5.184 5.734
N106 Chattogram‐Hathazari‐Rangamati Km 001.10‐002.04 S 0.94 15962 National Overlay 80mm @ IRI 5‐9 2021 11.032 14.582
Page 15 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N106 Chattogram‐Hathazari‐Rangamati Km 002.10‐005.60 R 3.50 15962 National Overlay 80mm @ IRI 5‐9 2021 42.292 11.774
N106 Chattogram‐Hathazari‐Rangamati Km 005.60‐005.80 R 0.20 15962 National Rehab 195mm @ IRI 9‐12 2021 8.853 5.145
N106 Chattogram‐Hathazari‐Rangamati Km 005.80‐007.73 R 1.93 15962 National Overlay 80mm @ IRI 5‐9 2021 23.289 11.442
N106 Chattogram‐Hathazari‐Rangamati Km 007.73‐007.88 S 0.15 15962 National Overlay 50mm @ IRI 5 2021 2.221 4.280
N106 Chattogram‐Hathazari‐Rangamati Km 007.90‐009.55 R 1.65 15962 National Overlay 80mm @ IRI 5‐9 2021 19.910 13.138
N106 Chattogram‐Hathazari‐Rangamati Km 009.55‐012.82 S 3.27 16684 National Overlay 80mm @ IRI 5‐9 2021 34.064 13.393
N106 Chattogram‐Hathazari‐Rangamati Km 030.24‐030.41 S 0.17 19463 National Full Recon 195mm 2021 9.061 3.852
N123 Baraiyerhat‐Joraganj Old Section Road Km 000.00‐000.30 S 0.30 7177 National DBST @ Traff >6000 2021 1.122 1.223
N123 Baraiyerhat‐Joraganj Old Section Road Km 000.30‐000.50 S 0.20 7177 National Rehab 180mm @ IRI 9‐12 2021 7.721 0.739
N123 Baraiyerhat‐Joraganj Old Section Road Km 000.50‐003.50 S 3.00 7177 National Overlay 50mm @ IRI 5‐7 2021 21.105 2.104
N123 Baraiyerhat‐Joraganj Old Section Road Km 003.50‐004.60 S 1.10 7177 National Overlay 50mm @ IRI 5‐7 2021 7.739 2.140
N123 Baraiyerhat‐Joraganj Old Section Road Km 004.60‐004.70 S 0.10 7177 National Rehab 180mm @ IRI 9‐12 2021 3.861 1.020
N123 Baraiyerhat‐Joraganj Old Section Road Km 004.70‐007.00 S 2.30 7177 National Overlay 50mm @ IRI 5‐7 2021 16.181 2.208
N123 Baraiyerhat‐Joraganj Old Section Road Km 007.00‐007.10 S 0.10 7177 National Full Recon 180mm 2021 4.689 1.013
N123 Baraiyerhat‐Joraganj Old Section Road Km 007.10‐008.06 S 0.96 7177 National Overlay 50mm @ IRI 5‐7 2021 6.713 2.328
N124 Mithachara Old Section Road Km 000.00‐000.50 S 0.50 7177 National DBST @ Traff >6000 2021 1.902 1.276
N124 Mithachara Old Section Road Km 000.50‐000.60 S 0.10 7177 National Rehab 180mm @ IRI 9‐12 2021 4.437 0.478
N125 Bartakia Old Section Road Km 000.00‐000.70 S 0.70 7177 National DBST @ Traff >6000 2021 2.697 1.870
N125 Bartakia Old Section Road Km 000.70‐001.14 S 0.44 7177 National DBST @ Traff >6000 2021 1.695 1.247
N128 Sitakunda Old Section Road Km 000.00‐000.80 S 0.80 7177 National Overlay 50mm @ IRI 5‐7 2021 8.392 0.968
N128 Sitakunda Old Section Road Km 000.90‐001.30 S 0.40 7177 National Overlay 50mm @ IRI 5‐7 2021 4.169 0.971
N129 Kumira Old Section Road Km 000.00‐000.10 S 0.10 7177 National Overlay 60mm @ IRI 7‐9 2021 0.926 2.123
N129 Kumira Old Section Road Km 000.10‐000.40 S 0.30 7177 National Full Recon 180mm 2021 15.538 0.352
N129 Kumira Old Section Road Km 000.40‐002.79 S 2.39 7177 National Overlay 50mm @ IRI 5‐7 2021 22.786 1.446
R152 Heako‐Ramgarh‐Jaliapara Road Km 013.91‐014.73 S 0.82 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.762 1.953
R163 Chattogram ‐Chandragona Road Km 000.00‐004.60 S 4.60 12543 Regional Overlay 60mm @ IRI 5.5‐9 2021 31.075 7.057
R163 Chattogram ‐Chandragona Road Km 004.60‐004.70 S 0.10 12543 Regional Full Recon 195mm 2021 3.943 2.677
R163 Chattogram ‐Chandragona Road Km 011.60‐011.72 S 0.12 12543 Regional Full Recon 195mm 2021 4.594 2.745
R163 Chattogram ‐Chandragona Road Km 011.72‐012.72 S 1.00 12543 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.505 7.702
R163 Chattogram ‐Chandragona Road Km 012.72‐012.82 S 0.10 12543 Regional Full Recon 195mm 2021 3.797 2.833
R163 Chattogram ‐Chandragona Road Km 012.82‐015.75 S 2.93 12543 Regional Overlay 60mm @ IRI 5.5‐9 2021 19.073 7.999
R163 Chattogram ‐Chandragona Road Km 015.75‐033.44 S 17.68 3576 Regional DBST @ Traff 2000‐4000 2021 46.647 1.844
R164 Baraichhari‐Kaptai Road Km 007.90‐008.00 S 0.10 2599 Regional DBST Traff All 2021 0.296 0.000
Z1016 Fouzderhat‐Biman Bandar Road Km 004.20‐004.62 S 0.42 389 Zilla Overlay 40mm @ IRI>12 2021 1.290 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 000.50‐000.90 S 0.40 2013 Zilla Overlay 40mm @ Traff >=2000 2021 1.223 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 000.90‐001.40 S 0.50 2013 Zilla Overlay 40mm @ Traff >=2000 2021 1.528 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 001.40‐001.50 S 0.10 2013 Zilla Full Recon 75mm @ IRI>12 2021 1.569 0.020
Z1021 Mirsarai‐Fatikchhari Road Km 001.50‐002.70 S 1.20 2013 Zilla Overlay 40mm @ Traff >=2000 2021 3.678 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 002.70‐002.80 S 0.10 2013 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 002.80‐003.60 S 0.80 2013 Zilla Overlay 40mm @ Traff >=2000 2021 2.452 0.000
Z1021 Mirsarai‐Fatikchhari Road Km 012.90‐015.40 S 2.50 2013 Zilla Overlay 40mm @ Traff >=2000 2021 7.747 0.000
Z1025 Kumira‐Sandwip Road Km 000.10‐000.20 S 0.10 3407 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.929
Z1025 Kumira‐Sandwip Road Km 000.30‐000.40 S 0.10 3407 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.889
Page 16 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1025 Kumira‐Sandwip Road Km 000.40‐012.30 S 11.90 3407 Zilla Rehab 75mm @ IRI 9‐12 2021 135.999 2.726
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 000.30‐000.40 S 0.10 6068 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 2.815
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 000.70‐000.90 S 0.20 6068 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 4.159
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 000.90‐002.20 S 1.30 6068 Zilla Overlay 50mm @ IRI 6‐9 2021 7.439 3.471
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 002.20‐002.30 S 0.10 6068 Zilla Rehab 75mm @ IRI 9‐12 2021 1.631 2.739
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 002.30‐002.90 S 0.60 6068 Zilla Overlay 50mm @ IRI 6‐9 2021 3.434 3.503
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 002.90‐003.80 S 0.90 6068 Zilla Rehab 75mm @ IRI 9‐12 2021 14.761 1.899
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 007.00‐020.20 S 13.20 6068 Zilla Rehab 75mm @ IRI 9‐12 2021 195.958 2.209
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 052.00‐054.50 S 2.50 3474 Zilla Overlay 40mm @ IRI>12 2021 11.674 0.000
Z1084 Muhuriganj‐Chattogram Beri Band Road Km 056.30‐067.30 S 11.00 3474 Zilla Overlay 40mm @ IRI>12 2021 51.365 0.000
Z1086 Sitakunda‐Hazarikhil‐Fatikchhari  Km 000.00‐000.10 S 0.10 1606 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z1086 Sitakunda‐Hazarikhil‐Fatikchhari  Km 001.55‐012.70 S 11.15 1606 Zilla Rehab 75mm @ IRI 9‐12 2021 34.367 1.788
Z1087  Sitakunda‐Hathazari Road Km 000.10‐001.27 S 1.17 382 Zilla Overlay 40mm @ IRI>12 2021 3.537 0.000
Z1087  Sitakunda‐Hathazari Road Km 006.79‐007.39 S 0.60 382 Zilla Overlay 40mm @ IRI>12 2021 1.701 0.000
Z1087  Sitakunda‐Hathazari Road Km 007.39‐007.59 S 0.20 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.567 0.000
Z1087  Sitakunda‐Hathazari Road Km 007.59‐007.89 S 0.30 382 Zilla Overlay 40mm @ IRI>12 2021 0.851 0.000
Z1087  Sitakunda‐Hathazari Road Km 007.89‐008.19 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.851 0.000
Z1087  Sitakunda‐Hathazari Road Km 008.19‐008.29 S 0.10 382 Zilla Overlay 40mm @ IRI>12 2021 0.284 0.000
Z1087  Sitakunda‐Hathazari Road Km 008.29‐008.59 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.851 0.000
Z1087  Sitakunda‐Hathazari Road Km 008.59‐008.89 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.851 0.000
Z1087  Sitakunda‐Hathazari Road Km 008.89‐009.39 S 0.50 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.418 0.000
Z1087  Sitakunda‐Hathazari Road Km 009.39‐009.59 S 0.20 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.569 0.000
Z1087  Sitakunda‐Hathazari Road Km 009.59‐009.79 S 0.20 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.569 0.000
Z1087  Sitakunda‐Hathazari Road Km 009.79‐009.89 S 0.10 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.284 0.000
Z1087  Sitakunda‐Hathazari Road Km 009.89‐010.19 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.853 0.000
Z1087  Sitakunda‐Hathazari Road Km 010.19‐010.29 S 0.10 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.284 0.000
Z1087  Sitakunda‐Hathazari Road Km 010.29‐010.39 S 0.10 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.284 0.000
Z1087  Sitakunda‐Hathazari Road Km 010.39‐010.69 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.853 0.000
Z1087  Sitakunda‐Hathazari Road Km 011.09‐011.39 S 0.30 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.856 0.000
Z1087  Sitakunda‐Hathazari Road Km 011.39‐011.49 S 0.10 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.285 0.000
Z1087  Sitakunda‐Hathazari Road Km 011.49‐011.99 S 0.50 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.435 0.000
Z1087  Sitakunda‐Hathazari Road Km 011.99‐012.19 S 0.20 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.593 0.000
Z1087  Sitakunda‐Hathazari Road Km 012.19‐012.39 S 0.20 382 Zilla Overlay 40mm @ IRI>12 2021 0.593 0.000
Z1087  Sitakunda‐Hathazari Road Km 012.39‐012.49 S 0.10 382 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.296 0.000
Z1618 Bhatiari ‐ Hathajari Road Km 000.00‐000.20 S 0.20 4167 Zilla Full Recon 75mm @ IRI>12 2021 3.478 1.172
Z1618 Bhatiari ‐ Hathajari Road Km 000.20‐010.50 S 10.30 4167 Zilla Overlay 50mm @ Cracking >25% 2021 43.260 1.388
Z1618 Bhatiari ‐ Hathajari Road Km 010.50‐010.60 S 0.10 4167 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 1.863
Z1618 Bhatiari ‐ Hathajari Road Km 010.60‐010.98 S 0.38 4167 Zilla Overlay 40mm @ Traff >=2000 2021 1.297 0.391
Z1620 Najirhat ‐ Maijbhandar Road Km 000.00‐003.10 S 3.10 4726 Zilla Overlay 50mm @ Cracking >25% 2021 12.336 0.293
Z1620 Najirhat ‐ Maijbhandar Road Km 003.10‐003.20 S 0.10 4726 Zilla Full Recon 75mm @ IRI>12 2021 1.630 0.743
Z1629 Raozan‐Noapara (Jelepara) Road Km 000.30‐000.60 S 0.30 3049 Zilla Full Recon 75mm @ IRI>12 2021 4.695 0.215
Z1629 Raozan‐Noapara (Jelepara) Road Km 000.60‐000.80 S 0.20 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.432
Z1629 Raozan‐Noapara (Jelepara) Road Km 003.30‐003.40 S 0.10 3049 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.730
Page 17 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1629 Raozan‐Noapara (Jelepara) Road Km 003.40‐005.12 S 1.72 3049 Zilla Overlay 40mm @ Traff >=2000 2021 5.233 0.778
Z1629 Raozan‐Noapara (Jelepara) Road Km 006.32‐006.42 S 0.10 3049 Zilla Full Recon 75mm @ IRI>12 2021 1.548 0.813
Z1629 Raozan‐Noapara (Jelepara) Road Km 006.42‐006.52 S 0.10 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.302 0.000
Z1629 Raozan‐Noapara (Jelepara) Road Km 006.52‐006.72 S 0.20 3049 Zilla Rehab 75mm @ IRI 9‐12 2021 2.131 0.635
Z1629 Raozan‐Noapara (Jelepara) Road Km 006.72‐006.82 S 0.10 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.302 0.000
Z1629 Raozan‐Noapara (Jelepara) Road Km 006.82‐007.12 S 0.30 3049 Zilla Rehab 75mm @ IRI 9‐12 2021 3.188 0.808
Z1629 Raozan‐Noapara (Jelepara) Road Km 007.12‐007.32 S 0.20 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.594 0.091
Z1629 Raozan‐Noapara (Jelepara) Road Km 007.32‐007.62 S 0.30 3049 Zilla Rehab 75mm @ IRI 9‐12 2021 3.143 0.612
Z1629 Raozan‐Noapara (Jelepara) Road Km 007.62‐008.02 S 0.40 3049 Zilla Overlay 40mm @ Cracks >25% 2021 1.126 0.064
Z1629 Raozan‐Noapara (Jelepara) Road Km 008.02‐008.12 S 0.10 3049 Zilla Full Recon 75mm @ IRI>12 2021 1.521 0.751
Z1629 Raozan‐Noapara (Jelepara) Road Km 008.12‐008.32 S 0.20 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.594 0.198
Z1629 Raozan‐Noapara (Jelepara) Road Km 008.32‐008.42 S 0.10 3049 Zilla Full Recon 75mm @ IRI>12 2021 1.521 0.635
Z1629 Raozan‐Noapara (Jelepara) Road Km 008.52‐008.92 S 0.40 3049 Zilla Rehab 75mm @ IRI 9‐12 2021 4.190 0.734
Z1629 Raozan‐Noapara (Jelepara) Road Km 008.92‐009.02 S 0.10 3049 Zilla Overlay 40mm @ Traff >=2000 2021 0.297 0.000
Z1629 Raozan‐Noapara (Jelepara) Road Km 009.02‐009.22 S 0.20 3049 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 0.945
Z1629 Raozan‐Noapara (Jelepara) Road Km 009.22‐010.52 S 1.30 3049 Zilla Overlay 40mm @ Traff >=2000 2021 3.885 0.521
Z1629 Raozan‐Noapara (Jelepara) Road Km 010.52‐010.72 S 0.20 3049 Zilla Full Recon 75mm @ IRI>12 2021 3.104 0.457
Z1629 Raozan‐Noapara (Jelepara) Road Km 010.72‐013.82 S 3.10 3049 Zilla Overlay 40mm @ Traff >=2000 2021 9.185 0.668
Z1629 Raozan‐Noapara (Jelepara) Road Km 013.82‐014.84 S 1.02 3049 Zilla Overlay 40mm @ Cracks >25% 2021 2.783 0.471
Z1636 Rangunia‐Bangalhalia Road  Km 000.00‐002.40 S 2.40 1289 Zilla Overlay 40mm @ 1000‐2000 2021 7.376 0.010
Z1636 Rangunia‐Bangalhalia Road  Km 002.40‐004.70 S 2.30 1289 Zilla Overlay 40mm @ 1000‐2000 2021 7.049 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 004.70‐004.80 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.304 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 004.80‐004.90 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.304 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 004.90‐005.00 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.304 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 005.00‐005.10 S 0.10 1289 Zilla Overlay 40mm @ IRI>12 2021 0.304 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 005.10‐005.20 S 0.10 1289 Zilla Seal Coat 2021 0.090 0.033
Z1636 Rangunia‐Bangalhalia Road  Km 005.20‐005.60 S 0.40 1289 Zilla Overlay 40mm @ 1000‐2000 2021 1.216 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 005.60‐005.80 S 0.20 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.611 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 005.80‐007.00 S 1.20 1289 Zilla Overlay 40mm @ 1000‐2000 2021 3.688 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 007.00‐007.20 S 0.20 1289 Zilla Seal Coat 2021 0.182 0.105
Z1636 Rangunia‐Bangalhalia Road  Km 007.20‐007.70 S 0.50 1289 Zilla Overlay 40mm @ 1000‐2000 2021 1.520 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 007.70‐007.90 S 0.20 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.608 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 007.90‐008.30 S 0.40 1289 Zilla Overlay 40mm @ 1000‐2000 2021 1.216 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 008.30‐008.40 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.304 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 008.40‐009.40 S 1.00 1289 Zilla Overlay 40mm @ 1000‐2000 2021 3.056 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 009.40‐009.50 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 009.50‐009.70 S 0.20 1289 Zilla Overlay 40mm @ IRI>12 2021 0.615 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 009.70‐009.80 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 009.80‐009.90 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 009.90‐010.60 S 0.70 1289 Zilla Overlay 40mm @ 1000‐2000 2021 2.151 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 012.70‐012.80 S 0.10 1289 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 012.80‐013.80 S 1.00 1289 Zilla Overlay 40mm @ IRI>12 2021 3.107 0.000
Z1636 Rangunia‐Bangalhalia Road  Km 013.80‐014.50 S 0.70 1289 Zilla Overlay 40mm @ 1000‐2000 2021 2.175 0.000
Page 18 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1636 Rangunia‐Bangalhalia Road  Km 014.50‐014.80 S 0.30 1289 Zilla Overlay 40mm @ IRI>12 2021 0.935 0.000
Z1637 Domekhali‐Madrasha Station Road Km 000.00‐002.21 S 2.21 3024 Zilla Overlay 40mm @ Traff >=2000 2021 6.529 0.000
Chattogram Total 3662.646
Cox's Bazar Division
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 313.38‐314.99 S 1.61 9089 National Overlay 60mm @ IRI 7‐9 2021 14.282 20.557
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 314.99‐315.09 S 0.10 9089 National Full Recon 180mm 2021 4.969 8.013
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 315.09‐330.66 S 15.57 7560 National Overlay 50mm @ IRI 4‐7 2021 115.123 12.442
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 330.66‐332.06 S 1.40 8339 National Overlay 60mm @ IRI 7‐9 2021 11.910 16.550
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 332.06‐332.16 S 0.10 8529 National Full Recon 180mm @ IRI 12 2021 4.759 6.668
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 332.16‐356.20 S 24.04 8027 National Overlay 50mm @ IRI 4‐7 2021 171.646 16.350
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 356.20‐356.40 S 0.20 7890 National Rehab 180mm @ IRI 9‐12 2021 9.196 6.591
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 356.40‐361.91 S 5.51 7890 National Overlay 50mm @ IRI 4‐7 2021 39.306 16.071
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 361.91‐362.01 S 0.10 7890 National Full Recon 180mm @ IRI 12 2021 4.759 6.642
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 362.01‐365.81 S 3.80 7890 National Overlay 60mm @ IRI 7‐9 2021 32.326 16.948
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 365.81‐365.91 S 0.10 7890 National Rehab 180mm @ IRI 9‐12 2021 4.598 7.329
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 365.91‐368.86 S 2.95 7890 National Overlay 60mm @ IRI 7‐9 2021 25.087 16.000
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 368.86‐369.06 S 0.20 7890 National Full Recon 180mm @ IRI 12 2021 9.519 6.089
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 369.06‐370.98 S 1.92 7890 National Overlay 60mm @ IRI 7‐9 2021 16.376 16.584
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 370.98‐371.46 S 0.47 2334 National Overlay 50mm @ IRI 4‐9 2021 3.392 0.826
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 371.46‐371.56 S 0.10 2334 National DBST @ Traff 2000‐4000 2021 0.336 0.918
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 371.56‐382.72 S 11.16 2334 National Overlay 50mm @ IRI 4‐9 2021 77.794 0.510
R172 Chokoria‐Baderkhali Road Km 000.00‐000.40 S 0.40 11775 Regional DBST @ Traff >6000 2021 1.099 4.149
R172 Chokoria‐Baderkhali Road Km 000.40‐000.60 S 0.20 11775 Regional Full Recon 150mm @ IRI 12 2021 6.566 1.949
R172 Chokoria‐Baderkhali Road Km 000.60‐003.70 S 3.10 11775 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.368 6.250
R172 Chokoria‐Baderkhali Road Km 003.70‐006.70 S 3.00 11775 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.604 3.363
R172 Chokoria‐Baderkhali Road Km 006.70‐006.80 S 0.10 11775 Regional Rehab 150mm @ IRI 9‐12 2021 2.685 3.184
R172 Chokoria‐Baderkhali Road Km 007.80‐008.20 S 0.40 11775 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.802 7.142
R172 Chokoria‐Baderkhali Road Km 008.20‐010.30 S 2.10 11775 Regional DBST @ 25% Crk 2021 5.809 3.696
R172 Chokoria‐Baderkhali Road Km 010.30‐010.60 S 0.30 11775 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.098 7.265
R172 Chokoria‐Baderkhali Road Km 010.60‐017.27 S 6.67 11775 Regional DBST @ Traff >6000 2021 18.617 3.777
R180 Laharpur‐Jhinukmarket‐Laboni More Km 002.40‐003.60 S 1.20 15967 Regional Full Recon 150mm @ IRI 12 2021 45.146 1.861
R180 Laharpur‐Jhinukmarket‐Laboni More Km 003.60‐006.11 S 2.51 15967 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.025 4.549
Z1002 Baraitali‐Magnamaghat Road Km 000.00‐000.10 S 0.10 2548 Zilla Seal Coat 2021 0.091 0.280
Z1002 Baraitali‐Magnamaghat Road Km 000.10‐000.20 S 0.10 2548 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.733
Z1002 Baraitali‐Magnamaghat Road Km 000.20‐000.80 S 0.60 2548 Zilla Rehab 75mm @ IRI 9‐12 2021 6.465 0.553
Z1002 Baraitali‐Magnamaghat Road Km 000.80‐000.90 S 0.10 2548 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.103
Z1002 Baraitali‐Magnamaghat Road Km 000.90‐003.90 S 3.00 2548 Zilla Rehab 75mm @ IRI 9‐12 2021 32.324 0.476
Z1002 Baraitali‐Magnamaghat Road Km 003.90‐006.90 S 3.00 2548 Zilla Rehab 75mm @ IRI 9‐12 2021 37.353 0.327
Z1002 Baraitali‐Magnamaghat Road Km 006.90‐006.96 S 0.06 2548 Zilla Overlay 40mm @ Traff >=2000 2021 0.289 0.000
Z1004 Janatabazar‐Gorokghata Road Km 000.00‐000.10 S 0.10 2057 Zilla Overlay 40mm @ IRI>12 2021 0.594 0.000
Z1004 Janatabazar‐Gorokghata Road Km 000.10‐003.10 S 3.00 2057 Zilla Overlay 40mm @ Traff >=2000 2021 11.360 0.000
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 000.00‐010.82 S 10.82 2468 Zilla Seal Coat 2021 10.172 0.201
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 010.82‐010.92 S 0.10 2468 Zilla Rehab 75mm @ IRI 9‐12 2021 1.083 0.869
Page 19 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 010.92‐013.14 S 2.21 2468 Zilla Overlay 40mm @ Traff >=2000 2021 6.801 0.000
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 014.03‐018.67 S 4.64 2468 Zilla Overlay 40mm @ Traff >=2000 2021 14.309 0.005
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 018.67‐018.77 S 0.10 2468 Zilla Rehab 75mm @ IRI 9‐12 2021 1.086 0.864
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 018.77‐019.02 S 0.25 2468 Zilla Overlay 40mm @ Traff >=2000 2021 0.777 0.000
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 019.99‐021.57 S 1.58 2468 Zilla Overlay 40mm @ Traff >=2000 2021 4.905 0.000
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 021.57‐021.87 S 0.30 2468 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 1.339
Z1098 Cox`s Bazar‐Teknaf Sea beach Road Km 021.87‐022.31 S 0.44 2468 Zilla Overlay 40mm @ Traff >=2000 2021 1.367 0.000
Z1099 Teknaf‐Shahparirdwip Road Km 000.00‐000.30 S 0.30 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.143
Z1099 Teknaf‐Shahparirdwip Road Km 000.30‐000.40 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1099 Teknaf‐Shahparirdwip Road Km 000.40‐008.20 S 7.80 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 24.502 0.000
Z1122 Noor Ahmed Ghata‐Badarkhali Road Km 000.10‐000.30 S 0.20 3035 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.206
Z1123 Moronguna‐Darbeshghata Road Km 000.00‐001.00 S 1.00 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 11.074 0.985
Z1124 Harbang‐Villagerpara‐Toitong Road Km 000.00‐001.00 S 1.00 1346 Zilla Overlay 40mm @ IRI>12 2021 3.124 0.000
Z1127 Lakkharchar‐Betua Bazar‐Bagguzzara Road Km 007.30‐007.40 S 0.10 687 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 000.00‐000.20 S 0.20 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 000.20‐000.50 S 0.30 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.937 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 000.50‐000.80 S 0.30 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.937 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 000.80‐001.70 S 0.90 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.812 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 001.70‐002.90 S 1.20 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.749 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 004.00‐006.60 S 2.60 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 8.101 0.139
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 006.60‐006.90 S 0.30 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.935 0.000
Z1128 Illisha Bazar‐Demusia‐Bagguzzara Road Km 006.90‐007.57 S 0.67 757 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.072 0.186
Z1129 Pir Malek Ghat‐Azam Road Km 000.00‐004.40 S 4.40 1745 Zilla Overlay 40mm @ 1000‐2000 2021 13.784 0.000
Z1130 Dulahazra‐Garzania‐Kossopia‐Baisari ‐Ukhia Road Km 002.40‐002.50 S 0.10 488 Zilla Overlay 40mm @ IRI>12 2021 0.309 0.000
Z1132 Khuruskul Bridge‐Chowfaldandi‐Eidgah Road Km 000.10‐000.20 S 0.10 3570 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.976
Z1132 Khuruskul Bridge‐Chowfaldandi‐Eidgah Road Km 001.40‐001.60 S 0.20 3570 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 1.792
Z1132 Khuruskul Bridge‐Chowfaldandi‐Eidgah Road Km 003.70‐003.80 S 0.10 3570 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 2.523
Z1133 Whykhong‐Shaplapur Road Km 000.00‐001.00 S 1.00 1391 Zilla Overlay 40mm @ 1000‐2000 2021 3.141 0.000
Z1133 Whykhong‐Shaplapur Road Km 001.00‐001.70 S 0.70 1391 Zilla Overlay 40mm @ 1000‐2000 2021 2.193 0.000
Z1133 Whykhong‐Shaplapur Road Km 001.70‐001.80 S 0.10 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.312 0.000
Z1133 Whykhong‐Shaplapur Road Km 001.80‐002.20 S 0.40 1391 Zilla Overlay 40mm @ 1000‐2000 2021 1.250 0.000
Z1133 Whykhong‐Shaplapur Road Km 002.20‐002.60 S 0.40 1391 Zilla Overlay 40mm @ 1000‐2000 2021 1.250 0.000
Z1133 Whykhong‐Shaplapur Road Km 002.60‐002.80 S 0.20 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.625 0.000
Z1133 Whykhong‐Shaplapur Road Km 002.80‐003.80 S 1.00 1391 Zilla Overlay 40mm @ 1000‐2000 2021 3.124 0.000
Z1133 Whykhong‐Shaplapur Road Km 003.80‐004.80 S 1.00 1391 Zilla Overlay 40mm @ 1000‐2000 2021 3.107 0.000
Z1133 Whykhong‐Shaplapur Road Km 004.80‐005.10 S 0.30 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.925 0.000
Z1133 Whykhong‐Shaplapur Road Km 005.10‐005.20 S 0.10 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.308 0.095
Z1133 Whykhong‐Shaplapur Road Km 005.20‐005.40 S 0.20 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.616 0.000
Z1133 Whykhong‐Shaplapur Road Km 005.40‐005.70 S 0.30 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.925 0.000
Z1133 Whykhong‐Shaplapur Road Km 005.70‐005.80 S 0.10 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.308 0.000
Z1133 Whykhong‐Shaplapur Road Km 005.80‐006.00 S 0.20 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.620 0.000
Z1133 Whykhong‐Shaplapur Road Km 006.00‐006.10 S 0.10 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z1133 Whykhong‐Shaplapur Road Km 006.10‐006.40 S 0.30 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Page 20 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1133 Whykhong‐Shaplapur Road Km 006.40‐006.60 S 0.20 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z1133 Whykhong‐Shaplapur Road Km 006.60‐008.10 S 1.50 1391 Zilla Overlay 40mm @ 1000‐2000 2021 4.661 0.000
Z1133 Whykhong‐Shaplapur Road Km 008.10‐008.90 S 0.80 1391 Zilla Overlay 40mm @ 1000‐2000 2021 2.479 0.000
Z1133 Whykhong‐Shaplapur Road Km 008.90‐009.10 S 0.20 1391 Zilla Overlay 40mm @ 1000‐2000 2021 0.623 0.000
Z1133 Whykhong‐Shaplapur Road Km 009.10‐009.61 S 0.51 1391 Zilla Overlay 40mm @ 1000‐2000 2021 1.583 0.000
Z1135 Konkakhali‐Demushian Road Km 000.20‐002.57 S 2.37 1433 Zilla Overlay 40mm @ 1000‐2000 2021 7.292 0.060
Z1136 Safaripark‐Majirpura Road Km 000.00‐000.40 L 0.40 1373 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z1136 Safaripark‐Majirpura Road Km 000.00‐000.40 R 0.40 1373 Zilla Overlay 40mm @ 1000‐2000 2021 1.260 0.000
Z1504 Ukhia‐Gundhum Road  Km 000.00‐002.04 S 2.04 1272 Zilla Overlay 40mm @ 1000‐2000 2021 6.227 0.000
Cox's Bazar Total 953.269
Dohazari Division
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 247.89‐248.56 S 0.67 16578 National Overlay 80mm @ IRI 4‐9 2021 7.753 23.669
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 248.56‐248.76 S 0.20 16578 National Full Recon 195mm @ IRI 12 2021 10.221 9.541
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 248.76‐251.32 S 2.56 15813 National Overlay 80mm @ IRI 4‐9 2021 29.564 23.599
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 251.32‐251.42 S 0.10 14795 National Full Recon 195mm @ IRI 12 2021 5.111 9.650
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 251.42‐252.12 S 0.70 14795 National Overlay 80mm @ IRI 4‐9 2021 8.100 22.691
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 252.12‐252.22 S 0.10 14795 National Full Recon 195mm @ IRI 12 2021 5.111 9.655
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 252.22‐263.32 S 11.10 16604 National Rehab 195mm @ IRI 9‐12 2021 483.962 8.463
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 263.32‐263.42 S 0.10 17278 National Full Recon 195mm 2021 5.330 7.057
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 263.42‐267.52 S 4.10 15333 National Overlay 80mm @ IRI 4‐9 2021 53.676 15.410
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 267.52‐267.72 S 0.20 15126 National Full Recon 195mm 2021 10.513 6.345
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 267.72‐268.32 S 0.60 15126 National Overlay 80mm @ IRI 4‐9 2021 7.141 16.895
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 268.32‐268.42 S 0.10 15126 National Full Recon 195mm 2021 5.257 6.345
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 268.42‐270.32 S 1.90 15126 National Rehab 195mm @ IRI 9‐12 2021 83.762 6.618
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 270.32‐270.42 S 0.10 15126 National Full Recon 195mm 2021 5.987 5.470
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 270.42‐271.52 S 1.10 15126 National Overlay 80mm @ IRI 4‐9 2021 14.910 14.133
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 271.52‐271.62 S 0.10 15126 National Full Recon 195mm 2021 5.987 5.473
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 271.62‐272.42 S 0.80 15126 National Overlay 80mm @ IRI 4‐9 2021 10.711 14.994
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 272.42‐272.62 S 0.20 15126 National Full Recon 195mm 2021 10.513 5.991
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 272.62‐278.62 S 6.00 13938 National Overlay 80mm @ IRI 4‐9 2021 71.410 16.925
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 278.62‐278.82 S 0.20 13157 National Rehab 195mm @ IRI 9‐12 2021 8.732 7.005
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 278.82‐278.92 S 0.10 13157 National Full Recon 195mm 2021 5.257 6.644
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 278.92‐279.22 S 0.30 13157 National Rehab 195mm @ IRI 9‐12 2021 13.098 7.147
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 279.22‐279.32 S 0.10 13157 National Full Recon 195mm 2021 5.257 6.667
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 279.32‐279.52 S 0.20 13157 National Full Recon 195mm 2021 10.513 6.407
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 279.52‐279.62 S 0.10 13157 National Full Recon 195mm 2021 5.257 6.668
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 279.62‐297.44 S 17.82 13157 National Rehab 195mm @ IRI 9‐12 2021 804.105 6.673
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 310.53‐313.38 S 2.85 9089 National Overlay 50mm @ IRI 4‐7 2021 21.262 18.722
R171 Banshkhali (Charati)‐Chunti Road Km 000.00‐000.90 S 0.90 1348 Regional DBST Traff All 2021 1.689 0.000
R171 Banshkhali (Charati)‐Chunti Road Km 000.90‐001.00 S 0.10 1348 Regional Overlay 50mm @ IRI 7‐9 2021 0.389 1.284
R171 Banshkhali (Charati)‐Chunti Road Km 001.00‐001.10 S 0.10 1348 Regional DBST Traff All 2021 0.183 0.000
R171 Banshkhali (Charati)‐Chunti Road Km 001.10‐001.70 S 0.60 1348 Regional Overlay 50mm @ IRI 7‐9 2021 2.306 0.662
R171 Banshkhali (Charati)‐Chunti Road Km 001.70‐001.91 S 0.21 1348 Regional DBST Traff All 2021 0.358 0.000
Page 21 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R171 Banshkhali (Charati)‐Chunti Road Km 009.93‐013.03 S 3.10 1348 Regional Overlay 50mm @ IRI 7‐9 2021 11.783 0.561
R171 Banshkhali (Charati)‐Chunti Road Km 013.03‐013.13 S 0.10 1348 Regional DBST @ Traff 100‐2000 2021 0.178 0.490
R171 Banshkhali (Charati)‐Chunti Road Km 013.13‐013.73 S 0.60 1348 Regional DBST @ 25% Crk 2021 1.070 0.286
R171 Banshkhali (Charati)‐Chunti Road Km 013.73‐013.83 S 0.10 1348 Regional Full Recon 110mm 2021 1.781 0.564
R171 Banshkhali (Charati)‐Chunti Road Km 013.83‐015.63 S 1.80 1348 Regional Overlay 50mm @ IRI 5‐7 2021 6.917 0.571
R171 Banshkhali (Charati)‐Chunti Road Km 015.63‐015.73 S 0.10 1348 Regional DBST Traff All 2021 0.181 0.000
R171 Banshkhali (Charati)‐Chunti Road Km 015.73‐015.87 S 0.14 1348 Regional DBST @ 25% Crk 2021 0.255 0.395
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 000.00‐000.10 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 000.10‐000.20 S 0.10 1712 Zilla Overlay 40mm @ IRI>12 2021 0.311 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 000.20‐000.60 S 0.40 1712 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 000.60‐001.00 S 0.40 1712 Zilla Overlay 40mm @ 1000‐2000 2021 1.240 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 001.10‐001.60 S 0.50 1712 Zilla Overlay 40mm @ 1000‐2000 2021 1.545 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 001.60‐002.00 S 0.40 1712 Zilla Overlay 40mm @ 1000‐2000 2021 1.236 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.00‐002.10 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.309 0.026
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.10‐002.20 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.309 0.015
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.20‐002.40 S 0.20 1712 Zilla Overlay 40mm @ IRI>12 2021 0.618 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.40‐002.50 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.309 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.50‐002.60 S 0.10 1712 Zilla Full Recon 75mm @ IRI>12 2021 1.582 0.125
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 002.60‐003.20 S 0.60 1712 Zilla Overlay 40mm @ 1000‐2000 2021 1.854 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 003.20‐003.40 S 0.20 1712 Zilla Overlay 40mm @ IRI>12 2021 0.618 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 003.40‐006.50 S 3.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 9.527 0.000
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 006.50‐006.60 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.019
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 006.80‐006.90 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.002
Z1026 Khanahat‐Dopchhari‐Bandarban Road Km 006.90‐007.00 S 0.10 1712 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.012
Z1037 Ghatiadanga‐Monufakirhat Road Km 004.10‐007.10 S 3.00 4444 Zilla Overlay 50mm @ Cracking >25% 2021 11.498 0.695
Z1037 Ghatiadanga‐Monufakirhat Road Km 007.10‐007.40 S 0.30 4444 Zilla Overlay 50mm @ IRI 6‐9 2021 1.121 1.522
Z1037 Ghatiadanga‐Monufakirhat Road Km 007.40‐008.00 S 0.60 4444 Zilla Full Recon 75mm @ IRI>12 2021 9.285 0.495
Z1037 Ghatiadanga‐Monufakirhat Road Km 008.10‐008.50 S 0.40 4444 Zilla Rehab 75mm @ IRI 9‐12 2021 4.286 1.428
Z1037 Ghatiadanga‐Monufakirhat Road Km 010.20‐012.24 S 2.04 4444 Zilla Rehab 75mm @ IRI 9‐12 2021 22.835 1.164
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 000.00‐000.10 S 0.10 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 000.10‐000.20 S 0.10 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.468
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 000.20‐000.60 S 0.40 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 000.60‐000.80 S 0.20 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.338
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 000.80‐001.20 S 0.40 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 001.20‐001.40 S 0.20 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.192
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 001.40‐001.50 S 0.10 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 001.50‐001.60 S 0.10 2489 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.216
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 001.60‐002.10 S 0.50 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.568 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 002.10‐002.50 S 0.40 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.387
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 002.50‐002.80 S 0.30 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 002.80‐002.90 S 0.10 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.448
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 006.70‐007.30 S 0.60 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.890 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 007.30‐008.50 S 1.20 2489 Zilla Overlay 40mm @ Traff >=2000 2021 3.780 0.239
Page 22 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 008.50‐008.70 S 0.20 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.630 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 008.70‐009.80 S 1.10 2489 Zilla Overlay 40mm @ IRI>12 2021 3.465 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 009.80‐010.10 S 0.30 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 010.10‐010.50 S 0.40 2489 Zilla Overlay 40mm @ IRI>12 2021 1.257 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 010.50‐010.60 S 0.10 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.311 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 010.60‐011.90 S 1.30 2489 Zilla Overlay 40mm @ IRI>12 2021 4.040 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 011.90‐012.20 S 0.30 2489 Zilla Overlay 40mm @ Traff >=2000 2021 0.932 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 012.20‐012.40 S 0.20 2489 Zilla Full Recon 75mm @ IRI>12 2021 3.182 0.198
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 012.40‐012.80 S 0.40 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.243 0.000
Z1039 Patiya ‐ Chandanaish (Baltali) Road Km 012.80‐012.90 S 0.10 2489 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 0.417
Z1040 Gachbaria‐Anowara Road Km 000.20‐000.30 S 0.10 7938 Zilla Full Recon 75mm @ IRI>12 2021 2.356 1.757
Z1040 Gachbaria‐Anowara Road Km 002.30‐002.40 S 0.10 7938 Zilla Rehab 75mm @ IRI 9‐12 2021 1.622 2.770
Z1040 Gachbaria‐Anowara Road Km 016.30‐016.48 S 0.18 7938 Zilla Rehab 75mm @ IRI 9‐12 2021 2.888 2.393
Z1054 Barkal Bridge‐Barkal Union Connecting Road Km 000.10‐000.60 S 0.50 4379 Zilla Full Recon 75mm @ IRI>12 2021 7.825 0.501
Z1054 Barkal Bridge‐Barkal Union Connecting Road Km 000.70‐000.90 S 0.20 4379 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.570
Z1054 Barkal Bridge‐Barkal Union Connecting Road Km 000.90‐001.20 S 0.30 4379 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 1.299
Z1054 Barkal Bridge‐Barkal Union Connecting Road Km 001.20‐001.30 S 0.10 4379 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.045
Z1054 Barkal Bridge‐Barkal Union Connecting Road Km 001.40‐001.68 S 0.28 4379 Zilla Rehab 75mm @ IRI 9‐12 2021 2.963 1.114
Z1057 Patiya‐Anadadatta‐Haidgaon‐Rangunia Road Km 005.07‐009.28 S 4.20 2647 Zilla Rehab 75mm @ IRI 9‐12 2021 51.601 0.984
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 016.36‐016.46 S 0.10 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.469 0.000
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 016.46‐016.66 S 0.20 1835 Zilla Rehab 75mm @ IRI 9‐12 2021 3.304 0.221
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 017.06‐018.53 S 1.47 1835 Zilla Full Recon 75mm @ IRI>12 2021 26.335 0.190
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 018.53‐018.63 S 0.10 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.115
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 018.63‐018.93 S 0.30 1835 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.440
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 018.93‐019.03 S 0.10 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.142
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 019.03‐020.13 S 1.10 1835 Zilla Full Recon 75mm @ IRI>12 2021 18.505 0.475
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 020.13‐020.23 S 0.10 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.312 0.000
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 020.23‐021.03 S 0.80 1835 Zilla Rehab 75mm @ IRI 9‐12 2021 9.338 0.859
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 021.33‐021.43 S 0.10 1835 Zilla Rehab 75mm @ IRI 9‐12 2021 1.098 1.066
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 021.43‐021.63 S 0.20 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.623 0.162
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 021.63‐023.03 S 1.40 1835 Zilla Full Recon 75mm @ IRI>12 2021 22.274 0.541
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 023.13‐023.33 S 0.20 1835 Zilla Full Recon 75mm @ IRI>12 2021 3.182 0.735
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 023.33‐024.09 S 0.76 1835 Zilla Overlay 40mm @ 1000‐2000 2021 2.365 0.000
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 024.09‐024.39 S 0.30 1835 Zilla Full Recon 75mm @ IRI>12 2021 4.773 0.540
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 024.39‐024.89 S 0.50 1835 Zilla Overlay 40mm @ 1000‐2000 2021 1.554 0.145
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 024.89‐024.99 S 0.10 1835 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.856
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 025.09‐025.19 S 0.10 1835 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.802
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 025.19‐025.49 S 0.30 1835 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z1065 Maizzertek‐Kanongapara‐Udarbanna Road Km 025.49‐025.67 S 0.18 1835 Zilla Rehab 75mm @ IRI 9‐12 2021 1.939 1.128
Z1070 Patiya ‐Anowara Road Km 000.90‐001.00 S 0.10 1135 Zilla Overlay 40mm @ IRI>12 2021 0.312 0.000
Z1070 Patiya ‐Anowara Road Km 001.20‐001.50 S 0.30 1135 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z1070 Patiya ‐Anowara Road Km 001.80‐001.90 S 0.10 1135 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1070 Patiya ‐Anowara Road Km 012.85‐013.45 S 0.60 1135 Zilla Overlay 40mm @ 1000‐2000 2021 1.824 0.000
Page 23 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1070 Patiya ‐Anowara Road Km 013.45‐013.75 S 0.30 1135 Zilla Overlay 40mm @ 1000‐2000 2021 0.912 0.000
Z1071 Santirhat‐Kaliganj Road Km 003.10‐003.23 S 0.13 2592 Zilla Rehab 75mm @ IRI 9‐12 2021 1.309 1.027
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 000.00‐000.30 S 0.30 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 3.286 2.150
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 000.80‐000.90 S 0.10 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 3.100
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 001.20‐001.30 S 0.10 3973 Zilla Full Recon 75mm @ IRI>12 2021 1.600 1.671
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 001.50‐001.60 S 0.10 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 1.101 2.328
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 001.90‐002.90 S 1.00 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 11.014 1.354
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 003.20‐003.50 S 0.30 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 3.304 2.240
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 003.50‐005.00 S 1.50 3973 Zilla Overlay 40mm @ Traff >=2000 2021 4.674 1.233
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 005.00‐005.40 S 0.40 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 4.382 2.189
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 006.40‐006.60 S 0.20 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 2.549
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 006.70‐006.90 S 0.20 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 2.549
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 007.10‐007.90 S 0.80 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 8.764 1.957
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 008.20‐008.30 S 0.10 3973 Zilla Full Recon 75mm @ IRI>12 2021 1.591 2.065
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 010.10‐010.30 S 0.20 3973 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.385
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 010.30‐011.20 S 0.90 3973 Zilla Overlay 40mm @ Traff >=2000 2021 2.789 1.245
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 011.20‐011.30 S 0.10 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 3.220
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 012.40‐012.60 S 0.20 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 2.196 2.549
Z1088 CUFL Gate‐Juidandi Ferry Ghat Road Km 012.80‐013.00 S 0.20 3973 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 2.419
Z1703 Anwara ‐ Tailardwip Ferryghat Road Km 000.00‐000.40 S 0.40 754 Zilla Overlay 40mm @ IRI>12 2021 1.189 0.000
Z1703 Anwara ‐ Tailardwip Ferryghat Road Km 001.20‐001.30 S 0.10 754 Zilla Overlay 40mm @ IRI>12 2021 0.301 0.000
Z1703 Anwara ‐ Tailardwip Ferryghat Road Km 003.30‐003.70 S 0.40 754 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.260 0.000
Z1802 Telegati‐Allaher Darber Sharif Road Km 000.25‐000.35 S 0.10 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 1.086 2.373
Z1802 Telegati‐Allaher Darber Sharif Road Km 000.35‐000.55 S 0.20 4131 Zilla Overlay 50mm @ IRI 6‐9 2021 0.762 2.330
Z1802 Telegati‐Allaher Darber Sharif Road Km 000.55‐000.75 S 0.20 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 2.173 1.665
Z1802 Telegati‐Allaher Darber Sharif Road Km 001.15‐001.35 S 0.20 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 2.161 1.611
Z1802 Telegati‐Allaher Darber Sharif Road Km 001.35‐002.05 S 0.70 4131 Zilla Overlay 50mm @ IRI 6‐9 2021 2.653 2.308
Z1802 Telegati‐Allaher Darber Sharif Road Km 002.05‐002.85 S 0.80 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 8.620 0.892
Z1802 Telegati‐Allaher Darber Sharif Road Km 002.95‐003.25 S 0.30 4131 Zilla Full Recon 75mm @ IRI>12 2021 4.695 0.766
Z1802 Telegati‐Allaher Darber Sharif Road Km 003.55‐004.35 S 0.80 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 8.620 1.328
Z1802 Telegati‐Allaher Darber Sharif Road Km 004.35‐004.45 S 0.10 4131 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1802 Telegati‐Allaher Darber Sharif Road Km 004.45‐004.55 S 0.10 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.843
Z1802 Telegati‐Allaher Darber Sharif Road Km 004.55‐004.65 S 0.10 4131 Zilla Overlay 50mm @ IRI 6‐9 2021 0.379 0.878
Z1802 Telegati‐Allaher Darber Sharif Road Km 004.65‐004.75 S 0.10 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 1.080 2.249
Z1802 Telegati‐Allaher Darber Sharif Road Km 004.85‐006.15 S 1.30 4131 Zilla Full Recon 75mm @ IRI>12 2021 20.400 0.588
Z1802 Telegati‐Allaher Darber Sharif Road Km 006.15‐006.35 S 0.20 4131 Zilla Overlay 50mm @ IRI 6‐9 2021 0.758 2.410
Z1802 Telegati‐Allaher Darber Sharif Road Km 006.35‐006.95 S 0.60 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 6.483 0.742
Z1802 Telegati‐Allaher Darber Sharif Road Km 007.05‐007.25 S 0.20 4131 Zilla Rehab 75mm @ IRI 9‐12 2021 2.161 1.611
Z1802 Telegati‐Allaher Darber Sharif Road Km 008.66‐008.96 S 0.30 4131 Zilla Full Recon 75mm @ IRI>12 2021 4.721 0.696
Z1802 Telegati‐Allaher Darber Sharif Road Km 008.96‐009.52 S 0.56 4131 Zilla Overlay 50mm @ IRI 6‐9 2021 2.132 1.673
Dohazari Total 2155.699
Khagrachari Division
R152 Heako‐Ramgarh‐Jaliapara Road Km 014.73‐017.91 S 3.18 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.271 2.539
Page 24 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R152 Heako‐Ramgarh‐Jaliapara Road Km 017.91‐020.11 S 2.20 5412 Regional DBST @ Traff 4000‐6000 2021 5.988 1.611
R152 Heako‐Ramgarh‐Jaliapara Road Km 020.11‐020.31 S 0.20 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.396 3.613
R152 Heako‐Ramgarh‐Jaliapara Road Km 020.31‐021.41 S 1.10 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.679 1.781
R152 Heako‐Ramgarh‐Jaliapara Road Km 021.41‐021.51 S 0.10 5412 Regional Full Recon 150mm 2021 3.398 1.505
R152 Heako‐Ramgarh‐Jaliapara Road Km 021.51‐022.31 S 0.80 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.624 2.109
R152 Heako‐Ramgarh‐Jaliapara Road Km 022.31‐022.50 S 0.19 5412 Regional Full Recon 150mm 2021 6.650 0.821
R152 Heako‐Ramgarh‐Jaliapara Road Km 022.50‐022.70 S 0.20 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.406 2.696
R152 Heako‐Ramgarh‐Jaliapara Road Km 022.70‐022.90 S 0.20 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.406 3.753
R152 Heako‐Ramgarh‐Jaliapara Road Km 022.90‐024.20 S 1.30 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.124 1.821
R152 Heako‐Ramgarh‐Jaliapara Road Km 024.20‐024.60 S 0.40 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.787 3.279
R152 Heako‐Ramgarh‐Jaliapara Road Km 024.60‐025.10 S 0.50 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.453 2.374
R152 Heako‐Ramgarh‐Jaliapara Road Km 025.10‐025.20 S 0.10 5412 Regional DBST @ Traff 4000‐6000 2021 0.273 3.772
R152 Heako‐Ramgarh‐Jaliapara Road Km 025.20‐026.10 S 0.90 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.215 1.931
R152 Heako‐Ramgarh‐Jaliapara Road Km 026.10‐026.40 S 0.30 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.068 3.545
R152 Heako‐Ramgarh‐Jaliapara Road Km 026.40‐027.10 S 0.70 5412 Regional DBST @ 25% Crk 2021 1.905 1.603
R152 Heako‐Ramgarh‐Jaliapara Road Km 027.10‐027.40 S 0.30 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.068 3.503
R152 Heako‐Ramgarh‐Jaliapara Road Km 027.40‐028.60 S 1.20 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.287 1.828
R152 Heako‐Ramgarh‐Jaliapara Road Km 028.60‐028.80 S 0.20 5412 Regional Full Recon 150mm 2021 6.699 1.037
R152 Heako‐Ramgarh‐Jaliapara Road Km 028.80‐032.10 S 3.30 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.871 1.883
R152 Heako‐Ramgarh‐Jaliapara Road Km 032.10‐032.30 S 0.20 5412 Regional DBST @ Traff 4000‐6000 2021 0.549 3.325
R152 Heako‐Ramgarh‐Jaliapara Road Km 032.30‐032.40 S 0.10 5412 Regional DBST @ Traff 4000‐6000 2021 0.274 2.862
R152 Heako‐Ramgarh‐Jaliapara Road Km 032.40‐032.50 S 0.10 5412 Regional Full Recon 150mm 2021 3.362 1.520
R152 Heako‐Ramgarh‐Jaliapara Road Km 032.50‐036.10 S 3.60 5412 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.995 2.547
R152 Heako‐Ramgarh‐Jaliapara Road Km 036.10‐036.20 S 0.10 5412 Regional Full Recon 150mm 2021 3.374 1.532
R152 Heako‐Ramgarh‐Jaliapara Road Km 036.20‐036.21 S 0.01 5412 Regional DBST @ 25% Crk 2021 0.019 27.628
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 042.77‐043.81 S 1.04 2923 Regional DBST @ Traff 2000‐4000 2021 2.825 0.719
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 043.81‐044.01 S 0.20 2923 Regional Full Recon 135mm 2021 6.021 0.447
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 044.01‐057.21 S 13.20 2923 Regional DBST @ Traff 2000‐4000 2021 36.647 0.580
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 057.21‐057.31 S 0.10 2923 Regional DBST @ Traff 2000‐4000 2021 0.276 1.744
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 057.31‐060.93 S 3.62 2923 Regional Overlay 50mm @ IRI 5‐7 2021 21.291 1.024
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 060.93‐069.93 S 9.00 2923 Regional DBST @ Traff 2000‐4000 2021 24.942 0.682
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 069.93‐070.53 S 0.60 2923 Regional Overlay 50mm @ IRI 7‐9 2021 3.509 1.609
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 070.53‐070.92 S 0.38 2923 Regional Overlay 50mm @ IRI 5‐7 2021 2.248 1.220
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 070.92‐074.43 S 3.52 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 25.240 1.852
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 074.43‐074.53 S 0.10 5313 Regional Full Recon 150mm 2021 3.404 1.431
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 074.53‐077.83 S 3.30 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.160 2.255
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 077.83‐077.93 S 0.10 5313 Regional DBST @ Traff 4000‐6000 2021 0.277 3.415
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 077.93‐080.43 S 2.50 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 17.451 1.635
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 080.43‐080.53 S 0.10 5313 Regional DBST @ Traff 4000‐6000 2021 0.275 3.528
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 080.53‐082.63 S 2.10 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.633 1.642
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 082.63‐083.63 S 1.00 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.968 2.807
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 083.63‐084.33 S 0.70 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.904 1.636
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 084.33‐084.53 S 0.20 5313 Regional DBST @ Traff 4000‐6000 2021 0.553 2.884
Page 25 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 084.53‐084.83 S 0.30 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 2.235
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 084.83‐085.13 S 0.30 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 3.260
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 085.13‐085.93 S 0.80 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.604 2.062
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 085.93‐086.03 S 0.10 5313 Regional Full Recon 150mm 2021 3.398 1.478
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 086.03‐086.73 S 0.70 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.904 1.811
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 086.73‐086.83 S 0.10 5313 Regional DBST @ Traff 4000‐6000 2021 0.277 3.545
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 086.83‐087.83 S 1.00 5313 Regional DBST @ Traff 4000‐6000 2021 2.929 0.988
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 087.83‐087.93 S 0.10 5313 Regional Rehab 150mm @ IRI 9‐12 2021 3.207 0.403
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 087.93‐089.03 S 1.10 5313 Regional DBST @ Traff 4000‐6000 2021 3.608 0.665
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 089.03‐089.23 S 0.20 5313 Regional DBST @ Traff 4000‐6000 2021 0.656 0.398
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 089.23‐089.73 S 0.50 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.153 1.402
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 089.73‐089.91 S 0.18 5313 Regional Full Recon 150mm 2021 7.132 0.442
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 089.91‐091.21 S 1.30 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.474 0.845
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 092.01‐092.31 S 0.30 5313 Regional Rehab 150mm @ IRI 9‐12 2021 8.274 0.687
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 092.31‐093.11 S 0.80 5313 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.715 1.597
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 093.11‐093.21 S 0.10 5313 Regional Rehab 150mm @ IRI 9‐12 2021 2.758 1.093
R160 Hathazari‐Fatikchhari‐Khagrachhari Road Km 093.21‐093.29 S 0.09 5313 Regional DBST @ 25% Crk 2021 0.245 2.439
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 039.67‐043.14 S 3.48 2925 Regional Overlay 50mm @ IRI 7‐9 2021 13.545 1.122
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 043.14‐043.24 S 0.10 2925 Regional DBST @ Traff 2000‐4000 2021 0.183 1.781
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 043.24‐044.64 S 1.40 2925 Regional Overlay 50mm @ IRI 5‐7 2021 5.454 1.136
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 044.64‐044.74 S 0.10 2925 Regional DBST @ 25% Crk 2021 0.183 2.495
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 044.74‐044.94 S 0.20 2925 Regional Overlay 50mm @ IRI 7‐9 2021 0.779 2.252
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 044.94‐047.94 S 3.00 2925 Regional Overlay 50mm @ IRI 5‐7 2021 14.553 0.894
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 047.94‐049.64 S 1.70 2925 Regional DBST @ Traff 2000‐4000 2021 4.711 0.174
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 049.64‐049.76 S 0.12 2925 Regional DBST Traff All 2021 0.327 0.000
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 049.76‐053.26 S 3.50 2925 Regional DBST @ 25% Crk 2021 9.717 0.228
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 053.26‐056.26 S 3.00 2925 Regional DBST @ Traff 2000‐4000 2021 8.329 0.152
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 056.26‐059.36 S 3.10 2925 Regional DBST @ Traff 2000‐4000 2021 8.606 0.153
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 059.36‐061.51 S 2.14 2925 Regional Overlay 50mm @ IRI 5‐7 2021 12.658 0.398
Z1601 Manikchahri‐Laksmichhari Road Km 000.00‐000.40 S 0.40 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 3.831 0.493
Z1601 Manikchahri‐Laksmichhari Road Km 000.40‐000.50 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 000.50‐003.10 S 2.60 3083 Zilla Overlay 40mm @ Traff >=2000 2021 7.064 0.929
Z1601 Manikchahri‐Laksmichhari Road Km 003.10‐003.20 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 003.20‐005.60 S 2.40 3083 Zilla Overlay 40mm @ Traff >=2000 2021 6.520 0.956
Z1601 Manikchahri‐Laksmichhari Road Km 005.60‐005.70 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 005.70‐005.90 S 0.20 3083 Zilla Full Recon 75mm @ IRI>12 2021 2.782 0.306
Z1601 Manikchahri‐Laksmichhari Road Km 005.90‐006.30 S 0.40 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.087 0.365
Z1601 Manikchahri‐Laksmichhari Road Km 006.30‐006.40 S 0.10 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 0.749
Z1601 Manikchahri‐Laksmichhari Road Km 006.40‐006.60 S 0.20 3083 Zilla Overlay 40mm @ Cracks >25% 2021 0.515 0.007
Z1601 Manikchahri‐Laksmichhari Road Km 006.60‐007.20 S 0.60 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 5.747 0.435
Z1601 Manikchahri‐Laksmichhari Road Km 007.20‐007.30 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 007.30‐007.40 S 0.10 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 0.817
Z1601 Manikchahri‐Laksmichhari Road Km 007.40‐007.50 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Page 26 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1601 Manikchahri‐Laksmichhari Road Km 007.50‐008.10 S 0.60 3083 Zilla Full Recon 75mm @ IRI>12 2021 8.346 0.119
Z1601 Manikchahri‐Laksmichhari Road Km 008.10‐008.50 S 0.40 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.087 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 008.50‐008.70 S 0.20 3083 Zilla Full Recon 75mm @ IRI>12 2021 2.782 0.326
Z1601 Manikchahri‐Laksmichhari Road Km 008.70‐009.70 S 1.00 3083 Zilla Overlay 40mm @ Traff >=2000 2021 2.717 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 009.70‐010.30 S 0.60 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 5.747 0.464
Z1601 Manikchahri‐Laksmichhari Road Km 010.30‐011.10 S 0.80 3083 Zilla Overlay 40mm @ Traff >=2000 2021 2.173 0.437
Z1601 Manikchahri‐Laksmichhari Road Km 011.10‐011.70 S 0.60 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.630 0.851
Z1601 Manikchahri‐Laksmichhari Road Km 011.70‐012.10 S 0.40 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.087 0.186
Z1601 Manikchahri‐Laksmichhari Road Km 012.10‐012.50 S 0.40 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.087 0.708
Z1601 Manikchahri‐Laksmichhari Road Km 012.50‐013.00 S 0.50 3083 Zilla Overlay 40mm @ Traff >=2000 2021 1.361 0.430
Z1601 Manikchahri‐Laksmichhari Road Km 013.00‐013.30 S 0.30 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.815 0.660
Z1601 Manikchahri‐Laksmichhari Road Km 013.30‐013.40 S 0.10 3083 Zilla Overlay 40mm @ Traff >=2000 2021 0.272 0.000
Z1601 Manikchahri‐Laksmichhari Road Km 013.40‐013.50 S 0.10 3083 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 0.523
Z1601 Manikchahri‐Laksmichhari Road Km 013.50‐013.84 S 0.33 3083 Zilla Overlay 40mm @ Cracks >25% 2021 0.859 0.086
Z1602 Jaliapara‐Sindukchhari‐Mahalchhari Road Km 003.30‐005.90 S 2.60 2951 Zilla Overlay 40mm @ Traff >=2000 2021 8.079 0.306
Z1602 Jaliapara‐Sindukchhari‐Mahalchhari Road Km 005.90‐006.00 S 0.10 2951 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.229
Z1602 Jaliapara‐Sindukchhari‐Mahalchhari Road Km 006.00‐007.60 S 1.60 2951 Zilla Overlay 40mm @ Traff >=2000 2021 4.972 0.504
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 000.10‐000.60 S 0.50 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 5.612 1.166
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 000.60‐000.80 S 0.20 5128 Zilla Overlay 40mm @ Traff >=2000 2021 0.637 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 000.80‐000.90 S 0.10 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 1.122 1.404
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 000.90‐001.20 S 0.30 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 1.181 0.377
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 001.50‐001.70 S 0.20 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 2.245 0.794
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 003.50‐003.70 S 0.20 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 0.785 0.616
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 003.70‐003.90 S 0.20 5128 Zilla Overlay 50mm @ Cracking >25% 2021 0.785 0.162
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 003.90‐004.00 S 0.10 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 1.119 1.268
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 006.10‐006.50 S 0.40 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 1.579 1.349
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 006.50‐012.70 S 6.20 5128 Zilla Overlay 50mm @ Cracking >25% 2021 24.612 0.397
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 012.70‐015.70 S 3.00 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 11.907 0.557
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 015.70‐016.80 S 1.10 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 4.377 0.774
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 016.80‐016.90 S 0.10 5128 Zilla Full Recon 75mm @ IRI>12 2021 1.648 1.542
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 016.90‐018.97 S 2.07 5128 Zilla Overlay 40mm @ Traff >=2000 2021 6.637 0.065
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 018.97‐019.37 S 0.40 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 4.454 0.696
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 019.37‐020.47 S 1.10 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 4.170 0.460
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 020.47‐020.57 S 0.10 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 1.080 1.679
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 020.57‐020.67 S 0.10 5128 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 020.67‐020.87 S 0.20 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 2.161 0.945
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 020.87‐021.07 S 0.20 5128 Zilla Overlay 40mm @ Traff >=2000 2021 0.615 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 021.07‐021.87 S 0.80 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 9.362 0.958
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 021.97‐022.27 S 0.30 15384 Zilla Rehab 75mm @ IRI 9‐12 2021 4.858 1.999
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 022.27‐022.47 S 0.20 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 0.825 0.950
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 022.57‐023.37 S 0.80 5128 Zilla Overlay 40mm @ Traff >=2000 2021 2.486 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 023.37‐023.47 S 0.10 5128 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.147
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 023.47‐023.67 S 0.20 5128 Zilla Overlay 50mm @ Cracking >25% 2021 0.769 0.199
Page 27 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 023.67‐025.57 S 1.90 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 21.098 0.493
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 025.57‐025.67 S 0.10 5128 Zilla Overlay 40mm @ Traff >=2000 2021 0.316 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 025.67‐025.97 S 0.30 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 3.304 1.247
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 025.97‐028.06 S 2.09 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 8.016 0.508
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 028.77‐028.97 S 0.20 945 Zilla Overlay 40mm @ IRI>12 2021 0.623 0.000
Z1603 Khagrachhari‐Dighinala‐Bagaihat‐Sajek Road Km 031.97‐032.07 S 0.10 945 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.315 0.000
Z1604 Khagrachhari‐Panchhari Road Km 000.04‐000.20 S 0.16 8871 Zilla Overlay 50mm @ IRI 6‐9 2021 1.042 0.437
Z1604 Khagrachhari‐Panchhari Road Km 000.20‐000.60 S 0.40 8871 Zilla Overlay 50mm @ IRI 6‐9 2021 2.604 1.340
Z1604 Khagrachhari‐Panchhari Road Km 000.60‐001.00 S 0.40 8871 Zilla Overlay 50mm @ IRI 6‐9 2021 2.604 0.888
Z1604 Khagrachhari‐Panchhari Road Km 001.00‐001.50 S 0.50 8871 Zilla Rehab 75mm @ IRI 9‐12 2021 9.278 0.893
Z1604 Khagrachhari‐Panchhari Road Km 001.50‐002.00 S 0.50 4860 Zilla Overlay 50mm @ Cracking >25% 2021 2.158 0.209
Z1604 Khagrachhari‐Panchhari Road Km 002.00‐004.50 S 2.50 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 9.660 1.881
Z1604 Khagrachhari‐Panchhari Road Km 004.50‐004.70 S 0.20 4860 Zilla Overlay 50mm @ Cracking >25% 2021 0.773 0.113
Z1604 Khagrachhari‐Panchhari Road Km 004.70‐004.80 S 0.10 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 1.101 1.451
Z1604 Khagrachhari‐Panchhari Road Km 004.80‐004.90 S 0.10 4860 Zilla Overlay 40mm @ Traff >=2000 2021 0.312 0.000
Z1604 Khagrachhari‐Panchhari Road Km 004.90‐005.60 S 0.70 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 7.710 0.691
Z1604 Khagrachhari‐Panchhari Road Km 005.60‐006.20 S 0.60 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 2.325 0.849
Z1604 Khagrachhari‐Panchhari Road Km 006.20‐006.40 S 0.20 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 1.184
Z1604 Khagrachhari‐Panchhari Road Km 006.40‐006.70 S 0.30 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 1.147 0.484
Z1604 Khagrachhari‐Panchhari Road Km 006.70‐008.10 S 1.40 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 5.380 1.033
Z1604 Khagrachhari‐Panchhari Road Km 008.20‐011.30 S 3.10 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 34.237 0.789
Z1604 Khagrachhari‐Panchhari Road Km 011.30‐014.10 S 2.80 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 31.019 0.716
Z1604 Khagrachhari‐Panchhari Road Km 014.10‐014.80 S 0.70 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 2.808 0.983
Z1604 Khagrachhari‐Panchhari Road Km 014.80‐014.90 S 0.10 4860 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.984
Z1604 Khagrachhari‐Panchhari Road Km 014.90‐015.60 S 0.70 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 7.752 0.791
Z1604 Khagrachhari‐Panchhari Road Km 015.60‐017.30 S 1.70 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 6.605 1.441
Z1604 Khagrachhari‐Panchhari Road Km 017.30‐018.80 S 1.50 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 16.611 0.698
Z1604 Khagrachhari‐Panchhari Road Km 018.80‐019.10 S 0.30 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 1.378
Z1604 Khagrachhari‐Panchhari Road Km 019.10‐019.60 S 0.50 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.899
Z1604 Khagrachhari‐Panchhari Road Km 019.60‐020.10 S 0.50 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 5.657 0.492
Z1604 Khagrachhari‐Panchhari Road Km 020.10‐020.80 S 0.70 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 7.961 0.734
Z1604 Khagrachhari‐Panchhari Road Km 020.80‐022.10 S 1.30 4860 Zilla Overlay 50mm @ IRI 6‐9 2021 5.187 1.417
Z1604 Khagrachhari‐Panchhari Road Km 022.10‐022.90 S 0.80 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 9.099 0.925
Z1604 Khagrachhari‐Panchhari Road Km 023.20‐023.40 S 0.20 4860 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.590
Z1604 Khagrachhari‐Panchhari Road Km 023.50‐024.70 S 1.20 4860 Zilla Rehab 75mm @ IRI 9‐12 2021 13.756 0.777
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 000.00‐002.10 S 2.10 1733 Zilla Overlay 40mm @ 1000‐2000 2021 6.971 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 002.10‐002.40 S 0.30 1733 Zilla Overlay 40mm @ IRI>12 2021 0.945 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 009.30‐010.00 S 0.70 1733 Zilla Overlay 40mm @ 1000‐2000 2021 2.193 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 016.40‐017.20 S 0.80 1733 Zilla Overlay 40mm @ 1000‐2000 2021 2.459 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 017.20‐017.40 S 0.20 1733 Zilla Overlay 40mm @ 1000‐2000 2021 0.623 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 017.40‐019.60 S 2.20 1733 Zilla Overlay 40mm @ 1000‐2000 2021 6.874 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 028.30‐028.70 S 0.40 1733 Zilla Overlay 40mm @ 1000‐2000 2021 1.250 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 035.90‐036.00 S 0.10 1733 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.024
Page 28 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 039.10‐039.60 S 0.50 1733 Zilla Overlay 40mm @ 1000‐2000 2021 0.989 0.000
Z1605 Dighinala‐Chhoto Merung‐Langadu Road Km 039.60‐040.44 S 0.84 1733 Zilla Overlay 40mm @ IRI>12 2021 2.639 0.000
Z1606 Baghaihat‐Marisha Road Km 000.00‐000.10 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 000.10‐002.90 S 2.80 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 8.558 0.000
Z1606 Baghaihat‐Marisha Road Km 002.90‐003.00 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.031
Z1606 Baghaihat‐Marisha Road Km 004.60‐004.90 S 0.30 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.917 0.000
Z1606 Baghaihat‐Marisha Road Km 011.90‐012.00 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.132
Z1606 Baghaihat‐Marisha Road Km 014.00‐014.10 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.051
Z1606 Baghaihat‐Marisha Road Km 014.10‐014.20 S 0.10 348 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 014.20‐014.30 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 014.30‐014.40 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 014.40‐014.70 S 0.30 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.917 0.000
Z1606 Baghaihat‐Marisha Road Km 014.70‐014.80 S 0.10 348 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 014.80‐016.00 S 1.20 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.668 0.000
Z1606 Baghaihat‐Marisha Road Km 016.00‐016.60 S 0.60 348 Zilla Overlay 40mm @ IRI>12 2021 1.834 0.000
Z1606 Baghaihat‐Marisha Road Km 016.60‐016.70 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 016.70‐017.40 S 0.70 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.139 0.000
Z1606 Baghaihat‐Marisha Road Km 017.40‐017.50 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.079
Z1606 Baghaihat‐Marisha Road Km 017.50‐018.70 S 1.20 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.668 0.000
Z1606 Baghaihat‐Marisha Road Km 018.70‐018.80 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.052
Z1606 Baghaihat‐Marisha Road Km 018.80‐018.90 S 0.10 348 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 018.90‐019.00 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1606 Baghaihat‐Marisha Road Km 019.00‐019.20 S 0.20 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.611 0.000
Z1606 Baghaihat‐Marisha Road Km 019.20‐019.30 S 0.10 348 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.051
Z1606 Baghaihat‐Marisha Road Km 019.30‐019.48 S 0.17 348 Zilla Overlay 40mm @ IRI>12 2021 0.532 0.000
Z1608 Matiranga‐Tannakapara Road Km 000.00‐000.10 S 0.10 5209 Zilla Overlay 50mm @ Cracking >25% 2021 0.420 0.080
Z1608 Matiranga‐Tannakapara Road Km 000.10‐002.00 S 1.90 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 20.586 1.120
Z1608 Matiranga‐Tannakapara Road Km 002.00‐002.10 S 0.10 5209 Zilla Overlay 50mm @ Cracking >25% 2021 0.380 0.282
Z1608 Matiranga‐Tannakapara Road Km 002.10‐008.40 S 6.30 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 69.201 0.686
Z1608 Matiranga‐Tannakapara Road Km 008.40‐009.70 S 1.30 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 14.202 1.147
Z1608 Matiranga‐Tannakapara Road Km 009.70‐009.80 S 0.10 5209 Zilla Overlay 50mm @ IRI 6‐9 2021 0.384 1.156
Z1608 Matiranga‐Tannakapara Road Km 009.80‐010.70 S 0.90 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 9.859 1.075
Z1608 Matiranga‐Tannakapara Road Km 010.70‐010.73 S 0.03 5209 Zilla Overlay 40mm @ Traff >=2000 2021 0.078 0.000
Z1608 Matiranga‐Tannakapara Road Km 010.73‐012.43 S 1.70 5209 Zilla Overlay 40mm @ Traff >=2000 2021 5.282 1.106
Z1608 Matiranga‐Tannakapara Road Km 012.63‐014.13 S 1.50 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 16.297 1.107
Z1608 Matiranga‐Tannakapara Road Km 014.23‐017.73 S 3.50 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 38.026 0.642
Z1608 Matiranga‐Tannakapara Road Km 017.73‐019.93 S 2.20 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 23.836 1.126
Z1608 Matiranga‐Tannakapara Road Km 019.93‐020.82 S 0.90 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 9.767 1.081
Z1608 Matiranga‐Tannakapara Road Km 020.82‐021.32 S 0.50 5209 Zilla Full Recon 75mm @ IRI>12 2021 7.868 0.629
Z1608 Matiranga‐Tannakapara Road Km 021.32‐025.92 S 4.60 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 49.977 1.018
Z1608 Matiranga‐Tannakapara Road Km 026.12‐026.92 S 0.80 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 8.764 1.105
Z1608 Matiranga‐Tannakapara Road Km 027.02‐028.32 S 1.30 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 14.163 1.139
Z1608 Matiranga‐Tannakapara Road Km 028.42‐029.02 S 0.60 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 6.501 1.147
Page 29 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1608 Matiranga‐Tannakapara Road Km 029.02‐029.52 S 0.50 5209 Zilla Overlay 50mm @ IRI 6‐9 2021 1.901 2.361
Z1608 Matiranga‐Tannakapara Road Km 030.12‐030.52 S 0.40 5209 Zilla Rehab 75mm @ IRI 9‐12 2021 4.274 1.320
Z1608 Matiranga‐Tannakapara Road Km 030.62‐031.02 S 0.40 5209 Zilla Overlay 50mm @ IRI 6‐9 2021 1.499 2.428
Z1608 Matiranga‐Tannakapara Road Km 031.02‐045.87 S 14.85 5209 Zilla Overlay 50mm @ IRI 6‐9 2021 56.586 1.867
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 000.00‐000.20 S 0.20 2185 Zilla Overlay 40mm @ IRI>12 2021 0.679 0.000
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 000.20‐001.00 S 0.80 2185 Zilla Overlay 40mm @ Traff >=2000 2021 2.717 0.000
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 001.00‐001.40 S 0.40 2185 Zilla Overlay 40mm @ Traff >=2000 2021 1.358 0.096
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 001.40‐001.70 S 0.30 2185 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.008
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 001.70‐001.80 S 0.10 2185 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.228
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 001.80‐003.60 S 1.80 2185 Zilla Overlay 40mm @ Traff >=2000 2021 6.052 0.000
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 003.60‐003.80 S 0.20 2185 Zilla Overlay 40mm @ Traff >=2000 2021 0.671 0.005
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 003.80‐006.20 S 2.40 2185 Zilla Overlay 40mm @ Traff >=2000 2021 8.049 0.000
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 040.12‐040.32 S 0.20 5128 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.916
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 040.42‐040.82 S 0.40 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 1.313
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 040.82‐041.62 S 0.80 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 3.066 1.427
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 041.62‐042.32 S 0.70 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 7.647 1.220
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 042.52‐042.92 S 0.40 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 1.373
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 042.92‐044.12 S 1.20 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 4.599 1.348
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 044.12‐044.32 S 0.20 5128 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.753
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 044.32‐045.92 S 1.60 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 6.115 1.177
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 045.92‐046.12 S 0.20 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 2.179 1.162
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 046.42‐046.82 S 0.40 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 1.529 1.445
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 046.82‐047.52 S 0.70 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 2.675 1.048
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 047.52‐049.82 S 2.30 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 8.742 1.893
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 049.82‐049.92 S 0.10 5128 Zilla Rehab 75mm @ IRI 9‐12 2021 1.080 1.660
Z1610 Dighinala‐Babuchhara‐Panchhari Road Km 049.92‐051.00 S 1.08 5128 Zilla Overlay 50mm @ IRI 6‐9 2021 4.079 0.765
Z1611 Dighinala Upazilla Connecting Road Km 000.00‐000.80 S 0.80 12741 Zilla Rehab 75mm @ IRI 9‐12 2021 12.930 1.291
Z1611 Dighinala Upazilla Connecting Road Km 000.80‐001.20 S 0.40 12741 Zilla Overlay 50mm @ IRI 6‐9 2021 2.268 0.752
Khagrachari Total 1412.153
Rangamati Division
N106 Chattogram‐Hathazari‐Rangamati Km 030.41‐030.44 S 0.03 19463 National Full Recon 195mm 2021 1.599 3.806
N106 Chattogram‐Hathazari‐Rangamati Km 030.44‐034.04 S 3.60 19463 National Overlay 80mm @ IRI 5‐9 2021 43.441 7.329
N106 Chattogram‐Hathazari‐Rangamati Km 034.04‐040.18 S 6.14 19463 National Overlay 80mm @ IRI 5‐9 2021 74.139 6.980
N106 Chattogram‐Hathazari‐Rangamati Km 040.18‐040.68 S 0.50 19463 National Overlay 80mm @ IRI 5‐9 2021 6.033 10.328
N106 Chattogram‐Hathazari‐Rangamati Km 040.68‐041.83 S 1.14 19463 National Overlay 80mm @ IRI 5‐9 2021 13.768 7.644
N106 Chattogram‐Hathazari‐Rangamati Km 047.88‐048.38 S 0.50 5243 National Overlay 50mm @ IRI 5‐9 2021 3.885 2.697
N106 Chattogram‐Hathazari‐Rangamati Km 048.38‐050.29 S 1.91 5243 National Overlay 50mm @ IRI 5‐9 2021 14.817 1.813
N106 Chattogram‐Hathazari‐Rangamati Km 050.29‐050.39 S 0.10 5243 National Full Recon 150mm 2021 4.490 0.900
N106 Chattogram‐Hathazari‐Rangamati Km 050.39‐057.89 S 7.50 5243 National Overlay 50mm @ IRI 5‐9 2021 57.409 2.648
N106 Chattogram‐Hathazari‐Rangamati Km 057.89‐058.09 S 0.20 5243 National DBST @ Traff 4000‐6000 2021 0.726 2.340
N106 Chattogram‐Hathazari‐Rangamati Km 058.09‐060.35 S 2.26 5243 National Overlay 50mm @ IRI 5‐9 2021 17.411 1.918
N106 Chattogram‐Hathazari‐Rangamati Km 060.35‐060.45 S 0.10 5243 National Rehab 150mm @ IRI 9‐12 2021 3.550 0.951
N106 Chattogram‐Hathazari‐Rangamati Km 060.45‐064.45 S 4.00 5243 National Overlay 50mm @ IRI 5‐9 2021 33.894 1.608
Page 30 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N106 Chattogram‐Hathazari‐Rangamati Km 064.45‐066.85 S 2.40 5243 National Overlay 50mm @ IRI 5‐9 2021 18.697 1.782
R161 Rangamati‐Chandragona‐Bandarban Road Km 001.30‐001.50 S 0.20 1289 Regional Overlay 50mm @ IRI 7‐9 2021 1.176 0.075
R161 Rangamati‐Chandragona‐Bandarban Road Km 001.50‐001.70 S 0.20 1289 Regional DBST @ 25% Crk 2021 0.553 0.045
R161 Rangamati‐Chandragona‐Bandarban Road Km 001.70‐001.80 S 0.10 1289 Regional DBST @ Traff 100‐2000 2021 0.277 0.135
R161 Rangamati‐Chandragona‐Bandarban Road Km 004.40‐004.60 S 0.20 1289 Regional Overlay 50mm @ IRI 7‐9 2021 1.178 0.213
R161 Rangamati‐Chandragona‐Bandarban Road Km 004.60‐004.70 S 0.10 1289 Regional DBST 2021 0.277 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 004.70‐004.80 S 0.10 1289 Regional DBST @ Traff 100‐2000 2021 0.277 0.137
R161 Rangamati‐Chandragona‐Bandarban Road Km 008.00‐008.10 S 0.10 1289 Regional DBST @ Traff 100‐2000 2021 0.276 0.141
R161 Rangamati‐Chandragona‐Bandarban Road Km 008.10‐010.30 S 2.20 1289 Regional DBST 2021 6.064 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 010.30‐010.40 S 0.10 1289 Regional DBST Traff All 2021 0.275 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 013.50‐013.70 S 0.20 1289 Regional DBST 2021 0.553 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 013.70‐016.70 S 3.00 1289 Regional DBST 2021 8.299 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 016.70‐016.90 S 0.20 1289 Regional Overlay 50mm @ IRI 7‐9 2021 1.174 0.235
R161 Rangamati‐Chandragona‐Bandarban Road Km 020.10‐024.19 S 4.09 1289 Regional DBST 2021 11.147 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 024.19‐024.29 S 0.10 1289 Regional DBST Traff All 2021 0.272 0.000
R161 Rangamati‐Chandragona‐Bandarban Road Km 027.49‐030.59 S 3.10 1289 Regional Overlay 50mm @ IRI 5‐7 2021 18.130 0.013
R161 Rangamati‐Chandragona‐Bandarban Road Km 030.59‐030.73 S 0.14 1289 Regional DBST @ Traff 100‐2000 2021 0.385 0.120
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 000.00‐000.20 S 0.20 1665 Regional DBST @ 25% Crk 2021 0.549 0.219
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 000.20‐000.30 S 0.10 1665 Regional DBST Traff All 2021 0.275 0.000
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 000.30‐003.30 S 3.00 1665 Regional DBST @ 25% Crk 2021 6.047 0.454
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 003.30‐006.30 S 3.00 1665 Regional Overlay 50mm @ IRI 5‐7 2021 11.655 0.690
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 006.30‐007.00 S 0.70 1665 Regional DBST @ Traff 100‐2000 2021 1.283 0.499
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 007.00‐007.10 S 0.10 1665 Regional DBST @ Traff 100‐2000 2021 0.183 0.606
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 007.10‐010.10 S 3.00 1665 Regional DBST @ Traff 100‐2000 2021 5.483 0.402
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 010.10‐013.13 S 3.03 1665 Regional Overlay 50mm @ IRI 5‐7 2021 11.756 0.705
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 013.13‐027.04 S 13.91 1665 Regional DBST @ 25% Crk 2021 25.497 0.359
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 027.04‐027.14 S 0.10 1665 Regional Full Recon 110mm 2021 1.835 0.338
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 027.14‐038.44 S 11.30 1665 Regional DBST @ 25% Crk 2021 20.769 0.559
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 038.44‐038.54 S 0.10 3098 Regional DBST @ Traff 2000‐4000 2021 0.176 8.205
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 038.54‐038.74 S 0.21 2925 Regional DBST @ Traff 2000‐4000 2021 0.378 1.446
R162 Rangamati‐Mohalchhari‐Khagrachhari Km 038.74‐039.67 S 0.92 2925 Regional Overlay 50mm @ IRI 5‐7 2021 3.596 1.181
Z1612 Bogachhari‐Nannerchar‐Longadu Road Km 000.00‐006.30 S 6.30 736 Zilla Overlay 40mm @ Traff 100‐1000 2021 19.683 0.000
Z1612 Bogachhari‐Nannerchar‐Longadu Road Km 008.00‐009.40 S 1.40 736 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.374 0.000
Z1612 Bogachhari‐Nannerchar‐Longadu Road Km 009.40‐012.60 S 3.20 736 Zilla Overlay 40mm @ Traff 100‐1000 2021 10.055 0.000
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 000.00‐000.30 S 0.30 3001 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.217
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 000.30‐003.30 S 3.00 3001 Zilla Overlay 40mm @ Traff >=2000 2021 11.385 0.228
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 003.30‐006.40 S 3.10 3001 Zilla Overlay 40mm @ Traff >=2000 2021 12.370 0.098
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 006.40‐013.70 S 7.30 3001 Zilla Overlay 40mm @ Traff >=2000 2021 29.753 0.220
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 013.70‐014.10 S 0.40 3001 Zilla Overlay 40mm @ IRI>12 2021 1.630 0.000
Z1814 Bangalhalia‐Rajasthali‐Barkal Road Km 018.60‐018.80 S 0.20 3001 Zilla Rehab 75mm @ IRI 9‐12 2021 2.245 0.952
Rangamati Total 526.170
Chattogram Zone Total 9123.672

Page 31 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Cumilla Zone
Brahmanbaria Division
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 040.36‐041.44 S 1.08 4618 National Overlay 50mm @ IRI 5‐9 2021 6.356 12.810
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 041.47‐041.54 S 0.08 4618 National Full Recon 150mm @ IRI 12 2021 2.549 5.300
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 041.54‐041.64 S 0.10 4618 National Rehab 150mm @ IRI 9‐12 2021 2.705 6.298
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 041.64‐041.74 S 0.10 4618 National Full Recon 150mm @ IRI 12 2021 3.398 5.062
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 041.74‐042.64 S 0.90 4618 National DBST @ Traff 4000‐6000 2021 2.490 10.983
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 042.64‐042.84 S 0.20 4618 National Full Recon 150mm @ IRI 12 2021 6.796 4.916
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 042.84‐043.44 S 0.60 4618 National Overlay 50mm @ IRI 5‐9 2021 3.522 12.690
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 043.44‐043.54 S 0.10 4618 National Full Recon 150mm @ IRI 12 2021 3.398 5.224
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 043.54‐043.57 S 0.03 4618 National DBST @ Traff 4000‐6000 2021 0.083 7.543
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 043.57‐043.87 S 0.30 4618 National Full Recon 150mm @ IRI 12 2021 10.194 4.869
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 043.87‐043.97 S 0.10 4618 National Rehab 150mm @ IRI 9‐12 2021 2.705 6.279
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 043.97‐044.17 S 0.20 4618 National Full Recon 150mm @ IRI 12 2021 6.796 4.958
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 044.17‐044.43 S 0.26 4618 National Overlay 50mm @ IRI 5‐9 2021 1.511 13.637
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 044.43‐045.97 S 1.54 8179 National Overlay 50mm @ IRI 5‐7 2021 9.067 15.396
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 045.97‐046.17 S 0.20 8179 National Full Recon 180mm @ IRI 12 2021 7.839 5.544
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 046.17‐046.97 S 0.80 8179 National Overlay 50mm @ IRI 5‐7 2021 4.754 15.495
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 046.97‐047.17 S 0.20 8179 National Full Recon 180mm @ IRI 12 2021 7.979 5.297
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 047.17‐049.27 S 2.10 8179 National Overlay 50mm @ IRI 5‐7 2021 12.568 15.353
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 049.27‐049.37 S 0.10 8179 National Full Recon 180mm @ IRI 12 2021 3.989 5.763
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 049.37‐050.17 S 0.80 8179 National Overlay 60mm @ IRI 7‐9 2021 5.697 14.887
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 050.17‐050.37 S 0.20 8179 National Full Recon 180mm @ IRI 12 2021 7.979 5.485
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 050.37‐050.47 S 0.10 8179 National Rehab 180mm @ IRI 9‐12 2021 3.284 6.751
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 050.47‐050.97 S 0.50 8179 National Full Recon 180mm @ IRI 12 2021 19.947 4.262
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 050.97‐051.17 S 0.20 8179 National Overlay 50mm @ IRI 5‐7 2021 1.197 15.841
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 051.17‐051.37 S 0.20 8179 National Full Recon 180mm @ IRI 12 2021 7.979 5.309
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 051.37‐053.37 S 2.00 8179 National Overlay 60mm @ IRI 7‐9 2021 14.186 14.856
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 053.52‐053.57 S 0.05 8179 National Full Recon 180mm 2021 1.814 5.116
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 053.57‐054.07 S 0.50 8179 National Overlay 60mm @ IRI 7‐9 2021 3.559 10.345
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 054.07‐054.37 S 0.30 8179 National Full Recon 180mm @ IRI 12 2021 12.178 5.295
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 054.37‐054.97 S 0.60 8179 National Overlay 50mm @ IRI 5‐7 2021 3.591 15.492
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 054.97‐055.37 S 0.40 8179 National Full Recon 180mm @ IRI 12 2021 15.678 5.406
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 055.37‐055.77 S 0.40 8179 National Rehab 180mm @ IRI 9‐12 2021 12.446 4.321
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 055.77‐055.97 S 0.20 8179 National Full Recon 180mm 2021 7.419 4.166
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 055.97‐056.07 S 0.10 8179 National Overlay 60mm @ IRI 7‐9 2021 0.663 11.620
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 056.07‐056.17 S 0.10 8179 National Full Recon 180mm 2021 3.709 4.497
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 056.17‐056.57 S 0.40 8179 National Full Recon 180mm 2021 14.838 3.834
N103 Brahmanbaria Town Road Km 000.40‐000.60 S 0.20 9897 National Full Recon 180mm @ IRI 12 2021 9.659 2.364
N103 Brahmanbaria Town Road Km 000.60‐001.30 S 0.70 9897 National Overlay 60mm @ IRI 7‐9 2021 7.978 4.783
N103 Brahmanbaria Town Road Km 001.30‐001.40 S 0.10 9897 National Full Recon 180mm 2021 6.999 0.836
N103 Brahmanbaria Town Road Km 001.40‐002.50 S 1.10 9897 National DBST @ 25% Crk 2021 4.381 1.968
N103 Brahmanbaria Town Road Km 002.50‐002.70 S 0.20 9897 National Full Recon 180mm 2021 7.699 1.950
Page 32 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N103 Brahmanbaria Town Road Km 003.40‐003.80 S 0.40 9897 National Overlay 60mm @ IRI 7‐9 2021 4.123 4.611
N103 Brahmanbaria Town Road Km 003.80‐004.50 S 0.70 9897 National Overlay 50mm @ IRI 5‐7 2021 5.513 4.356
N103 Brahmanbaria Town Road Km 004.50‐004.60 S 0.10 9897 National Full Recon 180mm 2021 5.249 1.931
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 084.94‐088.34 S 3.40 14133 National Overlay 80mm @ IRI 4‐9 2021 44.724 22.719
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 088.34‐088.44 S 0.10 13187 National Full Recon 195mm 2021 5.476 9.310
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 088.44‐090.34 S 1.90 13187 National Overlay 80mm @ IRI 4‐9 2021 23.417 22.680
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 090.34‐090.54 S 0.20 13187 National Full Recon 195mm 2021 10.805 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 090.54‐090.94 S 0.40 13187 National Rehab 195mm @ IRI 9‐12 2021 17.949 10.147
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 090.94‐091.04 S 0.10 13187 National Full Recon 195mm 2021 5.403 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 091.04‐091.44 S 0.40 13187 National Overlay 80mm @ IRI 4‐9 2021 4.893 23.726
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 091.44‐091.74 S 0.30 13187 National Full Recon 195mm 2021 16.208 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 091.74‐097.44 S 5.70 13187 National Overlay 80mm @ IRI 4‐9 2021 81.487 19.615
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 097.44‐097.64 S 0.20 13187 National Full Recon 195mm 2021 10.805 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 097.64‐099.74 S 2.10 13187 National Overlay 80mm @ IRI 4‐9 2021 25.675 23.095
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 099.74‐099.94 S 0.20 13187 National Full Recon 195mm 2021 10.805 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 099.94‐101.94 S 2.00 13187 National Overlay 80mm @ IRI 4‐9 2021 24.464 23.802
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 101.94‐102.04 S 0.10 13187 National Full Recon 195mm 2021 5.403 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 102.04‐103.84 S 1.80 13187 National Rehab 195mm @ IRI 9‐12 2021 80.728 10.085
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 103.84‐103.94 S 0.10 13187 National Full Recon 195mm 2021 5.403 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 103.94‐105.54 S 1.60 13187 National Overlay 80mm @ IRI 4‐9 2021 19.572 23.226
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 105.54‐105.74 S 0.20 13187 National Full Recon 195mm 2021 10.805 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 105.74‐107.61 S 1.87 13187 National Overlay 80mm @ IRI 4‐9 2021 22.886 19.114
N213 Ashuganj River Port Connecting Road Km 000.00‐000.50 S 0.50 5341 National Overlay 50mm @ IRI 5‐9 2021 4.032 0.708
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 020.48‐020.52 S 0.04 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.153 9.432
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 020.52‐020.72 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.585
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 020.72‐021.12 S 0.40 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.533 1.850
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 021.12‐021.42 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.963 0.487
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 021.42‐021.52 S 0.10 2575 Regional DBST @ Traff 2000‐4000 2021 0.180 2.498
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 021.52‐021.62 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 1.042
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 021.72‐021.82 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 1.000
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 021.82‐022.02 S 0.20 2575 Regional Overlay 50mm @ IRI 7‐9 2021 0.767 2.433
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 022.02‐022.12 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.975
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 022.12‐022.32 S 0.20 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.767 2.453
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 022.32‐022.62 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.983 0.450
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 022.62‐023.02 S 0.40 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.533 1.792
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 023.02‐023.42 S 0.40 2575 Regional DBST @ Traff 2000‐4000 2021 0.721 1.508
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 023.42‐023.72 S 0.30 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.150 2.021
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 023.72‐023.92 S 0.20 2575 Regional Rehab 135mm @ IRI 9‐12 2021 3.305 0.672
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 023.92‐024.62 S 0.70 2575 Regional Overlay 50mm @ IRI 7‐9 2021 2.683 1.680
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 024.62‐024.72 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.974
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 024.72‐024.82 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 1.297
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 024.82‐025.02 S 0.20 2575 Regional Overlay 50mm @ IRI 7‐9 2021 0.767 2.347
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 025.02‐025.22 S 0.20 2575 Regional DBST @ Traff 2000‐4000 2021 0.361 1.575
Page 33 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 025.22‐025.52 S 0.30 2575 Regional Rehab 135mm @ IRI 9‐12 2021 4.942 0.469
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 025.52‐025.62 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 3.066
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 025.62‐026.32 S 0.70 2575 Regional Overlay 50mm @ IRI 7‐9 2021 2.683 1.722
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 026.32‐026.62 S 0.30 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.150 2.027
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 026.62‐026.92 S 0.30 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.150 2.027
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 026.92‐027.02 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 2.224
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 027.02‐027.22 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.621
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 027.22‐027.62 S 0.40 2575 Regional DBST @ Traff 2000‐4000 2021 0.721 1.015
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 027.62‐027.72 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.992
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 027.72‐027.82 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 1.712
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 027.82‐028.02 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.565
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 029.02‐029.32 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.983 0.461
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 029.32‐029.92 S 0.60 2575 Regional DBST @ 25% Crk 2021 1.080 0.772
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 029.92‐030.52 S 0.60 2575 Regional Overlay 50mm @ IRI 7‐9 2021 2.300 1.719
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 030.52‐030.72 S 0.20 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.767 2.461
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 030.72‐031.02 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.983 0.388
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 031.32‐031.85 S 0.54 2575 Regional Full Recon 135mm @ IRI 12 2021 10.710 0.376
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 031.85‐032.15 S 0.30 2575 Regional Overlay 50mm @ IRI 5‐7 2021 1.150 2.004
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 032.15‐032.35 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.500
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 032.35‐032.85 S 0.50 2575 Regional DBST @ 25% Crk 2021 0.902 0.885
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 032.85‐032.95 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.985
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 032.95‐033.25 S 0.30 2575 Regional DBST @ 25% Crk 2021 0.541 0.643
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 033.25‐033.35 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.875
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 033.35‐033.45 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 2.256
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 033.45‐034.55 S 1.10 2575 Regional DBST @ Traff 2000‐4000 2021 1.982 1.287
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 034.55‐034.85 S 0.30 2575 Regional Overlay 50mm @ IRI 5‐7 2021 1.150 2.008
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 034.85‐034.95 S 0.10 2575 Regional Rehab 135mm @ IRI 9‐12 2021 1.653 0.927
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 035.25‐035.65 S 0.40 2575 Regional Rehab 135mm @ IRI 9‐12 2021 6.611 0.398
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 035.65‐036.05 S 0.40 2575 Regional Overlay 50mm @ IRI 5‐7 2021 1.533 1.724
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 036.05‐036.15 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.987
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 036.35‐036.45 S 0.10 2575 Regional Rehab 135mm @ IRI 9‐12 2021 1.653 1.454
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 036.55‐036.75 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.589
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 037.35‐037.45 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.879
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 038.75‐039.45 S 0.70 2575 Regional DBST @ Traff 2000‐4000 2021 1.262 1.454
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 039.45‐039.65 S 0.20 2575 Regional DBST @ 25% Crk 2021 0.361 1.009
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 039.65‐040.15 S 0.50 2575 Regional DBST @ Traff 2000‐4000 2021 0.902 1.514
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 040.15‐040.35 S 0.20 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.767 2.465
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 040.35‐040.55 S 0.20 2575 Regional Rehab 135mm @ IRI 9‐12 2021 3.305 0.621
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 040.55‐040.75 S 0.20 2575 Regional DBST @ 25% Crk 2021 0.361 1.558
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 040.75‐040.95 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.594
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 040.95‐042.15 S 1.20 2575 Regional Overlay 50mm @ IRI 5‐7 2021 4.595 1.304
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 042.15‐042.65 S 0.50 2575 Regional DBST @ Traff 2000‐4000 2021 0.902 1.409
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 042.65‐042.95 S 0.30 2575 Regional Overlay 50mm @ IRI 5‐7 2021 1.150 1.987
Page 34 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 042.95‐043.45 S 0.50 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.916 1.788
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 043.45‐043.65 S 0.20 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.767 2.558
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 043.65‐043.85 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.614
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 043.85‐044.95 S 1.10 2575 Regional Overlay 50mm @ IRI 7‐9 2021 4.216 1.414
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 044.95‐045.25 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.983 0.396
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 045.55‐045.65 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.992
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 045.65‐045.75 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.179 1.239
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 045.75‐045.85 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.979
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 045.85‐045.95 S 0.10 2575 Regional DBST @ 25% Crk 2021 0.180 2.210
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 045.95‐046.25 S 0.30 2575 Regional Full Recon 135mm @ IRI 12 2021 5.983 0.492
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 046.45‐046.55 S 0.10 2575 Regional Rehab 135mm @ IRI 9‐12 2021 1.653 0.901
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 046.55‐046.85 S 0.30 2575 Regional DBST @ 25% Crk 2021 0.541 0.639
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 046.85‐046.95 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.994
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 046.95‐047.05 S 0.10 2575 Regional Overlay 50mm @ IRI 5‐7 2021 0.383 3.819
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 047.05‐047.15 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.972
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 047.85‐048.05 S 0.20 2575 Regional Rehab 135mm @ IRI 9‐12 2021 3.305 0.662
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 048.95‐049.25 S 0.30 2575 Regional Overlay 50mm @ IRI 5‐7 2021 1.150 2.298
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 051.15‐051.35 S 0.20 2575 Regional Full Recon 135mm @ IRI 12 2021 3.989 0.507
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 052.15‐052.25 S 0.10 2575 Regional Full Recon 135mm @ IRI 12 2021 1.994 0.954
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 052.45‐052.65 S 0.20 2575 Regional Rehab 135mm @ IRI 9‐12 2021 3.305 0.861
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 053.05‐053.25 S 0.20 2575 Regional Rehab 135mm @ IRI 9‐12 2021 3.305 0.883
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 053.25‐053.45 S 0.20 2575 Regional Overlay 50mm @ IRI 7‐9 2021 0.767 2.812
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 053.45‐053.85 S 0.40 2575 Regional Full Recon 135mm @ IRI 12 2021 7.957 0.412
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 058.80‐059.13 S 0.33 2575 Regional Overlay 50mm @ IRI 7‐9 2021 1.906 1.458
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 064.35‐065.15 S 0.80 2575 Regional Overlay 50mm @ IRI 7‐9 2021 2.772 1.996
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 069.28‐070.15 S 0.87 2575 Regional Overlay 50mm @ IRI 7‐9 2021 3.015 1.968
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 000.00‐000.06 L 0.06 1950 Regional Overlay 50mm @ IRI 7‐9 2021 0.567 0.646
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 000.00‐000.06 R 0.06 1950 Regional Overlay 50mm @ IRI 7‐9 2021 0.473 0.948
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 001.00‐001.10 S 0.10 1950 Regional Full Recon 110mm 2021 2.783 0.676
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 001.80‐001.90 S 0.10 1950 Regional Full Recon 110mm 2021 2.733 0.241
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 001.90‐002.40 S 0.50 1950 Regional DBST @ 25% Crk 2021 1.366 0.696
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 002.40‐002.70 S 0.30 1950 Regional Overlay 50mm @ IRI 7‐9 2021 1.745 1.635
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 002.70‐002.80 S 0.10 1950 Regional DBST @ 25% Crk 2021 0.274 0.889
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 002.80‐002.90 S 0.10 1950 Regional Full Recon 110mm 2021 2.699 0.635
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 002.90‐003.50 S 0.60 1950 Regional Overlay 50mm @ IRI 5‐7 2021 3.446 1.480
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 003.50‐003.70 S 0.20 1950 Regional Overlay 50mm @ IRI 7‐9 2021 1.149 1.895
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 003.70‐004.20 S 0.50 1950 Regional Overlay 50mm @ IRI 5‐7 2021 2.877 1.449
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 004.20‐004.50 S 0.30 1950 Regional Full Recon 110mm 2021 8.171 0.248
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 004.50‐005.10 S 0.60 1950 Regional DBST @ Traff 100‐2000 2021 1.636 0.735
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 005.10‐005.50 S 0.40 1950 Regional Rehab 110mm @ IRI 9‐12 2021 8.163 0.395
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 005.50‐006.60 S 1.10 1950 Regional Overlay 50mm @ IRI 5‐7 2021 6.335 1.134
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 006.60‐006.80 S 0.20 1950 Regional Full Recon 110mm 2021 5.408 0.313
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 006.80‐007.70 S 0.90 1950 Regional Overlay 50mm @ IRI 5‐7 2021 5.216 1.333
Page 35 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 007.70‐009.00 S 1.30 1950 Regional Overlay 50mm @ IRI 7‐9 2021 7.576 1.436
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 009.00‐009.80 S 0.80 1950 Regional Overlay 50mm @ IRI 5‐7 2021 4.670 1.417
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 009.80‐011.20 S 1.40 1950 Regional Overlay 50mm @ IRI 7‐9 2021 8.211 1.492
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 011.22‐014.00 S 2.78 1950 Regional Overlay 50mm @ IRI 7‐9 2021 16.119 1.553
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 014.10‐014.80 S 0.70 1950 Regional Overlay 50mm @ IRI 7‐9 2021 4.063 1.488
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 014.80‐015.20 S 0.40 1950 Regional Rehab 110mm @ IRI 9‐12 2021 8.163 0.391
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 015.20‐017.90 S 2.70 1950 Regional Overlay 50mm @ IRI 5‐7 2021 15.593 1.238
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 017.93‐018.50 S 0.57 1950 Regional DBST @ 25% Crk 2021 1.546 0.924
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 018.50‐018.80 S 0.30 1950 Regional Overlay 50mm @ IRI 7‐9 2021 1.729 1.710
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 018.80‐018.90 S 0.10 1950 Regional DBST @ 25% Crk 2021 0.271 1.082
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 018.90‐019.30 S 0.40 1950 Regional Overlay 50mm @ IRI 7‐9 2021 2.302 1.892
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 019.50‐021.40 S 1.90 1950 Regional Rehab 110mm @ IRI 9‐12 2021 36.456 0.528
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 021.40‐021.50 S 0.10 1950 Regional DBST @ 25% Crk 2021 0.247 1.257
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 021.50‐022.09 S 0.60 1950 Regional Rehab 110mm @ IRI 9‐12 2021 11.449 0.568
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 022.14‐024.59 S 2.46 1950 Regional Rehab 110mm @ IRI 9‐12 2021 49.727 0.591
R220 Sarail‐Nasirnagar‐Lakhai‐Habiganj Road Km 024.69‐024.99 S 0.30 1950 Regional Full Recon 110mm 2021 9.621 0.016
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 036.61‐036.65 S 0.04 3637 Zilla Full Recon 75mm @ IRI>12 2021 0.692 2.240
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 036.75‐036.95 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.715
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 036.95‐037.55 S 0.60 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.087 0.133
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 038.95‐039.05 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.048
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 039.75‐039.85 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.272
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 039.95‐040.05 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.272
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 041.35‐041.45 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.294
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 041.45‐042.65 S 1.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.719 0.437
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 042.65‐042.85 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.979
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 042.85‐042.95 S 0.10 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 042.95‐043.65 S 0.70 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 7.647 0.855
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 043.65‐043.85 S 0.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 043.85‐043.95 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.335
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 043.95‐044.35 S 0.40 3637 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.584
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 044.35‐044.45 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.128
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 044.65‐044.75 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.010
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 044.75‐045.05 S 0.30 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.013
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 045.05‐045.15 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.272
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 046.05‐046.25 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.637
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 046.85‐047.05 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.063
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 047.05‐048.20 S 1.14 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.548 0.950
Z1043 Bancharampur‐Homna Road Km 003.40‐003.50 S 0.10 1711 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1043 Bancharampur‐Homna Road Km 004.70‐005.30 S 0.60 1711 Zilla Overlay 40mm @ IRI>12 2021 2.802 0.000
Z1043 Bancharampur‐Homna Road Km 008.10‐008.50 S 0.40 1711 Zilla Overlay 40mm @ 1000‐2000 2021 1.868 0.000
Z1043 Bancharampur‐Homna Road Km 010.40‐010.50 S 0.10 1711 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1043 Bancharampur‐Homna Road Km 010.50‐012.30 S 1.80 1711 Zilla Overlay 40mm @ 1000‐2000 2021 8.405 0.000
Z1043 Bancharampur‐Homna Road Km 012.30‐012.40 S 0.10 1711 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Page 36 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1201 Kashba‐Kuti Road Km 000.10‐000.50 S 0.40 3678 Zilla Rehab 75mm @ IRI 9‐12 2021 4.059 1.181
Z1201 Kashba‐Kuti Road Km 000.80‐000.90 S 0.10 3678 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.679
Z1201 Kashba‐Kuti Road Km 002.20‐002.30 S 0.10 3678 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.367
Z1201 Kashba‐Kuti Road Km 002.40‐002.60 S 0.20 3678 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.389
Z1201 Kashba‐Kuti Road Km 003.20‐003.60 S 0.40 3678 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.559
Z1201 Kashba‐Kuti Road Km 004.60‐004.90 S 0.30 3678 Zilla Full Recon 75mm @ IRI>12 2021 5.921 0.277
Z1201 Kashba‐Kuti Road Km 005.20‐005.50 S 0.30 3678 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.475
Z1201 Kashba‐Kuti Road Km 005.80‐006.30 S 0.50 3678 Zilla Full Recon 75mm @ IRI>12 2021 8.026 0.551
Z1201 Kashba‐Kuti Road Km 006.70‐006.80 S 0.10 3678 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.312
Z1201 Kashba‐Kuti Road Km 006.90‐007.30 S 0.40 3678 Zilla Rehab 75mm @ IRI 9‐12 2021 5.651 0.739
Z1201 Kashba‐Kuti Road Km 007.40‐007.50 S 0.10 3678 Zilla Full Recon 75mm @ IRI>12 2021 2.087 0.563
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 000.60‐000.70 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 001.40‐001.50 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 001.60‐001.70 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 002.30‐003.20 S 0.90 888 Zilla Overlay 40mm @ IRI>12 2021 2.789 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 003.80‐004.00 S 0.20 888 Zilla Overlay 40mm @ IRI>12 2021 0.620 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 004.50‐004.80 S 0.30 888 Zilla Overlay 40mm @ IRI>12 2021 0.945 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 004.80‐004.90 S 0.10 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.442 0.236
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 004.90‐005.20 S 0.30 888 Zilla Overlay 40mm @ IRI>12 2021 1.113 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 005.20‐005.30 S 0.10 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.323 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 005.90‐006.10 S 0.20 888 Zilla Overlay 40mm @ IRI>12 2021 0.642 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 007.00‐007.10 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.323 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 007.20‐008.20 S 1.00 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.226 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 008.20‐008.30 S 0.10 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.323 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 008.30‐008.40 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.323 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 008.40‐008.60 S 0.20 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.642 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 008.60‐008.70 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 009.70‐010.30 S 0.60 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.856 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 010.30‐010.70 S 0.40 888 Zilla Overlay 40mm @ IRI>12 2021 1.240 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 010.90‐011.00 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 011.00‐011.20 S 0.20 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.934 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 011.20‐011.40 S 0.20 888 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 011.50‐011.60 S 0.10 888 Zilla Seal Coat 2021 0.133 0.407
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 011.60‐011.80 S 0.20 888 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 011.80‐012.00 S 0.20 888 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.934 0.205
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 012.00‐012.10 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 012.10‐013.00 S 0.90 888 Zilla Seal Coat 2021 1.247 0.288
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 013.00‐013.10 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 013.60‐013.70 S 0.10 888 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1202 Dharkhar‐Akhaura‐Senarbadi Road Km 014.20‐014.50 S 0.30 888 Zilla Overlay 40mm @ IRI>12 2021 1.401 0.000
Z1206 Companiganj‐Nabinagar Road Km 017.10‐017.28 S 0.18 8957 Zilla Full Recon 75mm @ IRI>12 2021 4.304 2.007
Z1206 Companiganj‐Nabinagar Road Km 017.38‐017.58 S 0.20 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.702
Z1206 Companiganj‐Nabinagar Road Km 017.58‐019.28 S 1.70 4295 Zilla Overlay 50mm @ IRI 6‐9 2021 6.515 1.859
Page 37 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1206 Companiganj‐Nabinagar Road Km 019.28‐019.58 S 0.30 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 1.356
Z1206 Companiganj‐Nabinagar Road Km 020.58‐020.88 S 0.30 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 3.266 1.473
Z1206 Companiganj‐Nabinagar Road Km 021.38‐021.58 S 0.20 4295 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.877
Z1206 Companiganj‐Nabinagar Road Km 022.88‐024.18 S 1.30 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 14.202 1.119
Z1206 Companiganj‐Nabinagar Road Km 024.28‐024.38 S 0.10 4295 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.395
Z1206 Companiganj‐Nabinagar Road Km 024.38‐024.88 S 0.50 4295 Zilla Overlay 50mm @ IRI 6‐9 2021 1.912 2.288
Z1206 Companiganj‐Nabinagar Road Km 024.88‐024.98 S 0.10 4295 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.353
Z1206 Companiganj‐Nabinagar Road Km 025.18‐025.38 S 0.20 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.630
Z1206 Companiganj‐Nabinagar Road Km 025.78‐025.98 S 0.20 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 2.197 1.661
Z1206 Companiganj‐Nabinagar Road Km 026.18‐026.48 S 0.30 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.486
Z1206 Companiganj‐Nabinagar Road Km 026.50‐027.58 S 1.08 4295 Zilla Overlay 50mm @ IRI 6‐9 2021 4.207 2.034
Z1206 Companiganj‐Nabinagar Road Km 027.58‐027.78 S 0.20 4295 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.730
Z1210 Brahmanbaria‐Lalpur Road Km 000.00‐000.10 S 0.10 6257 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 0.167
Z1210 Brahmanbaria‐Lalpur Road Km 000.10‐000.80 S 0.70 4407 Zilla Full Recon 75mm @ IRI>12 2021 11.472 0.156
Z1210 Brahmanbaria‐Lalpur Road Km 000.90‐001.10 S 0.20 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.964
Z1210 Brahmanbaria‐Lalpur Road Km 001.20‐001.30 S 0.10 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.472
Z1210 Brahmanbaria‐Lalpur Road Km 001.60‐001.90 S 0.30 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.777
Z1210 Brahmanbaria‐Lalpur Road Km 002.10‐002.20 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.633
Z1210 Brahmanbaria‐Lalpur Road Km 002.30‐002.40 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.594
Z1210 Brahmanbaria‐Lalpur Road Km 003.60‐003.70 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.812
Z1210 Brahmanbaria‐Lalpur Road Km 004.60‐004.70 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.982
Z1210 Brahmanbaria‐Lalpur Road Km 005.20‐005.30 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.633
Z1210 Brahmanbaria‐Lalpur Road Km 007.40‐007.50 S 0.10 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.506
Z1210 Brahmanbaria‐Lalpur Road Km 008.40‐008.50 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.812
Z1210 Brahmanbaria‐Lalpur Road Km 008.70‐008.80 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.809
Z1210 Brahmanbaria‐Lalpur Road Km 009.70‐009.80 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.674
Z1210 Brahmanbaria‐Lalpur Road Km 011.80‐011.90 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.932
Z1210 Brahmanbaria‐Lalpur Road Km 012.60‐012.70 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.543 0.680
Z1210 Brahmanbaria‐Lalpur Road Km 012.80‐012.90 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.543 0.603
Z1210 Brahmanbaria‐Lalpur Road Km 013.40‐013.65 S 0.25 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 2.688 0.862
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 001.50‐001.60 S 0.10 3129 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.131
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 003.10‐003.20 S 0.10 3129 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.205
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 007.50‐007.80 S 0.30 3129 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.261
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 007.80‐008.10 S 0.30 3129 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.153
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 008.10‐008.50 S 0.40 3129 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.382
Z1216 Sultanpur‐Chinair‐Akhaura Road Km 009.30‐009.40 S 0.10 3129 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.141
Z2031 Nabinagar‐Ashuganj Road Km 000.00‐000.69 S 0.69 5341 Zilla Rehab 75mm @ IRI 9‐12 2021 7.670 1.395
Z2031 Nabinagar‐Ashuganj Road Km 000.95‐006.50 S 5.55 4658 Zilla Overlay 40mm @ Traff >=2000 2021 17.437 0.906
Z2031 Nabinagar‐Ashuganj Road Km 012.78‐013.41 S 0.63 4658 Zilla Rehab 75mm @ IRI 9‐12 2021 6.977 0.466
Z2031 Nabinagar‐Ashuganj Road Km 019.57‐019.67 S 0.10 4658 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.138
Z2031 Nabinagar‐Ashuganj Road Km 019.67‐019.77 S 0.10 4658 Zilla Overlay 50mm @ IRI 6‐9 2021 0.389 0.189
Z2031 Nabinagar‐Ashuganj Road Km 019.77‐020.07 S 0.30 4658 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.506
Z2031 Nabinagar‐Ashuganj Road Km 020.07‐020.57 S 0.50 4658 Zilla Overlay 50mm @ IRI 6‐9 2021 1.943 1.306
Page 38 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2031 Nabinagar‐Ashuganj Road Km 020.57‐020.87 S 0.30 4658 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.615
Z2031 Nabinagar‐Ashuganj Road Km 020.87‐021.00 S 0.13 4658 Zilla Overlay 50mm @ IRI 6‐9 2021 0.505 1.336
Brahmanbaria Total 1436.606
Chandpur Division
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 030.63‐030.71 S 0.08 15643 Regional Full Recon 150mm @ IRI 12 2021 2.924 10.757
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 030.71‐031.71 S 1.00 15643 Regional DBST @ Traff >6000 2021 3.013 22.669
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 031.71‐031.81 S 0.10 15643 Regional Full Recon 150mm @ IRI 12 2021 3.701 11.297
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 031.81‐036.11 S 4.30 15643 Regional Overlay 60mm @ IRI 5.5‐9 2021 32.376 26.874
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 036.11‐037.71 S 1.60 18305 Regional Rehab 150mm @ IRI 9‐12 2021 43.790 7.107
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 037.78‐037.91 S 0.13 18880 Regional Rehab 150mm @ IRI 9‐12 2021 3.570 7.014
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 037.91‐038.81 S 0.90 18880 Regional DBST @ 25% Crk 2021 2.490 12.621
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 038.81‐038.91 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.815
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 038.91‐040.81 S 1.90 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.304 15.743
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 040.81‐040.91 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.690
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 040.91‐041.11 S 0.20 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 17.017
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 041.11‐041.21 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.674
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 041.21‐041.41 S 0.20 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 17.037
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 041.41‐041.71 S 0.30 12764 Regional Full Recon 150mm @ IRI 12 2021 9.812 2.096
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 042.03‐042.51 S 0.48 12764 Regional DBST @ 25% Crk 2021 1.246 4.466
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 042.51‐042.61 S 0.10 12764 Regional Full Recon 195mm 2021 3.870 2.551
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 042.61‐043.01 S 0.40 12764 Regional DBST @ 25% Crk 2021 1.047 4.098
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 043.01‐043.71 S 0.70 12764 Regional Rehab 150mm @ IRI 9‐12 2021 17.919 2.056
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 043.81‐044.21 S 0.40 12764 Regional Full Recon 150mm @ IRI 12 2021 12.864 1.915
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 044.21‐044.41 S 0.20 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.334 7.425
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 044.72‐044.91 S 0.19 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.284 7.301
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 044.91‐045.41 S 0.50 12764 Regional Rehab 150mm @ IRI 9‐12 2021 13.041 1.645
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 045.41‐045.91 S 0.50 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.378 6.734
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 045.91‐046.41 S 0.50 12764 Regional Rehab 150mm @ IRI 9‐12 2021 13.041 2.483
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 046.41‐047.31 S 0.90 12764 Regional DBST @ 25% Crk 2021 2.401 4.221
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 047.31‐047.37 S 0.06 12764 Regional Full Recon 195mm 2021 2.563 2.784
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 047.41‐047.72 L 0.31 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.773 8.297
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 047.41‐047.72 R 0.31 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.773 8.297
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 047.90‐052.00 S 4.11 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 28.323 15.374
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 052.00‐052.20 S 0.20 12764 Regional Full Recon 150mm @ IRI 12 2021 6.553 2.444
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 052.20‐053.50 S 1.30 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.775 6.019
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 053.50‐053.60 S 0.10 12764 Regional Full Recon 195mm 2021 3.943 2.500
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 053.60‐053.80 S 0.20 12764 Regional DBST @ 25% Crk 2021 0.534 5.245
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 053.80‐053.90 S 0.10 12764 Regional Full Recon 195mm 2021 3.943 2.488
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 054.70‐056.80 S 2.11 12764 Regional DBST @ Traff >6000 2021 5.621 4.971
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 056.80‐056.90 S 0.10 12764 Regional Full Recon 195mm 2021 3.943 2.319
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 056.90‐057.10 S 0.20 12764 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.351 7.502
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 057.10‐057.20 S 0.10 12764 Regional Full Recon 195mm 2021 3.943 2.500
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 057.20‐057.50 S 0.30 12764 Regional DBST @ 25% Crk 2021 0.795 4.321
Page 39 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 058.00‐061.00 S 3.01 12764 Regional DBST @ 25% Crk 2021 8.167 4.084
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 061.00‐061.30 S 0.30 12764 Regional Full Recon 150mm @ IRI 12 2021 10.049 2.070
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 061.71‐062.20 S 0.50 18880 Regional DBST @ 25% Crk 2021 1.372 12.310
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 062.20‐062.30 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.720
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 062.30‐062.90 S 0.60 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.203 15.629
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 062.90‐063.00 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.838
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 063.00‐063.20 S 0.20 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 16.871
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 063.20‐063.40 S 0.20 18880 Regional Full Recon 195mm 2021 8.177 5.287
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 063.41‐063.60 S 0.20 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.373 15.986
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 063.60‐063.90 S 0.30 18880 Regional Full Recon 150mm @ IRI 12 2021 10.194 6.011
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 063.90‐064.40 S 0.50 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.503 15.204
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 064.40‐064.50 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.815
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 064.50‐064.80 S 0.30 18880 Regional DBST @ 25% Crk 2021 0.827 12.468
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 064.80‐064.90 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.367
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 064.90‐065.00 S 0.10 18880 Regional DBST @ Traff >6000 2021 0.277 13.113
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 065.00‐065.20 S 0.20 18880 Regional Full Recon 195mm 2021 8.177 5.246
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 065.20‐065.30 S 0.10 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.701 16.511
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 065.30‐065.40 S 0.10 18880 Regional Full Recon 195mm 2021 4.089 5.796
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 065.40‐065.70 S 0.30 18880 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 15.493
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 065.70‐066.50 S 0.80 18880 Regional Rehab 150mm @ IRI 9‐12 2021 21.638 4.424
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 066.50‐067.10 S 0.60 15450 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.203 10.607
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 067.10‐067.30 S 0.20 13040 Regional Full Recon 150mm @ IRI 12 2021 6.796 3.187
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 067.30‐067.60 S 0.30 13040 Regional DBST @ 25% Crk 2021 0.830 3.444
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 067.60‐067.70 S 0.10 13040 Regional Rehab 150mm @ IRI 9‐12 2021 2.705 3.477
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 067.81‐069.70 S 1.89 13040 Regional DBST @ 25% Crk 2021 5.240 2.465
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 069.70‐069.90 S 0.20 13040 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 3.146
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 070.00‐070.10 S 0.10 13040 Regional Full Recon 195mm 2021 4.089 3.237
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 070.10‐070.20 S 0.10 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.701 8.382
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 070.20‐070.30 S 0.10 13040 Regional Full Recon 195mm 2021 4.089 3.248
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 070.30‐071.90 S 1.60 13040 Regional DBST @ 25% Crk 2021 4.426 4.048
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 071.90‐072.00 S 0.10 13040 Regional Full Recon 195mm 2021 4.089 3.203
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 072.00‐073.70 S 1.70 13040 Regional DBST @ Traff >6000 2021 4.700 4.060
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 073.80‐075.30 S 1.50 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.529 5.630
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 075.70‐076.20 S 0.50 13040 Regional DBST @ 25% Crk 2021 1.391 3.829
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 076.20‐076.30 S 0.10 13040 Regional Full Recon 195mm 2021 4.089 3.248
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 076.30‐077.70 S 1.40 13040 Regional DBST @ 25% Crk 2021 3.829 3.434
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 077.70‐077.90 S 0.20 13040 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 1.859
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 077.90‐078.20 S 0.30 13040 Regional DBST @ 25% Crk 2021 0.815 2.506
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 078.20‐078.30 S 0.10 13040 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.401
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 078.30‐079.30 S 1.00 13040 Regional DBST @ Traff >6000 2021 2.717 2.157
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 079.30‐079.60 S 0.30 13040 Regional DBST @ Traff >6000 2021 0.815 4.027
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 080.60‐080.70 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.180
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 080.70‐081.50 S 0.80 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.498 4.075
Page 40 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 081.50‐081.60 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.509
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 081.60‐082.40 S 0.80 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.504 3.993
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 082.40‐082.70 S 0.30 13040 Regional Full Recon 150mm @ IRI 12 2021 9.830 1.679
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 082.70‐082.80 S 0.10 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.676 5.969
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 082.91‐083.50 S 0.59 13040 Regional DBST @ 25% Crk 2021 1.577 2.473
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 083.50‐083.60 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.277 2.525
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 083.60‐084.50 S 0.90 13040 Regional DBST @ Traff >6000 2021 2.401 1.898
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 084.50‐084.60 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.277 2.559
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 084.60‐084.80 S 0.20 13040 Regional DBST @ 25% Crk 2021 0.531 2.554
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 084.80‐085.00 S 0.20 13040 Regional Full Recon 150mm @ IRI 12 2021 6.553 1.983
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 085.00‐085.60 S 0.60 13040 Regional DBST @ 25% Crk 2021 1.601 2.248
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 085.68‐085.70 S 0.02 13040 Regional Full Recon 195mm 2021 0.789 5.516
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 085.70‐085.80 S 0.10 13040 Regional DBST @ 25% Crk 2021 0.267 3.750
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 085.80‐085.90 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.277 2.467
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 085.90‐087.00 S 1.10 13040 Regional DBST @ 25% Crk 2021 2.934 1.744
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.00‐087.20 S 0.20 13040 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 1.699
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.20‐087.30 S 0.10 13040 Regional DBST @ Traff >6000 2021 0.267 3.182
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.30‐087.50 S 0.20 13040 Regional Full Recon 150mm @ IRI 12 2021 6.553 1.852
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.50‐087.60 S 0.10 13040 Regional DBST @ 25% Crk 2021 0.267 3.855
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.60‐087.70 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.277 2.467
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.70‐087.88 S 0.19 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.277 5.189
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.88‐087.98 S 0.10 13040 Regional Full Recon 150mm @ IRI 12 2021 3.277 2.550
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 087.98‐088.18 S 0.20 13040 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.351 4.555
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 088.18‐088.48 S 0.30 13040 Regional Full Recon 150mm @ IRI 12 2021 9.830 1.640
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 088.48‐089.40 S 0.92 8704 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.188 7.423
R146 Wireless Bazar More ‐Illish Chattar Road Km 000.00‐000.10 S 0.10 31332 Regional DBST @ 25% Crk 2021 0.296 2.208
R146 Wireless Bazar More ‐Illish Chattar Road Km 000.10‐000.20 S 0.10 31332 Regional Full Recon 150mm @ IRI 12 2021 3.641 3.798
R146 Wireless Bazar More ‐Illish Chattar Road Km 000.20‐000.30 S 0.10 31332 Regional DBST @ 25% Crk 2021 0.296 2.196
R146 Wireless Bazar More ‐Illish Chattar Road Km 000.30‐000.40 S 0.10 31332 Regional Full Recon 150mm @ IRI 12 2021 3.641 3.681
R146 Wireless Bazar More ‐Illish Chattar Road Km 000.40‐001.00 S 0.60 31332 Regional DBST @ Traff >6000 2021 1.778 2.613
R146 Wireless Bazar More ‐Illish Chattar Road Km 001.00‐001.30 S 0.30 31332 Regional Rehab 150mm @ IRI 9‐12 2021 8.694 2.751
R146 Wireless Bazar More ‐Illish Chattar Road Km 001.30‐001.70 S 0.40 31332 Regional DBST @ Traff >6000 2021 1.186 1.174
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 063.44‐064.25 S 0.81 3885 Regional Full Recon 135mm @ IRI 12 2021 24.342 0.381
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 064.35‐065.65 S 1.30 3885 Regional Rehab 135mm @ IRI 9‐12 2021 32.350 0.612
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 066.15‐066.45 S 0.30 3885 Regional Rehab 135mm @ IRI 9‐12 2021 7.471 0.818
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 066.75‐066.95 S 0.20 3885 Regional Rehab 135mm @ IRI 9‐12 2021 4.981 0.755
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 066.95‐067.26 S 0.31 3885 Regional Overlay 50mm @ IRI 5‐7 2021 1.761 2.860
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 067.26‐067.46 S 0.20 3885 Regional Full Recon 135mm 2021 6.010 1.024
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 067.46‐070.56 S 3.10 3885 Regional Overlay 50mm @ IRI 5‐7 2021 17.897 2.285
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 070.56‐070.96 S 0.40 3885 Regional Overlay 50mm @ IRI 7‐9 2021 2.335 2.549
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 071.26‐071.66 S 0.40 3885 Regional Overlay 50mm @ IRI 7‐9 2021 2.394 2.332
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 072.06‐072.26 S 0.20 3885 Regional Full Recon 135mm 2021 6.010 1.029
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 072.46‐073.06 S 0.60 3885 Regional Rehab 135mm @ IRI 9‐12 2021 14.942 0.378
Page 41 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 073.06‐073.36 S 0.30 3885 Regional Overlay 50mm @ IRI 5‐7 2021 1.727 2.746
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 073.36‐073.46 S 0.10 3885 Regional Full Recon 135mm 2021 3.005 1.016
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 073.46‐073.76 S 0.30 3885 Regional Overlay 50mm @ IRI 5‐7 2021 1.733 2.816
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 073.76‐073.86 S 0.10 3885 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 0.808
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 074.36‐074.63 S 0.28 3885 Regional Rehab 135mm @ IRI 9‐12 2021 6.923 0.577
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 010.80‐010.90 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.456 0.780
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 012.30‐012.50 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 4.912 0.434
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 012.80‐013.00 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 4.912 0.426
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 013.90‐014.10 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 4.888 0.683
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 014.90‐016.00 S 1.10 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 18.108 1.007
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 016.40‐016.70 S 0.30 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.963
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 019.10‐019.40 S 0.30 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.232
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 019.50‐019.90 S 0.40 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 1.009
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 020.10‐020.50 S 0.40 3169 Zilla Full Recon 75mm @ IRI>12 2021 9.563 0.610
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 022.89‐023.09 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 3.217 1.299
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 023.19‐023.39 S 0.20 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.128
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 023.79‐024.29 S 0.50 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 0.837
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 026.19‐026.29 S 0.10 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.213
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 026.99‐027.09 S 0.10 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.295
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 030.29‐030.39 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.646
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 030.39‐031.49 S 1.10 3169 Zilla Overlay 40mm @ Traff >=2000 2021 5.136 0.000
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 031.49‐031.59 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.995
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 031.59‐032.89 S 1.30 3169 Zilla Overlay 40mm @ Traff >=2000 2021 6.070 0.000
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 032.89‐032.99 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.625
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 036.19‐036.39 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.683
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 036.39‐036.69 S 0.30 3169 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 036.69‐036.99 S 0.30 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.725
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 036.99‐037.99 S 1.00 3169 Zilla Overlay 40mm @ Traff >=2000 2021 4.665 0.000
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 037.99‐038.19 S 0.20 3169 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.655
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 038.19‐038.59 S 0.40 3169 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 038.59‐038.69 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.669
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 038.69‐040.36 S 1.66 3169 Zilla Overlay 40mm @ Traff >=2000 2021 7.775 0.234
Z1050 Kaliapara‐Kachua Road Km 000.00‐000.10 S 0.10 6056 Zilla Overlay 40mm @ Traff >=2000 2021 0.739 0.000
Z1050 Kaliapara‐Kachua Road Km 000.10‐002.70 S 2.60 6056 Zilla Full Recon 75mm @ IRI>12 2021 64.737 0.817
Z1050 Kaliapara‐Kachua Road Km 002.70‐002.80 S 0.10 6056 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 1.023
Z1050 Kaliapara‐Kachua Road Km 002.80‐004.00 S 1.20 6056 Zilla Full Recon 75mm @ IRI>12 2021 28.847 0.871
Z1050 Kaliapara‐Kachua Road Km 004.00‐004.10 S 0.10 6056 Zilla Overlay 50mm @ IRI 6‐9 2021 0.588 0.694
Z1050 Kaliapara‐Kachua Road Km 004.10‐004.60 S 0.50 6056 Zilla Full Recon 75mm @ IRI>12 2021 12.172 1.007
Z1050 Kaliapara‐Kachua Road Km 004.60‐004.70 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.135
Z1050 Kaliapara‐Kachua Road Km 004.70‐004.80 S 0.10 6056 Zilla Full Recon 75mm @ IRI>12 2021 2.434 1.300
Z1050 Kaliapara‐Kachua Road Km 004.80‐004.90 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.140
Z1050 Kaliapara‐Kachua Road Km 004.90‐005.80 S 0.90 6056 Zilla Full Recon 75mm @ IRI>12 2021 21.909 0.781
Z1050 Kaliapara‐Kachua Road Km 005.80‐006.30 S 0.50 6056 Zilla Overlay 40mm @ Traff >=2000 2021 2.563 0.000
Page 42 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1050 Kaliapara‐Kachua Road Km 006.30‐006.80 S 0.50 6056 Zilla Full Recon 75mm @ IRI>12 2021 11.954 0.856
Z1050 Kaliapara‐Kachua Road Km 006.80‐007.90 S 1.10 6056 Zilla Overlay 40mm @ Traff >=2000 2021 5.174 1.717
Z1050 Kaliapara‐Kachua Road Km 007.90‐008.00 S 0.10 6056 Zilla Full Recon 75mm @ IRI>12 2021 2.434 1.332
Z1050 Kaliapara‐Kachua Road Km 008.00‐008.10 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.741
Z1050 Kaliapara‐Kachua Road Km 008.10‐009.30 S 1.20 6056 Zilla Overlay 40mm @ Traff >=2000 2021 5.705 1.317
Z1050 Kaliapara‐Kachua Road Km 009.30‐009.40 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.106
Z1050 Kaliapara‐Kachua Road Km 009.40‐010.40 S 1.00 6056 Zilla Overlay 40mm @ Traff >=2000 2021 4.750 1.258
Z1050 Kaliapara‐Kachua Road Km 010.40‐010.50 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.130
Z1050 Kaliapara‐Kachua Road Km 010.50‐010.60 S 0.10 6056 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.120
Z1050 Kaliapara‐Kachua Road Km 010.60‐010.70 S 0.10 6056 Zilla Overlay 50mm @ Cracking >25% 2021 0.584 0.011
Z1050 Kaliapara‐Kachua Road Km 010.70‐011.00 S 0.30 6056 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.092
Z1050 Kaliapara‐Kachua Road Km 011.00‐011.10 S 0.10 6056 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 1.983
Z1050 Kaliapara‐Kachua Road Km 011.10‐011.80 S 0.70 6056 Zilla Full Recon 75mm @ IRI>12 2021 16.736 0.994
Z1050 Kaliapara‐Kachua Road Km 011.80‐012.60 S 0.80 6056 Zilla Rehab 75mm @ IRI 9‐12 2021 13.169 1.322
Z1050 Kaliapara‐Kachua Road Km 012.60‐012.90 S 0.30 6056 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.984
Z1050 Kaliapara‐Kachua Road Km 012.90‐013.31 S 0.41 6056 Zilla Overlay 50mm @ Cracking >25% 2021 2.356 1.421
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 010.63‐011.00 S 0.37 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 1.484 2.759
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 011.40‐011.50 S 0.10 4160 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.559
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 011.50‐011.80 S 0.30 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 1.150 1.389
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 011.80‐011.90 S 0.10 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.781
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 011.90‐012.10 S 0.20 4160 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.101
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 012.10‐012.30 S 0.20 4160 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.239
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 012.70‐013.80 S 1.10 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 12.017 1.809
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 013.80‐014.00 S 0.20 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 0.763 1.012
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 014.00‐014.20 S 0.20 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.985
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 014.20‐014.60 S 0.40 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 1.533 3.323
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 014.60‐014.90 S 0.30 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 1.699
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 014.90‐017.40 S 2.50 4160 Zilla Overlay 50mm @ Cracking >25% 2021 9.188 0.696
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 017.90‐018.10 S 0.20 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 1.817 1.741
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 018.80‐019.60 S 0.80 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 7.303 1.746
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 003.10‐006.00 S 2.90 2124 Zilla Overlay 40mm @ Traff >=2000 2021 9.113 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 017.20‐017.30 S 0.10 2124 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.304
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 021.90‐022.09 S 0.20 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 2.204 1.666
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 023.59‐023.89 S 0.30 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.109
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 023.99‐024.80 S 0.81 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 8.926 1.027
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 027.46‐027.89 S 0.43 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 4.795 1.497
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 027.89‐028.39 S 0.50 2124 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.029
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 028.39‐029.79 S 1.40 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 15.504 0.797
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 029.79‐029.89 S 0.10 2124 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 029.89‐030.19 S 0.30 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 3.311 1.156
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 030.19‐030.29 S 0.10 2124 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 030.29‐030.39 S 0.10 2124 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.939
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 030.69‐031.19 S 0.50 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 1.177
Page 43 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 031.19‐031.29 S 0.10 2124 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.261
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 031.29‐031.89 S 0.60 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 6.644 0.934
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 031.89‐032.29 S 0.40 2124 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 032.29‐032.39 S 0.10 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.262
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 032.39‐032.99 S 0.60 2124 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 032.99‐033.19 S 0.20 2124 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.816
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 033.19‐033.29 S 0.10 2124 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 033.29‐033.99 S 0.70 2124 Zilla Full Recon 75mm @ IRI>12 2021 11.243 0.763
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 033.99‐034.09 S 0.10 2124 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 034.09‐034.89 S 0.80 2124 Zilla Full Recon 75mm @ IRI>12 2021 12.867 0.848
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 035.19‐035.49 S 0.30 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.076
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 035.49‐035.89 S 0.40 2124 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 035.89‐036.69 S 0.80 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 8.859 1.283
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 036.69‐040.19 S 3.50 2124 Zilla Overlay 40mm @ Traff >=2000 2021 10.991 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 058.19‐058.99 S 0.80 2124 Zilla Overlay 40mm @ Traff >=2000 2021 2.581 0.000
Z1069 Matlab‐Meghna‐Dhonagoda‐Beriband Road Km 060.29‐061.27 S 0.99 2124 Zilla Rehab 75mm @ IRI 9‐12 2021 11.203 1.101
Z1402 Baburhat‐Matlab‐Pennai Road Km 026.09‐027.14 S 1.04 7299 Zilla Overlay 40mm @ Traff >=2000 2021 4.684 1.865
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 000.00‐000.10 S 0.10 3395 Zilla Overlay 40mm @ Traff >=2000 2021 0.524 0.033
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 000.10‐000.80 S 0.70 3395 Zilla Full Recon 75mm @ IRI>12 2021 16.432 0.116
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 000.80‐001.20 S 0.40 3395 Zilla Overlay 40mm @ Cracks >25% 2021 1.737 0.106
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 001.20‐001.50 S 0.30 3395 Zilla Full Recon 75mm @ IRI>12 2021 7.042 0.165
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 001.50‐001.70 S 0.20 3395 Zilla Overlay 40mm @ Cracks >25% 2021 0.868 0.245
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 001.70‐001.80 S 0.10 3395 Zilla Full Recon 75mm @ IRI>12 2021 2.347 0.103
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 001.80‐002.00 S 0.20 3395 Zilla Overlay 40mm @ Cracks >25% 2021 0.864 0.208
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 002.00‐002.20 S 0.20 3395 Zilla Full Recon 75mm @ IRI>12 2021 4.121 0.233
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 002.20‐005.30 S 3.10 3395 Zilla Overlay 40mm @ Traff >=2000 2021 7.238 1.256
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 005.30‐008.60 S 3.30 3395 Zilla Overlay 40mm @ Traff >=2000 2021 10.251 0.997
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 008.60‐008.80 S 0.20 3395 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.793
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 008.80‐009.40 S 0.60 3395 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.718
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 009.40‐009.50 S 0.10 3395 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.173
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 009.50‐009.90 S 0.40 3395 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.502
Z1403 Chandpur (Nanupur)‐Dokanghar‐Harina Road Km 009.90‐010.10 S 0.20 3395 Zilla Full Recon 75mm @ IRI>12 2021 3.201 0.710
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 000.60‐001.00 S 0.40 3929 Zilla Full Recon 75mm @ IRI>12 2021 6.607 0.865
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 001.30‐001.50 S 0.20 3929 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.955
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 001.50‐002.50 S 1.00 3929 Zilla Overlay 40mm @ Traff >=2000 2021 3.164 0.427
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 002.50‐002.60 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.417
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 002.60‐002.70 S 0.10 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 002.70‐002.80 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.572
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 002.80‐003.30 S 0.50 3929 Zilla Overlay 40mm @ Traff >=2000 2021 1.549 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 003.30‐003.40 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.455
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 003.70‐004.10 S 0.40 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 1.506
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 004.30‐005.00 S 0.70 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 8.674 0.803
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 005.00‐005.90 S 0.90 3929 Zilla Overlay 40mm @ Traff >=2000 2021 2.789 0.114
Page 44 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 005.90‐006.50 S 0.60 3929 Zilla Full Recon 75mm @ IRI>12 2021 9.504 0.719
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 006.50‐006.60 S 0.10 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 006.60‐006.70 S 0.10 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.550
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 006.90‐007.00 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.582 1.144
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 007.00‐007.20 S 0.20 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 007.20‐007.40 S 0.20 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 1.675
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 007.50‐007.60 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.603
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 008.30‐008.40 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 2.456 0.547
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 010.20‐010.60 S 0.40 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 1.365
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 011.00‐011.50 S 0.50 3929 Zilla Full Recon 75mm @ IRI>12 2021 7.933 0.823
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 012.40‐012.60 S 0.20 3929 Zilla Full Recon 75mm @ IRI>12 2021 4.208 0.663
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 012.60‐013.30 S 0.70 3929 Zilla Overlay 40mm @ Cracks >25% 2021 2.735 0.936
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 013.30‐013.40 S 0.10 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 2.154
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 013.40‐013.60 S 0.20 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.190
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 013.60‐013.70 S 0.10 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.240
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 015.10‐015.20 S 0.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.445
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 015.60‐015.70 S 0.10 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.697
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 015.70‐016.00 S 0.30 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 016.00‐016.20 S 0.20 3929 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.348
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 020.50‐020.76 S 0.26 3929 Zilla Full Recon 75mm @ IRI>12 2021 4.189 1.050
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 000.00‐001.85 S 1.85 4577 Zilla Overlay 40mm @ Traff >=2000 2021 5.749 0.464
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 001.85‐002.25 S 0.40 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 0.814
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 002.25‐002.65 S 0.40 4577 Zilla Overlay 50mm @ Cracking >25% 2021 1.625 0.671
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 002.65‐002.75 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.356 1.519
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 002.75‐002.95 S 0.20 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 0.630 1.428
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 002.95‐003.15 S 0.20 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 1.317
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 003.15‐003.55 S 0.40 4577 Zilla Overlay 50mm @ Cracking >25% 2021 1.504 0.974
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 003.55‐003.65 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.668
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 003.65‐004.15 S 0.50 4577 Zilla Overlay 50mm @ Cracking >25% 2021 1.748 1.052
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 004.15‐004.35 S 0.20 4577 Zilla Full Recon 75mm @ IRI>12 2021 2.608 1.366
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 004.35‐005.35 S 1.00 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 3.147 1.415
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 005.35‐005.65 S 0.30 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 2.855 1.111
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 005.65‐006.15 S 0.50 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.775 0.941
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 006.15‐006.25 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.562
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 006.25‐006.65 S 0.40 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.491 1.173
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 006.65‐006.75 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.579
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 006.75‐007.05 S 0.30 4577 Zilla Overlay 50mm @ Cracking >25% 2021 0.945 1.138
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 007.05‐007.15 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.691
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 007.15‐007.60 S 0.45 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.421 1.394
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 007.63‐008.55 S 0.91 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 3.311 1.138
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 008.55‐008.65 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.569
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 008.65‐009.85 S 1.20 4577 Zilla Overlay 40mm @ Traff >=2000 2021 3.278 0.784
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 009.85‐010.25 S 0.40 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.260 1.793
Page 45 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 010.25‐010.95 S 0.70 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 2.205 1.290
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 010.95‐011.05 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.916
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 011.46‐012.45 S 0.99 4577 Zilla Overlay 50mm @ Cracking >25% 2021 3.403 0.569
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 012.45‐012.55 S 0.10 7603 Zilla Full Recon 75mm @ IRI>12 2021 2.039 2.763
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 012.55‐013.45 S 0.90 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 2.832 1.721
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 013.45‐013.65 S 0.20 4577 Zilla Full Recon 75mm @ IRI>12 2021 2.608 1.398
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 013.65‐014.25 S 0.60 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.890 2.646
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 014.25‐014.35 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.830
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 014.65‐014.75 S 0.10 4577 Zilla Full Recon 75mm @ IRI>12 2021 2.230 0.682
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 015.15‐015.55 S 0.40 4577 Zilla Full Recon 75mm @ IRI>12 2021 5.216 1.050
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 015.55‐016.05 S 0.50 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.575 1.826
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 016.05‐017.05 S 1.00 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 9.120 1.478
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 017.45‐018.95 S 1.50 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 13.469 1.576
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 018.95‐019.15 S 0.20 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 0.630 1.371
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 019.15‐019.35 S 0.20 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 1.683
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 019.35‐019.95 S 0.60 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 1.890 1.410
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 019.95‐020.05 S 0.10 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 2.345
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 020.05‐020.15 S 0.10 4577 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 020.15‐021.04 S 0.90 4577 Zilla Full Recon 75mm @ IRI>12 2021 14.147 0.523
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 021.04‐021.24 S 0.20 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 1.079
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 021.24‐022.67 S 1.43 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 15.600 1.156
Z1422 Haziganj‐Lakshmipur Road Km 000.00‐000.80 S 0.80 11086 Zilla Overlay 40mm @ Traff >=2000 2021 4.259 1.373
Z1422 Haziganj‐Lakshmipur Road Km 000.80‐001.00 S 0.20 11086 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.544
Z1422 Haziganj‐Lakshmipur Road Km 001.00‐001.90 S 0.90 11086 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 2.705
Z1422 Haziganj‐Lakshmipur Road Km 001.90‐002.50 S 0.60 11086 Zilla Rehab 75mm @ IRI 9‐12 2021 9.860 2.686
Z1422 Haziganj‐Lakshmipur Road Km 002.50‐002.60 S 0.10 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 3.032
Z1422 Haziganj‐Lakshmipur Road Km 002.60‐002.80 S 0.20 11086 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.812
Z1422 Haziganj‐Lakshmipur Road Km 002.80‐003.80 S 1.00 11086 Zilla Overlay 50mm @ Cracking >25% 2021 5.775 2.720
Z1422 Haziganj‐Lakshmipur Road Km 003.80‐003.90 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.433
Z1422 Haziganj‐Lakshmipur Road Km 003.90‐004.80 S 0.90 11086 Zilla Overlay 50mm @ Cracking >25% 2021 5.198 3.253
Z1422 Haziganj‐Lakshmipur Road Km 004.80‐005.30 S 0.50 11086 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 3.107
Z1422 Haziganj‐Lakshmipur Road Km 005.30‐005.70 S 0.40 11086 Zilla Overlay 50mm @ Cracking >25% 2021 2.310 2.970
Z1422 Haziganj‐Lakshmipur Road Km 005.70‐005.80 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.423
Z1422 Haziganj‐Lakshmipur Road Km 005.80‐006.80 S 1.00 11086 Zilla Overlay 50mm @ Cracking >25% 2021 5.801 3.015
Z1422 Haziganj‐Lakshmipur Road Km 006.80‐007.10 S 0.30 11086 Zilla Full Recon 75mm @ IRI>12 2021 7.173 2.329
Z1422 Haziganj‐Lakshmipur Road Km 007.10‐007.70 S 0.60 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 3.486
Z1422 Haziganj‐Lakshmipur Road Km 007.70‐008.10 S 0.40 11086 Zilla Full Recon 75mm @ IRI>12 2021 9.563 2.219
Z1422 Haziganj‐Lakshmipur Road Km 008.10‐009.20 S 1.10 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 6.353 3.337
Z1422 Haziganj‐Lakshmipur Road Km 009.20‐009.30 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.138
Z1422 Haziganj‐Lakshmipur Road Km 009.30‐009.81 S 0.51 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 2.951 3.319
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 007.80‐008.20 S 0.40 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 0.915
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 008.50‐008.80 S 0.30 4025 Zilla Full Recon 75mm @ IRI>12 2021 4.786 0.355
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 009.00‐009.10 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.007
Page 46 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 009.20‐009.50 S 0.30 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.058
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 009.50‐009.70 S 0.20 4025 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.000
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 009.70‐010.10 S 0.40 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 4.538 0.808
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 010.70‐010.80 S 0.10 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 2.148
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 011.70‐012.30 S 0.60 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 5.387 1.221
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 012.40‐012.50 S 0.10 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 1.446
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 012.50‐012.70 S 0.20 4025 Zilla Overlay 50mm @ Cracking >25% 2021 0.630 0.027
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 012.70‐012.80 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.311
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 013.60‐013.70 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.304 1.228
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 013.70‐014.00 S 0.30 4025 Zilla Overlay 40mm @ Traff >=2000 2021 0.762 0.000
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 014.00‐014.30 S 0.30 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 2.694 0.880
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 014.30‐014.60 S 0.30 4025 Zilla Overlay 40mm @ Traff >=2000 2021 0.856 0.000
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 014.60‐015.30 S 0.70 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 7.752 0.699
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 015.40‐016.30 S 0.90 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 9.967 0.660
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 016.30‐017.20 S 0.90 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 3.497 1.033
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 017.20‐017.40 S 0.20 4025 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.391
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 017.40‐017.60 S 0.20 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.394
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 017.60‐017.70 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.589
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 017.90‐019.40 S 1.50 4025 Zilla Full Recon 75mm @ IRI>12 2021 24.110 0.198
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 020.20‐020.40 S 0.20 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.173
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 022.91‐023.84 S 0.93 4025 Zilla Full Recon 75mm @ IRI>12 2021 22.307 0.125
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 023.84‐024.24 S 0.40 4025 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 024.24‐025.74 S 1.50 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 6.894 1.211
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 025.74‐025.84 S 0.10 4025 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 025.84‐025.94 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.722
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 025.94‐026.04 S 0.10 4025 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1442 Kachua Bypass‐Akania More Link Road Km 000.00‐002.40 S 2.40 5586 Zilla Overlay 50mm @ IRI 6‐9 2021 13.860 2.271
Z1445 Kachua‐Matlab Dakhin  Road Km 000.20‐000.90 S 0.70 3926 Zilla Full Recon 75mm @ IRI>12 2021 12.811 0.292
Z1445 Kachua‐Matlab Dakhin  Road Km 000.90‐001.30 S 0.40 3926 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 001.30‐001.40 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.277
Z1445 Kachua‐Matlab Dakhin  Road Km 001.40‐001.60 S 0.20 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.038
Z1445 Kachua‐Matlab Dakhin  Road Km 001.60‐001.80 S 0.20 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.071
Z1445 Kachua‐Matlab Dakhin  Road Km 001.80‐002.00 S 0.20 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.642 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 002.00‐002.80 S 0.80 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 9.194 0.591
Z1445 Kachua‐Matlab Dakhin  Road Km 002.80‐003.40 S 0.60 3926 Zilla Overlay 40mm @ Traff >=2000 2021 2.073 0.364
Z1445 Kachua‐Matlab Dakhin  Road Km 003.40‐004.40 S 1.00 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 11.224 0.597
Z1445 Kachua‐Matlab Dakhin  Road Km 004.40‐004.70 S 0.30 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.217
Z1445 Kachua‐Matlab Dakhin  Road Km 004.70‐005.00 S 0.30 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.838
Z1445 Kachua‐Matlab Dakhin  Road Km 005.00‐005.60 S 0.60 3926 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 005.60‐005.70 S 0.10 3926 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.815
Z1445 Kachua‐Matlab Dakhin  Road Km 005.70‐006.10 S 0.40 3926 Zilla Overlay 40mm @ Traff >=2000 2021 1.402 0.834
Z1445 Kachua‐Matlab Dakhin  Road Km 006.10‐006.80 S 0.70 3926 Zilla Overlay 40mm @ Traff >=2000 2021 2.217 0.676
Z1445 Kachua‐Matlab Dakhin  Road Km 008.20‐008.30 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.116 1.890
Page 47 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1445 Kachua‐Matlab Dakhin  Road Km 008.60‐008.80 S 0.20 3926 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.558
Z1445 Kachua‐Matlab Dakhin  Road Km 008.80‐009.00 S 0.20 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 009.00‐009.30 S 0.30 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 0.793
Z1445 Kachua‐Matlab Dakhin  Road Km 009.40‐009.50 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.058
Z1445 Kachua‐Matlab Dakhin  Road Km 009.50‐009.70 S 0.20 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 009.70‐009.80 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.331
Z1445 Kachua‐Matlab Dakhin  Road Km 009.80‐010.00 S 0.20 3926 Zilla Overlay 40mm @ Traff >=2000 2021 0.642 0.000
Z1445 Kachua‐Matlab Dakhin  Road Km 010.00‐010.50 S 0.50 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 5.687 0.850
Z1445 Kachua‐Matlab Dakhin  Road Km 010.70‐010.80 S 0.10 3926 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.841
Z1445 Kachua‐Matlab Dakhin  Road Km 011.20‐011.40 S 0.20 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.472
Z1445 Kachua‐Matlab Dakhin  Road Km 011.50‐011.70 S 0.20 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 2.131 1.434
Z1445 Kachua‐Matlab Dakhin  Road Km 011.90‐012.10 S 0.20 3926 Zilla Full Recon 75mm @ IRI>12 2021 3.043 0.635
Z1445 Kachua‐Matlab Dakhin  Road Km 012.20‐012.30 S 0.10 3926 Zilla Full Recon 75mm @ IRI>12 2021 1.521 0.728
Z1445 Kachua‐Matlab Dakhin  Road Km 012.60‐013.00 S 0.40 3926 Zilla Full Recon 75mm @ IRI>12 2021 6.086 0.490
Z1445 Kachua‐Matlab Dakhin  Road Km 013.40‐013.50 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.934
Z1445 Kachua‐Matlab Dakhin  Road Km 014.10‐014.50 S 0.40 3926 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.418
Z1445 Kachua‐Matlab Dakhin  Road Km 014.80‐015.00 S 0.20 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.387
Z1445 Kachua‐Matlab Dakhin  Road Km 015.20‐015.40 S 0.20 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.438
Z1445 Kachua‐Matlab Dakhin  Road Km 015.70‐016.00 S 0.30 3926 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.655
Z1445 Kachua‐Matlab Dakhin  Road Km 016.20‐016.60 S 0.40 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.893
Z1445 Kachua‐Matlab Dakhin  Road Km 016.70‐017.00 S 0.30 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.243
Z1445 Kachua‐Matlab Dakhin  Road Km 017.30‐018.00 S 0.70 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 7.741 0.886
Z1445 Kachua‐Matlab Dakhin  Road Km 018.80‐018.90 S 0.10 3926 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.775
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 000.00‐000.10 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.551 0.090
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 000.10‐000.70 S 0.60 2787 Zilla Full Recon 75mm @ IRI>12 2021 9.755 0.060
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 000.70‐001.00 S 0.30 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.066
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 001.00‐001.10 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.821
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 001.10‐001.90 S 0.80 2787 Zilla Overlay 40mm @ Traff >=2000 2021 2.479 0.441
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 001.90‐002.50 S 0.60 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 6.544 0.444
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 002.50‐002.70 S 0.20 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.621 0.003
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 002.70‐002.80 S 0.10 2787 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.299
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 002.80‐002.90 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.312 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 002.90‐003.00 S 0.10 2787 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.638
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 003.00‐003.10 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 003.10‐003.30 S 0.20 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.363
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 003.30‐003.50 S 0.20 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 003.50‐003.80 S 0.30 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.554
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 003.80‐004.40 S 0.60 2787 Zilla Overlay 40mm @ Traff >=2000 2021 1.920 0.403
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 004.40‐004.50 S 0.10 2787 Zilla Full Recon 75mm @ IRI>12 2021 1.739 0.471
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 004.50‐004.60 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.340 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 004.60‐005.50 S 0.90 2787 Zilla Overlay 40mm @ Traff >=2000 2021 2.949 0.635
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 005.50‐005.80 S 0.30 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.947 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 005.80‐005.90 S 0.10 2787 Zilla Full Recon 75mm @ IRI>12 2021 1.739 0.479
Page 48 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 005.90‐007.10 S 1.20 2787 Zilla Overlay 40mm @ Traff >=2000 2021 3.868 0.316
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 007.10‐007.20 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.566
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 007.20‐007.60 S 0.40 2787 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 0.164
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 007.60‐007.80 S 0.20 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.396
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 007.80‐007.90 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 007.90‐008.40 S 0.50 2787 Zilla Full Recon 75mm @ IRI>12 2021 8.042 0.092
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 008.40‐008.70 S 0.30 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.010
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 008.70‐009.40 S 0.70 2787 Zilla Full Recon 75mm @ IRI>12 2021 11.107 0.190
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 009.40‐009.50 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 009.50‐009.70 S 0.20 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.655
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 009.70‐010.00 S 0.30 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.927 0.141
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 010.30‐010.40 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.902
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 010.40‐012.40 S 2.00 2787 Zilla Overlay 40mm @ Traff >=2000 2021 6.452 0.413
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 012.40‐012.50 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.842
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 012.50‐013.90 S 1.40 2787 Zilla Overlay 40mm @ Traff >=2000 2021 4.517 0.368
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 013.90‐014.20 S 0.30 2787 Zilla Full Recon 75mm @ IRI>12 2021 4.887 0.293
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 014.20‐015.20 S 1.00 2787 Zilla Overlay 40mm @ Traff >=2000 2021 3.141 0.473
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 015.20‐015.70 S 0.50 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.345
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 015.70‐015.80 S 0.10 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 015.80‐015.90 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.712
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 015.90‐016.10 S 0.20 2787 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.095
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 016.10‐016.20 S 0.10 2787 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.026
Z1482 Bakila‐Tekerhat‐Matlab Dakhin  Km 016.20‐016.74 S 0.54 2787 Zilla Overlay 40mm @ Traff >=2000 2021 1.779 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 000.00‐003.20 S 3.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 12.711 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 003.20‐003.30 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 003.30‐003.40 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.522
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 003.40‐003.70 S 0.30 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 003.70‐004.60 S 0.90 2159 Zilla Rehab 75mm @ IRI 9‐12 2021 9.832 0.552
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 004.60‐004.80 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 004.80‐005.00 S 0.20 2159 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.157
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.00‐005.10 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.10‐005.20 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.370
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.20‐005.60 S 0.40 2159 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.60‐005.70 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.372 0.425
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.70‐005.90 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 1.144 0.118
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 005.90‐006.00 S 0.10 2159 Zilla Overlay 40mm @ IRI>12 2021 0.567 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 006.00‐006.30 S 0.30 2159 Zilla Overlay 40mm @ Traff >=2000 2021 1.001 0.174
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 006.30‐006.40 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.407
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 006.40‐006.60 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 006.60‐006.70 S 0.10 2159 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.863
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 006.70‐007.70 S 1.00 2159 Zilla Overlay 40mm @ Traff >=2000 2021 3.099 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 007.70‐007.80 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.545
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 007.80‐008.00 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Page 49 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 008.00‐008.10 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.292
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 008.50‐008.80 S 0.30 2159 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.370
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 008.80‐010.40 S 1.60 2159 Zilla Overlay 40mm @ Traff >=2000 2021 5.009 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 010.40‐010.50 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.396
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 010.50‐010.60 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 010.60‐010.70 S 0.10 2159 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.556
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 011.30‐011.50 S 0.20 2159 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.258
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 011.80‐011.90 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.349
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 011.90‐012.10 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 012.10‐012.20 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.347
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 012.20‐012.50 S 0.30 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 012.50‐012.90 S 0.40 2159 Zilla Full Recon 75mm @ IRI>12 2021 6.347 0.217
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 012.90‐013.20 S 0.30 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 013.20‐013.30 S 0.10 2159 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.384
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 013.30‐013.70 S 0.40 2159 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 013.70‐013.90 S 0.20 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.192
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 013.90‐013.90 S 0.00 2159 Zilla Seal Coat 2021 0.003 14.846
Z8699 Chandra‐Haimchar Road Km 000.00‐000.40 S 0.40 3318 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.252
Z8699 Chandra‐Haimchar Road Km 000.40‐000.60 S 0.20 3318 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z8699 Chandra‐Haimchar Road Km 000.60‐000.70 S 0.10 3318 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.811
Z8699 Chandra‐Haimchar Road Km 000.70‐001.20 S 0.50 3318 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z8699 Chandra‐Haimchar Road Km 001.20‐001.40 S 0.20 3318 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.340
Z8699 Chandra‐Haimchar Road Km 001.40‐001.60 S 0.20 3318 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z8699 Chandra‐Haimchar Road Km 001.60‐001.70 S 0.10 3318 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.928
Z8699 Chandra‐Haimchar Road Km 001.70‐002.10 S 0.40 3318 Zilla Overlay 40mm @ Traff >=2000 2021 1.253 0.000
Z8699 Chandra‐Haimchar Road Km 002.10‐002.30 S 0.20 3318 Zilla Full Recon 75mm @ IRI>12 2021 3.756 0.375
Z8699 Chandra‐Haimchar Road Km 002.30‐003.60 S 1.30 3318 Zilla Overlay 40mm @ Traff >=2000 2021 5.485 0.000
Z8699 Chandra‐Haimchar Road Km 003.60‐003.80 S 0.20 3318 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.407
Z8699 Chandra‐Haimchar Road Km 003.80‐003.90 S 0.10 3318 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z8699 Chandra‐Haimchar Road Km 003.90‐004.60 S 0.70 3318 Zilla Rehab 75mm @ IRI 9‐12 2021 7.647 0.662
Z8699 Chandra‐Haimchar Road Km 004.60‐004.90 S 0.30 3318 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.337
Z8699 Chandra‐Haimchar Road Km 004.90‐008.38 S 3.48 3318 Zilla Overlay 40mm @ Cracks >25% 2021 10.215 0.051
Chandpur Total 2102.223
Cumilla Division
N101 Cumilla ‐ Bibirbazar Land Port Connecting Road Km 000.10‐001.00 S 0.90 7041 National Rehab 180mm @ IRI 9‐12 2021 36.301 1.898
N101 Cumilla ‐ Bibirbazar Land Port Connecting Road Km 001.00‐004.00 S 3.00 7041 National Overlay 50mm @ IRI 5‐7 2021 22.043 5.356
N101 Cumilla ‐ Bibirbazar Land Port Connecting Road Km 004.00‐004.10 S 0.10 7041 National Rehab 180mm @ IRI 9‐12 2021 4.033 1.938
N101 Cumilla ‐ Bibirbazar Land Port Connecting Road Km 004.10‐006.02 S 1.92 7041 National Overlay 50mm @ IRI 5‐7 2021 14.127 5.198
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 000.00‐000.20 S 0.20 7866 National Overlay 60mm @ IRI 7‐9 2021 1.626 20.644
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 000.20‐000.30 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.549 7.652
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 000.30‐001.00 S 0.70 7866 National Overlay 60mm @ IRI 7‐9 2021 5.692 19.839
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 001.00‐001.30 S 0.30 7866 National Full Recon 180mm @ IRI 12 2021 12.514 7.692
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 001.30‐001.50 S 0.20 7866 National Rehab 180mm @ IRI 9‐12 2021 6.569 9.850
Page 50 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 001.50‐002.20 S 0.70 7866 National Full Recon 180mm @ IRI 12 2021 27.886 6.903
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 002.20‐002.30 S 0.10 7866 National Rehab 180mm @ IRI 9‐12 2021 3.302 9.629
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 002.30‐002.40 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.059 8.463
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 002.40‐002.80 S 0.40 7866 National Rehab 180mm @ IRI 9‐12 2021 13.299 9.456
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 002.80‐003.00 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.371 7.953
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 003.00‐003.30 S 0.30 7866 National Overlay 60mm @ IRI 7‐9 2021 2.252 22.186
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 003.30‐003.40 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.199 8.176
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 003.40‐005.00 S 1.60 7866 National Overlay 50mm @ IRI 5‐7 2021 10.080 22.049
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 005.00‐005.10 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.199 8.166
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 006.60‐006.70 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.199 8.185
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 006.70‐006.90 S 0.20 7866 National Rehab 180mm @ IRI 9‐12 2021 6.914 8.955
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 006.90‐007.10 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.511 8.001
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 009.90‐010.30 S 0.40 7866 National Full Recon 180mm @ IRI 12 2021 16.756 7.802
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 016.00‐019.10 S 3.10 7866 National Overlay 60mm @ IRI 7‐9 2021 22.098 17.809
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 020.11‐020.60 S 0.49 7866 National Overlay 60mm @ IRI 7‐9 2021 3.398 23.004
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 020.60‐021.10 S 0.50 7866 National Full Recon 180mm @ IRI 12 2021 19.772 6.919
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 021.10‐021.30 S 0.20 7866 National Rehab 180mm @ IRI 9‐12 2021 6.569 9.902
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 021.30‐021.40 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 3.989 8.828
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 021.40‐021.70 S 0.30 7866 National Full Recon 180mm @ IRI 12 2021 12.577 7.623
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 021.70‐021.90 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.399 7.931
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 021.90‐022.09 S 0.20 7866 National Rehab 180mm @ IRI 9‐12 2021 6.880 9.167
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 022.09‐022.49 S 0.40 7866 National Full Recon 180mm @ IRI 12 2021 16.798 7.804
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 022.49‐022.99 S 0.50 7866 National Overlay 60mm @ IRI 7‐9 2021 3.753 21.913
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 022.99‐023.19 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.399 7.931
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 023.19‐023.49 S 0.30 7866 National Rehab 180mm @ IRI 9‐12 2021 10.372 8.948
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 023.49‐023.69 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.399 7.931
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 023.69‐023.79 S 0.10 7866 National Overlay 60mm @ IRI 7‐9 2021 0.751 23.018
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 023.79‐023.99 S 0.20 7866 National Full Recon 180mm @ IRI 12 2021 8.399 7.931
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 023.99‐024.09 S 0.10 7866 National Rehab 180mm @ IRI 9‐12 2021 3.457 9.397
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 024.09‐024.59 S 0.50 7866 National Full Recon 180mm @ IRI 12 2021 20.997 6.740
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 024.59‐024.89 S 0.30 7866 National Full Recon 180mm @ IRI 12 2021 12.598 7.603
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 024.89‐024.99 S 0.10 7866 National Full Recon 180mm @ IRI 12 2021 4.199 8.185
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 030.15‐030.65 S 0.50 4618 National Full Recon 150mm 2021 18.204 3.896
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 037.74‐037.84 S 0.10 4618 National Overlay 50mm @ IRI 5‐9 2021 0.588 14.109
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 037.84‐038.04 S 0.20 4618 National Full Recon 150mm @ IRI 12 2021 6.796 4.785
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 038.04‐038.54 S 0.50 4618 National Overlay 50mm @ IRI 5‐9 2021 2.940 13.221
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 040.04‐040.24 S 0.20 4618 National Rehab 150mm @ IRI 9‐12 2021 5.410 5.941
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 040.24‐040.34 S 0.10 4618 National Full Recon 150mm @ IRI 12 2021 3.398 5.224
N102 Cumilla‐Brahmanbaria (Sarail) Road Km 040.34‐040.36 S 0.02 4618 National Rehab 150mm @ IRI 9‐12 2021 0.514 9.486
N119 Chandina Town Old Section  Road Km 000.10‐000.20 S 0.10 3335 National Full Recon 135mm 2021 3.060 0.990
N119 Chandina Town Old Section  Road Km 000.20‐001.30 S 1.10 3335 National Overlay 50mm @ IRI 5‐9 2021 6.468 1.719
N119 Chandina Town Old Section  Road Km 001.30‐001.50 S 0.20 3335 National DBST @ Traff 2000‐4000 2021 0.553 1.667
N119 Chandina Town Old Section  Road Km 001.50‐002.40 S 0.90 3335 National Overlay 50mm @ IRI 5‐9 2021 5.286 1.694
Page 51 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N119 Chandina Town Old Section  Road Km 002.40‐002.85 S 0.45 3335 National Overlay 50mm @ IRI 5‐9 2021 2.652 1.776
N120 Cumilla Town Old Section Road Km 000.12‐000.60 S 0.48 22728 National Overlay 80mm @ IRI 5‐9 2021 8.331 7.611
N120 Cumilla Town Old Section Road Km 000.60‐000.70 S 0.10 22728 National Full Recon 195mm 2021 7.666 7.052
N120 Cumilla Town Old Section Road Km 000.70‐000.90 S 0.20 22728 National Overlay 50mm @ IRI 5 2021 2.205 8.444
N120 Cumilla Town Old Section Road Km 000.90‐001.20 S 0.30 22728 National Full Recon 195mm 2021 22.998 4.898
N120 Cumilla Town Old Section Road Km 001.20‐001.30 S 0.10 22728 National Overlay 50mm @ IRI 5 2021 1.103 8.155
N120 Cumilla Town Old Section Road Km 001.30‐001.50 S 0.20 22728 National Full Recon 195mm 2021 15.332 6.199
N120 Cumilla Town Old Section Road Km 001.50‐001.70 S 0.20 22728 National DBST @ Traff >6000 2021 1.037 7.065
N120 Cumilla Town Old Section Road Km 001.70‐001.80 S 0.10 22728 National Rehab 195mm @ IRI 9‐12 2021 6.367 4.866
N120 Cumilla Town Old Section Road Km 001.80‐002.10 S 0.30 22728 National Overlay 80mm @ IRI 5‐9 2021 5.190 10.245
N120 Cumilla Town Old Section Road Km 002.10‐002.30 S 0.20 22728 National Full Recon 195mm 2021 15.332 5.396
N120 Cumilla Town Old Section Road Km 002.30‐003.60 S 1.30 22728 National DBST @ Traff >6000 2021 7.148 5.970
N120 Cumilla Town Old Section Road Km 003.60‐003.80 S 0.20 22728 National DBST @ Traff >6000 2021 1.778 4.845
N120 Cumilla Town Old Section Road Km 003.80‐003.90 S 0.10 22728 National Overlay 50mm @ IRI 5 2021 1.890 3.378
N120 Cumilla Town Old Section Road Km 003.90‐004.10 S 0.20 22728 National Rehab 195mm @ IRI 9‐12 2021 21.830 1.835
N120 Cumilla Town Old Section Road Km 004.30‐004.40 S 0.10 22728 National Full Recon 195mm 2021 13.142 3.322
N120 Cumilla Town Old Section Road Km 004.40‐004.50 S 0.10 22728 National Overlay 80mm @ IRI 5‐9 2021 2.975 2.969
N120 Cumilla Town Old Section Road Km 004.50‐004.80 S 0.30 22728 National Rehab 195mm @ IRI 9‐12 2021 32.746 2.259
N120 Cumilla Town Old Section Road Km 006.30‐006.40 S 0.10 22728 National Full Recon 195mm 2021 5.330 7.920
N120 Cumilla Town Old Section Road Km 008.80‐009.60 S 0.80 11984 National DBST @ Traff >6000 2021 2.189 7.526
N120 Cumilla Town Old Section Road Km 009.60‐009.90 S 0.30 11984 National Overlay 50mm @ IRI 5 2021 1.733 3.551
N120 Cumilla Town Old Section Road Km 009.90‐010.00 S 0.10 11984 National Full Recon 195mm 2021 3.975 3.569
N120 Cumilla Town Old Section Road Km 010.00‐010.40 S 0.40 11984 National Overlay 50mm @ IRI 5 2021 2.310 4.083
N120 Cumilla Town Old Section Road Km 010.40‐010.60 S 0.20 11984 National Full Recon 195mm 2021 8.031 3.144
N120 Cumilla Town Old Section Road Km 010.60‐011.10 S 0.50 11984 National Overlay 80mm @ IRI 5‐9 2021 4.546 5.099
N120 Cumilla Town Old Section Road Km 011.10‐011.40 S 0.30 11984 National Rehab 195mm @ IRI 9‐12 2021 10.006 3.133
N120 Cumilla Town Old Section Road Km 011.40‐014.20 S 2.80 11984 National Overlay 80mm @ IRI 5‐9 2021 25.864 4.190
N120 Cumilla Town Old Section Road Km 014.20‐014.40 S 0.20 11984 National Rehab 195mm @ IRI 9‐12 2021 6.670 3.394
N120 Cumilla Town Old Section Road Km 014.40‐015.00 S 0.60 11984 National DBST @ Traff >6000 2021 1.630 2.482
N120 Cumilla Town Old Section Road Km 015.00‐015.10 S 0.10 11984 National Rehab 195mm @ IRI 9‐12 2021 3.335 3.165
N120 Cumilla Town Old Section Road Km 015.10‐015.20 S 0.10 11984 National Overlay 80mm @ IRI 5‐9 2021 0.909 6.403
N120 Cumilla Town Old Section Road Km 015.20‐015.40 S 0.20 11984 National Full Recon 195mm 2021 8.031 3.144
N120 Cumilla Town Old Section Road Km 015.40‐016.30 S 0.90 11984 National Overlay 50mm @ IRI 5 2021 5.198 3.968
N120 Cumilla Town Old Section Road Km 016.30‐016.60 S 0.30 11984 National DBST @ Traff >6000 2021 0.815 8.552
N120 Cumilla Town Old Section Road Km 016.60‐017.10 S 0.50 11984 National Overlay 50mm @ IRI 5 2021 2.888 4.281
N120 Cumilla Town Old Section Road Km 017.10‐017.30 S 0.20 11984 National DBST @ Traff >6000 2021 0.543 7.972
N120 Cumilla Town Old Section Road Km 018.40‐018.50 S 0.10 11984 National Rehab 195mm @ IRI 9‐12 2021 3.335 3.532
N120 Cumilla Town Old Section Road Km 018.50‐018.60 S 0.10 11984 National Overlay 80mm @ IRI 5‐9 2021 0.909 6.790
N120 Cumilla Town Old Section Road Km 018.60‐018.70 S 0.10 11984 National Rehab 195mm @ IRI 9‐12 2021 3.335 3.837
N120 Cumilla Town Old Section Road Km 018.80‐018.90 S 0.10 11984 National Full Recon 195mm 2021 4.016 4.060
N120 Cumilla Town Old Section Road Km 019.00‐019.10 S 0.10 11984 National Rehab 195mm @ IRI 9‐12 2021 3.335 3.533
N120 Cumilla Town Old Section Road Km 019.40‐020.94 S 1.54 11984 National DBST @ Traff >6000 2021 4.198 7.356
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 004.30‐004.40 L 0.10 7698 Regional Full Recon 180mm 2021 3.639 6.908
Page 52 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 004.30‐004.40 R 0.10 7698 Regional Full Recon 180mm 2021 3.709 6.734
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 004.40‐004.94 L 0.54 9503 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.519 13.687
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 004.40‐004.94 R 0.54 9503 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.587 13.704
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 009.31‐009.50 L 0.19 9611 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.141 14.614
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 009.31‐009.50 R 0.19 9611 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.141 14.614
R144 Laksam Old Section Road Km 000.00‐001.20 S 1.20 4776 Regional DBST @ 25% Crk 2021 2.940 0.293
R144 Laksam Old Section Road Km 001.20‐001.30 S 0.10 10009 Regional Rehab 150mm @ IRI 9‐12 2021 3.536 0.806
R144 Laksam Old Section Road Km 001.30‐002.20 S 0.90 10009 Regional DBST @ 25% Crk 2021 2.696 2.177
R144 Laksam Old Section Road Km 002.20‐002.30 S 0.10 10009 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.184
R144 Laksam Old Section Road Km 002.30‐003.38 S 1.08 10009 Regional DBST @ 25% Crk 2021 2.937 1.441
Z1008 Chandina‐Debidwar Road Km 000.30‐000.40 S 0.10 5444 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.195
Z1008 Chandina‐Debidwar Road Km 000.40‐001.00 S 0.60 5444 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 2.976
Z1008 Chandina‐Debidwar Road Km 001.00‐001.30 S 0.30 5444 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.923
Z1008 Chandina‐Debidwar Road Km 001.40‐001.60 S 0.20 5444 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.164
Z1008 Chandina‐Debidwar Road Km 001.70‐001.80 S 0.10 5444 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.449
Z1008 Chandina‐Debidwar Road Km 001.80‐002.30 S 0.50 5444 Zilla Overlay 50mm @ IRI 6‐9 2021 2.882 2.767
Z1008 Chandina‐Debidwar Road Km 002.30‐002.50 S 0.20 5444 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.081
Z1008 Chandina‐Debidwar Road Km 002.60‐002.70 S 0.10 5444 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.548
Z1008 Chandina‐Debidwar Road Km 002.70‐003.00 S 0.30 5444 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 3.179
Z1008 Chandina‐Debidwar Road Km 003.00‐003.30 S 0.30 5444 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.855
Z1008 Chandina‐Debidwar Road Km 003.30‐004.00 S 0.70 5444 Zilla Rehab 75mm @ IRI 9‐12 2021 11.523 1.283
Z1008 Chandina‐Debidwar Road Km 004.00‐004.50 S 0.50 5444 Zilla Full Recon 75mm @ IRI>12 2021 11.954 0.924
Z1008 Chandina‐Debidwar Road Km 004.50‐005.00 S 0.50 5444 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 2.750
Z1008 Chandina‐Debidwar Road Km 005.00‐005.80 S 0.80 5444 Zilla Rehab 75mm @ IRI 9‐12 2021 13.169 1.764
Z1008 Chandina‐Debidwar Road Km 006.70‐007.30 S 0.60 5444 Zilla Full Recon 75mm @ IRI>12 2021 14.345 0.976
Z1008 Chandina‐Debidwar Road Km 007.40‐007.70 S 0.30 5444 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.707
Z1008 Chandina‐Debidwar Road Km 007.80‐008.00 S 0.20 5444 Zilla Full Recon 75mm @ IRI>12 2021 4.721 1.185
Z1008 Chandina‐Debidwar Road Km 008.00‐008.10 S 0.10 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 0.383 1.535
Z1008 Chandina‐Debidwar Road Km 008.10‐008.20 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.246
Z1008 Chandina‐Debidwar Road Km 008.50‐009.00 S 0.50 4407 Zilla Full Recon 75mm @ IRI>12 2021 7.933 0.825
Z1008 Chandina‐Debidwar Road Km 009.00‐009.20 S 0.20 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 1.978
Z1008 Chandina‐Debidwar Road Km 009.20‐009.30 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.450
Z1008 Chandina‐Debidwar Road Km 009.30‐009.50 S 0.20 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 2.450
Z1008 Chandina‐Debidwar Road Km 009.50‐009.90 S 0.40 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 1.459
Z1008 Chandina‐Debidwar Road Km 009.90‐011.00 S 1.10 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 4.212 2.194
Z1008 Chandina‐Debidwar Road Km 011.00‐011.30 S 0.30 4407 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.826
Z1008 Chandina‐Debidwar Road Km 011.50‐011.70 S 0.20 4407 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.106
Z1008 Chandina‐Debidwar Road Km 011.70‐011.90 S 0.20 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 1.937
Z1008 Chandina‐Debidwar Road Km 011.90‐012.00 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.451
Z1008 Chandina‐Debidwar Road Km 012.40‐012.50 S 0.10 4407 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.474
Z1008 Chandina‐Debidwar Road Km 012.50‐012.60 S 0.10 4407 Zilla Overlay 50mm @ IRI 6‐9 2021 0.383 1.423
Z1008 Chandina‐Debidwar Road Km 012.60‐012.80 S 0.20 4407 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.099
Z1008 Chandina‐Debidwar Road Km 013.00‐013.20 S 0.20 4407 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.684
Page 53 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1008 Chandina‐Debidwar Road Km 013.50‐013.60 S 0.10 5444 Zilla Full Recon 75mm @ IRI>12 2021 2.087 1.811
Z1017 Chandina‐Chapera‐Companiganj  Road Km 000.00‐000.60 S 0.60 2413 Zilla Overlay 40mm @ Traff >=2000 2021 1.859 0.016
Z1017 Chandina‐Chapera‐Companiganj  Road Km 000.60‐001.20 S 0.60 2413 Zilla Full Recon 75mm @ IRI>12 2021 9.520 0.115
Z1017 Chandina‐Chapera‐Companiganj  Road Km 001.20‐002.60 S 1.40 2413 Zilla Overlay 40mm @ Traff >=2000 2021 4.335 0.050
Z1017 Chandina‐Chapera‐Companiganj  Road Km 002.60‐002.80 S 0.20 2413 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.242
Z1017 Chandina‐Chapera‐Companiganj  Road Km 002.80‐004.10 S 1.30 2413 Zilla Overlay 40mm @ Traff >=2000 2021 4.017 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 004.10‐004.20 S 0.10 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.557
Z1017 Chandina‐Chapera‐Companiganj  Road Km 004.20‐005.70 S 1.50 2413 Zilla Overlay 40mm @ Traff >=2000 2021 4.648 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 005.70‐005.90 S 0.20 2413 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.355
Z1017 Chandina‐Chapera‐Companiganj  Road Km 005.90‐007.30 S 1.40 2413 Zilla Overlay 40mm @ Traff >=2000 2021 4.335 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 009.50‐010.90 S 1.40 2413 Zilla Overlay 40mm @ Traff >=2000 2021 4.335 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 010.90‐011.70 S 0.80 2413 Zilla Full Recon 75mm @ IRI>12 2021 12.693 0.087
Z1017 Chandina‐Chapera‐Companiganj  Road Km 011.70‐011.78 S 0.08 2413 Zilla Seal Coat 2021 0.076 0.152
Z1017 Chandina‐Chapera‐Companiganj  Road Km 012.08‐012.10 S 0.02 2413 Zilla Full Recon 75mm @ IRI>12 2021 0.270 2.071
Z1017 Chandina‐Chapera‐Companiganj  Road Km 012.10‐012.30 S 0.20 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 012.30‐012.40 S 0.10 2413 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.457
Z1017 Chandina‐Chapera‐Companiganj  Road Km 012.40‐012.50 S 0.10 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.120
Z1017 Chandina‐Chapera‐Companiganj  Road Km 012.50‐013.10 S 0.60 2413 Zilla Full Recon 75mm @ IRI>12 2021 9.520 0.052
Z1017 Chandina‐Chapera‐Companiganj  Road Km 013.10‐014.00 S 0.90 2413 Zilla Overlay 40mm @ Traff >=2000 2021 2.786 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 014.00‐014.10 S 0.10 2413 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.416
Z1017 Chandina‐Chapera‐Companiganj  Road Km 014.10‐015.30 S 1.20 2413 Zilla Overlay 40mm @ Traff >=2000 2021 3.719 0.000
Z1017 Chandina‐Chapera‐Companiganj  Road Km 015.30‐015.90 S 0.60 2413 Zilla Full Recon 75mm @ IRI>12 2021 9.520 0.107
Z1017 Chandina‐Chapera‐Companiganj  Road Km 015.90‐017.00 S 1.10 2413 Zilla Overlay 40mm @ Traff >=2000 2021 3.409 0.046
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.00‐017.10 S 0.10 2413 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.472
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.10‐017.20 S 0.10 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.157
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.20‐017.40 S 0.20 2413 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.207
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.40‐017.60 S 0.20 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.078
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.60‐017.80 S 0.20 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.232
Z1017 Chandina‐Chapera‐Companiganj  Road Km 017.80‐017.82 S 0.03 2413 Zilla Seal Coat 2021 0.024 0.362
Z1017 Chandina‐Chapera‐Companiganj  Road Km 018.31‐018.61 S 0.29 2413 Zilla Overlay 40mm @ Traff >=2000 2021 0.914 0.344
Z1029 Cumilla Cantonment‐Barura Road Km 000.50‐000.80 S 0.30 4444 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.844
Z1029 Cumilla Cantonment‐Barura Road Km 000.80‐001.40 S 0.60 4444 Zilla Overlay 50mm @ Cracking >25% 2021 2.300 0.097
Z1029 Cumilla Cantonment‐Barura Road Km 001.40‐001.60 S 0.20 4444 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.956
Z1029 Cumilla Cantonment‐Barura Road Km 001.60‐002.38 S 0.78 4444 Zilla Overlay 50mm @ IRI 6‐9 2021 2.993 0.481
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 000.00‐000.20 S 0.20 6895 Zilla Overlay 40mm @ Traff >=2000 2021 0.961 0.000
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 000.20‐000.30 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.047
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 000.30‐000.40 S 0.10 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 2.235
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 000.40‐000.70 S 0.30 6895 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.335
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 000.70‐001.20 S 0.50 6895 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 1.462
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 001.20‐003.00 S 1.80 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 31.337 1.808
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 003.00‐003.10 S 0.10 6895 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 1.546
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 003.10‐003.30 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.396
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 003.50‐003.60 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.032
Page 54 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 003.60‐004.20 S 0.60 6895 Zilla Overlay 50mm @ Cracking >25% 2021 3.465 2.110
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 004.20‐004.30 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.949
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 005.10‐005.30 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.568
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 005.30‐005.50 S 0.20 6895 Zilla Overlay 50mm @ Cracking >25% 2021 1.155 1.631
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 005.50‐005.90 S 0.40 6895 Zilla Full Recon 75mm @ IRI>12 2021 9.563 1.229
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 005.90‐006.20 S 0.30 6895 Zilla Overlay 40mm @ Traff >=2000 2021 1.396 1.608
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 006.20‐006.60 S 0.40 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 2.196
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 006.60‐007.40 S 0.80 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 4.620 0.408
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 007.40‐007.50 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.595
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 007.50‐008.00 S 0.50 6895 Zilla Overlay 50mm @ Cracking >25% 2021 2.888 1.607
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 008.00‐008.10 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.637
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 008.20‐009.10 S 0.90 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 14.815 1.930
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 009.40‐009.60 S 0.20 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.933
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 009.60‐009.80 S 0.20 6895 Zilla Overlay 50mm @ Cracking >25% 2021 1.155 1.646
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 009.80‐010.60 S 0.80 6895 Zilla Full Recon 75mm @ IRI>12 2021 19.103 1.118
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 010.60‐010.90 S 0.30 6895 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 2.374
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 010.90‐011.20 S 0.30 6895 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.262
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 011.20‐011.90 S 0.70 6895 Zilla Overlay 50mm @ Cracking >25% 2021 4.087 1.907
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 011.90‐013.00 S 1.10 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 18.108 1.476
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 013.00‐013.10 S 0.10 6895 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 1.818
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 013.10‐013.20 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.904
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 013.20‐013.30 S 0.10 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 5.147
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 013.30‐013.50 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.274
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 013.50‐014.10 S 0.60 6895 Zilla Overlay 50mm @ Cracking >25% 2021 3.459 1.719
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 014.10‐014.30 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.652
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 014.30‐014.50 S 0.20 6895 Zilla Overlay 50mm @ Cracking >25% 2021 1.155 2.228
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 014.50‐014.60 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.612
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 014.60‐014.90 S 0.30 6895 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 2.125
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 014.90‐015.40 S 0.50 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 1.618
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 015.40‐015.70 S 0.30 6895 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 1.376
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 015.70‐016.10 S 0.40 6895 Zilla Full Recon 75mm @ IRI>12 2021 9.563 1.195
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 016.10‐016.80 S 0.70 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 4.131 3.966
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 016.80‐018.40 S 1.60 6895 Zilla Overlay 40mm @ Traff >=2000 2021 7.426 1.555
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 018.40‐018.60 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.260 1.680
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 018.60‐019.50 S 0.90 6895 Zilla Overlay 40mm @ Traff >=2000 2021 4.034 2.284
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 019.50‐019.80 S 0.30 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 5.010 1.809
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 019.80‐019.90 S 0.10 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 2.204
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 019.90‐020.00 S 0.10 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.303
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 020.00‐021.20 S 1.20 6895 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 1.568
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 021.20‐021.40 S 0.20 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.612
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 022.39‐022.59 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.421
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 022.59‐022.69 S 0.10 6895 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 1.521
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 022.69‐022.89 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.423
Page 55 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 022.89‐022.99 S 0.10 6895 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 1.465
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 022.99‐023.19 S 0.20 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.819
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 023.19‐023.89 S 0.70 6895 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 1.524
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 023.89‐024.09 S 0.20 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.829
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 024.09‐024.49 S 0.40 6895 Zilla Overlay 50mm @ Cracking >25% 2021 2.310 2.304
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 024.49‐024.59 S 0.10 6895 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.285
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 024.99‐025.09 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.611
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 025.09‐026.69 S 1.60 6895 Zilla Overlay 40mm @ Traff >=2000 2021 7.467 1.771
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 026.69‐026.79 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.714
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 026.79‐027.79 S 1.00 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 5.775 2.762
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 027.79‐027.99 S 0.20 6895 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.430
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 028.69‐028.99 S 0.30 6895 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.302
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 028.99‐029.49 S 0.50 6895 Zilla Overlay 50mm @ Cracking >25% 2021 2.552 0.442
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 029.49‐029.89 S 0.40 6895 Zilla Full Recon 75mm @ IRI>12 2021 8.346 1.680
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 029.89‐030.19 S 0.30 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 1.507 3.568
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 030.19‐030.29 S 0.10 6895 Zilla Full Recon 75mm @ IRI>12 2021 2.087 2.420
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 030.29‐030.49 S 0.20 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 1.008 4.548
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 030.49‐030.99 S 0.50 6895 Zilla Full Recon 75mm @ IRI>12 2021 10.433 1.571
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 030.99‐031.39 S 0.40 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 2.134 2.761
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 031.39‐032.29 S 0.90 6895 Zilla Full Recon 75mm @ IRI>12 2021 21.518 1.080
Z1041 Cumilla‐Burichang‐Brahmanpara‐Mirpur  Km 032.29‐033.59 S 1.30 6895 Zilla Overlay 50mm @ IRI 6‐9 2021 9.896 1.218
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 000.20‐000.90 S 0.70 3637 Zilla Full Recon 75mm @ IRI>12 2021 16.736 0.281
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 001.00‐001.20 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.298
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 002.50‐002.70 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.279
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 002.70‐003.60 S 0.90 3637 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 003.60‐003.90 S 0.30 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.434
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 003.90‐004.60 S 0.70 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 0.176
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 004.60‐005.00 S 0.40 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.306
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 005.00‐005.80 S 0.80 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.055
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 005.80‐005.90 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.476
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 005.90‐006.70 S 0.80 3637 Zilla Overlay 40mm @ Traff >=2000 2021 3.731 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 006.70‐006.80 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.506
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 006.80‐007.80 S 1.00 3637 Zilla Overlay 40mm @ Traff >=2000 2021 4.670 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 007.80‐007.90 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.512
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 007.90‐008.10 S 0.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.014
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 008.10‐008.40 S 0.30 3637 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.304
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 008.40‐008.50 S 0.10 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.325
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 008.50‐008.70 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.217
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 008.70‐008.90 S 0.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.102
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 008.90‐009.00 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.342
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 009.00‐009.40 S 0.40 3637 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.257
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 009.40‐009.50 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.329
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 010.00‐010.30 S 0.30 3637 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.381
Page 56 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 011.00‐011.20 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.462
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 011.21‐014.40 S 3.19 3637 Zilla Overlay 40mm @ Traff >=2000 2021 14.882 0.145
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 014.40‐014.50 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.459
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 014.50‐015.60 S 1.10 3637 Zilla Overlay 40mm @ Traff >=2000 2021 5.136 0.200
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 015.60‐015.90 S 0.30 3637 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.166
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 015.90‐016.00 S 0.10 3637 Zilla Overlay 40mm @ Cracks >25% 2021 0.442 0.198
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 016.00‐016.10 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.464
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 016.10‐016.30 S 0.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.202
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 016.30‐016.50 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.402
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 016.50‐016.70 S 0.20 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.280
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 016.70‐017.20 S 0.50 3637 Zilla Full Recon 75mm @ IRI>12 2021 11.954 0.123
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 017.20‐019.10 S 1.91 3637 Zilla Overlay 40mm @ Traff >=2000 2021 8.905 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 019.10‐019.30 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.394
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 019.30‐019.50 S 0.20 3637 Zilla Overlay 40mm @ Cracks >25% 2021 0.884 0.169
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 019.50‐019.70 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.497
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 019.70‐020.00 S 0.30 3637 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.155
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 020.00‐020.10 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.477
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 020.10‐020.60 S 0.50 3637 Zilla Overlay 40mm @ Cracks >25% 2021 2.211 0.138
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 020.60‐020.70 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.867
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 021.60‐021.90 S 0.30 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.633
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 021.90‐022.00 S 0.10 3637 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 022.00‐022.20 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.657
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 022.20‐023.56 S 1.35 3637 Zilla Overlay 40mm @ Traff >=2000 2021 4.748 0.136
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 023.56‐024.26 S 0.70 3637 Zilla Full Recon 75mm @ IRI>12 2021 15.184 0.543
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 024.46‐024.96 S 0.50 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 8.680 0.332
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 025.76‐025.86 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.736 0.486
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 026.06‐026.36 S 0.30 3637 Zilla Full Recon 75mm @ IRI>12 2021 7.564 0.092
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 028.76‐028.96 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 3.472 0.422
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 029.35‐029.55 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 5.043 0.261
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 030.75‐030.85 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.604
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 030.85‐031.15 S 0.30 3637 Zilla Overlay 40mm @ Cracks >25% 2021 1.327 0.174
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 031.15‐031.35 S 0.20 3637 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.455
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 031.35‐032.25 S 0.90 3637 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 0.039
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 032.25‐032.55 S 0.30 3637 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.216
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 032.55‐033.05 S 0.50 3637 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.006
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 033.05‐033.25 S 0.20 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 3.276 0.723
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 033.55‐033.65 S 0.10 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.851
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 033.95‐034.25 S 0.30 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.445
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 034.45‐034.55 S 0.10 3637 Zilla Full Recon 75mm @ IRI>12 2021 2.000 0.992
Z1042 Eliotganj‐Ramchandrapur‐Bancharampur Km 035.85‐036.35 S 0.50 3637 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 0.424
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 000.00‐000.40 S 0.40 3169 Zilla Overlay 40mm @ Traff >=2000 2021 3.162 0.092
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 000.40‐000.50 S 0.10 3169 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.950
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 000.50‐003.90 S 3.40 3169 Zilla Overlay 40mm @ Traff >=2000 2021 15.872 0.000
Page 57 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 003.90‐007.00 S 3.10 3169 Zilla Overlay 40mm @ Traff >=2000 2021 14.471 0.222
Z1044 Gouripur‐Kachua‐Hajiganj Road Km 009.60‐009.88 S 0.28 3169 Zilla Rehab 75mm @ IRI 9‐12 2021 4.752 0.837
Z1045 Chauddagram‐Laksam Road Km 000.00‐000.40 S 0.40 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 6.465 1.111
Z1045 Chauddagram‐Laksam Road Km 000.50‐001.10 S 0.60 4226 Zilla Full Recon 75mm @ IRI>12 2021 13.641 0.575
Z1045 Chauddagram‐Laksam Road Km 002.20‐002.40 S 0.20 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.617
Z1045 Chauddagram‐Laksam Road Km 002.40‐002.80 S 0.40 4226 Zilla Overlay 50mm @ Cracking >25% 2021 1.987 0.968
Z1045 Chauddagram‐Laksam Road Km 002.80‐003.40 S 0.60 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 7.578 1.175
Z1045 Chauddagram‐Laksam Road Km 003.40‐003.50 S 0.10 4226 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.096
Z1045 Chauddagram‐Laksam Road Km 003.50‐003.60 S 0.10 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.769
Z1045 Chauddagram‐Laksam Road Km 003.60‐004.40 S 0.80 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 4.620 0.408
Z1045 Chauddagram‐Laksam Road Km 004.40‐004.60 S 0.20 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.695
Z1045 Chauddagram‐Laksam Road Km 004.60‐005.10 S 0.50 4226 Zilla Overlay 50mm @ Cracking >25% 2021 2.378 0.282
Z1045 Chauddagram‐Laksam Road Km 005.10‐005.40 S 0.30 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.023
Z1045 Chauddagram‐Laksam Road Km 005.40‐006.10 S 0.70 4226 Zilla Overlay 50mm @ Cracking >25% 2021 2.789 0.689
Z1045 Chauddagram‐Laksam Road Km 006.10‐006.20 S 0.10 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.351
Z1045 Chauddagram‐Laksam Road Km 006.20‐006.50 S 0.30 4226 Zilla Overlay 50mm @ Cracking >25% 2021 1.197 0.610
Z1045 Chauddagram‐Laksam Road Km 006.50‐006.90 S 0.40 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 0.727
Z1045 Chauddagram‐Laksam Road Km 006.90‐007.40 S 0.50 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 1.995 1.024
Z1045 Chauddagram‐Laksam Road Km 007.40‐007.60 S 0.20 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.450
Z1045 Chauddagram‐Laksam Road Km 009.80‐010.30 S 0.50 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 2.882 1.097
Z1045 Chauddagram‐Laksam Road Km 010.30‐010.60 S 0.30 4226 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.022
Z1045 Chauddagram‐Laksam Road Km 010.60‐011.10 S 0.50 4226 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 1.060
Z1045 Chauddagram‐Laksam Road Km 011.10‐011.30 S 0.20 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 0.543
Z1045 Chauddagram‐Laksam Road Km 011.30‐011.40 S 0.10 4226 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.723
Z1045 Chauddagram‐Laksam Road Km 011.40‐012.90 S 1.50 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 8.663 0.544
Z1045 Chauddagram‐Laksam Road Km 012.90‐013.00 S 0.10 4226 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.778
Z1045 Chauddagram‐Laksam Road Km 013.00‐014.60 S 1.60 4226 Zilla Overlay 50mm @ Cracking >25% 2021 9.234 0.214
Z1045 Chauddagram‐Laksam Road Km 014.60‐014.70 S 0.10 4226 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.778
Z1045 Chauddagram‐Laksam Road Km 014.70‐016.30 S 1.60 4226 Zilla Overlay 50mm @ Cracking >25% 2021 8.971 0.233
Z1045 Chauddagram‐Laksam Road Km 016.30‐016.40 S 0.10 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 1.681
Z1045 Chauddagram‐Laksam Road Km 016.40‐016.60 S 0.20 4226 Zilla Overlay 50mm @ Cracking >25% 2021 0.840 0.573
Z1045 Chauddagram‐Laksam Road Km 016.60‐017.00 S 0.40 4226 Zilla Rehab 75mm @ IRI 9‐12 2021 4.789 0.876
Z1045 Chauddagram‐Laksam Road Km 017.00‐017.40 S 0.40 4226 Zilla Overlay 50mm @ Cracking >25% 2021 1.924 0.727
Z1045 Chauddagram‐Laksam Road Km 017.40‐017.60 S 0.20 4226 Zilla Full Recon 75mm @ IRI>12 2021 4.173 0.801
Z1045 Chauddagram‐Laksam Road Km 017.60‐018.40 S 0.80 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 4.027 1.864
Z1045 Chauddagram‐Laksam Road Km 018.40‐018.80 S 0.40 4226 Zilla Full Recon 75mm @ IRI>12 2021 8.346 0.697
Z1045 Chauddagram‐Laksam Road Km 018.80‐019.30 S 0.50 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 2.777 0.941
Z1045 Chauddagram‐Laksam Road Km 019.30‐019.40 S 0.10 4226 Zilla Full Recon 75mm @ IRI>12 2021 2.608 0.440
Z1045 Chauddagram‐Laksam Road Km 019.40‐019.60 S 0.20 4226 Zilla Overlay 50mm @ IRI 6‐9 2021 1.260 0.347
Z1045 Chauddagram‐Laksam Road Km 019.60‐019.70 S 0.10 4226 Zilla Full Recon 75mm @ IRI>12 2021 2.608 0.267
Z1045 Chauddagram‐Laksam Road Km 019.70‐021.32 S 1.62 4226 Zilla Overlay 50mm @ Cracking >25% 2021 10.219 0.205
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 000.00‐004.10 S 4.10 3843 Zilla Overlay 40mm @ Traff >=2000 2021 11.832 0.647
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 004.31‐004.60 S 0.29 3843 Zilla Overlay 40mm @ Traff >=2000 2021 0.849 0.181
Page 58 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 004.60‐005.10 S 0.50 3843 Zilla Overlay 40mm @ Traff >=2000 2021 1.443 0.865
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 005.10‐005.80 S 0.70 3843 Zilla Overlay 40mm @ Traff >=2000 2021 2.021 0.639
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 006.00‐008.40 S 2.40 3843 Zilla Overlay 40mm @ Cracks >25% 2021 6.561 0.353
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 008.40‐008.50 S 0.10 3843 Zilla Rehab 75mm @ IRI 9‐12 2021 1.018 1.594
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 009.20‐009.60 S 0.40 3843 Zilla Rehab 75mm @ IRI 9‐12 2021 4.070 1.005
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 011.40‐011.60 S 0.20 3843 Zilla Full Recon 75mm @ IRI>12 2021 2.956 0.527
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 013.90‐014.00 S 0.10 3843 Zilla Full Recon 75mm @ IRI>12 2021 1.463 0.741
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 015.00‐015.30 S 0.30 3843 Zilla Rehab 75mm @ IRI 9‐12 2021 3.053 1.011
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 017.40‐017.80 S 0.40 3843 Zilla Rehab 75mm @ IRI 9‐12 2021 4.070 0.950
Z1046 Harishchar‐Kashinagar‐Miabazar Road Km 017.80‐019.44 S 1.64 3843 Zilla Overlay 40mm @ Traff >=2000 2021 4.740 0.026
Z1047 Harishchar‐ Bijrabazar Road Km 000.00‐001.20 S 1.20 4414 Zilla Overlay 40mm @ Traff >=2000 2021 3.668 0.000
Z1047 Harishchar‐ Bijrabazar Road Km 001.20‐001.50 S 0.30 4414 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 0.633
Z1047 Harishchar‐ Bijrabazar Road Km 001.50‐002.80 S 1.30 4414 Zilla Overlay 50mm @ IRI 6‐9 2021 4.337 0.299
Z1047 Harishchar‐ Bijrabazar Road Km 002.80‐003.00 S 0.20 4414 Zilla Overlay 50mm @ IRI 6‐9 2021 0.546 0.810
Z1047 Harishchar‐ Bijrabazar Road Km 003.00‐003.70 S 0.70 4414 Zilla Overlay 50mm @ IRI 6‐9 2021 1.911 0.809
Z1047 Harishchar‐ Bijrabazar Road Km 003.70‐004.00 S 0.30 4414 Zilla Rehab 75mm @ IRI 9‐12 2021 2.335 1.235
Z1047 Harishchar‐ Bijrabazar Road Km 004.00‐004.50 S 0.50 4414 Zilla Overlay 40mm @ Traff >=2000 2021 1.371 0.000
Z1047 Harishchar‐ Bijrabazar Road Km 004.50‐004.70 S 0.20 4414 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.586
Z1047 Harishchar‐ Bijrabazar Road Km 004.70‐004.80 S 0.10 4414 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1047 Harishchar‐ Bijrabazar Road Km 004.80‐005.30 S 0.50 4414 Zilla Rehab 75mm @ IRI 9‐12 2021 4.729 0.524
Z1047 Harishchar‐ Bijrabazar Road Km 005.30‐006.00 S 0.70 4414 Zilla Overlay 40mm @ Traff >=2000 2021 1.602 0.000
Z1047 Harishchar‐ Bijrabazar Road Km 006.00‐006.20 S 0.20 4414 Zilla Full Recon 75mm @ IRI>12 2021 2.347 1.111
Z1047 Harishchar‐ Bijrabazar Road Km 006.20‐006.70 S 0.50 4414 Zilla Overlay 50mm @ Cracking >25% 2021 1.580 0.012
Z1047 Harishchar‐ Bijrabazar Road Km 006.70‐006.80 S 0.10 4414 Zilla Full Recon 75mm @ IRI>12 2021 1.352 1.152
Z1047 Harishchar‐ Bijrabazar Road Km 006.80‐006.90 S 0.10 4414 Zilla Overlay 50mm @ Cracking >25% 2021 0.327 0.403
Z1047 Harishchar‐ Bijrabazar Road Km 006.90‐007.00 S 0.10 4414 Zilla Full Recon 75mm @ IRI>12 2021 1.352 1.427
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 000.00‐000.30 S 0.30 4728 Zilla Overlay 50mm @ Cracking >25% 2021 1.203 0.224
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 000.30‐000.50 S 0.20 4728 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.913
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 000.50‐001.60 S 1.10 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 4.112 0.651
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 001.60‐002.20 S 0.60 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 2.233 1.614
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 002.20‐002.30 S 0.10 4728 Zilla Overlay 40mm @ Traff >=2000 2021 0.301 0.000
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 002.30‐002.60 S 0.30 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 1.118 1.458
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 002.60‐002.70 S 0.10 4728 Zilla Overlay 40mm @ Traff >=2000 2021 0.301 0.000
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 002.70‐002.90 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.125 1.172
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 002.90‐004.50 S 1.60 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 6.115 0.614
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 004.50‐004.70 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.371
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 004.70‐005.20 S 0.50 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 1.916 0.545
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 005.20‐005.60 S 0.40 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 1.533 0.984
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 005.60‐007.20 S 1.60 4728 Zilla Overlay 40mm @ Traff >=2000 2021 4.955 0.336
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 007.20‐007.30 S 0.10 4728 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.873
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 007.30‐008.10 S 0.80 4728 Zilla Overlay 40mm @ Traff >=2000 2021 2.479 0.306
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 008.10‐008.30 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.770
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 008.30‐008.60 S 0.30 4728 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Page 59 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 008.60‐008.70 S 0.10 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.370
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 008.70‐010.00 S 1.30 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 4.978 0.760
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 010.00‐010.20 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 3.238 0.135
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 010.20‐011.14 S 0.95 7472 Zilla Overlay 40mm @ Traff >=2000 2021 4.417 0.602
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 011.48‐011.90 S 0.41 4728 Zilla Overlay 50mm @ Cracking >25% 2021 1.587 0.129
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 011.90‐012.50 S 0.60 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 2.300 1.119
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 012.50‐013.10 S 0.60 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 2.300 0.744
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 013.10‐013.40 S 0.30 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.628
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 013.40‐013.70 S 0.30 4728 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.154
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 013.77‐015.70 S 1.93 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 7.401 1.104
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 015.77‐018.80 S 3.03 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 11.612 1.250
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 018.80‐019.40 S 0.60 4728 Zilla Overlay 40mm @ Traff >=2000 2021 1.859 0.016
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 019.40‐020.60 S 1.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 13.109 0.592
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 020.60‐021.60 S 1.00 4728 Zilla Overlay 40mm @ Traff >=2000 2021 3.099 0.056
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 021.60‐021.80 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.998
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 021.80‐022.09 S 0.30 7472 Zilla Overlay 50mm @ IRI 6‐9 2021 1.438 2.437
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 022.09‐022.29 S 0.20 7472 Zilla Rehab 75mm @ IRI 9‐12 2021 2.873 2.348
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 022.29‐022.39 S 0.10 7472 Zilla Overlay 40mm @ Traff >=2000 2021 0.408 1.077
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 022.39‐022.59 S 0.20 7472 Zilla Rehab 75mm @ IRI 9‐12 2021 2.873 1.913
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 023.29‐023.79 S 0.50 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 5.462 0.657
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 023.79‐024.39 S 0.60 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 2.300 0.681
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 024.39‐024.69 S 0.30 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.982
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 024.69‐024.89 S 0.20 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 1.561
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 024.89‐025.19 S 0.30 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 1.070
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 025.89‐025.99 S 0.10 7472 Zilla Full Recon 75mm @ IRI>12 2021 1.536 2.972
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 025.99‐026.39 S 0.40 4728 Zilla Overlay 50mm @ Cracking >25% 2021 1.470 0.384
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 026.39‐026.59 S 0.20 4728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.200
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 026.59‐026.89 S 0.30 4728 Zilla Overlay 50mm @ IRI 6‐9 2021 1.103 0.626
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 026.89‐027.59 S 0.70 4728 Zilla Overlay 40mm @ Traff >=2000 2021 2.532 0.615
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 027.59‐028.99 S 1.40 7472 Zilla Overlay 50mm @ IRI 6‐9 2021 13.230 0.272
Z1048 Laksham‐Nagalkoat‐Kodalia‐chewara Bazar Km 028.99‐029.39 S 0.40 7472 Zilla Rehab 75mm @ IRI 9‐12 2021 10.775 0.347
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 000.10‐000.20 S 0.10 3384 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.002
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 000.30‐000.40 S 0.10 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.856
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 000.50‐001.60 S 1.10 3384 Zilla Full Recon 75mm @ IRI>12 2021 17.214 0.480
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 004.20‐004.30 S 0.10 3384 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.865
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 008.00‐008.50 S 0.50 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 5.612 0.932
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 011.30‐011.50 S 0.20 3384 Zilla Full Recon 75mm @ IRI>12 2021 3.478 0.470
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 012.40‐012.60 S 0.20 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.281
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 014.20‐014.30 S 0.10 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.709
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 015.00‐015.20 S 0.20 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.320
Z1049 Mogbari‐Bagmara‐Bhushi‐Bangadda Road Km 017.40‐017.60 S 0.20 3384 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.301
Z1051 Changani‐Jungalia‐Rajapara‐Chaumohoni Road  Km 003.10‐005.20 S 2.10 3777 Zilla Overlay 40mm @ Traff >=2000 2021 6.508 0.175
Z1051 Changani‐Jungalia‐Rajapara‐Chaumohoni Road  Km 005.20‐005.70 S 0.50 3777 Zilla Rehab 75mm @ IRI 9‐12 2021 5.462 1.457
Page 60 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1051 Changani‐Jungalia‐Rajapara‐Chaumohoni Road  Km 005.70‐008.10 S 2.40 3777 Zilla Overlay 40mm @ Traff >=2000 2021 15.927 0.000
Z1051 Changani‐Jungalia‐Rajapara‐Chaumohoni Road  Km 008.10‐008.20 S 0.10 3777 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.770
Z1053 Gouripur‐Homna Road Km 000.00‐000.30 S 0.30 10363 Zilla Overlay 40mm @ Traff >=2000 2021 1.528 0.310
Z1053 Gouripur‐Homna Road Km 000.30‐000.40 S 0.10 10363 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.324
Z1053 Gouripur‐Homna Road Km 000.40‐000.60 S 0.20 10363 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.479
Z1053 Gouripur‐Homna Road Km 000.60‐000.70 S 0.10 10363 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.404
Z1053 Gouripur‐Homna Road Km 000.70‐001.10 S 0.40 10363 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.843
Z1053 Gouripur‐Homna Road Km 001.10‐001.20 S 0.10 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 1.748 3.123
Z1053 Gouripur‐Homna Road Km 001.50‐001.60 S 0.10 10363 Zilla Full Recon 75mm @ IRI>12 2021 2.608 2.169
Z1053 Gouripur‐Homna Road Km 001.60‐001.80 S 0.20 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 1.510 0.315
Z1053 Gouripur‐Homna Road Km 001.80‐002.10 S 0.30 10363 Zilla Full Recon 75mm @ IRI>12 2021 9.501 1.222
Z1053 Gouripur‐Homna Road Km 002.10‐004.30 S 2.20 10363 Zilla Overlay 50mm @ Cracking >25% 2021 13.606 0.292
Z1053 Gouripur‐Homna Road Km 004.30‐004.40 S 0.10 10363 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.543
Z1053 Gouripur‐Homna Road Km 004.40‐006.50 S 2.10 10363 Zilla Overlay 50mm @ Cracking >25% 2021 12.122 0.615
Z1053 Gouripur‐Homna Road Km 006.50‐006.70 S 0.20 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.835
Z1053 Gouripur‐Homna Road Km 006.70‐006.90 S 0.20 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 2.104
Z1053 Gouripur‐Homna Road Km 006.90‐007.60 S 0.70 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 11.523 2.246
Z1053 Gouripur‐Homna Road Km 007.60‐007.90 S 0.30 10363 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 0.549
Z1053 Gouripur‐Homna Road Km 007.90‐008.10 S 0.20 10363 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.792
Z1053 Gouripur‐Homna Road Km 008.10‐008.60 S 0.50 10363 Zilla Overlay 50mm @ Cracking >25% 2021 2.888 0.713
Z1053 Gouripur‐Homna Road Km 008.60‐008.70 S 0.10 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.663
Z1053 Gouripur‐Homna Road Km 008.70‐008.80 S 0.10 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 1.256
Z1053 Gouripur‐Homna Road Km 008.80‐009.60 S 0.80 10363 Zilla Full Recon 75mm @ IRI>12 2021 19.127 1.572
Z1053 Gouripur‐Homna Road Km 009.60‐010.20 S 0.60 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 3.459 2.684
Z1053 Gouripur‐Homna Road Km 010.20‐010.60 S 0.40 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 2.290
Z1053 Gouripur‐Homna Road Km 010.60‐010.70 S 0.10 10363 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.732
Z1053 Gouripur‐Homna Road Km 010.70‐010.80 S 0.10 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 1.766 2.915
Z1053 Gouripur‐Homna Road Km 010.80‐011.20 S 0.40 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 3.074 0.376
Z1053 Gouripur‐Homna Road Km 011.20‐011.50 S 0.30 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 6.573 1.450
Z1053 Gouripur‐Homna Road Km 011.80‐011.90 S 0.10 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 0.763
Z1053 Gouripur‐Homna Road Km 012.20‐012.40 S 0.20 10363 Zilla Full Recon 75mm @ IRI>12 2021 6.364 1.140
Z1053 Gouripur‐Homna Road Km 012.80‐013.00 S 0.20 10363 Zilla Full Recon 75mm @ IRI>12 2021 5.129 1.945
Z1053 Gouripur‐Homna Road Km 013.90‐014.00 S 0.10 10363 Zilla Full Recon 75mm @ IRI>12 2021 2.367 2.467
Z1053 Gouripur‐Homna Road Km 014.40‐014.90 S 0.50 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 1.875
Z1053 Gouripur‐Homna Road Km 014.90‐015.10 S 0.20 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.945
Z1053 Gouripur‐Homna Road Km 015.10‐015.20 S 0.10 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.724
Z1053 Gouripur‐Homna Road Km 015.20‐015.30 S 0.10 10363 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.196
Z1053 Gouripur‐Homna Road Km 015.30‐015.60 S 0.30 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 5.010 2.318
Z1053 Gouripur‐Homna Road Km 015.60‐015.80 S 0.20 10363 Zilla Overlay 50mm @ IRI 6‐9 2021 1.537 0.358
Z1053 Gouripur‐Homna Road Km 015.80‐016.20 S 0.40 10363 Zilla Rehab 75mm @ IRI 9‐12 2021 7.782 2.212
Z1053 Gouripur‐Homna Road Km 016.80‐017.10 S 0.30 10363 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.670
Z1055 Daudkandi Ferry Portion Road Km 000.00‐000.20 S 0.20 1259 Zilla Overlay 40mm @ IRI>12 2021 1.847 0.000
Z1055 Daudkandi Ferry Portion Road Km 000.20‐000.30 S 0.10 1259 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.304
Page 61 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1055 Daudkandi Ferry Portion Road Km 000.30‐000.40 S 0.10 1259 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.313
Z1055 Daudkandi Ferry Portion Road Km 000.50‐000.60 S 0.10 1259 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.119
Z1055 Daudkandi Ferry Portion Road Km 001.20‐001.30 S 0.10 1259 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.393
Z1056 Daudkandi Bazar Link Road Km 000.00‐000.10 S 0.10 1259 Zilla Overlay 40mm @ IRI>12 2021 0.839 0.000
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 000.20‐000.70 S 0.50 4160 Zilla Full Recon 75mm @ IRI>12 2021 7.933 1.264
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 000.90‐001.00 S 0.10 4160 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.728
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 001.20‐001.40 S 0.20 4160 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.416
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 001.50‐001.70 S 0.20 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 2.241
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 001.80‐003.70 S 1.90 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 20.120 1.374
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 004.10‐006.20 S 2.10 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 23.684 1.746
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 006.50‐006.80 S 0.30 4160 Zilla Full Recon 75mm @ IRI>12 2021 4.760 1.298
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 007.10‐007.20 S 0.10 4160 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.674
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 007.20‐007.80 S 0.60 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 2.394 3.118
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 007.80‐008.00 S 0.20 4160 Zilla Full Recon 75mm @ IRI>12 2021 3.304 1.312
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 008.10‐008.40 S 0.30 4160 Zilla Full Recon 75mm @ IRI>12 2021 4.956 1.139
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 008.50‐008.90 S 0.40 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 1.604
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 008.90‐009.50 S 0.60 4160 Zilla Overlay 50mm @ IRI 6‐9 2021 2.394 2.127
Z1062 Daudkandi‐Goalmari‐Matlab Utter  Km 009.50‐010.40 S 0.90 4160 Zilla Rehab 75mm @ IRI 9‐12 2021 10.225 1.271
Z1205 Companiganj‐Muradnagar‐Homna Road Km 000.40‐001.40 S 1.00 12942 Zilla Full Recon 75mm @ IRI>12 2021 23.909 1.606
Z1205 Companiganj‐Muradnagar‐Homna Road Km 002.30‐002.40 S 0.10 12942 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.691
Z1205 Companiganj‐Muradnagar‐Homna Road Km 003.30‐003.90 S 0.60 12942 Zilla Full Recon 75mm @ IRI>12 2021 14.345 1.557
Z1205 Companiganj‐Muradnagar‐Homna Road Km 004.80‐004.90 S 0.10 12942 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 3.675
Z1205 Companiganj‐Muradnagar‐Homna Road Km 004.90‐006.00 S 1.10 12942 Zilla Overlay 50mm @ IRI 6‐9 2021 6.347 4.244
Z1205 Companiganj‐Muradnagar‐Homna Road Km 006.00‐006.20 S 0.20 12942 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.011
Z1205 Companiganj‐Muradnagar‐Homna Road Km 006.30‐006.50 S 0.20 12942 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.968
Z1205 Companiganj‐Muradnagar‐Homna Road Km 007.40‐007.50 S 0.10 14739 Zilla Full Recon 75mm @ IRI>12 2021 2.608 3.630
Z1205 Companiganj‐Muradnagar‐Homna Road Km 008.70‐009.00 S 0.30 4314 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.251
Z1205 Companiganj‐Muradnagar‐Homna Road Km 010.90‐011.00 S 0.10 4314 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.101
Z1205 Companiganj‐Muradnagar‐Homna Road Km 012.60‐012.70 S 0.10 12942 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.982
Z1205 Companiganj‐Muradnagar‐Homna Road Km 012.70‐013.80 S 1.10 4314 Zilla Overlay 50mm @ IRI 6‐9 2021 4.932 0.767
Z1205 Companiganj‐Muradnagar‐Homna Road Km 013.80‐014.00 S 0.20 4314 Zilla Rehab 75mm @ IRI 9‐12 2021 2.263 1.123
Z1205 Companiganj‐Muradnagar‐Homna Road Km 014.00‐014.30 S 0.30 4314 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.000
Z1205 Companiganj‐Muradnagar‐Homna Road Km 014.30‐014.50 S 0.20 4314 Zilla Overlay 50mm @ IRI 6‐9 2021 0.798 0.969
Z1205 Companiganj‐Muradnagar‐Homna Road Km 015.40‐015.50 S 0.10 4314 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.390
Z1205 Companiganj‐Muradnagar‐Homna Road Km 015.50‐016.40 S 0.90 12942 Zilla Overlay 50mm @ IRI 6‐9 2021 4.460 3.144
Z1205 Companiganj‐Muradnagar‐Homna Road Km 016.40‐016.70 S 0.30 4314 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.865
Z1205 Companiganj‐Muradnagar‐Homna Road Km 019.00‐019.20 S 0.20 4314 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.930
Z1205 Companiganj‐Muradnagar‐Homna Road Km 019.20‐019.60 S 0.40 4314 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.021
Z1205 Companiganj‐Muradnagar‐Homna Road Km 019.60‐020.00 S 0.40 12942 Zilla Full Recon 75mm @ IRI>12 2021 8.155 2.158
Z1205 Companiganj‐Muradnagar‐Homna Road Km 020.00‐020.30 S 0.30 12942 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.267
Z1205 Companiganj‐Muradnagar‐Homna Road Km 020.30‐020.40 S 0.10 12942 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.867
Z1205 Companiganj‐Muradnagar‐Homna Road Km 020.40‐021.57 S 1.17 12942 Zilla Overlay 50mm @ IRI 6‐9 2021 6.786 3.754
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 000.00‐000.10 S 0.10 2217 Zilla Overlay 40mm @ Traff >=2000 2021 0.364 0.026
Page 62 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 000.10‐001.50 S 1.40 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 15.294 0.454
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 001.80‐002.00 S 0.20 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 2.174 0.701
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 002.00‐002.90 S 0.90 2217 Zilla Overlay 40mm @ Traff >=2000 2021 2.789 0.000
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 002.90‐003.20 S 0.30 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.756
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 003.30‐003.60 S 0.30 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.807
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 003.70‐003.80 S 0.10 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.348
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 003.80‐003.90 S 0.10 2217 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 003.90‐004.60 S 0.70 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 7.647 0.483
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 004.60‐004.90 S 0.30 2217 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 004.90‐005.80 S 0.90 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 9.832 0.487
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 006.50‐006.60 S 0.10 2217 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.303
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 006.60‐006.80 S 0.20 2217 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.089
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 006.80‐006.90 S 0.10 2217 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.371
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 006.90‐007.10 S 0.20 2217 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 007.10‐007.20 S 0.10 2217 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.300
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 007.40‐008.10 S 0.70 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 7.647 0.516
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 008.30‐008.60 S 0.30 2217 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.788
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 008.60‐008.84 S 0.24 2663 Zilla Overlay 40mm @ Traff >=2000 2021 0.850 0.000
Z1219 Nimsar‐Khangsanagar‐Burichang Road Km 008.84‐008.94 S 0.10 3129 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.026
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 000.00‐000.60 S 0.60 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 6.555 0.443
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 000.60‐000.90 S 0.30 1335 Zilla Overlay 40mm @ 1000‐2000 2021 0.930 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 000.90‐001.20 S 0.30 1335 Zilla Overlay 40mm @ IRI>12 2021 0.930 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 001.20‐001.60 S 0.40 1335 Zilla Overlay 40mm @ 1000‐2000 2021 1.240 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 001.60‐002.00 S 0.40 1335 Zilla Overlay 40mm @ IRI>12 2021 1.240 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 002.00‐002.70 S 0.70 1335 Zilla Overlay 40mm @ 1000‐2000 2021 2.169 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 002.70‐002.80 S 0.10 1335 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 003.20‐003.90 S 0.70 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 7.636 0.308
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 003.90‐004.10 S 0.20 1335 Zilla Overlay 40mm @ 1000‐2000 2021 0.620 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 004.10‐004.20 S 0.10 1335 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 004.20‐004.80 S 0.60 1335 Zilla Overlay 40mm @ 1000‐2000 2021 1.859 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 004.80‐005.20 S 0.40 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 0.238
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 005.60‐006.00 S 0.40 1335 Zilla Overlay 40mm @ IRI>12 2021 1.240 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 006.00‐006.20 S 0.20 1335 Zilla Overlay 40mm @ 1000‐2000 2021 0.620 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 006.20‐006.50 S 0.30 1335 Zilla Overlay 40mm @ IRI>12 2021 0.930 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 006.50‐006.70 S 0.20 1335 Zilla Overlay 40mm @ 1000‐2000 2021 0.620 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 006.70‐006.90 S 0.20 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.501
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 006.90‐007.30 S 0.40 1335 Zilla Overlay 40mm @ 1000‐2000 2021 1.240 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 007.30‐007.40 S 0.10 1335 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 008.20‐008.30 S 0.10 1335 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.039
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 008.40‐008.60 S 0.20 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.470
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 008.60‐008.70 S 0.10 1335 Zilla Overlay 40mm @ 1000‐2000 2021 0.310 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 008.70‐009.10 S 0.40 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 0.539
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 010.00‐010.10 S 0.10 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.575
Page 63 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 010.30‐010.50 S 0.20 1335 Zilla Overlay 40mm @ IRI>12 2021 0.620 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 011.39‐011.93 S 0.55 1335 Zilla Overlay 40mm @ IRI>12 2021 1.695 0.000
Z1220 Rajachapitala‐Ramchandrapur‐Patchkitta Road Km 013.40‐016.55 S 3.15 1335 Zilla Rehab 75mm @ IRI 9‐12 2021 35.872 0.167
Z1221 Nabipur‐Sreekail Road Km 002.90‐003.00 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 003.00‐004.20 S 1.20 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.411 0.000
Z1221 Nabipur‐Sreekail Road Km 004.60‐004.70 S 0.10 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 004.70‐004.90 S 0.20 971 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z1221 Nabipur‐Sreekail Road Km 005.30‐005.40 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 005.40‐006.70 S 1.30 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.724 0.000
Z1221 Nabipur‐Sreekail Road Km 006.80‐006.90 S 0.10 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 012.60‐012.80 S 0.20 971 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z1221 Nabipur‐Sreekail Road Km 013.30‐013.40 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 013.90‐014.00 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.462 0.000
Z1221 Nabipur‐Sreekail Road Km 014.00‐014.30 S 0.30 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.401 0.178
Z1221 Nabipur‐Sreekail Road Km 014.30‐014.50 S 0.20 971 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z1221 Nabipur‐Sreekail Road Km 014.80‐014.90 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 014.90‐015.20 S 0.30 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.289 0.185
Z1221 Nabipur‐Sreekail Road Km 015.20‐015.50 S 0.30 971 Zilla Overlay 40mm @ IRI>12 2021 1.258 0.000
Z1221 Nabipur‐Sreekail Road Km 015.90‐016.20 S 0.30 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.202 0.000
Z1221 Nabipur‐Sreekail Road Km 017.50‐017.80 S 0.30 971 Zilla Overlay 40mm @ IRI>12 2021 1.401 0.000
Z1221 Nabipur‐Sreekail Road Km 018.10‐018.20 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 018.20‐018.50 S 0.30 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.401 0.183
Z1221 Nabipur‐Sreekail Road Km 018.50‐018.60 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 018.60‐019.10 S 0.50 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.335 0.000
Z1221 Nabipur‐Sreekail Road Km 019.20‐019.80 S 0.60 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.802 0.000
Z1221 Nabipur‐Sreekail Road Km 019.80‐020.20 S 0.40 971 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.868 0.000
Z1221 Nabipur‐Sreekail Road Km 020.40‐020.50 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 020.60‐020.70 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1221 Nabipur‐Sreekail Road Km 021.90‐022.09 S 0.20 971 Zilla Overlay 40mm @ IRI>12 2021 0.929 0.000
Z1221 Nabipur‐Sreekail Road Km 023.49‐023.99 S 0.50 971 Zilla Overlay 40mm @ IRI>12 2021 2.335 0.000
Z1221 Nabipur‐Sreekail Road Km 024.89‐024.99 S 0.10 971 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 000.00‐000.10 S 0.10 4631 Zilla Overlay 40mm @ Traff >=2000 2021 0.468 0.000
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 000.10‐000.40 S 0.30 4631 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.146
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 000.60‐000.90 S 0.30 4631 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.157
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 000.90‐002.50 S 1.60 4631 Zilla Overlay 50mm @ IRI 6‐9 2021 9.234 0.747
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 002.50‐002.90 S 0.40 4631 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.782
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 004.20‐004.70 S 0.50 4631 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 0.678
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 004.70‐004.80 S 0.10 4631 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 004.80‐005.00 S 0.20 4631 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.652
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 005.00‐010.10 S 5.10 4631 Zilla Overlay 40mm @ Traff >=2000 2021 23.550 0.020
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 010.10‐010.50 S 0.40 4054 Zilla Full Recon 75mm @ IRI>12 2021 6.347 0.983
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 010.50‐013.60 S 3.10 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 11.877 1.771
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 013.60‐013.80 S 0.20 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.161
Page 64 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 013.80‐014.40 S 0.60 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 2.300 1.459
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 014.40‐014.60 S 0.20 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.298
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 014.60‐015.50 S 0.90 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 3.449 1.587
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 015.70‐015.90 S 0.20 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 2.992
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 015.90‐016.00 S 0.10 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 2.512
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 016.20‐016.80 S 0.60 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 6.555 1.755
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 017.00‐017.30 S 0.30 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 2.963 2.192
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 017.30‐019.10 S 1.80 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 6.143 3.312
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 019.10‐019.20 S 0.10 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 0.973 2.828
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 019.20‐022.30 S 3.10 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 10.575 3.264
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 022.30‐022.50 S 0.20 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 1.945 1.630
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 022.50‐022.80 S 0.30 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 1.024 1.984
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 022.80‐023.30 S 0.50 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 4.864 1.377
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 023.30‐024.09 S 0.80 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 2.727 1.813
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 024.09‐024.59 S 0.50 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 4.864 1.852
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 024.59‐027.69 S 3.10 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 10.575 2.055
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 027.69‐028.29 S 0.60 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 5.836 1.144
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 028.29‐030.49 S 2.20 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 7.300 1.909
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 030.49‐030.89 S 0.40 4054 Zilla Rehab 75mm @ IRI 9‐12 2021 3.711 1.507
Z1401 Lalmai‐Barura‐Jalam‐Adda‐Jagatpur Road Km 030.89‐032.39 S 1.49 4054 Zilla Overlay 50mm @ IRI 6‐9 2021 4.856 1.789
Z1402 Baburhat‐Matlab‐Pennai Road Km 027.14‐028.79 S 1.66 7299 Zilla Overlay 40mm @ Traff >=2000 2021 7.737 0.995
Z1402 Baburhat‐Matlab‐Pennai Road Km 028.79‐028.89 S 0.10 7299 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.909
Z1402 Baburhat‐Matlab‐Pennai Road Km 028.89‐030.79 S 1.90 7299 Zilla Overlay 40mm @ Traff >=2000 2021 8.867 1.010
Z1402 Baburhat‐Matlab‐Pennai Road Km 030.79‐030.99 S 0.20 7299 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.916
Z1402 Baburhat‐Matlab‐Pennai Road Km 030.99‐031.49 S 0.50 7299 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 2.311
Z1402 Baburhat‐Matlab‐Pennai Road Km 031.49‐031.59 S 0.10 7299 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.943
Z1402 Baburhat‐Matlab‐Pennai Road Km 031.59‐031.89 S 0.30 7299 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.721
Z1402 Baburhat‐Matlab‐Pennai Road Km 031.89‐032.49 S 0.60 7299 Zilla Rehab 75mm @ IRI 9‐12 2021 9.877 1.712
Z1402 Baburhat‐Matlab‐Pennai Road Km 032.49‐033.09 S 0.60 4347 Zilla Overlay 50mm @ IRI 6‐9 2021 2.690 0.760
Z1402 Baburhat‐Matlab‐Pennai Road Km 033.09‐033.49 S 0.40 7299 Zilla Full Recon 75mm @ IRI>12 2021 9.563 1.474
Z1402 Baburhat‐Matlab‐Pennai Road Km 033.49‐034.49 S 1.00 4347 Zilla Overlay 50mm @ IRI 6‐9 2021 4.657 0.767
Z1402 Baburhat‐Matlab‐Pennai Road Km 034.49‐035.39 S 0.90 7299 Zilla Full Recon 75mm @ IRI>12 2021 18.310 1.850
Z1402 Baburhat‐Matlab‐Pennai Road Km 035.39‐035.69 S 0.30 4347 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 1.243
Z1402 Baburhat‐Matlab‐Pennai Road Km 035.69‐036.69 S 1.00 4347 Zilla Full Recon 75mm @ IRI>12 2021 22.083 0.301
Z1402 Baburhat‐Matlab‐Pennai Road Km 036.69‐040.19 S 3.50 4347 Zilla Overlay 50mm @ Cracking >25% 2021 17.488 0.278
Z1402 Baburhat‐Matlab‐Pennai Road Km 040.19‐041.89 S 1.70 7299 Zilla Rehab 75mm @ IRI 9‐12 2021 27.018 1.627
Z1402 Baburhat‐Matlab‐Pennai Road Km 041.89‐043.85 S 1.96 7299 Zilla Overlay 50mm @ Cracking >25% 2021 11.313 0.963
Z1414 Laksham‐Muddaffarganj Road Km 000.00‐000.80 S 0.80 3698 Zilla Overlay 40mm @ Traff >=2000 2021 3.939 0.192
Z1414 Laksham‐Muddaffarganj Road Km 000.80‐001.00 S 0.20 3698 Zilla Full Recon 75mm @ IRI>12 2021 5.043 0.404
Z1414 Laksham‐Muddaffarganj Road Km 001.00‐002.60 S 1.60 3698 Zilla Overlay 40mm @ Traff >=2000 2021 7.874 0.164
Z1414 Laksham‐Muddaffarganj Road Km 002.60‐002.70 S 0.10 3698 Zilla Full Recon 75mm @ IRI>12 2021 2.521 0.422
Z1414 Laksham‐Muddaffarganj Road Km 002.70‐004.30 S 1.60 3698 Zilla Overlay 40mm @ Traff >=2000 2021 7.879 0.150
Z1414 Laksham‐Muddaffarganj Road Km 004.30‐004.40 S 0.10 3698 Zilla Full Recon 75mm @ IRI>12 2021 2.521 0.589
Page 65 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1414 Laksham‐Muddaffarganj Road Km 004.40‐005.30 S 0.90 3698 Zilla Overlay 40mm @ Cracks >25% 2021 4.197 0.026
Z1414 Laksham‐Muddaffarganj Road Km 005.30‐005.50 S 0.20 3698 Zilla Rehab 75mm @ IRI 9‐12 2021 3.472 0.703
Z1414 Laksham‐Muddaffarganj Road Km 005.50‐007.70 S 2.20 3698 Zilla Overlay 40mm @ Cracks >25% 2021 10.254 0.023
Z1414 Laksham‐Muddaffarganj Road Km 007.70‐007.80 S 0.10 3698 Zilla Rehab 75mm @ IRI 9‐12 2021 1.736 0.736
Z1414 Laksham‐Muddaffarganj Road Km 007.80‐008.02 S 0.22 3698 Zilla Overlay 40mm @ Traff >=2000 2021 1.093 0.217
Cumilla Total 3059.495
Feni Division
N104 Feni‐Noakhali Road Km 000.00‐000.10 L 0.10 27444 National Full Recon 195mm 2021 5.549 4.810
N104 Feni‐Noakhali Road Km 000.00‐000.10 R 0.10 27444 National Full Recon 195mm 2021 5.695 4.584
N104 Feni‐Noakhali Road Km 000.10‐000.30 L 0.20 27444 National Overlay 80mm @ IRI 5‐9 2021 2.513 13.248
N104 Feni‐Noakhali Road Km 000.10‐000.30 R 0.20 27444 National Overlay 80mm @ IRI 5‐9 2021 2.579 12.301
N104 Feni‐Noakhali Road Km 000.30‐000.40 L 0.10 27444 National Full Recon 195mm 2021 5.549 4.770
N104 Feni‐Noakhali Road Km 000.30‐000.40 R 0.10 27444 National Full Recon 195mm 2021 5.695 4.524
N104 Feni‐Noakhali Road Km 000.40‐000.60 L 0.20 27444 National Overlay 50mm @ IRI 5 2021 1.596 13.797
N104 Feni‐Noakhali Road Km 000.40‐000.60 R 0.20 27444 National Overlay 50mm @ IRI 5 2021 1.638 13.320
N104 Feni‐Noakhali Road Km 000.60‐000.80 L 0.20 27444 National Full Recon 195mm 2021 11.098 4.842
N104 Feni‐Noakhali Road Km 000.60‐000.80 R 0.20 27444 National Full Recon 195mm 2021 11.390 4.683
N104 Feni‐Noakhali Road Km 000.80‐000.90 L 0.10 27444 National Overlay 80mm @ IRI 5‐9 2021 1.256 13.094
N104 Feni‐Noakhali Road Km 000.80‐000.90 R 0.10 27444 National Overlay 80mm @ IRI 5‐9 2021 1.289 12.410
N104 Feni‐Noakhali Road Km 000.90‐001.70 L 0.80 27444 National Rehab 195mm @ IRI 9‐12 2021 36.869 4.273
N104 Feni‐Noakhali Road Km 000.90‐001.70 R 0.80 27444 National Rehab 195mm @ IRI 9‐12 2021 37.839 4.089
N104 Feni‐Noakhali Road Km 001.70‐001.80 L 0.10 27444 National Overlay 80mm @ IRI 5‐9 2021 1.256 13.094
N104 Feni‐Noakhali Road Km 001.70‐001.80 R 0.10 27444 National Overlay 80mm @ IRI 5‐9 2021 1.289 12.410
N112 Feni‐Noakhali Highway Link Road Km 000.00‐000.60 S 0.60 12829 National Overlay 50mm @ IRI 5 2021 3.667 1.706
N112 Feni‐Noakhali Highway Link Road Km 000.60‐000.70 S 0.10 12829 National Full Recon 195mm 2021 4.016 1.848
N112 Feni‐Noakhali Highway Link Road Km 000.70‐001.00 S 0.30 12829 National Overlay 80mm @ IRI 5‐9 2021 2.727 2.938
N112 Feni‐Noakhali Highway Link Road Km 001.00‐001.60 S 0.60 15014 National DBST @ Traff >6000 2021 1.651 7.828
N112 Feni‐Noakhali Highway Link Road Km 001.70‐002.00 S 0.30 12829 National Full Recon 195mm 2021 12.006 1.229
N112 Feni‐Noakhali Highway Link Road Km 002.00‐002.10 S 0.10 12829 National Overlay 50mm @ IRI 5 2021 0.428 3.558
N112 Feni‐Noakhali Highway Link Road Km 002.10‐002.20 S 0.10 4276 National Full Recon 150mm 2021 2.245 1.057
N112 Feni‐Noakhali Highway Link Road Km 002.20‐002.72 S 0.52 4276 National DBST @ 25% Crk 2021 0.952 0.887
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 000.10‐000.60 S 0.50 12829 Zilla Full Recon 75mm @ IRI>12 2021 10.933 2.180
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 000.60‐000.80 S 0.20 12829 Zilla Overlay 50mm @ IRI 6‐9 2021 1.092 4.064
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 000.80‐001.10 S 0.30 12829 Zilla Full Recon 75mm @ IRI>12 2021 6.781 2.086
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 001.20‐001.50 S 0.30 15014 Zilla Full Recon 75mm @ IRI>12 2021 7.564 3.102
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 003.70‐004.30 S 0.60 12829 Zilla Rehab 75mm @ IRI 9‐12 2021 9.877 2.620
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 004.30‐005.00 S 0.70 12829 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 2.266
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 005.00‐005.20 S 0.20 12829 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.060
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 005.20‐005.40 S 0.20 12829 Zilla Overlay 50mm @ Cracking >25% 2021 1.155 2.200
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 005.40‐005.60 S 0.20 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 4.017 2.203
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 005.60‐005.90 S 0.30 15014 Zilla Overlay 50mm @ IRI 6‐9 2021 3.367 0.353
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 005.90‐006.00 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 5.129 0.761
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 006.00‐006.20 S 0.20 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.467 0.000
Page 66 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 006.20‐006.40 S 0.20 15014 Zilla Overlay 50mm @ IRI 6‐9 2021 1.575 3.495
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.00‐008.10 L 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 3.418
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.00‐008.10 R 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 3.416
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.26‐008.56 L 0.30 15014 Zilla Full Recon 75mm @ IRI>12 2021 9.390 1.740
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.26‐008.56 R 0.30 15014 Zilla Full Recon 75mm @ IRI>12 2021 9.390 1.736
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.56‐008.66 L 0.10 15014 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.56‐008.66 R 0.10 15014 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.66‐008.76 L 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 3.130 1.976
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.66‐008.76 R 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 3.130 1.929
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.76‐009.16 L 0.40 15014 Zilla Overlay 50mm @ IRI 6‐9 2021 3.024 0.186
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 008.76‐009.16 R 0.40 15014 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 009.16‐009.26 L 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 2.107
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 009.16‐009.26 R 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 2.057
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 009.26‐009.48 L 0.22 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.375 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 009.26‐009.48 R 0.22 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.375 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 009.66‐009.86 S 0.20 15014 Zilla Full Recon 75mm @ IRI>12 2021 10.433 0.666
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 010.99‐014.06 S 3.07 15014 Zilla Overlay 50mm @ Cracking >25% 2021 19.973 2.891
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 014.06‐014.26 S 0.20 15014 Zilla Full Recon 75mm @ IRI>12 2021 5.363 3.198
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 014.86‐014.96 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.779
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 016.36‐016.46 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.824
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 022.95‐023.15 S 0.20 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 4.570
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 023.61‐023.95 S 0.34 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.612 3.493
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 023.95‐024.05 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.886
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 025.65‐025.75 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.727
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 026.15‐026.25 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.423
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 029.55‐029.65 S 0.10 15014 Zilla Full Recon 75mm @ IRI>12 2021 2.434 4.838
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 031.15‐031.45 S 0.30 15014 Zilla Full Recon 75mm @ IRI>12 2021 8.868 2.754
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 031.45‐031.65 S 0.20 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.155 0.000
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 031.65‐031.75 S 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 2.035 2.788
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 031.75‐031.95 S 0.20 15014 Zilla Overlay 40mm @ Traff >=2000 2021 1.075 0.175
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 031.95‐032.05 S 0.10 15014 Zilla Rehab 75mm @ IRI 9‐12 2021 1.736 5.651
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 032.05‐032.15 S 0.10 15014 Zilla Overlay 50mm @ Cracking >25% 2021 0.609 2.910
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 032.15‐032.35 S 0.20 15014 Zilla Full Recon 75mm @ IRI>12 2021 5.043 3.662
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 032.35‐032.45 S 0.10 15014 Zilla Overlay 50mm @ IRI 6‐9 2021 0.609 5.607
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 032.45‐032.65 S 0.20 15014 Zilla Full Recon 75mm @ IRI>12 2021 5.043 3.902
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 032.65‐033.25 S 0.60 15014 Zilla Overlay 50mm @ IRI 6‐9 2021 3.528 5.496
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 033.25‐033.45 S 0.20 12829 Zilla Full Recon 75mm @ IRI>12 2021 4.608 2.271
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 033.45‐034.55 S 1.10 12829 Zilla Overlay 50mm @ Cracking >25% 2021 6.116 0.976
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 034.55‐034.85 S 0.30 12829 Zilla Full Recon 75mm @ IRI>12 2021 6.912 2.160
Z1031 Feni ‐Chagalnaiya‐Karerhat Road  Km 034.85‐035.94 S 1.09 12829 Zilla Overlay 50mm @ IRI 6‐9 2021 6.038 2.770
Z1033 Feni‐Parsuram‐Belonia Road Km 000.00‐003.50 S 3.50 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 19.692 2.676
Z1033 Feni‐Parsuram‐Belonia Road Km 003.50‐003.70 S 0.20 7678 Zilla Overlay 50mm @ Cracking >25% 2021 1.092 1.682
Z1033 Feni‐Parsuram‐Belonia Road Km 003.70‐003.80 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.260 2.299
Page 67 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1033 Feni‐Parsuram‐Belonia Road Km 003.80‐005.50 S 1.70 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 9.282 3.070
Z1033 Feni‐Parsuram‐Belonia Road Km 005.50‐005.60 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.260 2.199
Z1033 Feni‐Parsuram‐Belonia Road Km 005.60‐006.10 S 0.50 7678 Zilla Overlay 50mm @ Cracking >25% 2021 2.725 1.593
Z1033 Feni‐Parsuram‐Belonia Road Km 006.10‐006.30 S 0.20 7678 Zilla Full Recon 75mm @ IRI>12 2021 4.521 1.736
Z1033 Feni‐Parsuram‐Belonia Road Km 006.30‐006.70 S 0.40 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 2.184 2.649
Z1033 Feni‐Parsuram‐Belonia Road Km 006.70‐006.80 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.260 2.415
Z1033 Feni‐Parsuram‐Belonia Road Km 006.80‐007.00 S 0.20 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 1.092 2.669
Z1033 Feni‐Parsuram‐Belonia Road Km 007.00‐007.20 S 0.20 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 3.113 2.430
Z1033 Feni‐Parsuram‐Belonia Road Km 007.20‐008.00 S 0.80 7678 Zilla Overlay 50mm @ Cracking >25% 2021 4.368 1.283
Z1033 Feni‐Parsuram‐Belonia Road Km 008.00‐008.40 S 0.40 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 2.184 3.238
Z1033 Feni‐Parsuram‐Belonia Road Km 009.00‐009.30 S 0.30 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 4.669 2.083
Z1033 Feni‐Parsuram‐Belonia Road Km 009.30‐009.40 S 0.10 7678 Zilla Overlay 50mm @ Cracking >25% 2021 0.546 0.726
Z1033 Feni‐Parsuram‐Belonia Road Km 009.40‐009.50 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.260 1.941
Z1033 Feni‐Parsuram‐Belonia Road Km 009.50‐009.90 S 0.40 7678 Zilla Overlay 50mm @ Cracking >25% 2021 2.524 0.040
Z1033 Feni‐Parsuram‐Belonia Road Km 009.90‐010.10 S 0.20 7678 Zilla Full Recon 75mm @ IRI>12 2021 5.623 1.217
Z1033 Feni‐Parsuram‐Belonia Road Km 010.10‐010.40 S 0.30 7678 Zilla Overlay 50mm @ Cracking >25% 2021 1.871 0.528
Z1033 Feni‐Parsuram‐Belonia Road Km 010.40‐010.50 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.521 1.723
Z1033 Feni‐Parsuram‐Belonia Road Km 010.50‐011.10 S 0.60 7678 Zilla Overlay 50mm @ Cracking >25% 2021 3.654 0.579
Z1033 Feni‐Parsuram‐Belonia Road Km 011.10‐011.40 S 0.30 7678 Zilla Full Recon 75mm @ IRI>12 2021 7.433 1.542
Z1033 Feni‐Parsuram‐Belonia Road Km 011.40‐013.30 S 1.90 7678 Zilla Overlay 40mm @ Traff >=2000 2021 8.985 1.783
Z1033 Feni‐Parsuram‐Belonia Road Km 013.30‐013.40 S 0.10 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 3.246
Z1033 Feni‐Parsuram‐Belonia Road Km 013.40‐014.40 S 1.00 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 5.664 4.045
Z1033 Feni‐Parsuram‐Belonia Road Km 014.40‐014.50 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.347 1.717
Z1033 Feni‐Parsuram‐Belonia Road Km 014.50‐015.20 S 0.70 7678 Zilla Overlay 40mm @ Traff >=2000 2021 4.208 0.000
Z1033 Feni‐Parsuram‐Belonia Road Km 015.20‐015.50 S 0.30 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 6.312 0.414
Z1033 Feni‐Parsuram‐Belonia Road Km 015.50‐016.40 S 0.90 7678 Zilla Overlay 40mm @ Traff >=2000 2021 4.967 0.000
Z1033 Feni‐Parsuram‐Belonia Road Km 016.40‐016.50 S 0.10 7678 Zilla Full Recon 75mm @ IRI>12 2021 2.826 1.283
Z1033 Feni‐Parsuram‐Belonia Road Km 016.50‐018.10 S 1.60 7678 Zilla Overlay 50mm @ Cracking >25% 2021 10.158 0.164
Z1033 Feni‐Parsuram‐Belonia Road Km 018.10‐018.60 S 0.50 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 1.830
Z1033 Feni‐Parsuram‐Belonia Road Km 019.50‐019.70 S 0.20 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.058
Z1033 Feni‐Parsuram‐Belonia Road Km 019.70‐020.30 S 0.60 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 2.707
Z1033 Feni‐Parsuram‐Belonia Road Km 020.30‐020.40 S 0.10 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.510
Z1033 Feni‐Parsuram‐Belonia Road Km 020.40‐020.70 S 0.30 7678 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 1.509
Z1033 Feni‐Parsuram‐Belonia Road Km 020.70‐020.90 S 0.20 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.825
Z1033 Feni‐Parsuram‐Belonia Road Km 020.90‐022.19 S 1.30 7678 Zilla Overlay 50mm @ Cracking >25% 2021 7.502 2.165
Z1033 Feni‐Parsuram‐Belonia Road Km 022.19‐022.49 S 0.30 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 2.583
Z1033 Feni‐Parsuram‐Belonia Road Km 024.09‐024.19 S 0.10 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 1.371 3.305
Z1033 Feni‐Parsuram‐Belonia Road Km 024.19‐024.49 S 0.30 4298 Zilla Overlay 50mm @ Cracking >25% 2021 1.197 0.615
Z1033 Feni‐Parsuram‐Belonia Road Km 024.49‐024.69 S 0.20 4298 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.942
Z1033 Feni‐Parsuram‐Belonia Road Km 024.69‐024.89 S 0.20 4298 Zilla Overlay 50mm @ IRI 6‐9 2021 0.798 1.053
Z1033 Feni‐Parsuram‐Belonia Road Km 024.89‐025.65 S 0.75 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 10.607 0.842
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 000.00‐000.20 L 0.20 16819 Zilla Rehab 75mm @ IRI 9‐12 2021 5.627 2.168
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 000.00‐000.20 R 0.20 16819 Zilla Rehab 75mm @ IRI 9‐12 2021 5.627 2.168
Page 68 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 000.60‐000.99 L 0.39 16819 Zilla Full Recon 75mm @ IRI>12 2021 12.715 3.127
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 000.60‐000.99 R 0.39 16819 Zilla Full Recon 75mm @ IRI>12 2021 12.715 3.139
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 000.99‐001.00 S 0.01 16819 Zilla Full Recon 75mm @ IRI>12 2021 0.413 1.926
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 001.00‐001.20 S 0.20 16819 Zilla Rehab 75mm @ IRI 9‐12 2021 5.591 1.416
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 001.20‐001.30 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 3.782 2.569
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 001.30‐002.80 S 1.50 16819 Zilla Overlay 40mm @ Traff >=2000 2021 8.870 1.020
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 002.80‐002.90 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.956 4.119
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 003.00‐003.10 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.956 3.488
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 003.50‐003.60 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.521 5.311
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 004.30‐004.50 S 0.20 16819 Zilla Rehab 75mm @ IRI 9‐12 2021 3.472 6.090
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 004.60‐004.70 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.521 5.565
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 004.70‐004.90 S 0.20 16819 Zilla Overlay 50mm @ IRI 6‐9 2021 1.218 9.509
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 004.90‐005.00 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.521 5.311
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 007.70‐008.00 S 0.30 16819 Zilla Full Recon 75mm @ IRI>12 2021 7.564 4.073
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 008.10‐008.20 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 2.521 4.798
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 008.30‐008.50 S 0.20 16819 Zilla Full Recon 75mm @ IRI>12 2021 4.869 4.418
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 009.60‐009.80 S 0.20 16819 Zilla Full Recon 75mm @ IRI>12 2021 4.869 4.295
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 012.20‐012.50 S 0.30 16819 Zilla Full Recon 75mm @ IRI>12 2021 7.303 4.432
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 012.70‐012.80 S 0.10 16819 Zilla Full Recon 75mm @ IRI>12 2021 3.130 2.943
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 012.80‐015.70 S 2.90 16819 Zilla Overlay 50mm @ Cracking >25% 2021 17.442 4.592
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 015.70‐016.00 S 0.30 16819 Zilla Full Recon 75mm @ IRI>12 2021 7.355 4.318
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 016.70‐016.80 S 0.10 13184 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 4.218
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 016.88‐016.90 S 0.01 13184 Zilla Full Recon 75mm @ IRI>12 2021 0.311 10.833
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 018.10‐018.30 S 0.20 13184 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.396
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 018.30‐018.70 S 0.40 13184 Zilla Overlay 50mm @ IRI 6‐9 2021 2.310 5.222
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 018.70‐018.90 S 0.20 16819 Zilla Rehab 75mm @ IRI 9‐12 2021 3.645 6.057
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 019.30‐019.50 S 0.20 7678 Zilla Full Recon 75mm @ IRI>12 2021 6.581 0.547
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 019.70‐019.80 S 0.10 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 3.255
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 019.90‐020.60 S 0.70 7678 Zilla Rehab 75mm @ IRI 9‐12 2021 10.874 2.664
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 021.10‐021.30 S 0.20 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 1.265
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 022.29‐022.59 S 0.30 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 1.293
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 022.59‐022.89 S 0.30 7678 Zilla Overlay 50mm @ IRI 6‐9 2021 1.282 5.497
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 022.89‐022.99 S 0.10 4298 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.363
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 023.79‐024.09 S 0.30 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 1.218
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 024.49‐024.89 S 0.40 7678 Zilla Full Recon 75mm @ IRI>12 2021 7.755 2.159
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 025.19‐025.39 S 0.20 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 1.130
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 025.79‐026.19 S 0.40 4298 Zilla Rehab 75mm @ IRI 9‐12 2021 4.777 1.190
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 026.49‐026.59 S 0.10 4298 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.332
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 027.49‐027.59 S 0.10 4298 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.324
Z1034 Feni‐Sonagazi‐Muhuriganj Project Road Km 028.59‐028.79 S 0.20 4298 Zilla Full Recon 75mm @ IRI>12 2021 3.478 0.843
Z1035 Chhagalnaiya‐Parsuram Road  Km 003.60‐003.80 S 0.20 6840 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.752
Z1035 Chhagalnaiya‐Parsuram Road  Km 004.50‐004.60 S 0.10 6840 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.004
Z1035 Chhagalnaiya‐Parsuram Road  Km 006.70‐006.80 S 0.10 6840 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.082
Page 69 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1035 Chhagalnaiya‐Parsuram Road  Km 006.80‐006.90 S 0.10 6840 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z1035 Chhagalnaiya‐Parsuram Road  Km 006.90‐007.00 S 0.10 6840 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.761
Z1035 Chhagalnaiya‐Parsuram Road  Km 008.10‐008.30 S 0.20 6840 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.433
Z1035 Chhagalnaiya‐Parsuram Road  Km 009.60‐009.70 S 0.10 6840 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.233
Z1035 Chhagalnaiya‐Parsuram Road  Km 011.50‐011.80 S 0.30 6840 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.329
Z1035 Chhagalnaiya‐Parsuram Road  Km 012.40‐012.60 S 0.20 6840 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.644
Z1035 Chhagalnaiya‐Parsuram Road  Km 012.70‐012.90 S 0.20 6840 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.707
Z1035 Chhagalnaiya‐Parsuram Road  Km 013.50‐013.70 S 0.20 6840 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.678
Z1035 Chhagalnaiya‐Parsuram Road  Km 014.10‐014.20 S 0.10 6840 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.167
Z1035 Chhagalnaiya‐Parsuram Road  Km 014.20‐015.00 S 0.80 6840 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.200
Z1035 Chhagalnaiya‐Parsuram Road  Km 015.00‐015.30 S 0.30 6840 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.549
Z1035 Chhagalnaiya‐Parsuram Road  Km 019.30‐019.40 S 0.10 6840 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.320
Z1035 Chhagalnaiya‐Parsuram Road  Km 020.30‐020.50 S 0.20 6840 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.744
Z1035 Chhagalnaiya‐Parsuram Road  Km 020.50‐021.00 S 0.50 6840 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.007
Z1035 Chhagalnaiya‐Parsuram Road  Km 021.00‐021.20 S 0.20 6840 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.857
Z1035 Chhagalnaiya‐Parsuram Road  Km 021.20‐021.66 S 0.46 6840 Zilla Overlay 50mm @ Cracking >25% 2021 2.657 0.160
Z1038 Parshuram‐Gathuma Road Km 000.00‐000.80 S 0.80 1988 Zilla Overlay 40mm @ 1000‐2000 2021 2.540 0.036
Z1038 Parshuram‐Gathuma Road Km 000.90‐001.00 S 0.10 1988 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.535
Z1038 Parshuram‐Gathuma Road Km 001.10‐001.40 S 0.30 1988 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z1038 Parshuram‐Gathuma Road Km 001.40‐001.63 S 0.23 1988 Zilla Overlay 40mm @ 1000‐2000 2021 0.713 0.000
Z1038 Parshuram‐Gathuma Road Km 001.63‐002.33 S 0.70 1988 Zilla Overlay 40mm @ IRI>12 2021 2.199 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 000.02‐000.20 S 0.18 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.827 0.133
Z1081 Fulgazi ‐Fazilpur Road  Km 000.20‐000.30 S 0.10 2542 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 000.30‐000.70 S 0.40 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.087
Z1081 Fulgazi ‐Fazilpur Road  Km 000.70‐000.80 S 0.10 2542 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 000.80‐001.80 S 1.00 2542 Zilla Overlay 40mm @ Traff >=2000 2021 4.670 0.066
Z1081 Fulgazi ‐Fazilpur Road  Km 001.80‐002.10 S 0.30 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.396 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 002.70‐002.80 S 0.10 2542 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 002.80‐003.00 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.145
Z1081 Fulgazi ‐Fazilpur Road  Km 003.00‐003.10 S 0.10 2542 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 004.00‐004.20 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.056
Z1081 Fulgazi ‐Fazilpur Road  Km 004.20‐004.80 S 0.60 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.083
Z1081 Fulgazi ‐Fazilpur Road  Km 004.80‐005.10 S 0.30 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 005.10‐006.00 S 0.90 2542 Zilla Overlay 40mm @ Traff >=2000 2021 4.198 0.073
Z1081 Fulgazi ‐Fazilpur Road  Km 006.00‐006.50 S 0.50 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.919 0.068
Z1081 Fulgazi ‐Fazilpur Road  Km 006.50‐007.90 S 1.40 2542 Zilla Overlay 40mm @ Traff >=2000 2021 4.398 0.109
Z1081 Fulgazi ‐Fazilpur Road  Km 007.90‐008.20 S 0.30 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.290
Z1081 Fulgazi ‐Fazilpur Road  Km 008.20‐008.70 S 0.50 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 008.70‐008.80 S 0.10 2542 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.369
Z1081 Fulgazi ‐Fazilpur Road  Km 008.80‐009.50 S 0.70 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.847 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 009.50‐010.50 S 1.00 2542 Zilla Overlay 40mm @ Traff >=2000 2021 3.198 0.227
Z1081 Fulgazi ‐Fazilpur Road  Km 010.50‐011.00 S 0.50 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.029 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 011.00‐011.10 S 0.10 2542 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.198
Page 70 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1081 Fulgazi ‐Fazilpur Road  Km 011.10‐011.90 S 0.80 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.513 0.270
Z1081 Fulgazi ‐Fazilpur Road  Km 011.90‐012.10 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.143
Z1081 Fulgazi ‐Fazilpur Road  Km 012.19‐012.20 S 0.00 2542 Zilla Full Recon 75mm @ IRI>12 2021 0.048 13.580
Z1081 Fulgazi ‐Fazilpur Road  Km 012.20‐012.30 S 0.10 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 012.30‐012.50 S 0.20 2542 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.011
Z1081 Fulgazi ‐Fazilpur Road  Km 012.50‐013.50 S 1.00 2542 Zilla Overlay 40mm @ Traff >=2000 2021 3.141 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 013.50‐013.60 S 0.10 2542 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.147
Z1081 Fulgazi ‐Fazilpur Road  Km 014.19‐015.00 S 0.81 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.529 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 015.00‐015.10 S 0.10 2542 Zilla Rehab 75mm @ IRI 9‐12 2021 1.227 0.294
Z1081 Fulgazi ‐Fazilpur Road  Km 015.10‐015.30 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.951 0.119
Z1081 Fulgazi ‐Fazilpur Road  Km 015.30‐015.40 S 0.10 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.475 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 015.40‐015.60 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.790 0.001
Z1081 Fulgazi ‐Fazilpur Road  Km 015.60‐015.90 S 0.30 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.298
Z1081 Fulgazi ‐Fazilpur Road  Km 015.90‐016.10 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 016.10‐016.40 S 0.30 2542 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 016.40‐016.50 S 0.10 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 016.50‐016.80 S 0.30 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.157
Z1081 Fulgazi ‐Fazilpur Road  Km 016.80‐017.00 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 017.00‐017.20 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.354
Z1081 Fulgazi ‐Fazilpur Road  Km 017.20‐017.90 S 0.70 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 017.90‐018.00 S 0.10 2542 Zilla Rehab 75mm @ IRI 9‐12 2021 1.096 0.345
Z1081 Fulgazi ‐Fazilpur Road  Km 018.00‐018.20 S 0.20 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 018.20‐018.30 S 0.10 2542 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.419
Z1081 Fulgazi ‐Fazilpur Road  Km 018.31‐019.00 S 0.68 2542 Zilla Overlay 40mm @ Traff >=2000 2021 2.149 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 019.00‐019.10 S 0.10 2542 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.374
Z1081 Fulgazi ‐Fazilpur Road  Km 019.10‐019.20 S 0.10 2542 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 019.20‐019.30 S 0.10 2542 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.334
Z1081 Fulgazi ‐Fazilpur Road  Km 019.30‐020.30 S 1.00 2542 Zilla Overlay 40mm @ Traff >=2000 2021 3.243 0.033
Z1081 Fulgazi ‐Fazilpur Road  Km 020.31‐020.80 S 0.48 2542 Zilla Overlay 40mm @ Traff >=2000 2021 1.837 0.000
Z1081 Fulgazi ‐Fazilpur Road  Km 021.00‐021.50 S 0.50 2542 Zilla Overlay 40mm @ IRI>12 2021 2.250 0.000
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 000.20‐000.50 S 0.30 3405 Zilla Full Recon 75mm @ IRI>12 2021 6.912 0.034
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 000.70‐000.80 S 0.10 3405 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.099
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 000.90‐001.00 S 0.10 3405 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.308
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 001.00‐001.10 S 0.10 3405 Zilla Overlay 40mm @ Cracks >25% 2021 0.442 0.048
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 001.10‐001.20 S 0.10 3405 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.046
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 001.40‐001.50 S 0.10 3405 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.126
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 002.20‐002.40 S 0.20 3405 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.216
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 002.40‐002.60 S 0.20 3405 Zilla Overlay 40mm @ Cracks >25% 2021 0.884 0.039
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 002.60‐002.80 S 0.20 3405 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.274
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 002.80‐002.90 S 0.10 3405 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 002.90‐003.00 S 0.10 3405 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 003.00‐003.50 S 0.50 3405 Zilla Overlay 40mm @ Cracks >25% 2021 2.211 0.002
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 003.50‐004.70 S 1.20 3405 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 0.314
Page 71 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 005.10‐005.20 S 0.10 3405 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.888
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 007.40‐007.50 S 0.10 3405 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.833
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 008.50‐008.90 S 0.40 3405 Zilla Full Recon 75mm @ IRI>12 2021 6.886 0.293
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 008.90‐009.10 S 0.20 3405 Zilla Overlay 40mm @ Cracks >25% 2021 0.587 0.055
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 009.10‐009.20 S 0.10 3405 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.039
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 009.20‐009.30 S 0.10 3405 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 009.30‐009.60 S 0.30 3405 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.207
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 011.12‐011.30 S 0.18 3405 Zilla Full Recon 75mm @ IRI>12 2021 2.856 0.524
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 011.40‐011.90 S 0.50 3405 Zilla Full Recon 75mm @ IRI>12 2021 7.933 0.302
Z1425 Boktarmunshi‐Kazirhat‐Daganbhuiyan Road Km 011.90‐015.39 S 3.49 3405 Zilla Overlay 40mm @ Traff >=2000 2021 11.032 0.810
Z1434 Sonagazi‐Companiganj Road Km 000.60‐000.70 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.913 0.498
Z1434 Sonagazi‐Companiganj Road Km 001.00‐001.20 S 0.20 3703 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.678
Z1434 Sonagazi‐Companiganj Road Km 001.20‐002.00 S 0.80 3703 Zilla Overlay 40mm @ Traff >=2000 2021 2.578 0.000
Z1434 Sonagazi‐Companiganj Road Km 002.00‐002.10 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.982
Z1434 Sonagazi‐Companiganj Road Km 002.10‐002.50 S 0.40 3703 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 0.000
Z1434 Sonagazi‐Companiganj Road Km 002.50‐002.60 S 0.10 3703 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.855
Z1434 Sonagazi‐Companiganj Road Km 002.60‐002.70 S 0.10 3703 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.000
Z1434 Sonagazi‐Companiganj Road Km 002.70‐002.80 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.013
Z1434 Sonagazi‐Companiganj Road Km 002.80‐004.00 S 1.20 3703 Zilla Overlay 40mm @ Cracks >25% 2021 3.666 0.022
Z1434 Sonagazi‐Companiganj Road Km 004.00‐004.10 S 0.10 3703 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.761
Z1434 Sonagazi‐Companiganj Road Km 004.10‐005.20 S 1.10 3703 Zilla Overlay 40mm @ Cracks >25% 2021 3.361 0.009
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 006.30‐007.10 S 0.80 8119 Zilla Rehab 75mm @ IRI 9‐12 2021 13.169 1.781
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 007.30‐007.60 S 0.30 8119 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.267
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 007.60‐007.90 S 0.30 8119 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 3.593
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 007.90‐008.00 S 0.10 8119 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 3.024
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 008.70‐009.00 S 0.30 8119 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.462
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 009.00‐009.10 S 0.10 8119 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.248
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 009.10‐009.50 S 0.40 4430 Zilla Rehab 75mm @ IRI 9‐12 2021 4.980 0.521
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 010.10‐010.20 S 0.10 4430 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.913
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 010.20‐010.40 S 0.20 4430 Zilla Overlay 50mm @ Cracking >25% 2021 0.777 0.003
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 010.40‐010.80 S 0.40 4430 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.597
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 010.80‐011.40 S 0.60 4430 Zilla Overlay 50mm @ Cracking >25% 2021 2.331 0.480
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 011.40‐011.60 S 0.20 4430 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.289
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 012.20‐012.40 S 0.20 8119 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.316
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 012.40‐012.50 S 0.10 8119 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 1.647
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 012.50‐012.60 S 0.10 8119 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.932
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 012.60‐012.80 S 0.20 8119 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.701
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 012.80‐012.90 S 0.10 8119 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.834
Feni Total 1484.967
Laxmipur Division
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 089.40‐089.98 S 0.58 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.938 7.544
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 089.98‐090.18 S 0.20 6967 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 3.218
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 090.18‐091.48 S 1.30 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.782 7.600
Page 72 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 091.48‐091.58 S 0.10 6967 Regional Full Recon 180mm 2021 3.779 2.823
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 091.58‐093.08 S 1.50 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.133 7.567
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 093.08‐093.28 S 0.20 6967 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 3.160
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 093.28‐093.58 S 0.30 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.027 7.801
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 093.58‐093.68 S 0.10 6967 Regional Full Recon 180mm 2021 3.779 2.858
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 093.68‐093.98 S 0.30 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.327 8.311
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 093.98‐094.08 S 0.10 6967 Regional Full Recon 150mm @ IRI 12 2021 4.490 2.173
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 094.08‐094.28 S 0.20 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.851 6.042
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 094.33‐094.38 S 0.06 6967 Regional Full Recon 180mm 2021 2.234 3.773
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 094.38‐096.68 S 2.30 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 16.113 9.023
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 096.68‐096.88 S 0.20 6967 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 3.485
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 096.88‐098.08 S 1.20 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.400 8.892
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 098.08‐098.28 S 0.20 6967 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 3.672
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 098.28‐103.38 S 5.10 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 35.722 8.819
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 103.38‐103.58 S 0.20 6967 Regional Full Recon 150mm @ IRI 12 2021 6.796 2.736
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 103.71‐106.78 S 3.07 6967 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.535 8.585
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 106.84‐107.18 S 0.34 6967 Regional Full Recon 150mm @ IRI 12 2021 11.689 2.767
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 107.18‐109.09 S 1.91 9810 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.775 8.555
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 109.09‐109.19 S 0.10 11850 Regional Rehab 150mm @ IRI 9‐12 2021 2.995 4.888
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 115.09‐115.19 S 0.10 11850 Regional Rehab 150mm @ IRI 9‐12 2021 2.898 4.859
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 115.89‐116.29 S 0.40 11850 Regional DBST @ Traff >6000 2021 1.186 11.022
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 117.58‐117.78 S 0.20 11850 Regional Rehab 150mm @ IRI 9‐12 2021 5.796 4.286
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 121.82‐123.08 S 1.26 11850 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.812 11.023
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 123.08‐123.38 S 0.30 11850 Regional Rehab 150mm @ IRI 9‐12 2021 10.143 3.688
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 123.38‐123.58 S 0.20 11850 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.526 12.437
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 123.58‐123.68 S 0.10 11850 Regional Full Recon 195mm 2021 4.381 4.122
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 123.68‐123.98 S 0.30 11850 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.252 12.424
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 123.98‐124.28 S 0.30 11850 Regional Rehab 150mm @ IRI 9‐12 2021 8.694 4.212
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 124.28‐124.98 S 0.70 11850 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.254 11.548
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 125.08‐126.98 S 1.90 13496 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.276 15.422
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 126.98‐127.18 S 0.20 14064 Regional Full Recon 195mm 2021 8.761 5.268
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 127.18‐127.65 S 0.47 14064 Regional DBST @ Traff >6000 2021 1.387 13.522
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 030.72‐031.55 S 0.83 8767 Regional Rehab 150mm @ IRI 9‐12 2021 22.076 3.580
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 031.55‐031.85 S 0.30 8767 Regional Full Recon 150mm @ IRI 12 2021 10.012 3.643
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 031.85‐032.05 S 0.20 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 10.133
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 032.05‐032.15 S 0.10 8767 Regional Full Recon 180mm 2021 3.849 3.485
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 032.15‐034.65 S 2.50 8767 Regional Rehab 150mm @ IRI 9‐12 2021 66.413 3.518
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 034.65‐034.85 S 0.20 8767 Regional Full Recon 150mm @ IRI 12 2021 6.675 3.735
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 034.85‐037.15 S 2.30 8767 Regional Rehab 150mm @ IRI 9‐12 2021 61.073 3.302
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 037.15‐037.45 S 0.30 8767 Regional Full Recon 180mm 2021 12.577 4.424
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 037.45‐037.72 S 0.27 8767 Regional DBST @ 25% Crk 2021 0.840 9.051
R143 Maijdi‐Chayani‐Basurhat‐Chandraganj Road Km 020.00‐020.26 S 0.26 4806 Regional DBST @ Traff 4000‐6000 2021 0.471 1.490
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 001.00‐001.20 S 0.20 4371 Regional Rehab 150mm @ IRI 9‐12 2021 3.574 1.130
Page 73 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 001.40‐001.50 S 0.10 4371 Regional Rehab 150mm @ IRI 9‐12 2021 1.787 1.511
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 001.50‐001.60 S 0.10 4371 Regional DBST @ 25% Crk 2021 0.183 2.702
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 001.60‐001.90 S 0.30 4371 Regional Full Recon 150mm 2021 7.464 0.710
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 001.90‐002.00 S 0.10 4371 Regional DBST @ 25% Crk 2021 0.176 2.721
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 002.00‐002.10 S 0.10 4371 Regional Full Recon 150mm 2021 2.184 1.531
R147 Lakshmipur Town Bridge‐Tero Baki Road Km 002.10‐002.21 S 0.11 4371 Regional Overlay 60mm @ IRI 7‐9 2021 0.477 4.830
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 001.74‐002.44 S 0.70 9769 Zilla Full Recon 75mm @ IRI>12 2021 19.292 2.642
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 002.44‐002.54 S 0.10 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 0.599 4.586
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 002.54‐002.64 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.478 3.695
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 002.64‐002.84 S 0.20 9769 Zilla Overlay 50mm @ Cracking >25% 2021 1.197 3.988
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 002.84‐002.94 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.478 3.695
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 002.94‐003.34 S 0.40 9769 Zilla Overlay 50mm @ Cracking >25% 2021 2.432 3.821
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 003.34‐003.64 S 0.30 9769 Zilla Full Recon 75mm @ IRI>12 2021 7.409 2.821
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 003.64‐003.74 S 0.10 9769 Zilla Overlay 50mm @ Cracking >25% 2021 0.599 3.923
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 003.74‐003.84 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.478 3.696
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 003.84‐003.94 S 0.10 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 0.599 4.627
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 003.94‐004.64 S 0.70 9769 Zilla Full Recon 75mm @ IRI>12 2021 17.345 2.785
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 004.64‐004.74 S 0.10 9769 Zilla Overlay 50mm @ Cracking >25% 2021 0.599 3.554
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 004.74‐005.24 S 0.50 9769 Zilla Full Recon 75mm @ IRI>12 2021 12.389 2.636
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 005.24‐007.74 S 2.50 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 14.957 4.967
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 007.74‐008.34 S 0.60 9769 Zilla Full Recon 75mm @ IRI>12 2021 18.466 1.709
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 008.34‐008.74 S 0.40 9769 Zilla Overlay 40mm @ Traff >=2000 2021 2.228 0.861
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 008.74‐009.34 S 0.60 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 10.416 3.310
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 009.34‐009.94 S 0.60 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 3.654 4.439
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 009.94‐010.34 S 0.40 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 6.944 3.705
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 010.34‐010.94 S 0.60 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 3.654 5.586
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 010.94‐011.04 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.521 3.039
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 011.04‐011.24 S 0.20 9769 Zilla Overlay 40mm @ Traff >=2000 2021 0.985 4.093
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 011.24‐011.54 S 0.30 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 5.190 3.832
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 011.54‐012.24 S 0.70 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 4.263 4.771
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 012.24‐013.14 S 0.90 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 15.623 3.277
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 013.14‐013.24 S 0.10 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 0.609 4.761
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 013.24‐013.54 S 0.30 9769 Zilla Full Recon 75mm @ IRI>12 2021 7.564 2.666
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 013.54‐015.44 S 1.90 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 11.571 5.076
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 015.44‐015.93 S 0.50 9769 Zilla Full Recon 75mm @ IRI>12 2021 20.737 0.891
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 015.93‐018.83 S 2.90 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 19.518 1.608
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 018.83‐018.93 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 3.695 1.550
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 018.93‐019.63 S 0.70 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 6.239 1.134
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 019.63‐019.93 S 0.30 9769 Zilla Full Recon 75mm @ IRI>12 2021 11.085 1.222
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 019.93‐020.23 S 0.30 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 2.678 1.218
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 020.23‐020.43 S 0.20 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 5.088 1.386
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 020.43‐020.83 S 0.40 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 3.570 0.770
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 020.83‐021.03 S 0.20 9769 Zilla Full Recon 75mm @ IRI>12 2021 7.390 1.515
Page 74 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 021.03‐022.43 S 1.40 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 10.937 1.422
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 022.43‐022.93 S 0.50 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 8.530 3.363
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 022.93‐023.23 S 0.30 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 1.796 5.064
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 023.23‐023.33 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.478 3.264
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 023.33‐024.43 S 1.10 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 6.670 4.508
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 024.43‐024.53 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.478 3.042
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 024.53‐024.83 S 0.30 9769 Zilla Overlay 40mm @ Traff >=2000 2021 1.452 4.160
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 024.83‐025.13 S 0.30 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 7.749 1.438
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 025.13‐026.03 S 0.90 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 5.377 5.087
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 026.03‐026.23 S 0.20 9769 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 3.656
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 026.23‐026.73 S 0.50 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 2.940 4.526
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 026.73‐026.83 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.434 3.227
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 026.83‐026.93 S 0.10 9769 Zilla Overlay 40mm @ Traff >=2000 2021 0.475 3.800
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 026.93‐027.03 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.434 3.796
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 027.03‐028.53 S 1.50 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 8.814 4.978
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 041.39‐041.49 S 0.10 9769 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.389
Z1405 Lakshmipur‐Char Alaxandar‐Sonapur Road Km 041.49‐041.69 S 0.20 9769 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 3.430
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 020.76‐020.80 S 0.04 3929 Zilla Full Recon 75mm @ IRI>12 2021 0.571 2.443
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 021.00‐021.50 S 0.50 3929 Zilla Full Recon 75mm @ IRI>12 2021 7.933 0.656
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 021.99‐022.49 S 0.50 3929 Zilla Full Recon 75mm @ IRI>12 2021 7.933 0.878
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 022.49‐022.57 S 0.07 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.229 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 022.57‐024.97 S 2.40 3929 Zilla Full Recon 75mm @ IRI>12 2021 37.542 0.698
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 024.97‐025.07 S 0.10 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 025.07‐026.17 S 1.10 3929 Zilla Full Recon 75mm @ IRI>12 2021 17.214 0.839
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 026.17‐026.37 S 0.20 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 026.37‐026.57 S 0.20 3929 Zilla Full Recon 75mm @ IRI>12 2021 3.156 1.103
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 026.77‐027.07 S 0.30 3929 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.971
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 027.17‐027.37 S 0.20 3929 Zilla Full Recon 75mm @ IRI>12 2021 3.669 0.889
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 027.37‐027.57 S 0.20 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.021
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 027.57‐027.87 S 0.30 3929 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.412
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 027.87‐027.97 S 0.10 3929 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.046
Z1407 Muddafarganj‐Chitosi‐Ramganj Road Km 027.97‐028.97 S 1.00 3929 Zilla Full Recon 75mm @ IRI>12 2021 23.885 0.590
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 022.67‐023.44 S 0.77 4577 Zilla Full Recon 75mm @ IRI>12 2021 12.249 0.545
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 023.44‐023.74 S 0.30 4577 Zilla Overlay 50mm @ Cracking >25% 2021 1.150 0.370
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 023.74‐024.74 S 1.00 4577 Zilla Full Recon 75mm @ IRI>12 2021 15.851 0.512
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 024.94‐026.64 S 1.70 4577 Zilla Rehab 75mm @ IRI 9‐12 2021 18.572 1.026
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 026.74‐027.04 S 0.30 4577 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.783
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 027.04‐027.14 S 0.10 4577 Zilla Overlay 50mm @ IRI 6‐9 2021 0.383 0.760
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 027.14‐029.44 S 2.30 4577 Zilla Full Recon 75mm @ IRI>12 2021 36.477 0.544
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 029.83‐030.02 S 0.19 4577 Zilla Overlay 50mm @ Cracking >25% 2021 0.766 0.162
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 030.02‐030.22 S 0.20 4577 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.998
Z1412 Chandpur‐Chandra‐Kamtabazar‐Ramganj  Km 030.22‐030.58 S 0.36 4577 Zilla Overlay 40mm @ Traff >=2000 2021 1.155 0.259
Z1413 Char Alaxander‐Ramgati Road Km 000.00‐006.40 S 6.40 5179 Zilla Overlay 40mm @ Traff >=2000 2021 20.114 0.874
Page 75 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1413 Char Alaxander‐Ramgati Road Km 006.40‐006.60 S 0.20 4601 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.079
Z1413 Char Alaxander‐Ramgati Road Km 006.60‐006.90 S 0.30 4601 Zilla Rehab 75mm @ IRI 9‐12 2021 3.439 0.758
Z1413 Char Alaxander‐Ramgati Road Km 006.90‐007.00 S 0.10 5179 Zilla Full Recon 75mm @ IRI>12 2021 2.260 1.164
Z1413 Char Alaxander‐Ramgati Road Km 007.00‐007.50 S 0.50 5179 Zilla Overlay 40mm @ Traff >=2000 2021 2.055 1.372
Z1413 Char Alaxander‐Ramgati Road Km 007.50‐007.80 S 0.30 4601 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 1.362
Z1413 Char Alaxander‐Ramgati Road Km 007.80‐008.20 S 0.40 4601 Zilla Overlay 50mm @ IRI 6‐9 2021 1.533 1.238
Z1413 Char Alaxander‐Ramgati Road Km 008.20‐008.40 S 0.20 4601 Zilla Full Recon 75mm @ IRI>12 2021 3.157 0.994
Z1413 Char Alaxander‐Ramgati Road Km 008.40‐008.70 S 0.30 4601 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.272
Z1413 Char Alaxander‐Ramgati Road Km 008.70‐009.50 S 0.80 4601 Zilla Rehab 75mm @ IRI 9‐12 2021 8.740 0.960
Z1413 Char Alaxander‐Ramgati Road Km 009.50‐009.80 S 0.30 4601 Zilla Overlay 50mm @ Cracking >25% 2021 1.150 0.507
Z1413 Char Alaxander‐Ramgati Road Km 009.80‐010.40 S 0.60 4601 Zilla Full Recon 75mm @ IRI>12 2021 9.520 0.668
Z1413 Char Alaxander‐Ramgati Road Km 010.40‐010.80 S 0.40 4601 Zilla Overlay 50mm @ Cracking >25% 2021 1.533 0.667
Z1413 Char Alaxander‐Ramgati Road Km 010.80‐011.70 S 0.90 4601 Zilla Rehab 75mm @ IRI 9‐12 2021 9.832 0.950
Z1413 Char Alaxander‐Ramgati Road Km 011.70‐012.00 S 0.30 4601 Zilla Overlay 50mm @ IRI 6‐9 2021 1.150 1.100
Z1413 Char Alaxander‐Ramgati Road Km 012.00‐012.10 S 0.10 4601 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.554
Z1413 Char Alaxander‐Ramgati Road Km 012.10‐013.35 S 1.25 5179 Zilla Overlay 50mm @ IRI 6‐9 2021 6.528 2.045
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 000.00‐000.10 S 0.10 377 Zilla Seal Coat 2021 0.096 1.141
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 000.10‐000.30 S 0.20 377 Zilla Overlay 40mm @ IRI>12 2021 0.620 0.000
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 000.30‐000.40 S 0.10 377 Zilla Seal Coat 2021 0.092 0.120
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 000.40‐001.10 S 0.70 377 Zilla Overlay 40mm @ IRI>12 2021 2.169 0.000
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 001.10‐001.60 S 0.50 377 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.549 0.000
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 001.60‐001.90 S 0.30 377 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.930 0.000
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 001.90‐002.00 S 0.10 377 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.307 0.064
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 002.00‐002.20 S 0.20 377 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z1417 Paniwala‐Munshihat‐Chatkhil Road Km 002.20‐003.70 S 1.50 377 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.368 0.046
Z1422 Haziganj‐Lakshmipur Road Km 009.81‐010.40 S 0.59 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 3.396 3.241
Z1422 Haziganj‐Lakshmipur Road Km 010.40‐010.50 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.466
Z1422 Haziganj‐Lakshmipur Road Km 010.50‐011.10 S 0.60 11086 Zilla Overlay 50mm @ Cracking >25% 2021 3.465 3.002
Z1422 Haziganj‐Lakshmipur Road Km 011.10‐011.30 S 0.20 11086 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.805
Z1422 Haziganj‐Lakshmipur Road Km 011.30‐012.80 S 1.50 11086 Zilla Overlay 50mm @ Cracking >25% 2021 8.710 4.202
Z1422 Haziganj‐Lakshmipur Road Km 012.80‐013.00 S 0.20 11086 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.477
Z1422 Haziganj‐Lakshmipur Road Km 013.00‐013.60 S 0.60 11086 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 3.267
Z1422 Haziganj‐Lakshmipur Road Km 013.60‐013.70 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.456
Z1422 Haziganj‐Lakshmipur Road Km 015.20‐015.30 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.801
Z1422 Haziganj‐Lakshmipur Road Km 015.30‐016.20 S 0.90 11086 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 2.307
Z1422 Haziganj‐Lakshmipur Road Km 016.20‐016.30 S 0.10 11086 Zilla Full Recon 75mm @ IRI>12 2021 2.821 3.192
Z1422 Haziganj‐Lakshmipur Road Km 016.30‐016.60 S 0.30 11086 Zilla Overlay 40mm @ Traff >=2000 2021 1.864 0.327
Z1422 Haziganj‐Lakshmipur Road Km 016.60‐016.90 S 0.30 11086 Zilla Full Recon 75mm @ IRI>12 2021 8.333 2.778
Z1422 Haziganj‐Lakshmipur Road Km 016.90‐018.06 S 1.17 8598 Zilla Overlay 50mm @ Cracking >25% 2021 6.440 1.954
Z1422 Haziganj‐Lakshmipur Road Km 018.06‐018.16 S 0.10 4669 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.858
Z1422 Haziganj‐Lakshmipur Road Km 021.36‐021.56 S 0.20 4669 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.459
Z1422 Haziganj‐Lakshmipur Road Km 021.56‐022.26 S 0.70 4669 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 0.522
Z1422 Haziganj‐Lakshmipur Road Km 022.26‐022.36 S 0.10 4669 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.386
Page 76 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1422 Haziganj‐Lakshmipur Road Km 022.36‐025.76 S 3.40 4669 Zilla Overlay 50mm @ IRI 6‐9 2021 19.665 0.272
Z1422 Haziganj‐Lakshmipur Road Km 025.76‐025.96 S 0.20 4669 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z1422 Haziganj‐Lakshmipur Road Km 025.96‐026.06 S 0.10 4669 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.443
Z1422 Haziganj‐Lakshmipur Road Km 026.06‐028.16 S 2.10 4669 Zilla Overlay 50mm @ IRI 6‐9 2021 12.122 0.215
Z1422 Haziganj‐Lakshmipur Road Km 028.16‐028.26 S 0.10 4669 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.522
Z1422 Haziganj‐Lakshmipur Road Km 028.26‐029.36 S 1.10 4669 Zilla Overlay 40mm @ Traff >=2000 2021 5.136 0.020
Z1422 Haziganj‐Lakshmipur Road Km 029.36‐029.96 S 0.60 4669 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.662
Z1422 Haziganj‐Lakshmipur Road Km 029.96‐030.16 S 0.20 4669 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.017
Z1422 Haziganj‐Lakshmipur Road Km 030.16‐030.26 S 0.10 4669 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.461
Z1422 Haziganj‐Lakshmipur Road Km 030.26‐030.96 S 0.70 4669 Zilla Overlay 50mm @ Cracking >25% 2021 4.043 0.018
Z1422 Haziganj‐Lakshmipur Road Km 030.96‐031.36 S 0.40 4669 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.633
Z1422 Haziganj‐Lakshmipur Road Km 031.36‐032.06 S 0.70 4669 Zilla Overlay 50mm @ Cracking >25% 2021 4.037 0.057
Z1422 Haziganj‐Lakshmipur Road Km 032.06‐032.36 S 0.30 4669 Zilla Full Recon 75mm @ IRI>12 2021 7.173 0.375
Z1422 Haziganj‐Lakshmipur Road Km 032.36‐032.96 S 0.60 4669 Zilla Overlay 40mm @ Traff >=2000 2021 2.481 0.329
Z1422 Haziganj‐Lakshmipur Road Km 032.96‐033.06 S 0.10 4669 Zilla Full Recon 75mm @ IRI>12 2021 1.952 1.139
Z1422 Haziganj‐Lakshmipur Road Km 033.06‐033.56 S 0.50 4669 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.031
Z1422 Haziganj‐Lakshmipur Road Km 033.56‐033.66 S 0.10 4669 Zilla Full Recon 75mm @ IRI>12 2021 2.178 0.762
Z1422 Haziganj‐Lakshmipur Road Km 033.66‐033.96 S 0.30 4669 Zilla Overlay 40mm @ Traff >=2000 2021 1.274 0.000
Z1422 Haziganj‐Lakshmipur Road Km 033.96‐034.26 S 0.30 4669 Zilla Full Recon 75mm @ IRI>12 2021 6.612 0.409
Z1422 Haziganj‐Lakshmipur Road Km 034.26‐035.16 S 0.90 4669 Zilla Overlay 50mm @ Cracking >25% 2021 5.009 0.092
Z1422 Haziganj‐Lakshmipur Road Km 035.16‐035.26 S 0.10 4669 Zilla Full Recon 75mm @ IRI>12 2021 2.304 0.599
Z1422 Haziganj‐Lakshmipur Road Km 035.26‐035.46 S 0.20 4669 Zilla Overlay 50mm @ Cracking >25% 2021 1.113 0.135
Z1422 Haziganj‐Lakshmipur Road Km 035.46‐035.96 S 0.50 4669 Zilla Rehab 75mm @ IRI 9‐12 2021 6.210 0.327
Z1422 Haziganj‐Lakshmipur Road Km 035.96‐036.16 S 0.20 4669 Zilla Overlay 50mm @ IRI 6‐9 2021 0.752 0.592
Z1422 Haziganj‐Lakshmipur Road Km 036.16‐036.46 S 0.30 4669 Zilla Full Recon 75mm @ IRI>12 2021 4.890 0.681
Z1422 Haziganj‐Lakshmipur Road Km 036.46‐037.42 S 0.96 4669 Zilla Overlay 40mm @ Traff >=2000 2021 3.352 0.455
Z1436 Paniwala Bazar‐Dashgarai Bazar Road Km 001.50‐001.60 S 0.10 1498 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1436 Paniwala Bazar‐Dashgarai Bazar Road Km 005.20‐005.50 S 0.30 1498 Zilla Overlay 40mm @ 1000‐2000 2021 0.930 0.000
Z1437 Batara Bazar Counecting Road Km 000.20‐000.30 S 0.10 897 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.301 0.000
Z1437 Batara Bazar Counecting Road Km 001.10‐001.30 S 0.20 897 Zilla Overlay 40mm @ IRI>12 2021 0.601 0.000
Z1447 Ramganj By‐Pass Road Km 000.20‐000.84 S 0.64 6075 Zilla Rehab 75mm @ IRI 9‐12 2021 12.834 1.064
Z1466 Nalgara ‐Kamarhat‐Ramganj Road Km 000.30‐001.10 S 0.80 1084 Zilla Overlay 40mm @ IRI>12 2021 2.398 0.000
Z1466 Nalgara ‐Kamarhat‐Ramganj Road Km 001.40‐001.50 S 0.10 1084 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1466 Nalgara ‐Kamarhat‐Ramganj Road Km 003.50‐004.20 S 0.70 1084 Zilla Overlay 40mm @ IRI>12 2021 1.783 0.000
Z1466 Nalgara ‐Kamarhat‐Ramganj Road Km 005.60‐006.00 S 0.40 1084 Zilla Overlay 40mm @ IRI>12 2021 1.084 0.000
Z1466 Nalgara ‐Kamarhat‐Ramganj Road Km 006.80‐007.20 S 0.40 1084 Zilla Overlay 40mm @ IRI>12 2021 1.032 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 000.10‐000.20 S 0.10 372 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 001.00‐002.30 S 1.30 372 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.970 0.148
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 002.30‐002.50 S 0.20 372 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 002.50‐002.60 S 0.10 372 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.306 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 002.60‐003.10 S 0.50 372 Zilla Overlay 40mm @ IRI>12 2021 1.528 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 003.10‐003.90 S 0.80 372 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.465 0.000
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 003.90‐004.10 S 0.20 372 Zilla Overlay 40mm @ IRI>12 2021 0.637 0.000
Page 77 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1472 Sardarbari‐Khairhat‐Mollarhat‐Raipur Road Km 008.60‐008.85 S 0.25 372 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.944 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 002.10‐002.60 S 0.50 1470 Zilla Overlay 40mm @ IRI>12 2021 1.596 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 004.30‐005.20 S 0.90 1470 Zilla Overlay 40mm @ IRI>12 2021 2.827 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 005.20‐005.80 S 0.60 1470 Zilla Overlay 40mm @ 1000‐2000 2021 1.885 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 006.10‐006.40 S 0.30 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 006.40‐006.60 S 0.20 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 006.60‐006.90 S 0.30 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 006.90‐007.00 S 0.10 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.035
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 007.00‐008.00 S 1.00 1470 Zilla Overlay 40mm @ 1000‐2000 2021 3.141 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 008.00‐008.40 S 0.40 1470 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 008.40‐008.50 S 0.10 1470 Zilla Seal Coat 2021 0.093 0.305
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 008.50‐008.80 S 0.30 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 008.80‐009.00 S 0.20 1470 Zilla Overlay 40mm @ 1000‐2000 2021 0.603 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 009.00‐011.30 S 2.30 1470 Zilla Overlay 40mm @ IRI>12 2021 6.441 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 011.30‐012.90 S 1.60 1470 Zilla Overlay 40mm @ 1000‐2000 2021 4.523 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 012.90‐014.10 S 1.20 1470 Zilla Overlay 40mm @ IRI>12 2021 3.716 0.000
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 014.10‐014.20 S 0.10 1470 Zilla Seal Coat 2021 0.092 0.234
Z1510 Lakshmipur‐Dattapara‐Chatkhil Road Km 014.20‐015.05 S 0.85 1470 Zilla Overlay 40mm @ IRI>12 2021 2.770 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 013.90‐014.90 S 1.00 2159 Zilla Overlay 40mm @ Traff >=2000 2021 3.086 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 014.90‐015.10 S 0.20 2159 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.437
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 015.10‐015.20 S 0.10 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 015.20‐015.50 S 0.30 2159 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.042
Z1824 Doabhanga‐Shaharasti‐Ramganj Road Km 015.50‐015.61 S 0.12 2159 Zilla Overlay 40mm @ Traff >=2000 2021 0.356 0.000
Laxmipur Total 1345.745
Noakhali Division
N104 Feni‐Noakhali Road Km 031.89‐033.29 L 1.40 12727 National Rehab 195mm @ IRI 9‐12 2021 60.276 6.331
N104 Feni‐Noakhali Road Km 031.89‐033.29 R 1.40 12727 National Rehab 195mm @ IRI 9‐12 2021 60.276 6.331
N104 Feni‐Noakhali Road Km 033.29‐034.29 L 1.00 12927 National Overlay 80mm @ IRI 5‐9 2021 11.725 15.318
N104 Feni‐Noakhali Road Km 033.29‐034.29 R 1.00 12927 National Overlay 80mm @ IRI 5‐9 2021 11.725 15.318
N104 Feni‐Noakhali Road Km 034.29‐035.15 L 0.86 19104 National Rehab 195mm @ IRI 9‐12 2021 36.984 3.657
N104 Feni‐Noakhali Road Km 034.29‐035.15 R 0.86 19104 National Rehab 195mm @ IRI 9‐12 2021 36.984 3.657
N104 Feni‐Noakhali Road Km 035.15‐035.29 S 0.14 19104 National Overlay 80mm @ IRI 5‐9 2021 1.706 9.375
N104 Feni‐Noakhali Road Km 035.29‐035.39 S 0.10 19104 National Full Recon 195mm 2021 5.344 3.827
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 127.65‐129.38 S 1.73 14064 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.993 16.321
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 129.38‐129.48 S 0.10 14064 Regional Rehab 150mm @ IRI 9‐12 2021 2.898 7.309
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 129.48‐130.68 S 1.20 14064 Regional DBST @ Traff >6000 2021 3.557 13.631
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 131.48‐131.58 S 0.10 14064 Regional Full Recon 195mm 2021 4.381 5.551
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 131.58‐132.38 S 0.80 14064 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.005 16.259
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 132.38‐132.48 S 0.10 14064 Regional Full Recon 195mm 2021 4.381 5.551
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 132.48‐134.58 S 2.10 14064 Regional DBST @ Traff >6000 2021 6.221 13.507
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 134.58‐134.78 S 0.20 14064 Regional Rehab 150mm @ IRI 9‐12 2021 5.796 6.872
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 134.78‐135.58 S 0.80 14064 Regional DBST @ Traff >6000 2021 2.371 13.311
R140 Cumilla‐Chandpur‐Lakshmipur‐Begumganj Km 135.58‐136.08 S 0.50 14064 Regional Rehab 150mm @ IRI 9‐12 2021 14.490 6.530
Page 78 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 010.71‐011.41 S 0.70 8884 Regional DBST @ 25% Crk 2021 1.912 10.257
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 011.41‐011.51 S 0.10 8767 Regional Full Recon 180mm 2021 3.849 3.698
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 011.51‐014.61 S 3.10 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.323 9.410
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 014.61‐018.21 S 3.60 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.988 9.572
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 018.21‐018.51 S 0.30 8767 Regional Rehab 150mm @ IRI 9‐12 2021 7.970 3.919
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 018.87‐019.11 S 0.24 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.665 9.861
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 019.11‐019.31 S 0.20 8767 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 4.199
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 019.31‐021.31 S 2.00 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.954 10.205
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 021.31‐021.51 S 0.20 8767 Regional Full Recon 150mm @ IRI 12 2021 6.675 3.722
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 021.51‐024.61 S 3.10 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.253 9.237
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 024.61‐024.71 S 0.10 8767 Regional Full Recon 180mm 2021 3.500 4.306
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 024.71‐024.81 S 0.10 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.626 11.961
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 024.81‐025.21 S 0.40 8767 Regional Full Recon 150mm @ IRI 12 2021 14.053 4.799
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 025.21‐025.85 S 0.64 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.569 8.687
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 025.85‐026.05 S 0.20 8767 Regional Rehab 150mm @ IRI 9‐12 2021 5.226 4.277
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 026.05‐026.45 S 0.40 8767 Regional Rehab 150mm @ IRI 9‐12 2021 10.626 3.644
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 026.45‐026.55 S 0.10 8767 Regional Full Recon 180mm 2021 3.849 3.732
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 026.55‐026.85 S 0.30 8767 Regional Rehab 150mm @ IRI 9‐12 2021 7.970 3.700
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 026.85‐026.95 S 0.10 8767 Regional Full Recon 180mm 2021 3.849 3.732
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 026.95‐027.65 S 0.70 8767 Regional Rehab 150mm @ IRI 9‐12 2021 18.569 3.701
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 027.74‐029.15 S 1.41 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.733 9.814
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 029.15‐029.65 S 0.50 8767 Regional Rehab 150mm @ IRI 9‐12 2021 14.007 5.154
R142  Begamganj‐Sonaimuri‐Ramganj Road Km 029.65‐030.72 S 1.07 8767 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.348 9.416
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 000.00‐000.20 S 0.20 4816 Regional DBST @ Traff 4000‐6000 2021 0.593 1.504
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 000.20‐003.40 S 3.20 5030 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.012 2.864
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 003.40‐005.30 S 1.90 7515 Regional Rehab 150mm @ IRI 9‐12 2021 55.062 3.691
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 005.30‐005.50 S 0.20 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.501 11.111
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 005.50‐005.80 S 0.30 7515 Regional DBST @ Traff >6000 2021 0.889 9.689
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 005.80‐006.70 S 0.90 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.748 10.125
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 006.70‐006.90 S 0.20 7515 Regional Rehab 150mm @ IRI 9‐12 2021 5.796 3.938
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 006.90‐008.50 S 1.60 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.010 9.318
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 008.50‐009.10 S 0.60 7515 Regional DBST @ Traff >6000 2021 1.778 9.115
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 009.10‐010.80 S 1.70 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.753 10.277
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 010.80‐011.80 S 1.00 7515 Regional Rehab 150mm @ IRI 9‐12 2021 28.690 3.734
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 011.80‐012.20 S 0.40 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.752 9.445
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 012.20‐013.10 S 0.90 7515 Regional Rehab 150mm @ IRI 9‐12 2021 24.126 3.196
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 013.10‐013.40 S 0.30 7515 Regional DBST @ Traff >6000 2021 0.815 7.630
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 013.40‐013.50 S 0.10 7515 Regional Full Recon 180mm 2021 3.849 3.265
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 013.50‐013.90 S 0.40 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.752 8.434
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 013.90‐014.00 S 0.10 7515 Regional Full Recon 180mm 2021 3.811 3.272
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 014.00‐015.30 S 1.30 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.945 9.076
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 015.30‐015.40 S 0.10 7515 Regional Full Recon 180mm 2021 3.849 3.251
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 015.40‐015.55 S 0.15 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.060 9.858
Page 79 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 015.55‐016.23 S 0.68 7515 Regional Full Recon 150mm @ IRI 12 2021 22.527 2.199
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 016.23‐016.53 S 0.30 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 9.344
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 016.53‐016.73 S 0.20 7515 Regional Full Recon 180mm 2021 7.699 2.685
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 016.73‐018.52 S 1.80 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.378 8.930
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 018.52‐019.12 S 0.60 7515 Regional Rehab 150mm @ IRI 9‐12 2021 15.939 2.930
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 019.12‐019.92 S 0.80 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.504 8.427
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 019.92‐020.22 S 0.30 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 9.323
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 020.22‐021.92 S 1.70 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.888 8.231
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 021.92‐022.62 S 0.70 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.369 9.843
R148 Sonapur‐Companiganj‐Daganbhuiyan Road Km 022.62‐023.70 S 1.08 7515 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.967 6.623
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 000.00‐000.30 S 0.30 4025 Zilla Full Recon 75mm @ IRI>12 2021 7.238 0.124
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 000.50‐000.70 S 0.20 4025 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.434
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 000.70‐002.00 S 1.30 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 4.869 1.254
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 002.00‐002.10 S 0.10 4025 Zilla Full Recon 75mm @ IRI>12 2021 1.391 1.159
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 002.10‐003.10 S 1.00 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 3.759 1.024
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 003.10‐003.30 S 0.20 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.251
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 003.60‐004.20 S 0.60 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 6.393 0.700
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 004.20‐004.40 S 0.20 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 0.672 1.322
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 004.40‐004.60 S 0.20 4025 Zilla Full Recon 75mm @ IRI>12 2021 2.895 0.543
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 004.80‐005.20 S 0.40 4025 Zilla Full Recon 75mm @ IRI>12 2021 6.242 0.447
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 005.20‐005.50 S 0.30 4025 Zilla Overlay 50mm @ IRI 6‐9 2021 1.008 1.684
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 005.50‐005.90 S 0.40 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 4.082 1.095
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 006.80‐007.00 S 0.20 4025 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.720
Z1430 Chatkhil‐Chitoshi‐Shaharasti (Kalibari) Road Km 007.30‐007.70 S 0.40 4025 Zilla Rehab 75mm @ IRI 9‐12 2021 4.370 0.940
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 004.50‐005.80 S 1.30 1661 Zilla Overlay 40mm @ 1000‐2000 2021 4.208 0.000
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 005.80‐005.90 S 0.10 1661 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 005.90‐008.60 S 2.70 1661 Zilla Seal Coat 2021 2.530 0.347
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 008.60‐008.70 S 0.10 1661 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 008.70‐008.90 S 0.20 1661 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.062
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 008.90‐009.00 S 0.10 1661 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 009.00‐009.40 S 0.40 1661 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.055
Z1433 Daganbhuiyan‐Choudhurihat‐Basurhat Km 009.40‐010.20 S 0.80 1661 Zilla Overlay 40mm @ IRI>12 2021 2.519 0.000
Z1434 Sonagazi‐Companiganj Road Km 008.50‐008.60 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.881
Z1434 Sonagazi‐Companiganj Road Km 008.80‐008.90 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.198
Z1434 Sonagazi‐Companiganj Road Km 009.00‐009.20 S 0.20 3703 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.074
Z1434 Sonagazi‐Companiganj Road Km 009.50‐009.60 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.020
Z1434 Sonagazi‐Companiganj Road Km 010.60‐010.80 S 0.20 3703 Zilla Full Recon 75mm @ IRI>12 2021 4.521 0.319
Z1434 Sonagazi‐Companiganj Road Km 010.80‐012.50 S 1.70 3703 Zilla Overlay 40mm @ Traff >=2000 2021 7.390 0.000
Z1434 Sonagazi‐Companiganj Road Km 012.50‐012.60 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 2.521 0.009
Z1434 Sonagazi‐Companiganj Road Km 012.80‐013.10 S 0.30 3703 Zilla Full Recon 75mm @ IRI>12 2021 7.564 0.001
Z1434 Sonagazi‐Companiganj Road Km 015.00‐015.10 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.913 0.776
Z1434 Sonagazi‐Companiganj Road Km 016.20‐016.30 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.913 0.775
Z1434 Sonagazi‐Companiganj Road Km 017.00‐017.10 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.913 0.569
Page 80 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1434 Sonagazi‐Companiganj Road Km 017.90‐018.00 S 0.10 3703 Zilla Full Recon 75mm @ IRI>12 2021 1.894 0.763
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 013.50‐013.60 S 0.10 8119 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.817
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 014.30‐014.50 S 0.20 8119 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.408
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 014.80‐014.90 S 0.10 8119 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.926
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 015.10‐015.30 S 0.20 8119 Zilla Full Recon 75mm @ IRI>12 2021 4.782 1.365
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 015.70‐015.80 S 0.10 8119 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.860
Z1444 Feni‐Biroli Bazar‐Sonaimuri Road Km 016.00‐016.40 S 0.40 8119 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 2.291
Z1449 Dadpurbazar‐Khalifarhat Road Km 000.00‐000.20 S 0.20 941 Zilla Seal Coat 2021 0.204 1.364
Z1449 Dadpurbazar‐Khalifarhat Road Km 000.20‐000.30 S 0.10 941 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1449 Dadpurbazar‐Khalifarhat Road Km 000.30‐000.40 S 0.10 941 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.362
Z1449 Dadpurbazar‐Khalifarhat Road Km 000.40‐001.20 S 0.80 941 Zilla Overlay 40mm @ IRI>12 2021 2.479 0.000
Z1449 Dadpurbazar‐Khalifarhat Road Km 001.30‐001.40 S 0.10 941 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 000.10‐001.25 S 1.15 1217 Zilla Overlay 40mm @ IRI>12 2021 3.564 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 001.55‐001.65 S 0.10 1217 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.070
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 004.15‐004.25 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 005.65‐005.85 S 0.20 1217 Zilla Overlay 40mm @ IRI>12 2021 0.620 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 008.15‐008.25 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 008.65‐008.95 S 0.30 1217 Zilla Overlay 40mm @ IRI>12 2021 0.930 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 009.05‐009.45 S 0.40 1217 Zilla Overlay 40mm @ IRI>12 2021 1.240 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 010.25‐010.55 S 0.30 1217 Zilla Overlay 40mm @ IRI>12 2021 0.917 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 013.45‐013.65 S 0.20 1217 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 014.25‐014.35 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 014.35‐014.65 S 0.30 1217 Zilla Overlay 40mm @ 1000‐2000 2021 0.917 0.077
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 014.65‐014.75 S 0.10 1217 Zilla Overlay 40mm @ 1000‐2000 2021 0.306 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 014.75‐015.05 S 0.30 1217 Zilla Overlay 40mm @ 1000‐2000 2021 1.077 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 015.05‐015.15 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 015.15‐016.45 S 1.30 1217 Zilla Overlay 40mm @ 1000‐2000 2021 3.970 0.043
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 016.45‐016.55 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 016.55‐019.85 S 3.30 1217 Zilla Overlay 40mm @ 1000‐2000 2021 10.083 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 019.85‐020.15 S 0.30 1217 Zilla Overlay 40mm @ 1000‐2000 2021 0.917 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 020.15‐020.65 S 0.50 1217 Zilla Overlay 40mm @ 1000‐2000 2021 1.528 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 020.65‐021.05 S 0.40 1217 Zilla Overlay 40mm @ IRI>12 2021 1.202 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 021.05‐022.05 S 1.00 1217 Zilla Overlay 40mm @ 1000‐2000 2021 2.759 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 022.05‐022.15 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 022.15‐022.35 S 0.20 1217 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 022.35‐022.45 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 022.45‐023.15 S 0.70 1217 Zilla Overlay 40mm @ 1000‐2000 2021 2.199 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 023.15‐023.24 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.311 0.000
Z1508 Dinmoni Bazar‐Moulavibazar‐Companirhat Km 023.94‐024.04 S 0.10 1217 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Noakhali Total 968.053
Cumilla Zone Total 10397.090

Page 81 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Dhaka Zone
Dhaka Division
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 000.00‐000.15 L 0.15 20248 National DBST @ Traff >6000 2021 1.482 12.907
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 000.00‐000.15 R 0.15 20248 National DBST @ Traff >6000 2021 1.186 16.574
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 000.15‐000.30 S 0.15 20248 National Rehab 195mm @ IRI 9‐12 2021 8.095 7.620
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 000.30‐000.50 S 0.20 20248 National Full Recon 195mm 2021 12.996 7.025
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 000.50‐001.10 S 0.60 20248 National Rehab 195mm @ IRI 9‐12 2021 32.382 7.781
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 001.10‐001.50 S 0.40 20248 National Full Recon 195mm 2021 25.700 7.115
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 001.50‐002.30 S 0.80 20248 National Overlay 80mm @ IRI 5‐9 2021 11.887 18.255
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 002.30‐002.60 S 0.30 42248 National Full Recon 195mm @ IRI 12 2021 20.151 29.010
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 002.60‐003.20 S 0.60 45936 National Full Recon 195mm @ IRI 12 2021 40.302 30.735
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 003.20‐003.30 S 0.10 45936 National Full Recon 195mm @ IRI 12 2021 6.717 30.735
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 003.30‐003.60 S 0.30 45936 National Full Recon 195mm @ IRI 12 2021 20.151 30.735
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 003.60‐003.80 S 0.20 45936 National Full Recon 195mm @ IRI 12 2021 13.463 30.667
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 003.80‐005.78 S 1.98 46379 National Rehab 195mm @ IRI 9‐12 2021 111.599 33.042
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 005.80‐005.90 L 0.10 21014 National Full Recon 195mm @ IRI 12 2021 4.277 12.939
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 005.80‐005.90 R 0.10 21014 National Full Recon 195mm @ IRI 12 2021 4.203 13.070
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 005.90‐007.50 S 1.60 50749 National Overlay 80mm @ IRI 5‐9 2021 25.358 73.011
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 007.50‐007.60 S 0.10 50749 National Full Recon 195mm @ IRI 12 2021 7.009 29.499
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 007.60‐008.80 S 1.20 50749 National Overlay 80mm @ IRI 5‐9 2021 19.043 71.410
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 008.80‐009.20 S 0.40 50749 National Full Recon 195mm @ IRI 12 2021 28.036 29.454
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 009.20‐009.30 S 0.10 50749 National Full Recon 195mm @ IRI 12 2021 7.009 29.455
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 009.30‐009.60 S 0.30 50749 National Full Recon 195mm @ IRI 12 2021 17.698 35.098
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 009.60‐009.70 S 0.10 21014 National Full Recon 195mm @ IRI 12 2021 5.330 9.130
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 009.70‐010.10 S 0.40 21014 National Full Recon 195mm @ IRI 12 2021 21.266 9.130
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 010.10‐011.00 S 0.90 21014 National Rehab 195mm @ IRI 9‐12 2021 39.840 10.296
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 011.00‐011.20 S 0.20 21014 National Full Recon 195mm @ IRI 12 2021 10.659 9.130
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 011.20‐013.30 S 2.10 21829 National Overlay 80mm @ IRI 5‐9 2021 25.340 23.423
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 013.30‐013.40 S 0.10 21983 National Full Recon 195mm 2021 5.330 9.076
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 013.40‐013.45 S 0.05 21983 National Full Recon 195mm 2021 2.825 9.003
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 013.50‐013.55 L 0.05 21983 National Full Recon 195mm 2021 3.328 7.422
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 013.50‐013.55 R 0.05 21983 National Full Recon 195mm 2021 3.328 7.365
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 013.55‐014.50 S 0.95 21983 National Overlay 80mm @ IRI 5‐9 2021 11.415 23.215
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 014.50‐014.80 S 0.30 21983 National Full Recon 195mm 2021 15.989 9.076
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 014.80‐015.10 S 0.30 21983 National Overlay 80mm @ IRI 5‐9 2021 3.620 24.322
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 015.10‐015.60 S 0.50 21983 National Full Recon 195mm 2021 26.649 8.629
N302 Tongi‐Ashulia‐Zerabo‐EPZ Road Km 015.60‐017.56 S 1.96 21983 National Overlay 80mm @ IRI 5‐9 2021 24.578 24.633
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.00‐000.40 L 0.40 19658 National Full Recon 195mm 2021 21.903 10.827
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.00‐000.40 R 0.40 18131 National Rehab 195mm @ IRI 9‐12 2021 18.192 12.149
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.40‐000.60 L 0.20 19658 National Full Recon 195mm 2021 10.952 10.962
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.40‐000.60 R 0.20 18131 National Full Recon 195mm 2021 10.952 11.021
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.60‐000.70 L 0.10 19658 National Rehab 195mm @ IRI 9‐12 2021 4.548 11.718
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.60‐000.70 R 0.10 18131 National Overlay 80mm @ IRI 4‐9 2021 1.240 27.535
Page 82 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.70‐000.80 L 0.10 19658 National Full Recon 195mm 2021 5.476 10.962
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.70‐000.80 R 0.10 18131 National Full Recon 195mm 2021 5.476 11.021
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.80‐001.10 L 0.30 19658 National Full Recon 195mm 2021 16.427 10.761
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 000.80‐001.10 R 0.30 18131 National Rehab 195mm @ IRI 9‐12 2021 13.644 12.377
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 001.10‐001.20 L 0.10 19658 National Full Recon 195mm 2021 5.476 10.962
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 001.10‐001.20 R 0.10 18131 National Full Recon 195mm 2021 5.476 11.021
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 001.20‐002.40 L 1.20 19658 National Overlay 80mm @ IRI 4‐9 2021 14.865 27.377
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 001.20‐002.40 R 1.20 18131 National Overlay 80mm @ IRI 4‐9 2021 14.865 27.024
N501 Mirpur Bridge‐Dhour Road Km 000.00‐000.10 S 0.10 17802 National Overlay 80mm @ IRI 5‐9 2021 1.207 30.835
N501 Mirpur Bridge‐Dhour Road Km 000.10‐000.20 S 0.10 17802 National Full Recon 195mm 2021 5.330 11.408
N501 Mirpur Bridge‐Dhour Road Km 000.20‐000.70 S 0.50 17802 National Rehab 195mm @ IRI 9‐12 2021 22.134 12.714
N501 Mirpur Bridge‐Dhour Road Km 000.70‐001.20 S 0.50 17802 National Rehab 195mm @ IRI 9‐12 2021 22.134 10.836
N501 Mirpur Bridge‐Dhour Road Km 001.20‐001.70 S 0.50 17802 National Rehab 195mm @ IRI 9‐12 2021 22.134 13.124
N501 Mirpur Bridge‐Dhour Road Km 001.70‐002.10 S 0.40 17802 National Full Recon 195mm 2021 21.266 11.401
N501 Mirpur Bridge‐Dhour Road Km 002.10‐003.60 S 1.50 17802 National Rehab 195mm @ IRI 9‐12 2021 66.401 13.124
N501 Mirpur Bridge‐Dhour Road Km 003.60‐004.00 S 0.40 17802 National Full Recon 195mm 2021 21.377 11.301
N501 Mirpur Bridge‐Dhour Road Km 004.00‐004.40 S 0.40 17802 National Rehab 195mm @ IRI 9‐12 2021 17.755 13.086
N501 Mirpur Bridge‐Dhour Road Km 004.40‐004.80 S 0.40 17802 National Full Recon 195mm 2021 21.377 11.338
N501 Mirpur Bridge‐Dhour Road Km 004.80‐005.30 S 0.50 17802 National Rehab 195mm @ IRI 9‐12 2021 22.194 12.908
N501 Mirpur Bridge‐Dhour Road Km 005.30‐005.50 S 0.20 17802 National Full Recon 195mm 2021 10.689 11.022
N501 Mirpur Bridge‐Dhour Road Km 005.50‐005.60 S 0.10 17802 National Overlay 80mm @ IRI 5‐9 2021 1.210 30.576
N501 Mirpur Bridge‐Dhour Road Km 005.60‐007.50 S 1.90 17802 National Rehab 195mm @ IRI 9‐12 2021 84.294 11.938
N501 Mirpur Bridge‐Dhour Road Km 007.50‐007.70 S 0.20 17802 National Rehab 195mm @ IRI 9‐12 2021 8.878 13.004
N501 Mirpur Bridge‐Dhour Road Km 007.70‐007.90 S 0.20 17802 National Full Recon 195mm 2021 10.689 11.236
N501 Mirpur Bridge‐Dhour Road Km 007.90‐008.50 S 0.60 17802 National Rehab 195mm @ IRI 9‐12 2021 26.706 12.898
N501 Mirpur Bridge‐Dhour Road Km 008.50‐009.50 S 1.00 17802 National Full Recon 195mm 2021 53.662 10.194
N501 Mirpur Bridge‐Dhour Road Km 009.50‐009.60 S 0.10 17802 National Overlay 80mm @ IRI 5‐9 2021 1.215 31.397
N501 Mirpur Bridge‐Dhour Road Km 009.60‐009.70 S 0.10 17802 National Full Recon 195mm 2021 5.366 11.314
N501 Mirpur Bridge‐Dhour Road Km 009.70‐009.80 S 0.10 17802 National Overlay 80mm @ IRI 5‐9 2021 1.215 30.602
N501 Mirpur Bridge‐Dhour Road Km 009.80‐009.90 S 0.10 17802 National Full Recon 195mm 2021 5.366 11.314
N501 Mirpur Bridge‐Dhour Road Km 009.90‐011.92 S 2.02 17802 National Overlay 80mm @ IRI 5‐9 2021 24.566 30.565
N501 Mirpur Bridge‐Dhour Road Km 011.92‐011.94 S 0.02 17802 National Rehab 195mm @ IRI 9‐12 2021 1.467 11.533
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 000.00‐001.50 S 1.50 11974 National Overlay 80mm @ IRI 5‐9 2021 13.885 14.697
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 001.50‐002.00 S 0.50 11974 National Rehab 195mm @ IRI 9‐12 2021 16.854 5.660
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 002.00‐003.40 S 1.40 11974 National Overlay 80mm @ IRI 5‐9 2021 12.890 14.896
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 003.40‐003.50 S 0.10 11974 National Full Recon 195mm 2021 4.067 6.393
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 003.50‐004.60 S 1.10 11974 National Overlay 80mm @ IRI 5‐9 2021 10.164 15.041
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 004.60‐004.70 S 0.10 11974 National Full Recon 195mm 2021 4.096 6.073
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 004.70‐005.00 S 0.30 11974 National Overlay 80mm @ IRI 5‐9 2021 2.782 15.603
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 005.00‐005.30 S 0.30 11974 National Rehab 195mm @ IRI 9‐12 2021 10.206 6.265
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 005.30‐006.00 S 0.70 11974 National Overlay 80mm @ IRI 5‐9 2021 6.482 15.068
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 006.00‐006.20 S 0.20 11974 National Full Recon 195mm @ IRI 12 2021 8.192 5.599
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 006.20‐006.80 S 0.60 11974 National DBST @ Traff >6000 2021 1.663 15.224
Page 83 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 006.80‐007.20 S 0.40 11974 National Full Recon 195mm @ IRI 12 2021 16.383 5.157
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 007.20‐007.40 S 0.20 11974 National Overlay 80mm @ IRI 5‐9 2021 1.855 15.694
N511 Mirpur (Birulia)‐Ashulia (Yearpur) Road Km 007.40‐008.20 S 0.80 11974 National Rehab 195mm @ IRI 9‐12 2021 27.215 5.465
N530 Gabtali‐Swarighat Road Km 000.00‐000.10 L 0.10 22964 National Full Recon 195mm 2021 4.089 11.488
N530 Gabtali‐Swarighat Road Km 000.00‐000.10 R 0.10 11266 National Full Recon 195mm 2021 3.943 4.611
N530 Gabtali‐Swarighat Road Km 000.10‐000.15 L 0.05 22964 National Overlay 80mm @ IRI 5‐9 2021 0.463 31.593
N530 Gabtali‐Swarighat Road Km 000.10‐000.15 R 0.05 11266 National Overlay 80mm @ IRI 5‐9 2021 0.446 14.169
N530 Gabtali‐Swarighat Road Km 000.15‐000.20 S 0.05 22964 National Rehab 195mm @ IRI 9‐12 2021 2.107 10.326
N530 Gabtali‐Swarighat Road Km 000.20‐000.30 S 0.10 22964 National Full Recon 195mm @ IRI 12 2021 5.074 8.839
N530 Gabtali‐Swarighat Road Km 000.30‐000.50 S 0.20 22964 National Full Recon 195mm @ IRI 12 2021 10.148 8.282
N530 Gabtali‐Swarighat Road Km 000.50‐000.80 S 0.30 22964 National Full Recon 195mm @ IRI 12 2021 15.223 8.507
N530 Gabtali‐Swarighat Road Km 000.80‐004.10 S 3.30 22964 National Rehab 195mm @ IRI 9‐12 2021 138.235 9.068
N530 Gabtali‐Swarighat Road Km 004.10‐004.40 S 0.30 22964 National Full Recon 195mm @ IRI 12 2021 12.309 10.489
N530 Gabtali‐Swarighat Road Km 004.40‐005.00 S 0.60 22964 National Rehab 195mm @ IRI 9‐12 2021 20.448 11.883
N530 Gabtali‐Swarighat Road Km 005.00‐005.10 S 0.10 22964 National Full Recon 195mm 2021 4.103 11.480
N530 Gabtali‐Swarighat Road Km 005.10‐011.64 S 6.54 22964 National Rehab 195mm @ IRI 9‐12 2021 222.915 11.449
N532 Postagola‐Chasara Road Km 000.20‐000.70 S 0.50 16676 National Overlay 80mm @ IRI 5‐9 2021 8.513 13.572
N532 Postagola‐Chasara Road Km 000.70‐001.10 S 0.40 16676 National Full Recon 195mm @ IRI 12 2021 25.992 6.121
N532 Postagola‐Chasara Road Km 001.10‐001.30 S 0.20 16676 National Rehab 195mm @ IRI 9‐12 2021 10.794 6.928
N532 Postagola‐Chasara Road Km 001.30‐002.00 S 0.70 16676 National Full Recon 195mm @ IRI 12 2021 44.961 5.540
N532 Postagola‐Chasara Road Km 002.00‐004.60 S 2.60 16676 National Overlay 80mm @ IRI 5‐9 2021 34.812 16.214
N532 Postagola‐Chasara Road Km 004.60‐005.20 S 0.60 16676 National Full Recon 195mm @ IRI 12 2021 32.592 6.566
N532 Postagola‐Chasara Road Km 005.20‐005.80 S 0.60 16676 National Overlay 80mm @ IRI 5‐9 2021 7.300 17.990
N532 Postagola‐Chasara Road Km 010.60‐010.64 L 0.05 16676 National Overlay 80mm @ IRI 5‐9 2021 0.684 20.344
N532 Postagola‐Chasara Road Km 010.60‐010.64 R 0.05 16676 National Overlay 80mm @ IRI 5‐9 2021 0.684 20.344
N802 2nd Buriganga Bridge Approach Road to National Highway Km 000.40‐000.50 S 0.10 20230 National Full Recon 195mm 2021 10.659 3.754
N802 2nd Buriganga Bridge Approach Road to National Highway Km 000.50‐000.90 S 0.40 20230 National Overlay 80mm @ IRI 5‐9 2021 9.654 11.494
N802 2nd Buriganga Bridge Approach Road to National Highway Km 000.90‐001.00 S 0.10 20230 National Full Recon 195mm 2021 10.659 3.887
N802 2nd Buriganga Bridge Approach Road to National Highway Km 001.00‐001.40 S 0.40 20230 National Overlay 80mm @ IRI 5‐9 2021 9.654 10.991
N802 2nd Buriganga Bridge Approach Road to National Highway Km 001.40‐001.50 S 0.10 20230 National Full Recon 195mm 2021 10.659 4.075
N802 2nd Buriganga Bridge Approach Road to National Highway Km 001.50‐001.80 S 0.30 20230 National DBST @ Traff >6000 2021 1.030 19.563
N802 2nd Buriganga Bridge Approach Road to National Highway Km 001.80‐001.90 S 0.10 20230 National Full Recon 195mm @ IRI 12 2021 5.074 8.126
N802 2nd Buriganga Bridge Approach Road to National Highway Km 001.90‐002.40 S 0.50 20230 National Overlay 80mm @ IRI 5‐9 2021 5.733 20.403
N802 2nd Buriganga Bridge Approach Road to National Highway Km 002.40‐002.70 S 0.30 20230 National Full Recon 195mm @ IRI 12 2021 15.223 7.790
N802 2nd Buriganga Bridge Approach Road to National Highway Km 002.70‐004.10 S 1.40 20230 National Overlay 80mm @ IRI 5‐9 2021 16.084 20.453
N802 2nd Buriganga Bridge Approach Road to National Highway Km 004.10‐004.20 S 0.10 20230 National Full Recon 195mm @ IRI 12 2021 5.074 8.071
N802 2nd Buriganga Bridge Approach Road to National Highway Km 004.20‐004.55 S 0.35 20230 National Overlay 80mm @ IRI 5‐9 2021 4.248 20.145
R110 Jatrabari‐Demra‐Narayanganj Road Km 000.00‐000.32 L 0.32 20581 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.127 16.735
R110 Jatrabari‐Demra‐Narayanganj Road Km 005.30‐005.80 S 0.50 20581 Regional Full Recon 150mm @ IRI 12 2021 22.118 9.180
R110 Jatrabari‐Demra‐Narayanganj Road Km 005.80‐006.60 S 0.80 16303 Regional Rehab 150mm @ IRI 9‐12 2021 28.320 10.510
R110 Jatrabari‐Demra‐Narayanganj Road Km 006.60‐006.70 S 0.10 11969 Regional Full Recon 150mm @ IRI 12 2021 4.442 7.520
R110 Jatrabari‐Demra‐Narayanganj Road Km 006.70‐008.90 S 2.20 11969 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.027 20.923
R110 Jatrabari‐Demra‐Narayanganj Road Km 008.90‐009.39 S 0.49 11969 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.481 20.426
Page 84 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R110 Jatrabari‐Demra‐Narayanganj Road Km 009.39‐009.52 S 0.14 11969 Regional Full Recon 150mm @ IRI 12 2021 6.102 7.502
R112 Demra‐Amulia‐Rampura Road Km 000.00‐000.70 S 0.70 19157 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.158 35.454
R112 Demra‐Amulia‐Rampura Road Km 000.70‐000.90 S 0.20 19157 Regional Full Recon 150mm @ IRI 12 2021 6.918 14.667
R112 Demra‐Amulia‐Rampura Road Km 000.90‐003.10 S 2.20 19157 Regional Rehab 150mm @ IRI 9‐12 2021 60.541 16.646
R112 Demra‐Amulia‐Rampura Road Km 003.10‐003.20 S 0.10 19157 Regional Full Recon 195mm 2021 4.162 13.315
R112 Demra‐Amulia‐Rampura Road Km 003.20‐003.30 S 0.10 19157 Regional Rehab 150mm @ IRI 9‐12 2021 2.753 17.602
R112 Demra‐Amulia‐Rampura Road Km 003.30‐003.80 S 0.50 19157 Regional Rehab 150mm @ IRI 9‐12 2021 13.766 14.254
R112 Demra‐Amulia‐Rampura Road Km 003.80‐004.20 S 0.40 19157 Regional Rehab 150mm @ IRI 9‐12 2021 11.012 16.858
R112 Demra‐Amulia‐Rampura Road Km 004.20‐004.30 S 0.10 19157 Regional Full Recon 195mm 2021 4.162 13.262
R112 Demra‐Amulia‐Rampura Road Km 004.30‐004.40 S 0.10 19157 Regional DBST @ Traff >6000 2021 0.282 16.241
R112 Demra‐Amulia‐Rampura Road Km 004.40‐004.50 S 0.10 19157 Regional Full Recon 195mm 2021 4.162 13.315
R112 Demra‐Amulia‐Rampura Road Km 004.50‐008.51 S 4.01 19157 Regional Rehab 150mm @ IRI 9‐12 2021 125.475 15.159
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 000.40‐000.70 S 0.30 7950 Regional Rehab 150mm @ IRI 9‐12 2021 10.868 0.734
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 000.90‐001.10 S 0.20 7950 Regional Full Recon 150mm @ IRI 12 2021 9.102 0.701
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 001.10‐001.30 S 0.20 7950 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.877 2.597
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 001.30‐001.40 S 0.10 7950 Regional Rehab 150mm @ IRI 9‐12 2021 3.623 0.878
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 001.50‐001.60 S 0.10 7950 Regional Full Recon 150mm @ IRI 12 2021 4.551 1.076
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 001.60‐001.90 S 0.30 7950 Regional DBST @ 25% Crk 2021 1.112 1.516
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 001.90‐002.00 S 0.10 7950 Regional Full Recon 150mm @ IRI 12 2021 4.505 1.144
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 002.00‐003.00 S 1.00 7950 Regional DBST @ 25% Crk 2021 3.176 2.189
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 003.00‐003.10 S 0.10 7950 Regional Full Recon 180mm 2021 3.849 1.905
R504 Hemayetpur ‐ Singair ‐ Manikgonj Road Km 003.10‐004.01 S 0.92 7950 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.296 4.183
R802 Majina‐Kayetpara‐Trimohoni Link Road Km 003.10‐004.46 S 1.36 4483 Regional Overlay 60mm @ IRI 7‐9 2021 6.955 0.942
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 002.40‐002.50 S 0.10 18998 Regional Rehab 150mm @ IRI 9‐12 2021 2.801 5.620
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 002.90‐003.00 S 0.10 18998 Regional Full Recon 195mm 2021 4.198 4.641
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 003.30‐003.40 S 0.10 18998 Regional Full Recon 195mm 2021 4.198 4.339
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 003.50‐003.70 S 0.20 18998 Regional Rehab 150mm @ IRI 9‐12 2021 5.555 5.166
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 004.10‐004.40 S 0.30 18998 Regional DBST @ Traff >6000 2021 0.869 10.711
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 004.40‐005.30 S 0.90 18998 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.620 11.032
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 005.30‐005.40 S 0.10 18998 Regional Rehab 150mm @ IRI 9‐12 2021 2.840 5.331
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 005.60‐005.70 S 0.10 18998 Regional Rehab 150mm @ IRI 9‐12 2021 2.840 5.546
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 005.70‐008.14 S 2.44 18998 Regional Overlay 60mm @ IRI 5.5‐9 2021 18.261 10.171
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 008.20‐008.29 L 0.09 13151 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.587 7.453
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 008.20‐008.29 R 0.09 13151 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.575 7.569
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 008.29‐008.33 S 0.04 18998 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.537 5.487
R814 R812 to Muktarpur Ferryghat Link Road Km 000.00‐000.10 S 0.10 13184 Regional DBST @ Traff >6000 2021 0.469 0.826
R814 R812 to Muktarpur Ferryghat Link Road Km 000.10‐000.75 S 0.65 13184 Regional Full Recon 150mm @ IRI 12 2021 26.937 1.059
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 000.00‐000.10 S 0.10 10846 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.439 1.607
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 002.30‐002.90 S 0.60 10846 Regional Rehab 150mm @ IRI 9‐12 2021 16.084 3.936
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 002.90‐003.00 S 0.10 10846 Regional DBST @ 25% Crk 2021 0.274 10.771
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 003.00‐003.30 S 0.30 10846 Regional Rehab 150mm @ IRI 9‐12 2021 8.042 5.604
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 003.30‐004.40 S 1.10 10846 Regional DBST @ Traff >6000 2021 3.016 10.744
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 004.40‐004.50 S 0.10 10846 Regional Full Recon 195mm 2021 4.052 5.004
Page 85 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 004.50‐004.60 S 0.10 10846 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.694 15.340
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 005.70‐005.80 S 0.10 10846 Regional Full Recon 195mm 2021 4.052 4.937
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 006.40‐006.50 S 0.10 10846 Regional Full Recon 195mm 2021 4.016 3.232
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 006.50‐006.60 S 0.10 10846 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 10.267
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 006.60‐006.70 S 0.10 10846 Regional Full Recon 195mm 2021 4.016 3.234
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 007.10‐007.30 S 0.20 10846 Regional Full Recon 195mm 2021 8.031 2.817
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 007.60‐007.80 S 0.20 10846 Regional Full Recon 195mm 2021 8.031 2.811
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 007.80‐007.90 S 0.10 10846 Regional DBST @ 25% Crk 2021 0.272 6.857
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 007.90‐008.00 S 0.10 10846 Regional Full Recon 195mm 2021 4.016 3.036
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 008.00‐008.70 S 0.70 10846 Regional DBST @ 25% Crk 2021 1.902 6.344
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 008.70‐008.90 S 0.20 10846 Regional Full Recon 195mm 2021 8.031 2.809
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 009.10‐009.30 S 0.20 10846 Regional Full Recon 195mm 2021 8.031 2.624
R820 Zinzira‐Nawabganj‐Dohar‐Srinagar Road Km 009.30‐010.17 S 0.87 10846 Regional DBST @ Traff >6000 2021 2.358 6.095
Z1101 Matuail‐Shampur Road Km 002.30‐002.40 S 0.10 3484 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.175
Z1101 Matuail‐Shampur Road Km 002.40‐002.70 S 0.30 3484 Zilla Overlay 40mm @ Cracks >25% 2021 1.737 0.144
Z1101 Matuail‐Shampur Road Km 002.70‐002.80 S 0.10 3484 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z1101 Matuail‐Shampur Road Km 002.80‐003.90 S 1.10 3484 Zilla Overlay 40mm @ Cracks >25% 2021 5.563 0.154
Z1101 Matuail‐Shampur Road Km 003.90‐004.00 S 0.10 3484 Zilla Full Recon 75mm @ IRI>12 2021 2.347 0.140
Z1101 Matuail‐Shampur Road Km 004.00‐004.49 S 0.49 3484 Zilla Overlay 40mm @ Cracks >25% 2021 2.127 0.077
Z1102 Matuail‐Manikandi‐Shakerjaiga Road Km 002.29‐002.30 S 0.01 3484 Zilla Overlay 40mm @ IRI>12 2021 0.056 0.000
Z1102 Matuail‐Manikandi‐Shakerjaiga Road Km 002.30‐002.50 S 0.20 3484 Zilla Overlay 40mm @ Cracks >25% 2021 1.174 0.140
Z1102 Matuail‐Manikandi‐Shakerjaiga Road Km 002.50‐002.60 S 0.10 3484 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.133
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 000.00‐000.80 L 0.80 13685 Zilla Overlay 40mm @ Traff >=2000 2021 6.113 3.271
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 000.00‐000.80 R 0.80 13685 Zilla Overlay 40mm @ Traff >=2000 2021 6.113 3.292
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 000.80‐001.00 L 0.20 13685 Zilla Rehab 75mm @ IRI 9‐12 2021 5.387 2.918
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 000.80‐001.00 R 0.20 13685 Zilla Rehab 75mm @ IRI 9‐12 2021 5.387 2.920
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 001.00‐001.17 L 0.17 13685 Zilla Overlay 40mm @ Traff >=2000 2021 1.299 3.278
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 001.00‐001.17 R 0.17 13685 Zilla Overlay 40mm @ Traff >=2000 2021 1.299 3.276
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 001.17‐001.50 S 0.33 13685 Zilla Overlay 40mm @ Traff >=2000 2021 2.017 3.882
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 001.50‐001.60 S 0.10 13685 Zilla Rehab 75mm @ IRI 9‐12 2021 2.843 1.962
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 002.30‐002.40 S 0.10 13685 Zilla Rehab 75mm @ IRI 9‐12 2021 2.843 2.152
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 003.80‐004.30 S 0.50 13685 Zilla Full Recon 75mm @ IRI>12 2021 20.648 1.294
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 004.60‐004.80 S 0.20 13685 Zilla Rehab 75mm @ IRI 9‐12 2021 5.687 2.101
Z3002 Dhaka Cantonment V.V.I.P Terminal Road Km 004.80‐005.38 S 0.58 13685 Zilla Overlay 50mm @ IRI 6‐9 2021 5.795 2.842
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 005.00‐005.20 S 0.20 13325 Zilla Full Recon 75mm @ IRI>12 2021 4.703 2.759
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 005.50‐006.00 S 0.50 13325 Zilla Full Recon 75mm @ IRI>12 2021 11.735 2.405
Z3006 West End of Mostofa Kamal Link to Pallabi Road Km 000.00‐005.74 S 5.74 3870 Zilla Overlay 40mm @ Traff >=2000 2021 54.825 0.454
Z3012 Uttara‐Tairmukh Road Km 000.00‐002.93 S 2.92 13325 Zilla Rehab 75mm @ IRI 9‐12 2021 47.537 3.531
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 000.00‐000.20 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.949 0.067
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 000.20‐000.30 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.199
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 000.30‐001.20 S 0.90 2100 Zilla Overlay 40mm @ Traff >=2000 2021 4.134 0.026
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 001.20‐001.50 S 0.30 2100 Zilla Full Recon 75mm @ IRI>12 2021 7.055 1.117
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 001.90‐002.00 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.384 1.120
Page 86 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 002.30‐002.40 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.408 1.145
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 002.50‐002.60 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.408 1.145
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 002.60‐002.80 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.941 0.077
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 002.80‐002.90 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.408 1.078
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 002.90‐003.10 S 0.20 2100 Zilla Seal Coat 2021 0.279 0.213
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 003.10‐003.40 S 0.30 2100 Zilla Full Recon 75mm @ IRI>12 2021 7.225 0.910
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 003.70‐003.80 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.408 1.207
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 003.80‐004.00 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.941 0.000
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 004.00‐004.40 S 0.40 2100 Zilla Full Recon 75mm @ IRI>12 2021 9.633 0.744
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 004.90‐005.20 S 0.30 2100 Zilla Full Recon 75mm @ IRI>12 2021 7.094 0.892
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 005.60‐005.70 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.365 1.193
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 005.90‐006.10 S 0.20 2100 Zilla Full Recon 75mm @ IRI>12 2021 4.730 1.181
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 006.20‐006.70 S 0.50 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 8.141 1.820
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 006.70‐007.20 S 0.50 2100 Zilla Overlay 40mm @ Traff >=2000 2021 2.309 0.039
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 007.20‐007.30 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.365 1.126
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 007.30‐007.70 S 0.40 2100 Zilla Overlay 40mm @ Traff >=2000 2021 1.847 0.048
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 007.70‐008.00 S 0.30 2100 Zilla Full Recon 75mm @ IRI>12 2021 7.133 1.134
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 008.00‐008.40 S 0.40 2100 Zilla Overlay 40mm @ Traff >=2000 2021 1.864 0.000
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 008.40‐008.80 S 0.40 2100 Zilla Full Recon 75mm @ IRI>12 2021 9.546 0.800
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 008.80‐009.00 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.932 0.057
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 009.00‐009.40 S 0.40 2100 Zilla Full Recon 75mm @ IRI>12 2021 9.546 0.893
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 009.40‐009.60 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.932 0.057
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 009.60‐009.80 S 0.20 2100 Zilla Full Recon 75mm @ IRI>12 2021 4.773 0.838
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 009.80‐010.30 S 0.50 2100 Zilla Overlay 40mm @ Traff >=2000 2021 2.331 0.031
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 010.30‐010.40 S 0.10 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 1.643 1.487
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 010.50‐010.70 S 0.20 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 3.286 1.369
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 010.80‐011.50 S 0.70 2100 Zilla Full Recon 75mm @ IRI>12 2021 16.706 1.079
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 011.80‐011.90 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.378 1.195
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 012.20‐012.30 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.378 1.000
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 012.70‐012.90 S 0.20 2100 Zilla Full Recon 75mm @ IRI>12 2021 4.756 1.168
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 013.60‐013.70 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.378 1.157
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 013.90‐014.60 S 0.70 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 11.502 1.607
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 014.70‐014.80 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.447 0.794
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 015.00‐015.10 S 0.10 2100 Zilla Full Recon 75mm @ IRI>12 2021 2.447 0.710
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 015.10‐015.30 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.956 0.052
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 015.30‐016.20 S 0.90 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 15.166 0.943
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 016.20‐016.40 S 0.20 2100 Zilla Overlay 40mm @ Traff >=2000 2021 0.956 0.068
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 016.40‐016.60 S 0.20 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 3.370 1.283
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 016.60‐017.00 S 0.40 2100 Zilla Overlay 40mm @ Traff >=2000 2021 1.912 0.000
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 017.00‐017.20 S 0.20 2100 Zilla Rehab 75mm @ IRI 9‐12 2021 3.370 1.031
Z5069 Turag‐Ruhitpur‐Baorvita Road Km 017.20‐017.53 S 0.33 2100 Zilla Overlay 40mm @ Traff >=2000 2021 1.592 0.067
Z8201 Kamrangirchar‐Kurerghat‐Shialkhali‐Keraniganj  Km 000.00‐007.47 S 7.47 3979 Zilla Rehab 75mm @ IRI 9‐12 2021 97.480 0.892
Dhaka Total 3127.165
Page 87 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Gazipur Division
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 000.00‐009.06 L 9.06 48779 National Overlay 80mm @ IRI 4‐9 2021 233.102 49.653
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 000.00‐029.96 R 29.96 24717 National Overlay 80mm @ IRI 4‐9 2021 517.507 38.472
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 029.96‐055.86 R 25.90 13360 National Overlay 80mm @ IRI 4‐9 2021 313.781 24.397
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 055.86‐056.00 R 0.14 12125 National Full Recon 195mm @ IRI 12 2021 7.675 9.036
N406 Kaliakoir Town Old Section Km 000.00‐000.04 L 0.04 3122 National Overlay 50mm @ IRI 5‐9 2021 0.261 1.045
N406 Kaliakoir Town Old Section Km 000.00‐000.04 R 0.04 3122 National Overlay 50mm @ IRI 5‐9 2021 0.257 1.117
N406 Kaliakoir Town Old Section Km 000.04‐001.20 S 1.16 3122 National Overlay 50mm @ IRI 5‐9 2021 9.052 0.931
N406 Kaliakoir Town Old Section Km 001.20‐001.40 S 0.20 3122 National DBST Traff All 2021 0.731 0.000
N406 Kaliakoir Town Old Section Km 001.40‐002.50 S 1.10 3122 National DBST @ Traff 2000‐4000 2021 3.980 0.464
N406 Kaliakoir Town Old Section Km 002.50‐002.70 S 0.20 3122 National DBST Traff All 2021 0.721 0.000
N406 Kaliakoir Town Old Section Km 002.70‐002.90 S 0.20 3122 National DBST @ 25% Crk 2021 0.721 0.464
N406 Kaliakoir Town Old Section Km 002.90‐003.04 S 0.14 3122 National DBST @ Traff 2000‐4000 2021 0.516 0.779
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 014.09‐015.20 L 1.10 9169 National Rehab 180mm @ IRI 9‐12 2021 46.119 10.224
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 014.09‐015.20 R 1.10 10404 National Overlay 80mm @ IRI 5‐9 2021 13.249 27.001
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 015.20‐015.40 L 0.20 9169 National Full Recon 180mm 2021 10.149 9.515
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 015.20‐015.40 R 0.20 10404 National Full Recon 195mm 2021 10.601 10.138
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 015.40‐016.01 L 0.61 9169 National Overlay 60mm @ IRI 7‐9 2021 5.561 25.232
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 015.40‐016.01 R 0.61 10404 National Overlay 80mm @ IRI 5‐9 2021 7.368 27.237
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 000.00‐000.30 S 0.30 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.764 15.012
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 000.30‐000.50 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 7.282 4.473
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 000.50‐000.70 S 0.20 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.826 15.119
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 000.70‐001.10 S 0.40 8537 Regional Full Recon 150mm @ IRI 12 2021 17.719 5.057
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 001.10‐001.30 S 0.20 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.882 14.767
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 001.30‐001.50 S 0.20 8537 Regional Rehab 150mm @ IRI 9‐12 2021 7.921 5.369
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 001.50‐001.90 S 0.40 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.103 13.462
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 001.90‐002.80 S 0.90 8537 Regional Rehab 150mm @ IRI 9‐12 2021 25.445 4.226
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 002.80‐003.00 S 0.20 8537 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 5.803
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 003.00‐003.10 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 3.277 5.260
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 003.10‐004.00 S 0.90 8537 Regional Rehab 150mm @ IRI 9‐12 2021 23.474 5.573
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 004.00‐004.20 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 6.553 4.978
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 004.20‐004.80 S 0.60 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.053 12.821
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 004.80‐005.00 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 6.553 4.966
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 005.00‐005.40 S 0.40 8537 Regional Rehab 150mm @ IRI 9‐12 2021 13.659 4.682
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 005.45‐005.50 S 0.05 8537 Regional Full Recon 150mm @ IRI 12 2021 2.259 5.178
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 005.50‐006.10 S 0.60 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.470 15.136
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 006.10‐006.60 S 0.50 8537 Regional Rehab 150mm @ IRI 9‐12 2021 17.630 4.900
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 006.60‐007.20 S 0.60 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.262 16.089
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 007.20‐007.30 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 4.066 6.369
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 007.30‐007.50 S 0.20 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.676 16.620
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 007.50‐007.70 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 8.131 5.864
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 007.70‐008.40 S 0.70 8537 Regional DBST @ Traff >6000 2021 2.317 14.370
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 008.40‐008.60 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 8.131 6.147
Page 88 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 008.60‐009.00 S 0.40 8537 Regional Rehab 150mm @ IRI 9‐12 2021 12.944 6.939
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.00‐009.10 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 4.066 6.422
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.10‐009.40 S 0.30 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.515 16.486
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.40‐009.50 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 4.066 6.421
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.50‐009.80 S 0.30 8537 Regional DBST @ Traff >6000 2021 0.993 14.407
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.80‐009.90 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 4.066 6.421
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 009.90‐013.10 S 3.20 8537 Regional DBST @ Traff >6000 2021 10.952 13.902
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 013.10‐013.20 S 0.10 8537 Regional Rehab 150mm @ IRI 9‐12 2021 3.284 7.105
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 013.95‐014.10 S 0.15 8537 Regional Rehab 150mm @ IRI 9‐12 2021 4.861 6.967
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 014.10‐014.20 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 4.126 6.215
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 014.20‐016.30 S 2.10 8537 Regional DBST @ Traff >6000 2021 7.054 13.913
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 016.30‐016.40 S 0.10 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.851 17.225
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 016.40‐016.60 S 0.20 8537 Regional Full Recon 150mm @ IRI 12 2021 8.252 5.959
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 016.60‐017.10 S 0.50 8537 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.590 12.502
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 017.10‐017.20 S 0.10 8537 Regional Full Recon 150mm @ IRI 12 2021 3.216 5.369
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 017.20‐017.30 S 0.10 10529 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.663 13.487
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 017.30‐017.70 S 0.40 10513 Regional Full Recon 150mm @ IRI 12 2021 12.864 4.914
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 017.70‐018.00 S 0.30 10513 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.982 13.329
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 018.01‐019.54 S 1.53 10513 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.164 13.022
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 020.24‐023.09 S 2.86 10513 Regional Overlay 60mm @ IRI 5.5‐9 2021 18.936 12.861
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.09‐023.19 S 0.10 10513 Regional Full Recon 150mm @ IRI 12 2021 3.216 5.465
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.19‐023.29 S 0.10 10513 Regional Rehab 150mm @ IRI 9‐12 2021 2.560 6.296
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.29‐023.39 S 0.10 10513 Regional Full Recon 150mm @ IRI 12 2021 3.216 5.458
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.39‐023.69 S 0.30 10513 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.989 12.582
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.69‐023.89 S 0.20 10513 Regional Full Recon 150mm @ IRI 12 2021 6.432 5.109
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 023.89‐024.39 S 0.50 10513 Regional Rehab 150mm @ IRI 9‐12 2021 12.723 5.559
R302 Kaliganj Bazar Road Km 000.00‐000.50 S 0.50 5291 Regional Rehab 150mm @ IRI 9‐12 2021 13.838 1.201
R302 Kaliganj Bazar Road Km 000.50‐000.80 S 0.30 5291 Regional DBST @ 25% Crk 2021 0.848 1.773
R302 Kaliganj Bazar Road Km 000.80‐001.10 S 0.30 5291 Regional Rehab 150mm @ IRI 9‐12 2021 8.375 0.999
R302 Kaliganj Bazar Road Km 002.30‐003.30 S 1.00 5291 Regional Rehab 150mm @ IRI 9‐12 2021 26.710 1.048
R302 Kaliganj Bazar Road Km 003.40‐003.50 S 0.10 5291 Regional Rehab 150mm @ IRI 9‐12 2021 2.661 1.405
R302 Kaliganj Bazar Road Km 003.70‐004.00 S 0.30 5291 Regional Full Recon 150mm 2021 10.030 1.053
R302 Kaliganj Bazar Road Km 004.00‐004.60 S 0.60 5291 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.128 3.659
R302 Kaliganj Bazar Road Km 004.60‐004.70 S 0.10 5291 Regional Full Recon 150mm 2021 3.337 1.882
R302 Kaliganj Bazar Road Km 004.70‐005.00 S 0.30 5291 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 4.204
R302 Kaliganj Bazar Road Km 005.00‐005.10 S 0.10 5291 Regional Full Recon 150mm 2021 3.337 1.890
R302 Kaliganj Bazar Road Km 005.10‐007.32 S 2.22 5291 Regional DBST @ 25% Crk 2021 6.084 2.639
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 000.00‐000.30 S 0.30 21406 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.941 19.110
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 000.30‐000.80 S 0.50 21406 Regional Rehab 150mm @ IRI 9‐12 2021 21.977 6.031
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 000.80‐001.10 S 0.30 21406 Regional DBST @ Traff >6000 2021 1.260 15.343
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 001.10‐001.20 S 0.10 21406 Regional Full Recon 150mm @ IRI 12 2021 5.158 6.429
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 001.20‐001.80 S 0.60 21406 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.380 16.598
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 001.80‐002.30 S 0.50 21406 Regional Rehab 150mm @ IRI 9‐12 2021 20.486 5.091
Page 89 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 002.30‐002.40 S 0.10 21406 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.063 17.616
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 002.40‐002.50 S 0.10 21406 Regional Full Recon 150mm @ IRI 12 2021 5.158 6.753
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 002.50‐002.70 S 0.20 21406 Regional Rehab 150mm @ IRI 9‐12 2021 8.211 7.443
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 002.70‐003.00 S 0.30 21406 Regional Full Recon 150mm @ IRI 12 2021 15.473 6.678
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 003.00‐005.60 S 2.60 11622 Regional DBST @ Traff >6000 2021 8.156 7.229
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 005.60‐005.70 S 0.10 7871 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.648
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 005.70‐006.70 S 1.00 7871 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.874 4.918
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 006.70‐007.30 S 0.60 7871 Regional Full Recon 150mm @ IRI 12 2021 20.024 1.154
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 007.30‐007.60 S 0.30 7871 Regional DBST @ Traff >6000 2021 0.815 3.827
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 007.60‐007.70 S 0.10 7871 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.676
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 007.70‐007.90 S 0.20 7871 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 5.698
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 007.90‐008.00 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.451
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 008.00‐009.60 S 1.60 7871 Regional DBST @ 25% Crk 2021 4.347 3.768
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 009.60‐009.70 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.481
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 009.70‐009.80 S 0.10 7871 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 7.056
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 009.80‐009.90 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.353
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 009.90‐010.10 S 0.20 7871 Regional DBST @ 25% Crk 2021 0.541 3.693
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 010.10‐010.20 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.337 2.431
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 010.20‐010.30 S 0.10 7871 Regional DBST @ Traff >6000 2021 0.272 4.513
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 010.30‐010.50 S 0.20 7871 Regional Full Recon 150mm @ IRI 12 2021 6.675 2.140
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 010.50‐011.20 S 0.70 7871 Regional DBST @ 25% Crk 2021 1.902 3.256
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 011.20‐011.40 S 0.20 7871 Regional Full Recon 150mm @ IRI 12 2021 6.675 1.952
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 011.40‐011.60 S 0.20 7871 Regional DBST @ Traff >6000 2021 0.543 3.829
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 011.60‐011.60 S 0.01 7871 Regional Full Recon 180mm 2021 0.269 11.383
R311 Joydebpur ‐Ordinance Factory  Km 000.50‐000.90 S 0.40 10777 Regional Full Recon 150mm @ IRI 12 2021 15.825 4.709
R311 Joydebpur ‐Ordinance Factory  Km 001.10‐001.20 S 0.10 10777 Regional Rehab 150mm @ IRI 9‐12 2021 3.149 4.888
R311 Joydebpur ‐Ordinance Factory  Km 001.70‐002.10 S 0.40 10777 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.244 12.796
R311 Joydebpur ‐Ordinance Factory  Km 002.50‐002.60 S 0.10 10777 Regional Rehab 150mm @ IRI 9‐12 2021 3.140 4.752
R311 Joydebpur ‐Ordinance Factory  Km 003.60‐004.10 S 0.50 10777 Regional Rehab 150mm @ IRI 9‐12 2021 15.577 4.431
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 001.70‐001.80 S 0.10 5015 Regional Full Recon 150mm 2021 3.398 1.548
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 003.10‐004.20 S 1.10 5015 Regional DBST @ Traff 4000‐6000 2021 3.043 2.922
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 004.40‐004.50 S 0.10 5015 Regional Full Recon 150mm 2021 3.398 1.399
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 004.50‐004.60 S 0.10 5015 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.701 3.402
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 004.60‐004.80 S 0.20 5015 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 0.987
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 004.80‐005.00 S 0.20 5015 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 2.556
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 005.00‐005.20 S 0.20 5015 Regional DBST @ Traff 4000‐6000 2021 0.553 3.250
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 006.20‐006.50 S 0.30 5015 Regional Full Recon 150mm @ IRI 12 2021 10.012 0.986
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 008.52‐008.72 S 0.20 5015 Regional Full Recon 150mm @ IRI 12 2021 6.796 1.166
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 010.82‐010.92 S 0.10 5015 Regional Full Recon 150mm 2021 3.398 1.235
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 016.72‐016.92 S 0.20 5015 Regional Rehab 150mm @ IRI 9‐12 2021 3.439 1.236
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 016.92‐018.92 S 2.00 5015 Regional DBST @ 25% Crk 2021 3.547 1.684
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 018.92‐019.02 S 0.10 5015 Regional Rehab 150mm @ IRI 9‐12 2021 1.748 1.701
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 019.82‐019.92 S 0.10 5015 Regional Full Recon 150mm 2021 2.197 1.713
Page 90 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 019.92‐020.12 S 0.20 5015 Regional DBST @ 25% Crk 2021 0.358 1.986
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 020.12‐020.42 S 0.30 5015 Regional Full Recon 150mm 2021 6.590 0.987
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 020.42‐020.62 S 0.20 5015 Regional DBST @ Traff 4000‐6000 2021 0.358 2.097
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 020.62‐020.82 S 0.20 5015 Regional Full Recon 150mm 2021 4.393 1.219
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 020.82‐022.02 S 1.20 5015 Regional DBST @ 25% Crk 2021 2.146 1.715
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 022.02‐022.12 S 0.10 5015 Regional Rehab 150mm @ IRI 9‐12 2021 1.748 1.724
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 022.12‐022.72 S 0.60 5015 Regional DBST @ Traff 4000‐6000 2021 1.073 1.945
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 022.72‐022.92 S 0.20 5015 Regional Full Recon 150mm 2021 4.393 1.230
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 022.92‐023.72 S 0.80 5015 Regional DBST @ 25% Crk 2021 1.431 1.636
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 023.72‐023.82 S 0.10 5015 Regional Full Recon 150mm 2021 2.184 1.747
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 023.82‐024.02 S 0.20 5015 Regional DBST @ 25% Crk 2021 0.356 1.959
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 024.02‐024.12 S 0.10 5015 Regional Full Recon 150mm 2021 2.184 1.598
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 024.12‐024.22 S 0.10 5015 Regional DBST @ 25% Crk 2021 0.178 2.870
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 024.22‐024.32 S 0.10 5015 Regional Rehab 150mm @ IRI 9‐12 2021 1.739 1.728
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 024.32‐026.52 S 2.20 5015 Regional DBST @ 25% Crk 2021 3.912 1.311
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 026.52‐026.62 S 0.10 5015 Regional Full Recon 150mm 2021 2.184 1.748
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 026.62‐027.32 S 0.70 5015 Regional DBST @ Traff 4000‐6000 2021 1.245 1.689
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 027.32‐027.42 S 0.10 5015 Regional Full Recon 150mm 2021 2.184 1.746
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 027.42‐028.02 S 0.60 5015 Regional DBST @ Traff 4000‐6000 2021 1.067 1.534
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 028.02‐028.12 S 0.10 5015 Regional Rehab 150mm @ IRI 9‐12 2021 1.739 1.713
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 029.22‐029.32 S 0.10 5015 Regional Full Recon 150mm 2021 2.184 1.717
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 029.32‐033.92 S 4.60 5015 Regional DBST @ 25% Crk 2021 0.091 197.915
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 033.92‐034.32 S 0.40 5015 Regional Full Recon 150mm @ IRI 12 2021 8.981 0.000
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 034.32‐034.52 S 0.20 5015 Regional Full Recon 150mm @ IRI 12 2021 4.490 0.000
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 034.52‐034.72 S 0.20 5015 Regional Full Recon 150mm @ IRI 12 2021 4.490 0.000
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 035.42‐035.52 S 0.10 5015 Regional Full Recon 150mm @ IRI 12 2021 2.245 0.000
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 035.52‐035.72 S 0.20 5015 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.613 4.813
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 035.72‐036.12 S 0.40 5015 Regional Full Recon 150mm 2021 8.665 0.816
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 036.42‐036.82 S 0.40 5015 Regional Full Recon 150mm 2021 8.665 0.998
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 036.92‐037.02 S 0.10 5015 Regional Full Recon 150mm 2021 2.166 1.532
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 037.12‐037.32 S 0.20 5015 Regional Full Recon 150mm 2021 4.333 1.187
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 037.42‐037.62 S 0.20 5015 Regional Full Recon 150mm 2021 4.333 1.276
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 037.82‐037.92 S 0.10 5015 Regional Rehab 150mm @ IRI 9‐12 2021 1.724 1.657
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 037.92‐038.12 S 0.20 5015 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.893 3.619
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 038.12‐038.62 S 0.50 5015 Regional Full Recon 150mm 2021 10.831 0.691
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 038.62‐039.42 S 0.80 5015 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.573 3.254
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 039.82‐040.12 S 0.30 5015 Regional Full Recon 150mm 2021 6.590 0.990
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 040.12‐041.02 S 0.90 5015 Regional DBST @ Traff 4000‐6000 2021 1.609 1.394
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 041.02‐041.32 S 0.30 5015 Regional Full Recon 150mm 2021 6.590 1.094
R313 Mawna‐Kapasia‐Hitirdia‐Monohardi  Km 042.32‐042.35 S 0.03 5015 Regional Full Recon 150mm 2021 0.747 3.547
R314 Gafargaon‐Bormi‐Mawna Road Km 000.00‐000.60 S 0.60 3954 Regional Overlay 50mm @ IRI 7‐9 2021 2.337 3.978
R314 Gafargaon‐Bormi‐Mawna Road Km 000.60‐000.70 S 0.10 3954 Regional Full Recon 135mm 2021 2.027 2.313
R314 Gafargaon‐Bormi‐Mawna Road Km 000.70‐008.20 S 7.50 3954 Regional DBST @ 25% Crk 2021 13.671 3.159
Page 91 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R314 Gafargaon‐Bormi‐Mawna Road Km 008.20‐008.30 S 0.10 3954 Regional Full Recon 135mm 2021 2.011 2.216
R314 Gafargaon‐Bormi‐Mawna Road Km 008.30‐011.80 S 3.50 3954 Regional DBST @ Traff 2000‐4000 2021 6.415 3.366
R314 Gafargaon‐Bormi‐Mawna Road Km 011.80‐012.20 S 0.40 3954 Regional Overlay 50mm @ IRI 7‐9 2021 1.554 4.414
R314 Gafargaon‐Bormi‐Mawna Road Km 012.40‐012.60 S 0.20 3954 Regional Rehab 135mm @ IRI 9‐12 2021 3.358 1.765
R314 Gafargaon‐Bormi‐Mawna Road Km 013.17‐014.89 S 1.72 3954 Regional DBST @ 25% Crk 2021 3.143 3.100
R314 Gafargaon‐Bormi‐Mawna Road Km 015.59‐018.00 S 2.41 3954 Regional DBST @ 25% Crk 2021 4.383 3.156
R314 Gafargaon‐Bormi‐Mawna Road Km 018.00‐018.50 S 0.50 3954 Regional Overlay 50mm @ IRI 7‐9 2021 1.932 4.207
R314 Gafargaon‐Bormi‐Mawna Road Km 018.50‐018.53 S 0.03 3954 Regional Full Recon 135mm 2021 0.643 4.369
R314 Gafargaon‐Bormi‐Mawna Road Km 018.68‐018.71 S 0.04 3954 Regional DBST @ 25% Crk 2021 0.133 1.947
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 000.00‐000.40 S 0.40 1810 Zilla Overlay 40mm @ IRI>12 2021 1.358 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 001.20‐001.40 S 0.20 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.228
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 002.70‐003.30 S 0.60 1810 Zilla Overlay 40mm @ IRI>12 2021 2.038 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 003.54‐003.84 S 0.30 1810 Zilla Overlay 40mm @ IRI>12 2021 1.019 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 003.94‐004.74 S 0.80 1810 Zilla Overlay 40mm @ IRI>12 2021 2.717 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 006.34‐007.34 S 1.00 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 10.775 0.226
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 007.54‐009.64 S 2.10 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 22.627 0.155
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 011.34‐011.94 S 0.60 1810 Zilla Overlay 40mm @ IRI>12 2021 1.834 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 012.04‐012.34 S 0.30 1810 Zilla Full Recon 75mm @ IRI>12 2021 4.695 0.018
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 014.54‐014.84 S 0.30 1810 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.003
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 015.34‐015.44 S 0.10 1810 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.163
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 015.74‐015.84 S 0.10 1810 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.182
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 017.34‐017.74 S 0.40 1810 Zilla Overlay 40mm @ IRI>12 2021 1.290 0.000
Z2034 Lakpur‐Kamargaon‐Katiadi Road Km 017.84‐018.34 S 0.50 1810 Zilla Overlay 40mm @ IRI>12 2021 1.613 0.000
Z3008 Board Bazar‐Zugitalla‐Gazipur Road Km 000.00‐003.50 S 3.50 4454 Zilla Overlay 50mm @ IRI 6‐9 2021 15.509 3.199
Z3008 Board Bazar‐Zugitalla‐Gazipur Road Km 003.50‐006.72 S 3.22 4454 Zilla Overlay 50mm @ Cracking >25% 2021 13.461 1.270
Z3009 Sripur‐Bairagirchala Road Km 000.00‐000.60 S 0.60 1685 Zilla Overlay 40mm @ 1000‐2000 2021 2.776 0.225
Z3009 Sripur‐Bairagirchala Road Km 000.60‐000.70 S 0.10 1685 Zilla Overlay 40mm @ 1000‐2000 2021 0.463 0.000
Z3009 Sripur‐Bairagirchala Road Km 000.70‐001.10 S 0.40 1685 Zilla Overlay 40mm @ 1000‐2000 2021 1.854 0.234
Z3009 Sripur‐Bairagirchala Road Km 001.10‐001.20 S 0.10 1685 Zilla Overlay 40mm @ IRI>12 2021 0.464 0.000
Z3009 Sripur‐Bairagirchala Road Km 002.00‐002.20 S 0.20 1685 Zilla Overlay 40mm @ 1000‐2000 2021 0.927 0.000
Z3009 Sripur‐Bairagirchala Road Km 002.20‐002.50 S 0.30 1685 Zilla Overlay 40mm @ 1000‐2000 2021 1.391 0.225
Z3009 Sripur‐Bairagirchala Road Km 002.70‐003.00 S 0.30 1685 Zilla Overlay 40mm @ 1000‐2000 2021 1.391 0.236
Z3009 Sripur‐Bairagirchala Road Km 003.00‐003.20 S 0.20 1685 Zilla Overlay 40mm @ IRI>12 2021 0.927 0.000
Z3009 Sripur‐Bairagirchala Road Km 003.20‐003.40 S 0.20 1685 Zilla Overlay 40mm @ 1000‐2000 2021 0.761 0.276
Z3009 Sripur‐Bairagirchala Road Km 003.40‐003.60 S 0.20 1685 Zilla Overlay 40mm @ IRI>12 2021 0.649 0.000
Z3009 Sripur‐Bairagirchala Road Km 003.60‐003.80 S 0.20 1685 Zilla Overlay 40mm @ 1000‐2000 2021 0.649 0.068
Z3009 Sripur‐Bairagirchala Road Km 003.80‐004.00 S 0.20 1685 Zilla Overlay 40mm @ IRI>12 2021 0.649 0.000
Z3009 Sripur‐Bairagirchala Road Km 004.00‐004.80 S 0.80 1685 Zilla Overlay 40mm @ 1000‐2000 2021 2.595 0.090
Z3009 Sripur‐Bairagirchala Road Km 004.80‐004.90 S 0.10 1685 Zilla Full Recon 75mm @ IRI>12 2021 1.661 0.013
Z3009 Sripur‐Bairagirchala Road Km 004.90‐005.38 S 0.48 1685 Zilla Overlay 40mm @ 1000‐2000 2021 1.547 0.088
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 000.00‐000.40 S 0.40 1639 Zilla Overlay 40mm @ 1000‐2000 2021 1.885 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 000.40‐000.70 S 0.30 1639 Zilla Full Recon 75mm @ IRI>12 2021 7.042 0.084
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 000.70‐001.10 S 0.40 1639 Zilla Overlay 40mm @ 1000‐2000 2021 1.830 0.000
Page 92 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 001.10‐001.20 S 0.10 1639 Zilla Full Recon 75mm @ IRI>12 2021 2.343 0.162
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 001.20‐002.10 S 0.90 1639 Zilla Overlay 40mm @ 1000‐2000 2021 3.374 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 002.10‐002.40 S 0.30 1639 Zilla Full Recon 75mm @ IRI>12 2021 5.216 0.369
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 002.40‐002.60 S 0.20 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.679 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 002.60‐002.80 S 0.20 1639 Zilla Full Recon 75mm @ IRI>12 2021 3.765 0.347
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 002.80‐003.00 S 0.20 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.914 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.00‐003.10 S 0.10 1639 Zilla Full Recon 75mm @ IRI>12 2021 2.339 0.259
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.10‐003.30 S 0.20 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.914 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.30‐003.50 S 0.20 1639 Zilla Rehab 75mm @ IRI 9‐12 2021 3.220 0.257
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.50‐003.70 S 0.20 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.914 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.70‐003.90 S 0.20 1639 Zilla Rehab 75mm @ IRI 9‐12 2021 3.220 0.239
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 003.90‐004.00 S 0.10 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.457 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 004.00‐004.90 S 0.90 1639 Zilla Rehab 75mm @ IRI 9‐12 2021 9.805 0.192
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 004.90‐005.40 S 0.50 1639 Zilla Overlay 40mm @ 1000‐2000 2021 1.524 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 005.40‐005.50 S 0.10 1639 Zilla Full Recon 75mm @ IRI>12 2021 1.556 0.936
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 005.50‐005.70 S 0.20 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.608 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 005.70‐005.80 S 0.10 1639 Zilla Full Recon 75mm @ IRI>12 2021 1.556 0.853
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 005.80‐006.10 S 0.30 1639 Zilla Rehab 75mm @ IRI 9‐12 2021 3.204 0.236
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 006.10‐006.20 S 0.10 1639 Zilla Full Recon 75mm @ IRI>12 2021 1.556 0.793
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 006.20‐006.30 S 0.10 1639 Zilla Overlay 40mm @ 1000‐2000 2021 0.304 0.000
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 006.30‐006.50 S 0.20 1639 Zilla Rehab 75mm @ IRI 9‐12 2021 2.143 0.464
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 006.80‐007.20 S 0.40 1639 Zilla Full Recon 75mm @ IRI>12 2021 6.242 0.435
Z3010 Kaliganj‐Tumulia‐Ulukhola Road Km 007.80‐008.36 S 0.56 1639 Zilla Full Recon 75mm @ IRI>12 2021 8.699 0.485
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 000.00‐004.00 S 4.00 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 23.220 3.795
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 004.00‐004.50 S 0.50 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 2.679
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 004.50‐005.70 S 1.20 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 3.880
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 005.70‐005.90 S 0.20 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.238
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 006.00‐006.40 S 0.40 8158 Zilla Full Recon 75mm @ IRI>12 2021 9.563 1.905
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 006.50‐007.30 S 0.80 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 11.780 3.415
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 007.40‐007.50 S 0.10 4284 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.940
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 007.50‐007.90 S 0.40 4284 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 2.013
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 007.90‐008.60 S 0.70 8158 Zilla Full Recon 75mm @ IRI>12 2021 15.549 2.488
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 008.80‐009.10 S 0.30 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 3.200
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 009.10‐009.40 S 0.30 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 3.856
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 009.40‐009.60 S 0.20 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.995
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 009.60‐009.70 S 0.10 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 3.616
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 009.70‐009.90 S 0.20 8158 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.227
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 009.90‐011.10 S 1.20 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 6.924 4.806
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 011.10‐011.70 S 0.60 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 9.877 2.925
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 011.70‐012.30 S 0.60 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 5.309
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 012.30‐012.50 S 0.20 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.528
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 012.50‐012.70 S 0.20 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 6.225
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 012.70‐013.00 S 0.30 8158 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.925
Page 93 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 013.10‐013.40 S 0.30 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 3.376
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 013.40‐013.60 S 0.20 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 6.386
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 013.60‐013.70 S 0.10 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 4.109
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 015.07‐016.07 S 1.00 4284 Zilla Full Recon 75mm @ IRI>12 2021 14.389 1.179
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 016.07‐016.67 S 0.60 4284 Zilla Rehab 75mm @ IRI 9‐12 2021 5.747 2.274
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 016.67‐016.77 S 0.10 4284 Zilla Full Recon 75mm @ IRI>12 2021 1.391 2.141
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 016.97‐017.07 S 0.10 4284 Zilla Full Recon 75mm @ IRI>12 2021 1.391 1.810
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 017.37‐017.47 S 0.10 4284 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 3.387
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 017.57‐017.67 S 0.10 4284 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 3.631
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 017.67‐017.97 S 0.30 4284 Zilla Overlay 50mm @ IRI 6‐9 2021 1.008 4.336
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 017.97‐018.27 S 0.30 4284 Zilla Rehab 75mm @ IRI 9‐12 2021 2.918 2.554
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 018.27‐020.57 S 2.30 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 13.283 6.214
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 020.57‐021.27 S 0.70 8158 Zilla Rehab 75mm @ IRI 9‐12 2021 11.523 3.394
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 021.27‐021.77 S 0.50 8158 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 6.253
Z3024 Master Bari‐Mirzapur‐Nuhashpalli‐Mawna Road Km 021.77‐025.33 S 3.56 8158 Zilla Full Recon 75mm @ IRI>12 2021 85.210 2.307
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 000.00‐002.10 S 2.10 3686 Zilla Overlay 40mm @ Cracks >25% 2021 6.042 1.064
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 002.10‐002.20 S 0.10 3686 Zilla Rehab 75mm @ IRI 9‐12 2021 1.069 2.092
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 002.20‐002.70 S 0.50 3686 Zilla Overlay 40mm @ Cracks >25% 2021 1.435 1.079
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 002.70‐002.80 S 0.10 3686 Zilla Full Recon 75mm @ IRI>12 2021 1.552 1.725
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 002.80‐002.90 S 0.10 3686 Zilla Overlay 40mm @ Cracks >25% 2021 0.288 0.446
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 002.90‐003.00 S 0.10 3686 Zilla Full Recon 75mm @ IRI>12 2021 1.574 1.288
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 003.00‐003.90 S 0.90 3686 Zilla Overlay 40mm @ Cracks >25% 2021 2.583 1.040
Z3026 Mawna (M.C Bazar)‐Shishupalli Road Km 003.90‐004.02 S 0.12 3686 Zilla Full Recon 75mm @ IRI>12 2021 1.775 1.458
Gazipur Total 2499.720
Manikganj Division
N503 Utholi‐Aricha Road Km 000.00‐000.20 S 0.20 4570 National Overlay 50mm @ IRI 5‐9 2021 3.150 0.479
N503 Utholi‐Aricha Road Km 001.70‐002.33 L 0.63 4570 National DBST @ Traff 4000‐6000 2021 1.559 3.221
N503 Utholi‐Aricha Road Km 001.70‐002.33 R 0.63 4570 National DBST @ 25% Crk 2021 1.575 3.695
N503 Utholi‐Aricha Road Km 002.33‐002.40 S 0.07 4570 National DBST @ 25% Crk 2021 0.242 3.171
N503 Utholi‐Aricha Road Km 002.40‐002.80 S 0.40 4570 National Full Recon 150mm 2021 16.068 1.070
N503 Utholi‐Aricha Road Km 002.80‐003.27 S 0.47 4570 National Overlay 50mm @ IRI 5‐9 2021 3.267 3.731
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 000.00‐001.30 L 1.30 15672 National Rehab 195mm @ IRI 9‐12 2021 56.444 11.086
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 000.00‐001.30 R 1.30 19114 National Rehab 195mm @ IRI 9‐12 2021 56.838 12.464
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 001.30‐001.50 L 0.20 15672 National Full Recon 195mm @ IRI 12 2021 10.572 10.140
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 001.30‐001.50 R 0.20 19114 National Full Recon 195mm 2021 10.586 11.202
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 001.50‐002.90 L 1.40 15672 National Overlay 80mm @ IRI 5‐9 2021 16.743 27.116
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 001.50‐002.90 R 1.40 19114 National Rehab 195mm @ IRI 9‐12 2021 61.506 12.574
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 002.98‐003.10 L 0.12 9169 National Full Recon 180mm @ IRI 12 2021 5.830 9.872
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 002.98‐003.10 R 0.12 10404 National Full Recon 195mm 2021 13.032 4.226
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 003.10‐004.10 L 1.00 9169 National Overlay 60mm @ IRI 7‐9 2021 9.120 25.604
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 003.10‐004.10 R 1.00 10404 National Overlay 80mm @ IRI 5‐9 2021 12.166 25.960
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.10‐004.20 L 0.10 9169 National Full Recon 180mm 2021 5.109 9.449
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.10‐004.20 R 0.10 10404 National Full Recon 195mm 2021 5.257 10.223
Page 94 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.20‐004.40 L 0.20 9169 National Rehab 180mm @ IRI 9‐12 2021 8.413 9.833
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.20‐004.40 R 0.20 10404 National Rehab 195mm @ IRI 9‐12 2021 8.732 10.533
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.40‐004.50 L 0.10 9169 National Full Recon 180mm 2021 5.109 9.449
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.40‐004.50 R 0.10 10404 National Full Recon 195mm 2021 5.264 10.208
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.50‐004.60 L 0.10 9169 National Overlay 60mm @ IRI 7‐9 2021 0.913 25.019
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.50‐004.60 R 0.10 10404 National Overlay 80mm @ IRI 5‐9 2021 1.197 27.696
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.60‐004.90 L 0.30 9169 National Full Recon 180mm 2021 15.328 9.308
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.60‐004.90 R 0.30 10404 National Full Recon 195mm 2021 15.858 10.029
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.90‐005.50 L 0.60 9169 National Overlay 60mm @ IRI 7‐9 2021 5.442 25.037
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 004.90‐005.50 R 0.60 10404 National Overlay 80mm @ IRI 5‐9 2021 7.181 26.764
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 005.50‐005.70 L 0.20 9169 National Full Recon 180mm 2021 10.149 9.515
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 005.50‐005.70 R 0.20 10404 National Full Recon 195mm 2021 10.572 10.166
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 005.70‐007.60 L 1.90 9169 National Overlay 60mm @ IRI 7‐9 2021 17.318 24.883
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 005.70‐007.60 R 1.90 10404 National Overlay 80mm @ IRI 5‐9 2021 22.884 26.765
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 007.60‐007.80 L 0.20 9169 National Full Recon 180mm 2021 10.219 9.449
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 007.60‐007.80 R 0.20 10404 National Full Recon 195mm 2021 10.659 10.059
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 007.80‐009.90 L 2.10 9169 National Overlay 50mm @ IRI 5‐7 2021 16.052 20.343
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 007.80‐009.90 R 2.10 10404 National Overlay 80mm @ IRI 5‐9 2021 25.236 22.903
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 012.60‐012.70 L 0.10 9169 National Full Recon 180mm 2021 5.074 9.515
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 012.60‐012.70 R 0.10 10404 National Full Recon 195mm 2021 5.257 10.223
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 012.70‐014.09 L 1.39 9169 National Rehab 180mm @ IRI 9‐12 2021 58.275 9.924
N540 Nabinagar‐EPZ‐Kaliakoir (Chandra) Road Km 012.70‐014.09 R 1.39 10404 National Overlay 80mm @ IRI 5‐9 2021 16.626 27.160
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 000.00‐000.40 S 0.40 5207 Regional Rehab 150mm @ IRI 9‐12 2021 10.684 2.103
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 000.40‐000.70 S 0.30 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.030 7.558
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 000.70‐000.80 S 0.10 5207 Regional Rehab 150mm @ IRI 9‐12 2021 2.613 2.728
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 000.80‐001.30 S 0.50 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.384 6.758
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 001.30‐001.40 S 0.10 5207 Regional Full Recon 150mm 2021 3.271 2.570
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 001.40‐001.50 S 0.10 5207 Regional DBST @ 25% Crk 2021 0.266 6.273
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 001.50‐001.70 S 0.20 5207 Regional DBST @ Traff 4000‐6000 2021 0.533 6.571
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 001.70‐001.90 S 0.20 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.349 7.992
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 001.90‐002.20 S 0.30 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.023 7.040
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 002.20‐007.30 S 5.10 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 34.580 6.743
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 007.30‐011.10 S 3.80 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 25.718 6.892
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 011.10‐012.60 S 1.50 5207 Regional DBST @ Traff 4000‐6000 2021 4.004 6.193
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 012.60‐014.10 S 1.50 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.096 6.995
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 014.10‐014.20 S 0.10 5207 Regional Full Recon 150mm 2021 3.271 2.542
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 014.70‐014.90 S 0.20 5207 Regional Full Recon 150mm 2021 6.541 2.286
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 014.90‐016.00 S 1.10 5207 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.403 7.588
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 016.00‐016.70 S 0.70 5207 Regional Rehab 150mm @ IRI 9‐12 2021 17.885 2.427
R503 Kalampur Bus Stand‐Balia‐Warsi‐Mirzapur Road Km 016.70‐018.58 S 1.88 4197 Regional Overlay 60mm @ IRI 7‐9 2021 9.281 3.757
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 002.40‐004.90 S 2.50 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 16.889 4.085
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 013.00‐013.10 S 0.10 5251 Regional Full Recon 150mm 2021 3.404 1.801
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 013.10‐015.30 S 2.20 5251 Regional DBST @ Traff 4000‐6000 2021 6.097 2.363
Page 95 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 015.30‐017.60 S 2.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 16.142 3.516
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 017.60‐018.37 S 0.77 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.392 3.000
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 000.00‐000.10 S 0.10 4103 Zilla Overlay 50mm @ IRI 6‐9 2021 0.568 1.731
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 000.10‐000.20 S 0.10 4103 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.579
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 000.20‐003.20 S 3.00 4103 Zilla Overlay 50mm @ Cracking >25% 2021 16.947 0.869
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 003.20‐003.70 S 0.50 4103 Zilla Rehab 75mm @ IRI 9‐12 2021 8.036 1.290
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 003.70‐004.20 S 0.50 4103 Zilla Overlay 50mm @ IRI 6‐9 2021 2.819 0.906
Z5062 Kawalipara‐Saturia (West Nandeswari) Road Km 004.20‐004.24 S 0.04 4103 Zilla Rehab 75mm @ IRI 9‐12 2021 0.579 1.968
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 000.20‐000.30 S 0.10 2650 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.233
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 001.10‐001.20 S 0.10 2650 Zilla Full Recon 75mm @ IRI>12 2021 2.439 0.083
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 001.20‐001.70 S 0.50 2650 Zilla Overlay 40mm @ Traff >=2000 2021 2.381 0.030
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 001.70‐001.90 S 0.20 2650 Zilla Full Recon 75mm @ IRI>12 2021 4.877 0.322
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 002.90‐003.20 S 0.30 2650 Zilla Full Recon 75mm @ IRI>12 2021 7.316 0.145
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 003.20‐003.50 S 0.30 2650 Zilla Overlay 40mm @ Traff >=2000 2021 1.429 0.054
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 003.50‐003.90 S 0.40 2650 Zilla Full Recon 75mm @ IRI>12 2021 9.737 0.229
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 005.10‐005.30 S 0.20 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 0.558
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 005.40‐005.50 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.352
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 005.60‐005.70 S 0.10 2650 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.220
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 005.70‐006.40 S 0.70 2650 Zilla Overlay 40mm @ Traff >=2000 2021 3.323 0.000
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 006.40‐006.50 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.679 0.312
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 007.60‐007.70 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.214
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 007.70‐008.10 S 0.40 2650 Zilla Overlay 40mm @ Traff >=2000 2021 1.902 0.022
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 008.10‐008.20 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.313
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 008.20‐008.30 S 0.10 2650 Zilla Overlay 40mm @ Traff >=2000 2021 0.475 0.014
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 008.30‐008.40 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.383
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 008.40‐009.40 S 1.00 2650 Zilla Overlay 40mm @ Traff >=2000 2021 4.754 0.039
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 009.40‐009.60 S 0.20 2650 Zilla Overlay 40mm @ Traff >=2000 2021 0.951 0.168
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 010.10‐010.40 S 0.30 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.511
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 010.60‐010.80 S 0.20 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.636
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 011.10‐011.20 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.682 0.491
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 011.20‐011.40 S 0.20 2650 Zilla Overlay 40mm @ Traff >=2000 2021 0.954 0.000
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 011.40‐011.60 S 0.20 2650 Zilla Full Recon 75mm @ IRI>12 2021 4.886 0.296
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 012.20‐012.30 S 0.10 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 1.682 0.208
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 012.50‐012.80 S 0.30 2650 Zilla Full Recon 75mm @ IRI>12 2021 7.329 0.055
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 013.40‐013.70 S 0.30 2650 Zilla Full Recon 75mm @ IRI>12 2021 4.969 0.859
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 013.70‐015.00 S 1.30 2650 Zilla Overlay 40mm @ Traff >=2000 2021 5.459 0.000
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 015.00‐015.10 S 0.10 2650 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.252
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 015.10‐015.30 S 0.20 2650 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.715
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 015.30‐015.80 S 0.50 2650 Zilla Rehab 75mm @ IRI 9‐12 2021 5.687 0.932
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 015.80‐016.30 S 0.50 2650 Zilla Overlay 40mm @ Traff >=2000 2021 1.613 1.196
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 016.30‐016.40 S 0.10 2650 Zilla Full Recon 75mm @ IRI>12 2021 1.765 1.066
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 016.40‐016.50 S 0.10 2650 Zilla Overlay 40mm @ Traff >=2000 2021 0.460 0.000
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 016.50‐016.70 S 0.20 2650 Zilla Full Recon 75mm @ IRI>12 2021 4.712 0.178
Page 96 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5064 Baniajuri‐Zitka‐Harirampur Road Km 016.80‐017.00 S 0.20 2650 Zilla Full Recon 75mm @ IRI>12 2021 4.712 0.345
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 000.00‐000.10 S 0.10 1194 Zilla Seal Coat 2021 0.105 0.171
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 000.10‐000.60 S 0.50 1194 Zilla Overlay 40mm @ IRI>12 2021 1.549 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 001.40‐001.50 S 0.10 1194 Zilla Overlay 40mm @ IRI>12 2021 0.310 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 001.60‐001.80 S 0.20 1194 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.128
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 003.80‐003.86 S 0.06 1194 Zilla Overlay 40mm @ IRI>12 2021 0.189 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 010.50‐010.60 S 0.10 1194 Zilla Overlay 40mm @ IRI>12 2021 0.263 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 011.00‐011.10 S 0.10 1194 Zilla Overlay 40mm @ IRI>12 2021 0.263 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 011.10‐012.60 S 1.50 1194 Zilla Overlay 40mm @ 1000‐2000 2021 3.948 0.000
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 012.60‐012.90 S 0.30 1194 Zilla Rehab 75mm @ IRI 9‐12 2021 2.783 0.147
Z5066 Shibalay‐Nayakandi‐Balla‐Harirampur Road Km 013.50‐013.90 S 0.40 1194 Zilla Overlay 40mm @ IRI>12 2021 1.053 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 014.10‐017.20 S 3.10 4176 Zilla Overlay 40mm @ Traff >=2000 2021 9.498 0.742
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 017.20‐018.00 S 0.80 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 8.620 0.653
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 018.00‐018.30 S 0.30 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 018.30‐019.10 S 0.80 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 8.620 0.549
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 019.10‐020.80 S 1.70 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 6.426 0.574
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 020.80‐021.00 S 0.20 4176 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.583
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 021.00‐023.28 S 2.28 4176 Zilla Overlay 40mm @ Traff >=2000 2021 6.875 0.008
Manikganj Total 961.795
Munshiganj Division
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 011.00‐011.20 S 0.20 13151 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 5.896
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 011.20‐011.40 S 0.20 13151 Regional Full Recon 150mm @ IRI 12 2021 6.675 2.175
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 011.40‐011.50 S 0.10 13151 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 6.930
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 011.50‐011.70 S 0.20 13151 Regional Full Recon 150mm @ IRI 12 2021 6.675 2.125
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 012.56‐012.66 S 0.10 13151 Regional Full Recon 195mm 2021 3.943 2.235
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 012.66‐013.26 S 0.60 13131 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.053 5.477
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 013.26‐013.96 S 0.70 8350 Regional Full Recon 150mm @ IRI 12 2021 22.937 1.384
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 013.96‐014.16 S 0.20 8350 Regional DBST @ 25% Crk 2021 0.534 4.915
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 014.16‐014.96 S 0.80 8350 Regional Rehab 150mm @ IRI 9‐12 2021 21.136 1.518
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 014.96‐015.16 S 0.20 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 7.243
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 015.16‐015.26 S 0.10 8350 Regional Full Recon 180mm 2021 3.849 2.411
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 015.26‐015.46 S 0.20 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 6.986
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 015.46‐016.06 S 0.60 8350 Regional Full Recon 150mm @ IRI 12 2021 20.024 1.278
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 016.06‐016.56 S 0.50 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.434 6.484
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 016.56‐017.36 S 0.80 8350 Regional Full Recon 150mm @ IRI 12 2021 26.456 1.328
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 017.36‐017.46 S 0.10 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.682 7.983
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 017.46‐018.06 S 0.60 8350 Regional Rehab 150mm @ IRI 9‐12 2021 15.794 1.498
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 018.06‐018.16 S 0.10 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.682 7.400
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 018.16‐018.36 S 0.20 8350 Regional Full Recon 150mm @ IRI 12 2021 6.614 2.179
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 018.36‐018.66 S 0.30 8350 Regional DBST @ Traff >6000 2021 0.808 3.868
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 018.66‐019.06 S 0.40 8350 Regional DBST @ Traff >6000 2021 1.075 5.531
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 019.06‐019.16 S 0.10 8350 Regional DBST @ 25% Crk 2021 0.268 4.909
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 019.16‐019.66 S 0.50 8350 Regional Rehab 150mm @ IRI 9‐12 2021 13.113 1.552
Page 97 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 019.66‐019.76 S 0.10 8350 Regional DBST @ 25% Crk 2021 0.268 5.191
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 019.76‐020.26 S 0.50 8350 Regional Full Recon 150mm @ IRI 12 2021 16.475 1.301
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 020.26‐020.66 S 0.40 8350 Regional DBST @ 25% Crk 2021 1.085 4.633
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 020.66‐020.76 S 0.10 8350 Regional Full Recon 180mm 2021 3.849 2.370
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 020.76‐021.06 S 0.30 8350 Regional DBST @ 25% Crk 2021 0.815 4.616
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 021.06‐021.46 S 0.40 8350 Regional Full Recon 150mm @ IRI 12 2021 13.350 1.970
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 021.46‐021.56 S 0.10 8350 Regional DBST @ 25% Crk 2021 0.272 4.824
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 021.56‐021.66 S 0.10 8350 Regional Full Recon 180mm 2021 3.849 2.420
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 021.66‐021.96 S 0.30 8350 Regional DBST @ Traff >6000 2021 0.815 4.091
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 021.96‐022.56 S 0.60 8350 Regional Full Recon 150mm @ IRI 12 2021 20.024 1.220
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 022.56‐022.96 S 0.40 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.752 6.695
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 022.96‐023.06 S 0.10 8350 Regional Full Recon 180mm 2021 3.849 2.407
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 023.46‐023.86 S 0.40 8350 Regional DBST @ Traff >6000 2021 1.087 5.441
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 023.86‐024.36 S 0.50 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 6.305
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 024.36‐024.56 S 0.20 8350 Regional Full Recon 180mm 2021 7.713 2.579
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 024.56‐024.66 S 0.10 8350 Regional DBST @ 25% Crk 2021 0.272 6.190
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 024.66‐025.16 S 0.50 8350 Regional Full Recon 150mm @ IRI 12 2021 16.717 1.743
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 025.16‐026.36 S 1.20 8350 Regional DBST @ 25% Crk 2021 3.266 5.320
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 026.36‐026.46 S 0.10 8350 Regional Full Recon 180mm 2021 3.856 2.829
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 026.46‐026.76 S 0.30 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.068 7.408
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 026.76‐027.06 S 0.30 8350 Regional Full Recon 150mm @ IRI 12 2021 10.049 2.640
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 027.06‐027.26 S 0.20 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.381 7.811
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 027.26‐027.36 S 0.10 8350 Regional Rehab 150mm @ IRI 9‐12 2021 2.666 3.225
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 027.36‐027.96 S 0.60 8350 Regional DBST @ 25% Crk 2021 1.636 5.744
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 027.96‐028.16 S 0.20 8350 Regional Full Recon 180mm 2021 7.727 2.544
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 028.16‐029.46 S 1.30 8350 Regional DBST @ Traff >6000 2021 3.539 6.922
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 029.57‐030.06 S 0.49 8350 Regional DBST @ Traff >6000 2021 1.337 4.307
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 030.06‐030.76 S 0.70 8350 Regional Full Recon 150mm @ IRI 12 2021 23.404 1.720
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 030.76‐031.46 S 0.70 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.834 7.439
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 031.46‐031.66 S 0.20 8350 Regional Full Recon 180mm 2021 7.727 2.583
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 031.66‐032.06 S 0.40 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.762 8.243
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.06‐032.36 S 0.30 8350 Regional Rehab 150mm @ IRI 9‐12 2021 7.998 2.895
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.36‐032.46 S 0.10 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.691 9.755
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.46‐032.56 S 0.10 8350 Regional Full Recon 180mm 2021 3.863 2.978
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.56‐032.66 S 0.10 8350 Regional DBST @ Traff >6000 2021 0.273 6.253
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.66‐032.86 S 0.20 8350 Regional DBST @ Traff >6000 2021 0.545 7.123
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 032.86‐033.26 S 0.40 8350 Regional DBST @ Traff >6000 2021 1.091 4.711
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 033.26‐034.16 S 0.90 8350 Regional Rehab 150mm @ IRI 9‐12 2021 23.995 3.026
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 034.16‐034.96 S 0.80 8350 Regional DBST @ Traff >6000 2021 2.363 5.177
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 034.96‐035.26 S 0.30 8350 Regional DBST @ Traff >6000 2021 0.817 7.690
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 035.26‐035.96 S 0.70 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.825 7.621
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 035.96‐036.16 S 0.20 8350 Regional Full Recon 180mm 2021 7.713 2.400
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 036.16‐036.66 S 0.50 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.447 8.315
Page 98 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 036.66‐036.96 S 0.30 8350 Regional Full Recon 150mm @ IRI 12 2021 10.030 2.395
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 036.96‐037.66 S 0.70 8350 Regional Rehab 150mm @ IRI 9‐12 2021 18.528 1.966
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 037.66‐037.76 S 0.10 8350 Regional Full Recon 180mm 2021 3.835 2.422
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 037.76‐038.06 S 0.30 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.057 6.736
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 038.06‐038.26 S 0.20 8350 Regional Full Recon 150mm @ IRI 12 2021 6.651 2.115
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 038.26‐038.56 S 0.30 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.060 6.256
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 038.56‐039.46 S 0.90 8350 Regional Rehab 150mm @ IRI 9‐12 2021 23.908 2.010
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 039.46‐039.66 S 0.20 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 6.296
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 039.66‐039.76 S 0.10 8350 Regional Full Recon 180mm 2021 3.849 2.335
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 039.76‐040.25 S 0.49 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.358 6.373
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 040.26‐042.29 L 2.03 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.207 7.621
R812 Fatullah‐Munshiganj‐Lohajang‐Mawa  Km 040.26‐042.29 R 2.03 8350 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.954 6.178
R813 Muktarpur Ferry Ghat to Munshiganj Road Km 002.20‐002.30 L 0.10 13184 Regional Full Recon 150mm @ IRI 12 2021 6.432 0.217
R813 Muktarpur Ferry Ghat to Munshiganj Road Km 002.20‐002.30 R 0.10 13184 Regional Full Recon 150mm @ IRI 12 2021 6.675 0.166
R814 R812 to Muktarpur Ferryghat Link Road Km 001.29‐002.03 S 0.75 7698 Regional Rehab 150mm @ IRI 9‐12 2021 24.564 8.930
R821 Sreenagar Bazar bypass Road Km 000.20‐000.30 S 0.10 5450 Regional Full Recon 150mm 2021 3.337 1.352
R822 Sreenagar Upazilla‐UNO Office Road  Km 001.60‐001.80 S 0.20 4933 Regional Full Recon 150mm 2021 4.490 0.940
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 000.00‐000.90 S 0.90 2170 Zilla Overlay 40mm @ Traff >=2000 2021 2.751 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 000.90‐001.30 S 0.40 2170 Zilla Rehab 75mm @ IRI 9‐12 2021 4.310 0.352
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 001.30‐004.80 S 3.50 2170 Zilla Overlay 40mm @ Traff >=2000 2021 12.091 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 004.80‐004.90 S 0.10 2170 Zilla Overlay 40mm @ Traff >=2000 2021 0.475 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 004.90‐005.10 S 0.20 2170 Zilla Overlay 40mm @ Traff >=2000 2021 0.951 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 005.10‐005.20 S 0.10 2170 Zilla Overlay 40mm @ Traff >=2000 2021 0.475 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 005.20‐005.60 S 0.40 2170 Zilla Overlay 40mm @ Traff >=2000 2021 1.902 0.000
Z8003 Srinagar‐Alampur‐Shibrampur‐Nawabganj Road Km 005.60‐006.40 S 0.80 2170 Zilla Overlay 40mm @ Traff >=2000 2021 3.799 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 000.00‐000.10 S 0.10 5364 Zilla Overlay 50mm @ IRI 6‐9 2021 0.651 0.644
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 000.10‐000.50 S 0.40 5364 Zilla Rehab 75mm @ IRI 9‐12 2021 6.740 0.764
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 000.70‐000.80 S 0.10 5364 Zilla Full Recon 75mm @ IRI>12 2021 2.443 0.572
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 001.40‐001.50 S 0.10 5364 Zilla Full Recon 75mm @ IRI>12 2021 2.008 1.245
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 001.50‐001.60 S 0.10 4531 Zilla Overlay 40mm @ Traff >=2000 2021 0.307 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 001.60‐001.80 S 0.20 4531 Zilla Full Recon 75mm @ IRI>12 2021 3.147 0.636
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 001.80‐002.10 S 0.30 4531 Zilla Overlay 50mm @ IRI 6‐9 2021 1.136 1.093
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 002.10‐002.20 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.574 1.028
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 002.20‐002.40 S 0.20 4531 Zilla Overlay 40mm @ Traff >=2000 2021 0.615 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 002.40‐002.50 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.574 0.980
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 002.50‐002.80 S 0.30 5364 Zilla Overlay 50mm @ Cracking >25% 2021 1.638 0.884
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 002.80‐003.00 S 0.20 5364 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.501
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 004.00‐004.20 S 0.20 4531 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 0.743
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 004.20‐005.00 S 0.80 4531 Zilla Overlay 40mm @ Traff >=2000 2021 2.995 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 005.00‐005.20 S 0.20 4531 Zilla Full Recon 75mm @ IRI>12 2021 3.147 0.459
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 005.60‐005.70 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.711
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 005.70‐006.00 S 0.30 4531 Zilla Overlay 40mm @ Traff >=2000 2021 0.914 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 006.00‐006.10 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.131
Page 99 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 006.60‐006.80 S 0.20 4531 Zilla Full Recon 75mm @ IRI>12 2021 3.199 0.622
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 007.60‐007.70 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.600 0.957
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 007.70‐007.80 S 0.10 4531 Zilla Overlay 40mm @ Traff >=2000 2021 0.312 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 007.80‐008.20 S 0.40 4531 Zilla Full Recon 75mm @ IRI>12 2021 6.399 0.461
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 012.00‐012.10 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.034
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 012.10‐012.80 S 0.70 4531 Zilla Overlay 50mm @ Cracking >25% 2021 2.749 0.111
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 012.80‐012.90 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.634 0.977
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 012.90‐013.50 S 0.60 4531 Zilla Overlay 40mm @ Traff >=2000 2021 1.915 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 013.50‐013.60 S 0.10 4531 Zilla Rehab 75mm @ IRI 9‐12 2021 1.125 0.927
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 013.60‐013.80 S 0.20 4531 Zilla Overlay 40mm @ Traff >=2000 2021 0.638 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 013.80‐013.90 S 0.10 4531 Zilla Full Recon 75mm @ IRI>12 2021 1.634 1.047
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 013.90‐014.80 S 0.90 4531 Zilla Overlay 40mm @ Traff >=2000 2021 2.870 0.000
Z8004 Munshiganj‐Kunderbazar‐Srinagar Road Km 014.80‐015.00 S 0.20 4531 Zilla Full Recon 75mm @ IRI>12 2021 3.260 0.629
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 008.20‐008.40 S 0.20 3605 Zilla Full Recon 75mm @ IRI>12 2021 5.686 0.051
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 009.20‐009.90 S 0.70 3605 Zilla Overlay 40mm @ Traff >=2000 2021 3.887 0.467
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 009.90‐010.10 S 0.20 3605 Zilla Overlay 40mm @ Cracks >25% 2021 1.046 0.089
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 010.10‐010.20 S 0.10 3605 Zilla Full Recon 75mm @ IRI>12 2021 2.843 0.307
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 010.20‐010.30 S 0.10 3605 Zilla Overlay 40mm @ Cracks >25% 2021 0.526 0.102
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 010.30‐010.60 S 0.30 3605 Zilla Overlay 40mm @ Traff >=2000 2021 1.666 0.459
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 010.60‐011.60 S 1.00 3605 Zilla Overlay 40mm @ Cracks >25% 2021 4.760 0.069
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 011.60‐011.80 S 0.20 3605 Zilla Full Recon 75mm @ IRI>12 2021 4.695 0.511
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 011.80‐012.00 S 0.20 3605 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.319
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 012.00‐012.30 S 0.30 3605 Zilla Full Recon 75mm @ IRI>12 2021 7.042 0.545
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 012.30‐012.40 S 0.10 3605 Zilla Overlay 40mm @ Cracks >25% 2021 0.434 0.106
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 012.40‐012.50 S 0.10 3605 Zilla Full Recon 75mm @ IRI>12 2021 2.347 0.614
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 012.50‐012.70 S 0.20 3605 Zilla Overlay 40mm @ Cracks >25% 2021 0.868 0.114
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 012.70‐013.00 S 0.30 3605 Zilla Full Recon 75mm @ IRI>12 2021 7.042 0.395
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 013.00‐013.20 S 0.20 3605 Zilla Overlay 40mm @ Cracks >25% 2021 0.868 0.101
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 013.20‐013.30 S 0.10 3605 Zilla Full Recon 75mm @ IRI>12 2021 2.347 0.731
Z8005 Nimtali‐Sirajdikhan‐Kakhali Road Km 013.30‐013.78 S 0.49 3605 Zilla Overlay 40mm @ Traff >=2000 2021 2.224 0.214
Z8009 Dohar (Fultala)‐Srinagar (Hashara) Road Km 000.00‐002.43 S 2.42 4531 Zilla Overlay 40mm @ Traff >=2000 2021 7.329 0.718
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 000.90‐001.00 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.356 1.005
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 001.00‐001.80 S 0.80 5702 Zilla Overlay 40mm @ Traff >=2000 2021 3.681 0.042
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 001.80‐002.00 S 0.20 5702 Zilla Rehab 75mm @ IRI 9‐12 2021 3.228 0.871
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 002.00‐005.10 S 3.10 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 17.577 0.497
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 005.10‐006.30 S 1.20 5702 Zilla Overlay 40mm @ Traff >=2000 2021 5.507 1.216
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 006.30‐007.00 S 0.70 5702 Zilla Overlay 50mm @ Cracking >25% 2021 3.976 0.362
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 007.00‐007.30 S 0.30 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 1.704 1.353
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 007.30‐007.60 S 0.30 5702 Zilla Overlay 50mm @ Cracking >25% 2021 1.704 0.364
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 007.60‐007.70 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.027
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 007.70‐008.10 S 0.40 5702 Zilla Overlay 40mm @ Traff >=2000 2021 1.837 0.000
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 008.10‐008.30 S 0.20 5702 Zilla Full Recon 75mm @ IRI>12 2021 4.703 0.870
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 008.30‐008.80 S 0.50 5702 Zilla Overlay 40mm @ Traff >=2000 2021 2.297 1.110
Page 100 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 008.80‐009.10 S 0.30 5702 Zilla Full Recon 75mm @ IRI>12 2021 7.055 0.810
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 009.10‐009.40 S 0.30 5702 Zilla Overlay 40mm @ Traff >=2000 2021 1.378 0.000
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 009.40‐009.50 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.072
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 009.50‐009.70 S 0.20 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 1.136 0.803
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 009.70‐010.40 S 0.70 5702 Zilla Rehab 75mm @ IRI 9‐12 2021 11.318 1.129
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 010.40‐010.60 S 0.20 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 1.136 0.709
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 010.60‐011.60 S 1.00 5702 Zilla Full Recon 75mm @ IRI>12 2021 23.517 0.652
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 011.60‐011.90 S 0.30 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 1.707 0.613
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 011.90‐012.00 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.356 1.020
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 012.00‐012.70 S 0.70 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 3.984 0.502
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 012.70‐013.30 S 0.60 5702 Zilla Rehab 75mm @ IRI 9‐12 2021 9.733 1.049
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 013.30‐013.50 S 0.20 5702 Zilla Overlay 50mm @ Cracking >25% 2021 1.138 0.080
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 013.50‐013.70 S 0.20 5702 Zilla Rehab 75mm @ IRI 9‐12 2021 3.244 1.266
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 013.70‐014.70 S 1.00 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 5.685 0.529
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 014.70‐014.80 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.086
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 014.80‐014.90 S 0.10 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 0.568 0.707
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 014.90‐015.00 S 0.10 5702 Zilla Full Recon 75mm @ IRI>12 2021 2.352 1.001
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 015.00‐015.30 S 0.30 5702 Zilla Overlay 50mm @ IRI 6‐9 2021 1.704 1.013
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 015.30‐015.70 S 0.40 5702 Zilla Full Recon 75mm @ IRI>12 2021 9.407 0.699
Z8121 Rikkabibazar‐Digirpar‐Banglabazar‐Munshiganj  Km 015.70‐016.42 S 0.72 5702 Zilla Overlay 40mm @ Traff >=2000 2021 3.325 0.000
Z8204 Megula‐Jalalpur‐Gobindapur‐Tikorpur Road Km 007.60‐009.10 S 1.50 2055 Zilla Overlay 40mm @ IRI>12 2021 4.636 0.000
Z8204 Megula‐Jalalpur‐Gobindapur‐Tikorpur Road Km 009.10‐009.63 S 0.53 2055 Zilla Overlay 40mm @ Traff >=2000 2021 1.638 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 000.00‐000.60 S 0.60 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.854 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 000.60‐000.70 S 0.10 2096 Zilla Full Recon 75mm @ IRI>12 2021 1.582 0.297
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 000.70‐002.30 S 1.60 2096 Zilla Overlay 40mm @ Traff >=2000 2021 4.941 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 002.30‐002.40 S 0.10 2096 Zilla Full Recon 75mm @ IRI>12 2021 1.582 0.341
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 002.40‐002.70 S 0.30 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.925 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 002.70‐003.90 S 1.20 2096 Zilla Overlay 40mm @ Traff >=2000 2021 3.698 0.072
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 004.60‐006.60 S 2.00 2096 Zilla Overlay 40mm @ IRI>12 2021 6.161 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 006.60‐006.80 S 0.20 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.616 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 006.80‐007.20 S 0.40 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.233 0.144
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 007.20‐007.30 S 0.10 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.308 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 007.30‐007.80 S 0.50 2096 Zilla Overlay 40mm @ IRI>12 2021 1.541 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 007.80‐007.90 S 0.10 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.308 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 007.90‐008.00 S 0.10 2096 Zilla Full Recon 75mm @ IRI>12 2021 1.578 0.277
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 008.00‐008.40 S 0.40 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.233 0.065
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 008.40‐008.70 S 0.30 2096 Zilla Full Recon 75mm @ IRI>12 2021 4.734 0.088
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 008.70‐009.30 S 0.60 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.854 0.045
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 009.30‐010.00 S 0.70 2096 Zilla Overlay 40mm @ Traff >=2000 2021 2.160 0.067
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 010.00‐010.60 S 0.60 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.854 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 010.60‐010.70 S 0.10 2096 Zilla Full Recon 75mm @ IRI>12 2021 1.582 0.265
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 010.70‐011.10 S 0.40 2096 Zilla Overlay 40mm @ Traff >=2000 2021 1.236 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 011.10‐011.70 S 0.60 2096 Zilla Rehab 75mm @ IRI 9‐12 2021 6.537 0.213
Page 101 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 011.70‐011.90 S 0.20 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.618 0.000
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 011.90‐013.20 S 1.30 2096 Zilla Rehab 75mm @ IRI 9‐12 2021 14.163 0.207
Z8205 Padma By‐Pass (Alternative Road of ZKDS Road) Km 013.20‐013.42 S 0.22 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.689 0.000
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 000.00‐000.80 S 0.80 4408 Zilla Overlay 50mm @ IRI 6‐9 2021 3.074 1.385
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 000.80‐000.90 S 0.10 4408 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.816
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 000.90‐001.10 S 0.20 4408 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 1.298
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 001.10‐001.20 S 0.10 4408 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.556
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 001.60‐001.70 S 0.10 4408 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.611
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 001.70‐002.20 S 0.50 4408 Zilla Overlay 50mm @ IRI 6‐9 2021 1.912 2.372
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 002.20‐002.40 S 0.20 4408 Zilla Full Recon 75mm @ IRI>12 2021 3.173 1.041
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 002.40‐002.70 S 0.30 4408 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.965
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 002.70‐002.80 S 0.10 4408 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.584
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 003.20‐003.30 S 0.10 4408 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.183
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 003.30‐003.70 S 0.40 4408 Zilla Overlay 40mm @ Traff >=2000 2021 1.236 0.276
Z8206 Dohar (Nikra)‐Tikorpur (Galimpur) Road Km 003.70‐004.60 S 0.90 4408 Zilla Rehab 75mm @ IRI 9‐12 2021 9.805 0.958
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 000.00‐000.10 S 0.10 7923 Zilla Overlay 40mm @ Traff >=2000 2021 0.478 0.661
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 000.10‐000.30 S 0.20 7923 Zilla Full Recon 75mm @ IRI>12 2021 4.886 1.618
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 001.30‐001.50 S 0.20 7923 Zilla Rehab 75mm @ IRI 9‐12 2021 3.346 1.732
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 001.50‐001.60 S 0.10 7923 Zilla Overlay 50mm @ Cracking >25% 2021 0.587 0.795
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 001.60‐001.90 S 0.30 7923 Zilla Overlay 50mm @ IRI 6‐9 2021 1.761 3.085
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 001.90‐003.20 S 1.30 7923 Zilla Overlay 40mm @ Traff >=2000 2021 6.187 1.506
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 003.20‐003.30 S 0.10 7923 Zilla Full Recon 75mm @ IRI>12 2021 2.443 1.797
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 004.30‐004.40 S 0.10 7923 Zilla Full Recon 75mm @ IRI>12 2021 2.443 1.743
Z8207 Dohar‐Kartikpur‐Jhowkanda (Mainut) Road Km 004.40‐004.40 S 0.00 7923 Zilla Overlay 40mm @ Traff >=2000 2021 0.005 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 000.00‐000.90 S 0.90 4176 Zilla Full Recon 75mm @ IRI>12 2021 14.632 0.296
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 000.90‐001.00 S 0.10 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 001.00‐001.20 S 0.20 4176 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.438
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 001.20‐001.50 S 0.30 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 0.472
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 001.50‐002.10 S 0.60 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 6.633 0.464
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 002.10‐002.40 S 0.30 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 0.521
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 002.40‐002.70 S 0.30 4176 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.301
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 002.70‐003.00 S 0.30 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 0.278
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 003.00‐003.70 S 0.70 4176 Zilla Full Recon 75mm @ IRI>12 2021 11.259 0.266
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 003.70‐004.10 S 0.40 4176 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 004.10‐004.20 S 0.10 4176 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.991
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 004.20‐004.30 S 0.10 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 004.30‐004.80 S 0.50 4176 Zilla Full Recon 75mm @ IRI>12 2021 8.042 0.458
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 004.80‐005.00 S 0.20 4176 Zilla Overlay 50mm @ Cracking >25% 2021 0.777 0.074
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 005.00‐005.20 S 0.20 4176 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.669
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 006.80‐007.50 S 0.70 4176 Zilla Full Recon 75mm @ IRI>12 2021 10.954 0.360
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 007.50‐007.80 S 0.30 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.012
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 007.80‐008.20 S 0.40 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 4.310 0.801
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 008.20‐008.30 S 0.10 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 0.378 0.056
Page 102 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 008.30‐009.20 S 0.90 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 9.697 0.669
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 009.20‐009.90 S 0.70 4176 Zilla Overlay 40mm @ Traff >=2000 2021 2.139 0.145
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 009.90‐010.00 S 0.10 4176 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.022
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 010.00‐011.00 S 1.00 4176 Zilla Overlay 40mm @ Traff >=2000 2021 3.090 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 011.00‐011.10 S 0.10 4176 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.003
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 011.10‐011.20 S 0.10 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 0.383 1.022
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 011.20‐011.30 S 0.10 4176 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.707
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 011.30‐012.20 S 0.90 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 3.449 0.548
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 012.20‐012.40 S 0.20 4176 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.664
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 012.40‐012.70 S 0.30 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 012.70‐013.10 S 0.40 4176 Zilla Full Recon 75mm @ IRI>12 2021 6.347 0.298
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 013.10‐013.30 S 0.20 4176 Zilla Overlay 50mm @ IRI 6‐9 2021 0.767 0.504
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 013.30‐013.50 S 0.20 4176 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.488
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 013.50‐013.80 S 0.30 4176 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z8209 Dohar‐Kartikpur‐Balirtek Road Km 013.80‐014.10 S 0.30 4176 Zilla Rehab 75mm @ IRI 9‐12 2021 3.288 0.637
Munshiganj Total 1081.369
Narayanganj Division
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 000.00‐000.80 L 0.80 35684 National Overlay 80mm @ IRI 4‐9 2021 14.930 46.124
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 000.00‐000.80 R 0.80 35320 National Rehab 195mm @ IRI 9‐12 2021 60.203 18.470
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 000.80‐001.00 L 0.20 35684 National Full Recon 195mm @ IRI 12 2021 19.567 15.005
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 000.80‐001.00 R 0.20 35320 National Full Recon 195mm @ IRI 12 2021 21.757 13.137
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 001.00‐005.20 L 4.20 21392 National Overlay 80mm @ IRI 4‐9 2021 49.154 22.258
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 001.00‐005.20 R 4.20 29571 National Overlay 80mm @ IRI 4‐9 2021 66.371 35.974
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 005.20‐005.30 L 0.10 19926 National Full Recon 195mm @ IRI 12 2021 5.257 10.194
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 005.20‐005.30 R 0.10 20142 National Full Recon 195mm 2021 6.571 6.982
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 005.30‐007.90 L 2.60 19920 National Overlay 80mm @ IRI 4‐9 2021 41.345 20.660
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 005.30‐007.90 R 2.60 20074 National Overlay 80mm @ IRI 4‐9 2021 46.287 12.825
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 007.90‐008.00 L 0.10 19388 National Full Recon 195mm 2021 5.403 9.080
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 007.90‐008.00 R 0.10 18790 National Full Recon 195mm 2021 5.476 11.626
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 008.00‐020.38 L 12.38 17170 National Overlay 80mm @ IRI 4‐9 2021 153.010 29.683
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 008.00‐020.38 R 12.38 17415 National Overlay 80mm @ IRI 4‐9 2021 155.874 28.404
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 020.38‐020.48 L 0.10 15792 National Full Recon 195mm @ IRI 12 2021 5.403 11.590
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 020.38‐020.48 R 0.10 19641 National Full Recon 195mm @ IRI 12 2021 5.403 9.448
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 020.48‐021.64 L 1.17 15792 National Rehab 195mm @ IRI 9‐12 2021 52.412 13.288
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 020.48‐021.64 R 1.17 19641 National Overlay 80mm @ IRI 4‐9 2021 14.287 23.764
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 021.64‐021.74 L 0.10 15792 National Full Recon 195mm @ IRI 12 2021 5.403 11.590
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 021.64‐021.74 R 0.10 19641 National Full Recon 195mm @ IRI 12 2021 5.403 9.448
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 021.74‐038.04 L 16.30 10481 National Overlay 80mm @ IRI 4‐9 2021 209.046 18.822
N1 Dhaka‐Cumilla‐Chattogram‐Teknaf Road Km 021.74‐038.04 R 16.30 11453 National Overlay 80mm @ IRI 4‐9 2021 194.769 24.376
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 001.80‐002.90 S 1.10 21072 National Rehab 195mm @ IRI 9‐12 2021 47.450 9.734
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 002.90‐003.20 S 0.30 21204 National Full Recon 195mm @ IRI 12 2021 15.332 8.566
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 003.20‐003.80 S 0.60 21204 National Overlay 80mm @ IRI 4‐9 2021 6.943 20.521
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 003.80‐004.20 S 0.40 21204 National Full Recon 195mm @ IRI 12 2021 20.443 8.531
Page 103 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 005.50‐005.60 S 0.10 21204 National Full Recon 195mm 2021 5.330 8.124
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 005.60‐005.80 S 0.20 21204 National Full Recon 195mm 2021 10.659 8.222
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 005.80‐006.08 S 0.28 21204 National Rehab 195mm @ IRI 9‐12 2021 12.296 9.095
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 006.08‐006.10 S 0.02 21204 National Full Recon 195mm 2021 1.189 8.168
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 006.10‐006.30 S 0.20 21204 National Full Recon 195mm @ IRI 12 2021 10.674 7.936
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 006.30‐006.80 S 0.50 21204 National Rehab 195mm @ IRI 9‐12 2021 22.134 8.944
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 006.80‐007.00 S 0.20 21204 National Full Recon 195mm @ IRI 12 2021 10.659 7.948
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 008.10‐009.10 S 1.00 21204 National Overlay 80mm @ IRI 4‐9 2021 12.067 19.370
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 009.10‐009.60 S 0.50 21204 National Rehab 195mm @ IRI 9‐12 2021 22.134 7.943
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 009.60‐009.80 S 0.20 21204 National Rehab 195mm @ IRI 9‐12 2021 8.853 8.811
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 009.80‐010.10 S 0.30 21204 National Full Recon 195mm @ IRI 12 2021 15.936 7.948
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 010.10‐011.00 S 0.90 21204 National Rehab 195mm @ IRI 9‐12 2021 39.796 8.636
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 011.11‐011.28 L 0.17 22062 National Overlay 80mm @ IRI 4‐9 2021 1.909 25.093
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 011.11‐011.28 R 0.17 22062 National Overlay 80mm @ IRI 4‐9 2021 1.909 25.093
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 011.28‐011.49 S 0.21 22597 National Overlay 80mm @ IRI 4‐9 2021 3.992 31.514
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 011.49‐012.40 S 0.91 22123 National Overlay 80mm @ IRI 4‐9 2021 11.008 24.476
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 012.40‐012.60 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 012.60‐013.70 S 1.10 22125 National Rehab 195mm @ IRI 9‐12 2021 48.694 10.435
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 013.70‐013.80 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 013.80‐014.00 S 0.20 22125 National Rehab 195mm @ IRI 9‐12 2021 8.809 10.446
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 014.00‐014.20 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 015.10‐015.40 S 0.30 22125 National Full Recon 195mm 2021 15.989 9.564
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 015.40‐016.00 S 0.60 22125 National Full Recon 195mm 2021 31.978 8.784
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 018.10‐018.50 S 0.40 22125 National Rehab 195mm @ IRI 9‐12 2021 17.707 10.543
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 018.50‐018.66 S 0.17 22125 National Full Recon 195mm 2021 8.794 9.650
R110 Jatrabari‐Demra‐Narayanganj Road Km 009.52‐009.69 S 0.16 11969 Regional Full Recon 150mm @ IRI 12 2021 7.260 7.341
R110 Jatrabari‐Demra‐Narayanganj Road Km 009.69‐009.89 S 0.20 11969 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.836 21.277
R110 Jatrabari‐Demra‐Narayanganj Road Km 009.89‐010.19 S 0.30 11969 Regional Rehab 150mm @ IRI 9‐12 2021 10.636 8.674
R110 Jatrabari‐Demra‐Narayanganj Road Km 010.39‐010.59 S 0.20 19706 Regional Rehab 150mm @ IRI 9‐12 2021 9.438 8.055
R110 Jatrabari‐Demra‐Narayanganj Road Km 010.59‐011.19 S 0.60 19706 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.356 18.840
R110 Jatrabari‐Demra‐Narayanganj Road Km 011.19‐011.29 S 0.10 19706 Regional Full Recon 150mm @ IRI 12 2021 5.887 6.737
R110 Jatrabari‐Demra‐Narayanganj Road Km 011.29‐015.49 S 4.20 19706 Regional Overlay 60mm @ IRI 5.5‐9 2021 49.693 19.703
R110 Jatrabari‐Demra‐Narayanganj Road Km 015.49‐017.89 S 2.40 19706 Regional Overlay 60mm @ IRI 5.5‐9 2021 27.112 22.049
R110 Jatrabari‐Demra‐Narayanganj Road Km 017.89‐017.99 S 0.10 19706 Regional Full Recon 150mm @ IRI 12 2021 5.461 5.867
R110 Jatrabari‐Demra‐Narayanganj Road Km 017.99‐018.93 S 0.94 19706 Regional DBST @ Traff >6000 2021 4.184 13.454
R110 Jatrabari‐Demra‐Narayanganj Road Km 018.19‐018.93 L 0.74 19706 Regional DBST @ Traff >6000 2021 2.065 21.703
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.00‐000.20 S 0.20 11513 Regional DBST @ Traff >6000 2021 0.553 14.390
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.20‐000.30 S 0.10 11513 Regional Full Recon 195mm 2021 4.089 5.802
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.30‐000.40 S 0.10 11513 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.701 16.906
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.40‐000.50 S 0.10 11513 Regional Full Recon 195mm 2021 4.089 5.800
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.50‐000.80 S 0.30 11513 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 16.050
R113 Madanpur‐Madanganj‐Sayedpur Road Km 000.80‐001.00 S 0.20 11513 Regional Full Recon 195mm 2021 8.177 5.244
R113 Madanpur‐Madanganj‐Sayedpur Road Km 001.00‐001.50 S 0.50 11513 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.503 16.211
Page 104 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R113 Madanpur‐Madanganj‐Sayedpur Road Km 001.50‐001.70 S 0.20 11513 Regional Full Recon 195mm 2021 8.177 5.373
R113 Madanpur‐Madanganj‐Sayedpur Road Km 001.70‐003.40 S 1.70 11513 Regional Rehab 150mm @ IRI 9‐12 2021 45.955 6.386
R113 Madanpur‐Madanganj‐Sayedpur Road Km 003.40‐004.60 S 1.20 11513 Regional Rehab 150mm @ IRI 9‐12 2021 32.458 4.962
R113 Madanpur‐Madanganj‐Sayedpur Road Km 004.60‐004.80 S 0.20 11513 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 16.568
R113 Madanpur‐Madanganj‐Sayedpur Road Km 004.80‐004.90 S 0.10 11513 Regional Full Recon 195mm 2021 4.089 5.860
R113 Madanpur‐Madanganj‐Sayedpur Road Km 004.90‐005.30 S 0.40 11513 Regional Full Recon 150mm @ IRI 12 2021 13.592 5.601
R113 Madanpur‐Madanganj‐Sayedpur Road Km 005.30‐005.40 S 0.10 11513 Regional Full Recon 195mm 2021 4.089 5.814
R113 Madanpur‐Madanganj‐Sayedpur Road Km 005.40‐008.20 S 2.80 8253 Regional Rehab 150mm @ IRI 9‐12 2021 74.896 6.123
R113 Madanpur‐Madanganj‐Sayedpur Road Km 008.20‐008.40 S 0.20 7698 Regional Full Recon 150mm @ IRI 12 2021 6.675 6.885
R113 Madanpur‐Madanganj‐Sayedpur Road Km 008.40‐008.60 S 0.20 7698 Regional Full Recon 150mm @ IRI 12 2021 6.675 7.054
R113 Madanpur‐Madanganj‐Sayedpur Road Km 008.60‐008.70 S 0.10 7698 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 8.360
R113 Madanpur‐Madanganj‐Sayedpur Road Km 008.70‐008.90 S 0.20 7698 Regional Full Recon 150mm @ IRI 12 2021 6.675 6.978
R113 Madanpur‐Madanganj‐Sayedpur Road Km 008.90‐010.70 S 1.80 7698 Regional Rehab 150mm @ IRI 9‐12 2021 47.790 7.566
R113 Madanpur‐Madanganj‐Sayedpur Road Km 010.70‐010.90 S 0.20 7698 Regional Full Recon 150mm @ IRI 12 2021 6.675 6.883
R113 Madanpur‐Madanganj‐Sayedpur Road Km 010.90‐012.12 S 1.22 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.408 17.233
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 000.00‐000.05 L 0.05 7207 Regional Rehab 150mm @ IRI 9‐12 2021 1.507 3.418
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 000.00‐000.05 R 0.05 7207 Regional Rehab 150mm @ IRI 9‐12 2021 1.532 3.006
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 000.05‐000.20 S 0.15 7207 Regional Full Recon 150mm @ IRI 12 2021 7.050 0.821
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 000.90‐001.00 S 0.10 7207 Regional Full Recon 180mm 2021 3.877 2.735
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 001.00‐001.10 S 0.10 7207 Regional DBST @ 25% Crk 2021 0.274 6.242
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 001.10‐001.50 S 0.40 7207 Regional Full Recon 150mm @ IRI 12 2021 13.447 2.136
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 001.50‐001.90 S 0.40 7207 Regional DBST @ 25% Crk 2021 1.095 5.335
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 001.90‐002.00 S 0.10 7207 Regional Full Recon 180mm 2021 3.839 2.740
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 002.00‐002.50 S 0.50 7207 Regional DBST @ Traff >6000 2021 1.368 4.309
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 002.50‐002.70 S 0.20 7207 Regional Full Recon 180mm 2021 7.755 2.393
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 002.70‐004.70 S 2.00 7207 Regional DBST @ Traff >6000 2021 5.474 4.535
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 004.70‐004.80 S 0.10 7207 Regional Full Recon 180mm 2021 3.877 2.714
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 004.81‐006.90 S 2.09 7207 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.471 6.628
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 007.14‐007.80 S 0.66 7207 Regional DBST @ 25% Crk 2021 1.828 4.401
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 007.80‐008.10 S 0.30 7207 Regional DBST @ Traff >6000 2021 0.827 6.650
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 008.10‐008.70 S 0.60 7207 Regional DBST @ Traff >6000 2021 1.654 3.794
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 008.70‐009.10 S 0.40 7207 Regional Full Recon 150mm @ IRI 12 2021 13.544 2.552
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 009.33‐009.41 S 0.08 6652 Regional DBST Traff All 2021 0.502 0.000
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 009.43‐009.47 L 0.04 6381 Regional Full Recon 150mm @ IRI 12 2021 1.167 3.319
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 009.43‐009.47 R 0.04 6381 Regional Full Recon 180mm 2021 1.398 2.697
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 009.47‐009.93 S 0.46 6381 Regional Rehab 150mm @ IRI 9‐12 2021 15.430 0.940
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 011.03‐011.23 S 0.20 6381 Regional Rehab 150mm @ IRI 9‐12 2021 5.392 1.533
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 012.53‐012.63 S 0.10 6381 Regional Rehab 150mm @ IRI 9‐12 2021 2.710 1.940
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 012.63‐013.33 S 0.70 6381 Regional DBST @ 25% Crk 2021 1.940 2.312
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 013.33‐013.43 S 0.10 6381 Regional Full Recon 150mm @ IRI 12 2021 3.975 1.271
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 014.63‐014.83 S 0.20 6381 Regional Rehab 150mm @ IRI 9‐12 2021 7.052 0.868
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 014.83‐015.24 S 0.41 6381 Regional DBST @ Traff >6000 2021 1.461 1.621
R201 Tarabo‐Demra Road Km 000.00‐000.20 S 0.20 24476 Regional Full Recon 150mm @ IRI 12 2021 10.146 17.386
Page 105 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R201 Tarabo‐Demra Road Km 000.20‐000.60 S 0.40 23115 Regional DBST @ Traff >6000 2021 1.482 9.940
R201 Tarabo‐Demra Road Km 000.60‐001.00 S 0.40 23115 Regional Full Recon 150mm @ IRI 12 2021 18.083 9.145
R201 Tarabo‐Demra Road Km 001.00‐001.80 S 0.80 23115 Regional Rehab 150mm @ IRI 9‐12 2021 28.246 10.993
R201 Tarabo‐Demra Road Km 001.80‐002.00 S 0.20 23115 Regional Full Recon 150mm @ IRI 12 2021 8.839 9.327
R201 Tarabo‐Demra Road Km 002.00‐002.20 S 0.20 23115 Regional Rehab 150mm @ IRI 9‐12 2021 6.986 10.865
R202 Bhulta‐Rupganj‐Kayetpara‐Rampura Road Km 000.30‐000.90 S 0.60 11324 Regional Full Recon 150mm @ IRI 12 2021 18.459 1.781
R202 Bhulta‐Rupganj‐Kayetpara‐Rampura Road Km 001.30‐001.40 S 0.10 4541 Regional Full Recon 150mm 2021 2.367 1.573
R202 Bhulta‐Rupganj‐Kayetpara‐Rampura Road Km 003.60‐003.90 S 0.30 4541 Regional Overlay 60mm @ IRI 7‐9 2021 1.464 3.175
R202 Bhulta‐Rupganj‐Kayetpara‐Rampura Road Km 003.90‐006.76 S 2.86 4541 Regional Overlay 50mm @ IRI 5‐7 2021 13.849 1.903
R202 Bhulta‐Rupganj‐Kayetpara‐Rampura Road Km 006.76‐008.85 S 2.09 4541 Regional Overlay 60mm @ IRI 7‐9 2021 12.024 2.066
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 000.00‐000.10 S 0.10 8935 Regional Full Recon 150mm @ IRI 12 2021 7.888 0.748
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 000.10‐001.00 S 0.90 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.192 7.212
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 001.00‐001.10 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.112
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 001.40‐001.60 S 0.20 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 8.898
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 001.60‐001.70 S 0.10 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 9.320
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 001.70‐002.20 S 0.50 8935 Regional Full Recon 180mm 2021 19.209 1.884
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 002.20‐003.10 S 0.90 8935 Regional DBST @ Traff >6000 2021 2.445 5.238
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 003.10‐003.20 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.313
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 004.00‐004.20 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.601
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 004.20‐004.50 S 0.30 8935 Regional DBST @ Traff >6000 2021 0.815 5.820
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 004.50‐004.70 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.955
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 005.80‐005.90 S 0.10 8935 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 3.758
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 005.90‐006.20 S 0.30 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.057 8.558
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 006.20‐006.80 S 0.60 8935 Regional Full Recon 150mm @ IRI 12 2021 20.024 1.951
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 008.30‐008.40 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.313
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 008.80‐009.20 S 0.40 8935 Regional Rehab 150mm @ IRI 9‐12 2021 17.485 1.552
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 009.20‐009.40 S 0.20 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.581 6.408
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 009.40‐009.80 S 0.40 8935 Regional Full Recon 150mm @ IRI 12 2021 14.515 3.502
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 009.80‐009.90 S 0.10 8935 Regional DBST @ Traff >6000 2021 0.272 6.509
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 009.90‐010.10 S 0.20 8935 Regional Full Recon 180mm 2021 7.660 2.949
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 010.10‐010.30 S 0.20 8935 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 8.238
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 010.30‐010.40 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.337
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 010.40‐010.60 S 0.20 8935 Regional DBST @ 25% Crk 2021 0.543 5.083
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 010.60‐010.70 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.357
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 010.70‐011.80 S 1.10 8935 Regional DBST @ Traff >6000 2021 2.989 5.164
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 011.80‐011.90 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.341
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 011.90‐012.40 S 0.50 8935 Regional DBST @ Traff >6000 2021 1.359 5.322
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 012.40‐012.70 S 0.30 8935 Regional Full Recon 180mm 2021 11.548 2.669
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 012.70‐013.00 S 0.30 8935 Regional DBST @ Traff >6000 2021 0.815 4.559
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 013.00‐013.20 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.719
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 013.20‐013.40 S 0.20 8935 Regional DBST @ Traff >6000 2021 0.543 5.521
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 013.40‐013.50 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.334
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 014.10‐014.20 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.350
Page 106 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 014.20‐014.30 S 0.10 8935 Regional DBST @ 25% Crk 2021 0.272 6.581
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 014.30‐014.40 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.173
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 014.40‐014.80 S 0.40 8935 Regional DBST @ Traff >6000 2021 1.087 5.127
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 014.80‐015.00 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.950
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 015.00‐015.40 S 0.40 8935 Regional DBST @ 25% Crk 2021 1.095 7.736
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 015.40‐015.60 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.884
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 017.10‐017.20 S 0.10 8935 Regional Full Recon 180mm 2021 3.849 3.314
R203 Bhulta‐Araihazar‐Shibpur‐Radhika Road Km 017.70‐017.90 S 0.20 8935 Regional Full Recon 180mm 2021 7.699 2.916
R802 Majina‐Kayetpara‐Trimohoni Link Road Km 000.03‐003.10 S 3.07 13184 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.850 3.888
Z1061 Madanganj (Minarbari)‐Langalbandh Road Km 000.30‐000.50 S 0.20 3200 Zilla Full Recon 75mm @ IRI>12 2021 3.199 1.374
Z1061 Madanganj (Minarbari)‐Langalbandh Road Km 000.70‐000.90 S 0.20 3200 Zilla Rehab 75mm @ IRI 9‐12 2021 2.203 2.373
Z1061 Madanganj (Minarbari)‐Langalbandh Road Km 001.10‐001.60 S 0.50 3200 Zilla Rehab 75mm @ IRI 9‐12 2021 5.447 1.986
Z1061 Madanganj (Minarbari)‐Langalbandh Road Km 001.80‐001.90 S 0.10 3200 Zilla Full Recon 75mm @ IRI>12 2021 1.582 1.951
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 000.00‐000.10 S 0.10 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.458 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 000.10‐000.20 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 2.347 0.264
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 000.20‐002.70 S 2.50 3670 Zilla Overlay 40mm @ Traff >=2000 2021 8.635 0.176
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 002.70‐002.90 S 0.20 3670 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.862
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 002.90‐003.10 S 0.20 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 003.10‐003.20 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.984
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 003.20‐003.50 S 0.30 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.930 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 003.50‐003.60 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.007
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 003.60‐004.10 S 0.50 3670 Zilla Overlay 40mm @ Traff >=2000 2021 1.549 0.237
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 004.10‐004.20 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.587 1.044
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 004.20‐004.90 S 0.70 3670 Zilla Overlay 40mm @ Traff >=2000 2021 2.169 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 004.90‐005.10 S 0.20 3670 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.655
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.10‐005.30 S 0.20 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.30‐005.50 S 0.20 3670 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 0.484
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.50‐005.60 S 0.10 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.310 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.60‐005.90 S 0.30 3670 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.624
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.90‐005.93 S 0.03 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.102 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 005.93‐012.41 S 6.48 3670 Zilla Full Recon 75mm @ IRI>12 2021 102.549 0.359
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 012.41‐012.91 S 0.50 3670 Zilla Overlay 40mm @ Traff >=2000 2021 1.528 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 012.91‐013.01 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.050
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 013.01‐013.11 S 0.10 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 013.11‐013.21 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.050
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 013.21‐013.51 S 0.30 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.262
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 013.51‐013.61 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.184
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 014.31‐014.41 S 0.10 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 014.41‐015.01 S 0.60 3670 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.703
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 015.91‐016.01 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.027
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 016.01‐016.11 S 0.10 3670 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 016.11‐016.21 S 0.10 3670 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.028
Z1063 Bhaberchar‐Gazaria‐Munshiganj Road Km 016.21‐017.00 S 0.79 3670 Zilla Overlay 40mm @ Traff >=2000 2021 2.421 0.000
Page 107 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z1064 Sonargaon Museum Link Road  Km 000.00‐000.20 S 0.20 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.758 0.004
Z1064 Sonargaon Museum Link Road  Km 000.20‐000.60 S 0.40 4461 Zilla Full Recon 75mm @ IRI>12 2021 6.277 0.884
Z1064 Sonargaon Museum Link Road  Km 000.60‐000.90 S 0.30 4461 Zilla Overlay 50mm @ IRI 6‐9 2021 1.137 0.703
Z1064 Sonargaon Museum Link Road  Km 000.90‐001.10 S 0.20 4461 Zilla Rehab 75mm @ IRI 9‐12 2021 2.161 1.283
Z1064 Sonargaon Museum Link Road  Km 001.10‐001.30 S 0.20 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.754 0.018
Z1064 Sonargaon Museum Link Road  Km 001.30‐001.70 S 0.40 4461 Zilla Rehab 75mm @ IRI 9‐12 2021 4.298 0.999
Z1064 Sonargaon Museum Link Road  Km 001.70‐001.90 S 0.20 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.754 0.313
Z1064 Sonargaon Museum Link Road  Km 001.90‐002.00 S 0.10 4461 Zilla Full Recon 75mm @ IRI>12 2021 1.545 1.105
Z1064 Sonargaon Museum Link Road  Km 002.00‐002.13 S 0.13 4461 Zilla Overlay 40mm @ Traff >=2000 2021 0.405 0.000
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 000.00‐000.70 S 0.70 11425 Zilla Overlay 50mm @ IRI 6‐9 2021 3.932 1.287
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 000.70‐000.80 S 0.10 11425 Zilla Rehab 75mm @ IRI 9‐12 2021 1.604 2.669
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 000.80‐001.60 S 0.80 11425 Zilla Overlay 50mm @ Cracking >25% 2021 4.502 0.903
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 001.60‐001.70 S 0.10 11425 Zilla Full Recon 75mm @ IRI>12 2021 2.343 2.702
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 001.80‐001.90 S 0.10 11425 Zilla Full Recon 75mm @ IRI>12 2021 2.343 2.394
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 001.90‐002.30 S 0.40 11425 Zilla Overlay 40mm @ Traff >=2000 2021 1.826 0.755
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 002.30‐002.80 S 0.50 11425 Zilla Rehab 75mm @ IRI 9‐12 2021 8.036 2.091
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 002.80‐003.20 S 0.40 11425 Zilla Overlay 50mm @ Cracking >25% 2021 2.318 1.058
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 003.20‐003.30 S 0.10 11425 Zilla Full Recon 75mm @ IRI>12 2021 2.956 1.594
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 003.30‐003.50 S 0.20 11425 Zilla Overlay 50mm @ Cracking >25% 2021 1.210 0.491
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 003.50‐003.60 S 0.10 11425 Zilla Full Recon 75mm @ IRI>12 2021 2.334 2.637
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 003.60‐004.20 S 0.60 4461 Zilla Overlay 50mm @ Cracking >25% 2021 2.564 0.216
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 004.20‐004.30 S 0.10 4461 Zilla Full Recon 75mm @ IRI>12 2021 1.574 1.468
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 004.30‐004.40 S 0.10 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.380 0.521
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 004.40‐004.60 S 0.20 4461 Zilla Rehab 75mm @ IRI 9‐12 2021 2.167 1.455
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 004.60‐004.80 S 0.20 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.760 0.369
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 004.80‐005.00 S 0.20 4461 Zilla Full Recon 75mm @ IRI>12 2021 3.147 0.919
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 005.00‐005.20 S 0.20 4461 Zilla Overlay 50mm @ Cracking >25% 2021 0.760 0.008
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 005.20‐005.60 S 0.40 4461 Zilla Full Recon 75mm @ IRI>12 2021 6.381 0.618
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 005.60‐006.10 S 0.50 4461 Zilla Overlay 50mm @ Cracking >25% 2021 1.928 0.078
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 006.10‐006.60 S 0.50 4461 Zilla Full Recon 75mm @ IRI>12 2021 7.998 0.632
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 006.60‐006.70 S 0.10 4461 Zilla Overlay 50mm @ IRI 6‐9 2021 0.386 0.487
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 006.70‐006.90 S 0.20 4461 Zilla Full Recon 75mm @ IRI>12 2021 3.199 0.976
Z1066 Sonargaon College‐Kaikhertek‐Nabiganj Road Km 006.90‐007.10 S 0.20 4461 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 0.568
Z1089 Mograpara‐Anandabazar Road Km 000.00‐000.30 S 0.30 10658 Zilla Rehab 75mm @ IRI 9‐12 2021 4.903 2.083
Z1089 Mograpara‐Anandabazar Road Km 000.30‐000.90 S 0.60 10658 Zilla Overlay 50mm @ IRI 6‐9 2021 3.408 2.930
Z1089 Mograpara‐Anandabazar Road Km 000.90‐001.00 S 0.10 10658 Zilla Full Recon 75mm @ IRI>12 2021 2.352 2.878
Z1089 Mograpara‐Anandabazar Road Km 001.00‐001.30 S 0.30 10658 Zilla Overlay 40mm @ Traff >=2000 2021 1.378 1.972
Z1089 Mograpara‐Anandabazar Road Km 001.30‐001.50 S 0.20 10658 Zilla Full Recon 75mm @ IRI>12 2021 4.712 2.096
Z1089 Mograpara‐Anandabazar Road Km 001.50‐002.54 S 1.03 10658 Zilla Overlay 50mm @ IRI 6‐9 2021 6.064 2.603
Z1089 Mograpara‐Anandabazar Road Km 002.69‐003.70 S 1.01 10658 Zilla Overlay 40mm @ Traff >=2000 2021 4.619 2.142
Z1089 Mograpara‐Anandabazar Road Km 003.70‐004.00 S 0.30 10658 Zilla Rehab 75mm @ IRI 9‐12 2021 4.813 2.171
Z1089 Mograpara‐Anandabazar Road Km 004.00‐006.70 S 2.70 10658 Zilla Overlay 50mm @ IRI 6‐9 2021 15.292 2.666
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 006.80‐006.90 S 0.10 13325 Zilla Full Recon 75mm @ IRI>12 2021 1.782 3.854
Page 108 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 007.20‐007.40 S 0.20 13325 Zilla Full Recon 75mm @ IRI>12 2021 3.565 3.337
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 007.50‐007.60 S 0.10 13325 Zilla Full Recon 75mm @ IRI>12 2021 1.782 4.671
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 007.90‐008.40 S 0.50 13325 Zilla Full Recon 75mm @ IRI>12 2021 11.194 2.442
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 008.70‐008.80 S 0.10 13325 Zilla Full Recon 75mm @ IRI>12 2021 2.352 3.608
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 008.90‐009.10 S 0.20 13325 Zilla Full Recon 75mm @ IRI>12 2021 4.703 2.604
Z3003 Abdullahpur‐Tairmukh‐Ulukhola Road Km 009.40‐009.70 S 0.30 13325 Zilla Full Recon 75mm @ IRI>12 2021 7.068 2.307
Narayanganj Total 2814.681
Narsingdi Division
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 018.66‐018.70 S 0.04 22125 National Full Recon 195mm 2021 1.865 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 018.70‐019.10 S 0.40 22125 National Overlay 80mm @ IRI 4‐9 2021 4.827 24.592
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 019.10‐019.30 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 019.30‐019.40 S 0.10 22125 National Overlay 80mm @ IRI 4‐9 2021 1.207 24.551
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 019.40‐019.60 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 019.60‐019.80 S 0.20 22125 National Rehab 195mm @ IRI 9‐12 2021 8.853 10.549
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 019.80‐020.00 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 020.00‐020.30 S 0.30 22125 National Rehab 195mm @ IRI 9‐12 2021 13.280 10.508
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 020.30‐020.70 S 0.40 22125 National Full Recon 195mm 2021 21.319 9.650
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 020.70‐022.09 S 1.40 22125 National Rehab 195mm @ IRI 9‐12 2021 61.930 10.364
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 022.09‐022.19 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.642
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 022.19‐022.69 S 0.50 22125 National Overlay 80mm @ IRI 4‐9 2021 6.033 24.692
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 022.69‐022.79 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.642
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 022.79‐023.49 S 0.70 22125 National Rehab 195mm @ IRI 9‐12 2021 30.987 10.408
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 023.49‐023.69 S 0.20 22125 National Full Recon 195mm 2021 10.659 9.642
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 023.69‐024.29 S 0.60 22125 National Rehab 195mm @ IRI 9‐12 2021 26.560 10.403
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 024.29‐024.39 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.642
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 024.39‐024.49 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.527
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 024.49‐024.59 S 0.10 22125 National Full Recon 195mm 2021 5.330 9.642
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 024.59‐024.79 S 0.20 22125 National Rehab 195mm @ IRI 9‐12 2021 8.853 10.430
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 024.79‐025.39 S 0.60 22125 National Full Recon 195mm 2021 31.978 8.807
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.39‐025.42 S 0.02 22125 National Overlay 80mm @ IRI 4‐9 2021 0.265 25.048
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.49‐025.69 L 0.20 22125 National Full Recon 195mm @ IRI 12 2021 9.783 10.540
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.49‐025.69 R 0.20 22125 National Rehab 195mm @ IRI 9‐12 2021 8.126 11.671
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.69‐025.99 L 0.30 22125 National Full Recon 195mm @ IRI 12 2021 14.626 10.528
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.69‐025.99 R 0.30 22125 National Full Recon 195mm @ IRI 12 2021 14.626 10.528
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.99‐026.04 L 0.04 22125 National Full Recon 195mm 2021 2.103 11.793
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 025.99‐026.04 R 0.04 22125 National Overlay 80mm @ IRI 4‐9 2021 0.476 28.190
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.04‐026.29 S 0.26 22125 National Rehab 195mm @ IRI 9‐12 2021 12.156 9.704
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.29‐026.49 S 0.20 22125 National Full Recon 195mm 2021 10.864 9.444
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.49‐026.59 S 0.10 22125 National Rehab 195mm @ IRI 9‐12 2021 4.487 10.290
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.59‐026.69 S 0.10 22125 National Full Recon 195mm 2021 5.403 9.500
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.69‐026.99 S 0.30 22125 National Full Recon 195mm 2021 16.208 9.300
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 026.99‐027.29 S 0.30 22125 National Full Recon 195mm 2021 16.208 9.500
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 027.29‐027.38 S 0.08 22125 National Overlay 80mm @ IRI 4‐9 2021 1.015 25.043
Page 109 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 027.39‐027.88 L 0.48 22125 National Rehab 195mm @ IRI 9‐12 2021 19.624 11.924
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 027.39‐027.88 R 0.48 22125 National Rehab 195mm @ IRI 9‐12 2021 19.624 11.924
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 027.88‐029.83 S 1.95 22125 National Rehab 195mm @ IRI 9‐12 2021 109.498 8.156
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 029.89‐030.08 L 0.18 22125 National Rehab 195mm @ IRI 9‐12 2021 7.435 12.075
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 029.89‐030.08 R 0.18 22125 National Rehab 195mm @ IRI 9‐12 2021 7.435 12.014
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 030.08‐030.17 S 0.10 22236 National Overlay 80mm @ IRI 4‐9 2021 22.448 1.752
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 030.17‐030.37 S 0.20 22832 National Full Recon 195mm 2021 204.428 0.253
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 030.37‐030.97 S 0.60 21630 National Overlay 80mm @ IRI 4‐9 2021 18.953 9.970
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 030.97‐031.07 S 0.10 21630 National Full Recon 195mm 2021 5.403 9.957
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 031.07‐031.17 S 0.10 21630 National Rehab 195mm @ IRI 9‐12 2021 4.487 10.801
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 031.17‐031.37 S 0.20 21630 National Full Recon 195mm 2021 10.805 9.957
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 031.37‐031.77 S 0.40 21630 National Full Recon 195mm 2021 21.611 9.759
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 031.77‐031.87 S 0.10 21630 National Full Recon 195mm 2021 5.403 9.957
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 031.87‐032.07 S 0.20 21630 National Rehab 195mm @ IRI 9‐12 2021 8.930 10.890
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 032.07‐032.17 S 0.10 21630 National Full Recon 195mm 2021 5.403 9.957
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 032.17‐032.77 S 0.60 21630 National Overlay 80mm @ IRI 4‐9 2021 7.339 23.236
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 032.77‐033.37 S 0.60 21630 National Full Recon 195mm 2021 32.416 9.380
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 033.37‐033.44 S 0.06 21630 National Overlay 80mm @ IRI 4‐9 2021 0.783 26.471
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 033.54‐033.61 L 0.07 21630 National Overlay 80mm @ IRI 4‐9 2021 1.041 21.411
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 033.54‐033.61 R 0.07 21630 National Overlay 80mm @ IRI 4‐9 2021 1.041 21.411
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 033.61‐035.27 S 1.67 21630 National Overlay 80mm @ IRI 4‐9 2021 20.379 25.643
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 035.27‐035.47 S 0.20 21630 National Full Recon 195mm 2021 10.805 9.923
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 035.47‐035.77 S 0.30 21630 National Rehab 195mm @ IRI 9‐12 2021 13.462 11.016
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 035.77‐035.97 S 0.20 21630 National Full Recon 195mm 2021 12.742 8.240
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 035.97‐036.17 S 0.20 23041 National Overlay 80mm @ IRI 4‐9 2021 3.306 40.362
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 036.17‐036.47 S 0.30 23041 National Full Recon 195mm @ IRI 12 2021 21.903 16.393
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 036.47‐036.82 S 0.34 23041 National Rehab 195mm @ IRI 9‐12 2021 20.921 18.015
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 036.87‐037.37 L 0.50 23041 National Rehab 195mm @ IRI 9‐12 2021 30.017 18.208
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 036.87‐037.37 R 0.50 23041 National Rehab 195mm @ IRI 9‐12 2021 30.017 18.208
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 037.37‐037.97 S 0.61 21630 National Overlay 80mm @ IRI 4‐9 2021 7.400 25.483
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 037.97‐038.07 S 0.10 21630 National Full Recon 195mm 2021 5.403 9.937
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 038.07‐039.37 S 1.30 21630 National Overlay 80mm @ IRI 4‐9 2021 15.902 25.240
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 039.37‐039.57 S 0.20 21630 National Full Recon 195mm 2021 10.805 9.855
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 039.57‐041.47 S 1.90 21630 National Overlay 80mm @ IRI 4‐9 2021 23.292 25.575
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 041.47‐041.57 S 0.10 21630 National Full Recon 195mm 2021 6.571 8.019
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 041.57‐041.87 S 0.30 21630 National Full Recon 195mm 2021 17.479 9.137
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 041.87‐041.97 S 0.10 21630 National Full Recon 195mm 2021 5.476 9.793
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 041.97‐042.27 S 0.30 21630 National Overlay 80mm @ IRI 4‐9 2021 3.719 25.157
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.27‐042.37 S 0.10 21630 National Full Recon 195mm 2021 5.476 9.792
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.37‐042.53 S 0.16 21630 National Overlay 80mm @ IRI 4‐9 2021 1.934 25.419
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.57‐042.77 L 0.20 21630 National Full Recon 195mm 2021 12.163 8.565
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.57‐042.77 R 0.20 21630 National Full Recon 195mm 2021 12.163 8.565
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.77‐042.87 S 0.10 23041 National Full Recon 195mm 2021 10.630 10.751
Page 110 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 042.87‐043.17 S 0.30 20405 National Full Recon 195mm 2021 18.618 10.152
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 043.17‐043.37 S 0.20 12209 National Full Recon 195mm @ IRI 12 2021 10.952 9.663
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 043.37‐046.47 S 3.10 12209 National Overlay 80mm @ IRI 4‐9 2021 38.420 23.593
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 046.47‐046.57 S 0.10 12209 National Full Recon 195mm @ IRI 12 2021 5.476 9.547
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 046.57‐050.17 S 3.60 12209 National Overlay 80mm @ IRI 4‐9 2021 44.656 23.293
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 050.27‐050.39 L 0.12 12209 National Overlay 80mm @ IRI 4‐9 2021 1.728 20.607
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 050.27‐050.39 R 0.12 12209 National Overlay 80mm @ IRI 4‐9 2021 1.728 20.607
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 050.39‐051.67 S 1.28 12209 National Overlay 80mm @ IRI 4‐9 2021 15.869 23.345
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 051.77‐051.87 L 0.10 12209 National Overlay 80mm @ IRI 4‐9 2021 1.362 21.895
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 051.77‐051.87 R 0.10 12209 National Overlay 80mm @ IRI 4‐9 2021 1.362 21.895
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 051.87‐052.17 S 0.30 12209 National Overlay 80mm @ IRI 4‐9 2021 3.670 23.343
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.17‐052.37 S 0.20 12209 National Full Recon 195mm 2021 10.952 9.844
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.37‐052.47 S 0.10 12209 National Overlay 80mm @ IRI 4‐9 2021 1.240 24.446
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.47‐052.57 S 0.10 12209 National Full Recon 195mm 2021 5.476 9.853
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.57‐052.67 S 0.10 12209 National Overlay 80mm @ IRI 4‐9 2021 1.289 23.888
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.67‐052.82 L 0.15 12209 National Overlay 80mm @ IRI 4‐9 2021 1.984 22.292
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.67‐052.82 R 0.15 12209 National Overlay 80mm @ IRI 4‐9 2021 1.984 22.292
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 052.82‐053.77 S 0.95 12209 National Overlay 80mm @ IRI 4‐9 2021 11.728 23.181
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 053.77‐053.97 S 0.20 12209 National Full Recon 195mm @ IRI 12 2021 10.952 9.320
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 053.97‐054.07 S 0.10 12209 National Overlay 80mm @ IRI 4‐9 2021 1.240 24.136
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 054.07‐054.17 S 0.10 12209 National Full Recon 195mm @ IRI 12 2021 5.476 9.663
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 054.17‐054.44 S 0.27 12209 National Rehab 195mm @ IRI 9‐12 2021 12.234 10.459
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 054.47‐054.73 L 0.26 11813 National Overlay 80mm @ IRI 4‐9 2021 3.511 22.589
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 054.47‐054.73 R 0.26 11813 National Overlay 80mm @ IRI 4‐9 2021 3.511 22.589
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 054.73‐058.37 S 3.64 11518 National Overlay 80mm @ IRI 4‐9 2021 45.127 22.377
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 058.37‐058.57 S 0.20 11518 National Full Recon 195mm @ IRI 12 2021 10.952 9.192
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 058.57‐058.88 S 0.31 11518 National Rehab 195mm @ IRI 9‐12 2021 14.099 9.591
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 058.97‐059.13 L 0.16 11518 National Overlay 80mm @ IRI 4‐9 2021 2.116 21.035
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 058.97‐059.13 R 0.16 11518 National Overlay 80mm @ IRI 4‐9 2021 2.116 21.035
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 059.13‐063.17 S 4.04 11518 National Overlay 80mm @ IRI 4‐9 2021 50.074 22.129
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 063.17‐063.27 S 0.10 11518 National Rehab 195mm @ IRI 9‐12 2021 4.548 9.981
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 063.27‐063.47 S 0.20 11518 National Full Recon 195mm @ IRI 12 2021 10.952 9.192
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 063.47‐063.85 S 0.38 11518 National Overlay 80mm @ IRI 4‐9 2021 4.748 22.653
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 063.87‐064.05 L 0.18 11518 National Overlay 80mm @ IRI 4‐9 2021 2.420 20.874
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 063.87‐064.05 R 0.18 11518 National Overlay 80mm @ IRI 4‐9 2021 2.420 20.874
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 064.05‐064.86 S 0.82 11518 National Overlay 80mm @ IRI 4‐9 2021 9.981 22.403
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 064.86‐065.06 S 0.20 11518 National Full Recon 195mm @ IRI 12 2021 10.805 9.323
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 065.06‐065.16 S 0.10 11518 National Overlay 80mm @ IRI 4‐9 2021 1.223 22.803
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 065.16‐065.26 S 0.10 11518 National Full Recon 195mm @ IRI 12 2021 5.403 9.328
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 065.26‐068.06 S 2.80 11518 National Overlay 80mm @ IRI 4‐9 2021 34.238 22.554
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 068.06‐068.14 S 0.08 11518 National Full Recon 195mm @ IRI 12 2021 4.376 9.329
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 068.14‐070.10 S 1.95 11518 National Overlay 80mm @ IRI 4‐9 2021 26.421 21.186
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.14‐070.44 L 0.30 11518 National Overlay 80mm @ IRI 4‐9 2021 3.967 20.809
Page 111 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.14‐070.44 R 0.30 11518 National Overlay 80mm @ IRI 4‐9 2021 3.967 20.809
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.44‐070.54 L 0.10 11518 National Full Recon 195mm 2021 5.841 8.525
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.44‐070.54 R 0.10 11518 National Full Recon 195mm 2021 5.841 8.525
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.54‐070.85 L 0.31 10490 National Rehab 195mm @ IRI 9‐12 2021 14.796 9.388
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.54‐070.85 R 0.31 10490 National Rehab 195mm @ IRI 9‐12 2021 14.796 9.388
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.85‐071.11 S 0.26 10189 National Overlay 80mm @ IRI 4‐9 2021 5.157 14.870
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 071.14‐072.64 L 1.50 10189 National Overlay 80mm @ IRI 4‐9 2021 21.076 20.332
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 071.14‐072.64 R 1.50 10189 National Overlay 80mm @ IRI 4‐9 2021 21.076 20.330
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 072.64‐072.84 L 0.20 10189 National Full Recon 195mm 2021 12.412 8.415
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 072.64‐072.84 R 0.20 10189 National Full Recon 195mm 2021 12.412 8.415
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 072.84‐073.14 L 0.30 10189 National Overlay 80mm @ IRI 4‐9 2021 4.215 20.823
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 072.84‐073.14 R 0.30 10189 National Overlay 80mm @ IRI 4‐9 2021 4.215 20.823
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 073.14‐073.34 L 0.20 10189 National Full Recon 195mm 2021 12.412 8.415
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 073.14‐073.34 R 0.20 10189 National Full Recon 195mm 2021 12.412 8.415
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 073.53‐073.54 L 0.01 16368 National Overlay 80mm @ IRI 4‐9 2021 0.141 20.890
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 073.53‐073.54 R 0.01 16368 National Overlay 80mm @ IRI 4‐9 2021 0.141 20.890
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 015.73‐016.03 S 0.30 6381 Regional Rehab 150mm @ IRI 9‐12 2021 10.578 0.850
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 017.59‐019.23 S 1.64 6381 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.502 3.831
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 019.23‐019.43 S 0.20 6381 Regional DBST @ Traff >6000 2021 0.555 4.794
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 019.43‐019.73 S 0.30 6381 Regional DBST @ 25% Crk 2021 0.833 2.882
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 019.73‐020.03 S 0.30 6381 Regional Full Recon 150mm @ IRI 12 2021 10.231 1.742
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 020.03‐020.93 S 0.90 6381 Regional DBST @ 25% Crk 2021 2.485 2.415
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 020.93‐021.03 S 0.10 6381 Regional Full Recon 180mm 2021 3.891 2.008
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 023.73‐025.33 S 1.60 6381 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.129 4.644
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 025.41‐025.83 S 0.41 6381 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.887 4.951
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 025.83‐025.93 L 0.10 9935 Regional DBST @ 25% Crk 2021 0.267 12.435
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 025.93‐026.22 S 0.29 11969 Regional DBST @ Traff >6000 2021 0.819 22.790
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 026.22‐026.72 S 0.50 11969 Regional Full Recon 150mm @ IRI 12 2021 17.051 9.202
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 026.72‐026.82 S 0.10 11969 Regional Rehab 150mm @ IRI 9‐12 2021 2.714 12.581
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 026.82‐027.12 S 0.30 11969 Regional Full Recon 150mm @ IRI 12 2021 10.231 9.855
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 027.12‐027.59 S 0.47 11969 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.269 26.133
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 027.72‐028.06 S 0.34 11969 Regional Rehab 150mm @ IRI 9‐12 2021 9.196 12.076
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 028.12‐028.22 L 0.10 11969 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.708 26.871
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 028.12‐028.22 R 0.10 3586 Regional Overlay 50mm @ IRI 7‐9 2021 0.127 23.254
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 028.22‐028.72 S 0.50 3586 Regional Overlay 50mm @ IRI 7‐9 2021 1.939 7.078
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 028.72‐028.92 S 0.20 3586 Regional Full Recon 135mm 2021 4.043 2.684
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 028.92‐029.22 S 0.30 3586 Regional Overlay 50mm @ IRI 5‐7 2021 1.166 7.114
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 029.22‐029.42 S 0.20 3586 Regional Full Recon 135mm 2021 4.043 2.567
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 029.42‐029.43 S 0.01 3586 Regional DBST @ 25% Crk 2021 0.027 8.595
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 037.82‐037.92 S 0.10 10759 Regional Full Recon 195mm 2021 4.016 4.909
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 037.92‐038.02 S 0.10 10759 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 6.192
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 038.02‐038.12 S 0.10 10759 Regional Full Recon 195mm 2021 4.016 4.901
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 038.12‐039.02 S 0.90 10759 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.192 13.300
Page 112 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 039.02‐039.12 S 0.10 10759 Regional Full Recon 195mm 2021 4.016 4.909
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 039.12‐039.82 S 0.70 10759 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.816 13.499
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 039.82‐040.12 S 0.30 10759 Regional Full Recon 150mm @ IRI 12 2021 10.197 4.893
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 041.52‐041.62 S 0.10 10759 Regional Full Recon 195mm 2021 4.016 4.750
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 041.62‐042.32 S 0.70 10759 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.816 13.105
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 042.32‐042.42 S 0.10 10759 Regional Full Recon 195mm 2021 4.016 4.906
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 042.42‐042.92 S 0.50 10759 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 13.519
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 042.92‐043.02 S 0.10 11969 Regional Full Recon 150mm @ IRI 12 2021 3.884 8.769
R114 Nayapur‐Araihazar‐Narsingdi‐Raipura Road Km 044.82‐046.44 S 1.62 10759 Regional Rehab 150mm @ IRI 9‐12 2021 43.062 5.629
R210 Shahepratap‐Narsingdi Road Km 000.00‐000.70 S 0.70 15422 Regional Full Recon 150mm @ IRI 12 2021 46.086 1.290
R210 Shahepratap‐Narsingdi Road Km 000.70‐000.90 S 0.20 15422 Regional DBST @ 25% Crk 2021 0.761 5.480
R210 Shahepratap‐Narsingdi Road Km 000.90‐001.10 S 0.20 15422 Regional DBST @ Traff >6000 2021 0.761 8.017
R210 Shahepratap‐Narsingdi Road Km 001.10‐001.28 S 0.18 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.734 7.751
R210 Shahepratap‐Narsingdi Road Km 001.33‐001.38 L 0.05 13081 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.288 10.107
R210 Shahepratap‐Narsingdi Road Km 001.33‐001.38 R 0.05 13081 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.293 10.522
R210 Shahepratap‐Narsingdi Road Km 001.38‐001.40 S 0.02 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.206 5.333
R210 Shahepratap‐Narsingdi Road Km 001.40‐001.50 S 0.10 15422 Regional Full Recon 150mm @ IRI 12 2021 6.250 2.180
R210 Shahepratap‐Narsingdi Road Km 001.50‐001.60 S 0.10 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.289 4.334
R210 Shahepratap‐Narsingdi Road Km 001.60‐001.80 S 0.20 15422 Regional Full Recon 150mm @ IRI 12 2021 12.500 1.866
R210 Shahepratap‐Narsingdi Road Km 001.80‐001.90 S 0.10 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.289 3.998
R210 Shahepratap‐Narsingdi Road Km 001.90‐002.00 S 0.10 15422 Regional Full Recon 150mm @ IRI 12 2021 6.250 2.222
R210 Shahepratap‐Narsingdi Road Km 002.00‐002.30 S 0.30 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.866 3.883
R210 Shahepratap‐Narsingdi Road Km 002.30‐002.40 S 0.10 15422 Regional Full Recon 150mm @ IRI 12 2021 6.250 2.002
R210 Shahepratap‐Narsingdi Road Km 002.80‐003.30 S 0.50 15422 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.430 4.246
R210 Shahepratap‐Narsingdi Road Km 003.80‐003.90 S 0.10 15422 Regional Rehab 150mm @ IRI 9‐12 2021 2.898 5.476
R210 Shahepratap‐Narsingdi Road Km 003.90‐004.40 S 0.50 15422 Regional DBST @ 25% Crk 2021 1.482 7.696
R210 Shahepratap‐Narsingdi Road Km 004.40‐004.99 S 0.60 15422 Regional DBST @ Traff >6000 2021 1.740 11.595
R211 Itakhola‐Motkhola‐Kotiadi Road Km 000.00‐000.06 L 0.06 9946 Regional Rehab 150mm @ IRI 9‐12 2021 2.376 4.954
R211 Itakhola‐Motkhola‐Kotiadi Road Km 000.00‐000.06 R 0.06 9946 Regional Rehab 150mm @ IRI 9‐12 2021 2.318 4.878
R211 Itakhola‐Motkhola‐Kotiadi Road Km 000.06‐033.04 S 32.98 8184 Regional DBST @ Traff >6000 2021 94.003 11.845
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 000.00‐000.10 S 0.10 2833 Regional DBST @ 25% Crk 2021 0.385 0.315
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 000.10‐000.40 S 0.30 2833 Regional DBST Traff All 2021 1.156 0.000
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 001.00‐001.10 S 0.10 2833 Regional Full Recon 135mm 2021 3.038 0.644
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 001.90‐002.00 S 0.10 2833 Regional Full Recon 135mm 2021 3.002 0.693
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 002.00‐002.40 S 0.40 2833 Regional Overlay 50mm @ IRI 5‐7 2021 2.331 1.523
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 002.40‐002.60 S 0.20 2833 Regional Full Recon 135mm 2021 6.065 0.325
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 002.70‐002.90 S 0.20 2833 Regional Full Recon 135mm 2021 6.065 0.430
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 003.30‐003.40 S 0.10 2833 Regional Full Recon 135mm 2021 3.033 0.861
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 005.30‐005.50 S 0.20 2833 Regional Full Recon 135mm 2021 6.196 0.248
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 005.50‐005.70 S 0.20 2833 Regional Overlay 50mm @ IRI 5‐7 2021 1.191 1.270
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 005.70‐005.80 S 0.10 2833 Regional DBST @ Traff 2000‐4000 2021 0.280 1.710
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 005.80‐006.60 S 0.80 2833 Regional DBST @ 25% Crk 2021 2.214 0.564
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 006.60‐006.70 S 0.10 2833 Regional Full Recon 135mm 2021 3.033 0.890
Page 113 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 006.70‐007.00 S 0.30 2833 Regional DBST @ Traff 2000‐4000 2021 0.823 0.866
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 007.00‐007.40 S 0.40 2833 Regional DBST @ Traff 2000‐4000 2021 1.097 0.243
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 007.60‐007.80 S 0.20 2833 Regional DBST @ Traff 2000‐4000 2021 0.548 1.602
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 008.50‐008.60 S 0.10 2833 Regional Full Recon 135mm 2021 3.033 0.376
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 008.80‐009.00 S 0.20 2833 Regional Full Recon 135mm 2021 6.065 0.365
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 009.00‐009.30 S 0.30 2833 Regional DBST @ 25% Crk 2021 0.823 0.442
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 009.30‐009.50 S 0.20 2833 Regional Rehab 135mm @ IRI 9‐12 2021 5.026 0.342
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 009.50‐009.80 S 0.30 2833 Regional Overlay 50mm @ IRI 5‐7 2021 1.751 1.301
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 009.80‐009.90 S 0.10 2833 Regional Full Recon 135mm 2021 3.038 0.888
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 010.00‐010.20 S 0.20 2833 Regional DBST @ Traff 2000‐4000 2021 0.549 1.628
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 010.20‐010.60 S 0.40 2833 Regional DBST @ 25% Crk 2021 1.099 0.618
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 010.60‐010.90 S 0.30 2833 Regional DBST @ Traff 2000‐4000 2021 0.824 1.576
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 011.10‐011.40 S 0.30 2833 Regional Overlay 50mm @ IRI 7‐9 2021 1.751 1.771
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 011.40‐012.00 S 0.60 2833 Regional Overlay 50mm @ IRI 5‐7 2021 3.503 1.560
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 012.00‐012.20 S 0.20 2833 Regional Overlay 50mm @ IRI 7‐9 2021 1.168 1.845
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 012.20‐012.50 S 0.30 2833 Regional DBST @ 25% Crk 2021 0.824 0.640
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 012.50‐012.60 S 0.10 2833 Regional Full Recon 135mm 2021 3.038 0.290
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 014.00‐014.30 S 0.30 2833 Regional Full Recon 135mm 2021 9.065 0.232
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 014.30‐014.50 S 0.20 2833 Regional DBST @ 25% Crk 2021 0.546 0.906
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 014.50‐014.60 S 0.10 2833 Regional Full Recon 135mm 2021 3.022 0.564
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 015.10‐015.20 S 0.10 2833 Regional Full Recon 135mm @ IRI 12 2021 3.065 0.747
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 015.20‐016.00 S 0.80 2833 Regional Overlay 50mm @ IRI 7‐9 2021 4.712 1.882
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 016.00‐016.10 S 0.10 2833 Regional Full Recon 135mm @ IRI 12 2021 3.065 0.737
R212 Akdaria ‐Shekher Bazar‐Agarpur Road Km 016.10‐017.00 S 0.90 2833 Regional DBST @ 25% Crk 2021 2.481 0.570
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 024.39‐024.99 S 0.60 10513 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.998 13.163
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 024.99‐025.19 S 0.20 10513 Regional Full Recon 150mm @ IRI 12 2021 6.432 5.098
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 025.19‐025.29 S 0.10 10513 Regional Full Recon 150mm @ IRI 12 2021 3.216 5.315
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 025.29‐025.39 S 0.10 10513 Regional Full Recon 150mm @ IRI 12 2021 3.337 5.160
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 025.39‐026.32 S 0.93 15064 Regional DBST @ Traff >6000 2021 3.248 9.883
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 026.32‐026.42 S 0.10 15064 Regional Full Recon 150mm @ IRI 12 2021 4.248 9.761
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 026.42‐027.42 S 1.00 15064 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.757 22.240
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 028.25‐030.72 S 2.47 15064 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.595 22.107
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 030.72‐030.82 S 0.10 15064 Regional Full Recon 150mm @ IRI 12 2021 4.248 9.761
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 030.82‐032.12 S 1.30 15064 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.384 22.212
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 032.22‐032.32 S 0.10 15064 Regional Full Recon 150mm @ IRI 12 2021 4.163 9.772
R301 Tongi‐Kaliganj‐Gorashal‐Panchdona Road Km 032.32‐033.04 S 0.72 15064 Regional DBST @ Traff >6000 2021 2.486 10.132
R304 Palas‐Gorashal Road Km 000.00‐000.40 S 0.40 7220 Regional Rehab 150mm @ IRI 9‐12 2021 10.684 0.929
R304 Palas‐Gorashal Road Km 000.40‐000.50 S 0.10 7220 Regional DBST @ Traff >6000 2021 0.262 3.088
R304 Palas‐Gorashal Road Km 000.50‐000.60 S 0.10 7220 Regional Rehab 150mm @ IRI 9‐12 2021 2.560 1.461
R304 Palas‐Gorashal Road Km 001.20‐001.30 S 0.10 7220 Regional Rehab 150mm @ IRI 9‐12 2021 2.560 1.498
R304 Palas‐Gorashal Road Km 002.00‐002.10 S 0.10 7220 Regional Full Recon 180mm 2021 3.709 1.222
R304 Palas‐Gorashal Road Km 002.50‐002.90 S 0.40 7220 Regional Full Recon 150mm @ IRI 12 2021 13.107 0.791
R304 Palas‐Gorashal Road Km 002.90‐004.90 S 2.00 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.761 2.007
Page 114 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R304 Palas‐Gorashal Road Km 004.90‐005.10 S 0.20 7220 Regional Full Recon 150mm @ IRI 12 2021 6.675 0.934
R304 Palas‐Gorashal Road Km 005.30‐006.00 S 0.70 7220 Regional Full Recon 150mm @ IRI 12 2021 23.413 0.465
R304 Palas‐Gorashal Road Km 006.00‐007.20 S 1.20 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.377 1.964
R304 Palas‐Gorashal Road Km 007.20‐007.60 S 0.40 7220 Regional Full Recon 150mm @ IRI 12 2021 13.350 0.755
R304 Palas‐Gorashal Road Km 007.60‐008.10 S 0.50 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 2.970
R304 Palas‐Gorashal Road Km 008.10‐008.20 S 0.10 7220 Regional Full Recon 180mm 2021 3.849 1.234
R304 Palas‐Gorashal Road Km 008.30‐008.40 S 0.10 7220 Regional Full Recon 180mm 2021 3.849 1.087
R304 Palas‐Gorashal Road Km 008.40‐008.70 S 0.30 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 2.692
R304 Palas‐Gorashal Road Km 008.70‐008.80 S 0.10 7220 Regional Full Recon 180mm 2021 3.849 1.153
R304 Palas‐Gorashal Road Km 008.80‐009.00 S 0.20 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 3.281
R304 Palas‐Gorashal Road Km 009.00‐009.40 S 0.40 7220 Regional DBST @ Traff >6000 2021 1.087 2.918
R304 Palas‐Gorashal Road Km 009.60‐009.80 S 0.20 7220 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 1.104
R304 Palas‐Gorashal Road Km 009.80‐010.60 S 0.80 7220 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.498 2.223
R304 Palas‐Gorashal Road Km 010.60‐010.70 S 0.10 7220 Regional Full Recon 180mm 2021 3.849 1.176
R304 Palas‐Gorashal Road Km 010.70‐010.90 S 0.20 7220 Regional DBST @ 25% Crk 2021 0.543 2.093
R304 Palas‐Gorashal Road Km 010.90‐011.30 S 0.40 7220 Regional DBST @ Traff >6000 2021 1.087 2.786
R304 Palas‐Gorashal Road Km 011.30‐011.32 S 0.02 7220 Regional DBST @ 25% Crk 2021 0.054 10.572
R304 Palas‐Gorashal Road Km 011.32‐011.34 L 0.03 7220 Regional DBST @ 25% Crk 2021 0.062 9.842
R304 Palas‐Gorashal Road Km 011.32‐011.34 R 0.03 7220 Regional DBST @ 25% Crk 2021 0.062 8.758
R304 Palas‐Gorashal Road Km 011.60‐011.80 S 0.20 7220 Regional Full Recon 150mm @ IRI 12 2021 6.675 1.093
R305 Panchdona‐Charsindur (Dulalpur) Road Km 000.00‐000.40 S 0.40 4632 Regional DBST @ Traff 4000‐6000 2021 1.087 3.098
R305 Panchdona‐Charsindur (Dulalpur) Road Km 001.10‐001.30 S 0.20 4632 Regional Full Recon 150mm 2021 6.675 1.216
R305 Panchdona‐Charsindur (Dulalpur) Road Km 002.70‐002.80 S 0.10 4632 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.231
R305 Panchdona‐Charsindur (Dulalpur) Road Km 002.80‐002.90 S 0.10 4632 Regional DBST @ 25% Crk 2021 0.272 3.346
R305 Panchdona‐Charsindur (Dulalpur) Road Km 002.90‐003.10 S 0.20 4632 Regional Full Recon 150mm 2021 6.675 1.009
R305 Panchdona‐Charsindur (Dulalpur) Road Km 003.10‐003.30 S 0.20 4632 Regional DBST @ 25% Crk 2021 0.543 2.354
R305 Panchdona‐Charsindur (Dulalpur) Road Km 003.30‐003.70 S 0.40 4632 Regional Rehab 150mm @ IRI 9‐12 2021 10.626 0.985
R305 Panchdona‐Charsindur (Dulalpur) Road Km 003.70‐003.80 S 0.10 4632 Regional DBST @ Traff 4000‐6000 2021 0.272 3.073
R305 Panchdona‐Charsindur (Dulalpur) Road Km 003.80‐003.90 S 0.10 4632 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.316
R305 Panchdona‐Charsindur (Dulalpur) Road Km 003.90‐004.10 S 0.20 4632 Regional DBST @ 25% Crk 2021 0.543 2.353
R305 Panchdona‐Charsindur (Dulalpur) Road Km 004.10‐004.30 S 0.20 4632 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 0.956
R305 Panchdona‐Charsindur (Dulalpur) Road Km 004.30‐004.40 S 0.10 4632 Regional DBST @ Traff 4000‐6000 2021 0.272 3.091
R305 Panchdona‐Charsindur (Dulalpur) Road Km 004.40‐004.90 S 0.50 4632 Regional DBST @ Traff 4000‐6000 2021 1.359 3.262
R305 Panchdona‐Charsindur (Dulalpur) Road Km 004.90‐005.20 S 0.30 4632 Regional DBST @ Traff 4000‐6000 2021 0.815 2.297
R305 Panchdona‐Charsindur (Dulalpur) Road Km 005.20‐005.30 S 0.10 4632 Regional Full Recon 150mm 2021 3.337 1.591
R305 Panchdona‐Charsindur (Dulalpur) Road Km 005.30‐006.00 S 0.70 4632 Regional DBST @ 25% Crk 2021 1.899 1.887
R305 Panchdona‐Charsindur (Dulalpur) Road Km 006.00‐006.40 S 0.40 4632 Regional Full Recon 150mm @ IRI 12 2021 13.350 0.801
R305 Panchdona‐Charsindur (Dulalpur) Road Km 006.40‐006.80 S 0.40 4632 Regional DBST @ Traff 4000‐6000 2021 1.087 2.269
R305 Panchdona‐Charsindur (Dulalpur) Road Km 006.80‐006.90 S 0.10 4632 Regional Full Recon 150mm 2021 3.337 1.601
R305 Panchdona‐Charsindur (Dulalpur) Road Km 006.90‐007.10 S 0.20 4632 Regional DBST @ 25% Crk 2021 0.543 2.529
R305 Panchdona‐Charsindur (Dulalpur) Road Km 007.10‐007.20 S 0.10 4632 Regional Full Recon 150mm 2021 3.337 1.563
R305 Panchdona‐Charsindur (Dulalpur) Road Km 007.20‐007.62 S 0.43 4632 Regional DBST @ 25% Crk 2021 1.155 2.230
R305 Panchdona‐Charsindur (Dulalpur) Road Km 007.62‐007.92 S 0.30 4632 Regional Full Recon 150mm @ IRI 12 2021 10.012 0.901
Page 115 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R305 Panchdona‐Charsindur (Dulalpur) Road Km 007.92‐009.72 S 1.80 4632 Regional Overlay 50mm @ IRI 5‐7 2021 10.389 3.270
R305 Panchdona‐Charsindur (Dulalpur) Road Km 009.72‐009.82 S 0.10 4632 Regional Full Recon 150mm 2021 3.337 1.620
R305 Panchdona‐Charsindur (Dulalpur) Road Km 009.82‐011.92 S 2.10 4632 Regional Overlay 50mm @ IRI 5‐7 2021 12.127 2.945
R305 Panchdona‐Charsindur (Dulalpur) Road Km 011.92‐014.02 S 2.10 4632 Regional Overlay 60mm @ IRI 7‐9 2021 14.442 3.194
R305 Panchdona‐Charsindur (Dulalpur) Road Km 014.02‐014.42 S 0.40 4632 Regional Full Recon 150mm @ IRI 12 2021 13.350 0.795
R305 Panchdona‐Charsindur (Dulalpur) Road Km 015.52‐016.42 S 0.90 4632 Regional DBST @ Traff 4000‐6000 2021 2.445 3.281
R305 Panchdona‐Charsindur (Dulalpur) Road Km 016.42‐018.32 S 1.90 4632 Regional DBST @ 25% Crk 2021 5.160 2.206
R305 Panchdona‐Charsindur (Dulalpur) Road Km 018.32‐018.52 S 0.20 4632 Regional Full Recon 150mm 2021 6.675 1.078
R305 Panchdona‐Charsindur (Dulalpur) Road Km 018.52‐018.77 S 0.25 4632 Regional DBST @ 25% Crk 2021 0.679 2.504
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 028.14‐032.39 S 4.25 7871 Regional DBST @ 25% Crk 2021 11.742 4.133
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 032.39‐032.49 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.374 2.223
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 033.59‐033.69 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.374 2.612
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 033.69‐034.19 S 0.50 7871 Regional DBST @ Traff >6000 2021 1.371 2.961
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 034.19‐034.29 S 0.10 7871 Regional Full Recon 150mm @ IRI 12 2021 3.374 2.831
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 034.29‐035.99 S 1.70 7871 Regional DBST @ 25% Crk 2021 4.669 3.275
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 035.99‐036.19 S 0.20 7871 Regional Rehab 150mm @ IRI 9‐12 2021 5.371 2.420
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 036.19‐036.69 S 0.50 7871 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.478 5.310
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 036.69‐036.89 S 0.20 7871 Regional Full Recon 150mm @ IRI 12 2021 6.748 2.507
R310 Joydebpur‐Gazipur‐Azmatpur‐Itakhola Road Km 036.89‐037.34 S 0.45 7871 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.116 5.772
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 000.00‐000.60 S 0.60 1810 Zilla Overlay 40mm @ 1000‐2000 2021 1.686 0.048
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 000.60‐001.00 S 0.40 1810 Zilla Full Recon 75mm @ IRI>12 2021 5.738 0.028
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 001.00‐001.10 S 0.10 1810 Zilla Overlay 40mm @ 1000‐2000 2021 0.280 0.000
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 001.10‐001.40 S 0.30 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 2.963 0.171
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 001.40‐001.60 S 0.20 1810 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 001.60‐001.70 S 0.10 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.157
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 001.70‐002.20 S 0.50 1810 Zilla Overlay 40mm @ 1000‐2000 2021 1.568 0.013
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 002.20‐002.60 S 0.40 1810 Zilla Overlay 40mm @ IRI>12 2021 1.257 0.000
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 002.60‐002.70 S 0.10 1810 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 002.70‐003.10 S 0.40 1810 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.118
Z2032 Belabo‐Batiban‐Kuliarchar Road Km 003.10‐005.71 S 2.61 1810 Zilla Overlay 40mm @ 1000‐2000 2021 7.810 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 000.00‐000.70 S 0.70 1059 Zilla Overlay 40mm @ 1000‐2000 2021 2.217 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 000.70‐001.20 S 0.50 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.532 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 001.20‐001.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.306 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 001.30‐001.90 S 0.60 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.895 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 001.90‐002.00 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.315 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.00‐002.20 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.637 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.20‐002.40 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.637 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.40‐002.60 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.637 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.60‐002.80 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.637 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.80‐002.90 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.318 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 002.90‐003.10 S 0.20 1059 Zilla Overlay 40mm @ IRI>12 2021 0.637 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 004.50‐005.00 S 0.50 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.613 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 005.00‐005.20 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Page 116 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 005.20‐005.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 005.30‐005.40 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 005.40‐005.80 S 0.40 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.270 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 005.80‐005.90 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.316 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 006.60‐006.70 S 0.10 1059 Zilla Overlay 40mm @ IRI>12 2021 0.316 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 006.90‐007.10 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.632 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 007.10‐007.90 S 0.80 1059 Zilla Overlay 40mm @ 1000‐2000 2021 2.493 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 007.90‐008.00 S 0.10 1059 Zilla Overlay 40mm @ IRI>12 2021 0.311 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 008.00‐008.20 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 008.20‐008.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 008.30‐008.70 S 0.40 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 008.70‐009.20 S 0.50 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.507 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 009.20‐009.70 S 0.50 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.486 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 009.70‐009.80 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.297 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 009.80‐009.90 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.297 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 009.90‐010.20 S 0.30 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.888 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 013.70‐013.80 S 0.10 1059 Zilla Overlay 40mm @ IRI>12 2021 0.255 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 013.90‐014.00 S 0.10 1059 Zilla Overlay 40mm @ IRI>12 2021 0.252 0.000
Z2035 Shibpur‐Daripura‐Kamrabo Road Km 014.40‐015.30 S 0.90 1059 Zilla Overlay 40mm @ IRI>12 2021 2.544 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 000.30‐000.60 S 0.30 1059 Zilla Overlay 40mm @ IRI>12 2021 0.922 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 000.60‐000.70 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.307 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 000.70‐001.20 S 0.50 1059 Zilla Overlay 40mm @ IRI>12 2021 1.528 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 002.30‐002.50 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.608 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 002.50‐002.70 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.611 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 003.00‐003.20 S 0.20 1059 Zilla Overlay 40mm @ IRI>12 2021 0.613 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 003.20‐003.60 S 0.40 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.226 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 003.60‐004.20 S 0.60 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.839 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 004.20‐004.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.306 0.200
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 005.20‐005.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.301 0.185
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 005.30‐005.70 S 0.40 1059 Zilla Overlay 40mm @ 1000‐2000 2021 1.202 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 005.80‐005.90 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.301 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 005.90‐006.10 S 0.20 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.598 0.043
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 006.10‐006.40 S 0.30 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.902 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 008.20‐008.30 S 0.10 1059 Zilla Overlay 40mm @ 1000‐2000 2021 0.303 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 010.30‐010.40 S 0.10 1059 Zilla Overlay 40mm @ IRI>12 2021 0.300 0.000
Z2036 Shibpur‐Bannerbazar‐Palas Road Km 011.00‐011.90 S 0.90 1059 Zilla Overlay 40mm @ 1000‐2000 2021 2.781 0.000
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 000.00‐000.20 S 0.20 2902 Zilla Overlay 40mm @ Traff >=2000 2021 2.219 0.000
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 000.20‐000.40 S 0.20 2902 Zilla Full Recon 75mm @ IRI>12 2021 3.217 1.125
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 000.40‐002.40 S 2.00 2902 Zilla Overlay 40mm @ Traff >=2000 2021 6.483 0.526
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 002.40‐002.50 S 0.10 2902 Zilla Full Recon 75mm @ IRI>12 2021 2.978 0.176
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 002.50‐004.80 S 2.30 2902 Zilla Overlay 40mm @ Traff >=2000 2021 8.514 0.007
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 004.80‐004.90 S 0.10 2902 Zilla Full Recon 75mm @ IRI>12 2021 2.260 0.648
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 004.90‐005.00 S 0.10 2902 Zilla Overlay 40mm @ Traff >=2000 2021 0.446 0.241
Page 117 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 005.00‐005.08 L 0.08 2902 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.326
Z2037 Gorashal‐Daladia‐Palash‐Fulbaria‐Charsindur Km 005.08‐012.11 S 7.03 2902 Zilla Rehab 75mm @ IRI 9‐12 2021 69.175 1.025
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 000.00‐000.03 L 0.03 4873 Zilla Overlay 40mm @ Traff >=2000 2021 0.108 0.000
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 000.03‐000.90 S 0.88 4873 Zilla Overlay 50mm @ Cracking >25% 2021 5.154 0.207
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 000.90‐001.00 S 0.10 4873 Zilla Full Recon 75mm @ IRI>12 2021 2.352 0.712
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 001.00‐001.40 S 0.40 4873 Zilla Overlay 50mm @ Cracking >25% 2021 2.121 0.460
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 001.40‐001.50 S 0.10 4873 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.585
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 001.50‐002.80 S 1.30 4873 Zilla Overlay 50mm @ IRI 6‐9 2021 7.638 0.217
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 002.80‐003.00 S 0.20 4873 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.706
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 003.00‐003.20 S 0.20 4873 Zilla Overlay 50mm @ Cracking >25% 2021 1.176 0.203
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 003.20‐003.40 S 0.20 4873 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 0.272
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 003.40‐003.50 S 0.10 4873 Zilla Overlay 50mm @ Cracking >25% 2021 0.588 0.328
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 003.50‐003.70 S 0.20 4873 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.618
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 003.70‐004.30 S 0.60 4873 Zilla Overlay 50mm @ Cracking >25% 2021 3.528 0.119
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 004.30‐004.60 S 0.30 4873 Zilla Rehab 75mm @ IRI 9‐12 2021 5.028 0.695
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 004.60‐004.80 S 0.20 4873 Zilla Overlay 50mm @ Cracking >25% 2021 1.176 0.191
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 004.80‐004.90 S 0.10 4873 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.894
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 004.90‐005.60 S 0.70 4873 Zilla Overlay 50mm @ Cracking >25% 2021 4.116 0.078
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 005.60‐005.70 S 0.10 4873 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.918
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 005.70‐006.30 S 0.60 4873 Zilla Overlay 50mm @ Cracking >25% 2021 3.522 0.115
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 006.30‐006.40 S 0.10 4873 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.187
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 006.90‐007.10 S 0.20 4873 Zilla Full Recon 75mm @ IRI>12 2021 4.877 0.511
Z2041 Narsingdi (Jongi Shibpur)‐Raipura Road Km 007.90‐008.10 S 0.20 4873 Zilla Full Recon 75mm @ IRI>12 2021 4.877 0.621
Z2042 Narsingdi (Morjal)‐Belabo Road Km 000.00‐000.30 S 0.30 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.978 0.025
Z2042 Narsingdi (Morjal)‐Belabo Road Km 000.30‐000.50 S 0.20 2245 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.266
Z2042 Narsingdi (Morjal)‐Belabo Road Km 000.50‐000.60 S 0.10 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 000.60‐000.70 S 0.10 2245 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.439
Z2042 Narsingdi (Morjal)‐Belabo Road Km 000.70‐001.50 S 0.80 2245 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 001.50‐001.60 S 0.10 2245 Zilla Rehab 75mm @ IRI 9‐12 2021 0.515 2.109
Z2042 Narsingdi (Morjal)‐Belabo Road Km 001.60‐001.90 S 0.30 2245 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 001.90‐002.20 S 0.30 2245 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 002.20‐003.00 S 0.80 2245 Zilla Overlay 40mm @ IRI>12 2021 2.513 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.00‐003.10 S 0.10 2245 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.10‐003.30 S 0.20 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.304 0.679
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.30‐003.40 S 0.10 2245 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.386
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.40‐003.70 S 0.30 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.70‐003.80 S 0.10 2245 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.654
Z2042 Narsingdi (Morjal)‐Belabo Road Km 003.80‐004.00 S 0.20 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 004.00‐004.20 S 0.20 2245 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.216
Z2042 Narsingdi (Morjal)‐Belabo Road Km 004.20‐004.90 S 0.70 2245 Zilla Overlay 40mm @ Traff >=2000 2021 2.258 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 004.90‐005.10 S 0.20 2245 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.339
Z2042 Narsingdi (Morjal)‐Belabo Road Km 005.10‐005.40 S 0.30 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 005.40‐005.90 S 0.50 2245 Zilla Rehab 75mm @ IRI 9‐12 2021 5.687 0.331
Page 118 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2042 Narsingdi (Morjal)‐Belabo Road Km 005.90‐007.30 S 1.40 2245 Zilla Overlay 40mm @ Traff >=2000 2021 4.656 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 007.30‐007.50 S 0.20 2245 Zilla Full Recon 75mm @ IRI>12 2021 3.312 0.184
Z2042 Narsingdi (Morjal)‐Belabo Road Km 007.50‐007.80 S 0.30 2245 Zilla Overlay 40mm @ Traff >=2000 2021 0.970 0.000
Z2042 Narsingdi (Morjal)‐Belabo Road Km 007.80‐008.30 S 0.50 2245 Zilla Overlay 40mm @ IRI>12 2021 1.898 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 000.90‐001.10 S 0.20 2098 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 001.10‐002.10 S 1.00 2098 Zilla Overlay 40mm @ Traff >=2000 2021 4.665 0.035
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 003.20‐003.30 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 003.90‐004.10 S 0.20 2098 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 005.50‐006.10 S 0.60 2098 Zilla Overlay 40mm @ IRI>12 2021 2.797 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 007.17‐007.27 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 007.67‐007.77 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 007.97‐008.07 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 008.47‐008.57 S 0.10 2098 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.005
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 010.47‐010.77 S 0.30 2098 Zilla Overlay 40mm @ IRI>12 2021 1.401 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 010.87‐010.97 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 011.07‐011.17 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 012.47‐012.57 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 013.27‐013.37 S 0.10 2098 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 016.57‐017.27 S 0.70 2098 Zilla Overlay 40mm @ Traff >=2000 2021 3.174 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 017.27‐017.37 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 017.77‐017.87 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.425 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 020.17‐020.27 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.425 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 020.57‐020.77 S 0.20 2098 Zilla Overlay 40mm @ IRI>12 2021 0.849 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 020.97‐021.17 S 0.20 2098 Zilla Overlay 40mm @ IRI>12 2021 0.849 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 022.17‐022.27 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.425 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 022.27‐023.07 S 0.80 2098 Zilla Overlay 40mm @ Traff >=2000 2021 3.396 0.153
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 023.07‐023.17 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 023.97‐024.07 S 0.10 2098 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2044 Shibpur‐Dulalpur‐Lakpur‐Monohardi Road Km 024.07‐024.67 S 0.60 2098 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.104
Z2049 Manohardi Link Road Km 002.10‐002.40 S 0.30 4672 Zilla Rehab 75mm @ IRI 9‐12 2021 3.277 0.873
Z2049 Manohardi Link Road Km 002.70‐002.80 S 0.10 4672 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 1.466
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 002.55‐007.18 S 4.63 4672 Zilla Overlay 40mm @ Traff >=2000 2021 14.371 0.000
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 007.18‐007.48 S 0.30 4672 Zilla Full Recon 75mm @ IRI>12 2021 4.773 0.529
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 007.48‐007.68 S 0.20 4672 Zilla Overlay 50mm @ Cracking >25% 2021 0.769 0.078
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 007.68‐008.18 S 0.50 4672 Zilla Full Recon 75mm @ IRI>12 2021 7.955 0.435
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 009.08‐009.18 S 0.10 4672 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.090
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 009.18‐009.38 S 0.20 4672 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 0.227
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 009.38‐009.58 S 0.20 4672 Zilla Full Recon 75mm @ IRI>12 2021 3.182 0.606
Z2055 Narsindi‐Karimpur‐Jamalpur‐Alokbali Road Km 014.28‐016.52 S 2.24 4672 Zilla Overlay 40mm @ Traff >=2000 2021 5.779 0.909
Z2115 Monohardi (Hatemdi)‐Shakerbazar Road Km 000.00‐000.10 S 0.10 994 Zilla Overlay 40mm @ IRI>12 2021 0.311 0.000
Z2115 Monohardi (Hatemdi)‐Shakerbazar Road Km 002.80‐002.90 S 0.10 994 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z2115 Monohardi (Hatemdi)‐Shakerbazar Road Km 003.00‐003.80 S 0.80 994 Zilla Overlay 40mm @ IRI>12 2021 2.452 0.000
Z2115 Monohardi (Hatemdi)‐Shakerbazar Road Km 003.90‐004.00 S 0.10 994 Zilla Overlay 40mm @ IRI>12 2021 0.308 0.000
Page 119 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2121 Puradia‐Belabo Road Km 000.00‐000.50 S 0.50 3191 Zilla Overlay 40mm @ Traff >=2000 2021 1.842 0.000
Z2121 Puradia‐Belabo Road Km 000.50‐000.60 S 0.10 3191 Zilla Full Recon 75mm @ IRI>12 2021 1.556 0.672
Z2121 Puradia‐Belabo Road Km 000.60‐001.90 S 1.30 3191 Zilla Overlay 40mm @ Cracks >25% 2021 3.815 0.012
Z2121 Puradia‐Belabo Road Km 001.90‐002.00 S 0.10 3191 Zilla Full Recon 75mm @ IRI>12 2021 1.597 0.820
Z2121 Puradia‐Belabo Road Km 002.00‐003.10 S 1.10 3191 Zilla Overlay 40mm @ Cracks >25% 2021 3.281 0.039
Z2121 Puradia‐Belabo Road Km 003.10‐003.20 S 0.10 3191 Zilla Full Recon 75mm @ IRI>12 2021 1.613 0.491
Z2121 Puradia‐Belabo Road Km 003.20‐007.10 S 3.90 3191 Zilla Overlay 40mm @ Cracks >25% 2021 12.069 0.075
Z2121 Puradia‐Belabo Road Km 007.10‐007.40 S 0.30 3191 Zilla Full Recon 75mm @ IRI>12 2021 5.569 0.162
Z2121 Puradia‐Belabo Road Km 007.40‐007.50 S 0.10 3191 Zilla Overlay 40mm @ Cracks >25% 2021 0.446 0.222
Z2121 Puradia‐Belabo Road Km 007.50‐007.60 S 0.10 3191 Zilla Overlay 40mm @ Traff >=2000 2021 0.471 0.319
Z2121 Puradia‐Belabo Road Km 007.60‐008.01 S 0.41 3191 Zilla Overlay 40mm @ Cracks >25% 2021 1.825 0.193
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 000.00‐003.32 S 3.32 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 10.210 0.044
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 003.32‐006.38 S 3.06 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 9.249 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.38‐006.48 S 0.10 994 Zilla Overlay 40mm @ IRI>12 2021 0.302 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.48‐006.58 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.302 0.294
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.58‐006.68 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.302 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.68‐006.78 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.302 0.300
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.78‐006.88 S 0.10 994 Zilla Overlay 40mm @ IRI>12 2021 0.302 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 006.88‐007.38 S 0.50 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.511 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 007.38‐007.78 S 0.40 994 Zilla Overlay 40mm @ IRI>12 2021 1.209 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 007.78‐007.88 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.302 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 007.88‐008.18 S 0.30 994 Zilla Overlay 40mm @ IRI>12 2021 0.907 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 008.18‐008.28 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.302 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 008.28‐008.88 S 0.60 994 Zilla Overlay 40mm @ IRI>12 2021 1.813 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 008.88‐009.08 S 0.20 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.603 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 009.08‐009.88 S 0.80 994 Zilla Overlay 40mm @ IRI>12 2021 2.411 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 009.88‐009.98 S 0.10 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.301 0.272
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 009.98‐010.38 S 0.40 994 Zilla Overlay 40mm @ IRI>12 2021 1.206 0.000
Z2122 Nayakandi‐Chalakchar‐Shakerbazar Road Km 010.38‐010.55 S 0.17 994 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.509 0.119
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 000.00‐000.10 S 0.10 4043 Zilla Overlay 50mm @ Cracking >25% 2021 0.326 1.538
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 000.10‐000.50 S 0.40 4043 Zilla Full Recon 75mm @ IRI>12 2021 5.390 1.446
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 000.50‐000.60 S 0.10 4043 Zilla Overlay 50mm @ IRI 6‐9 2021 0.326 1.795
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 000.60‐001.90 S 1.30 4043 Zilla Full Recon 75mm @ IRI>12 2021 17.518 1.076
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 001.90‐002.10 S 0.20 4043 Zilla Rehab 75mm @ IRI 9‐12 2021 1.846 1.672
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 002.10‐003.10 S 1.00 4043 Zilla Full Recon 75mm @ IRI>12 2021 13.476 1.021
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 004.00‐004.30 S 0.30 4043 Zilla Full Recon 75mm @ IRI>12 2021 4.173 1.252
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 004.90‐005.50 S 0.60 4043 Zilla Rehab 75mm @ IRI 9‐12 2021 5.639 2.093
Z2123  Monohardi‐Urulia‐Bajitpur Road Km 005.50‐007.42 S 1.92 4043 Zilla Overlay 50mm @ IRI 6‐9 2021 6.237 1.958
Narsingdi Total 3225.791
Dhaka Zone Total 13710.519

Gopalganj Zone
Faridpur Division

Page 120 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 018.65‐020.90 S 2.25 10345 National Overlay 80mm @ IRI 4‐9 2021 27.919 18.086
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 020.90‐021.00 S 0.10 10345 National Full Recon 195mm 2021 5.330 7.968
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 021.00‐029.75 S 8.75 10345 National Overlay 80mm @ IRI 4‐9 2021 105.549 19.536
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 029.79‐029.85 L 0.06 10345 National Overlay 80mm @ IRI 4‐9 2021 0.736 21.301
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 029.79‐029.85 R 0.06 10345 National Overlay 80mm @ IRI 4‐9 2021 0.736 21.301
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 029.85‐036.69 S 6.84 10345 National Overlay 80mm @ IRI 4‐9 2021 83.317 20.147
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 036.69‐036.89 S 0.20 10345 National Full Recon 195mm 2021 10.659 7.892
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 036.89‐038.09 S 1.20 10345 National Overlay 80mm @ IRI 4‐9 2021 14.480 20.368
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 038.09‐038.19 S 0.10 10345 National Full Recon 195mm 2021 5.330 7.925
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 038.19‐044.89 S 6.70 9472 National Overlay 50mm @ IRI 4‐7 2021 51.785 20.443
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 044.89‐044.99 S 0.10 9023 National Full Recon 180mm 2021 5.109 6.811
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 044.99‐050.09 S 5.10 9023 National Overlay 50mm @ IRI 4‐7 2021 39.092 19.092
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 050.09‐050.19 S 0.10 9023 National Full Recon 180mm 2021 5.109 6.915
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 050.19‐052.63 S 2.44 9173 National Overlay 50mm @ IRI 4‐7 2021 18.741 19.195
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 052.63‐052.73 S 0.10 10872 National Full Recon 195mm 2021 5.330 6.115
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 052.73‐057.23 S 4.50 10872 National Overlay 80mm @ IRI 4‐9 2021 54.301 15.338
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 057.23‐057.33 S 0.10 10872 National Full Recon 195mm 2021 5.330 5.906
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 057.33‐062.93 S 5.59 10872 National Overlay 80mm @ IRI 4‐9 2021 67.514 15.852
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 062.93‐063.08 L 0.14 3643 National Overlay 50mm @ IRI 4‐9 2021 0.601 5.741
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 062.93‐063.08 R 0.14 3643 National Overlay 50mm @ IRI 4‐9 2021 0.601 5.741
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 063.08‐065.76 S 2.68 10872 National Overlay 80mm @ IRI 4‐9 2021 41.245 11.148
N804 Bhanga‐Faridpur (Goalchamot) Road Km 000.00‐000.01 S 0.00 18037 National Overlay 80mm @ IRI 5‐9 2021 0.156 15.386
N804 Bhanga‐Faridpur (Goalchamot) Road Km 000.01‐000.05 L 0.05 18037 National Overlay 80mm @ IRI 5‐9 2021 0.658 24.575
N804 Bhanga‐Faridpur (Goalchamot) Road Km 000.01‐000.05 R 0.05 9296 National Overlay 50mm @ IRI 5‐7 2021 0.217 22.370
N804 Bhanga‐Faridpur (Goalchamot) Road Km 000.05‐005.80 S 5.75 18037 National Rehab 195mm @ IRI 9‐12 2021 254.536 12.230
N804 Bhanga‐Faridpur (Goalchamot) Road Km 012.20‐016.80 S 4.60 6340 National Overlay 50mm @ IRI 5‐7 2021 35.236 16.317
N804 Bhanga‐Faridpur (Goalchamot) Road Km 016.80‐025.35 S 8.55 9987 National Overlay 60mm @ IRI 7‐9 2021 78.090 15.324
N804 Bhanga‐Faridpur (Goalchamot) Road Km 027.40‐029.70 L 2.30 13435 National Overlay 50mm @ IRI 5 2021 17.147 5.741
N804 Bhanga‐Faridpur (Goalchamot) Road Km 027.40‐029.70 R 2.30 13435 National Overlay 50mm @ IRI 5 2021 17.147 5.722
N804 Bhanga‐Faridpur (Goalchamot) Road Km 029.76‐030.10 L 0.34 13435 National Overlay 80mm @ IRI 5‐9 2021 4.397 4.303
N804 Bhanga‐Faridpur (Goalchamot) Road Km 029.76‐030.10 R 0.34 13435 National Overlay 80mm @ IRI 5‐9 2021 4.397 4.248
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.10‐030.20 L 0.10 13435 National Rehab 195mm @ IRI 9‐12 2021 4.730 1.935
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.10‐030.20 R 0.10 13435 National Rehab 195mm @ IRI 9‐12 2021 4.730 2.085
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.20‐030.30 L 0.10 13435 National Overlay 50mm @ IRI 5 2021 0.819 3.991
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.20‐030.30 R 0.10 13435 National Overlay 50mm @ IRI 5 2021 0.819 3.924
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.30‐030.36 L 0.06 13435 National Overlay 50mm @ IRI 5 2021 0.467 4.155
N804 Bhanga‐Faridpur (Goalchamot) Road Km 030.30‐030.36 R 0.06 13435 National Overlay 50mm @ IRI 5 2021 0.467 4.077
N804 Bhanga‐Faridpur (Goalchamot) Road Km 032.00‐032.06 L 0.06 13435 National Rehab 195mm @ IRI 9‐12 2021 2.933 2.077
N804 Bhanga‐Faridpur (Goalchamot) Road Km 032.00‐032.06 R 0.06 13435 National Rehab 195mm @ IRI 9‐12 2021 2.933 2.077
Z7004 Faridpur‐Saltha‐Soanapur‐Muksudpur Km 008.10‐008.20 S 0.10 4921 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.343
Z7004 Faridpur‐Saltha‐Soanapur‐Muksudpur Km 040.90‐041.83 S 0.93 4921 Zilla Rehab 75mm @ IRI 9‐12 2021 12.693 1.274
Z7108 Goalanda‐Faridpur‐Tarail Road Km 043.23‐043.33 S 0.10 2188 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.449
Z8067 Nagarkanda‐Bhanga Road Km 000.00‐004.10 S 4.10 4885 Zilla Overlay 50mm @ IRI 6‐9 2021 16.316 1.331
Page 121 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8067 Nagarkanda‐Bhanga Road Km 004.30‐004.50 S 0.20 4885 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.441
Z8067 Nagarkanda‐Bhanga Road Km 004.50‐004.70 S 0.20 4885 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.950
Z8067 Nagarkanda‐Bhanga Road Km 004.70‐005.90 S 1.20 4885 Zilla Overlay 50mm @ IRI 6‐9 2021 4.662 0.604
Z8067 Nagarkanda‐Bhanga Road Km 005.90‐006.10 S 0.20 4885 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.333
Z8067 Nagarkanda‐Bhanga Road Km 006.10‐006.95 S 0.85 4885 Zilla Overlay 40mm @ Traff >=2000 2021 2.670 0.170
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 000.00‐010.18 S 10.18 9484 Zilla Overlay 50mm @ Cracking >25% 2021 57.197 0.341
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 010.18‐010.46 S 0.28 1536 Zilla Overlay 40mm @ 1000‐2000 2021 1.317 0.179
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 010.46‐010.66 S 0.20 1536 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 010.66‐011.36 S 0.70 1536 Zilla Overlay 40mm @ 1000‐2000 2021 3.269 0.156
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 011.36‐011.56 S 0.20 1536 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 011.56‐017.56 S 6.00 1536 Zilla Overlay 40mm @ 1000‐2000 2021 26.387 0.012
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 017.56‐018.06 S 0.50 1536 Zilla Overlay 40mm @ 1000‐2000 2021 1.914 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 018.06‐018.16 S 0.10 1536 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 018.16‐019.56 S 1.40 1536 Zilla Overlay 40mm @ 1000‐2000 2021 4.398 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 024.77‐024.97 S 0.20 1536 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 028.27‐028.37 S 0.10 1536 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z8402 Faridpur‐Hatgazaria‐‐Sadarpur Road Km 034.37‐037.67 S 3.30 1536 Zilla Overlay 40mm @ 1000‐2000 2021 10.366 0.000
Z8404 Talma‐Nagarkanda Road Km 005.10‐005.20 S 0.10 9471 Zilla Rehab 75mm @ IRI 9‐12 2021 1.586 3.998
Z8404 Talma‐Nagarkanda Road Km 008.20‐008.30 S 0.10 9471 Zilla Full Recon 75mm @ IRI>12 2021 2.413 2.262
Z8404 Talma‐Nagarkanda Road Km 009.90‐010.00 S 0.10 9471 Zilla Rehab 75mm @ IRI 9‐12 2021 1.736 3.310
Z8404 Talma‐Nagarkanda Road Km 011.50‐011.60 S 0.10 5115 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 2.201
Z8404 Talma‐Nagarkanda Road Km 011.60‐012.46 S 0.86 5115 Zilla Overlay 50mm @ IRI 6‐9 2021 3.251 2.552
Z8416 Munshibazar ‐ Hatgazaria Alternative Road Km 000.20‐000.30 S 0.10 5051 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.858
Z8416 Munshibazar ‐ Hatgazaria Alternative Road Km 000.40‐000.60 S 0.20 5051 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 1.214
Z8416 Munshibazar ‐ Hatgazaria Alternative Road Km 003.60‐003.80 S 0.20 5051 Zilla Overlay 50mm @ IRI 6‐9 2021 0.748 1.418
Faridpur Total 1144.826
Gopalganj Division
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 016.82‐018.22 S 1.39 16636 National Overlay 80mm @ IRI 5‐9 2021 22.414 16.050
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 029.20‐029.30 S 0.10 7576 National Overlay 50mm @ IRI 5‐7 2021 0.788 12.020
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 029.86‐037.72 S 7.86 7576 National Overlay 50mm @ IRI 5‐7 2021 63.053 11.424
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 037.73‐037.83 L 0.10 7576 National Rehab 180mm @ IRI 9‐12 2021 2.708 6.527
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 037.73‐037.83 R 0.10 7576 National Rehab 180mm @ IRI 9‐12 2021 2.708 6.527
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 037.83‐037.85 L 0.02 7576 National DBST @ Traff >6000 2021 0.056 7.495
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 037.83‐037.85 R 0.02 7576 National DBST @ Traff >6000 2021 0.056 7.495
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 040.33‐040.43 S 0.10 7576 National Rehab 180mm @ IRI 9‐12 2021 5.935 2.324
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 067.83‐068.02 L 0.19 7576 National DBST @ Traff >6000 2021 0.450 12.579
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 067.83‐068.02 R 0.19 7576 National DBST @ Traff >6000 2021 0.450 12.579
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 077.03‐077.38 L 0.35 6595 National Overlay 60mm @ IRI 7‐9 2021 2.058 16.377
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 077.03‐077.38 R 0.35 6595 National Overlay 60mm @ IRI 7‐9 2021 2.058 16.377
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 000.00‐000.10 S 0.10 5726 National Rehab 150mm @ IRI 9‐12 2021 3.840 0.700
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 000.10‐002.60 S 2.50 5726 National DBST @ 25% Crk 2021 6.793 4.478
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 002.60‐002.70 S 0.10 5726 National Rehab 150mm @ IRI 9‐12 2021 2.657 2.790
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 002.70‐003.64 S 0.94 5726 National DBST @ Traff 4000‐6000 2021 2.605 5.203
Page 122 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 000.00‐000.15 L 0.15 6625 Regional Rehab 150mm @ IRI 9‐12 2021 5.072 2.133
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 000.00‐000.15 R 0.15 6625 Regional Rehab 150mm @ IRI 9‐12 2021 5.072 2.117
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 000.15‐003.30 S 3.15 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.068 6.781
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 003.30‐004.70 S 1.40 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.528 7.523
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 004.70‐004.90 S 0.20 6625 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 2.815
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 004.90‐006.30 S 1.40 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.458 7.544
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 006.30‐006.40 S 0.10 6625 Regional Full Recon 180mm 2021 3.779 2.681
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 006.40‐006.50 S 0.10 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.676 8.790
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 006.50‐006.70 S 0.20 6625 Regional Rehab 150mm @ IRI 9‐12 2021 5.216 2.945
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 006.70‐009.40 S 2.70 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 18.240 7.544
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 009.40‐012.80 S 3.40 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.975 7.512
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 012.80‐013.80 S 1.00 6625 Regional Rehab 150mm @ IRI 9‐12 2021 26.082 2.531
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 013.80‐014.10 S 0.30 3973 Regional Overlay 50mm @ IRI 5‐7 2021 1.490 3.261
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 014.10‐014.20 S 0.10 3973 Regional Full Recon 135mm 2021 2.415 1.284
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 014.20‐015.60 S 1.40 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.810 8.130
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 015.60‐015.70 S 0.10 3973 Regional Full Recon 135mm 2021 1.858 1.996
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 015.70‐020.50 S 4.80 3973 Regional Overlay 50mm @ IRI 7‐9 2021 23.587 2.332
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 020.50‐020.60 S 0.10 6625 Regional Full Recon 180mm 2021 3.779 2.658
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 020.60‐021.90 S 1.30 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.782 7.735
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 021.90‐022.00 S 0.10 6625 Regional Full Recon 180mm 2021 3.779 2.478
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 022.00‐028.30 S 6.30 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 42.566 7.452
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 028.30‐032.90 S 4.60 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 31.075 6.874
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 032.90‐033.30 S 0.40 6625 Regional Rehab 150mm @ IRI 9‐12 2021 10.433 2.606
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 033.30‐034.10 S 0.80 6625 Regional DBST @ Traff >6000 2021 2.134 6.534
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 034.10‐034.46 S 0.36 6625 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.418 7.554
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 035.10‐044.80 S 9.70 11491 Regional DBST @ 25% Crk 2021 28.853 0.964
R850 Tekerhat‐Gopalganj‐Mollahhat Road Km 044.80‐044.83 S 0.03 11491 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.189 11.571
R851 Gopalganj Bus Terminal Link Road Km 000.00‐000.20 S 0.20 11491 Regional Rehab 150mm @ IRI 9‐12 2021 7.245 1.193
R851 Gopalganj Bus Terminal Link Road Km 000.20‐000.65 S 0.45 11491 Regional DBST @ Traff >6000 2021 1.667 1.404
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 016.84‐019.90 S 3.06 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.047 17.501
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 019.90‐023.40 S 3.50 7698 Regional Rehab 150mm @ IRI 9‐12 2021 92.977 7.339
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 023.40‐024.70 S 1.30 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.945 17.819
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 024.70‐024.80 S 0.10 7698 Regional Full Recon 150mm @ IRI 12 2021 3.337 7.256
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 024.80‐026.60 S 1.80 10872 Regional Rehab 150mm @ IRI 9‐12 2021 47.817 4.687
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 026.60‐026.70 S 0.10 10872 Regional Full Recon 195mm 2021 4.016 4.268
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 026.70‐039.30 S 12.60 10872 Regional Rehab 150mm @ IRI 9‐12 2021 334.746 4.574
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 039.30‐039.40 S 0.10 10872 Regional Full Recon 195mm 2021 4.016 4.231
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 039.40‐046.00 S 6.60 10872 Regional Overlay 60mm @ IRI 5.5‐9 2021 45.411 11.723
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 046.00‐046.10 S 0.10 10872 Regional Full Recon 195mm 2021 4.016 4.383
R852 Gouranadi‐Paisarhat‐Kotalipara‐Gopalganj Road Km 046.10‐046.24 S 0.14 10872 Regional Rehab 150mm @ IRI 9‐12 2021 3.719 5.330
Z7001 Faridpur‐Boalmari‐Gopalganj Road Km 035.84‐035.94 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.872
Z7001 Faridpur‐Boalmari‐Gopalganj Road Km 042.74‐042.84 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.375
Z7001 Faridpur‐Boalmari‐Gopalganj Road Km 043.34‐043.44 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 2.434 0.908
Page 123 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 037.84‐038.04 S 0.20 3419 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.241
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 038.84‐039.04 S 0.20 3419 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.000
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 040.84‐040.94 S 0.10 8344 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.251
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 040.94‐049.00 S 8.07 8344 Zilla Overlay 40mm @ Traff >=2000 2021 49.991 0.000
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 049.00‐049.06 L 0.06 8344 Zilla Rehab 75mm @ IRI 9‐12 2021 1.376 1.002
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 049.00‐049.06 R 0.06 8344 Zilla Rehab 75mm @ IRI 9‐12 2021 1.376 1.474
Z8021 Baraitala‐Muksudpur Road Km 000.00‐000.20 S 0.20 2229 Zilla Overlay 40mm @ IRI>12 2021 3.532 0.000
Z8021 Baraitala‐Muksudpur Road Km 001.80‐001.90 S 0.10 2229 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8021 Baraitala‐Muksudpur Road Km 004.10‐004.20 S 0.10 2229 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.251
Z8032 Kotalipara‐Rajoir Road Km 000.00‐002.70 S 2.70 2732 Zilla Overlay 40mm @ Traff >=2000 2021 12.608 0.138
Z8032 Kotalipara‐Rajoir Road Km 002.70‐002.80 S 0.10 2732 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.343
Z8032 Kotalipara‐Rajoir Road Km 002.80‐009.20 S 6.40 2732 Zilla Overlay 40mm @ Traff >=2000 2021 29.885 0.096
Z8032 Kotalipara‐Rajoir Road Km 009.50‐009.80 S 0.30 2732 Zilla Overlay 40mm @ Traff >=2000 2021 1.294 0.189
Z8032 Kotalipara‐Rajoir Road Km 010.10‐010.90 S 0.80 2732 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.000
Z8032 Kotalipara‐Rajoir Road Km 010.90‐011.10 S 0.20 2732 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.402
Z8032 Kotalipara‐Rajoir Road Km 011.10‐011.30 S 0.20 2732 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.062
Z8032 Kotalipara‐Rajoir Road Km 011.30‐011.50 S 0.20 2732 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.068
Z8032 Kotalipara‐Rajoir Road Km 011.50‐012.60 S 1.10 2732 Zilla Overlay 40mm @ Traff >=2000 2021 5.141 0.094
Z8032 Kotalipara‐Rajoir Road Km 012.60‐013.80 S 1.20 2732 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 0.412
Z8032 Kotalipara‐Rajoir Road Km 013.80‐014.90 S 1.10 2732 Zilla Overlay 40mm @ Traff >=2000 2021 5.136 0.090
Z8032 Kotalipara‐Rajoir Road Km 014.90‐015.10 S 0.20 2732 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z8032 Kotalipara‐Rajoir Road Km 015.10‐016.90 S 1.80 2732 Zilla Overlay 40mm @ Traff >=2000 2021 8.405 0.100
Z8032 Kotalipara‐Rajoir Road Km 016.90‐017.00 S 0.10 2732 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8032 Kotalipara‐Rajoir Road Km 017.00‐017.14 S 0.14 2732 Zilla Overlay 40mm @ Traff >=2000 2021 0.649 0.066
Z8035 Kotalipara‐Pirerbari‐ Dakshin Dashar Road Km 000.00‐009.00 S 9.00 3447 Zilla Overlay 40mm @ Traff >=2000 2021 41.567 0.198
Z8035 Kotalipara‐Pirerbari‐ Dakshin Dashar Road Km 010.90‐011.00 S 0.10 3447 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8408 Borashi‐Parkushali‐Tungipara Road Km 007.20‐007.30 S 0.10 326 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z8408 Borashi‐Parkushali‐Tungipara Road Km 010.30‐010.40 S 0.10 326 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.467 0.000
Z8408 Borashi‐Parkushali‐Tungipara Road Km 013.00‐013.20 S 0.20 326 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z8408 Borashi‐Parkushali‐Tungipara Road Km 013.20‐013.45 S 0.25 326 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.158 0.005
Z8412 Bajunia‐Gaindasur Road Km 000.00‐006.50 S 6.50 2136 Zilla Overlay 40mm @ Traff >=2000 2021 30.352 0.000
Z8412 Bajunia‐Gaindasur Road Km 006.50‐010.10 S 3.60 2136 Zilla Overlay 40mm @ Traff >=2000 2021 16.810 0.008
Z8412 Bajunia‐Gaindasur Road Km 010.10‐010.20 S 0.10 2136 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z8412 Bajunia‐Gaindasur Road Km 010.20‐010.60 S 0.40 2136 Zilla Overlay 40mm @ Traff >=2000 2021 1.810 0.122
Z8412 Bajunia‐Gaindasur Road Km 010.60‐010.80 S 0.20 2136 Zilla Overlay 40mm @ Traff >=2000 2021 0.849 0.000
Z8412 Bajunia‐Gaindasur Road Km 011.00‐011.10 S 0.10 2136 Zilla Overlay 40mm @ Traff >=2000 2021 0.425 0.000
Z8412 Bajunia‐Gaindasur Road Km 011.10‐011.30 S 0.20 2136 Zilla Overlay 40mm @ Traff >=2000 2021 0.849 0.167
Z8412 Bajunia‐Gaindasur Road Km 011.30‐011.70 S 0.40 2136 Zilla Overlay 40mm @ Traff >=2000 2021 1.698 0.000
Z8412 Bajunia‐Gaindasur Road Km 011.70‐012.50 S 0.80 2136 Zilla Overlay 40mm @ Traff >=2000 2021 3.396 0.109
Z8412 Bajunia‐Gaindasur Road Km 012.50‐012.67 S 0.17 2136 Zilla Overlay 40mm @ IRI>12 2021 0.722 0.000
Z8414 Gopalganj‐Chapail‐Kalia Road Km 000.00‐000.20 S 0.20 3760 Zilla Overlay 40mm @ Traff >=2000 2021 0.849 0.254
Z8414 Gopalganj‐Chapail‐Kalia Road Km 000.20‐000.40 S 0.20 3760 Zilla Rehab 75mm @ IRI 9‐12 2021 2.993 1.173
Z8414 Gopalganj‐Chapail‐Kalia Road Km 000.40‐000.70 S 0.30 3760 Zilla Overlay 40mm @ Cracks >25% 2021 1.290 0.005
Page 124 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8414 Gopalganj‐Chapail‐Kalia Road Km 000.70‐000.80 S 0.10 3760 Zilla Full Recon 75mm @ IRI>12 2021 2.478 0.178
Z8414 Gopalganj‐Chapail‐Kalia Road Km 000.80‐002.41 S 1.61 3760 Zilla Overlay 40mm @ Cracks >25% 2021 6.472 0.058
Z8419 Satpar‐Ramdia‐Fukurah Road Km 018.20‐018.40 S 0.20 2619 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.480
Z8429 Tungipara‐Patgati By‐Pass Road Km 000.00‐001.75 S 1.75 4446 Zilla Overlay 40mm @ Traff >=2000 2021 10.400 0.133
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 000.80‐001.50 S 0.70 2282 Zilla Overlay 40mm @ Traff >=2000 2021 4.457 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 001.50‐003.00 S 1.50 2282 Zilla Overlay 40mm @ Traff >=2000 2021 9.551 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 003.00‐003.10 S 0.10 2282 Zilla Overlay 40mm @ Traff >=2000 2021 0.529 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 003.10‐003.30 S 0.20 2282 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 003.30‐009.10 S 5.80 2282 Zilla Overlay 40mm @ Traff >=2000 2021 27.083 0.161
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 009.20‐009.30 S 0.10 2282 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.142
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 009.30‐009.40 S 0.10 2282 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 009.40‐010.60 S 1.20 2282 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 0.077
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 010.60‐011.30 S 0.70 2282 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 0.000
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 011.30‐012.10 S 0.80 2282 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.163
Z8430 Tungipara ‐ Kotalipara (Majbadi) Road Km 012.10‐018.26 S 6.16 2282 Zilla Overlay 40mm @ Traff >=2000 2021 28.764 0.000
Z8504 Tungipara Thana Complex‐Patgati Road Km 001.70‐001.87 S 0.17 7679 Zilla Overlay 40mm @ Traff >=2000 2021 1.039 0.458
Z8507 Bangabandhu Mazar Connecting Road Km 000.00‐000.30 S 0.30 7925 Zilla Overlay 40mm @ Traff >=2000 2021 1.426 0.000
Z8507 Bangabandhu Mazar Connecting Road Km 000.30‐001.40 S 1.10 7925 Zilla Overlay 50mm @ IRI 6‐9 2021 6.468 1.214
Gopalganj Total 1374.387
Madaripur Division
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 067.90‐068.10 L 0.20 8408 National Overlay 50mm @ IRI 4‐7 2021 1.134 15.204
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 067.90‐068.10 R 0.20 8408 National Overlay 50mm @ IRI 4‐7 2021 1.134 15.271
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 068.10‐077.59 S 9.50 18226 National Overlay 80mm @ IRI 4‐9 2021 114.587 28.657
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 087.45‐094.08 S 6.63 5308 National Overlay 50mm @ IRI 4‐9 2021 50.827 11.013
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 094.08‐094.48 S 0.40 5308 National Rehab 150mm @ IRI 9‐12 2021 14.104 5.095
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 094.48‐110.80 S 16.32 5308 National Overlay 50mm @ IRI 4‐9 2021 125.233 10.856
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 110.80‐114.76 S 3.96 8353 National Overlay 50mm @ IRI 4‐7 2021 30.369 12.725
N8 Dhaka ‐Mawa‐Bhanga‐Barishal‐Patuakhali Road Km 114.76‐115.04 S 0.28 8353 National Rehab 180mm @ IRI 9‐12 2021 13.822 5.017
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 000.00‐000.01 S 0.00 3098 National Full Recon 135mm 2021 0.101 17.563
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 000.01‐000.05 L 0.05 18037 National Full Recon 195mm @ IRI 12 2021 2.904 8.917
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 000.01‐000.05 R 0.05 18037 National Full Recon 195mm @ IRI 12 2021 2.904 8.917
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 000.05‐000.10 S 0.05 18037 National Full Recon 195mm 2021 2.738 10.634
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 000.10‐016.82 S 16.72 14758 National Overlay 80mm @ IRI 5‐9 2021 207.839 18.938
R862 Pacchar‐Sibchar‐Madaripur Road Km 000.00‐003.00 S 3.00 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.379 1.862
R862 Pacchar‐Sibchar‐Madaripur Road Km 003.80‐003.90 S 0.10 7071 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.852
R862 Pacchar‐Sibchar‐Madaripur Road Km 003.90‐005.10 S 1.20 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.257 3.475
R862 Pacchar‐Sibchar‐Madaripur Road Km 005.10‐005.20 S 0.10 7071 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.907
R862 Pacchar‐Sibchar‐Madaripur Road Km 005.20‐005.50 S 0.30 7071 Regional DBST @ 25% Crk 2021 0.815 2.668
R862 Pacchar‐Sibchar‐Madaripur Road Km 005.50‐006.00 S 0.50 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 4.754
R862 Pacchar‐Sibchar‐Madaripur Road Km 006.00‐007.80 S 1.80 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.385 3.965
R862 Pacchar‐Sibchar‐Madaripur Road Km 007.80‐008.00 S 0.20 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 4.421
R862 Pacchar‐Sibchar‐Madaripur Road Km 008.00‐008.20 S 0.20 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 5.318
R862 Pacchar‐Sibchar‐Madaripur Road Km 011.30‐014.40 S 3.10 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.336 3.795
Page 125 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R862 Pacchar‐Sibchar‐Madaripur Road Km 014.50‐014.60 S 0.10 7071 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.943
R862 Pacchar‐Sibchar‐Madaripur Road Km 014.60‐016.60 S 2.00 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.761 3.612
R862 Pacchar‐Sibchar‐Madaripur Road Km 016.60‐016.70 S 0.10 7071 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.813
R862 Pacchar‐Sibchar‐Madaripur Road Km 016.70‐018.60 S 1.90 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.073 3.360
R862 Pacchar‐Sibchar‐Madaripur Road Km 018.60‐018.70 S 0.10 7071 Regional Full Recon 180mm 2021 3.849 1.643
R862 Pacchar‐Sibchar‐Madaripur Road Km 021.40‐021.90 S 0.50 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 4.639
R862 Pacchar‐Sibchar‐Madaripur Road Km 021.90‐023.80 S 1.90 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.073 3.736
R862 Pacchar‐Sibchar‐Madaripur Road Km 023.80‐024.00 S 0.20 7071 Regional Full Recon 150mm @ IRI 12 2021 6.675 1.534
R862 Pacchar‐Sibchar‐Madaripur Road Km 024.00‐024.20 S 0.20 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 4.419
R862 Pacchar‐Sibchar‐Madaripur Road Km 024.20‐024.30 S 0.10 7071 Regional Full Recon 180mm 2021 3.849 1.551
R862 Pacchar‐Sibchar‐Madaripur Road Km 024.30‐024.40 S 0.10 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 5.617
R862 Pacchar‐Sibchar‐Madaripur Road Km 024.40‐024.70 S 0.30 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 4.944
R862 Pacchar‐Sibchar‐Madaripur Road Km 024.70‐031.00 S 6.30 7071 Regional Overlay 60mm @ IRI 5.5‐9 2021 43.347 3.661
Z8032 Kotalipara‐Rajoir Road Km 017.14‐018.00 S 0.86 2732 Zilla Overlay 40mm @ Traff >=2000 2021 4.020 0.000
Z8032 Kotalipara‐Rajoir Road Km 018.30‐024.80 S 6.50 2732 Zilla Overlay 40mm @ Traff >=2000 2021 30.352 0.174
Z8032 Kotalipara‐Rajoir Road Km 024.80‐027.10 S 2.30 2732 Zilla Overlay 40mm @ Traff >=2000 2021 10.740 0.019
Z8032 Kotalipara‐Rajoir Road Km 027.10‐027.90 S 0.80 2732 Zilla Overlay 40mm @ Traff >=2000 2021 3.731 0.287
Z8035 Kotalipara‐Pirerbari‐ Dakshin Dashar Road Km 022.33‐023.80 S 1.47 3447 Zilla Overlay 40mm @ Traff >=2000 2021 6.855 0.349
Madaripur Total 808.580
Rajbari Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 000.00‐000.10 S 0.10 11199 National Full Recon 195mm 2021 8.060 4.051
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 000.10‐000.20 S 0.10 11199 National Overlay 80mm @ IRI 4‐9 2021 1.207 16.722
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 000.20‐000.30 S 0.10 11199 National Full Recon 195mm 2021 5.330 6.753
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 000.30‐001.00 S 0.70 11199 National Overlay 80mm @ IRI 4‐9 2021 8.447 17.635
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 001.00‐003.00 R 2.00 11199 National Overlay 80mm @ IRI 4‐9 2021 24.795 15.871
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 001.00‐003.25 L 2.25 11199 National Overlay 80mm @ IRI 4‐9 2021 27.907 15.785
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 003.00‐003.25 R 0.25 11199 National Overlay 80mm @ IRI 4‐9 2021 3.112 15.752
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 013.98‐018.65 S 4.67 10345 National Overlay 80mm @ IRI 4‐9 2021 66.562 16.334
R712 Tottipur at R771‐Machpara Link Road Km 000.00‐002.22 S 2.22 4911 Regional Overlay 60mm @ IRI 7‐9 2021 10.276 1.129
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 011.50‐014.50 S 3.00 2701 Zilla Overlay 40mm @ Traff >=2000 2021 9.427 0.057
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 015.30‐015.40 S 0.10 2701 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.175
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 017.70‐018.00 S 0.30 2701 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.296
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 018.60‐019.00 S 0.40 2701 Zilla Overlay 40mm @ IRI>12 2021 1.257 0.000
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 019.00‐022.20 S 3.20 2701 Zilla Overlay 40mm @ Traff >=2000 2021 10.052 0.265
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 022.20‐022.38 S 0.17 2701 Zilla Overlay 40mm @ Traff >=2000 2021 0.587 0.000
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 022.38‐022.48 S 0.10 2701 Zilla Rehab 75mm @ IRI 9‐12 2021 1.278 0.190
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 022.48‐022.68 S 0.20 2701 Zilla Overlay 40mm @ Traff >=2000 2021 0.725 0.023
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 022.68‐022.88 S 0.20 2701 Zilla Overlay 40mm @ Traff >=2000 2021 0.725 0.326
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 022.88‐023.74 S 0.86 2701 Zilla Overlay 40mm @ Traff >=2000 2021 3.132 0.000
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 030.88‐031.68 S 0.80 2701 Zilla Overlay 40mm @ Traff >=2000 2021 2.513 0.406
Z7106 Goalonda‐Godarbazar‐Habashpur Road Km 031.68‐033.84 S 2.16 2701 Zilla Overlay 40mm @ Traff >=2000 2021 6.798 0.000
Rajbari Total 197.119
Sariatpur Division
Page 126 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 020.73‐023.57 S 2.84 7947 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.529 6.413
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 023.57‐024.67 S 1.10 7947 Regional Rehab 150mm @ IRI 9‐12 2021 34.003 2.169
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 029.17‐029.87 S 0.70 3885 Regional Overlay 50mm @ IRI 7‐9 2021 4.043 2.345
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 029.87‐036.08 S 6.20 3885 Regional DBST @ Traff 2000‐4000 2021 16.848 1.370
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 036.08‐040.08 S 4.00 3885 Regional Overlay 50mm @ IRI 5‐7 2021 23.100 2.133
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 040.08‐040.28 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 2.759
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 040.28‐042.08 S 1.80 3885 Regional DBST @ Traff 2000‐4000 2021 4.891 1.454
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 042.08‐042.28 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 2.764
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 042.28‐044.08 S 1.80 3885 Regional DBST @ Traff 2000‐4000 2021 4.891 1.451
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 044.08‐044.28 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 2.701
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 044.28‐048.08 S 3.80 3885 Regional DBST @ Traff 2000‐4000 2021 10.325 1.449
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 053.28‐053.48 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 2.772
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 053.48‐054.78 S 1.30 3885 Regional DBST @ Traff 2000‐4000 2021 3.532 1.473
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 054.78‐054.98 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 2.784
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 054.98‐056.28 S 1.30 3885 Regional DBST @ Traff 2000‐4000 2021 3.532 1.465
R860 Mostafapur‐Shariatpur Harina‐Chandpur  Km 056.28‐056.48 S 0.20 3885 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 3.117
R861 Monohar Bazar More at R860‐Shariatpur Road Km 000.00‐000.20 S 0.20 14249 Regional Rehab 150mm @ IRI 9‐12 2021 5.854 2.111
R861 Monohar Bazar More at R860‐Shariatpur Road Km 000.20‐001.90 S 1.70 14249 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.697 6.791
R861 Monohar Bazar More at R860‐Shariatpur Road Km 001.90‐002.00 S 0.10 14249 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 3.713
R861 Monohar Bazar More at R860‐Shariatpur Road Km 002.00‐005.20 S 3.20 14249 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.018 6.802
R861 Monohar Bazar More at R860‐Shariatpur Road Km 005.20‐006.90 S 1.70 14249 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.724 7.369
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 000.00‐000.10 S 0.10 9665 Regional DBST 2021 0.753 0.000
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 000.10‐003.10 S 3.00 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.341 4.377
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 003.10‐007.00 S 3.90 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 26.834 4.703
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 007.00‐007.30 S 0.30 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 4.307
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 007.30‐010.30 S 3.00 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.642 4.616
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 010.30‐010.90 S 0.60 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.128 5.018
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 010.90‐012.00 S 1.10 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.569 3.923
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 012.00‐012.60 S 0.60 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.135 5.035
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 012.60‐014.50 S 1.90 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.073 4.398
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 014.50‐014.60 S 0.10 9665 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.325
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 014.60‐015.10 S 0.50 9665 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 4.550
R863 Shariatpur‐Janjira‐Kawrakandi (Kathalbari) Road Km 023.80‐028.65 S 4.84 4828 Regional DBST @ 25% Crk 2021 9.119 0.776
Z8065 Shariatpur‐Ganganagar‐Mongalmazirghat Road Km 000.00‐010.18 S 10.18 4887 Zilla Overlay 50mm @ Cracking >25% 2021 39.866 0.308
Z8065 Shariatpur‐Ganganagar‐Mongalmazirghat Road Km 010.18‐010.28 S 0.10 4887 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.468
Z8065 Shariatpur‐Ganganagar‐Mongalmazirghat Road Km 010.28‐018.08 S 7.80 4887 Zilla Overlay 50mm @ Cracking >25% 2021 30.307 0.992
Z8601 Shariatpur (Burirhat)‐Goshairhat Road Km 000.00‐002.90 S 2.90 4081 Zilla Overlay 50mm @ IRI 6‐9 2021 16.748 0.289
Z8601 Shariatpur (Burirhat)‐Goshairhat Road Km 002.90‐003.00 S 0.10 4081 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.206
Z8601 Shariatpur (Burirhat)‐Goshairhat Road Km 003.00‐012.30 S 9.30 4081 Zilla Overlay 50mm @ IRI 6‐9 2021 53.708 0.274
Z8601 Shariatpur (Burirhat)‐Goshairhat Road Km 012.30‐015.80 S 3.50 4081 Zilla Overlay 50mm @ IRI 6‐9 2021 20.218 0.363
Z8601 Shariatpur (Burirhat)‐Goshairhat Road Km 015.80‐016.01 S 0.21 4081 Zilla Overlay 40mm @ Traff >=2000 2021 0.985 0.021
Z8602 Shariatpur‐Naria Road Km 000.00‐000.20 S 0.20 1938 Zilla Rehab 75mm @ IRI 9‐12 2021 2.538 0.084
Z8602 Shariatpur‐Naria Road Km 000.20‐011.30 S 11.10 1938 Zilla Overlay 40mm @ 1000‐2000 2021 36.188 0.020
Page 127 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z8605 Kaneswar‐Damudya Road Km 000.90‐003.59 S 2.69 4932 Zilla Overlay 50mm @ Cracking >25% 2021 12.663 0.310
Z8607 Naria‐Pathanbadi‐Nayan‐Dagri‐Shaora Road Km 000.00‐000.30 S 0.30 1915 Zilla Overlay 40mm @ 1000‐2000 2021 1.110 0.008
Z8607 Naria‐Pathanbadi‐Nayan‐Dagri‐Shaora Road Km 000.30‐000.40 S 0.10 1915 Zilla Overlay 40mm @ IRI>12 2021 0.357 0.000
Z8607 Naria‐Pathanbadi‐Nayan‐Dagri‐Shaora Road Km 000.40‐001.30 S 0.90 1915 Zilla Overlay 40mm @ 1000‐2000 2021 2.713 0.000
Sariatpur Total 522.726
Gopalganj Zone Total 4047.639

Khulna Zone
Bagerhat Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 219.12‐223.10 S 3.98 10263 National Overlay 80mm @ IRI 4‐9 2021 51.248 10.991
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 223.10‐223.30 S 0.20 10263 National Full Recon 195mm 2021 10.659 4.838
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 223.30‐240.79 S 17.49 10263 National Overlay 80mm @ IRI 4‐9 2021 202.677 13.114
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 240.79‐240.99 S 0.20 10263 National Full Recon 195mm @ IRI 12 2021 9.783 5.644
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 240.99‐243.29 S 2.30 10263 National Overlay 80mm @ IRI 4‐9 2021 25.473 14.129
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 084.23‐084.35 L 0.12 10433 National Overlay 80mm @ IRI 5‐9 2021 1.031 12.868
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 084.23‐084.35 R 0.12 10433 National Overlay 80mm @ IRI 5‐9 2021 1.071 12.389
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 084.35‐094.32 S 9.96 13637 National Overlay 80mm @ IRI 5‐9 2021 124.352 19.234
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 094.32‐094.42 S 0.10 13637 National Full Recon 195mm 2021 5.476 7.147
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 094.42‐100.52 S 6.11 13637 National Overlay 80mm @ IRI 5‐9 2021 75.712 18.931
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 108.92‐109.02 S 0.10 8030 National Rehab 180mm @ IRI 9‐12 2021 4.322 5.710
N805 Bhanga‐Mollahhat‐Fakirhat‐Noapara Road Km 110.42‐110.63 S 0.22 8030 National Full Recon 180mm 2021 11.391 4.984
R770 Noapara‐Bagerhat‐Pirojpur Road Km 000.00‐000.05 L 0.05 7698 Regional Full Recon 180mm 2021 3.135 5.043
R770 Noapara‐Bagerhat‐Pirojpur Road Km 000.00‐000.05 R 0.05 3098 Regional Full Recon 135mm 2021 0.268 18.859
R770 Noapara‐Bagerhat‐Pirojpur Road Km 000.05‐000.20 S 0.15 7698 Regional Rehab 150mm @ IRI 9‐12 2021 7.643 5.279
R770 Noapara‐Bagerhat‐Pirojpur Road Km 000.20‐001.50 S 1.30 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.872 19.955
R770 Noapara‐Bagerhat‐Pirojpur Road Km 001.50‐001.60 S 0.10 7698 Regional Full Recon 150mm @ IRI 12 2021 4.430 7.533
R770 Noapara‐Bagerhat‐Pirojpur Road Km 001.60‐005.30 S 3.70 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 35.086 19.140
R770 Noapara‐Bagerhat‐Pirojpur Road Km 005.30‐005.40 S 0.10 7698 Regional Full Recon 180mm 2021 6.397 4.619
R770 Noapara‐Bagerhat‐Pirojpur Road Km 012.40‐012.50 S 0.10 7698 Regional Full Recon 150mm @ IRI 12 2021 4.430 7.173
R770 Noapara‐Bagerhat‐Pirojpur Road Km 012.50‐012.60 S 0.10 7698 Regional DBST @ Traff >6000 2021 0.364 16.992
R770 Noapara‐Bagerhat‐Pirojpur Road Km 012.60‐012.80 S 0.20 7698 Regional Rehab 150mm @ IRI 9‐12 2021 7.052 8.762
R770 Noapara‐Bagerhat‐Pirojpur Road Km 012.80‐014.18 S 1.38 7698 Regional DBST @ 25% Crk 2021 4.973 16.495
R770 Noapara‐Bagerhat‐Pirojpur Road Km 014.20‐014.33 L 0.13 7698 Regional Rehab 150mm @ IRI 9‐12 2021 3.738 10.752
R770 Noapara‐Bagerhat‐Pirojpur Road Km 014.20‐014.33 R 0.13 7698 Regional Rehab 150mm @ IRI 9‐12 2021 3.738 10.759
R770 Noapara‐Bagerhat‐Pirojpur Road Km 014.33‐018.38 S 4.05 4074 Regional Overlay 50mm @ IRI 5‐7 2021 31.418 8.163
R770 Noapara‐Bagerhat‐Pirojpur Road Km 018.38‐018.68 S 0.30 7256 Regional Full Recon 150mm @ IRI 12 2021 10.558 1.766
R770 Noapara‐Bagerhat‐Pirojpur Road Km 018.68‐026.38 S 7.70 7256 Regional DBST @ 25% Crk 2021 22.062 2.824
R770 Noapara‐Bagerhat‐Pirojpur Road Km 026.38‐026.48 S 0.10 8273 Regional Full Recon 180mm 2021 4.059 2.405
R770 Noapara‐Bagerhat‐Pirojpur Road Km 026.48‐039.56 S 13.08 8842 Regional DBST @ 25% Crk 2021 38.126 3.485
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 009.00‐012.10 S 3.10 4771 Regional Overlay 50mm @ IRI 5‐7 2021 15.461 0.435
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 012.10‐012.40 S 0.30 6995 Regional DBST @ 25% Crk 2021 0.815 1.028
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 012.40‐012.70 S 0.30 6995 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.071 2.179
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 012.70‐013.20 S 0.50 6995 Regional DBST @ 25% Crk 2021 1.359 0.720

Page 128 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 013.20‐013.40 S 0.20 6995 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 2.531
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 013.50‐014.00 S 0.50 6995 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 1.807
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 014.00‐021.25 S 7.25 4882 Regional DBST @ 25% Crk 2021 19.696 0.599
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 021.25‐021.35 S 0.10 4697 Regional DBST @ Traff 4000‐6000 2021 0.272 0.979
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 021.35‐021.95 S 0.60 4697 Regional DBST @ 25% Crk 2021 1.630 0.464
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 021.95‐022.05 S 0.10 4697 Regional DBST @ Traff 4000‐6000 2021 0.272 2.216
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 022.05‐024.85 S 2.80 4697 Regional DBST @ 25% Crk 2021 6.072 0.209
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 024.85‐025.15 S 0.30 4697 Regional Overlay 60mm @ IRI 7‐9 2021 1.389 1.862
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 025.15‐026.25 S 1.10 4697 Regional DBST @ Traff 4000‐6000 2021 2.011 0.475
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 026.25‐026.55 S 0.30 4697 Regional Overlay 60mm @ IRI 7‐9 2021 1.389 1.847
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 026.55‐028.95 S 2.40 4697 Regional DBST @ Traff 4000‐6000 2021 4.649 0.398
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 028.95‐029.05 S 0.10 4697 Regional DBST @ Traff 4000‐6000 2021 0.272 2.212
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 029.05‐030.95 S 1.90 4697 Regional DBST @ Traff 4000‐6000 2021 3.745 0.330
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 030.95‐031.18 S 0.23 4697 Regional DBST @ Traff 4000‐6000 2021 0.419 1.377
R772 Bagerhat Town Section  Km 000.00‐000.63 S 0.63 9414 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.548 9.628
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 008.20‐008.30 S 0.10 5361 Regional Full Recon 150mm 2021 4.551 0.399
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 015.60‐015.70 S 0.10 5361 Regional Full Recon 150mm 2021 4.248 0.185
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 018.10‐018.20 S 0.10 4838 Regional Full Recon 150mm 2021 2.245 1.133
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 033.10‐033.60 S 0.50 4838 Regional Overlay 50mm @ IRI 5‐7 2021 1.943 1.878
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 033.60‐033.90 S 0.30 4838 Regional DBST @ Traff 4000‐6000 2021 0.548 1.860
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 033.90‐036.30 S 2.40 4838 Regional Overlay 50mm @ IRI 5‐7 2021 9.324 1.439
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 036.30‐036.40 S 0.10 4838 Regional Full Recon 150mm 2021 2.245 1.148
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 036.40‐039.50 S 3.10 4838 Regional Overlay 50mm @ IRI 5‐7 2021 12.044 1.517
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 039.50‐041.60 S 2.10 4838 Regional Overlay 50mm @ IRI 5‐7 2021 8.158 1.456
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 041.60‐041.70 S 0.10 4838 Regional Rehab 150mm @ IRI 9‐12 2021 1.787 1.002
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 044.90‐046.28 S 1.38 4838 Regional Overlay 50mm @ IRI 5‐7 2021 5.350 1.628
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 046.95‐048.20 S 1.25 5361 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.608 2.088
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 048.20‐050.60 S 2.40 5361 Regional Overlay 60mm @ IRI 5.5‐9 2021 16.513 2.761
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 050.60‐051.40 S 0.80 5361 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.504 2.014
R773 Signboard‐Morelganj‐Sharankhola‐Bogi Road Km 051.40‐052.04 S 0.64 5361 Regional Rehab 150mm @ IRI 9‐12 2021 16.948 0.723
Z7045 Terakhada‐Mollahat Road Km 011.72‐012.62 S 0.90 2964 Zilla Overlay 40mm @ Traff >=2000 2021 2.563 0.174
Z7045 Terakhada‐Mollahat Road Km 012.62‐013.02 S 0.40 2964 Zilla Overlay 40mm @ Traff >=2000 2021 0.951 0.937
Z7045 Terakhada‐Mollahat Road Km 013.02‐013.52 S 0.50 2964 Zilla Overlay 40mm @ Traff >=2000 2021 1.189 0.691
Z7045 Terakhada‐Mollahat Road Km 013.52‐013.62 S 0.10 2964 Zilla Full Recon 75mm @ IRI>12 2021 1.217 0.923
Z7045 Terakhada‐Mollahat Road Km 013.62‐014.12 S 0.50 2964 Zilla Overlay 40mm @ Traff >=2000 2021 1.189 0.523
Z7045 Terakhada‐Mollahat Road Km 014.12‐014.52 S 0.40 2964 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 0.636
Z7045 Terakhada‐Mollahat Road Km 014.52‐015.52 S 1.00 2964 Zilla Overlay 40mm @ Traff >=2000 2021 2.377 0.715
Z7045 Terakhada‐Mollahat Road Km 015.52‐017.32 S 1.80 2964 Zilla Overlay 40mm @ Traff >=2000 2021 5.532 0.724
Z7045 Terakhada‐Mollahat Road Km 017.42‐018.32 S 0.91 2964 Zilla Overlay 40mm @ Traff >=2000 2021 2.831 0.686
Z7045 Terakhada‐Mollahat Road Km 018.32‐018.92 S 0.60 2964 Zilla Overlay 40mm @ Traff >=2000 2021 1.864 0.631
Z7045 Terakhada‐Mollahat Road Km 018.92‐019.02 S 0.10 2964 Zilla Overlay 40mm @ Traff >=2000 2021 0.311 0.000
Z7045 Terakhada‐Mollahat Road Km 019.02‐019.22 S 0.20 2964 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 0.630
Z7045 Terakhada‐Mollahat Road Km 019.22‐019.99 S 0.77 2964 Zilla Overlay 40mm @ Traff >=2000 2021 2.380 0.154
Page 129 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 000.00‐003.10 S 3.10 5390 Zilla Overlay 40mm @ Traff >=2000 2021 9.764 0.000
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 003.10‐003.20 S 0.10 5390 Zilla Rehab 75mm @ IRI 9‐12 2021 1.302 0.932
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 009.90‐011.10 S 1.20 5390 Zilla Overlay 50mm @ IRI 6‐9 2021 4.662 0.492
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 011.10‐011.30 S 0.20 5390 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.955
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 011.30‐012.60 S 1.30 5390 Zilla Overlay 50mm @ Cracking >25% 2021 5.054 0.114
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 012.60‐013.10 S 0.50 5390 Zilla Rehab 75mm @ IRI 9‐12 2021 6.300 0.249
Z7054 Chitalmari‐Tungipara (Patgati) Road Km 013.10‐013.80 S 0.70 5390 Zilla Overlay 40mm @ Traff >=2000 2021 2.392 0.093
Z7701 Morelganj (CARE Bazar) ‐Mongla Road Km 025.80‐025.89 S 0.09 351 Zilla Overlay 40mm @ IRI>12 2021 0.286 0.000
Z7703 Bagerhat (Signboard)‐Kachua Road Km 004.99‐007.45 S 2.46 2048 Zilla Overlay 40mm @ Traff >=2000 2021 8.323 0.000
Z7704 Pirojpur‐Nazirpur‐Matibhanga‐Patgati‐Gonapara Road Km 028.86‐035.20 S 6.34 3419 Zilla Overlay 40mm @ Traff >=2000 2021 29.595 0.417
Z7708 Bagerhat‐Chitolmari Road Km 013.80‐013.90 S 0.10 4773 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.397
Z7708 Bagerhat‐Chitolmari Road Km 023.80‐024.20 S 0.40 4773 Zilla Overlay 50mm @ IRI 6‐9 2021 2.310 1.477
Z7708 Bagerhat‐Chitolmari Road Km 024.30‐024.40 S 0.10 4773 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.341
Z7716 Nazirpur‐Kuchua Road Km 001.30‐002.00 S 0.70 907 Zilla Overlay 40mm @ IRI>12 2021 2.330 0.000
Z7716 Nazirpur‐Kuchua Road Km 004.10‐004.20 S 0.10 907 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7716 Nazirpur‐Kuchua Road Km 005.80‐006.00 S 0.20 907 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 004.60‐006.90 S 2.30 2808 Zilla Overlay 40mm @ Traff >=2000 2021 6.834 0.183
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 023.70‐023.90 S 0.20 2808 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.083
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 024.00‐024.10 S 0.10 2808 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.451
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 024.30‐024.50 S 0.20 2808 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.138
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 026.00‐027.50 S 1.50 2808 Zilla Rehab 75mm @ IRI 9‐12 2021 16.611 0.243
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 028.50‐028.60 S 0.10 2808 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.222
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 030.70‐030.90 S 0.20 2808 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.086
Z7717 Bagerhat‐Rampal ‐Mongla Road Km 032.20‐032.30 S 0.10 2808 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.180
Z7719 Bagerhat Circuit House‐Karapara Road Km 000.40‐000.50 S 0.10 3341 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.695
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 001.50‐004.40 S 2.90 4528 Zilla Overlay 50mm @ IRI 6‐9 2021 11.267 0.857
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 004.40‐006.40 S 2.00 4528 Zilla Overlay 50mm @ IRI 6‐9 2021 7.770 0.492
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 006.40‐006.60 S 0.20 4528 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.336
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 016.42‐016.72 S 0.30 4528 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.814
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 019.22‐019.32 S 0.10 4528 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.226
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 020.02‐020.12 S 0.10 4528 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.451
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 021.22‐022.62 S 1.40 4528 Zilla Rehab 75mm @ IRI 9‐12 2021 15.504 0.546
Z7801 Chitalmari‐Fakirhat (Faltita) Road Km 022.72‐022.86 S 0.14 4528 Zilla Rehab 75mm @ IRI 9‐12 2021 1.539 0.792
Bagerhat Total 1083.326
Chuadanga Division
R743 Jibannagar‐Duttanagar Road Km 000.00‐000.10 S 0.10 2141 Regional DBST @ Traff 2000‐4000 2021 0.272 0.530
R743 Jibannagar‐Duttanagar Road Km 000.10‐000.20 S 0.10 2141 Regional Full Recon 135mm 2021 3.005 0.016
R743 Jibannagar‐Duttanagar Road Km 000.20‐005.26 S 5.06 2141 Regional DBST @ 25% Crk 2021 10.648 0.811
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 069.51‐078.55 S 9.04 3599 Regional DBST @ 25% Crk 2021 31.875 0.265
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 078.55‐079.24 S 0.69 3599 Regional Overlay 50mm @ IRI 7‐9 2021 6.231 0.610
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 079.24‐079.54 S 0.29 3599 Regional DBST @ 25% Crk 2021 1.253 0.180
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 080.43‐080.70 S 0.27 3599 Regional Overlay 50mm @ IRI 5‐7 2021 1.588 1.136
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 080.75‐081.33 L 0.58 3599 Regional DBST @ 25% Crk 2021 1.456 1.368
Page 130 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 083.15‐083.65 S 0.50 3599 Regional DBST @ 25% Crk 2021 1.408 0.496
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 083.65‐083.75 S 0.10 3599 Regional Full Recon 135mm 2021 3.114 0.898
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 083.75‐083.95 S 0.20 3599 Regional DBST @ 25% Crk 2021 0.563 0.618
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 083.95‐084.05 S 0.10 3599 Regional DBST @ Traff 2000‐4000 2021 0.282 1.612
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 084.05‐084.45 S 0.40 3599 Regional DBST @ Traff 2000‐4000 2021 1.126 0.587
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 085.14‐088.01 S 2.87 3599 Regional DBST @ 25% Crk 2021 7.977 0.453
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 088.01‐088.11 S 0.10 3599 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 0.775
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 091.51‐092.11 S 0.60 3599 Regional Overlay 50mm @ IRI 5‐7 2021 4.725 0.853
R747 Kustia‐Poradah‐Chuadanga Road Km 017.61‐024.90 S 7.30 10172 Regional DBST @ Traff >6000 2021 19.823 5.824
R747 Kustia‐Poradah‐Chuadanga Road Km 024.90‐025.00 S 0.10 10172 Regional Full Recon 195mm 2021 4.016 2.737
R747 Kustia‐Poradah‐Chuadanga Road Km 025.00‐040.87 S 15.87 10172 Regional DBST @ Traff >6000 2021 45.950 8.469
R747 Kustia‐Poradah‐Chuadanga Road Km 040.87‐040.97 S 0.10 10172 Regional Rehab 150mm @ IRI 9‐12 2021 2.946 3.812
R747 Kustia‐Poradah‐Chuadanga Road Km 040.97‐042.77 S 1.80 10172 Regional DBST @ Traff >6000 2021 5.424 7.461
R747 Kustia‐Poradah‐Chuadanga Road Km 042.77‐043.43 S 0.65 10172 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.991 8.849
R747 Kustia‐Poradah‐Chuadanga Road Km 043.43‐043.47 L 0.04 10172 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.315 11.288
R747 Kustia‐Poradah‐Chuadanga Road Km 043.43‐043.47 R 0.04 10172 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.290 12.694
R748 Chuadanga‐Darsana‐Kaliganj Road Km 000.00‐000.40 S 0.40 5093 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.273 2.012
R748 Chuadanga‐Darsana‐Kaliganj Road Km 000.40‐000.90 S 0.50 5093 Regional Rehab 150mm @ IRI 9‐12 2021 15.842 1.488
R748 Chuadanga‐Darsana‐Kaliganj Road Km 000.90‐002.00 S 1.10 5093 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.532 3.669
R748 Chuadanga‐Darsana‐Kaliganj Road Km 002.30‐002.77 L 0.47 5093 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.940 7.209
R748 Chuadanga‐Darsana‐Kaliganj Road Km 002.30‐002.77 R 0.47 5093 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.763 7.639
R748 Chuadanga‐Darsana‐Kaliganj Road Km 003.80‐004.00 S 0.20 5093 Regional DBST @ Traff 4000‐6000 2021 0.741 3.459
R748 Chuadanga‐Darsana‐Kaliganj Road Km 005.10‐005.20 S 0.10 5093 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.100
R748 Chuadanga‐Darsana‐Kaliganj Road Km 013.05‐016.30 S 3.26 5093 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.218 4.406
R748 Chuadanga‐Darsana‐Kaliganj Road Km 016.30‐021.14 S 4.84 4457 Regional Overlay 50mm @ IRI 5‐7 2021 28.555 8.310
R748 Chuadanga‐Darsana‐Kaliganj Road Km 021.14‐021.44 S 0.30 7698 Regional Rehab 150mm @ IRI 9‐12 2021 8.984 10.133
R748 Chuadanga‐Darsana‐Kaliganj Road Km 021.44‐024.54 S 3.10 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.044 23.887
R748 Chuadanga‐Darsana‐Kaliganj Road Km 024.54‐027.54 S 3.00 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.269 23.823
R748 Chuadanga‐Darsana‐Kaliganj Road Km 027.54‐031.44 S 3.90 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 29.330 23.769
R748 Chuadanga‐Darsana‐Kaliganj Road Km 031.44‐031.56 S 0.12 7698 Regional Full Recon 150mm @ IRI 12 2021 3.731 7.469
R748 Chuadanga‐Darsana‐Kaliganj Road Km 031.56‐037.06 S 5.50 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 40.824 24.595
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 047.03‐055.48 S 8.44 2857 Zilla Overlay 40mm @ Traff >=2000 2021 24.590 0.000
Chuadanga Total 406.060
Jashore Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 134.68‐135.41 S 0.74 11200 National Rehab 195mm @ IRI 9‐12 2021 25.956 7.554
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 135.41‐135.61 S 0.20 11200 National Full Recon 195mm @ IRI 12 2021 8.469 7.054
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 135.61‐142.22 S 6.60 11194 National Overlay 80mm @ IRI 4‐9 2021 68.633 16.125
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 142.22‐147.34 S 5.13 9252 National Rehab 180mm @ IRI 9‐12 2021 247.882 6.427
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 151.24‐151.28 L 0.04 9252 National Rehab 180mm @ IRI 9‐12 2021 1.388 10.036
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 151.24‐151.28 R 0.04 9252 National Rehab 180mm @ IRI 9‐12 2021 1.388 10.036
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 000.00‐000.06 L 0.06 6769 National Overlay 50mm @ IRI 5‐7 2021 0.461 17.812
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 000.00‐000.06 R 0.06 6769 National Overlay 50mm @ IRI 5‐7 2021 0.461 17.757
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 000.06‐000.40 S 0.34 6769 National Overlay 60mm @ IRI 7‐9 2021 3.364 15.984
Page 131 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 000.40‐000.80 S 0.40 6769 National Full Recon 180mm 2021 22.705 5.148
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 000.80‐006.60 S 5.80 6769 National Overlay 60mm @ IRI 7‐9 2021 56.958 16.655
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 006.60‐006.80 S 0.20 6769 National Full Recon 180mm 2021 10.079 6.268
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 006.80‐008.00 S 1.20 6769 National Overlay 60mm @ IRI 7‐9 2021 11.499 17.060
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 008.00‐008.10 S 0.10 6769 National Full Recon 180mm 2021 5.039 6.189
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 008.10‐011.61 S 3.51 6769 National Overlay 50mm @ IRI 5‐7 2021 26.536 17.000
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 011.61‐012.70 S 1.09 6769 National Rehab 180mm @ IRI 9‐12 2021 48.279 5.596
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 012.70‐013.00 S 0.30 6769 National Rehab 180mm @ IRI 9‐12 2021 14.088 5.664
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 013.00‐013.80 S 0.80 6769 National Overlay 60mm @ IRI 7‐9 2021 7.206 17.803
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 013.80‐013.90 S 0.10 6769 National Full Recon 180mm 2021 5.039 6.203
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 013.90‐014.40 S 0.50 6928 National DBST @ Traff >6000 2021 1.778 16.061
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 014.40‐014.50 S 0.10 8268 National Full Recon 180mm 2021 5.039 4.086
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 014.50‐022.57 S 8.06 8268 National Overlay 60mm @ IRI 7‐9 2021 73.349 12.955
N707 Jashore Town Old Section ‐Monihar‐Murali) Road Km 000.00‐003.10 S 3.10 27752 National Overlay 80mm @ IRI 5‐9 2021 47.400 8.796
N707 Jashore Town Old Section ‐Monihar‐Murali) Road Km 003.10‐003.30 S 0.20 21865 National Rehab 195mm @ IRI 9‐12 2021 18.192 2.826
N707 Jashore Town Old Section ‐Monihar‐Murali) Road Km 003.30‐003.60 S 0.30 21865 National Overlay 80mm @ IRI 5‐9 2021 7.439 8.909
N708 Jashore Town Old Section Alternate Road  Km 000.00‐001.87 S 1.87 21865 National Overlay 80mm @ IRI 5‐9 2021 22.009 16.313
N708 Jashore Town Old Section Alternate Road  Km 001.90‐002.47 L 0.57 21865 National Overlay 80mm @ IRI 5‐9 2021 5.842 21.102
N708 Jashore Town Old Section Alternate Road  Km 001.90‐002.47 R 0.57 21865 National Overlay 80mm @ IRI 5‐9 2021 5.842 20.807
N708 Jashore Town Old Section Alternate Road  Km 002.47‐002.68 S 0.21 21865 National Overlay 80mm @ IRI 5‐9 2021 8.331 4.977
N708 Jashore Town Old Section Alternate Road  Km 002.70‐002.90 L 0.20 21865 National Overlay 80mm @ IRI 5‐9 2021 2.050 21.190
N708 Jashore Town Old Section Alternate Road  Km 002.70‐002.90 R 0.20 21865 National Overlay 80mm @ IRI 5‐9 2021 2.050 21.190
N708 Jashore Town Old Section Alternate Road  Km 002.90‐002.99 S 0.09 21865 National Overlay 80mm @ IRI 5‐9 2021 3.570 4.946
N708 Jashore Town Old Section Alternate Road  Km 003.00‐003.35 L 0.34 21865 National Overlay 80mm @ IRI 5‐9 2021 3.878 19.621
N708 Jashore Town Old Section Alternate Road  Km 003.00‐003.35 R 0.34 21865 National Overlay 80mm @ IRI 5‐9 2021 3.878 19.412
N708 Jashore Town Old Section Alternate Road  Km 003.35‐004.75 S 1.40 21865 National Overlay 80mm @ IRI 5‐9 2021 20.972 12.737
N711 Benapole Town Old Section Road Km 000.00‐000.20 S 0.20 1940 National Full Recon 110mm 2021 7.776 0.638
N711 Benapole Town Old Section Road Km 002.00‐002.60 S 0.60 1940 National DBST @ Traff 100‐2000 2021 1.630 4.525
N711 Benapole Town Old Section Road Km 002.60‐003.58 S 0.98 1940 National Overlay 50mm @ IRI 5‐9 2021 5.660 5.298
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 034.62‐054.51 S 19.89 7459 National DBST @ Traff >6000 2021 54.344 4.869
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 054.51‐055.17 S 0.65 7459 National Overlay 60mm @ IRI 7‐9 2021 6.957 3.784
Z7050 Jashore Cantonment‐Shadinata Sharani Road Km 000.20‐000.30 S 0.10 742 Zilla Overlay 40mm @ IRI>12 2021 1.528 0.000
Z7058 Sutighata‐Dakuria Road Km 000.00‐001.00 S 1.00 1489 Zilla Overlay 40mm @ 1000‐2000 2021 3.727 0.000
Z7058 Sutighata‐Dakuria Road Km 001.00‐001.10 S 0.10 1489 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7058 Sutighata‐Dakuria Road Km 001.10‐002.00 S 0.90 1489 Zilla Overlay 40mm @ 1000‐2000 2021 2.827 0.000
Z7058 Sutighata‐Dakuria Road Km 002.00‐002.10 S 0.10 1489 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7058 Sutighata‐Dakuria Road Km 002.10‐002.30 S 0.20 1489 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.105
Z7058 Sutighata‐Dakuria Road Km 002.30‐002.60 S 0.30 1489 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z7058 Sutighata‐Dakuria Road Km 002.60‐002.80 S 0.20 1489 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z7058 Sutighata‐Dakuria Road Km 002.80‐002.90 S 0.10 1489 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7058 Sutighata‐Dakuria Road Km 002.90‐003.70 S 0.80 1489 Zilla Overlay 40mm @ 1000‐2000 2021 2.513 0.000
Z7058 Sutighata‐Dakuria Road Km 003.70‐003.80 S 0.10 1489 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7058 Sutighata‐Dakuria Road Km 005.70‐005.90 S 0.20 1489 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Page 132 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7058 Sutighata‐Dakuria Road Km 005.90‐006.00 S 0.10 1489 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z7058 Sutighata‐Dakuria Road Km 006.00‐006.40 S 0.40 1489 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z7058 Sutighata‐Dakuria Road Km 006.40‐007.40 S 1.00 1489 Zilla Overlay 40mm @ 1000‐2000 2021 3.337 0.000
Z7058 Sutighata‐Dakuria Road Km 007.40‐007.60 S 0.20 1489 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7058 Sutighata‐Dakuria Road Km 008.70‐009.00 S 0.30 1489 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z7058 Sutighata‐Dakuria Road Km 011.30‐011.90 S 0.60 1489 Zilla Overlay 40mm @ 1000‐2000 2021 1.885 0.000
Z7058 Sutighata‐Dakuria Road Km 011.90‐012.30 S 0.40 1489 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z7058 Sutighata‐Dakuria Road Km 012.30‐012.40 S 0.10 1489 Zilla Seal Coat 2021 0.093 0.216
Z7058 Sutighata‐Dakuria Road Km 012.40‐012.70 S 0.30 1489 Zilla Overlay 40mm @ 1000‐2000 2021 0.946 0.000
Z7058 Sutighata‐Dakuria Road Km 012.70‐013.10 S 0.40 1489 Zilla Overlay 40mm @ 1000‐2000 2021 1.541 0.000
Z7059 Bolianpur‐Kuada Road Km 000.00‐000.30 S 0.30 1834 Zilla Overlay 40mm @ 1000‐2000 2021 0.998 0.000
Z7059 Bolianpur‐Kuada Road Km 000.30‐000.40 S 0.10 1834 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7501 Bagherpara Link Road Km 003.60‐004.34 S 0.74 4048 Zilla Overlay 50mm @ IRI 6‐9 2021 4.274 0.839
Z7551 Monirampur‐Jikorgachha Road Km 000.00‐003.10 S 3.10 4619 Zilla Overlay 50mm @ IRI 6‐9 2021 12.402 0.736
Z7551 Monirampur‐Jikorgachha Road Km 006.20‐012.40 S 6.20 4619 Zilla Overlay 50mm @ IRI 6‐9 2021 24.738 1.097
Z7551 Monirampur‐Jikorgachha Road Km 016.80‐017.49 S 0.69 4619 Zilla Overlay 50mm @ IRI 6‐9 2021 2.677 1.687
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 000.00‐000.80 S 0.80 2980 Zilla Overlay 40mm @ Traff >=2000 2021 2.119 0.994
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 000.80‐002.10 S 1.30 2980 Zilla Overlay 40mm @ Traff >=2000 2021 3.421 1.071
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 002.10‐002.90 S 0.80 2980 Zilla Overlay 40mm @ Traff >=2000 2021 2.106 1.143
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 003.00‐004.20 S 1.20 2980 Zilla Overlay 40mm @ Traff >=2000 2021 3.158 1.153
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 004.20‐004.70 S 0.50 2980 Zilla Overlay 40mm @ Traff >=2000 2021 1.316 1.074
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 004.70‐006.00 S 1.30 2980 Zilla Overlay 40mm @ Traff >=2000 2021 3.421 1.209
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 009.00‐009.10 S 0.10 2980 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.570
Z7553 Keshabpur ‐Betgram Road Km 004.98‐005.28 S 0.30 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.266
Z7553 Keshabpur ‐Betgram Road Km 005.28‐005.38 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7553 Keshabpur ‐Betgram Road Km 005.38‐005.58 S 0.20 2610 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.004
Z7553 Keshabpur ‐Betgram Road Km 005.58‐005.68 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.035
Z7553 Keshabpur ‐Betgram Road Km 005.68‐005.78 S 0.10 2610 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.266
Z7553 Keshabpur ‐Betgram Road Km 005.78‐006.08 S 0.30 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z7553 Keshabpur ‐Betgram Road Km 006.08‐006.28 S 0.20 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.265
Z7553 Keshabpur ‐Betgram Road Km 006.28‐006.38 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7553 Keshabpur ‐Betgram Road Km 006.38‐006.78 S 0.40 2610 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.006
Z7553 Keshabpur ‐Betgram Road Km 006.78‐006.88 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.035
Z7553 Keshabpur ‐Betgram Road Km 006.88‐007.28 S 0.40 2610 Zilla Overlay 40mm @ IRI>12 2021 1.257 0.000
Z7553 Keshabpur ‐Betgram Road Km 008.98‐009.08 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7553 Keshabpur ‐Betgram Road Km 017.28‐017.48 S 0.20 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.202
Z7553 Keshabpur ‐Betgram Road Km 017.48‐018.28 S 0.80 2610 Zilla Overlay 40mm @ Traff >=2000 2021 2.513 0.302
Z7553 Keshabpur ‐Betgram Road Km 018.28‐018.58 S 0.30 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.340
Z7553 Keshabpur ‐Betgram Road Km 018.58‐018.68 S 0.10 2610 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.469
Z7553 Keshabpur ‐Betgram Road Km 018.68‐018.78 S 0.10 2610 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7553 Keshabpur ‐Betgram Road Km 018.78‐020.08 S 1.30 2610 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 0.588
Z7619 Modhanpur College More‐Trimohoni Bazar Road Km 018.80‐020.40 S 1.60 4704 Zilla Overlay 50mm @ IRI 6‐9 2021 6.216 1.962
Z7619 Modhanpur College More‐Trimohoni Bazar Road Km 020.70‐022.60 S 1.90 4704 Zilla Overlay 50mm @ IRI 6‐9 2021 7.860 1.696
Page 133 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7619 Modhanpur College More‐Trimohoni Bazar Road Km 022.90‐024.50 S 1.60 4704 Zilla Overlay 50mm @ IRI 6‐9 2021 5.981 1.845
Z7619 Modhanpur College More‐Trimohoni Bazar Road Km 024.50‐024.60 S 0.10 4704 Zilla Full Recon 75mm @ IRI>12 2021 1.326 1.408
Jashore Total 1009.915
Jhenaidah Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 090.84‐094.34 S 3.50 6699 National Overlay 50mm @ IRI 4‐7 2021 27.394 12.637
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 094.34‐094.44 S 0.10 6699 National Full Recon 180mm 2021 5.249 4.474
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 094.44‐098.24 S 3.80 6699 National Overlay 50mm @ IRI 4‐7 2021 29.925 12.442
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 098.24‐098.34 S 0.10 6699 National Full Recon 180mm 2021 5.249 4.360
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 098.34‐099.74 S 1.40 6699 National Overlay 50mm @ IRI 4‐7 2021 11.025 12.364
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 099.74‐099.84 S 0.10 6699 National Full Recon 180mm 2021 5.249 4.380
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 099.84‐102.64 S 2.80 6699 National Overlay 50mm @ IRI 4‐7 2021 21.932 12.546
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 102.64‐102.74 S 0.10 6699 National Rehab 180mm @ IRI 9‐12 2021 4.936 5.016
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 102.74‐102.84 S 0.10 6699 National Overlay 50mm @ IRI 4‐7 2021 0.767 13.209
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 102.84‐102.94 S 0.10 6699 National Full Recon 180mm 2021 5.109 4.410
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 102.94‐103.31 S 0.37 6699 National Overlay 50mm @ IRI 4‐7 2021 2.821 13.258
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.31‐103.49 S 0.18 18037 National Rehab 195mm @ IRI 9‐12 2021 7.835 11.907
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.49‐103.59 S 0.10 18037 National Full Recon 195mm 2021 5.330 10.924
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.59‐103.70 S 0.11 18037 National Rehab 195mm @ IRI 9‐12 2021 4.958 12.126
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.70‐103.76 L 0.05 18037 National Overlay 80mm @ IRI 4‐9 2021 0.664 28.527
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.70‐103.76 R 0.05 18037 National Overlay 80mm @ IRI 4‐9 2021 0.664 28.527
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 103.76‐105.52 S 1.77 18037 National Overlay 80mm @ IRI 4‐9 2021 21.994 27.649
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 105.67‐105.89 S 0.22 18037 National Overlay 80mm @ IRI 4‐9 2021 2.728 37.375
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 105.89‐105.99 S 0.10 18037 National Full Recon 195mm @ IRI 12 2021 5.330 10.900
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 105.99‐106.19 S 0.20 18037 National Rehab 195mm @ IRI 9‐12 2021 8.853 12.477
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 106.40‐112.69 S 6.29 18037 National Overlay 80mm @ IRI 4‐9 2021 63.508 32.841
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 112.69‐112.89 S 0.20 18037 National Full Recon 195mm 2021 14.894 11.078
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 112.89‐114.19 S 1.30 18037 National Overlay 80mm @ IRI 4‐9 2021 13.796 31.410
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 114.19‐114.29 S 0.10 18037 National Full Recon 195mm 2021 4.089 14.683
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 114.29‐115.39 S 1.10 18037 National Rehab 195mm @ IRI 9‐12 2021 39.355 14.406
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 115.39‐115.59 S 0.20 18037 National Full Recon 195mm 2021 11.536 10.058
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 115.73‐116.89 S 1.16 18037 National Overlay 80mm @ IRI 4‐9 2021 11.801 32.649
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 116.89‐116.99 S 0.10 18037 National Full Recon 195mm 2021 4.746 12.836
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 116.99‐117.59 S 0.60 18037 National Overlay 80mm @ IRI 4‐9 2021 6.447 28.189
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 117.68‐123.61 S 5.93 9439 National Rehab 180mm @ IRI 9‐12 2021 321.006 7.822
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 123.61‐123.71 S 0.10 11200 National Full Recon 195mm 2021 5.330 5.377
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 123.79‐125.88 S 2.10 11200 National Overlay 80mm @ IRI 4‐9 2021 25.280 13.736
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 126.77‐127.11 S 0.34 11200 National Overlay 80mm @ IRI 4‐9 2021 4.151 14.588
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 127.11‐127.21 S 0.10 11200 National Full Recon 195mm 2021 5.330 5.375
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 127.21‐134.68 S 7.46 11200 National Overlay 80mm @ IRI 4‐9 2021 84.863 14.359
N703 Jhenaidah Town Old Section Road Km 000.00‐000.01 S 0.01 23706 National DBST @ Traff >6000 2021 0.114 0.436
N703 Jhenaidah Town Old Section Road Km 000.01‐000.03 L 0.02 23706 National Rehab 195mm @ IRI 9‐12 2021 0.947 3.032
N703 Jhenaidah Town Old Section Road Km 000.01‐000.03 R 0.02 23706 National Rehab 195mm @ IRI 9‐12 2021 0.867 4.813
N703 Jhenaidah Town Old Section Road Km 000.03‐001.99 S 1.96 23706 National Overlay 50mm @ IRI 5 2021 13.624 2.481
Page 134 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N703 Jhenaidah Town Old Section Road Km 001.99‐002.03 S 0.04 8682 National Overlay 50mm @ IRI 5‐7 2021 0.277 10.865
N703 Jhenaidah Town Old Section Road Km 002.03‐002.17 L 0.14 8682 National Overlay 60mm @ IRI 7‐9 2021 1.200 7.960
N703 Jhenaidah Town Old Section Road Km 002.03‐002.17 R 0.14 8682 National Overlay 60mm @ IRI 7‐9 2021 1.200 7.960
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 000.00‐000.90 S 0.90 11968 National Overlay 80mm @ IRI 5‐9 2021 7.394 10.474
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 001.02‐003.90 S 2.88 15097 National Rehab 195mm @ IRI 9‐12 2021 185.820 4.312
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 010.92‐012.40 S 1.48 15097 National Overlay 80mm @ IRI 5‐9 2021 17.847 17.709
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 013.00‐015.90 S 2.90 15097 National Overlay 80mm @ IRI 5‐9 2021 35.569 17.471
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 015.90‐018.80 S 2.90 15097 National Overlay 80mm @ IRI 5‐9 2021 35.928 16.617
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 018.90‐021.52 S 2.62 14415 National DBST @ Traff >6000 2021 9.434 14.948
N712 Jhenaidaha ‐Arappur Intersection‐Alhera Road Km 000.00‐000.01 S 0.01 4561 National Full Recon 150mm 2021 0.085 17.746
N712 Jhenaidaha ‐Arappur Intersection‐Alhera Road Km 000.01‐000.03 L 0.02 8682 National Full Recon 180mm 2021 1.093 3.225
N712 Jhenaidaha ‐Arappur Intersection‐Alhera Road Km 000.01‐000.03 R 0.02 8682 National Full Recon 180mm @ IRI 12 2021 1.001 5.069
N712 Jhenaidaha ‐Arappur Intersection‐Alhera Road Km 000.03‐000.13 S 0.10 8682 National Rehab 180mm @ IRI 9‐12 2021 5.308 1.063
N712 Jhenaidaha ‐Arappur Intersection‐Alhera Road Km 000.13‐002.13 S 2.00 8682 National DBST @ Traff >6000 2021 7.223 5.182
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 096.80‐101.01 S 4.21 3599 Regional DBST @ 25% Crk 2021 11.641 0.432
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 101.01‐101.98 S 0.97 3599 Regional Overlay 50mm @ IRI 5‐7 2021 5.680 1.130
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 113.01‐115.72 S 2.71 8682 Regional Overlay 60mm @ IRI 5.5‐9 2021 18.999 9.917
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 115.72‐115.91 S 0.19 8682 Regional DBST @ Traff >6000 2021 0.522 7.349
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 115.91‐116.01 S 0.10 8682 Regional Rehab 150mm @ IRI 9‐12 2021 3.623 2.671
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 116.01‐116.02 S 0.01 8682 Regional DBST @ Traff >6000 2021 0.033 5.432
R748 Chuadanga‐Darsana‐Kaliganj Road Km 037.06‐043.96 S 6.90 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 49.180 24.016
R748 Chuadanga‐Darsana‐Kaliganj Road Km 044.15‐051.16 S 7.01 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 49.657 24.578
R748 Chuadanga‐Darsana‐Kaliganj Road Km 051.16‐051.76 S 0.60 7698 Regional Rehab 150mm @ IRI 9‐12 2021 15.939 6.288
R748 Chuadanga‐Darsana‐Kaliganj Road Km 051.76‐052.06 S 0.30 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.147 17.546
R748 Chuadanga‐Darsana‐Kaliganj Road Km 052.08‐052.56 S 0.48 7698 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.411 20.758
R748 Chuadanga‐Darsana‐Kaliganj Road Km 052.56‐055.66 S 3.10 3441 Regional Overlay 50mm @ IRI 5‐7 2021 19.986 4.962
R748 Chuadanga‐Darsana‐Kaliganj Road Km 055.66‐055.76 S 0.10 3441 Regional Rehab 135mm @ IRI 9‐12 2021 2.626 2.199
R748 Chuadanga‐Darsana‐Kaliganj Road Km 058.76‐063.36 S 4.60 3441 Regional Overlay 50mm @ IRI 5‐7 2021 27.821 4.752
R748 Chuadanga‐Darsana‐Kaliganj Road Km 063.36‐063.86 S 0.50 3441 Regional Rehab 135mm @ IRI 9‐12 2021 11.773 2.327
R748 Chuadanga‐Darsana‐Kaliganj Road Km 063.86‐065.86 S 2.00 3441 Regional Overlay 50mm @ IRI 5‐7 2021 11.151 6.146
R748 Chuadanga‐Darsana‐Kaliganj Road Km 065.86‐065.88 S 0.02 3441 Regional Full Recon 135mm 2021 1.036 1.146
Z7021 Arpara‐Kaliganj Road Km 014.34‐029.00 S 14.66 1301 Zilla Overlay 40mm @ 1000‐2000 2021 48.046 0.088
Z7021 Arpara‐Kaliganj Road Km 029.00‐029.71 S 0.71 1301 Zilla Overlay 40mm @ 1000‐2000 2021 2.781 0.000
Z7023 Khalishpur‐Maheshpur‐Jadabpur Road Km 000.10‐004.60 S 4.50 5908 Zilla Overlay 40mm @ Traff >=2000 2021 21.089 0.195
Z7023 Khalishpur‐Maheshpur‐Jadabpur Road Km 004.60‐005.28 S 0.68 5908 Zilla Overlay 50mm @ IRI 6‐9 2021 3.950 0.854
Z7023 Khalishpur‐Maheshpur‐Jadabpur Road Km 005.28‐005.38 S 0.10 5908 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.080
Z7023 Khalishpur‐Maheshpur‐Jadabpur Road Km 005.38‐016.28 S 10.90 5908 Zilla Overlay 50mm @ Cracking >25% 2021 62.947 0.088
Z7023 Khalishpur‐Maheshpur‐Jadabpur Road Km 041.73‐041.83 S 0.10 5099 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.372
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 000.00‐004.60 S 4.60 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 14.333 0.190
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 006.00‐006.60 S 0.60 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.885 0.185
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 006.90‐013.00 S 6.10 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 20.978 0.181
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 013.00‐013.30 S 0.30 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 013.30‐013.50 S 0.20 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.220
Page 135 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 013.50‐013.70 S 0.20 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 013.70‐016.10 S 2.40 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 7.539 0.137
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 016.10‐016.30 S 0.20 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 016.30‐017.70 S 1.40 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.398 0.139
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 017.70‐017.80 S 0.10 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 020.30‐020.50 S 0.20 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 020.50‐023.00 S 2.50 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 7.853 0.119
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 023.00‐023.30 S 0.30 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 024.60‐024.90 S 0.30 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.000
Z7024 Gopalpur‐Talsar BazarMaheshpur Road Km 024.90‐025.83 S 0.93 793 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.981 0.177
Z7057 Kaliganj‐Khajura‐Raipur‐Bagharapara Road Km 000.00‐014.08 S 14.07 1301 Zilla Overlay 40mm @ 1000‐2000 2021 44.333 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 000.00‐000.10 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.425 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 000.10‐000.70 S 0.60 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.710 0.111
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 000.70‐000.80 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.382 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 000.80‐004.70 S 3.90 2857 Zilla Overlay 40mm @ Traff >=2000 2021 13.807 0.332
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 004.88‐005.90 S 1.02 2857 Zilla Overlay 40mm @ Traff >=2000 2021 3.150 0.442
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 005.90‐006.70 S 0.80 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 0.046
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 006.70‐007.40 S 0.70 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.139 0.330
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 007.40‐008.30 S 0.90 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.751 0.094
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 008.30‐008.80 S 0.50 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.528 0.350
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 008.80‐008.90 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 008.90‐009.60 S 0.70 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.139 0.511
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 009.60‐010.40 S 0.80 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 0.004
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 010.40‐011.20 S 0.80 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.486 0.377
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 011.20‐011.70 S 0.50 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 011.70‐013.50 S 1.80 2857 Zilla Overlay 40mm @ Traff >=2000 2021 5.657 0.434
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 013.50‐014.40 S 0.90 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.827 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 014.40‐015.50 S 1.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 0.532
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 015.50‐015.80 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.167 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 015.80‐016.00 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.076
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 016.00‐016.10 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.375 0.048
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 016.10‐017.90 S 1.80 2857 Zilla Overlay 40mm @ Traff >=2000 2021 5.502 0.380
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 017.90‐018.00 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 018.00‐018.10 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 0.283
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 018.10‐018.30 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 018.30‐019.60 S 1.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 3.973 0.568
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 019.60‐020.00 S 0.40 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.223 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 020.40‐020.90 S 0.50 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.528 0.016
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 020.90‐021.10 S 0.20 2857 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 021.10‐021.40 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 021.40‐022.00 S 0.60 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.318
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 022.00‐022.10 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 022.10‐022.40 S 0.30 2857 Zilla Overlay 40mm @ IRI>12 2021 0.917 0.000
Page 136 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 022.40‐022.50 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 022.50‐023.10 S 0.60 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.226
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 023.10‐023.30 S 0.20 2857 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.016
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 023.30‐023.40 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 023.40‐023.80 S 0.40 2857 Zilla Overlay 40mm @ IRI>12 2021 1.223 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 023.80‐023.90 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 023.90‐024.10 S 0.20 2857 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 024.10‐024.20 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 024.20‐025.20 S 1.00 2857 Zilla Overlay 40mm @ IRI>12 2021 3.056 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 025.20‐025.30 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 025.30‐025.50 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 0.316
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 025.50‐025.60 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 025.60‐026.20 S 0.60 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.252
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.20‐026.40 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.40‐026.50 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.184
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.50‐026.60 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.60‐026.70 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.199
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.70‐026.90 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 026.90‐027.10 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 0.174
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.10‐027.30 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.30‐027.40 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.152
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.40‐027.60 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.115
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.60‐027.70 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.263
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.70‐027.80 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 027.80‐028.00 S 0.20 2857 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 028.00‐028.30 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 028.30‐028.50 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 0.305
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 028.50‐028.60 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 028.60‐029.20 S 0.60 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 6.465 0.184
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 029.20‐029.40 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.615 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 032.37‐033.37 S 1.00 2857 Zilla Overlay 40mm @ Traff >=2000 2021 3.056 0.134
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 033.37‐033.87 S 0.50 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 5.387 0.200
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 033.87‐034.07 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 034.07‐034.37 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.774 0.476
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 034.37‐036.03 S 1.65 2857 Zilla Overlay 40mm @ Traff >=2000 2021 4.205 0.000
Z7457 Jhenaidah‐Harinakundu Road Km 000.00‐004.00 S 4.00 3726 Zilla Overlay 40mm @ Cracks >25% 2021 14.118 0.055
Z7457 Jhenaidah‐Harinakundu Road Km 004.00‐004.10 S 0.10 3726 Zilla Rehab 75mm @ IRI 9‐12 2021 1.048 1.329
Z7457 Jhenaidah‐Harinakundu Road Km 004.10‐011.40 S 7.30 3726 Zilla Overlay 40mm @ Cracks >25% 2021 20.542 0.267
Z7457 Jhenaidah‐Harinakundu Road Km 011.40‐011.50 S 0.10 3726 Zilla Rehab 75mm @ IRI 9‐12 2021 1.048 1.224
Z7457 Jhenaidah‐Harinakundu Road Km 011.50‐019.70 S 8.20 3726 Zilla Overlay 40mm @ Cracks >25% 2021 23.341 0.250
Z7457 Jhenaidah‐Harinakundu Road Km 019.70‐019.88 S 0.18 3726 Zilla Rehab 75mm @ IRI 9‐12 2021 2.027 0.816
Z7458 Garagonj‐Shailakupa Road Km 000.00‐000.10 S 0.10 7208 Zilla Overlay 50mm @ IRI 6‐9 2021 0.714 0.987
Z7458 Garagonj‐Shailakupa Road Km 000.10‐000.20 S 0.10 7208 Zilla Full Recon 75mm @ IRI>12 2021 2.478 1.318
Page 137 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7458 Garagonj‐Shailakupa Road Km 000.20‐003.20 S 3.00 7208 Zilla Overlay 50mm @ IRI 6‐9 2021 17.514 1.268
Z7458 Garagonj‐Shailakupa Road Km 003.20‐006.22 S 3.02 7208 Zilla Overlay 50mm @ IRI 6‐9 2021 17.686 1.764
Z7460 Dakbanglabazar‐Gopalpur‐Kaliganj Road Km 001.40‐007.80 S 6.40 4130 Zilla Overlay 50mm @ IRI 6‐9 2021 41.261 0.131
Z7460 Dakbanglabazar‐Gopalpur‐Kaliganj Road Km 008.30‐008.40 S 0.10 4130 Zilla Overlay 40mm @ Traff >=2000 2021 0.569 0.181
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 000.00‐001.90 S 1.90 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 8.937 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 002.60‐002.70 S 0.10 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 002.70‐003.10 S 0.40 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.257 0.077
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 003.10‐003.30 S 0.20 599 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 003.30‐003.70 S 0.40 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.257 0.078
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 003.70‐004.30 S 0.60 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.885 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 004.90‐005.00 S 0.10 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 013.02‐013.22 S 0.20 599 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 013.92‐014.12 S 0.20 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 014.12‐014.42 S 0.30 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 014.42‐015.62 S 1.20 599 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.770 0.000
Z7488 Nayanipara‐Joluli‐Jadabpur‐Gopalpur Road Km 015.62‐015.69 S 0.06 599 Zilla Overlay 40mm @ IRI>12 2021 0.204 0.000
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 010.60‐011.10 S 0.50 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.571 0.198
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 012.00‐012.20 S 0.20 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 012.20‐012.40 S 0.20 711 Zilla Seal Coat 2021 0.186 1.733
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 012.40‐013.80 S 1.40 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.377 0.000
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 013.80‐014.20 S 0.40 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.253 0.242
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 014.20‐014.50 S 0.30 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.942 0.000
Z7489 Chandpara‐Drolaxmipur‐Khalishpur Road Km 016.53‐016.63 S 0.10 711 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Jhenaidah Total 1904.202
Khulna Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 185.05‐190.58 S 5.53 9375 National Overlay 50mm @ IRI 4‐7 2021 51.097 13.800
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 190.58‐190.68 S 0.10 10727 National Full Recon 195mm 2021 6.629 2.511
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 190.68‐194.98 S 4.30 10727 National Overlay 80mm @ IRI 4‐9 2021 66.814 4.170
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 194.98‐195.28 S 0.30 10727 National DBST @ Traff >6000 2021 1.393 4.992
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 195.28‐199.04 S 3.76 10727 National Overlay 80mm @ IRI 4‐9 2021 58.859 4.048
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 199.04‐199.08 L 0.04 10727 National Overlay 80mm @ IRI 4‐9 2021 0.531 7.325
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 199.04‐199.08 R 0.04 10727 National Overlay 80mm @ IRI 4‐9 2021 0.531 7.325
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 200.88‐202.78 L 1.90 10727 National Overlay 80mm @ IRI 4‐9 2021 20.415 9.084
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 200.88‐202.78 R 1.90 10727 National Overlay 80mm @ IRI 4‐9 2021 20.415 9.084
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 202.91‐203.58 L 0.67 10727 National Overlay 80mm @ IRI 4‐9 2021 7.156 10.353
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 202.91‐203.58 R 0.67 10727 National Overlay 80mm @ IRI 4‐9 2021 7.156 10.353
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 203.90‐204.72 L 0.82 10727 National Overlay 80mm @ IRI 4‐9 2021 8.810 8.991
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 203.90‐204.72 R 0.82 10727 National Overlay 80mm @ IRI 4‐9 2021 8.810 8.989
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 208.88‐209.78 L 0.90 10727 National Overlay 80mm @ IRI 4‐9 2021 10.860 7.639
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 208.88‐209.78 R 0.90 10727 National Overlay 80mm @ IRI 4‐9 2021 10.860 7.639
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 209.91‐210.46 L 0.55 10727 National Overlay 80mm @ IRI 4‐9 2021 6.637 7.439
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 209.91‐210.46 R 0.55 10727 National Overlay 80mm @ IRI 4‐9 2021 6.637 7.422
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 210.46‐211.45 S 0.99 10727 National Overlay 80mm @ IRI 4‐9 2021 14.237 6.332
Page 138 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 211.48‐213.11 L 1.63 10727 National Overlay 80mm @ IRI 4‐9 2021 13.505 8.429
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 211.48‐213.11 R 1.63 10727 National Overlay 80mm @ IRI 4‐9 2021 13.505 8.429
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 213.11‐214.90 S 1.79 10575 National Overlay 80mm @ IRI 4‐9 2021 23.464 7.886
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 215.92‐219.12 S 3.19 10263 National Overlay 80mm @ IRI 4‐9 2021 38.554 13.433
N709 Khulna City By‐Pass Road  Km 000.00‐000.05 L 0.05 3620 National DBST @ Traff 2000‐4000 2021 0.080 4.076
N709 Khulna City By‐Pass Road  Km 000.00‐000.05 R 0.05 3620 National DBST @ Traff 2000‐4000 2021 0.080 4.130
N709 Khulna City By‐Pass Road  Km 000.05‐000.10 S 0.05 4523 National Overlay 50mm @ IRI 5‐9 2021 0.414 7.879
N709 Khulna City By‐Pass Road  Km 000.10‐000.20 S 0.10 4523 National Full Recon 150mm 2021 4.430 2.430
N710 Khulna Town Old Section‐Dakbangla More Road Km 000.00‐000.10 S 0.10 4089 National Overlay 50mm @ IRI 5‐9 2021 0.890 1.283
N710 Khulna Town Old Section‐Dakbangla More Road Km 000.10‐000.20 S 0.10 13022 National Full Recon 195mm 2021 8.250 1.955
R760 Khulna‐Chuknagar‐Satkhira Road Km 000.00‐000.90 S 0.90 7601 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.683 8.245
R760 Khulna‐Chuknagar‐Satkhira Road Km 004.80‐005.20 S 0.40 7601 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.578 10.925
R760 Khulna‐Chuknagar‐Satkhira Road Km 005.73‐007.20 S 1.47 7601 Regional DBST @ 25% Crk 2021 4.514 11.420
R760 Khulna‐Chuknagar‐Satkhira Road Km 007.20‐007.30 S 0.10 7601 Regional Full Recon 150mm @ IRI 12 2021 3.701 4.516
R760 Khulna‐Chuknagar‐Satkhira Road Km 007.30‐029.20 S 21.90 7601 Regional DBST @ 25% Crk 2021 65.996 11.342
R760 Khulna‐Chuknagar‐Satkhira Road Km 029.71‐030.44 S 0.73 8663 Regional Rehab 150mm @ IRI 9‐12 2021 21.720 4.310
R760 Khulna‐Chuknagar‐Satkhira Road Km 030.44‐033.38 S 2.93 11539 Regional DBST @ Traff >6000 2021 8.844 6.286
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 000.00‐003.30 S 3.30 4771 Regional DBST @ 25% Crk 2021 6.113 0.183
R771 Rupsha‐Fakirhat‐Bagerhat Road Km 004.20‐004.50 S 0.30 4771 Regional DBST @ Traff 4000‐6000 2021 0.548 0.976
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 001.86‐002.16 S 0.30 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 002.16‐002.46 S 0.30 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.512
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 002.46‐002.86 S 0.40 2582 Zilla Overlay 40mm @ Traff >=2000 2021 1.223 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 003.16‐003.26 S 0.10 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 003.46‐004.36 S 0.90 2582 Zilla Overlay 40mm @ Traff >=2000 2021 2.751 0.285
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 004.36‐004.46 S 0.10 2582 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.231
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 006.46‐006.76 S 0.30 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 006.76‐006.86 S 0.10 2582 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.042
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 006.86‐009.16 S 2.30 2582 Zilla Overlay 40mm @ Traff >=2000 2021 7.030 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 009.16‐009.46 S 0.30 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.372
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 009.46‐011.16 S 1.70 2582 Zilla Overlay 40mm @ Traff >=2000 2021 5.196 0.642
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 011.16‐011.76 S 0.60 2582 Zilla Overlay 40mm @ IRI>12 2021 1.834 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 011.84‐015.25 S 3.41 2582 Zilla Overlay 40mm @ Traff >=2000 2021 10.718 0.491
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 015.25‐015.85 S 0.60 2582 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.038
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 015.85‐015.95 S 0.10 2582 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.296
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 015.95‐016.15 S 0.20 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.003
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 016.15‐020.05 S 3.90 2582 Zilla Overlay 40mm @ Traff >=2000 2021 12.251 0.409
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 020.05‐022.05 S 2.00 2582 Zilla Overlay 40mm @ Traff >=2000 2021 6.283 0.510
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 022.05‐022.25 S 0.20 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 022.25‐023.35 S 1.10 2582 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 0.210
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 023.35‐023.95 S 0.60 2582 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 023.95‐024.45 S 0.50 2582 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.181
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 024.45‐024.65 S 0.20 2582 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 024.65‐024.85 S 0.20 2582 Zilla Rehab 75mm @ IRI 9‐12 2021 2.226 0.310
Page 139 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 025.35‐025.65 S 0.30 2582 Zilla Overlay 40mm @ IRI>12 2021 0.942 0.000
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 025.65‐027.55 S 1.90 2582 Zilla Overlay 40mm @ Traff >=2000 2021 5.968 0.132
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 027.55‐027.65 S 0.10 2582 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.375
Z7040 Fulbari Railgate‐Dighalia‐Terokhada Road Km 028.45‐028.95 S 0.50 2582 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.315
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 000.00‐000.30 S 0.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 3.421 1.949
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 000.30‐000.40 S 0.10 3474 Zilla Overlay 40mm @ Cracks >25% 2021 0.297 1.591
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 000.40‐000.60 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.404
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 000.60‐001.75 S 1.15 3474 Zilla Overlay 40mm @ Traff >=2000 2021 3.527 1.863
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 004.20‐005.15 S 0.95 3531 Zilla Overlay 40mm @ Traff >=2000 2021 4.106 0.021
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 005.15‐005.25 S 0.10 3531 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.358
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 005.25‐008.09 S 2.84 3531 Zilla Overlay 40mm @ Cracks >25% 2021 10.656 0.032
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 011.15‐011.25 S 0.10 3531 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.688
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 021.86‐021.96 S 0.10 3531 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.376
Z7041 Khulna (Rupsha)‐Srifaltala‐Terokhada Road Km 021.96‐022.19 S 0.23 3531 Zilla Overlay 40mm @ Cracks >25% 2021 0.687 0.334
Z7042 Srifaltala‐Senerbazar Road Km 000.00‐000.10 S 0.10 5265 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 0.104
Z7042 Srifaltala‐Senerbazar Road Km 000.10‐000.50 S 0.40 5265 Zilla Rehab 75mm @ IRI 9‐12 2021 5.830 0.872
Z7042 Srifaltala‐Senerbazar Road Km 000.50‐003.30 S 2.80 5265 Zilla Overlay 50mm @ IRI 6‐9 2021 15.611 0.421
Z7042 Srifaltala‐Senerbazar Road Km 003.30‐003.80 S 0.50 5265 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 0.631
Z7042 Srifaltala‐Senerbazar Road Km 003.80‐004.10 S 0.30 5265 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z7042 Srifaltala‐Senerbazar Road Km 004.10‐004.30 S 0.20 5265 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.816
Z7042 Srifaltala‐Senerbazar Road Km 004.30‐004.66 S 0.36 5265 Zilla Overlay 40mm @ Traff >=2000 2021 1.681 0.000
Z7043 Fultala‐Shahapur‐Miximil‐Dumuria Road Km 003.30‐003.40 S 0.10 4922 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.174
Z7043 Fultala‐Shahapur‐Miximil‐Dumuria Road Km 003.40‐009.80 S 6.40 4922 Zilla Overlay 50mm @ IRI 6‐9 2021 24.864 1.427
Z7043 Fultala‐Shahapur‐Miximil‐Dumuria Road Km 017.20‐020.70 S 3.50 8277 Zilla Overlay 50mm @ IRI 6‐9 2021 19.551 3.483
Z7043 Fultala‐Shahapur‐Miximil‐Dumuria Road Km 020.70‐020.80 S 0.10 4922 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.882
Z7043 Fultala‐Shahapur‐Miximil‐Dumuria Road Km 020.80‐023.90 S 3.10 4922 Zilla Overlay 50mm @ IRI 6‐9 2021 12.044 0.960
Z7045 Terakhada‐Mollahat Road Km 000.00‐000.60 S 0.60 2964 Zilla Overlay 40mm @ Traff >=2000 2021 2.420 0.184
Z7045 Terakhada‐Mollahat Road Km 000.60‐000.90 S 0.30 2964 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.344
Z7045 Terakhada‐Mollahat Road Km 000.98‐004.20 S 3.22 2964 Zilla Overlay 40mm @ Traff >=2000 2021 10.115 0.727
Z7045 Terakhada‐Mollahat Road Km 004.20‐004.40 S 0.20 2964 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.554
Z7045 Terakhada‐Mollahat Road Km 004.40‐007.20 S 2.80 2964 Zilla Overlay 40mm @ Traff >=2000 2021 8.796 0.696
Z7045 Terakhada‐Mollahat Road Km 007.20‐007.30 S 0.10 2964 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.350
Z7045 Terakhada‐Mollahat Road Km 007.30‐007.80 S 0.50 2964 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.434
Z7045 Terakhada‐Mollahat Road Km 007.80‐007.90 S 0.10 2964 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.354
Z7045 Terakhada‐Mollahat Road Km 007.90‐010.90 S 3.00 2964 Zilla Overlay 40mm @ Traff >=2000 2021 9.424 0.495
Z7045 Terakhada‐Mollahat Road Km 010.90‐011.40 S 0.50 2964 Zilla Rehab 75mm @ IRI 9‐12 2021 6.420 0.245
Z7045 Terakhada‐Mollahat Road Km 011.40‐011.72 S 0.32 2964 Zilla Overlay 40mm @ Traff >=2000 2021 1.494 0.153
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 043.60‐043.70 S 0.10 4968 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.081
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 043.70‐044.40 S 0.70 4968 Zilla Overlay 50mm @ IRI 6‐9 2021 2.720 0.671
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 044.40‐044.60 S 0.20 4968 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.808
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 044.60‐052.00 S 7.40 4968 Zilla Overlay 50mm @ IRI 6‐9 2021 29.984 0.939
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 001.11‐006.10 S 4.99 4851 Zilla Overlay 50mm @ IRI 6‐9 2021 25.663 0.451
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 006.12‐008.00 S 1.88 6331 Zilla Overlay 50mm @ IRI 6‐9 2021 10.845 1.836
Page 140 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 008.00‐009.20 S 1.20 6331 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 1.367
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 009.20‐009.30 S 0.10 6331 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.126
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 018.40‐018.60 S 0.20 4851 Zilla Overlay 50mm @ Cracking >25% 2021 0.777 0.277
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 018.60‐018.80 S 0.20 4851 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.628
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 018.80‐020.10 S 1.30 4851 Zilla Overlay 50mm @ IRI 6‐9 2021 5.051 0.777
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 020.10‐020.40 S 0.30 4851 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.476
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 020.40‐020.80 S 0.40 4851 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 1.077
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 021.04‐021.41 S 0.36 4851 Zilla Full Recon 75mm @ IRI>12 2021 5.838 0.588
Z7606 Gollamari‐Batiaghata‐Dacope‐Nalian Forest Road Km 025.01‐027.37 S 2.37 4851 Zilla Overlay 50mm @ IRI 6‐9 2021 9.196 1.888
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 009.68‐009.88 S 0.20 1156 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 009.88‐010.58 S 0.70 1156 Zilla Overlay 40mm @ 1000‐2000 2021 2.199 0.164
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 010.58‐010.78 S 0.20 1156 Zilla Overlay 40mm @ IRI>12 2021 0.628 0.000
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 010.78‐010.88 S 0.10 1156 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.039
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 010.88‐010.98 S 0.10 1156 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 010.98‐013.23 S 2.25 1156 Zilla Overlay 40mm @ 1000‐2000 2021 7.080 0.000
Khulna Total 913.453
Kushtia Division
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 045.76‐045.78 L 0.02 9840 National DBST @ Traff >6000 2021 0.052 6.739
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 045.76‐045.78 R 0.02 9840 National DBST @ Traff >6000 2021 0.047 7.214
N713 Kushtia Town By‐Pass Road Km 000.00‐000.10 S 0.10 2708 National Full Recon 135mm @ IRI 12 2021 3.934 0.000
R710 Ahaladipur‐Kumarkhali‐Kushtia  Km 063.26‐063.30 S 0.04 6792 Regional Full Recon 180mm 2021 1.543 3.295
R710 Ahaladipur‐Kumarkhali‐Kushtia  Km 069.10‐069.20 S 0.10 6792 Regional Rehab 150mm @ IRI 9‐12 2021 2.705 2.439
R710 Ahaladipur‐Kumarkhali‐Kushtia  Km 072.70‐073.09 S 0.39 6792 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.893 5.233
R710 Ahaladipur‐Kumarkhali‐Kushtia  Km 073.09‐073.11 L 0.02 6792 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.198 4.330
R710 Ahaladipur‐Kumarkhali‐Kushtia  Km 073.09‐073.11 R 0.02 6792 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.198 4.323
R713 Charikoal at R711‐Shilahdah Link Road Km 000.00‐005.44 S 5.43 2703 Regional DBST @ 25% Crk 2021 14.713 0.506
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 010.79‐010.80 S 0.01 4118 Regional Rehab 150mm @ IRI 9‐12 2021 0.379 4.305
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 010.80‐014.00 S 3.20 4118 Regional DBST @ 25% Crk 2021 8.839 2.433
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 014.00‐017.10 S 3.10 4118 Regional Overlay 60mm @ IRI 7‐9 2021 21.756 4.581
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 017.10‐017.90 S 0.80 4118 Regional Overlay 50mm @ IRI 5‐7 2021 4.788 3.388
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 017.90‐018.10 S 0.20 4118 Regional Rehab 150mm @ IRI 9‐12 2021 5.506 1.206
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 018.10‐023.78 S 5.68 4118 Regional Overlay 50mm @ IRI 5‐7 2021 33.983 3.571
R747 Kustia‐Poradah‐Chuadanga Road Km 000.00‐000.10 S 0.10 4638 Regional DBST @ Traff 4000‐6000 2021 0.249 2.147
R747 Kustia‐Poradah‐Chuadanga Road Km 003.04‐004.30 S 1.26 10172 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.347 9.351
R747 Kustia‐Poradah‐Chuadanga Road Km 004.30‐004.50 S 0.20 10172 Regional Rehab 150mm @ IRI 9‐12 2021 5.120 3.187
R747 Kustia‐Poradah‐Chuadanga Road Km 004.60‐004.80 S 0.20 10172 Regional Rehab 150mm @ IRI 9‐12 2021 5.120 3.148
R747 Kustia‐Poradah‐Chuadanga Road Km 004.80‐017.61 S 12.81 10172 Regional DBST @ Traff >6000 2021 34.791 5.748
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 000.00‐000.10 S 0.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.385 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 000.10‐000.90 S 0.80 3651 Zilla Overlay 40mm @ IRI>12 2021 2.513 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 000.90‐001.10 S 0.20 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 001.10‐001.30 S 0.20 3651 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.148
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 001.30‐001.40 S 0.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 001.40‐001.70 S 0.30 3651 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.443
Page 141 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 001.70‐003.10 S 1.40 3651 Zilla Overlay 40mm @ Traff >=2000 2021 4.398 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 003.10‐003.60 S 0.50 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.498
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 003.60‐003.70 S 0.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 003.70‐004.30 S 0.60 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.253
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 004.30‐005.40 S 1.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 0.130
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 005.60‐006.70 S 1.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 0.099
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 006.70‐008.00 S 1.30 3651 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 0.591
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 008.00‐008.50 S 0.50 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 008.50‐008.90 S 0.40 3651 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.295
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 008.90‐009.20 S 0.30 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.008
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 009.20‐009.30 S 0.10 3651 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.390
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 009.30‐010.20 S 0.90 3651 Zilla Overlay 40mm @ Traff >=2000 2021 2.827 0.587
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 010.20‐010.60 S 0.40 3651 Zilla Full Recon 75mm @ IRI>12 2021 6.434 0.082
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 011.00‐011.30 S 0.30 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.234
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 011.30‐011.90 S 0.60 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 012.10‐012.20 S 0.10 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 012.20‐012.50 S 0.30 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.917 0.357
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 012.50‐013.10 S 0.60 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.837 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 013.10‐013.20 S 0.10 3651 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 0.395
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 013.20‐013.40 S 0.20 3651 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.000
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 013.40‐014.00 S 0.60 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.374
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 014.00‐014.60 S 0.60 3651 Zilla Overlay 40mm @ Traff >=2000 2021 1.834 0.036
Z7105 Ishwardi‐Paikpara‐Singra‐Bhabaniganj Road Km 014.60‐014.65 S 0.05 3651 Zilla Rehab 75mm @ IRI 9‐12 2021 0.528 1.262
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 036.03‐036.27 S 0.25 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.634 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 036.27‐037.27 S 1.00 2857 Zilla Overlay 40mm @ Traff >=2000 2021 2.547 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 037.27‐037.47 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 0.339
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 037.47‐037.77 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.764 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 037.77‐037.87 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.312
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 037.87‐038.07 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.509 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.07‐038.17 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.304 0.321
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.17‐038.57 S 0.40 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.57‐038.67 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.328
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.67‐038.87 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.509 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.87‐038.97 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.632
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 038.97‐039.07 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.07‐039.17 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.319
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.17‐039.37 S 0.20 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.509 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.37‐039.57 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 0.183
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.57‐039.67 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.67‐039.97 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.764 0.350
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 039.97‐040.07 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.07‐040.17 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.320
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.17‐040.27 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Page 142 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.27‐040.57 S 0.30 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.764 0.349
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.57‐040.67 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.67‐040.77 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.304 0.336
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.77‐040.87 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 040.87‐041.07 S 0.20 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 0.508
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 041.07‐041.17 S 0.10 2857 Zilla Overlay 40mm @ Traff >=2000 2021 0.255 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 041.17‐041.27 S 0.10 2857 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 0.329
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 041.27‐041.67 S 0.40 2857 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.000
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 041.67‐041.77 S 0.10 2857 Zilla Full Recon 75mm @ IRI>12 2021 1.304 0.450
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 041.77‐044.78 S 3.00 2857 Zilla Overlay 40mm @ Traff >=2000 2021 7.644 0.388
Z7404 Amtali‐Tailtupi‐Alamdanga Road Km 044.78‐047.03 S 2.26 2857 Zilla Overlay 40mm @ Traff >=2000 2021 5.746 0.332
Z7409 Bheramara Rail Station‐Bheramara Ferry Ghat Road Km 000.00‐000.20 S 0.20 3474 Zilla Full Recon 75mm @ IRI>12 2021 6.686 0.381
Z7409 Bheramara Rail Station‐Bheramara Ferry Ghat Road Km 000.20‐002.60 S 2.40 3474 Zilla Overlay 40mm @ Traff >=2000 2021 12.327 0.000
Z7409 Bheramara Rail Station‐Bheramara Ferry Ghat Road Km 002.60‐004.10 S 1.50 914 Zilla Overlay 40mm @ Traff 100‐1000 2021 7.004 0.248
Z7412 Daulatpur‐Mathurapur High School Bazar Km 011.10‐011.30 S 0.20 4696 Zilla Rehab 75mm @ IRI 9‐12 2021 1.916 2.023
Z7412 Daulatpur‐Mathurapur High School Bazar Km 011.30‐012.40 S 1.10 4696 Zilla Overlay 50mm @ IRI 6‐9 2021 3.696 2.374
Z7451 8th km of Kushtia‐Miupur Thana Connecting Road Km 000.10‐001.30 S 1.20 5733 Zilla Overlay 50mm @ IRI 6‐9 2021 4.662 1.885
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 000.00‐000.40 S 0.40 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 4.669 0.804
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 000.40‐001.30 S 0.90 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 3.497 1.180
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 001.30‐001.50 S 0.20 5663 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.654
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 001.50‐002.80 S 1.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 5.051 0.679
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 002.80‐002.90 S 0.10 5663 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.161
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 002.90‐006.00 S 3.10 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 11.718 0.485
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 006.00‐006.20 S 0.20 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 0.756 0.528
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 006.20‐006.70 S 0.50 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.890 0.518
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 006.70‐007.00 S 0.30 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 3.232 0.982
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 007.70‐008.80 S 1.10 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 11.852 0.571
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 008.90‐009.10 S 0.20 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 1.126
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 009.10‐009.40 S 0.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 0.565
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 009.40‐010.20 S 0.80 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 8.620 0.479
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 010.20‐010.50 S 0.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 0.336
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 010.50‐012.60 S 2.10 5663 Zilla Overlay 40mm @ Traff >=2000 2021 6.421 0.694
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 012.60‐013.20 S 0.60 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 6.465 0.545
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 013.20‐013.80 S 0.60 5663 Zilla Overlay 50mm @ Cracking >25% 2021 2.268 0.187
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 013.80‐014.40 S 0.60 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 2.268 0.657
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 014.40‐014.80 S 0.40 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.512 0.711
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 014.80‐014.90 S 0.10 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.452
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 014.90‐015.20 S 0.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.134 0.521
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 015.20‐017.30 S 2.10 5663 Zilla Overlay 40mm @ Traff >=2000 2021 6.418 0.688
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 017.30‐017.90 S 0.60 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 2.268 0.294
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 017.90‐018.00 S 0.10 5663 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.284
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 018.10‐018.20 S 0.10 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.357
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 019.00‐019.10 S 0.10 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.318
Page 143 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 022.30‐025.30 S 3.00 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 11.655 0.508
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 025.30‐028.30 S 3.00 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 11.655 1.024
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 028.40‐029.70 S 1.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 5.051 1.292
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 030.00‐030.20 S 0.20 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.363
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 030.20‐030.60 S 0.40 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 0.339
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 030.60‐031.60 S 1.00 5663 Zilla Overlay 40mm @ Traff >=2000 2021 3.141 0.622
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 031.60‐032.00 S 0.40 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 0.431
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 032.00‐032.20 S 0.20 5663 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.084
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 032.40‐032.70 S 0.30 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.531 0.145
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 032.70‐033.20 S 0.50 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 3.150 0.059
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 033.20‐034.10 S 0.90 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 5.670 0.247
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 034.10‐034.30 S 0.20 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 1.260 0.163
Z7461 Mirpur‐Shehala‐Pragpur BDR Camp Road Km 034.30‐034.80 S 0.50 5663 Zilla Overlay 50mm @ IRI 6‐9 2021 3.150 0.427
Z7463 Bheramara‐ Mirpur Thana Road Km 000.00‐001.70 S 1.70 3767 Zilla Overlay 40mm @ Traff >=2000 2021 5.571 0.830
Z7463 Bheramara‐ Mirpur Thana Road Km 001.70‐001.90 S 0.20 3767 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.779
Z7463 Bheramara‐ Mirpur Thana Road Km 001.90‐003.90 S 2.00 3767 Zilla Rehab 75mm @ IRI 9‐12 2021 22.747 0.630
Z7463 Bheramara‐ Mirpur Thana Road Km 003.90‐004.60 S 0.70 3767 Zilla Rehab 75mm @ IRI 9‐12 2021 7.961 0.938
Z7463 Bheramara‐ Mirpur Thana Road Km 004.60‐009.00 S 4.40 3767 Zilla Rehab 75mm @ IRI 9‐12 2021 50.043 0.696
Z7463 Bheramara‐ Mirpur Thana Road Km 009.00‐009.50 S 0.50 3767 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.994
Z7463 Bheramara‐ Mirpur Thana Road Km 009.50‐010.80 S 1.30 3767 Zilla Rehab 75mm @ IRI 9‐12 2021 14.396 0.602
Z7463 Bheramara‐ Mirpur Thana Road Km 010.80‐010.93 S 0.13 3767 Zilla Full Recon 75mm @ IRI>12 2021 2.091 0.969
Z7464 Sadarpur‐Jutiadanga‐Ashannagar‐Hatbolia Road Km 006.48‐009.68 S 3.20 5176 Zilla Overlay 50mm @ IRI 6‐9 2021 12.365 0.718
Z7464 Sadarpur‐Jutiadanga‐Ashannagar‐Hatbolia Road Km 010.68‐010.88 S 0.20 5176 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.499
Z7464 Sadarpur‐Jutiadanga‐Ashannagar‐Hatbolia Road Km 010.88‐011.68 S 0.80 5176 Zilla Overlay 50mm @ IRI 6‐9 2021 2.839 1.258
Z7464 Sadarpur‐Jutiadanga‐Ashannagar‐Hatbolia Road Km 011.68‐012.18 S 0.50 5176 Zilla Overlay 50mm @ IRI 6‐9 2021 1.575 0.999
Z7464 Sadarpur‐Jutiadanga‐Ashannagar‐Hatbolia Road Km 012.18‐012.58 S 0.40 5176 Zilla Overlay 50mm @ IRI 6‐9 2021 1.260 1.523
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 003.73‐003.93 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 2.535
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 003.93‐004.73 S 0.80 3474 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 2.607
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 004.73‐005.03 S 0.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 3.268 2.591
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 005.03‐006.83 S 1.80 3474 Zilla Overlay 40mm @ Traff >=2000 2021 5.654 2.519
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 006.83‐006.93 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 3.303
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 006.93‐014.53 S 7.60 3474 Zilla Overlay 40mm @ Traff >=2000 2021 23.551 2.333
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 014.73‐014.93 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 2.784
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 015.53‐015.73 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 2.656
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 015.83‐015.93 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 3.505
Z7465 Sadarpur Bazar‐Halsha Rail Bazar Road Km 015.93‐017.20 S 1.27 3474 Zilla Overlay 40mm @ Traff >=2000 2021 3.496 2.958
Kushtia Total 614.334
Magura Division
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 065.76‐066.59 S 0.83 10872 National Overlay 80mm @ IRI 4‐9 2021 12.263 11.092
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 066.65‐066.93 S 0.28 18037 National Full Recon 195mm @ IRI 12 2021 15.136 10.467
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 066.93‐075.43 S 8.50 18037 National Overlay 80mm @ IRI 4‐9 2021 109.875 26.025
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 080.64‐084.24 S 3.60 6699 National Overlay 50mm @ IRI 4‐7 2021 32.092 8.497
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 084.24‐084.34 S 0.10 6699 National Full Recon 180mm 2021 5.109 4.337
Page 144 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N7 Daulatdia‐Faridpur‐Jhenaidah‐Jashore‐Khulna‐Mongla Km 084.34‐090.84 S 6.50 6699 National Overlay 50mm @ IRI 4‐7 2021 49.815 12.950
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 022.57‐025.65 S 3.08 8268 National Overlay 60mm @ IRI 7‐9 2021 28.195 11.895
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 025.65‐028.65 S 3.00 8268 National Overlay 60mm @ IRI 7‐9 2021 27.472 11.799
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 028.65‐034.75 S 6.10 7263 National Overlay 50mm @ IRI 5‐7 2021 49.254 10.962
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 034.75‐034.95 S 0.20 6800 National DBST @ Traff >6000 2021 0.723 10.407
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 034.95‐035.45 S 0.50 6800 National Overlay 50mm @ IRI 5‐7 2021 3.851 10.590
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 035.45‐035.55 S 0.10 6800 National Full Recon 180mm 2021 5.123 3.871
N702 Jashore (Daratana More)‐Magura (Vaina More) Road Km 035.55‐043.75 S 8.20 6800 National Overlay 50mm @ IRI 5‐7 2021 63.401 11.257
Z7007 Ramnagar‐Hazratala‐Sripur Road Km 000.00‐007.70 S 7.70 1223 Zilla Overlay 40mm @ 1000‐2000 2021 24.907 0.000
Z7007 Ramnagar‐Hazratala‐Sripur Road Km 007.70‐008.00 S 0.30 1223 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z7007 Ramnagar‐Hazratala‐Sripur Road Km 008.00‐010.70 S 2.70 1223 Zilla Overlay 40mm @ 1000‐2000 2021 8.482 0.000
Z7007 Ramnagar‐Hazratala‐Sripur Road Km 010.70‐010.90 S 0.20 1223 Zilla Overlay 40mm @ 1000‐2000 2021 0.662 0.000
Z7007 Ramnagar‐Hazratala‐Sripur Road Km 010.90‐016.43 S 5.53 1223 Zilla Overlay 40mm @ 1000‐2000 2021 17.559 0.000
Z7011 Magura‐Sripur Road Km 000.00‐000.20 S 0.20 4408 Zilla Overlay 50mm @ IRI 6‐9 2021 1.092 0.723
Z7011 Magura‐Sripur Road Km 000.20‐000.50 S 0.30 4408 Zilla Overlay 50mm @ IRI 6‐9 2021 1.597 0.718
Z7011 Magura‐Sripur Road Km 000.50‐002.00 S 1.50 4408 Zilla Overlay 40mm @ Traff >=2000 2021 6.469 0.010
Z7011 Magura‐Sripur Road Km 002.09‐014.10 S 12.01 4408 Zilla Overlay 40mm @ Traff >=2000 2021 55.242 0.000
Z7012 Magura‐Mohammadpur Road Km 000.20‐000.40 S 0.20 4939 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.388
Z7012 Magura‐Mohammadpur Road Km 000.40‐000.90 S 0.50 4939 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 1.623
Z7012 Magura‐Mohammadpur Road Km 000.90‐001.20 S 0.30 4939 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.039
Z7012 Magura‐Mohammadpur Road Km 002.00‐002.20 S 0.20 4939 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.605
Z7012 Magura‐Mohammadpur Road Km 003.50‐003.70 S 0.20 4939 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.602
Z7012 Magura‐Mohammadpur Road Km 004.20‐004.30 S 0.10 4939 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.428
Z7012 Magura‐Mohammadpur Road Km 005.80‐005.90 S 0.10 4939 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.544
Z7012 Magura‐Mohammadpur Road Km 005.90‐013.60 S 7.70 4939 Zilla Overlay 40mm @ Traff >=2000 2021 35.960 0.000
Z7012 Magura‐Mohammadpur Road Km 013.60‐013.70 S 0.10 4939 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.663
Z7012 Magura‐Mohammadpur Road Km 013.70‐016.60 S 2.90 4939 Zilla Overlay 40mm @ Traff >=2000 2021 13.542 0.015
Z7012 Magura‐Mohammadpur Road Km 016.60‐016.80 S 0.20 4939 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.043
Z7012 Magura‐Mohammadpur Road Km 016.80‐020.70 S 3.90 4939 Zilla Overlay 40mm @ Traff >=2000 2021 17.284 0.000
Z7012 Magura‐Mohammadpur Road Km 020.70‐020.80 S 0.10 4939 Zilla Overlay 50mm @ IRI 6‐9 2021 0.515 1.177
Z7012 Magura‐Mohammadpur Road Km 020.80‐020.90 S 0.10 4939 Zilla Full Recon 75mm @ IRI>12 2021 2.213 0.792
Z7012 Magura‐Mohammadpur Road Km 020.90‐021.60 S 0.70 4939 Zilla Overlay 40mm @ Traff >=2000 2021 3.090 0.729
Z7012 Magura‐Mohammadpur Road Km 021.60‐021.70 S 0.10 4939 Zilla Full Recon 75mm @ IRI>12 2021 2.260 0.836
Z7012 Magura‐Mohammadpur Road Km 021.70‐025.41 S 3.71 4939 Zilla Overlay 40mm @ Traff >=2000 2021 15.020 0.615
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 036.90‐037.20 S 0.30 1875 Zilla Overlay 40mm @ 1000‐2000 2021 1.248 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 037.20‐037.30 S 0.10 1875 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.299
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 037.30‐037.50 S 0.20 1875 Zilla Overlay 40mm @ 1000‐2000 2021 0.832 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 037.50‐037.80 S 0.30 1875 Zilla Overlay 40mm @ 1000‐2000 2021 1.248 0.188
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 037.80‐037.90 S 0.10 1875 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 037.90‐038.20 S 0.30 1875 Zilla Overlay 40mm @ 1000‐2000 2021 1.281 0.198
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 038.20‐038.40 S 0.20 1875 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 038.70‐038.90 S 0.20 1875 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 048.16‐048.66 S 0.50 1875 Zilla Overlay 40mm @ IRI>12 2021 2.335 0.000
Page 145 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 049.06‐049.16 S 0.10 1875 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Magura Total 639.724
Meherpur Division
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 023.78‐026.85 S 3.07 4118 Regional Overlay 60mm @ IRI 7‐9 2021 21.518 4.430
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 026.85‐029.85 S 3.00 4118 Regional Overlay 60mm @ IRI 7‐9 2021 21.017 3.994
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 029.85‐029.87 S 0.02 4118 Regional Overlay 60mm @ IRI 7‐9 2021 0.168 8.554
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 029.87‐030.75 S 0.88 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.137 4.590
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 030.75‐030.95 S 0.20 7399 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 1.877
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 030.95‐031.65 S 0.70 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.904 5.217
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 031.65‐031.75 S 0.10 7399 Regional Full Recon 180mm 2021 3.919 1.913
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 031.75‐033.15 S 1.40 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.808 5.053
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 033.15‐033.45 S 0.30 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 5.704
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 033.45‐037.65 S 4.20 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 29.431 5.028
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 037.65‐037.85 S 0.20 7399 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 1.795
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 037.85‐040.65 S 2.80 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 19.616 3.819
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 040.65‐040.95 S 0.30 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.102 5.412
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 040.95‐051.95 S 11.00 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 77.062 3.873
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 051.95‐053.74 S 1.79 7399 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.725 4.882
R745  Kushtia‐Meherpur‐Chuadanga‐Jhenaidah Km 053.74‐069.51 S 15.77 3599 Regional DBST @ 25% Crk 2021 43.634 0.485
Z7408 WAPDA More‐ Kalibari Link Road Km 000.00‐000.20 S 0.20 6834 Zilla Overlay 50mm @ IRI 6‐9 2021 1.384 4.797
Z7408 WAPDA More‐ Kalibari Link Road Km 000.20‐000.90 S 0.70 6834 Zilla Full Recon 75mm @ IRI>12 2021 16.736 3.138
Z7408 WAPDA More‐ Kalibari Link Road Km 000.90‐001.00 S 0.10 6834 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 6.132
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 000.00‐000.40 S 0.40 2925 Zilla Overlay 40mm @ Traff >=2000 2021 1.362 0.000
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 000.40‐000.50 S 0.10 2925 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.746
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 000.50‐001.20 S 0.70 2925 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.210
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 001.20‐001.30 S 0.10 2925 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.618
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 001.30‐006.40 S 5.10 2925 Zilla Overlay 40mm @ Traff >=2000 2021 16.021 0.279
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 006.40‐006.60 S 0.20 2925 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.342
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 006.60‐010.90 S 4.30 2925 Zilla Overlay 40mm @ Traff >=2000 2021 13.508 0.271
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 010.90‐013.90 S 3.00 2925 Zilla Overlay 40mm @ Traff >=2000 2021 13.351 0.075
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 013.90‐014.10 S 0.20 2925 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 014.10‐015.90 S 1.80 2925 Zilla Overlay 40mm @ Traff >=2000 2021 8.405 0.025
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 015.90‐016.00 S 0.10 2925 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 016.00‐019.90 S 3.90 2925 Zilla Overlay 40mm @ Traff >=2000 2021 18.211 0.000
Z7452 Gangni‐Kathuli‐Kulbaria Road Km 019.90‐020.35 S 0.45 2925 Zilla Overlay 40mm @ IRI>12 2021 2.097 0.000
Z7456 Bamundi‐Hatboalia‐Alamdanga Road Km 001.89‐001.99 S 0.10 842 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7466 Meherpur‐North Shalikha‐Kaligangni Road Km 000.00‐010.16 S 10.16 1130 Zilla Overlay 40mm @ 1000‐2000 2021 31.916 0.016
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 000.00‐000.30 S 0.30 1326 Zilla Overlay 40mm @ IRI>12 2021 0.815 0.000
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 000.30‐001.85 S 1.55 1326 Zilla Overlay 40mm @ 1000‐2000 2021 4.356 0.000
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 001.85‐002.05 S 0.20 1326 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 002.05‐003.55 S 1.50 1326 Zilla Overlay 40mm @ 1000‐2000 2021 4.712 0.000
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 004.75‐005.05 S 0.30 3474 Zilla Full Recon 75mm @ IRI>12 2021 4.825 1.958
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 007.35‐007.55 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.587
Page 146 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7467 Amjhupi‐Madandanga‐Shampur‐Noapara Road Km 010.55‐011.15 S 0.60 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 6.644 2.201
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 000.00‐000.10 S 0.10 8716 Zilla Full Recon 75mm @ IRI>12 2021 2.600 0.708
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 000.10‐000.40 S 0.30 8716 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.067
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 000.40‐000.60 S 0.20 8716 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.198
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 000.60‐000.90 S 0.30 8716 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 1.032
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 000.90‐001.10 S 0.20 8716 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.972
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 001.10‐001.40 S 0.30 8716 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 1.000
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 001.40‐001.60 S 0.20 8716 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.989
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 001.60‐001.70 S 0.10 8716 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.033
Z7469  Mujibnagar‐Bhoberpara‐BGB Camp Link Road Km 001.70‐001.82 S 0.12 8716 Zilla Full Recon 75mm @ IRI>12 2021 2.965 1.027
Meherpur Total 444.943
Narail Division
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 003.64‐004.19 S 0.55 4677 National DBST @ 25% Crk 2021 1.505 1.225
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 004.19‐004.29 S 0.10 4677 National Rehab 150mm @ IRI 9‐12 2021 2.657 1.312
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 004.29‐023.70 S 19.40 4677 National DBST @ Traff 4000‐6000 2021 54.054 1.164
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 023.70‐023.80 S 0.10 4677 National Full Recon 150mm 2021 3.762 0.513
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 023.80‐030.82 S 7.02 4677 National DBST @ 25% Crk 2021 19.258 0.997
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 030.82‐030.91 S 0.09 7459 National DBST @ 25% Crk 2021 0.255 5.249
N806 Bhatiapara‐Lohagara‐Narail‐Jashore Road Km 030.91‐031.11 S 0.20 7459 National Rehab 180mm @ IRI 9‐12 2021 6.338 2.542
Z7502 Narail‐Kalia Road Km 000.10‐000.30 S 0.20 2255 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.330
Z7502 Narail‐Kalia Road Km 000.30‐000.80 S 0.50 2255 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.000
Z7503 Lohagara Bazar‐Naragati Road Km 000.70‐003.80 S 3.10 2673 Zilla Overlay 40mm @ Traff >=2000 2021 14.475 0.147
Z7503 Lohagara Bazar‐Naragati Road Km 003.80‐006.90 S 3.10 2673 Zilla Overlay 40mm @ Traff >=2000 2021 13.238 0.130
Z7503 Lohagara Bazar‐Naragati Road Km 006.90‐013.21 S 6.31 2673 Zilla Overlay 40mm @ Traff >=2000 2021 20.839 0.352
Z7504 Narail (Tularampur)‐Maijpara Road Km 002.30‐002.40 S 0.10 1808 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 014.50‐015.40 S 0.90 1875 Zilla Overlay 40mm @ IRI>12 2021 2.445 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 022.90‐023.00 S 0.10 1875 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 023.20‐025.40 S 2.20 1875 Zilla Overlay 40mm @ 1000‐2000 2021 6.911 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 025.80‐025.90 S 0.10 1875 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z7506 Lohagara‐Nahata‐Mohammadpur Road Km 026.00‐026.10 S 0.10 1875 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Narail Total 152.403
Satkhira Division
R760 Khulna‐Chuknagar‐Satkhira Road Km 033.38‐048.74 S 15.37 11539 Regional DBST @ 25% Crk 2021 46.304 6.638
R760 Khulna‐Chuknagar‐Satkhira Road Km 048.74‐049.04 S 0.30 11539 Regional DBST @ Traff >6000 2021 0.904 8.773
R760 Khulna‐Chuknagar‐Satkhira Road Km 049.04‐058.50 S 9.46 11539 Regional DBST @ 25% Crk 2021 32.419 5.538
R765 Navaran‐Illishpur‐ Satkhira Road Km 016.90‐017.00 S 0.10 8950 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 9.544
R765 Navaran‐Illishpur‐ Satkhira Road Km 017.00‐017.20 S 0.20 8950 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 2.902
R765 Navaran‐Illishpur‐ Satkhira Road Km 017.20‐018.20 S 1.00 8950 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.881 7.628
R765 Navaran‐Illishpur‐ Satkhira Road Km 027.00‐041.50 S 14.50 8950 Regional Overlay 60mm @ IRI 5.5‐9 2021 108.482 8.834
R765 Navaran‐Illishpur‐ Satkhira Road Km 041.50‐042.94 S 1.44 8950 Regional Overlay 60mm @ IRI 5.5‐9 2021 18.568 3.074
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 011.42‐012.22 S 0.80 2980 Zilla Rehab 75mm @ IRI 9‐12 2021 7.662 0.958
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 012.42‐012.52 S 0.10 2980 Zilla Full Recon 75mm @ IRI>12 2021 1.391 0.903
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 014.32‐014.62 S 0.30 2980 Zilla Full Recon 75mm @ IRI>12 2021 4.173 0.431
Page 147 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 014.62‐014.82 S 0.20 2980 Zilla Overlay 40mm @ Traff >=2000 2021 0.543 0.749
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 014.82‐015.02 S 0.20 2980 Zilla Rehab 75mm @ IRI 9‐12 2021 1.916 0.855
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 015.72‐016.02 S 0.30 2980 Zilla Rehab 75mm @ IRI 9‐12 2021 2.873 1.116
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 016.82‐017.02 S 0.20 2980 Zilla Full Recon 75mm @ IRI>12 2021 2.782 0.545
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 017.62‐018.52 S 0.90 2980 Zilla Overlay 40mm @ Traff >=2000 2021 2.445 1.105
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 018.52‐019.32 S 0.80 2980 Zilla Overlay 40mm @ Traff >=2000 2021 2.173 0.509
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 019.32‐019.62 S 0.30 2980 Zilla Overlay 40mm @ Traff >=2000 2021 0.815 0.797
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 019.62‐019.72 S 0.10 2980 Zilla Overlay 40mm @ Traff >=2000 2021 0.401 0.000
Z7552 Keshabpur‐ Sharaskhati ‐Kalaroa Road Km 019.72‐019.93 S 0.21 2980 Zilla Overlay 40mm @ Traff >=2000 2021 0.962 0.120
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 000.00‐000.10 S 0.10 13826 Zilla Overlay 50mm @ IRI 6‐9 2021 1.113 2.177
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 000.10‐000.20 S 0.10 13826 Zilla Full Recon 75mm @ IRI>12 2021 4.608 1.921
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 000.20‐003.00 S 2.80 13826 Zilla Overlay 40mm @ Traff >=2000 2021 16.949 1.133
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 003.00‐003.10 S 0.10 13557 Zilla Full Recon 75mm @ IRI>12 2021 2.391 4.273
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 003.10‐003.80 S 0.70 13826 Zilla Overlay 50mm @ IRI 6‐9 2021 4.711 7.381
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 003.80‐003.90 S 0.10 13826 Zilla Full Recon 75mm @ IRI>12 2021 3.173 4.864
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 003.90‐007.60 S 3.70 6610 Zilla Overlay 50mm @ IRI 6‐9 2021 22.883 2.346
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 007.60‐007.90 S 0.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.067
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 007.90‐010.10 S 2.20 3474 Zilla Overlay 40mm @ Traff >=2000 2021 10.273 0.067
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 012.00‐012.50 S 0.50 3474 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.086
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 012.50‐013.10 S 0.60 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 9.893 1.186
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 013.10‐015.70 S 2.60 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 42.800 0.615
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 015.70‐015.90 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.177
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 015.90‐017.00 S 1.10 3474 Zilla Overlay 40mm @ Traff >=2000 2021 5.136 0.490
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 017.00‐017.10 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 2.391 1.274
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 017.10‐020.40 S 3.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 54.323 0.772
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 020.40‐023.90 S 3.50 3474 Zilla Overlay 40mm @ Traff >=2000 2021 16.522 0.410
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 023.90‐024.70 S 0.80 3474 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.058
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 025.10‐028.30 S 3.20 3474 Zilla Overlay 40mm @ Traff >=2000 2021 15.323 0.000
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 028.30‐034.40 S 6.10 3474 Zilla Overlay 40mm @ Traff >=2000 2021 28.846 0.503
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 034.40‐034.50 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 3.260 0.440
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 034.50‐034.80 S 0.30 3474 Zilla Overlay 40mm @ Traff >=2000 2021 1.910 0.000
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 034.80‐034.90 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 3.260 0.602
Z7602 Satkhira‐Shakhipur‐Kaliganj Road Km 034.90‐035.04 S 0.14 3474 Zilla Overlay 40mm @ Traff >=2000 2021 0.804 0.166
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 023.60‐023.70 S 0.10 10900 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.213
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 023.70‐025.00 S 1.30 4968 Zilla Overlay 50mm @ Cracking >25% 2021 5.132 0.352
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 025.00‐025.10 S 0.10 4968 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.978
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 025.10‐027.00 S 1.90 4968 Zilla Overlay 50mm @ IRI 6‐9 2021 7.382 0.536
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 027.00‐027.10 S 0.10 4968 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.189
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 027.10‐028.10 S 1.00 4968 Zilla Overlay 40mm @ Traff >=2000 2021 3.141 0.098
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 032.80‐036.00 S 3.20 10900 Zilla Rehab 75mm @ IRI 9‐12 2021 52.660 1.503
Z7603 Satkhira‐Asasuni‐Goaldanga‐Paikgachha Road Km 036.00‐038.82 S 2.81 10900 Zilla Overlay 50mm @ IRI 6‐9 2021 16.251 1.455
Z7605 Satkhira Town Bypass Road Km 000.00‐000.10 S 0.10 4519 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7605 Satkhira Town Bypass Road Km 000.10‐003.70 S 3.60 4519 Zilla Overlay 40mm @ IRI>12 2021 16.810 0.000
Page 148 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7605 Satkhira Town Bypass Road Km 003.70‐003.80 S 0.10 4519 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7605 Satkhira Town Bypass Road Km 003.80‐005.60 S 1.80 4519 Zilla Overlay 40mm @ IRI>12 2021 8.405 0.000
Z7605 Satkhira Town Bypass Road Km 005.60‐005.70 S 0.10 4519 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7605 Satkhira Town Bypass Road Km 005.70‐006.70 S 1.00 4519 Zilla Overlay 40mm @ IRI>12 2021 4.670 0.000
Z7605 Satkhira Town Bypass Road Km 006.70‐006.80 S 0.10 4519 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7605 Satkhira Town Bypass Road Km 006.80‐009.10 S 2.30 4519 Zilla Overlay 40mm @ IRI>12 2021 10.740 0.000
Z7605 Satkhira Town Bypass Road Km 009.10‐009.20 S 0.10 4519 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z7605 Satkhira Town Bypass Road Km 009.20‐012.35 S 3.15 4519 Zilla Overlay 40mm @ IRI>12 2021 14.709 0.000
Z7607 Satkhira (Shakhipur)‐Debhata Road Km 000.00‐000.10 S 0.10 14114 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.701
Z7607 Satkhira (Shakhipur)‐Debhata Road Km 000.10‐000.20 S 0.10 14114 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.001
Z7607 Satkhira (Shakhipur)‐Debhata Road Km 000.20‐005.42 S 5.22 14114 Zilla Overlay 50mm @ Cracking >25% 2021 29.724 0.056
Z7610 Koyra‐Noabaki‐Shyamnagar Road Km 007.02‐029.67 S 22.65 4989 Zilla Overlay 50mm @ IRI 6‐9 2021 173.612 0.161
Z7610 Koyra‐Noabaki‐Shyamnagar Road Km 029.67‐029.87 S 0.20 4989 Zilla Full Recon 75mm @ IRI>12 2021 3.417 0.400
Z7610 Koyra‐Noabaki‐Shyamnagar Road Km 038.57‐038.67 S 0.10 4989 Zilla Full Recon 75mm @ IRI>12 2021 1.521 0.975
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.00‐000.10 S 0.10 3722 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.025
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.10‐000.20 S 0.10 3722 Zilla Full Recon 75mm @ IRI>12 2021 1.739 0.501
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.20‐000.40 S 0.20 3722 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.000
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.40‐000.70 S 0.30 3722 Zilla Overlay 40mm @ Traff >=2000 2021 1.019 0.545
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.70‐000.90 S 0.20 3722 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.000
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 000.90‐003.00 S 2.10 3722 Zilla Overlay 40mm @ Traff >=2000 2021 7.149 0.691
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 003.00‐003.10 S 0.10 3722 Zilla Overlay 40mm @ Cracks >25% 2021 0.375 0.047
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 003.10‐004.00 S 0.90 3722 Zilla Overlay 40mm @ Traff >=2000 2021 3.347 0.555
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 004.00‐004.10 S 0.10 3722 Zilla Overlay 40mm @ Traff >=2000 2021 0.340 0.000
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 004.10‐007.10 S 3.00 3722 Zilla Overlay 40mm @ Traff >=2000 2021 10.213 0.689
Z7613 Tala‐Islamkati‐Sujanshaha‐Satkhira Road Km 007.10‐010.10 S 3.00 3722 Zilla Overlay 40mm @ Traff >=2000 2021 11.079 0.662
Z7615 Dacope‐Barobaria‐Magurkhali‐Tala Road Km 023.51‐023.91 S 0.40 4892 Zilla Overlay 50mm @ IRI 6‐9 2021 1.554 0.581
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 000.10‐000.40 S 0.30 8098 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.724
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 000.40‐013.90 S 13.50 8098 Zilla Overlay 40mm @ Traff >=2000 2021 63.043 2.450
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 013.90‐014.30 S 0.40 8098 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 2.874
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 014.30‐017.70 S 3.40 8098 Zilla Overlay 50mm @ IRI 6‐9 2021 19.635 5.448
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 017.70‐020.70 S 3.00 8098 Zilla Overlay 50mm @ IRI 6‐9 2021 17.325 4.949
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 020.70‐021.30 S 0.60 8098 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 4.963
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 021.30‐021.70 S 0.40 8098 Zilla Full Recon 75mm @ IRI>12 2021 9.563 1.663
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 021.70‐023.40 S 1.70 8098 Zilla Overlay 50mm @ IRI 6‐9 2021 9.818 4.979
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 023.40‐024.20 S 0.80 8098 Zilla Rehab 75mm @ IRI 9‐12 2021 13.169 2.321
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 024.20‐024.30 S 0.10 8098 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 1.501
Z7617 Kaliganj‐Shyamnagar‐Betkhali Road Km 024.30‐027.29 S 2.98 8098 Zilla Rehab 75mm @ IRI 9‐12 2021 49.121 2.374
Z7618 Ashasuni‐Shamnagar Road Km 013.50‐018.30 S 4.79 804 Zilla Seal Coat 2021 6.644 0.515
Z7618 Ashasuni‐Shamnagar Road Km 019.30‐019.40 S 0.10 804 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z7618 Ashasuni‐Shamnagar Road Km 019.40‐020.90 S 1.50 804 Zilla Overlay 40mm @ Traff 100‐1000 2021 4.585 0.000
Z7618 Ashasuni‐Shamnagar Road Km 020.90‐021.20 S 0.30 804 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.917 0.000
Z7618 Ashasuni‐Shamnagar Road Km 021.20‐021.90 S 0.70 804 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.139 0.211
Z7618 Ashasuni‐Shamnagar Road Km 021.90‐022.30 S 0.40 804 Zilla Overlay 40mm @ IRI>12 2021 1.223 0.000
Page 149 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z7618 Ashasuni‐Shamnagar Road Km 022.30‐022.40 S 0.10 804 Zilla Seal Coat 2021 0.091 1.666
Satkhira Total 1124.262
Khulna Zone Total 8292.621

Mymensingh Zone
Jamalpur Division
R461 Jamalpur‐Madarganj Road Km 016.14‐016.44 S 0.30 4866 Regional Overlay 60mm @ IRI 7‐9 2021 1.426 2.067
R461 Jamalpur‐Madarganj Road Km 016.44‐018.44 S 2.00 4866 Regional Overlay 50mm @ IRI 5‐7 2021 7.980 0.879
R461 Jamalpur‐Madarganj Road Km 018.44‐018.64 S 0.20 4866 Regional DBST @ Traff 4000‐6000 2021 0.375 1.470
R461 Jamalpur‐Madarganj Road Km 021.04‐021.14 S 0.10 4866 Regional Rehab 150mm @ IRI 9‐12 2021 1.835 0.971
R461 Jamalpur‐Madarganj Road Km 024.74‐026.94 S 2.20 4866 Regional Overlay 50mm @ IRI 5‐7 2021 8.870 0.847
R461 Jamalpur‐Madarganj Road Km 026.94‐027.04 S 0.10 4866 Regional Full Recon 150mm 2021 2.306 1.033
R461 Jamalpur‐Madarganj Road Km 027.09‐028.50 S 1.41 4866 Regional Overlay 60mm @ IRI 7‐9 2021 6.722 1.287
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 000.00‐000.20 S 0.20 14794 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.651 3.369
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 000.20‐000.30 S 0.10 14794 Regional Full Recon 150mm @ IRI 12 2021 4.005 2.104
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 000.30‐001.30 S 1.00 14794 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.294 3.992
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 001.30‐001.40 S 0.10 14794 Regional Full Recon 150mm @ IRI 12 2021 4.066 1.976
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 001.40‐002.30 S 0.90 14794 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.600 2.217
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 002.30‐002.40 S 0.10 14794 Regional Full Recon 150mm @ IRI 12 2021 4.157 1.885
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 005.50‐005.60 S 0.10 4810 Regional Rehab 150mm @ IRI 9‐12 2021 2.260 0.841
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 008.10‐008.20 S 0.10 14794 Regional Full Recon 150mm @ IRI 12 2021 4.066 1.963
R465 Jamalpur‐Islampur‐Dewanganj‐Bahadurabad Ghat Road Km 027.20‐027.30 S 0.10 4810 Regional Rehab 150mm @ IRI 9‐12 2021 1.835 1.059
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 000.00‐000.20 S 0.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 000.20‐000.40 S 0.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 000.40‐000.50 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 000.50‐000.70 S 0.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 000.70‐002.70 S 2.00 1053 Zilla Overlay 40mm @ 1000‐2000 2021 6.198 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 002.70‐002.90 S 0.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.620 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 002.90‐003.70 S 0.80 1053 Zilla Overlay 40mm @ 1000‐2000 2021 2.479 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 003.70‐003.80 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.310 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 003.80‐005.20 S 1.40 1053 Zilla Overlay 40mm @ 1000‐2000 2021 4.350 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 005.20‐006.00 S 0.80 1053 Zilla Overlay 40mm @ 1000‐2000 2021 2.486 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 006.00‐006.05 S 0.05 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.233 0.000
Z4024 Madarganj (Malancha) Link Road Km 000.00‐000.10 S 0.10 4438 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.937
Z4024 Madarganj (Malancha) Link Road Km 000.10‐001.20 S 1.10 4438 Zilla Overlay 50mm @ IRI 6‐9 2021 4.227 3.156
Z4024 Madarganj (Malancha) Link Road Km 001.20‐001.30 S 0.10 4438 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.864
Z4024 Madarganj (Malancha) Link Road Km 001.30‐003.65 S 2.35 4438 Zilla Overlay 50mm @ IRI 6‐9 2021 9.096 3.212
Z4614 Bakshiganj‐Balugaon‐Dewanganj Road Km 000.00‐001.80 S 1.80 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.654 0.000
Z4614 Bakshiganj‐Balugaon‐Dewanganj Road Km 001.80‐001.90 S 0.10 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Z4614 Bakshiganj‐Balugaon‐Dewanganj Road Km 001.90‐003.10 S 1.20 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.770 0.000
Z4614 Bakshiganj‐Balugaon‐Dewanganj Road Km 003.10‐003.21 S 0.11 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.346 0.000
Z4614 Bakshiganj‐Balugaon‐Dewanganj Road Km 003.62‐006.99 S 3.36 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 9.987 0.000
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 000.20‐000.30 S 0.10 2835 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.671

Page 150 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 000.80‐000.90 S 0.10 2835 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.731
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 000.90‐001.10 S 0.20 2835 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.812
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 002.80‐002.90 S 0.10 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.544
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 004.80‐005.10 S 0.30 2835 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 1.030
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 005.90‐006.10 S 0.20 2835 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.902
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 006.10‐006.50 S 0.40 2835 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 1.024
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 006.50‐006.70 S 0.20 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.924
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 006.70‐009.70 S 3.00 2835 Zilla Overlay 40mm @ Traff >=2000 2021 9.831 1.050
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 009.70‐013.30 S 3.60 2835 Zilla Overlay 40mm @ Traff >=2000 2021 12.443 0.601
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 013.30‐013.50 S 0.20 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.880
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 013.50‐014.10 S 0.60 2835 Zilla Overlay 40mm @ Traff >=2000 2021 1.936 1.051
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 014.10‐014.20 S 0.10 2835 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.689
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 014.20‐014.90 S 0.70 2835 Zilla Overlay 40mm @ Traff >=2000 2021 2.258 0.976
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 014.90‐015.10 S 0.20 2835 Zilla Full Recon 75mm @ IRI>12 2021 3.304 0.482
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 015.10‐018.20 S 3.10 2835 Zilla Overlay 40mm @ Traff >=2000 2021 9.922 1.077
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 018.20‐019.00 S 0.80 2835 Zilla Overlay 40mm @ Traff >=2000 2021 2.540 1.127
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 019.00‐019.40 S 0.40 2835 Zilla Overlay 40mm @ Traff >=2000 2021 1.270 1.036
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 019.40‐021.50 S 2.10 2835 Zilla Overlay 40mm @ Traff >=2000 2021 7.524 0.645
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 021.50‐021.80 S 0.30 2835 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.457
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 021.80‐021.90 S 0.10 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.846
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 021.90‐023.40 S 1.50 2835 Zilla Overlay 40mm @ Traff >=2000 2021 4.839 0.966
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 023.40‐023.50 S 0.10 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.792
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 023.50‐025.40 S 1.90 2835 Zilla Overlay 40mm @ Traff >=2000 2021 6.130 1.132
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 025.40‐028.20 S 2.80 2835 Zilla Overlay 40mm @ Traff >=2000 2021 9.033 1.246
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 028.20‐029.20 S 1.00 2835 Zilla Overlay 40mm @ Traff >=2000 2021 3.226 1.118
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 029.20‐029.60 S 0.40 2835 Zilla Overlay 40mm @ Traff >=2000 2021 1.277 1.089
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 029.60‐030.90 S 1.30 2835 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 1.001
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 030.90‐031.70 S 0.80 2835 Zilla Rehab 75mm @ IRI 9‐12 2021 8.859 0.716
Z4615 Bakshiganj‐Sanandabari‐Char Rajibpur Road Km 031.70‐032.19 S 0.49 2835 Zilla Overlay 40mm @ Traff >=2000 2021 1.527 0.557
Jamalpur Total 230.313
Kishoreganj Division
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 068.79‐069.14 S 0.36 11518 National Full Recon 195mm @ IRI 12 2021 22.348 7.835
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 069.14‐069.54 S 0.40 11518 National Rehab 195mm @ IRI 9‐12 2021 22.631 6.622
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 069.54‐070.10 S 0.55 11518 National Overlay 80mm @ IRI 4‐9 2021 7.326 20.882
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 070.85‐071.08 S 0.23 10189 National Overlay 80mm @ IRI 4‐9 2021 4.602 14.872
N203 Bhairab Bazar Old Ferryghat link Road Km 000.00‐000.50 S 0.50 5341 National Overlay 50mm @ IRI 5‐9 2021 2.961 1.918
N203 Bhairab Bazar Old Ferryghat link Road Km 000.50‐000.98 S 0.47 5341 National DBST Traff All 2021 2.347 0.000
R211 Itakhola‐Motkhola‐Kotiadi Road Km 033.04‐036.13 S 3.10 5648 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.566 4.222
R211 Itakhola‐Motkhola‐Kotiadi Road Km 036.13‐045.03 S 8.90 5237 Regional DBST @ 25% Crk 2021 24.753 2.834
R211 Itakhola‐Motkhola‐Kotiadi Road Km 045.03‐045.11 S 0.08 5237 Regional Rehab 150mm @ IRI 9‐12 2021 2.164 2.074
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 000.10‐000.30 S 0.20 14680 Regional Rehab 150mm @ IRI 9‐12 2021 7.322 4.272
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 000.30‐007.20 S 6.90 14680 Regional DBST @ Traff >6000 2021 19.872 11.912
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 008.15‐010.40 S 2.25 14680 Regional DBST @ Traff >6000 2021 6.324 12.263
Page 151 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 011.15‐020.16 S 9.01 14680 Regional DBST @ 25% Crk 2021 25.240 12.084
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 047.48‐048.37 S 0.89 7480 Regional DBST @ 25% Crk 2021 2.480 7.917
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 059.48‐059.50 L 0.02 7480 Regional Rehab 150mm @ IRI 9‐12 2021 0.629 5.948
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 059.48‐059.50 R 0.02 7480 Regional Rehab 150mm @ IRI 9‐12 2021 0.639 5.822
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 059.50‐059.68 S 0.18 7480 Regional Full Recon 150mm @ IRI 12 2021 6.028 3.538
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 062.43‐063.08 S 0.65 7480 Regional DBST @ 25% Crk 2021 1.788 9.226
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 063.08‐063.28 S 0.20 7480 Regional Rehab 150mm @ IRI 9‐12 2021 5.361 3.999
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 063.99‐065.01 S 1.02 7480 Regional DBST @ Traff >6000 2021 2.807 8.784
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 067.03‐068.08 S 1.05 7480 Regional DBST @ 25% Crk 2021 2.889 8.381
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 070.03‐073.58 S 3.55 7480 Regional DBST @ Traff >6000 2021 9.835 8.641
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 073.58‐074.28 S 0.70 7480 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.913 10.969
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 085.38‐085.48 S 0.10 7480 Regional Rehab 150mm @ IRI 9‐12 2021 2.710 4.375
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 095.36‐096.48 S 1.12 8172 Regional DBST @ Traff >6000 2021 3.087 9.886
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 100.79‐100.89 S 0.10 8172 Regional Rehab 150mm @ IRI 9‐12 2021 2.705 5.141
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 103.41‐103.79 S 0.37 8172 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.578 12.360
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 103.79‐103.99 S 0.20 8172 Regional DBST @ Traff >6000 2021 0.547 11.239
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 106.52‐108.29 S 1.77 8172 Regional DBST @ Traff >6000 2021 4.894 10.239
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 108.29‐108.49 S 0.20 8172 Regional Rehab 150mm @ IRI 9‐12 2021 5.419 4.729
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 108.49‐109.39 S 0.90 8172 Regional DBST @ 25% Crk 2021 2.494 10.434
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 109.45‐110.37 S 0.92 8172 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.450 11.955
R360 Mymensingh ‐Kishoreganj ‐Bhairab Road Km 113.44‐116.39 S 2.94 8172 Regional DBST @ Traff >6000 2021 10.442 7.261
R364 Battoli at R360‐Kishoreganj Road Km 000.00‐003.00 S 3.00 7309 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.355 1.938
R364 Battoli at R360‐Kishoreganj Road Km 003.00‐003.03 S 0.03 7309 Regional DBST @ 25% Crk 2021 0.104 2.942
Z3034 Trisal‐Balipara‐Nandail (Kanurampur) Road Km 015.00‐015.10 S 0.10 3315 Zilla Rehab 75mm @ IRI 9‐12 2021 1.083 2.918
Z3034 Trisal‐Balipara‐Nandail (Kanurampur) Road Km 022.90‐023.00 S 0.10 3315 Zilla Rehab 75mm @ IRI 9‐12 2021 1.101 2.182
Z3601 Katiadi‐Bajitpur‐Astogram Road Km 015.80‐016.80 S 1.00 2986 Zilla Overlay 40mm @ Traff >=2000 2021 3.053 0.516
Z3601 Katiadi‐Bajitpur‐Astogram Road Km 017.84‐033.01 S 15.17 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 249.754 2.220
Z3601 Katiadi‐Bajitpur‐Astogram Road Km 036.41‐036.61 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.283
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 000.30‐000.40 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.525
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 000.40‐000.60 S 0.20 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 0.798 0.545
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 000.60‐000.70 S 0.10 4908 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.425
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 000.70‐003.80 S 3.10 5398 Zilla Overlay 50mm @ IRI 6‐9 2021 15.461 1.932
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 003.80‐004.10 S 0.30 4908 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.078
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 004.10‐004.20 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.745
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 004.20‐006.30 S 2.10 4908 Zilla Overlay 50mm @ Cracking >25% 2021 8.225 0.671
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 006.30‐006.40 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.131 2.084
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 007.10‐007.20 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.131 1.865
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 007.20‐007.80 S 0.60 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 2.381 1.604
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 008.00‐009.10 S 1.10 4908 Zilla Overlay 50mm @ Cracking >25% 2021 4.389 0.267
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 009.10‐009.20 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.937
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 009.90‐010.00 S 0.10 4908 Zilla Full Recon 75mm @ IRI>12 2021 1.643 1.207
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 010.00‐013.20 S 3.20 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 12.738 0.750
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 013.90‐014.10 S 0.20 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 2.263 0.989
Page 152 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 014.10‐014.60 S 0.50 4908 Zilla Overlay 40mm @ Traff >=2000 2021 1.605 0.172
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 014.60‐015.00 S 0.40 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 1.588 1.280
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 016.40‐016.60 S 0.20 5398 Zilla Rehab 75mm @ IRI 9‐12 2021 2.544 2.153
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 016.60‐017.20 S 0.60 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 2.432 1.299
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 017.20‐017.50 S 0.30 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 1.876
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 017.90‐018.00 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.131 1.970
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 018.20‐018.50 S 0.30 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 3.394 1.305
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 018.50‐019.30 S 0.80 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 3.175 0.893
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 019.30‐019.80 S 0.50 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 5.657 0.623
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 019.80‐020.70 S 0.90 4908 Zilla Overlay 40mm @ Traff >=2000 2021 2.888 0.241
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 020.90‐021.50 S 0.60 4908 Zilla Overlay 40mm @ Traff >=2000 2021 1.926 0.421
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 021.50‐021.60 S 0.10 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 1.131 1.656
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 021.60‐021.70 S 0.10 4908 Zilla Overlay 40mm @ Traff >=2000 2021 0.385 0.000
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 021.70‐022.00 S 0.30 4908 Zilla Overlay 50mm @ IRI 6‐9 2021 1.184 1.085
Z3602 Kishoreganj‐Nikli‐Moharkona Road Km 022.30‐022.50 S 0.20 4908 Zilla Rehab 75mm @ IRI 9‐12 2021 2.167 1.644
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 025.46‐026.46 S 1.00 10870 Zilla Overlay 50mm @ IRI 6‐9 2021 5.775 4.693
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 026.46‐027.16 S 0.70 10870 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 4.430
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 027.16‐029.46 S 2.30 10870 Zilla Overlay 50mm @ IRI 6‐9 2021 13.283 4.766
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 029.46‐029.56 S 0.10 10870 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 3.802
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 030.56‐030.86 S 0.30 10870 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 2.710
Z3603 Kishoreganj‐Karimganj‐Mithamain Road Km 030.86‐032.20 S 1.34 10870 Zilla Overlay 50mm @ IRI 6‐9 2021 7.744 4.910
Z3604 Kishoreganj‐Hossainpur Road Km 000.00‐004.10 S 4.10 7523 Zilla Overlay 50mm @ IRI 6‐9 2021 22.860 3.832
Z3604 Kishoreganj‐Hossainpur Road Km 004.10‐004.20 S 0.10 7523 Zilla Full Recon 75mm @ IRI>12 2021 2.426 2.051
Z3604 Kishoreganj‐Hossainpur Road Km 004.20‐014.81 S 10.61 7523 Zilla Overlay 50mm @ Cracking >25% 2021 61.619 2.823
Z3605 Bhairab‐Mendipur Road Km 000.30‐000.40 S 0.10 4629 Zilla Full Recon 75mm @ IRI>12 2021 1.574 1.079
Z3605 Bhairab‐Mendipur Road Km 000.40‐000.60 S 0.20 4629 Zilla Overlay 50mm @ IRI 6‐9 2021 0.760 0.773
Z3605 Bhairab‐Mendipur Road Km 001.50‐001.90 S 0.40 4629 Zilla Overlay 50mm @ IRI 6‐9 2021 1.344 1.375
Z3605 Bhairab‐Mendipur Road Km 001.90‐003.40 S 1.50 4629 Zilla Overlay 50mm @ IRI 6‐9 2021 5.339 0.436
Z3605 Bhairab‐Mendipur Road Km 003.40‐003.70 S 0.30 4629 Zilla Overlay 50mm @ IRI 6‐9 2021 1.115 0.594
Z3605 Bhairab‐Mendipur Road Km 003.70‐003.80 S 0.10 4629 Zilla Overlay 40mm @ Traff >=2000 2021 0.301 0.000
Z3605 Bhairab‐Mendipur Road Km 003.80‐003.90 S 0.10 4629 Zilla Rehab 75mm @ IRI 9‐12 2021 1.060 0.942
Z3605 Bhairab‐Mendipur Road Km 003.90‐004.00 S 0.10 4629 Zilla Overlay 40mm @ Traff >=2000 2021 0.301 0.000
Z3605 Bhairab‐Mendipur Road Km 005.40‐006.30 S 0.90 4629 Zilla Rehab 75mm @ IRI 9‐12 2021 9.536 0.692
Z3605 Bhairab‐Mendipur Road Km 008.20‐009.00 S 0.80 4629 Zilla Overlay 50mm @ IRI 6‐9 2021 2.974 0.816
Z3607 Nandail Chowrasta‐Tarail Road Km 000.00‐000.10 S 0.10 4123 Zilla Overlay 40mm @ Traff >=2000 2021 0.472 0.222
Z3607 Nandail Chowrasta‐Tarail Road Km 000.10‐000.20 S 0.10 4123 Zilla Full Recon 75mm @ IRI>12 2021 2.417 0.344
Z3607 Nandail Chowrasta‐Tarail Road Km 000.20‐014.70 S 14.50 4123 Zilla Overlay 40mm @ Traff >=2000 2021 68.446 0.000
Z3607 Nandail Chowrasta‐Tarail Road Km 014.70‐016.09 S 1.39 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 7.719 0.892
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 000.00‐000.30 S 0.30 1058 Zilla Overlay 40mm @ 1000‐2000 2021 0.917 0.000
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 000.30‐000.90 S 0.60 1058 Zilla Overlay 40mm @ 1000‐2000 2021 1.834 0.000
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 002.00‐002.10 S 0.10 1058 Zilla Overlay 40mm @ IRI>12 2021 0.306 0.000
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 008.70‐008.80 S 0.10 1058 Zilla Overlay 40mm @ IRI>12 2021 0.314 0.000
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 011.00‐011.30 S 0.30 1058 Zilla Overlay 40mm @ 1000‐2000 2021 0.930 0.000
Page 153 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3615 Trisal‐Anandaganj‐Gouripur Road Km 011.30‐011.60 S 0.30 1058 Zilla Overlay 40mm @ 1000‐2000 2021 0.930 0.021
Z3616 Pakundia‐Kishoreganj Road Km 000.00‐003.10 S 3.10 5009 Zilla Overlay 50mm @ IRI 6‐9 2021 11.946 1.110
Z3616 Pakundia‐Kishoreganj Road Km 003.10‐004.60 S 1.50 5009 Zilla Overlay 40mm @ Traff >=2000 2021 4.712 0.571
Z3616 Pakundia‐Kishoreganj Road Km 004.60‐005.00 S 0.40 5009 Zilla Overlay 50mm @ IRI 6‐9 2021 1.726 1.192
Z3623 Itna‐Chamraghat Road Km 000.00‐002.80 S 2.80 5055 Zilla Overlay 50mm @ IRI 6‐9 2021 16.170 1.833
Z3623 Itna‐Chamraghat Road Km 002.80‐002.90 S 0.10 5055 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.722
Z3623 Itna‐Chamraghat Road Km 002.90‐004.10 S 1.20 5055 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 1.797
Z3623 Itna‐Chamraghat Road Km 004.10‐004.20 S 0.10 5055 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.498
Z3623 Itna‐Chamraghat Road Km 004.20‐004.40 S 0.20 5055 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.924
Z3623 Itna‐Chamraghat Road Km 004.45‐012.63 S 8.19 5055 Zilla Overlay 50mm @ IRI 6‐9 2021 47.274 1.808
Z3623 Itna‐Chamraghat Road Km 012.63‐012.83 S 0.20 5055 Zilla Full Recon 75mm @ IRI>12 2021 4.782 0.508
Z3623 Itna‐Chamraghat Road Km 014.67‐014.77 S 0.10 5055 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.733
Z3623 Itna‐Chamraghat Road Km 014.77‐019.00 S 4.23 5055 Zilla Overlay 50mm @ IRI 6‐9 2021 24.446 1.861
Kishoreganj Total 973.432
Mymensingh Division
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 056.00‐078.62 R 22.62 11081 National Overlay 80mm @ IRI 4‐9 2021 272.965 22.200
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 056.00‐083.62 L 27.62 11482 National Overlay 80mm @ IRI 4‐9 2021 333.300 22.519
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 078.62‐078.72 R 0.10 9218 National Rehab 180mm @ IRI 9‐12 2021 4.936 8.780
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 078.72‐105.72 R 27.00 8878 National DBST @ Traff >6000 2021 97.371 14.884
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 083.62‐105.72 L 22.10 8788 National DBST @ Traff >6000 2021 79.701 14.587
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 105.72‐105.94 L 0.21 8788 National Rehab 180mm @ IRI 9‐12 2021 10.514 6.956
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 105.72‐105.94 R 0.21 8859 National Rehab 180mm @ IRI 9‐12 2021 10.514 6.643
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 105.94‐110.00 L 4.06 8788 National Overlay 50mm @ IRI 4‐7 2021 31.151 16.648
N3 Dhaka (Banani)‐Joydebpur‐Mymensingh Road Km 105.94‐110.00 R 4.06 8859 National Overlay 50mm @ IRI 4‐7 2021 31.151 16.585
N303 Churkhai Bazar Link Road Km 000.00‐001.01 S 1.01 3686 National Overlay 50mm @ IRI 5‐9 2021 5.827 2.358
N309 Mymensingh Town By‐Pass Road Km 000.00‐000.50 S 0.50 13249 National Overlay 80mm @ IRI 5‐9 2021 6.595 16.977
N309 Mymensingh Town By‐Pass Road Km 000.50‐000.70 S 0.20 13249 National Full Recon 195mm @ IRI 12 2021 10.440 7.275
N309 Mymensingh Town By‐Pass Road Km 000.70‐000.80 S 0.10 13249 National Overlay 80mm @ IRI 5‐9 2021 1.182 22.718
N309 Mymensingh Town By‐Pass Road Km 000.80‐001.30 S 0.50 13249 National Rehab 195mm @ IRI 9‐12 2021 21.618 8.545
N309 Mymensingh Town By‐Pass Road Km 001.30‐001.70 S 0.40 13249 National Overlay 80mm @ IRI 5‐9 2021 4.708 22.342
N309 Mymensingh Town By‐Pass Road Km 001.70‐002.40 S 0.70 13249 National DBST @ Traff >6000 2021 2.472 18.387
N309 Mymensingh Town By‐Pass Road Km 002.40‐002.80 S 0.40 13249 National Rehab 195mm @ IRI 9‐12 2021 17.416 8.035
N309 Mymensingh Town By‐Pass Road Km 002.80‐003.16 S 0.36 13249 National Full Recon 195mm 2021 18.872 7.513
N401 Madhupur‐Mymensingh Road Km 014.97‐021.70 S 6.73 7690 National Overlay 50mm @ IRI 5‐7 2021 40.992 10.170
N401 Madhupur‐Mymensingh Road Km 021.70‐021.80 S 0.10 7690 National Full Recon 180mm @ IRI 12 2021 4.059 3.863
N401 Madhupur‐Mymensingh Road Km 021.80‐028.64 S 6.84 7690 National Overlay 50mm @ IRI 5‐7 2021 41.943 9.507
N401 Madhupur‐Mymensingh Road Km 028.64‐029.84 S 1.20 7690 National Overlay 60mm @ IRI 7‐9 2021 8.557 10.358
N401 Madhupur‐Mymensingh Road Km 029.84‐030.14 S 0.30 7690 National Overlay 60mm @ IRI 7‐9 2021 2.139 10.389
N401 Madhupur‐Mymensingh Road Km 030.14‐030.41 S 0.26 7690 National Overlay 60mm @ IRI 7‐9 2021 1.890 10.586
N401 Madhupur‐Mymensingh Road Km 030.41‐036.24 S 5.84 11706 National Overlay 80mm @ IRI 5‐9 2021 54.978 17.989
N401 Madhupur‐Mymensingh Road Km 036.41‐038.34 S 1.94 11706 National Rehab 195mm @ IRI 9‐12 2021 66.917 6.922
N401 Madhupur‐Mymensingh Road Km 038.34‐038.44 S 0.10 11706 National Full Recon 195mm @ IRI 12 2021 4.162 6.950
N401 Madhupur‐Mymensingh Road Km 038.44‐040.94 S 2.50 11706 National Overlay 80mm @ IRI 5‐9 2021 25.002 18.529
Page 154 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N401 Madhupur‐Mymensingh Road Km 040.94‐041.24 S 0.30 11706 National Rehab 195mm @ IRI 9‐12 2021 10.551 6.937
N401 Madhupur‐Mymensingh Road Km 041.24‐041.54 S 0.30 11706 National Overlay 80mm @ IRI 5‐9 2021 2.876 18.269
N401 Madhupur‐Mymensingh Road Km 041.54‐042.34 S 0.80 11706 National Rehab 195mm @ IRI 9‐12 2021 28.137 6.800
N401 Madhupur‐Mymensingh Road Km 042.34‐042.74 S 0.40 11706 National Rehab 195mm @ IRI 9‐12 2021 14.068 6.520
N401 Madhupur‐Mymensingh Road Km 042.74‐044.04 S 1.30 11706 National Overlay 80mm @ IRI 5‐9 2021 12.464 17.580
N401 Madhupur‐Mymensingh Road Km 044.04‐044.24 S 0.20 11706 National Full Recon 195mm @ IRI 12 2021 8.469 5.999
N401 Madhupur‐Mymensingh Road Km 044.25‐046.34 S 2.10 11706 National Overlay 80mm @ IRI 5‐9 2021 25.465 13.674
N401 Madhupur‐Mymensingh Road Km 046.34‐046.44 S 0.10 11706 National Rehab 195mm @ IRI 9‐12 2021 5.761 3.290
N401 Madhupur‐Mymensingh Road Km 046.44‐046.98 S 0.54 11706 National Overlay 80mm @ IRI 5‐9 2021 8.464 9.286
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 003.50‐003.90 S 0.40 22031 Regional Rehab 150mm @ IRI 9‐12 2021 12.172 6.971
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 003.90‐006.40 S 2.49 21080 Regional Overlay 60mm @ IRI 5.5‐9 2021 19.664 16.990
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 006.40‐006.52 L 0.12 10183 Regional DBST @ Traff >6000 2021 0.415 10.098
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 006.40‐006.52 R 0.12 10183 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.051 12.787
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 006.52‐021.23 S 14.71 4190 Regional DBST @ 25% Crk 2021 34.158 2.036
Z3030 Bhaluka‐Shakhipur Road Km 000.00‐006.40 S 6.40 2328 Zilla Overlay 40mm @ Traff >=2000 2021 20.485 0.023
Z3030 Bhaluka‐Shakhipur Road Km 006.80‐007.20 S 0.40 2328 Zilla Overlay 40mm @ Traff >=2000 2021 1.284 0.000
Z3030 Bhaluka‐Shakhipur Road Km 007.20‐010.00 S 2.80 2328 Zilla Rehab 75mm @ IRI 9‐12 2021 31.594 0.046
Z3030 Bhaluka‐Shakhipur Road Km 010.00‐010.40 S 0.40 2328 Zilla Overlay 40mm @ Traff >=2000 2021 1.280 0.000
Z3030 Bhaluka‐Shakhipur Road Km 010.40‐011.10 S 0.70 2328 Zilla Overlay 40mm @ Traff >=2000 2021 2.241 0.000
Z3030 Bhaluka‐Shakhipur Road Km 011.10‐011.80 S 0.70 2328 Zilla Overlay 40mm @ Traff >=2000 2021 2.145 0.000
Z3030 Bhaluka‐Shakhipur Road Km 011.80‐012.00 S 0.20 2328 Zilla Rehab 75mm @ IRI 9‐12 2021 2.035 0.673
Z3030 Bhaluka‐Shakhipur Road Km 012.60‐013.50 S 0.90 2328 Zilla Overlay 40mm @ Traff >=2000 2021 2.598 0.000
Z3030 Bhaluka‐Shakhipur Road Km 013.50‐014.00 S 0.50 2328 Zilla Overlay 40mm @ Traff >=2000 2021 1.443 0.000
Z3030 Bhaluka‐Shakhipur Road Km 014.00‐014.50 S 0.50 2328 Zilla Overlay 40mm @ Traff >=2000 2021 1.418 0.000
Z3030 Bhaluka‐Shakhipur Road Km 014.60‐017.60 S 3.00 2328 Zilla Overlay 40mm @ Traff >=2000 2021 8.161 0.353
Z3030 Bhaluka‐Shakhipur Road Km 017.60‐018.30 S 0.70 2328 Zilla Overlay 40mm @ Traff >=2000 2021 1.902 0.006
Z3030 Bhaluka‐Shakhipur Road Km 018.30‐018.50 S 0.20 2328 Zilla Overlay 40mm @ Traff >=2000 2021 0.580 0.337
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 000.90‐001.00 S 0.10 2709 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.528
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 003.50‐003.60 S 0.10 2709 Zilla Overlay 40mm @ Traff >=2000 2021 0.312 0.081
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 003.60‐004.00 S 0.40 2709 Zilla Overlay 40mm @ Traff >=2000 2021 1.250 0.435
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 005.90‐006.10 S 0.20 2709 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.885
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 022.90‐023.50 S 0.60 2709 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.112
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 023.50‐024.20 S 0.70 2709 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.376
Z3032 Fulbaria‐Ashim‐Sangkibanga‐Bagar Bazar Road Km 024.20‐028.70 S 4.50 2709 Zilla Overlay 40mm @ Traff >=2000 2021 14.063 0.132
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 048.83‐048.93 S 0.10 2895 Zilla Full Recon 75mm @ IRI>12 2021 1.600 0.598
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 048.93‐050.23 S 1.30 2895 Zilla Rehab 75mm @ IRI 9‐12 2021 14.319 0.621
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 052.83‐052.93 S 0.10 2895 Zilla Full Recon 75mm @ IRI>12 2021 1.591 0.606
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 054.93‐055.03 S 0.10 2895 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.556
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 057.83‐058.23 S 0.40 2895 Zilla Full Recon 75mm @ IRI>12 2021 6.381 0.278
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 061.93‐062.53 S 0.60 2895 Zilla Full Recon 75mm @ IRI>12 2021 9.546 0.219
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 063.93‐064.53 S 0.60 2895 Zilla Rehab 75mm @ IRI 9‐12 2021 6.609 0.687
Z3033 Mymensingh‐Gafargaon‐Toke Road Km 065.03‐065.13 S 0.10 2895 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.660
Z3042 Dakhin Harina‐Shakchura Road Km 000.40‐001.40 S 1.00 2895 Zilla Overlay 40mm @ Traff >=2000 2021 3.124 0.816
Page 155 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3042 Dakhin Harina‐Shakchura Road Km 001.40‐002.40 S 1.00 2895 Zilla Overlay 40mm @ Traff >=2000 2021 3.133 0.348
Z3042 Dakhin Harina‐Shakchura Road Km 003.90‐004.10 S 0.20 2895 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.119
Z3604 Kishoreganj‐Hossainpur Road Km 014.81‐016.19 S 1.38 7523 Zilla Overlay 50mm @ IRI 6‐9 2021 8.042 3.491
Z3604 Kishoreganj‐Hossainpur Road Km 016.19‐016.29 S 0.10 7523 Zilla Full Recon 75mm @ IRI>12 2021 2.395 2.504
Z3604 Kishoreganj‐Hossainpur Road Km 016.29‐016.69 S 0.40 7523 Zilla Overlay 50mm @ IRI 6‐9 2021 2.314 3.262
Z3604 Kishoreganj‐Hossainpur Road Km 016.69‐016.79 S 0.10 7523 Zilla Rehab 75mm @ IRI 9‐12 2021 1.649 3.227
Z3604 Kishoreganj‐Hossainpur Road Km 016.79‐017.11 S 0.32 7523 Zilla Overlay 50mm @ IRI 6‐9 2021 1.875 3.517
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 033.00‐042.78 S 9.78 4046 Zilla Overlay 40mm @ Traff >=2000 2021 38.029 0.785
Z4104 Piarpur Bazar‐Karnil Road Km 000.00‐000.50 S 0.50 1414 Zilla Overlay 40mm @ IRI>12 2021 1.562 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 000.50‐002.00 S 1.50 1414 Zilla Overlay 40mm @ 1000‐2000 2021 4.686 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 002.00‐002.10 S 0.10 1414 Zilla Overlay 40mm @ IRI>12 2021 0.312 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 002.10‐002.70 S 0.60 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.875 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 002.70‐002.80 S 0.10 1414 Zilla Overlay 40mm @ IRI>12 2021 0.312 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 002.80‐003.40 S 0.60 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.859 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 003.40‐003.60 S 0.20 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.618 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 003.60‐003.70 S 0.10 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.309 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 003.70‐004.30 S 0.60 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.854 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 004.30‐004.40 S 0.10 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.309 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 004.40‐004.80 S 0.40 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.236 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 004.80‐005.00 S 0.20 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.618 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 005.00‐005.40 S 0.40 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.236 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 005.40‐005.80 S 0.40 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.236 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 005.80‐006.00 S 0.20 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.618 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 010.80‐011.90 S 1.10 1414 Zilla Overlay 40mm @ 1000‐2000 2021 3.455 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 012.50‐013.00 S 0.50 1414 Zilla Overlay 40mm @ 1000‐2000 2021 1.574 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 013.10‐013.10 S 0.00 1414 Zilla Overlay 40mm @ 1000‐2000 2021 0.003 12.641
Z4104 Piarpur Bazar‐Karnil Road Km 013.10‐014.10 S 1.00 1414 Zilla Overlay 40mm @ 1000‐2000 2021 3.141 0.000
Z4104 Piarpur Bazar‐Karnil Road Km 014.10‐015.05 S 0.95 1414 Zilla Overlay 40mm @ 1000‐2000 2021 2.994 0.000
Z4105 Fulbaria‐Muktagachha Road Km 000.00‐001.10 S 1.10 2304 Zilla Overlay 40mm @ Traff >=2000 2021 3.418 0.111
Z4105 Fulbaria‐Muktagachha Road Km 001.20‐004.40 S 3.20 2304 Zilla Overlay 40mm @ Traff >=2000 2021 9.862 0.816
Z4105 Fulbaria‐Muktagachha Road Km 004.40‐004.50 S 0.10 2304 Zilla Overlay 40mm @ Traff >=2000 2021 0.308 0.682
Z4105 Fulbaria‐Muktagachha Road Km 004.50‐005.00 S 0.50 2304 Zilla Overlay 40mm @ Traff >=2000 2021 1.541 0.493
Z4105 Fulbaria‐Muktagachha Road Km 005.00‐005.30 S 0.30 2304 Zilla Rehab 75mm @ IRI 9‐12 2021 3.259 0.411
Z4105 Fulbaria‐Muktagachha Road Km 005.30‐008.40 S 3.10 2304 Zilla Overlay 40mm @ Traff >=2000 2021 9.554 0.592
Z4105 Fulbaria‐Muktagachha Road Km 008.40‐009.90 S 1.50 2304 Zilla Overlay 40mm @ Traff >=2000 2021 4.610 0.449
Z4105 Fulbaria‐Muktagachha Road Km 009.90‐010.10 S 0.20 2304 Zilla Overlay 40mm @ Traff >=2000 2021 0.615 0.000
Z4105 Fulbaria‐Muktagachha Road Km 010.10‐010.40 S 0.30 2304 Zilla Overlay 40mm @ Traff >=2000 2021 0.922 0.500
Z4105 Fulbaria‐Muktagachha Road Km 010.40‐010.70 S 0.30 2304 Zilla Overlay 40mm @ Traff >=2000 2021 0.922 0.084
Z4105 Fulbaria‐Muktagachha Road Km 010.70‐012.30 S 1.60 2304 Zilla Overlay 40mm @ Traff >=2000 2021 4.931 0.729
Z4105 Fulbaria‐Muktagachha Road Km 012.30‐012.70 S 0.40 2304 Zilla Overlay 40mm @ Traff >=2000 2021 1.229 0.469
Z4105 Fulbaria‐Muktagachha Road Km 012.70‐013.60 S 0.90 2304 Zilla Overlay 40mm @ Traff >=2000 2021 2.758 0.899
Z4105 Fulbaria‐Muktagachha Road Km 013.60‐015.50 S 1.90 2304 Zilla Overlay 40mm @ Traff >=2000 2021 5.839 0.473
Z4105 Fulbaria‐Muktagachha Road Km 015.50‐015.55 S 0.05 2304 Zilla Full Recon 75mm @ IRI>12 2021 0.708 0.943
Page 156 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Mymensingh Total 1680.461
Netrokona Division
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 039.88‐040.18 S 0.30 10183 Regional Rehab 150mm @ IRI 9‐12 2021 10.578 4.256
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 040.18‐041.18 S 1.00 9252 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.931 10.036
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 041.18‐041.28 S 0.10 5665 Regional Rehab 150mm @ IRI 9‐12 2021 2.714 1.496
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 044.88‐051.62 S 6.74 5665 Regional DBST @ Traff 4000‐6000 2021 18.701 2.823
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 051.62‐052.02 S 0.40 5665 Regional Rehab 150mm @ IRI 9‐12 2021 10.877 1.556
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 052.02‐053.32 S 1.30 5665 Regional DBST @ Traff 4000‐6000 2021 3.616 2.830
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 053.32‐053.62 S 0.30 5665 Regional DBST @ Traff 4000‐6000 2021 0.834 4.692
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 053.62‐060.92 S 7.30 5665 Regional DBST @ Traff 4000‐6000 2021 20.267 3.136
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 060.92‐061.22 S 0.30 5041 Regional Rehab 150mm @ IRI 9‐12 2021 5.245 1.010
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 062.82‐063.12 S 0.30 5041 Regional DBST @ Traff 4000‐6000 2021 0.536 3.077
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 063.12‐066.22 S 3.10 5041 Regional Overlay 60mm @ IRI 5.5‐9 2021 14.664 3.363
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 066.22‐066.32 S 0.10 5041 Regional Full Recon 150mm 2021 2.209 1.507
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 066.32‐067.32 S 1.00 5041 Regional DBST @ 25% Crk 2021 1.798 2.243
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 067.32‐067.72 S 0.40 5041 Regional Rehab 150mm @ IRI 9‐12 2021 7.032 0.925
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 067.72‐068.62 S 0.90 5665 Regional DBST @ 25% Crk 2021 2.103 5.270
Z2805 Dharmapasha‐Madayanagar Road Km 000.00‐000.20 S 0.20 2318 Zilla Full Recon 75mm @ IRI>12 2021 3.147 0.079
Z2805 Dharmapasha‐Madayanagar Road Km 003.00‐003.10 S 0.10 2318 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.226
Z2805 Dharmapasha‐Madayanagar Road Km 004.10‐004.20 S 0.10 2318 Zilla Full Recon 75mm @ IRI>12 2021 1.587 0.243
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 000.00‐000.20 S 0.20 5465 Zilla Overlay 50mm @ IRI 6‐9 2021 1.386 1.431
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 000.20‐016.05 S 15.85 5465 Zilla Overlay 50mm @ Cracking >25% 2021 93.697 0.279
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 016.05‐016.15 S 0.10 5465 Zilla Full Recon 75mm @ IRI>12 2021 2.478 0.897
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 016.15‐017.15 S 1.00 5465 Zilla Overlay 50mm @ IRI 6‐9 2021 5.985 0.497
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 017.15‐017.35 S 0.20 5465 Zilla Rehab 75mm @ IRI 9‐12 2021 3.364 0.682
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 017.35‐019.25 S 1.90 5465 Zilla Overlay 40mm @ Traff >=2000 2021 9.033 0.037
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 019.25‐019.55 S 0.30 5465 Zilla Overlay 50mm @ IRI 6‐9 2021 1.764 0.911
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 031.65‐034.05 S 2.40 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 7.812 1.621
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 034.05‐034.48 S 0.43 5459 Zilla Rehab 75mm @ IRI 9‐12 2021 4.008 2.032
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 034.48‐035.08 S 0.60 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 1.644 3.819
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 035.08‐036.58 S 1.50 5459 Zilla Rehab 75mm @ IRI 9‐12 2021 10.999 2.276
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 036.58‐037.58 S 1.00 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 2.573 3.895
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 037.58‐037.78 S 0.20 5459 Zilla Rehab 75mm @ IRI 9‐12 2021 1.467 3.029
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 037.78‐040.68 S 2.90 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 7.460 4.254
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 040.68‐040.78 S 0.10 5459 Zilla Full Recon 75mm @ IRI>12 2021 1.065 2.515
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 040.78‐042.68 S 1.90 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 4.888 4.188
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 042.68‐042.88 S 0.20 5459 Zilla Full Recon 75mm @ IRI>12 2021 2.130 2.065
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 042.88‐044.38 S 1.50 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 3.859 4.127
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 044.48‐045.98 S 1.50 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 3.859 4.310
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 045.98‐046.08 S 0.10 5459 Zilla Full Recon 75mm @ IRI>12 2021 1.065 2.691
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 046.38‐048.18 S 1.80 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 4.631 4.411
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 048.18‐049.08 S 0.90 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 2.315 4.184
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 049.08‐049.58 S 0.50 5459 Zilla Rehab 75mm @ IRI 9‐12 2021 3.666 2.400
Page 157 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 049.68‐049.88 S 0.20 5459 Zilla Full Recon 75mm @ IRI>12 2021 2.130 1.742
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 049.88‐050.28 S 0.40 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 1.029 4.156
Z3701 Netrokona‐Madan‐Kaliajuri Road Km 050.28‐055.00 S 4.71 5459 Zilla Overlay 50mm @ IRI 6‐9 2021 12.124 4.284
Z3705 Bririshiri‐Bijoypur Landport Connecting Road Km 000.00‐000.37 S 0.37 767 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.728 0.000
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 015.40‐015.70 S 0.30 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 1.707 0.473
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 015.70‐016.30 S 0.60 4046 Zilla Overlay 50mm @ Cracking >25% 2021 2.344 0.440
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 016.30‐018.90 S 2.60 4046 Zilla Rehab 75mm @ IRI 9‐12 2021 27.548 0.608
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 018.90‐020.00 S 1.10 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 4.123 0.979
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 020.00‐020.10 S 0.10 4046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.071 1.287
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 020.10‐020.50 S 0.40 4046 Zilla Overlay 50mm @ Cracking >25% 2021 1.504 0.515
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 020.50‐020.80 S 0.30 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 1.128 1.250
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 020.80‐021.10 S 0.30 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 1.128 1.019
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 021.10‐021.30 S 0.20 4046 Zilla Rehab 75mm @ IRI 9‐12 2021 2.143 0.946
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 021.30‐021.90 S 0.60 4046 Zilla Overlay 40mm @ Traff >=2000 2021 1.824 0.231
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 021.90‐022.70 S 0.80 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 3.007 1.334
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 022.70‐023.00 S 0.30 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 1.128 1.149
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 023.00‐023.10 S 0.10 4046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.071 1.131
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 023.10‐024.00 S 0.90 4046 Zilla Overlay 50mm @ Cracking >25% 2021 3.393 0.605
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 024.00‐024.20 S 0.20 4046 Zilla Rehab 75mm @ IRI 9‐12 2021 2.155 0.768
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 024.20‐024.40 S 0.20 4046 Zilla Overlay 50mm @ Cracking >25% 2021 0.756 0.498
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 024.40‐024.60 S 0.20 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 0.756 1.141
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 024.60‐026.80 S 2.20 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 8.316 0.802
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 026.80‐027.00 S 0.20 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 0.756 2.044
Z3707 Netrokona‐Purbadhala‐Hugla‐Dhobaura Road Km 027.00‐033.00 S 6.00 4046 Zilla Overlay 50mm @ IRI 6‐9 2021 22.676 1.238
Z3709 Netrokona‐Birishiri Road Km 012.74‐026.00 S 13.26 2794 Zilla Overlay 40mm @ Traff >=2000 2021 39.846 0.755
Z3713 Avoipasha‐Atpara Road Km 000.00‐000.10 S 0.10 4763 Zilla Overlay 50mm @ Cracking >25% 2021 0.599 0.633
Z3713 Avoipasha‐Atpara Road Km 000.10‐000.20 S 0.10 4763 Zilla Rehab 75mm @ IRI 9‐12 2021 1.631 1.269
Z3713 Avoipasha‐Atpara Road Km 000.20‐006.20 S 6.00 4763 Zilla Overlay 40mm @ Traff >=2000 2021 27.508 0.989
Z3713 Avoipasha‐Atpara Road Km 006.20‐006.70 S 0.50 4763 Zilla Rehab 75mm @ IRI 9‐12 2021 8.051 0.837
Z3713 Avoipasha‐Atpara Road Km 006.70‐006.95 S 0.25 4763 Zilla Overlay 40mm @ Traff >=2000 2021 1.146 0.000
Netrokona Total 480.901
Sherpur Division
N402 Nakla‐Nalitabadi‐Nakugaon Road Km 000.70‐000.90 S 0.20 5737 National Overlay 50mm @ IRI 5‐9 2021 1.271 6.163
N402 Nakla‐Nalitabadi‐Nakugaon Road Km 002.00‐002.30 S 0.30 5737 National Overlay 50mm @ IRI 5‐9 2021 1.906 6.181
N402 Nakla‐Nalitabadi‐Nakugaon Road Km 014.40‐014.50 S 0.10 5737 National Full Recon 150mm 2021 6.371 0.480
N402 Nakla‐Nalitabadi‐Nakugaon Road Km 017.80‐017.90 S 0.10 5737 National Full Recon 150mm 2021 4.430 1.470
N402 Nakla‐Nalitabadi‐Nakugaon Road Km 027.00‐028.00 S 1.00 5737 National Rehab 150mm @ IRI 9‐12 2021 38.601 1.589
Z4603 Sherpur (Bangaon)‐Nunni‐Hatipagar Road Km 000.00‐000.20 S 0.20 2726 Zilla Rehab 75mm @ IRI 9‐12 2021 3.173 0.526
Z4603 Sherpur (Bangaon)‐Nunni‐Hatipagar Road Km 000.20‐012.70 S 12.50 2726 Zilla Overlay 40mm @ Traff >=2000 2021 42.984 0.000
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 000.00‐000.05 L 0.05 4005 Zilla Overlay 40mm @ IRI>12 2021 0.361 0.000
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 000.00‐000.05 R 0.05 4005 Zilla Overlay 40mm @ IRI>12 2021 0.361 0.000
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 000.05‐000.10 S 0.05 4005 Zilla Full Recon 75mm @ IRI>12 2021 1.195 0.829
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 008.20‐008.50 S 0.30 4005 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.318
Page 158 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 011.70‐011.80 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.073
Z4605 Jhulgaon‐Jhenaigati‐Sandahkura Road Km 011.80‐012.52 S 0.71 3474 Zilla Overlay 40mm @ Traff >=2000 2021 3.630 0.000
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 000.00‐000.30 S 0.30 4701 Zilla Overlay 50mm @ IRI 6‐9 2021 1.764 2.248
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 000.30‐000.50 S 0.20 4701 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.564
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 000.70‐000.90 S 0.20 4701 Zilla Overlay 50mm @ IRI 6‐9 2021 1.176 2.118
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 003.40‐003.50 S 0.10 4701 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.780
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 003.90‐004.10 S 0.20 4701 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 2.702
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 004.60‐004.70 S 0.10 4573 Zilla Rehab 75mm @ IRI 9‐12 2021 1.149 2.399
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 004.80‐005.00 S 0.20 4573 Zilla Rehab 75mm @ IRI 9‐12 2021 2.299 1.032
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 005.00‐006.70 S 1.70 4573 Zilla Overlay 40mm @ Traff >=2000 2021 5.528 1.008
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 006.70‐006.80 S 0.10 4573 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 2.422
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 006.80‐007.50 S 0.70 4573 Zilla Overlay 50mm @ IRI 6‐9 2021 2.793 2.343
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 007.50‐007.70 S 0.20 4573 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.906
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 008.80‐008.90 S 0.10 4701 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 1.971
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 015.10‐015.20 S 0.10 4701 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 1.900
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 015.20‐017.60 S 2.40 4701 Zilla Overlay 50mm @ IRI 6‐9 2021 13.608 2.592
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 017.60‐018.00 S 0.40 4701 Zilla Overlay 50mm @ IRI 6‐9 2021 2.268 2.229
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 020.40‐020.60 S 0.20 4573 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.944
Z4607 Sherpur‐Sribardi‐Bakshiganj Road Km 025.10‐025.20 S 0.10 4573 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.552
Z4609 Nakla‐Shibbari Road Km 000.00‐000.10 S 0.10 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.508 0.000
Z4609 Nakla‐Shibbari Road Km 000.10‐000.30 S 0.20 935 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z4610 Nakla By‐Pass Road Km 000.10‐000.20 S 0.10 935 Zilla Overlay 40mm @ IRI>12 2021 0.475 0.000
Z4610 Nakla By‐Pass Road Km 000.20‐006.10 S 5.90 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 27.901 0.000
Z4610 Nakla By‐Pass Road Km 006.10‐006.20 S 0.10 935 Zilla Overlay 40mm @ IRI>12 2021 0.475 0.000
Z4610 Nakla By‐Pass Road Km 006.20‐007.37 S 1.17 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.567 0.000
Z4610 Nakla By‐Pass Road Km 007.37‐007.57 S 0.20 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.951 0.000
Z4610 Nakla By‐Pass Road Km 007.57‐011.50 S 3.93 935 Zilla Overlay 40mm @ Traff 100‐1000 2021 18.680 0.000
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 000.90‐001.00 S 0.10 1884 Zilla Overlay 40mm @ IRI>12 2021 0.313 0.000
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 001.00‐001.30 S 0.30 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.940 0.000
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 001.30‐001.70 S 0.40 1884 Zilla Rehab 75mm @ IRI 9‐12 2021 4.418 0.190
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 001.70‐001.90 S 0.20 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.625 0.000
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 001.90‐002.10 S 0.20 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.159
Z4617 Sherpur(Kanashakhola)‐Ashtomitala By Pass Km 002.10‐003.35 S 1.25 1884 Zilla Overlay 40mm @ 1000‐2000 2021 3.884 0.240
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 002.80‐002.90 S 0.10 1884 Zilla Full Recon 75mm @ IRI>12 2021 1.652 0.011
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 006.50‐006.80 S 0.30 1884 Zilla Full Recon 75mm @ IRI>12 2021 4.956 0.020
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 006.90‐007.00 S 0.10 1884 Zilla Overlay 40mm @ IRI>12 2021 0.331 0.000
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 007.00‐007.30 S 0.30 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.993 0.044
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 007.30‐007.40 S 0.10 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.331 0.105
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 007.40‐007.50 S 0.10 1884 Zilla Overlay 40mm @ 1000‐2000 2021 0.331 0.028
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 007.50‐007.90 S 0.40 1884 Zilla Overlay 40mm @ 1000‐2000 2021 1.324 0.000
Z4619 Nalitabari‐Papuajuri (Baily Bridge) Road Km 007.90‐008.28 S 0.38 1884 Zilla Overlay 40mm @ 1000‐2000 2021 1.262 0.001
Sherpur Total 237.122
Tangail Division
Page 159 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N401 Madhupur‐Mymensingh Road Km 000.00‐000.60 S 0.60 7690 National Overlay 50mm @ IRI 5‐7 2021 6.426 3.596
N401 Madhupur‐Mymensingh Road Km 000.60‐000.70 S 0.10 7690 National Full Recon 180mm 2021 5.529 1.906
N401 Madhupur‐Mymensingh Road Km 000.70‐005.60 S 4.90 7690 National Overlay 50mm @ IRI 5‐7 2021 30.304 9.741
N401 Madhupur‐Mymensingh Road Km 005.60‐005.70 S 0.10 7690 National Full Recon 180mm @ IRI 12 2021 4.059 3.775
N401 Madhupur‐Mymensingh Road Km 005.70‐006.50 S 0.80 7690 National Overlay 50mm @ IRI 5‐7 2021 4.872 9.246
N401 Madhupur‐Mymensingh Road Km 006.50‐006.80 S 0.30 7690 National Full Recon 180mm @ IRI 12 2021 12.178 3.545
N401 Madhupur‐Mymensingh Road Km 006.80‐009.80 S 3.00 7690 National Overlay 50mm @ IRI 5‐7 2021 18.050 10.091
N401 Madhupur‐Mymensingh Road Km 009.80‐010.50 S 0.70 7690 National Overlay 60mm @ IRI 7‐9 2021 4.991 10.553
N401 Madhupur‐Mymensingh Road Km 010.50‐014.97 S 4.47 7690 National Overlay 50mm @ IRI 5‐7 2021 26.753 10.281
N403 Mirzapur Town old Section Road Km 000.00‐000.10 S 0.10 6272 National Overlay 50mm @ IRI 5‐7 2021 1.155 0.711
N403 Mirzapur Town old Section Road Km 000.10‐000.20 S 0.10 6272 National Full Recon 180mm 2021 7.699 0.045
N403 Mirzapur Town old Section Road Km 002.30‐002.60 S 0.30 6272 National Overlay 60mm @ IRI 7‐9 2021 2.211 3.330
N403 Mirzapur Town old Section Road Km 003.70‐003.72 S 0.02 6272 National Rehab 180mm @ IRI 9‐12 2021 0.690 1.175
N403 Mirzapur Town old Section Road Km 003.72‐003.73 L 0.01 6272 National DBST @ Traff >6000 2021 0.083 0.605
N403 Mirzapur Town old Section Road Km 003.72‐003.73 R 0.01 6272 National DBST @ Traff >6000 2021 0.080 0.662
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 000.00‐000.03 L 0.03 17020 National Overlay 50mm @ IRI 5 2021 1.575 0.860
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 000.00‐000.03 R 0.03 17020 National Overlay 50mm @ IRI 5 2021 0.504 3.509
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 000.03‐001.10 S 1.07 17020 National Overlay 50mm @ IRI 5 2021 8.853 10.720
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 001.10‐001.30 S 0.20 17020 National Rehab 195mm @ IRI 9‐12 2021 9.096 4.698
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 001.30‐003.30 S 2.00 17020 National Overlay 80mm @ IRI 5‐9 2021 29.423 10.300
N404 Tangail Old Section (Nagarjalpai‐Baila) Road Km 003.30‐003.50 S 0.20 17020 National Overlay 80mm @ IRI 5‐9 2021 3.042 9.704
N407 Korotia‐Bhanga Road Km 000.30‐000.50 S 0.20 10176 National DBST @ Traff >6000 2021 0.453 4.304
N407 Korotia‐Bhanga Road Km 000.60‐001.10 S 0.50 4801 National Overlay 50mm @ IRI 5‐9 2021 1.932 1.740
N407 Korotia‐Bhanga Road Km 001.20‐001.40 S 0.20 4801 National Full Recon 150mm 2021 4.466 0.557
N407 Korotia‐Bhanga Road Km 001.40‐002.21 S 0.81 4801 National DBST @ Traff 4000‐6000 2021 1.473 0.660
N408 Korotia Bazar Portion Road Km 000.00‐000.10 S 0.10 4178 National Full Recon 150mm 2021 3.337 1.001
N408 Korotia Bazar Portion Road Km 000.10‐003.53 S 3.43 4178 National DBST @ 25% Crk 2021 9.376 1.039
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 000.00‐001.52 S 1.52 6752 Regional DBST @ 25% Crk 2021 4.325 2.532
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 001.52‐001.55 L 0.03 6752 Regional DBST @ 25% Crk 2021 0.178 0.462
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 001.52‐001.55 R 0.03 6752 Regional DBST @ 25% Crk 2021 0.163 0.544
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 001.55‐019.80 S 18.25 6752 Regional DBST @ 25% Crk 2021 52.924 2.570
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 019.80‐020.00 S 0.20 6752 Regional DBST @ Traff >6000 2021 0.554 5.126
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 020.00‐022.10 S 2.10 6752 Regional DBST @ 25% Crk 2021 5.820 2.599
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 022.10‐022.20 S 0.10 6752 Regional Full Recon 150mm @ IRI 12 2021 3.422 1.997
R480 Elenga‐Bhuanpur (Char Gabsara) Road Km 022.20‐022.40 S 0.20 6752 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.418 4.059
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 018.37‐018.80 S 0.43 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.005 3.220
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 018.80‐019.10 S 0.30 5251 Regional Full Recon 150mm 2021 10.212 1.135
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 019.10‐022.10 S 3.00 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.979 3.780
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 022.10‐022.30 S 0.20 5251 Regional DBST @ Traff 4000‐6000 2021 0.550 4.178
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 022.30‐024.50 S 2.20 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 15.357 3.397
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 024.50‐024.90 S 0.40 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.792 4.413
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 024.90‐025.70 S 0.80 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.594 3.385
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 025.70‐025.80 S 0.10 5251 Regional Full Recon 150mm 2021 3.392 1.896
Page 160 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 025.80‐025.90 S 0.10 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.699 3.831
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 025.90‐026.20 S 0.30 5251 Regional DBST @ Traff 4000‐6000 2021 0.830 4.051
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 026.20‐029.20 S 3.00 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.017 3.125
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 029.20‐030.00 S 0.80 5251 Regional Rehab 150mm @ IRI 9‐12 2021 21.638 1.230
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 030.00‐030.30 S 0.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.098 3.369
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 030.30‐030.40 S 0.10 5251 Regional Rehab 150mm @ IRI 9‐12 2021 2.700 1.543
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 030.40‐031.60 S 1.20 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.377 3.617
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 031.60‐031.70 S 0.10 5251 Regional Full Recon 150mm 2021 3.337 1.850
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 031.70‐033.00 S 1.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.977 4.119
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 033.00‐033.30 S 0.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.094 4.790
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 033.30‐035.50 S 2.20 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 15.385 3.177
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 035.50‐035.60 S 0.10 5251 Regional Full Recon 150mm 2021 3.380 1.658
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 035.60‐037.30 S 1.70 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 15.151 2.007
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 037.30‐037.40 S 0.10 5251 Regional Rehab 150mm @ IRI 9‐12 2021 3.545 0.643
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 037.40‐038.10 S 0.70 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.315 2.765
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 038.10‐038.20 S 0.10 5251 Regional Rehab 150mm @ IRI 9‐12 2021 2.710 1.571
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 038.20‐038.50 S 0.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.105 3.500
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 038.50‐038.70 S 0.20 5251 Regional Rehab 150mm @ IRI 9‐12 2021 5.419 1.279
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 038.70‐040.20 S 1.50 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.508 3.127
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 040.20‐040.30 S 0.10 5251 Regional Rehab 150mm @ IRI 9‐12 2021 2.695 1.508
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 040.30‐042.20 S 1.90 5251 Regional DBST @ Traff 4000‐6000 2021 5.256 2.411
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 042.20‐042.30 S 0.10 5251 Regional Full Recon 150mm 2021 3.404 1.511
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 042.30‐043.80 S 1.50 5251 Regional DBST @ Traff 4000‐6000 2021 4.157 2.548
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 043.80‐044.00 S 0.20 5251 Regional Rehab 150mm @ IRI 9‐12 2021 5.419 1.396
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 044.00‐046.30 S 2.30 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 16.113 3.052
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 046.30‐046.50 S 0.20 5251 Regional Rehab 150mm @ IRI 9‐12 2021 5.419 1.233
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 046.50‐051.70 S 5.20 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 36.364 2.933
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 051.70‐051.90 S 0.20 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.409 4.654
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 051.90‐052.40 S 0.50 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.178 1.767
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 052.40‐052.80 S 0.40 5251 Regional DBST @ Traff 4000‐6000 2021 1.642 2.060
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 052.80‐053.40 S 0.60 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.853 1.298
R506 Aricha‐Ghior‐Daulatpur‐Tangail Road Km 053.40‐053.73 S 0.33 5251 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.934 1.365
Z3030 Bhaluka‐Shakhipur Road Km 018.50‐019.40 S 0.90 2328 Zilla Overlay 40mm @ Traff >=2000 2021 2.677 0.221
Z3030 Bhaluka‐Shakhipur Road Km 019.40‐019.50 S 0.10 2328 Zilla Full Recon 75mm @ IRI>12 2021 1.521 0.287
Z3030 Bhaluka‐Shakhipur Road Km 019.50‐022.80 S 3.30 2328 Zilla Overlay 40mm @ Traff >=2000 2021 12.692 0.000
Z3030 Bhaluka‐Shakhipur Road Km 022.80‐023.00 S 0.20 2328 Zilla Overlay 40mm @ Traff >=2000 2021 0.883 0.122
Z3030 Bhaluka‐Shakhipur Road Km 023.00‐023.20 S 0.20 2328 Zilla Overlay 40mm @ Traff >=2000 2021 0.883 0.000
Z3030 Bhaluka‐Shakhipur Road Km 023.20‐024.40 S 1.20 2328 Zilla Overlay 40mm @ Traff >=2000 2021 5.339 0.000
Z3030 Bhaluka‐Shakhipur Road Km 024.40‐026.08 S 1.68 2328 Zilla Overlay 40mm @ Traff >=2000 2021 7.613 0.000
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 000.00‐000.20 S 0.20 3079 Zilla Overlay 40mm @ Cracks >25% 2021 0.917 0.118
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 000.20‐000.40 S 0.20 3079 Zilla Full Recon 75mm @ IRI>12 2021 4.712 0.098
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 000.40‐000.90 S 0.50 3079 Zilla Overlay 40mm @ Traff >=2000 2021 2.301 0.072
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 000.90‐001.00 S 0.10 3079 Zilla Overlay 40mm @ Traff >=2000 2021 0.460 0.366
Page 161 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 001.00‐002.60 S 1.60 3079 Zilla Overlay 40mm @ Traff >=2000 2021 7.050 0.000
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 002.60‐002.70 S 0.10 3079 Zilla Rehab 75mm @ IRI 9‐12 2021 1.089 1.378
Z4007 Mirzapur (Pakullah)‐Delduar‐Elasin Road Km 002.70‐011.30 S 8.60 3079 Zilla Overlay 40mm @ Traff >=2000 2021 30.739 0.648
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 000.00‐000.20 S 0.20 2267 Zilla Overlay 40mm @ Traff >=2000 2021 0.662 0.405
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 000.20‐000.40 S 0.20 2267 Zilla Full Recon 75mm @ IRI>12 2021 3.391 0.642
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 000.40‐000.80 S 0.40 2267 Zilla Overlay 40mm @ Traff >=2000 2021 1.324 0.279
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 000.80‐001.60 S 0.80 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 9.338 0.794
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 001.60‐001.70 S 0.10 2267 Zilla Overlay 40mm @ Traff >=2000 2021 0.331 0.375
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 001.70‐002.10 S 0.40 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 4.669 0.648
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 002.10‐003.00 S 0.90 2267 Zilla Overlay 40mm @ Traff >=2000 2021 2.980 0.399
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 003.00‐003.60 S 0.60 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 7.004 0.458
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 003.60‐003.90 S 0.30 2267 Zilla Overlay 40mm @ Traff >=2000 2021 0.993 0.411
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 003.90‐004.20 S 0.30 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 3.502 0.539
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 004.20‐005.00 S 0.80 2267 Zilla Overlay 40mm @ Traff >=2000 2021 2.649 0.392
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 005.00‐005.60 S 0.60 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 7.004 0.763
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 005.60‐005.70 S 0.10 2267 Zilla Overlay 40mm @ Traff >=2000 2021 0.331 0.422
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 005.70‐005.80 S 0.10 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.117
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 005.80‐006.70 S 0.90 2267 Zilla Overlay 40mm @ Traff >=2000 2021 2.980 0.292
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 006.70‐006.80 S 0.10 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.076
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 006.80‐007.80 S 1.00 2267 Zilla Overlay 40mm @ Traff >=2000 2021 3.311 0.220
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 007.80‐013.20 S 5.40 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 63.033 0.857
Z4009 Nagarpur (Duburia)‐Salimabad‐Chauhali Road Km 013.20‐013.73 S 0.53 2267 Zilla Rehab 75mm @ IRI 9‐12 2021 6.187 1.073
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 000.00‐000.50 S 0.50 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 2.924 5.706
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 000.50‐001.00 S 0.50 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 8.336 2.849
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 001.00‐001.70 S 0.70 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 4.094 3.034
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 001.70‐001.80 S 0.10 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 1.670 3.509
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 001.80‐002.10 S 0.30 5359 Zilla Overlay 50mm @ Cracking >25% 2021 1.758 2.903
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 002.10‐002.40 S 0.30 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 4.570 3.761
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 002.40‐003.20 S 0.80 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 3.914 5.107
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 003.20‐003.40 S 0.20 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 3.328 2.878
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 003.40‐006.50 S 3.10 5359 Zilla Overlay 40mm @ Traff >=2000 2021 14.633 2.483
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 006.50‐010.00 S 3.50 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 21.646 2.362
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 010.00‐012.60 S 2.60 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 16.577 1.476
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 012.60‐012.80 S 0.20 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 3.346 2.983
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 012.80‐023.20 S 10.40 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 54.709 4.939
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 023.40‐025.80 S 2.40 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 13.109 4.593
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 025.80‐025.90 S 0.10 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 1.710
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 025.90‐026.00 S 0.10 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 0.850
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 026.00‐026.20 S 0.20 5359 Zilla Rehab 75mm @ IRI 9‐12 2021 4.382 1.984
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 026.20‐026.30 S 0.10 5359 Zilla Overlay 50mm @ Cracking >25% 2021 0.769 0.796
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 026.30‐026.40 S 0.10 5359 Zilla Full Recon 75mm @ IRI>12 2021 3.182 1.421
Z4011 Mirzapur (Gorai)‐Shakhipur Road Km 026.40‐026.78 S 0.38 5359 Zilla Overlay 50mm @ IRI 6‐9 2021 2.882 3.430
Z4012 Korotia‐Basail‐Shakhipur Road Km 008.36‐018.00 S 9.64 10176 Zilla Overlay 50mm @ IRI 6‐9 2021 53.343 3.066
Page 162 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z4012 Korotia‐Basail‐Shakhipur Road Km 018.00‐022.42 S 4.41 10176 Zilla Overlay 50mm @ Cracking >25% 2021 25.960 2.951
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 000.00‐000.20 S 0.20 6512 Zilla Overlay 50mm @ IRI 6‐9 2021 0.857 3.717
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 000.20‐000.40 S 0.20 4649 Zilla Full Recon 75mm @ IRI>12 2021 3.260 1.238
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 000.40‐002.70 S 2.30 4649 Zilla Rehab 75mm @ IRI 9‐12 2021 25.815 1.042
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 002.70‐003.10 S 0.40 4649 Zilla Full Recon 75mm @ IRI>12 2021 6.503 0.805
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 003.10‐004.10 S 1.00 4649 Zilla Rehab 75mm @ IRI 9‐12 2021 11.194 1.203
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 004.10‐007.70 S 3.60 4649 Zilla Full Recon 75mm @ IRI>12 2021 58.528 0.603
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 007.70‐007.90 S 0.20 4649 Zilla Overlay 50mm @ IRI 6‐9 2021 0.785 1.343
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 007.90‐008.50 S 0.60 4649 Zilla Full Recon 75mm @ IRI>12 2021 9.755 0.784
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 008.50‐008.60 S 0.10 4649 Zilla Overlay 50mm @ IRI 6‐9 2021 0.393 1.234
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 008.60‐009.60 S 1.00 6512 Zilla Rehab 75mm @ IRI 9‐12 2021 16.641 1.962
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 009.60‐009.80 S 0.20 6512 Zilla Overlay 50mm @ IRI 6‐9 2021 1.222 2.829
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 009.80‐009.90 S 0.10 6512 Zilla Rehab 75mm @ IRI 9‐12 2021 1.742 2.154
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 009.90‐010.30 S 0.40 6512 Zilla Overlay 50mm @ IRI 6‐9 2021 2.444 2.811
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 010.30‐010.40 S 0.10 6512 Zilla Rehab 75mm @ IRI 9‐12 2021 1.742 2.228
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 010.40‐013.00 S 2.60 6512 Zilla Overlay 50mm @ IRI 6‐9 2021 15.895 2.718
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 013.00‐013.30 S 0.30 6512 Zilla Rehab 75mm @ IRI 9‐12 2021 5.226 1.843
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 013.30‐017.90 S 4.60 4649 Zilla Overlay 50mm @ IRI 6‐9 2021 20.866 1.907
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 017.90‐020.00 S 2.10 4649 Zilla Rehab 75mm @ IRI 9‐12 2021 23.004 1.063
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 020.00‐020.50 S 0.50 4649 Zilla Overlay 50mm @ IRI 6‐9 2021 1.927 1.500
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 020.50‐021.00 S 0.50 4649 Zilla Full Recon 75mm @ IRI>12 2021 7.977 0.738
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 021.00‐021.10 S 0.10 4649 Zilla Overlay 40mm @ Traff >=2000 2021 0.312 0.247
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 021.10‐021.40 S 0.30 4649 Zilla Rehab 75mm @ IRI 9‐12 2021 3.295 1.531
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 021.40‐021.60 S 0.20 4649 Zilla Overlay 50mm @ Cracking >25% 2021 0.771 0.814
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 021.60‐021.70 S 0.10 4649 Zilla Rehab 75mm @ IRI 9‐12 2021 1.098 2.121
Z4016 Kalihati‐Ratanganj‐Shakipur Road Km 021.70‐022.87 S 1.16 4649 Zilla Overlay 50mm @ IRI 6‐9 2021 4.485 1.733
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 006.30‐008.50 S 2.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 10.273 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 008.50‐008.80 S 0.30 1053 Zilla Overlay 40mm @ 1000‐2000 2021 1.401 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 008.80‐008.90 S 0.10 1053 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 008.90‐015.80 S 6.90 1053 Zilla Overlay 40mm @ 1000‐2000 2021 32.400 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 015.80‐015.90 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 015.90‐016.20 S 0.30 1053 Zilla Overlay 40mm @ 1000‐2000 2021 1.401 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 016.20‐016.40 S 0.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 016.40‐017.60 S 1.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 5.603 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 017.60‐017.70 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 017.70‐019.10 S 1.40 1053 Zilla Overlay 40mm @ 1000‐2000 2021 6.537 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 019.10‐019.20 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 019.20‐020.40 S 1.20 1053 Zilla Overlay 40mm @ 1000‐2000 2021 5.603 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 020.40‐020.60 S 0.20 1053 Zilla Overlay 40mm @ IRI>12 2021 0.931 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 020.60‐023.60 S 3.00 1053 Zilla Overlay 40mm @ 1000‐2000 2021 13.958 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 023.60‐026.70 S 3.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 14.475 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 026.70‐026.80 S 0.10 1053 Zilla Overlay 40mm @ IRI>12 2021 0.469 0.000
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 026.80‐029.40 S 2.60 1053 Zilla Overlay 40mm @ 1000‐2000 2021 12.185 0.000
Page 163 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z4018 Baushi‐Gopalpur‐Bhuapur Road Km 029.40‐029.82 S 0.42 1053 Zilla Overlay 40mm @ IRI>12 2021 1.982 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 000.00‐003.00 S 3.00 1053 Zilla Overlay 40mm @ 1000‐2000 2021 13.958 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 003.00‐003.60 S 0.60 1053 Zilla Overlay 40mm @ 1000‐2000 2021 2.776 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 003.60‐005.40 S 1.80 1053 Zilla Overlay 40mm @ 1000‐2000 2021 5.700 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 005.40‐005.60 S 0.20 1053 Zilla Overlay 40mm @ IRI>12 2021 0.611 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 005.60‐008.70 S 3.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 9.475 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 008.80‐009.30 S 0.50 1053 Zilla Overlay 40mm @ 1000‐2000 2021 1.528 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 009.30‐009.80 S 0.50 1053 Zilla Overlay 40mm @ 1000‐2000 2021 1.889 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 009.80‐010.80 S 1.00 1053 Zilla Overlay 40mm @ 1000‐2000 2021 4.670 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 010.80‐010.90 S 0.10 1053 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 010.90‐011.90 S 1.00 1053 Zilla Overlay 40mm @ 1000‐2000 2021 4.670 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 012.00‐013.50 S 1.50 1053 Zilla Overlay 40mm @ 1000‐2000 2021 7.009 0.000
Z4020 Gopalpur ‐ Bhuapur Road Km 013.50‐014.10 S 0.60 1053 Zilla Overlay 40mm @ 1000‐2000 2021 2.415 0.000
Tangail Total 1401.344
Mymensingh Zone Total 5003.573

Rajshahi Zone
Naogaon Division
R542 Naogaon Town By‐Pass Road Km 000.00‐000.04 R 0.04 3829 Regional Overlay 50mm @ IRI 7‐9 2021 0.487 2.699
R542 Naogaon Town By‐Pass Road Km 001.30‐004.40 S 3.10 5958 Regional Overlay 60mm @ IRI 5.5‐9 2021 44.584 3.720
R542 Naogaon Town By‐Pass Road Km 004.40‐004.50 S 0.10 5958 Regional Rehab 150mm @ IRI 9‐12 2021 5.555 1.343
R542 Naogaon Town By‐Pass Road Km 004.50‐007.95 S 3.45 5958 Regional Overlay 60mm @ IRI 5.5‐9 2021 49.000 3.833
R542 Naogaon Town By‐Pass Road Km 007.95‐008.00 L 0.05 5958 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.726 4.130
R542 Naogaon Town By‐Pass Road Km 007.95‐008.00 R 0.05 5958 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.788 3.411
R543 Mohadebpur Bypass Road Km 000.00‐000.26 L 0.26 3262 Regional Overlay 50mm @ IRI 7‐9 2021 0.410 8.432
R543 Mohadebpur Bypass Road Km 000.00‐000.26 R 0.26 3262 Regional Overlay 50mm @ IRI 7‐9 2021 0.410 8.425
R544  Santahar Atrai Road Km 000.00‐003.20 S 3.20 2614 Regional DBST @ 25% Crk 2021 8.265 0.291
R544  Santahar Atrai Road Km 004.50‐004.70 S 0.20 2614 Regional Overlay 50mm @ IRI 7‐9 2021 1.092 1.472
R544  Santahar Atrai Road Km 007.10‐007.30 S 0.20 2614 Regional DBST @ Traff 2000‐4000 2021 0.514 1.077
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 051.35‐051.37 S 0.02 12143 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.237 11.289
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 052.00‐056.97 S 4.97 12143 Regional Overlay 60mm @ IRI 5.5‐9 2021 37.397 9.285
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 057.00‐067.67 S 10.67 12143 Regional DBST @ Traff >6000 2021 30.161 7.976
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 067.67‐068.17 S 0.50 12143 Regional Rehab 150mm @ IRI 9‐12 2021 13.283 4.346
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 068.17‐069.87 S 1.70 12143 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.697 10.069
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 069.96‐070.40 S 0.44 12143 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.027 10.197
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 070.47‐070.57 L 0.10 12143 Regional Full Recon 150mm @ IRI 12 2021 6.250 2.248
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 070.47‐070.57 R 0.10 12143 Regional Full Recon 150mm @ IRI 12 2021 6.250 2.221
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 070.96‐073.87 S 2.91 7388 Regional Rehab 150mm @ IRI 9‐12 2021 80.507 2.846
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 073.99‐076.01 S 2.03 7388 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.933 8.134
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 077.00‐083.47 S 6.47 7388 Regional Overlay 60mm @ IRI 5.5‐9 2021 44.544 8.664
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 083.47‐083.57 S 0.10 7388 Regional Full Recon 180mm 2021 3.849 2.851
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 085.77‐085.97 S 0.20 3684 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 4.294
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 100.47‐100.87 S 0.40 3684 Regional Rehab 135mm @ IRI 9‐12 2021 9.962 1.632
Page 164 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 102.27‐102.37 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 1.999
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 102.37‐104.17 S 1.80 3684 Regional DBST @ Traff 2000‐4000 2021 4.888 3.454
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 104.17‐104.27 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 2.418
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 104.27‐105.47 S 1.20 3684 Regional DBST @ 25% Crk 2021 3.260 3.390
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 105.47‐105.57 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 1.994
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 105.57‐105.87 S 0.30 3684 Regional DBST @ 25% Crk 2021 0.815 3.756
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 105.87‐106.17 S 0.30 3684 Regional DBST @ Traff 2000‐4000 2021 0.815 3.706
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 106.17‐106.37 S 0.20 3684 Regional DBST @ 25% Crk 2021 0.543 3.882
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 106.37‐106.47 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 2.103
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 106.47‐107.27 S 0.80 3684 Regional DBST @ Traff 2000‐4000 2021 2.171 3.022
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 107.27‐107.37 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 1.971
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 107.37‐108.17 S 0.80 3684 Regional DBST @ Traff 2000‐4000 2021 2.174 3.538
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 108.17‐108.37 S 0.20 3684 Regional DBST @ Traff 2000‐4000 2021 0.543 3.995
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 108.37‐109.67 S 1.30 3684 Regional DBST @ 25% Crk 2021 3.532 3.428
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 109.67‐109.87 S 0.20 3684 Regional Rehab 135mm @ IRI 9‐12 2021 4.981 1.495
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 109.87‐110.99 S 1.12 3684 Regional DBST @ Traff 2000‐4000 2021 3.038 3.553
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 110.99‐111.09 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 2.403
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 111.09‐111.39 S 0.30 3684 Regional DBST @ 25% Crk 2021 0.815 3.432
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 111.39‐111.49 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 2.399
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 111.49‐111.61 S 0.12 3684 Regional DBST @ Traff 2000‐4000 2021 0.312 4.200
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 000.00‐001.30 S 1.30 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.197 2.863
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 001.30‐002.10 S 0.80 5039 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.108 2.607
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 002.10‐006.60 S 4.50 5039 Regional DBST @ 25% Crk 2021 8.601 1.660
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 006.60‐010.20 S 3.60 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.718 5.445
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 010.20‐010.80 S 0.60 6224 Regional DBST @ Traff >6000 2021 1.630 4.452
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 010.80‐010.90 S 0.10 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.688 7.102
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 010.90‐011.00 S 0.10 6224 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.748
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 011.00‐012.00 S 1.00 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.881 4.651
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 012.01‐012.20 S 0.19 6224 Regional DBST @ Traff >6000 2021 0.508 4.769
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 012.20‐013.40 S 1.20 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.257 4.629
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 013.40‐013.50 S 0.10 6224 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.948
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 013.50‐014.00 S 0.50 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.440 4.550
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 014.00‐014.50 S 0.50 6224 Regional Rehab 150mm @ IRI 9‐12 2021 13.283 1.509
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 014.50‐014.70 S 0.20 6224 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 4.999
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 014.70‐014.80 S 0.10 6224 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.797
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 059.40‐060.60 S 1.20 3397 Regional Overlay 50mm @ IRI 5‐7 2021 6.930 3.105
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 060.60‐060.70 S 0.10 3397 Regional Full Recon 135mm 2021 3.005 1.607
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 062.80‐063.00 S 0.20 3397 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 3.210
R547 Naogaon‐Badalgachhi‐Patnitala‐honpur  Km 065.70‐065.90 S 0.20 3397 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 3.145
R548 Naogaon‐Atrai‐Natore Road Km 000.10‐000.50 S 0.40 5135 Regional DBST @ Traff 4000‐6000 2021 0.749 1.568
R548 Naogaon‐Atrai‐Natore Road Km 000.50‐008.00 S 7.50 5135 Regional DBST @ Traff 4000‐6000 2021 17.001 0.580
R548 Naogaon‐Atrai‐Natore Road Km 008.00‐008.90 S 0.90 5135 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.841 1.367
R548 Naogaon‐Atrai‐Natore Road Km 012.00‐012.40 S 0.40 5135 Regional Rehab 150mm @ IRI 9‐12 2021 7.148 0.391
Page 165 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R548 Naogaon‐Atrai‐Natore Road Km 012.40‐013.20 S 0.80 5135 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.703 1.720
R548 Naogaon‐Atrai‐Natore Road Km 013.20‐013.40 S 0.20 5135 Regional DBST @ Traff 4000‐6000 2021 0.366 1.828
R548 Naogaon‐Atrai‐Natore Road Km 016.80‐020.10 S 3.30 5135 Regional Overlay 60mm @ IRI 5.5‐9 2021 15.270 1.299
R548 Naogaon‐Atrai‐Natore Road Km 020.10‐021.61 S 1.51 5135 Regional DBST @ Traff 4000‐6000 2021 2.769 0.950
R548 Naogaon‐Atrai‐Natore Road Km 021.61‐021.71 S 0.10 5135 Regional Rehab 150mm @ IRI 9‐12 2021 1.787 1.085
R548 Naogaon‐Atrai‐Natore Road Km 021.71‐021.81 S 0.10 5135 Regional DBST @ 25% Crk 2021 0.183 2.584
R548 Naogaon‐Atrai‐Natore Road Km 021.81‐021.91 S 0.10 5135 Regional Rehab 150mm @ IRI 9‐12 2021 1.787 1.078
R548 Naogaon‐Atrai‐Natore Road Km 021.91‐028.20 S 6.29 5135 Regional Overlay 60mm @ IRI 5.5‐9 2021 30.216 1.094
R549 Badalgachhi‐Joypurhat Road Km 000.00‐000.20 S 0.20 2017 Regional Overlay 50mm @ IRI 7‐9 2021 1.254 0.902
R549 Badalgachhi‐Joypurhat Road Km 001.70‐001.80 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.262 0.314
R549 Badalgachhi‐Joypurhat Road Km 001.80‐002.60 S 0.80 2017 Regional DBST @ 25% Crk 2021 2.092 0.547
R549 Badalgachhi‐Joypurhat Road Km 002.60‐002.70 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.262 0.300
R549 Badalgachhi‐Joypurhat Road Km 002.70‐003.20 S 0.50 2017 Regional DBST @ Traff 2000‐4000 2021 1.309 0.646
R549 Badalgachhi‐Joypurhat Road Km 003.20‐003.30 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.262 0.313
R549 Badalgachhi‐Joypurhat Road Km 003.30‐004.80 S 1.50 2017 Regional DBST @ 25% Crk 2021 3.927 0.532
R549 Badalgachhi‐Joypurhat Road Km 004.80‐005.00 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.524 0.142
R549 Badalgachhi‐Joypurhat Road Km 005.00‐005.80 S 0.80 2017 Regional DBST @ 25% Crk 2021 2.095 0.562
R549 Badalgachhi‐Joypurhat Road Km 005.80‐006.00 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.521 1.189
R549 Badalgachhi‐Joypurhat Road Km 006.00‐009.00 S 3.00 2017 Regional DBST @ 25% Crk 2021 7.855 0.440
R549 Badalgachhi‐Joypurhat Road Km 009.00‐009.50 S 0.50 2017 Regional DBST @ Traff 2000‐4000 2021 1.309 0.060
R549 Badalgachhi‐Joypurhat Road Km 009.50‐009.60 S 0.10 2017 Regional DBST @ 25% Crk 2021 0.259 0.759
R549 Badalgachhi‐Joypurhat Road Km 009.60‐009.70 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.262 0.383
R549 Badalgachhi‐Joypurhat Road Km 009.70‐010.00 S 0.30 2017 Regional DBST @ 25% Crk 2021 0.785 0.608
R549 Badalgachhi‐Joypurhat Road Km 010.00‐010.20 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.524 1.255
R549 Badalgachhi‐Joypurhat Road Km 010.20‐010.40 S 0.20 2017 Regional DBST @ 25% Crk 2021 0.524 0.559
R549 Badalgachhi‐Joypurhat Road Km 010.40‐010.50 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.262 0.381
R549 Badalgachhi‐Joypurhat Road Km 010.50‐011.50 S 1.00 2017 Regional DBST @ 25% Crk 2021 2.618 0.572
R549 Badalgachhi‐Joypurhat Road Km 011.50‐011.90 S 0.40 2017 Regional DBST @ Traff 2000‐4000 2021 1.047 1.174
R549 Badalgachhi‐Joypurhat Road Km 011.90‐012.10 S 0.20 2017 Regional DBST @ 25% Crk 2021 0.522 0.623
R549 Badalgachhi‐Joypurhat Road Km 012.10‐012.30 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.514 1.338
R549 Badalgachhi‐Joypurhat Road Km 012.30‐012.70 S 0.40 2017 Regional DBST @ Traff 2000‐4000 2021 1.028 0.647
R549 Badalgachhi‐Joypurhat Road Km 012.70‐012.90 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.514 1.257
R549 Badalgachhi‐Joypurhat Road Km 012.90‐013.00 S 0.10 2017 Regional DBST @ 25% Crk 2021 0.257 0.839
R549 Badalgachhi‐Joypurhat Road Km 013.00‐013.10 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.257 0.452
R549 Badalgachhi‐Joypurhat Road Km 013.10‐014.10 S 1.00 2017 Regional DBST @ 25% Crk 2021 2.569 0.694
R549 Badalgachhi‐Joypurhat Road Km 014.10‐014.18 S 0.08 2017 Regional DBST @ Traff 2000‐4000 2021 0.213 0.425
R685 Rajshahi‐Nawhata‐Chowmasia Road Km 064.85‐066.42 S 1.57 4668 Regional Overlay 50mm @ IRI 5‐7 2021 12.116 4.887
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 016.24‐019.30 S 3.06 3916 Zilla Overlay 40mm @ Traff >=2000 2021 9.606 1.613
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 019.30‐019.60 S 0.30 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.689
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 020.20‐020.40 S 0.20 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.093
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 022.00‐022.20 S 0.20 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.096
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 022.40‐022.80 S 0.40 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 1.650
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 023.00‐023.20 S 0.20 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.120
Page 166 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 023.70‐024.40 S 0.70 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 7.752 1.713
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 024.50‐024.70 S 0.20 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 2.133
Z5452 Joypurhat‐Akkelpur‐Badalgachhi‐Road Km 025.50‐025.60 S 0.10 3916 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.765
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 000.36‐015.14 S 14.78 3262 Zilla Overlay 40mm @ Traff >=2000 2021 58.491 0.452
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 015.14‐015.34 S 0.20 3262 Zilla Rehab 75mm @ IRI 9‐12 2021 2.855 0.808
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 015.34‐016.84 S 1.50 3262 Zilla Overlay 40mm @ Cracks >25% 2021 4.764 1.587
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 016.84‐016.94 S 0.10 3262 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.848
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 016.94‐020.34 S 3.40 3262 Zilla Overlay 40mm @ Traff >=2000 2021 11.142 1.521
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 020.34‐020.64 S 0.30 3262 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.102
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 020.64‐022.54 S 1.90 3262 Zilla Overlay 40mm @ Traff >=2000 2021 6.436 1.320
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 022.54‐022.74 S 0.20 3262 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.336
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 022.74‐023.24 S 0.50 3262 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 1.034
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 023.64‐024.74 S 1.10 3262 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 1.460
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 024.74‐025.04 S 0.30 3262 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.134
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 028.94‐029.55 S 0.61 3262 Zilla Overlay 40mm @ Traff >=2000 2021 2.698 0.260
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 029.55‐032.95 S 3.40 2683 Zilla Overlay 40mm @ Traff >=2000 2021 10.680 0.368
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 032.95‐033.25 S 0.30 2672 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.372
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 033.25‐034.35 S 1.10 2672 Zilla Overlay 40mm @ Traff >=2000 2021 3.455 0.124
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 034.35‐034.45 S 0.10 2672 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.299
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 034.45‐035.05 S 0.60 2672 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.213
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 035.25‐035.55 S 0.30 2672 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.169
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 035.55‐036.25 S 0.70 2672 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 0.434
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 036.25‐036.45 S 0.20 2672 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 036.45‐036.55 S 0.10 2672 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.207
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 036.55‐037.15 S 0.60 2672 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 0.005
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 037.15‐037.35 S 0.20 2672 Zilla Rehab 75mm @ IRI 9‐12 2021 2.478 0.651
Z5456 Mahadebpur‐Saraigachhi‐Porsha (Nitpur) Road Km 037.35‐038.28 S 0.93 2672 Zilla Overlay 40mm @ Traff >=2000 2021 3.805 0.014
Z5463 Enayaetpur‐Mohadebpur‐Patakatahat (Manda) Road Km 003.00‐005.50 S 2.50 673 Zilla Overlay 40mm @ IRI>12 2021 9.021 0.000
Z5463 Enayaetpur‐Mohadebpur‐Patakatahat (Manda) Road Km 005.90‐006.41 L 0.50 673 Zilla Overlay 40mm @ IRI>12 2021 2.615 0.000
Z5463 Enayaetpur‐Mohadebpur‐Patakatahat (Manda) Road Km 005.90‐006.41 R 0.50 673 Zilla Overlay 40mm @ IRI>12 2021 2.615 0.000
Z5463 Enayaetpur‐Mohadebpur‐Patakatahat (Manda) Road Km 006.41‐023.58 S 17.17 673 Zilla Overlay 40mm @ IRI>12 2021 53.645 0.000
Z5464 Patnitala‐Shibpur Road Km 000.00‐003.20 S 3.20 2569 Zilla Overlay 40mm @ Traff >=2000 2021 11.706 0.185
Z5464 Patnitala‐Shibpur Road Km 003.20‐004.70 S 1.50 2569 Zilla Overlay 40mm @ Traff >=2000 2021 6.126 0.000
Z5464 Patnitala‐Shibpur Road Km 004.90‐007.50 S 2.60 2569 Zilla Overlay 40mm @ Traff >=2000 2021 10.922 0.000
Z5464 Patnitala‐Shibpur Road Km 007.50‐007.70 S 0.20 2569 Zilla Rehab 75mm @ IRI 9‐12 2021 1.916 1.346
Z5469 Atrai‐Singra Road Km 000.00‐000.30 S 0.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.981 0.000
Z5469 Atrai‐Singra Road Km 000.30‐000.50 S 0.20 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z5469 Atrai‐Singra Road Km 000.50‐000.80 S 0.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.024 0.000
Z5469 Atrai‐Singra Road Km 000.80‐000.90 S 0.10 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5469 Atrai‐Singra Road Km 000.90‐001.20 S 0.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5469 Atrai‐Singra Road Km 001.20‐001.90 S 0.70 1303 Zilla Overlay 40mm @ 1000‐2000 2021 2.199 0.000
Z5469 Atrai‐Singra Road Km 001.90‐002.50 S 0.60 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.882 0.000
Z5469 Atrai‐Singra Road Km 002.50‐003.00 S 0.50 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.571 0.000
Page 167 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5469 Atrai‐Singra Road Km 003.00‐003.30 S 0.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5469 Atrai‐Singra Road Km 003.30‐003.90 S 0.60 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.885 0.000
Z5469 Atrai‐Singra Road Km 003.90‐004.00 S 0.10 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5469 Atrai‐Singra Road Km 004.00‐004.60 S 0.60 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.885 0.000
Z5469 Atrai‐Singra Road Km 004.60‐006.90 S 2.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 7.222 0.000
Z5469 Atrai‐Singra Road Km 006.90‐007.20 S 0.30 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5469 Atrai‐Singra Road Km 007.20‐007.40 S 0.20 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z5469 Atrai‐Singra Road Km 007.40‐007.50 S 0.10 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5469 Atrai‐Singra Road Km 007.50‐007.90 S 0.40 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z5469 Atrai‐Singra Road Km 007.90‐008.10 S 0.20 1303 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z5469 Atrai‐Singra Road Km 008.10‐010.30 S 2.20 1303 Zilla Overlay 40mm @ 1000‐2000 2021 6.908 0.000
Z5469 Atrai‐Singra Road Km 010.30‐010.80 S 0.50 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.571 0.000
Z5469 Atrai‐Singra Road Km 010.80‐013.80 S 3.00 1303 Zilla Overlay 40mm @ 1000‐2000 2021 9.424 0.000
Z5469 Atrai‐Singra Road Km 013.80‐016.50 S 2.70 1303 Zilla Overlay 40mm @ 1000‐2000 2021 8.491 0.000
Z6810 Manda Thana Link Road Km 000.10‐000.50 S 0.40 5276 Zilla Full Recon 75mm @ IRI>12 2021 9.563 0.291
Z6810 Manda Thana Link Road Km 000.50‐002.50 S 2.00 5276 Zilla Overlay 40mm @ Traff >=2000 2021 9.101 0.000
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 054.31‐054.41 S 0.10 1437 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z6852 Manda‐Niamatpur‐Shibpur‐Porsha Road Km 006.70‐007.10 S 0.40 4234 Zilla Overlay 50mm @ IRI 6‐9 2021 2.310 1.182
Z6852 Manda‐Niamatpur‐Shibpur‐Porsha Road Km 007.20‐009.80 S 2.60 4234 Zilla Overlay 50mm @ IRI 6‐9 2021 15.015 1.226
Z6852 Manda‐Niamatpur‐Shibpur‐Porsha Road Km 009.90‐010.60 S 0.70 4234 Zilla Overlay 50mm @ IRI 6‐9 2021 4.037 1.249
Z6852 Manda‐Niamatpur‐Shibpur‐Porsha Road Km 010.60‐010.70 S 0.10 4234 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.056
Z6856 Manda‐Bagmara‐Atrai Road Km 021.96‐027.96 S 6.00 4092 Zilla Overlay 50mm @ IRI 6‐9 2021 25.452 1.140
Z6856 Manda‐Bagmara‐Atrai Road Km 027.96‐031.04 S 3.08 2589 Zilla Overlay 40mm @ Traff >=2000 2021 10.371 0.000
Z6856 Manda‐Bagmara‐Atrai Road Km 040.84‐040.94 S 0.10 2178 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.339
Z6856 Manda‐Bagmara‐Atrai Road Km 040.94‐042.04 S 1.10 2178 Zilla Overlay 40mm @ Traff >=2000 2021 3.549 0.038
Z6856 Manda‐Bagmara‐Atrai Road Km 042.04‐042.54 S 0.50 2178 Zilla Overlay 40mm @ Traff >=2000 2021 1.613 0.000
Z6856 Manda‐Bagmara‐Atrai Road Km 042.54‐043.14 S 0.60 2178 Zilla Overlay 40mm @ Traff >=2000 2021 1.936 0.000
Z6856 Manda‐Bagmara‐Atrai Road Km 043.14‐043.24 S 0.10 2178 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.332
Z6856 Manda‐Bagmara‐Atrai Road Km 043.24‐046.54 S 3.30 2178 Zilla Overlay 40mm @ Traff >=2000 2021 10.979 0.000
Naogaon Total 1069.837
Natore Division
N507 Hatikamrul‐Banpara Road Km 051.25‐051.26 L 0.01 18037 National Overlay 80mm @ IRI 5‐9 2021 0.187 27.415
N507 Hatikamrul‐Banpara Road Km 051.25‐051.26 R 0.01 18037 National Rehab 195mm @ IRI 9‐12 2021 0.443 12.160
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 068.01‐068.64 S 0.63 8383 National Overlay 60mm @ IRI 7‐9 2021 8.107 14.569
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 069.00‐079.74 S 10.74 8383 National Overlay 60mm @ IRI 7‐9 2021 102.879 19.226
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 079.74‐080.14 S 0.40 8383 National Rehab 180mm @ IRI 9‐12 2021 20.286 8.358
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 083.04‐083.34 S 0.30 8383 National Full Recon 180mm @ IRI 12 2021 15.695 7.794
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 083.34‐084.48 S 1.15 8383 National Overlay 60mm @ IRI 7‐9 2021 11.856 16.893
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 084.48‐084.78 S 0.30 8383 National Full Recon 180mm @ IRI 12 2021 15.748 7.672
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 084.78‐085.38 S 0.60 8383 National DBST @ Traff >6000 2021 2.223 8.207
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 085.38‐085.48 S 0.10 8383 National Full Recon 180mm @ IRI 12 2021 5.249 7.906
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 085.48‐086.38 S 0.90 8383 National DBST @ Traff >6000 2021 3.335 8.211
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 086.38‐086.58 S 0.20 8383 National Full Recon 180mm @ IRI 12 2021 10.499 7.881
Page 168 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 086.58‐088.98 S 2.40 8383 National Overlay 60mm @ IRI 7‐9 2021 22.518 19.642
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 088.98‐089.28 S 0.30 8383 National Full Recon 180mm @ IRI 12 2021 15.748 7.828
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 089.28‐090.06 S 0.78 8383 National Overlay 60mm @ IRI 7‐9 2021 8.845 16.242
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 090.06‐094.98 S 4.92 14474 National Overlay 80mm @ IRI 4‐9 2021 75.101 15.918
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 094.98‐095.38 S 0.40 14474 National Rehab 195mm @ IRI 9‐12 2021 22.316 7.174
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 095.38‐095.78 S 0.40 14474 National Overlay 80mm @ IRI 4‐9 2021 6.083 17.397
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 095.78‐096.08 S 0.30 14474 National Full Recon 195mm 2021 20.151 6.320
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 096.08‐096.28 S 0.20 14474 National Overlay 80mm @ IRI 4‐9 2021 3.042 17.456
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 096.28‐096.48 S 0.20 14474 National Full Recon 195mm 2021 13.434 6.470
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 096.48‐096.88 S 0.40 14474 National Overlay 80mm @ IRI 4‐9 2021 6.083 17.288
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 096.88‐097.08 S 0.20 14474 National Rehab 195mm @ IRI 9‐12 2021 11.158 7.333
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 097.08‐098.48 S 1.40 14474 National Overlay 80mm @ IRI 4‐9 2021 21.291 17.570
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 098.48‐098.98 S 0.50 14474 National DBST @ Traff >6000 2021 2.272 13.805
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 098.98‐099.38 S 0.40 14474 National Rehab 195mm @ IRI 9‐12 2021 22.316 6.940
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 099.38‐099.78 S 0.40 14474 National DBST @ Traff >6000 2021 1.818 14.103
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 099.78‐099.98 S 0.20 14474 National Overlay 80mm @ IRI 4‐9 2021 3.042 17.057
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 099.98‐100.38 S 0.40 14474 National Rehab 195mm @ IRI 9‐12 2021 22.316 6.029
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 100.38‐101.78 S 1.40 14474 National Overlay 80mm @ IRI 4‐9 2021 18.907 20.576
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 103.98‐105.38 S 1.40 14474 National Overlay 80mm @ IRI 4‐9 2021 16.894 19.776
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 105.38‐105.68 S 0.30 14474 National Full Recon 195mm 2021 15.989 7.940
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 105.68‐108.58 S 2.90 10442 National Overlay 80mm @ IRI 4‐9 2021 34.994 16.620
R548 Naogaon‐Atrai‐Natore Road Km 037.20‐037.61 S 0.41 6226 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.672 3.160
R548 Naogaon‐Atrai‐Natore Road Km 037.61‐037.71 S 0.10 6226 Regional DBST @ Traff >6000 2021 0.272 1.459
R548 Naogaon‐Atrai‐Natore Road Km 037.71‐038.41 S 0.70 6226 Regional DBST @ 25% Crk 2021 1.902 1.492
R548 Naogaon‐Atrai‐Natore Road Km 038.41‐038.91 S 0.50 6226 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.433 3.215
R548 Naogaon‐Atrai‐Natore Road Km 038.91‐039.91 S 1.00 6226 Regional DBST @ 25% Crk 2021 2.717 1.337
R548 Naogaon‐Atrai‐Natore Road Km 039.91‐039.99 S 0.07 6226 Regional DBST @ Traff >6000 2021 0.196 1.838
R548 Naogaon‐Atrai‐Natore Road Km 039.99‐040.01 S 0.03 3651 Regional DBST @ Traff 2000‐4000 2021 0.076 1.569
R548 Naogaon‐Atrai‐Natore Road Km 040.01‐041.41 S 1.40 3651 Regional DBST @ 25% Crk 2021 3.368 1.039
R548 Naogaon‐Atrai‐Natore Road Km 041.41‐041.51 S 0.10 3651 Regional DBST @ Traff 2000‐4000 2021 0.272 2.093
R548 Naogaon‐Atrai‐Natore Road Km 041.51‐042.01 S 0.50 3651 Regional Overlay 50mm @ IRI 7‐9 2021 2.888 1.746
R548 Naogaon‐Atrai‐Natore Road Km 042.01‐042.11 S 0.10 3651 Regional Full Recon 135mm @ IRI 12 2021 3.005 0.726
R548 Naogaon‐Atrai‐Natore Road Km 042.11‐045.41 S 3.30 3651 Regional Overlay 50mm @ IRI 5‐7 2021 19.052 1.142
R548 Naogaon‐Atrai‐Natore Road Km 046.91‐047.31 S 0.40 3651 Regional Overlay 50mm @ IRI 7‐9 2021 2.310 1.720
R548 Naogaon‐Atrai‐Natore Road Km 050.21‐050.61 S 0.40 3651 Regional DBST @ Traff 2000‐4000 2021 1.084 1.540
R548 Naogaon‐Atrai‐Natore Road Km 050.61‐051.21 S 0.60 3651 Regional DBST @ 25% Crk 2021 1.630 0.666
R548 Naogaon‐Atrai‐Natore Road Km 051.21‐051.31 S 0.10 3651 Regional DBST @ Traff 2000‐4000 2021 0.272 1.652
R548 Naogaon‐Atrai‐Natore Road Km 051.31‐051.71 S 0.40 3651 Regional DBST @ 25% Crk 2021 1.087 0.711
R548 Naogaon‐Atrai‐Natore Road Km 051.71‐051.91 S 0.20 3651 Regional DBST @ Traff 2000‐4000 2021 0.543 1.688
R548 Naogaon‐Atrai‐Natore Road Km 051.91‐052.31 S 0.40 3651 Regional Overlay 50mm @ IRI 5‐7 2021 2.310 1.163
R548 Naogaon‐Atrai‐Natore Road Km 052.31‐052.51 S 0.20 3651 Regional DBST @ Traff 2000‐4000 2021 0.543 1.785
R548 Naogaon‐Atrai‐Natore Road Km 052.51‐052.81 S 0.30 3651 Regional DBST @ 25% Crk 2021 0.815 0.841
R548 Naogaon‐Atrai‐Natore Road Km 052.81‐053.01 S 0.20 3651 Regional DBST @ Traff 2000‐4000 2021 0.543 0.328
Page 169 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R548 Naogaon‐Atrai‐Natore Road Km 053.01‐053.32 S 0.31 3651 Regional DBST @ 25% Crk 2021 0.845 0.848
Z5043 Taras‐Gurudaspur Road Km 016.40‐016.60 S 0.20 780 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.628 0.000
Z5207 Nandigram (Katham)‐Kaliganj‐Raninagar Road Km 014.25‐014.28 S 0.03 326 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.106 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 032.32‐032.42 S 0.10 1432 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 032.42‐032.62 S 0.20 1432 Zilla Overlay 40mm @ 1000‐2000 2021 0.832 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 032.62‐032.72 S 0.10 1432 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 032.72‐033.02 S 0.30 1432 Zilla Overlay 40mm @ 1000‐2000 2021 1.248 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 033.12‐033.81 S 0.69 1432 Zilla Overlay 40mm @ 1000‐2000 2021 2.883 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 033.81‐033.92 S 0.11 2532 Zilla Overlay 40mm @ Traff >=2000 2021 0.445 0.000
Z5211 Natore (Dalsarak)‐Bildahar‐Gurudaspur Road Km 000.00‐000.50 S 0.50 2592 Zilla Overlay 40mm @ Traff >=2000 2021 2.135 0.000
Z5211 Natore (Dalsarak)‐Bildahar‐Gurudaspur Road Km 000.50‐001.80 S 1.30 2592 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 0.706
Z5211 Natore (Dalsarak)‐Bildahar‐Gurudaspur Road Km 004.00‐004.20 S 0.20 2592 Zilla Overlay 40mm @ Traff >=2000 2021 0.830 0.150
Z5211 Natore (Dalsarak)‐Bildahar‐Gurudaspur Road Km 012.50‐012.70 S 0.20 2592 Zilla Overlay 40mm @ Traff >=2000 2021 0.883 0.125
Z5211 Natore (Dalsarak)‐Bildahar‐Gurudaspur Road Km 021.33‐021.53 S 0.20 2592 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.313
Z5469 Atrai‐Singra Road Km 016.50‐016.90 S 0.40 1303 Zilla Overlay 40mm @ 1000‐2000 2021 1.244 0.000
Z5469 Atrai‐Singra Road Km 016.90‐022.10 S 5.20 1303 Zilla Overlay 40mm @ 1000‐2000 2021 16.347 0.000
Z5469 Atrai‐Singra Road Km 022.48‐023.81 S 1.34 1303 Zilla Overlay 40mm @ 1000‐2000 2021 4.307 0.000
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 005.10‐005.30 S 0.20 3255 Zilla Rehab 75mm @ IRI 9‐12 2021 2.574 0.922
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 005.30‐005.90 S 0.60 3255 Zilla Overlay 40mm @ Cracks >25% 2021 2.074 0.802
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 005.90‐006.40 S 0.50 3255 Zilla Rehab 75mm @ IRI 9‐12 2021 7.214 0.428
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 006.40‐006.90 S 0.50 3255 Zilla Overlay 40mm @ Traff >=2000 2021 2.080 0.302
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 006.90‐007.20 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.248 0.620
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 007.20‐007.30 S 0.10 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.394 0.171
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 007.30‐007.60 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.248 0.611
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 007.60‐007.90 S 0.30 3255 Zilla Overlay 40mm @ Cracks >25% 2021 1.182 0.064
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 007.90‐008.40 S 0.50 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.965 0.884
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 008.40‐008.50 S 0.10 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.297 0.625
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 008.50‐008.70 S 0.20 3255 Zilla Overlay 40mm @ Traff >=2000 2021 0.779 0.859
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 008.70‐009.20 S 0.50 3255 Zilla Overlay 40mm @ Cracks >25% 2021 1.753 0.654
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 009.20‐009.90 S 0.70 3255 Zilla Overlay 40mm @ Traff >=2000 2021 2.555 1.407
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 009.90‐010.30 S 0.40 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.457 1.317
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 010.30‐010.60 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.095 1.220
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 010.60‐010.80 S 0.20 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.691 1.069
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 010.80‐012.40 S 1.60 3255 Zilla Overlay 40mm @ Traff >=2000 2021 6.466 0.730
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 012.40‐012.90 S 0.50 3255 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.071
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 012.90‐014.50 S 1.60 3255 Zilla Overlay 40mm @ Traff >=2000 2021 7.467 0.283
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 014.50‐014.70 S 0.20 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.884 0.194
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 014.70‐015.00 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.151
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 015.00‐015.40 S 0.40 3255 Zilla Overlay 40mm @ Cracks >25% 2021 1.769 0.143
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 015.40‐015.70 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.345
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 015.70‐015.80 S 0.10 3255 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 015.80‐017.10 S 1.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 5.739 0.476
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 017.10‐018.10 S 1.00 3255 Zilla Overlay 40mm @ Traff >=2000 2021 4.665 0.000
Page 170 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 018.10‐018.70 S 0.60 3255 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.361
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 018.70‐019.50 S 0.80 3255 Zilla Overlay 40mm @ Traff >=2000 2021 3.586 0.084
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 019.50‐019.80 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.095 1.375
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 019.80‐019.90 S 0.10 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.346 0.917
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 019.90‐020.40 S 0.50 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.825 1.296
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 020.40‐020.60 S 0.20 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.691 0.400
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 020.60‐020.70 S 0.10 3255 Zilla Rehab 75mm @ IRI 9‐12 2021 1.287 1.047
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 020.70‐021.00 S 0.30 3255 Zilla Overlay 40mm @ Traff >=2000 2021 1.095 0.362
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 021.00‐021.20 S 0.20 3255 Zilla Overlay 40mm @ Traff >=2000 2021 0.730 1.267
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 021.20‐021.40 S 0.20 3255 Zilla Overlay 40mm @ Cracks >25% 2021 0.674 0.478
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 021.40‐021.60 S 0.20 3255 Zilla Rehab 75mm @ IRI 9‐12 2021 2.335 1.032
Z6011 Lalpur‐ Dayarampur‐ Shankerbagerhat ‐ Natore Km 021.60‐021.76 S 0.17 3255 Zilla Overlay 40mm @ Traff >=2000 2021 0.546 0.163
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 000.30‐000.50 S 0.20 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.688
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 006.40‐009.49 S 3.09 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 24.422 0.193
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 009.49‐009.69 S 0.20 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 0.724
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 009.69‐010.09 S 0.40 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.805
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 011.29‐012.69 S 1.40 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 23.046 0.855
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 012.69‐013.39 S 0.70 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 0.961
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 013.39‐013.49 S 0.10 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.570
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 013.49‐013.79 S 0.30 5456 Zilla Overlay 50mm @ Cracking >25% 2021 1.733 0.465
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 013.79‐013.99 S 0.20 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.082
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 013.99‐014.19 S 0.20 5456 Zilla Overlay 50mm @ Cracking >25% 2021 1.155 0.068
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 014.19‐014.49 S 0.30 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 4.947 0.581
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 014.49‐014.79 S 0.30 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 1.156
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 014.79‐015.49 S 0.70 5456 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 1.174
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 015.49‐016.69 S 1.20 5456 Zilla Overlay 50mm @ IRI 6‐9 2021 6.930 0.940
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 016.69‐016.79 S 0.10 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.481
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 016.79‐017.19 S 0.40 5456 Zilla Overlay 50mm @ Cracking >25% 2021 2.310 0.021
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 017.19‐017.49 S 0.30 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.363
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 017.89‐017.99 S 0.10 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.457
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 017.99‐018.19 S 0.20 5456 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 018.19‐018.29 S 0.10 5456 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.387
Z6014 Bonpara‐Gopalpur‐Lalpur Road Km 018.29‐018.72 S 0.43 5456 Zilla Overlay 40mm @ Traff >=2000 2021 2.003 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 001.00‐001.10 S 0.10 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.441 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 002.20‐002.40 S 0.20 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.883 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 003.50‐003.60 S 0.10 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.441 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 003.60‐004.90 S 1.30 2146 Zilla Overlay 40mm @ Traff >=2000 2021 5.739 0.092
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 004.90‐005.00 S 0.10 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.441 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 005.00‐006.40 S 1.40 2146 Zilla Overlay 40mm @ Traff >=2000 2021 5.986 0.084
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 006.40‐006.60 S 0.20 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.890 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 006.60‐007.20 S 0.60 2146 Zilla Overlay 40mm @ Traff >=2000 2021 3.056 0.059
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 007.20‐007.40 S 0.20 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.868 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 007.40‐007.90 S 0.50 2146 Zilla Overlay 40mm @ Traff >=2000 2021 2.165 0.074
Page 171 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 007.90‐008.10 S 0.20 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.866 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 008.10‐008.30 S 0.20 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.866 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 008.30‐008.40 S 0.10 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.433 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 008.40‐008.70 S 0.30 2146 Zilla Overlay 40mm @ Traff >=2000 2021 1.299 0.150
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 009.50‐010.20 S 0.70 2146 Zilla Overlay 40mm @ Traff >=2000 2021 2.831 0.080
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 010.20‐010.90 S 0.70 2146 Zilla Overlay 40mm @ Traff >=2000 2021 3.126 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 010.90‐011.00 S 0.10 2146 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.148
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 011.00‐012.00 S 1.00 2146 Zilla Overlay 40mm @ Traff >=2000 2021 4.670 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 012.00‐012.60 S 0.60 2146 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.130
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 012.60‐013.07 S 0.47 2146 Zilla Overlay 40mm @ Traff >=2000 2021 2.209 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 013.07‐013.20 S 0.13 1800 Zilla Overlay 40mm @ 1000‐2000 2021 0.485 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 013.20‐013.50 S 0.30 1800 Zilla Overlay 40mm @ 1000‐2000 2021 1.146 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 014.40‐014.50 S 0.10 1800 Zilla Overlay 40mm @ 1000‐2000 2021 0.382 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 014.50‐014.70 S 0.20 1800 Zilla Overlay 40mm @ 1000‐2000 2021 0.764 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 014.70‐015.10 S 0.40 1800 Zilla Overlay 40mm @ 1000‐2000 2021 1.528 0.123
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 015.10‐015.50 S 0.40 1800 Zilla Overlay 40mm @ 1000‐2000 2021 1.637 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 015.50‐015.60 S 0.10 1800 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.286
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 015.60‐015.70 S 0.10 1800 Zilla Overlay 40mm @ 1000‐2000 2021 0.416 0.000
Z6015 Ahamadpur‐Baraigram‐Gurudashpur Road  Km 015.70‐023.00 S 7.30 1800 Zilla Overlay 40mm @ 1000‐2000 2021 28.215 0.163
Z6022 Ishwardi‐Kadamchilan Road Km 004.05‐004.40 S 0.35 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 3.220 0.949
Z6022 Ishwardi‐Kadamchilan Road Km 004.40‐004.70 S 0.30 4498 Zilla Overlay 40mm @ Traff >=2000 2021 0.919 0.000
Z6022 Ishwardi‐Kadamchilan Road Km 004.70‐005.30 S 0.60 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 6.555 0.350
Z6022 Ishwardi‐Kadamchilan Road Km 005.30‐005.80 S 0.50 4498 Zilla Overlay 40mm @ Traff >=2000 2021 1.549 0.000
Z6022 Ishwardi‐Kadamchilan Road Km 005.80‐006.40 S 0.60 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 6.544 0.537
Z6022 Ishwardi‐Kadamchilan Road Km 006.80‐009.80 S 3.00 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 32.773 0.715
Z6022 Ishwardi‐Kadamchilan Road Km 009.80‐013.40 S 3.60 4498 Zilla Overlay 50mm @ IRI 6‐9 2021 14.965 1.426
Z6022 Ishwardi‐Kadamchilan Road Km 013.40‐013.70 S 0.30 4498 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 1.167
Z6022 Ishwardi‐Kadamchilan Road Km 014.90‐016.85 S 1.95 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 22.341 0.975
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 007.37‐007.80 S 0.42 1543 Zilla Overlay 40mm @ 1000‐2000 2021 1.623 0.000
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 007.80‐008.40 S 0.60 1543 Zilla Overlay 40mm @ 1000‐2000 2021 2.267 0.000
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 008.40‐008.80 S 0.40 1543 Zilla Overlay 40mm @ 1000‐2000 2021 1.987 0.012
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 008.80‐010.50 S 1.70 1543 Zilla Overlay 40mm @ 1000‐2000 2021 7.933 0.000
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 010.70‐011.00 S 0.30 1543 Zilla Overlay 40mm @ 1000‐2000 2021 1.401 0.000
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 011.00‐011.10 S 0.10 1543 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.144
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 013.60‐013.70 S 0.10 1543 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.139
Z6029 Baraigram Thana‐Zonail‐Chatmohor Road Km 013.90‐016.30 S 2.40 1543 Zilla Overlay 40mm @ 1000‐2000 2021 11.202 0.023
Natore Total 1023.973
Nawabganj Division
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 190.05‐192.07 S 2.01 6866 National Overlay 50mm @ IRI 4‐7 2021 12.880 17.030
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 192.07‐192.47 S 0.40 6866 National Rehab 180mm @ IRI 9‐12 2021 16.499 6.061
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 192.47‐194.07 S 1.60 6866 National Overlay 60mm @ IRI 7‐9 2021 12.210 16.548
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 194.07‐196.37 S 2.30 17856 National Overlay 80mm @ IRI 4‐9 2021 24.940 10.821
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 196.37‐196.47 S 0.10 18591 National Rehab 195mm @ IRI 9‐12 2021 4.063 4.845
Page 172 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 207.07‐230.82 S 23.76 10552 National Overlay 80mm @ IRI 4‐9 2021 246.638 8.086
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 230.82‐232.24 S 1.42 6646 National Overlay 50mm @ IRI 4‐7 2021 12.152 2.818
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 003.20‐004.30 S 1.10 4753 Zilla Overlay 50mm @ IRI 6‐9 2021 4.474 2.501
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 005.14‐005.30 S 0.16 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 1.761 1.875
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 010.12‐014.40 S 4.28 4753 Zilla Overlay 50mm @ IRI 6‐9 2021 20.025 1.767
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 014.51‐014.70 S 0.19 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 3.062 0.847
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 014.70‐015.40 S 0.70 4753 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 0.000
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 015.40‐015.60 S 0.20 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.343
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 016.30‐016.80 S 0.50 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 0.875
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 017.10‐019.69 S 2.60 4753 Zilla Overlay 50mm @ IRI 6‐9 2021 14.986 1.728
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 019.89‐020.29 S 0.40 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 1.164
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 020.29‐020.59 S 0.30 4753 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 1.154
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 020.59‐020.89 S 0.30 4753 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.942
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 020.89‐028.79 S 7.90 3082 Zilla Overlay 40mm @ Traff >=2000 2021 27.030 0.000
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 028.79‐029.09 S 0.30 2993 Zilla Full Recon 75mm @ IRI>12 2021 4.760 0.261
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 029.09‐030.29 S 1.20 2993 Zilla Overlay 40mm @ Traff >=2000 2021 3.719 0.103
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 030.29‐030.49 S 0.20 2993 Zilla Overlay 40mm @ Traff >=2000 2021 0.620 0.800
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 030.49‐031.09 S 0.60 2993 Zilla Overlay 40mm @ Traff >=2000 2021 1.859 0.000
Z6802 Kansat‐Gomostapur‐Rohonpur Road Km 031.09‐033.87 S 2.78 2993 Zilla Overlay 40mm @ Traff >=2000 2021 8.612 0.216
Z6803 Nawabganj‐Amnura Road Km 000.00‐000.60 S 0.60 4382 Zilla Rehab 75mm @ IRI 9‐12 2021 9.428 1.565
Z6803 Nawabganj‐Amnura Road Km 008.60‐008.80 S 0.20 4382 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.305
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 000.60‐000.70 S 0.10 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.489
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 003.50‐004.40 S 0.90 3704 Zilla Overlay 40mm @ Cracks >25% 2021 2.677 0.766
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 004.40‐004.50 S 0.10 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.010
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 006.70‐006.80 S 0.10 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.951
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 006.80‐007.20 S 0.40 3704 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.481
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 007.40‐008.30 S 0.90 3704 Zilla Overlay 40mm @ Cracks >25% 2021 2.677 0.832
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 008.80‐009.10 S 0.30 3704 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 1.069
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 011.20‐011.30 S 0.10 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.659
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 011.30‐011.90 S 0.60 3704 Zilla Overlay 40mm @ Traff >=2000 2021 1.885 1.233
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 011.90‐012.00 S 0.10 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.374
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 012.00‐013.30 S 1.30 3704 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 1.156
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 013.30‐013.60 S 0.30 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.364
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 015.00‐016.60 S 1.60 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 17.719 0.771
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 017.40‐018.00 S 0.60 3704 Zilla Overlay 40mm @ Traff >=2000 2021 1.882 1.167
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 018.00‐018.25 S 0.26 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 2.846 1.268
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 018.25‐018.45 S 0.20 3704 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.976
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 018.45‐018.75 S 0.30 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 0.869
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 018.75‐021.15 S 2.40 3704 Zilla Overlay 40mm @ Traff >=2000 2021 7.539 1.356
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 021.15‐021.35 S 0.20 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.445
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 022.85‐022.95 S 0.10 3704 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.210
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 022.95‐023.65 S 0.70 3704 Zilla Overlay 40mm @ Traff >=2000 2021 2.199 1.225
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 024.75‐025.15 S 0.40 3704 Zilla Rehab 75mm @ IRI 9‐12 2021 4.430 0.926
Page 173 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z6805 Rahonpur‐Bholahati BDR Camp Road Km 026.25‐029.27 S 3.02 3704 Zilla Overlay 40mm @ Traff >=2000 2021 8.917 0.836
Z6806 Nawabganj‐Uttermallick‐Gomastapur Road Km 000.00‐025.81 S 25.81 5230 Zilla Overlay 40mm @ Traff >=2000 2021 122.906 0.212
Z6812 Dhansura‐Parbatipur‐Adda Link Road Km 003.30‐003.40 S 0.10 2633 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.875
Z6812 Dhansura‐Parbatipur‐Adda Link Road Km 004.30‐004.40 S 0.10 2633 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.941
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 017.58‐027.85 S 10.27 4386 Zilla Overlay 50mm @ Cracking >25% 2021 58.986 0.702
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 027.85‐028.05 S 0.20 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.871
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 028.05‐032.83 S 4.78 4386 Zilla Overlay 50mm @ Cracking >25% 2021 27.605 0.097
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 032.83‐040.05 S 7.22 1437 Zilla Overlay 40mm @ 1000‐2000 2021 33.714 0.075
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 040.05‐040.15 S 0.10 1437 Zilla Overlay 40mm @ 1000‐2000 2021 0.467 0.000
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 040.15‐040.65 S 0.50 1437 Zilla Overlay 40mm @ 1000‐2000 2021 2.335 0.189
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 040.65‐040.85 S 0.20 1437 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.000
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 040.85‐041.05 S 0.20 1437 Zilla Overlay 40mm @ 1000‐2000 2021 0.934 0.157
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 041.05‐041.45 S 0.40 1437 Zilla Overlay 40mm @ 1000‐2000 2021 1.868 0.000
Z6817 Nachol‐Gomastapur (Rohonpur) Road Km 009.70‐011.60 S 1.90 3409 Zilla Overlay 40mm @ Traff >=2000 2021 5.965 1.365
Z6817 Nachol‐Gomastapur (Rohonpur) Road Km 011.60‐011.70 S 0.10 3409 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.538
Z6818 Baragaria‐Gohalbari‐Jadabpur Kheya Ghat  Km 003.40‐003.90 S 0.50 2692 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.263
Z6818 Baragaria‐Gohalbari‐Jadabpur Kheya Ghat  Km 003.90‐004.83 S 0.93 2692 Zilla Overlay 40mm @ Traff >=2000 2021 2.870 0.000
Z6819 Boalia‐Chowdhala Road Km 000.00‐000.80 S 0.80 1333 Zilla Overlay 40mm @ 1000‐2000 2021 2.581 0.000
Z6819 Boalia‐Chowdhala Road Km 000.80‐001.20 S 0.40 1333 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z6819 Boalia‐Chowdhala Road Km 003.20‐003.30 S 0.10 1333 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z6819 Boalia‐Chowdhala Road Km 003.30‐003.40 S 0.10 1333 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Nawabganj Total 808.799
Pabna Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 099.00‐100.04 S 1.04 13342 National Rehab 195mm @ IRI 9‐12 2021 49.065 10.083
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 100.04‐107.37 S 7.33 1605 National Overlay 50mm @ IRI 4‐9 2021 56.908 0.223
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 107.37‐110.47 S 3.10 1605 National Overlay 50mm @ IRI 4‐9 2021 26.919 0.125
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 111.77‐112.11 S 0.34 1605 National Overlay 50mm @ IRI 4‐9 2021 2.583 0.240
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 112.11‐117.57 S 5.46 9519 National Overlay 50mm @ IRI 4‐7 2021 41.874 5.853
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 117.57‐118.47 S 0.90 9519 National Rehab 180mm @ IRI 9‐12 2021 44.426 2.285
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 123.27‐123.29 L 0.02 10572 National Overlay 80mm @ IRI 4‐9 2021 0.217 11.417
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 123.27‐123.29 R 0.02 10572 National Overlay 80mm @ IRI 4‐9 2021 0.217 11.417
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 123.29‐127.37 S 4.08 10572 National Overlay 80mm @ IRI 4‐9 2021 51.146 6.354
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 127.37‐127.57 S 0.20 10572 National Rehab 195mm @ IRI 9‐12 2021 8.975 4.405
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 127.57‐127.84 S 0.27 10572 National Rehab 195mm @ IRI 9‐12 2021 12.116 4.162
N504 Nagarbari (Pratappur)‐Kashinathpur Road Km 001.00‐003.49 S 2.48 5104 National Overlay 50mm @ IRI 5‐9 2021 24.318 2.028
N504 Nagarbari (Pratappur)‐Kashinathpur Road Km 003.50‐004.67 L 1.17 5104 National Overlay 50mm @ IRI 5‐9 2021 6.745 5.866
N504 Nagarbari (Pratappur)‐Kashinathpur Road Km 003.50‐004.67 R 1.17 5104 National Overlay 50mm @ IRI 5‐9 2021 6.745 5.859
N504 Nagarbari (Pratappur)‐Kashinathpur Road Km 004.67‐006.65 S 1.99 5104 National DBST @ 25% Crk 2021 6.907 2.618
N505 Baderhat‐Kazirhat (Latifpur) Road Km 000.00‐002.80 S 2.80 2353 National DBST @ Traff 2000‐4000 2021 9.900 1.032
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 000.00‐003.55 S 3.55 4614 National Overlay 50mm @ IRI 4‐9 2021 27.203 3.839
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 003.55‐003.60 L 0.05 4614 National Overlay 50mm @ IRI 4‐9 2021 0.383 4.152
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 003.60‐004.66 S 1.06 4614 National Overlay 50mm @ IRI 4‐9 2021 8.102 3.877
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 004.70‐004.72 L 0.02 4614 National Overlay 50mm @ IRI 4‐9 2021 0.130 5.110
Page 174 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 004.70‐004.72 R 0.02 4614 National Overlay 50mm @ IRI 4‐9 2021 0.109 8.864
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 006.70‐006.70 L 0.00 4614 National Overlay 50mm @ IRI 4‐9 2021 0.015 4.262
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 006.70‐006.70 R 0.00 4614 National Overlay 50mm @ IRI 4‐9 2021 0.013 28.945
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 006.70‐008.94 S 2.24 4614 National Overlay 50mm @ IRI 4‐9 2021 17.185 4.205
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 008.94‐009.00 L 0.06 4614 National Overlay 50mm @ IRI 4‐9 2021 0.460 3.858
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 008.94‐009.00 R 0.06 4614 National Overlay 50mm @ IRI 4‐9 2021 0.384 5.839
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 009.00‐009.20 S 0.20 4614 National Overlay 50mm @ IRI 4‐9 2021 1.502 4.876
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 009.20‐009.30 S 0.10 4614 National Rehab 150mm @ IRI 9‐12 2021 3.526 2.140
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 009.30‐009.90 S 0.60 4614 National Overlay 50mm @ IRI 4‐9 2021 4.599 4.996
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 009.90‐015.97 S 6.07 4614 National DBST @ 25% Crk 2021 21.890 3.618
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 015.97‐016.07 S 0.10 4614 National Rehab 150mm @ IRI 9‐12 2021 3.526 2.215
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 016.27‐016.32 S 0.05 4614 National Rehab 150mm @ IRI 9‐12 2021 1.869 2.208
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 016.37‐016.67 L 0.30 4614 National Rehab 150mm @ IRI 9‐12 2021 5.941 4.744
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 016.37‐016.67 R 0.30 4614 National Rehab 150mm @ IRI 9‐12 2021 5.941 4.838
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 018.57‐018.67 S 0.10 4614 National Rehab 150mm @ IRI 9‐12 2021 3.526 2.211
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 021.67‐021.97 S 0.30 4614 National Rehab 150mm @ IRI 9‐12 2021 10.578 2.587
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 022.61‐025.07 S 2.46 18037 National Overlay 80mm @ IRI 4‐9 2021 30.526 26.965
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 025.07‐025.17 S 0.10 18037 National Full Recon 195mm 2021 8.031 9.935
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 025.17‐025.43 S 0.26 18037 National Rehab 195mm @ IRI 9‐12 2021 17.210 10.842
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 025.43‐032.97 S 7.54 7672 National DBST @ 25% Crk 2021 27.198 4.626
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 032.97‐033.20 S 0.23 7672 National Overlay 60mm @ IRI 7‐9 2021 2.137 6.822
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 033.20‐033.22 L 0.02 7672 National Overlay 50mm @ IRI 4‐7 2021 0.128 11.239
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 033.20‐033.22 R 0.02 7672 National Overlay 50mm @ IRI 4‐7 2021 0.128 11.343
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 033.22‐035.47 S 2.25 7672 National DBST @ 25% Crk 2021 8.100 4.452
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 035.47‐035.67 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.718
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 035.67‐036.47 S 0.80 7672 National Overlay 50mm @ IRI 4‐7 2021 6.132 5.979
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 036.47‐036.67 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.772
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 036.67‐037.07 S 0.40 7672 National Overlay 60mm @ IRI 7‐9 2021 3.653 6.874
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.07‐037.09 S 0.02 7672 National Full Recon 180mm 2021 1.175 2.485
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.17‐037.27 L 0.10 7672 National Rehab 180mm @ IRI 9‐12 2021 2.772 4.862
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.17‐037.27 R 0.10 7672 National Full Recon 180mm 2021 2.870 4.594
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.27‐037.55 L 0.28 7672 National Overlay 50mm @ IRI 4‐7 2021 1.218 8.410
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.27‐037.55 R 0.28 7672 National Overlay 50mm @ IRI 4‐7 2021 1.218 9.343
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.77‐037.97 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.371
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 037.97‐039.07 S 1.10 7672 National Overlay 50mm @ IRI 4‐7 2021 8.432 6.607
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 039.07‐039.57 S 0.50 7672 National Rehab 180mm @ IRI 9‐12 2021 24.681 2.565
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 039.57‐039.67 S 0.10 7672 National Overlay 50mm @ IRI 4‐7 2021 0.767 6.085
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 039.67‐039.77 S 0.10 7672 National Full Recon 180mm 2021 5.109 2.439
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 039.77‐040.37 S 0.60 7672 National Overlay 50mm @ IRI 4‐7 2021 4.599 5.917
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 040.37‐040.57 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.592
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 040.57‐040.87 S 0.30 7672 National Overlay 50mm @ IRI 4‐7 2021 2.300 6.004
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 040.87‐041.07 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.823
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 041.07‐041.47 S 0.40 7672 National Overlay 60mm @ IRI 7‐9 2021 3.653 6.508
Page 175 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 041.47‐041.67 S 0.20 7672 National Rehab 180mm @ IRI 9‐12 2021 9.873 2.757
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 041.67‐041.77 S 0.10 7672 National Overlay 50mm @ IRI 4‐7 2021 0.767 6.591
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 041.77‐043.55 S 1.78 18037 National Overlay 80mm @ IRI 4‐9 2021 21.467 25.213
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 043.55‐043.61 L 0.06 18037 National Rehab 195mm @ IRI 9‐12 2021 2.219 15.688
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 043.55‐043.61 R 0.06 18037 National Rehab 195mm @ IRI 9‐12 2021 2.219 15.347
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 043.61‐043.77 S 0.16 18037 National Rehab 195mm @ IRI 9‐12 2021 7.127 12.617
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 043.77‐043.87 S 0.10 18037 National Full Recon 195mm @ IRI 12 2021 5.330 10.829
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 043.87‐046.37 S 2.50 18037 National Overlay 80mm @ IRI 4‐9 2021 30.179 27.798
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 046.37‐046.43 L 0.06 18037 National Full Recon 195mm 2021 2.672 14.138
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 046.37‐046.43 R 0.06 18037 National Full Recon 195mm 2021 2.672 14.201
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 046.43‐046.97 S 0.54 18037 National Overlay 80mm @ IRI 4‐9 2021 6.504 27.702
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 046.97‐047.17 S 0.20 18037 National Full Recon 195mm @ IRI 12 2021 10.659 10.886
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 047.17‐048.57 S 1.40 18037 National Overlay 80mm @ IRI 4‐9 2021 16.894 27.875
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 048.57‐048.97 S 0.40 18037 National Rehab 195mm @ IRI 9‐12 2021 17.707 10.678
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 048.97‐049.07 S 0.10 18037 National Rehab 195mm @ IRI 9‐12 2021 4.427 12.122
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 049.07‐049.67 S 0.60 18037 National Full Recon 195mm @ IRI 12 2021 31.978 10.120
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 049.67‐051.29 S 1.62 18037 National Overlay 80mm @ IRI 4‐9 2021 19.560 28.044
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 051.29‐051.33 L 0.04 18037 National Full Recon 195mm 2021 1.781 14.509
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 051.29‐051.33 R 0.04 18037 National Full Recon 195mm @ IRI 12 2021 2.132 10.729
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 051.33‐066.54 S 15.21 8817 National Overlay 60mm @ IRI 7‐9 2021 138.911 14.439
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 066.54‐066.74 S 0.20 8383 National Full Recon 180mm @ IRI 12 2021 10.219 7.957
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 066.74‐067.41 S 0.67 8383 National Overlay 60mm @ IRI 7‐9 2021 6.137 20.172
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 067.44‐067.58 L 0.14 8383 National Full Recon 180mm 2021 5.274 6.985
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 067.44‐067.58 R 0.14 8383 National Full Recon 180mm 2021 5.274 6.981
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 067.58‐068.00 S 0.42 8383 National Rehab 180mm @ IRI 9‐12 2021 20.930 9.235
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 068.00‐068.01 S 0.01 8383 National Overlay 60mm @ IRI 7‐9 2021 0.073 20.917
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 000.00‐000.07 S 0.07 13288 National Overlay 80mm @ IRI 5‐9 2021 0.984 3.537
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 000.10‐001.11 L 1.01 13288 National Overlay 80mm @ IRI 5‐9 2021 11.721 4.401
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 000.10‐001.11 R 1.01 13288 National Overlay 80mm @ IRI 5‐9 2021 11.721 4.401
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 001.11‐001.80 S 0.69 13288 National Overlay 80mm @ IRI 5‐9 2021 14.195 0.952
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 001.80‐001.90 S 0.10 13288 National DBST @ Traff >6000 2021 0.618 1.868
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 001.93‐002.43 L 0.50 13288 National Overlay 80mm @ IRI 5‐9 2021 6.010 5.583
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 001.93‐002.43 R 0.50 13288 National Overlay 80mm @ IRI 5‐9 2021 6.094 6.034
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 002.43‐003.39 S 0.96 13288 National Overlay 80mm @ IRI 5‐9 2021 19.753 1.904
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 003.39‐005.10 S 1.71 4563 National Overlay 50mm @ IRI 5‐9 2021 22.712 3.897
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 005.13‐005.56 L 0.44 4563 National Overlay 50mm @ IRI 5‐9 2021 3.289 9.440
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 005.13‐005.56 R 0.44 4563 National Overlay 50mm @ IRI 5‐9 2021 3.289 9.985
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 005.56‐005.73 S 0.17 4563 National Rehab 150mm @ IRI 9‐12 2021 9.962 1.286
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 005.73‐005.77 S 0.05 4563 National Overlay 50mm @ IRI 5‐9 2021 0.591 4.537
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 006.00‐007.83 L 1.83 4563 National DBST @ 25% Crk 2021 6.509 9.024
N604 Pabna Town Old Section (Bus Stand‐Gachpara) Road Km 006.00‐007.83 R 1.83 4563 National DBST @ Traff 4000‐6000 2021 6.509 9.021
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 063.56‐069.17 S 5.61 8760 National Overlay 50mm @ IRI 5‐7 2021 46.140 12.466
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 069.24‐070.75 L 1.51 7770 National Overlay 50mm @ IRI 5‐7 2021 9.061 24.685
Page 176 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 069.24‐070.75 R 1.51 7770 National DBST @ Traff >6000 2021 4.114 6.001
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 071.84‐072.04 S 0.20 7770 National Rehab 180mm @ IRI 9‐12 2021 8.873 7.368
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 072.04‐072.44 S 0.40 7770 National Overlay 50mm @ IRI 5‐7 2021 3.234 18.988
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 072.54‐074.27 S 1.74 7770 National Overlay 50mm @ IRI 5‐7 2021 14.036 18.582
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 074.27‐074.34 S 0.06 14241 National Full Recon 195mm 2021 3.598 7.742
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 074.34‐074.74 S 0.40 14241 National Overlay 80mm @ IRI 5‐9 2021 5.157 21.116
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 074.74‐074.84 S 0.10 14241 National Full Recon 195mm @ IRI 12 2021 5.980 7.508
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 074.84‐075.24 S 0.40 14241 National Overlay 80mm @ IRI 5‐9 2021 5.079 20.929
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 075.24‐075.34 S 0.10 14241 National Full Recon 195mm 2021 5.622 7.956
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 075.34‐078.04 S 2.70 14241 National Overlay 80mm @ IRI 5‐9 2021 34.634 20.777
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 078.04‐078.14 S 0.10 14241 National Full Recon 195mm 2021 5.622 7.743
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 078.14‐081.19 S 3.06 14241 National Overlay 80mm @ IRI 5‐9 2021 39.655 20.273
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 081.19‐081.44 S 0.25 14241 National Rehab 195mm @ IRI 9‐12 2021 12.732 7.762
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 081.44‐081.54 L 0.10 14241 National Overlay 80mm @ IRI 5‐9 2021 1.289 22.045
N704 Jhenaidah‐Kushtia‐Paksey Ferry‐Dasuria Road Km 081.44‐081.54 R 0.10 10119 National Overlay 80mm @ IRI 5‐9 2021 0.843 14.997
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 000.00‐000.30 S 0.30 10193 National DBST @ Traff >6000 2021 0.897 7.105
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 000.50‐001.00 S 0.50 10193 National DBST @ Traff >6000 2021 1.531 7.334
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 001.00‐001.80 S 0.80 10193 National Overlay 50mm @ IRI 5 2021 5.208 5.724
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 001.80‐001.90 S 0.10 10193 National Rehab 195mm @ IRI 9‐12 2021 3.760 2.686
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 004.70‐004.80 S 0.10 10193 National Rehab 195mm @ IRI 9‐12 2021 3.760 3.005
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 004.80‐005.00 S 0.20 10193 National Overlay 50mm @ IRI 5 2021 1.302 7.129
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 005.00‐005.30 S 0.30 10193 National Rehab 195mm @ IRI 9‐12 2021 13.025 1.636
N705 Paksey (Ruppur)‐Iswardi‐Dasuria Old Section Road Km 006.40‐006.60 S 0.20 10193 National Overlay 80mm @ IRI 5‐9 2021 2.493 5.885
R601 Pabna‐Sujanagar‐ Baderhat Km 000.20‐000.30 S 0.10 11411 Regional DBST @ Traff >6000 2021 0.321 3.873
R601 Pabna‐Sujanagar‐ Baderhat Km 000.30‐000.50 S 0.20 11411 Regional DBST @ Traff >6000 2021 0.642 2.153
R601 Pabna‐Sujanagar‐ Baderhat Km 000.50‐000.90 S 0.40 11411 Regional DBST @ Traff >6000 2021 1.227 3.280
R601 Pabna‐Sujanagar‐ Baderhat Km 001.30‐001.80 S 0.50 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.465 2.904
R601 Pabna‐Sujanagar‐ Baderhat Km 002.10‐002.30 S 0.20 11411 Regional DBST @ Traff >6000 2021 0.543 2.756
R601 Pabna‐Sujanagar‐ Baderhat Km 002.40‐002.50 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.563
R601 Pabna‐Sujanagar‐ Baderhat Km 002.80‐002.90 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.536
R601 Pabna‐Sujanagar‐ Baderhat Km 002.90‐003.10 S 0.20 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.376 2.591
R601 Pabna‐Sujanagar‐ Baderhat Km 003.10‐003.30 S 0.20 11411 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 1.080
R601 Pabna‐Sujanagar‐ Baderhat Km 004.50‐004.60 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.510
R601 Pabna‐Sujanagar‐ Baderhat Km 004.90‐005.00 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.606
R601 Pabna‐Sujanagar‐ Baderhat Km 005.10‐005.50 S 0.40 11411 Regional DBST @ Traff >6000 2021 1.087 2.457
R601 Pabna‐Sujanagar‐ Baderhat Km 005.70‐006.00 S 0.30 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.057 3.265
R601 Pabna‐Sujanagar‐ Baderhat Km 006.70‐006.80 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.510
R601 Pabna‐Sujanagar‐ Baderhat Km 006.90‐007.20 S 0.30 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 3.155
R601 Pabna‐Sujanagar‐ Baderhat Km 007.40‐007.50 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.517
R601 Pabna‐Sujanagar‐ Baderhat Km 008.20‐008.80 S 0.60 11411 Regional DBST @ Traff >6000 2021 1.630 2.527
R601 Pabna‐Sujanagar‐ Baderhat Km 008.80‐009.50 S 0.70 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.816 1.748
R601 Pabna‐Sujanagar‐ Baderhat Km 009.50‐010.00 S 0.50 11411 Regional DBST @ Traff >6000 2021 1.356 2.542
R601 Pabna‐Sujanagar‐ Baderhat Km 010.00‐011.10 S 1.10 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.569 1.493
Page 177 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R601 Pabna‐Sujanagar‐ Baderhat Km 011.10‐011.20 S 0.10 11411 Regional DBST @ Traff >6000 2021 0.272 2.972
R601 Pabna‐Sujanagar‐ Baderhat Km 012.10‐012.20 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.518
R601 Pabna‐Sujanagar‐ Baderhat Km 012.30‐012.50 S 0.20 11411 Regional DBST @ Traff >6000 2021 0.543 2.825
R601 Pabna‐Sujanagar‐ Baderhat Km 012.90‐013.30 S 0.40 11411 Regional DBST @ Traff >6000 2021 1.087 2.661
R601 Pabna‐Sujanagar‐ Baderhat Km 014.00‐014.10 S 0.10 11411 Regional Full Recon 195mm 2021 4.016 1.320
R601 Pabna‐Sujanagar‐ Baderhat Km 014.10‐018.38 S 4.29 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 29.504 1.471
R601 Pabna‐Sujanagar‐ Baderhat Km 018.38‐018.45 S 0.06 1259 Regional DBST @ Traff 100‐2000 2021 0.170 0.549
R601 Pabna‐Sujanagar‐ Baderhat Km 019.45‐020.05 S 0.60 1259 Regional Overlay 50mm @ IRI 7‐9 2021 3.465 0.646
R601 Pabna‐Sujanagar‐ Baderhat Km 020.85‐021.95 S 1.10 1259 Regional Overlay 50mm @ IRI 7‐9 2021 6.353 0.583
R601 Pabna‐Sujanagar‐ Baderhat Km 021.95‐022.25 S 0.30 1259 Regional Overlay 50mm @ IRI 5‐7 2021 1.733 0.358
R601 Pabna‐Sujanagar‐ Baderhat Km 022.25‐023.05 S 0.80 1259 Regional Overlay 50mm @ IRI 7‐9 2021 4.620 0.565
R601 Pabna‐Sujanagar‐ Baderhat Km 024.05‐024.45 S 0.40 1259 Regional Overlay 50mm @ IRI 7‐9 2021 2.310 0.812
R601 Pabna‐Sujanagar‐ Baderhat Km 026.45‐026.85 S 0.40 1259 Regional Overlay 50mm @ IRI 7‐9 2021 2.310 0.735
R601 Pabna‐Sujanagar‐ Baderhat Km 028.55‐028.95 S 0.40 1259 Regional Overlay 50mm @ IRI 7‐9 2021 2.310 0.779
R601 Pabna‐Sujanagar‐ Baderhat Km 029.25‐029.45 S 0.20 1259 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 0.782
R601 Pabna‐Sujanagar‐ Baderhat Km 029.75‐029.95 S 0.20 1259 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 0.754
R601 Pabna‐Sujanagar‐ Baderhat Km 036.93‐037.29 S 0.36 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.491 3.038
R601 Pabna‐Sujanagar‐ Baderhat Km 038.49‐038.59 S 0.10 11411 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.534
R601 Pabna‐Sujanagar‐ Baderhat Km 044.69‐047.69 S 3.00 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 20.642 2.073
R601 Pabna‐Sujanagar‐ Baderhat Km 049.49‐050.79 S 1.30 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.945 1.580
R601 Pabna‐Sujanagar‐ Baderhat Km 050.79‐051.09 S 0.30 11411 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.064 3.027
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 000.00‐000.90 S 0.90 8108 Regional DBST @ 25% Crk 2021 3.966 0.529
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 000.90‐001.50 S 0.60 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.052 2.185
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 002.60‐002.70 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.371 1.887
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 002.70‐003.40 S 0.70 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.436 1.168
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 003.40‐003.70 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.748
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 003.70‐004.20 S 0.50 8108 Regional DBST @ Traff >6000 2021 1.803 0.795
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 004.20‐004.50 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.646
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 006.40‐006.70 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.729
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 007.00‐007.20 S 0.20 8108 Regional DBST @ Traff >6000 2021 0.721 1.627
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 007.20‐007.70 S 0.50 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.566 0.956
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 007.70‐008.00 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.744
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 008.00‐008.30 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 0.724
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 008.30‐008.40 S 0.10 8108 Regional Rehab 150mm @ IRI 9‐12 2021 3.526 0.306
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 009.70‐009.80 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 1.659
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 009.80‐010.00 S 0.20 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.817 0.981
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 010.00‐010.60 S 0.60 8108 Regional DBST @ Traff >6000 2021 2.164 1.497
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 010.60‐010.80 S 0.20 8108 Regional DBST @ Traff >6000 2021 0.721 0.760
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 010.80‐010.90 S 0.10 8108 Regional Full Recon 150mm @ IRI 12 2021 4.430 0.715
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 010.90‐011.30 S 0.40 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.653 1.020
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 011.30‐011.60 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.687
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 011.60‐011.70 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 0.784
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 011.70‐011.80 S 0.10 8108 Regional Rehab 150mm @ IRI 9‐12 2021 3.526 0.305
Page 178 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 012.50‐012.80 S 0.30 8108 Regional DBST @ Traff >6000 2021 1.082 1.726
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 013.20‐013.30 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 1.541
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 013.60‐013.80 S 0.20 8108 Regional DBST @ Traff >6000 2021 0.721 1.730
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 013.90‐014.30 S 0.40 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.644 1.778
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 014.90‐015.10 S 0.20 8108 Regional Full Recon 150mm @ IRI 12 2021 8.859 0.716
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 015.70‐015.80 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 1.736
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 015.80‐016.20 S 0.40 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.653 1.438
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 016.20‐016.30 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 1.531
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 017.60‐017.70 S 0.10 8108 Regional DBST @ Traff >6000 2021 0.361 1.831
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 018.00‐018.50 S 0.50 8108 Regional DBST @ Traff >6000 2021 1.803 1.749
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 018.60‐018.80 S 0.20 8108 Regional DBST @ Traff >6000 2021 0.721 1.775
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 019.40‐020.00 S 0.60 8108 Regional DBST @ Traff >6000 2021 2.164 1.690
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 020.40‐020.60 S 0.20 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.826 2.034
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 021.10‐021.30 S 0.20 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.826 1.969
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 021.30‐021.50 S 0.20 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.826 1.539
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 021.92‐021.97 L 0.05 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.332 7.147
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 021.92‐021.97 R 0.05 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.332 7.147
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 021.97‐024.99 S 3.02 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 28.193 1.533
R603  Pabna‐Paksey Nadi Bandar (EPZ) Road Km 024.99‐025.80 S 0.80 8108 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.315 1.883
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 000.80‐000.90 S 0.10 4440 Regional DBST @ Traff 4000‐6000 2021 0.272 4.196
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 001.00‐001.10 S 0.10 4440 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.224
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 001.80‐002.30 S 0.50 4440 Regional Overlay 60mm @ IRI 7‐9 2021 3.433 3.973
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 003.10‐003.40 S 0.30 4440 Regional DBST @ Traff 4000‐6000 2021 0.815 3.571
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 004.60‐005.00 S 0.40 4440 Regional DBST @ Traff 4000‐6000 2021 1.087 3.634
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 005.50‐005.80 S 0.30 4440 Regional Overlay 60mm @ IRI 7‐9 2021 2.064 3.293
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 007.00‐007.10 S 0.10 4440 Regional Full Recon 150mm 2021 3.337 1.447
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 018.00‐018.20 S 0.20 4440 Regional DBST @ Traff 4000‐6000 2021 0.543 3.415
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 020.10‐020.20 S 0.10 4440 Regional DBST @ Traff 4000‐6000 2021 0.272 4.222
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 021.20‐021.30 S 0.10 4440 Regional Full Recon 150mm 2021 3.337 1.592
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 021.30‐022.02 S 0.73 4440 Regional Overlay 50mm @ IRI 5‐7 2021 4.187 3.457
R604 Tebunia‐Chatmohor‐Handial‐Hamkuria Road Km 036.22‐036.92 S 0.70 2537 Regional Overlay 50mm @ IRI 7‐9 2021 4.043 1.178
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 000.00‐000.80 S 0.80 3394 Regional Overlay 50mm @ IRI 5‐7 2021 4.754 1.115
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 000.80‐001.00 S 0.20 3394 Regional DBST @ Traff 2000‐4000 2021 0.543 1.544
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 001.00‐003.80 S 2.80 3394 Regional DBST @ Traff 2000‐4000 2021 7.605 0.609
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 003.80‐004.26 S 0.46 3394 Regional Overlay 50mm @ IRI 7‐9 2021 2.657 1.601
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 004.26‐004.86 S 0.60 3394 Regional Overlay 50mm @ IRI 5‐7 2021 3.465 1.403
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 004.86‐005.06 S 0.20 3394 Regional DBST @ Traff 2000‐4000 2021 0.543 1.653
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 005.36‐005.56 S 0.20 3394 Regional DBST @ Traff 2000‐4000 2021 0.543 0.383
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 007.96‐008.36 S 0.40 3394 Regional DBST @ Traff 2000‐4000 2021 1.087 0.334
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 008.36‐014.36 S 6.00 3394 Regional Overlay 50mm @ IRI 5‐7 2021 34.650 1.219
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 014.36‐014.76 S 0.40 3394 Regional DBST @ Traff 2000‐4000 2021 1.087 0.759
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 014.76‐014.86 S 0.10 3394 Regional DBST @ Traff 2000‐4000 2021 0.272 0.566
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 031.56‐031.66 S 0.10 3394 Regional DBST @ Traff 2000‐4000 2021 0.272 2.075
Page 179 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 038.66‐041.66 S 3.00 3394 Regional Overlay 50mm @ IRI 5‐7 2021 17.325 1.249
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 041.66‐041.76 S 0.10 3394 Regional DBST @ Traff 2000‐4000 2021 0.272 2.077
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 041.76‐042.06 S 0.30 3394 Regional DBST @ 25% Crk 2021 0.815 0.788
R605 Sujangar‐Lalan Shah Bridge Approach Road Km 042.06‐042.65 S 0.59 3394 Regional DBST @ Traff 2000‐4000 2021 1.611 1.326
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 045.51‐045.61 S 0.10 2532 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.021
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 045.61‐045.91 S 0.30 2532 Zilla Seal Coat 2021 0.416 0.314
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 045.91‐046.31 S 0.40 2532 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 046.31‐049.11 S 2.80 2532 Zilla Overlay 40mm @ Traff >=2000 2021 12.856 0.112
Z5209 Singra‐Gurudaspur‐Chatmohor Road Km 049.11‐050.32 S 1.21 2532 Zilla Overlay 40mm @ Traff >=2000 2021 4.837 0.351
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 000.00‐003.00 S 3.00 4519 Zilla Overlay 50mm @ IRI 6‐9 2021 18.030 0.541
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 009.20‐016.00 S 6.80 4265 Zilla Overlay 50mm @ IRI 6‐9 2021 39.258 0.445
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 016.00‐016.30 S 0.30 3714 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.267
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 016.30‐016.40 S 0.10 3714 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.014
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 016.40‐016.70 S 0.30 3714 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.274
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 016.80‐017.10 S 0.30 3714 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.133
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 018.20‐018.40 S 0.20 3714 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.354
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 018.40‐018.60 S 0.20 3714 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.018
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 018.60‐018.70 S 0.10 3714 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.187
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 018.70‐018.90 S 0.20 3714 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z6021 Chatmohor‐Bhangura‐Faridpur‐Bagabari Road Km 019.00‐023.59 S 4.60 3714 Zilla Overlay 40mm @ Traff >=2000 2021 21.466 0.000
Z6022 Ishwardi‐Kadamchilan Road Km 001.46‐003.30 S 1.84 4498 Zilla Overlay 50mm @ IRI 6‐9 2021 12.976 0.220
Z6022 Ishwardi‐Kadamchilan Road Km 003.30‐004.05 S 0.75 4498 Zilla Rehab 75mm @ IRI 9‐12 2021 9.668 0.761
Z6026 Madhpur‐Santhia‐ Bera Road Km 000.00‐000.50 S 0.50 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 8.769 0.379
Z6026 Madhpur‐Santhia‐ Bera Road Km 000.50‐000.70 S 0.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 000.70‐000.80 S 0.10 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.726
Z6026 Madhpur‐Santhia‐ Bera Road Km 000.80‐001.50 S 0.70 3134 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 001.50‐001.80 S 0.30 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.362
Z6026 Madhpur‐Santhia‐ Bera Road Km 001.80‐002.00 S 0.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.929 0.174
Z6026 Madhpur‐Santhia‐ Bera Road Km 002.00‐002.20 S 0.20 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.518
Z6026 Madhpur‐Santhia‐ Bera Road Km 002.20‐005.10 S 2.90 3134 Zilla Overlay 40mm @ Traff >=2000 2021 13.542 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 005.10‐005.20 S 0.10 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.668
Z6026 Madhpur‐Santhia‐ Bera Road Km 005.20‐006.40 S 1.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 5.599 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 006.40‐006.70 S 0.30 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.356
Z6026 Madhpur‐Santhia‐ Bera Road Km 006.70‐006.80 S 0.10 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 006.80‐007.00 S 0.20 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.434
Z6026 Madhpur‐Santhia‐ Bera Road Km 007.00‐008.20 S 1.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 008.20‐008.60 S 0.40 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.490
Z6026 Madhpur‐Santhia‐ Bera Road Km 008.60‐010.10 S 1.50 3134 Zilla Overlay 40mm @ Traff >=2000 2021 7.000 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 010.16‐010.30 S 0.14 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.630 0.181
Z6026 Madhpur‐Santhia‐ Bera Road Km 010.30‐011.10 S 0.80 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 13.169 0.409
Z6026 Madhpur‐Santhia‐ Bera Road Km 011.10‐012.60 S 1.50 3134 Zilla Overlay 40mm @ Traff >=2000 2021 7.628 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 012.60‐013.10 S 0.50 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 8.665 0.254
Z6026 Madhpur‐Santhia‐ Bera Road Km 013.10‐013.87 S 0.77 3134 Zilla Overlay 40mm @ Traff >=2000 2021 3.600 0.000
Page 180 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z6026 Madhpur‐Santhia‐ Bera Road Km 013.87‐014.17 S 0.30 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.621
Z6026 Madhpur‐Santhia‐ Bera Road Km 014.17‐014.37 S 0.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 014.37‐014.57 S 0.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.342
Z6026 Madhpur‐Santhia‐ Bera Road Km 014.57‐016.07 S 1.50 3134 Zilla Overlay 40mm @ Traff >=2000 2021 7.004 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 016.07‐016.37 S 0.30 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.325
Z6026 Madhpur‐Santhia‐ Bera Road Km 016.37‐016.47 S 0.10 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 016.47‐017.77 S 1.30 3134 Zilla Overlay 40mm @ Traff >=2000 2021 6.070 0.353
Z6026 Madhpur‐Santhia‐ Bera Road Km 017.77‐018.07 S 0.30 3134 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 018.07‐018.37 S 0.30 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 5.046 0.474
Z6026 Madhpur‐Santhia‐ Bera Road Km 018.37‐020.07 S 1.70 3134 Zilla Overlay 40mm @ Traff >=2000 2021 8.458 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 020.07‐020.37 S 0.30 3134 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.237
Z6026 Madhpur‐Santhia‐ Bera Road Km 020.37‐021.07 S 0.70 3134 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 0.000
Z6026 Madhpur‐Santhia‐ Bera Road Km 021.07‐021.17 S 0.10 3134 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.590
Z6026 Madhpur‐Santhia‐ Bera Road Km 021.17‐021.37 S 0.20 3134 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.215
Z6026 Madhpur‐Santhia‐ Bera Road Km 021.37‐021.67 S 0.30 3134 Zilla Overlay 40mm @ Traff >=2000 2021 1.312 0.533
Z6026 Madhpur‐Santhia‐ Bera Road Km 021.67‐022.19 S 0.52 3134 Zilla Overlay 40mm @ Traff >=2000 2021 2.083 0.318
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 000.00‐000.70 S 0.70 1275 Zilla Overlay 40mm @ 1000‐2000 2021 2.211 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 000.70‐000.90 S 0.20 1275 Zilla Overlay 40mm @ 1000‐2000 2021 0.621 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 000.90‐002.70 S 1.80 1275 Zilla Overlay 40mm @ 1000‐2000 2021 5.590 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 002.70‐003.20 S 0.50 1275 Zilla Overlay 40mm @ 1000‐2000 2021 1.554 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 003.20‐003.30 S 0.10 1275 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 003.30‐003.70 S 0.40 1275 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 003.70‐003.80 S 0.10 1275 Zilla Overlay 40mm @ 1000‐2000 2021 0.311 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 003.80‐004.70 S 0.90 1275 Zilla Overlay 40mm @ 1000‐2000 2021 2.797 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 004.70‐007.20 S 2.50 1275 Zilla Overlay 40mm @ 1000‐2000 2021 7.765 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 007.20‐007.60 S 0.40 1275 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 007.60‐007.90 S 0.30 1275 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 007.90‐008.20 S 0.30 1275 Zilla Overlay 40mm @ 1000‐2000 2021 0.932 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 008.20‐008.60 S 0.40 1275 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 008.60‐009.70 S 1.10 1275 Zilla Overlay 40mm @ 1000‐2000 2021 3.418 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 009.70‐011.20 S 1.50 1275 Zilla Overlay 40mm @ 1000‐2000 2021 4.658 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 011.20‐011.60 S 0.40 1275 Zilla Overlay 40mm @ 1000‐2000 2021 1.243 0.000
Z6028 Satiakhola‐Manpur‐Chabbismile Biswa Road Km 011.60‐011.74 S 0.14 1275 Zilla Seal Coat 2021 0.132 0.367
Z6033 Bhangura Upazilla Connecting Road  Km 003.80‐005.34 S 1.54 5125 Zilla Overlay 50mm @ IRI 6‐9 2021 6.949 2.000
Z6033 Bhangura Upazilla Connecting Road  Km 005.34‐009.90 S 4.56 5125 Zilla Overlay 40mm @ Traff >=2000 2021 21.047 1.204
Z6034 Faridpur Upazilla Connecting Road Km 000.00‐000.10 S 0.10 4327 Zilla Overlay 40mm @ Traff >=2000 2021 0.340 0.000
Z6034 Faridpur Upazilla Connecting Road Km 000.10‐000.40 S 0.30 4327 Zilla Overlay 40mm @ Traff >=2000 2021 1.358 0.230
Z6034 Faridpur Upazilla Connecting Road Km 000.40‐002.34 S 1.94 4327 Zilla Overlay 40mm @ Traff >=2000 2021 8.169 0.000
Z6034 Faridpur Upazilla Connecting Road Km 002.34‐002.54 S 0.20 4327 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 0.674
Z6034 Faridpur Upazilla Connecting Road Km 002.54‐002.66 S 0.12 4327 Zilla Overlay 40mm @ Traff >=2000 2021 0.404 0.000
Z6035 Bhangura‐Lahiri Mohonpur Road Km 003.80‐003.90 S 0.10 286 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.314 0.000
Pabna Total 2154.978
Rajshahi Division
Page 181 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 115.38‐115.68 S 0.30 9406 National Full Recon 180mm 2021 15.328 6.190
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 115.68‐119.29 S 3.61 9406 National Overlay 50mm @ IRI 4‐7 2021 34.446 13.131
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 119.38‐120.09 L 0.71 3576 National Overlay 50mm @ IRI 4‐9 2021 2.978 6.360
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 119.38‐120.09 R 0.71 9406 National Overlay 60mm @ IRI 7‐9 2021 6.652 16.642
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 120.09‐130.34 S 10.25 9406 National Overlay 50mm @ IRI 4‐7 2021 87.077 15.877
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 130.34‐130.44 S 0.10 9406 National Full Recon 180mm 2021 7.139 3.581
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 130.44‐130.94 S 0.50 9406 National Overlay 50mm @ IRI 4‐7 2021 5.355 10.703
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 130.94‐131.44 S 0.50 9406 National Rehab 180mm @ IRI 9‐12 2021 34.486 4.102
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 131.44‐131.51 S 0.07 9406 National Overlay 50mm @ IRI 4‐7 2021 0.782 10.603
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 131.51‐132.64 S 1.13 9234 National DBST @ Traff >6000 2021 4.176 11.969
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 132.64‐132.74 S 0.10 9182 National Full Recon 180mm 2021 5.249 5.299
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 134.44‐134.64 S 0.20 9182 National Rehab 180mm @ IRI 9‐12 2021 10.143 5.507
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 136.04‐136.54 S 0.50 9182 National Overlay 60mm @ IRI 7‐9 2021 6.568 7.442
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 136.54‐137.11 S 0.57 9182 National Overlay 50mm @ IRI 4‐7 2021 6.328 6.097
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 137.14‐137.21 L 0.07 3908 National Overlay 50mm @ IRI 4‐9 2021 0.311 5.958
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 137.14‐137.21 R 0.07 9182 National Overlay 60mm @ IRI 7‐9 2021 0.694 13.241
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 137.21‐139.95 S 2.74 9182 National Overlay 50mm @ IRI 4‐7 2021 30.209 6.529
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 139.96‐140.41 L 0.46 3908 National Overlay 50mm @ IRI 4‐9 2021 1.436 6.088
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 139.96‐140.41 R 0.46 9182 National Overlay 50mm @ IRI 4‐7 2021 3.591 12.641
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 140.41‐143.06 S 2.64 9182 National Overlay 50mm @ IRI 4‐7 2021 30.538 5.911
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 143.06‐143.26 S 0.20 9182 National Full Recon 180mm 2021 15.398 2.523
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 145.33‐145.51 S 0.18 9182 National Overlay 50mm @ IRI 4‐7 2021 1.796 7.923
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 145.56‐146.28 L 0.73 3908 National Overlay 50mm @ IRI 4‐9 2021 2.516 5.666
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 145.56‐146.28 R 0.73 9182 National Overlay 50mm @ IRI 4‐7 2021 7.089 7.664
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 146.28‐146.96 S 0.67 9182 National Overlay 50mm @ IRI 4‐7 2021 7.296 5.553
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 146.96‐147.64 S 0.69 9182 National Overlay 50mm @ IRI 4‐7 2021 6.094 11.309
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 149.74‐149.86 S 0.11 9182 National Overlay 60mm @ IRI 7‐9 2021 2.039 3.717
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 149.86‐151.56 S 1.70 9182 National Overlay 50mm @ IRI 4‐7 2021 15.494 7.225
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 151.56‐151.66 S 0.10 9182 National Rehab 180mm @ IRI 9‐12 2021 5.072 5.565
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 151.66‐151.96 S 0.30 9182 National Overlay 50mm @ IRI 4‐7 2021 2.948 10.167
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 151.96‐152.46 S 0.50 9182 National Overlay 60mm @ IRI 7‐9 2021 5.379 12.119
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 152.46‐155.16 S 2.70 8377 National Overlay 50mm @ IRI 4‐7 2021 17.407 17.296
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 155.16‐155.36 S 0.20 8300 National Full Recon 180mm @ IRI 12 2021 8.539 6.188
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 155.36‐173.62 S 18.26 7699 National Overlay 50mm @ IRI 4‐7 2021 119.831 15.847
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 173.62‐173.72 S 0.10 6866 National Full Recon 180mm @ IRI 12 2021 4.269 5.861
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 173.72‐174.12 S 0.40 6866 National Overlay 50mm @ IRI 4‐7 2021 2.562 16.491
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 174.12‐174.22 S 0.10 6866 National Full Recon 180mm @ IRI 12 2021 4.269 5.740
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 174.22‐175.12 S 0.90 6866 National Overlay 50mm @ IRI 4‐7 2021 5.765 16.365
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 175.12‐175.22 S 0.10 6866 National Full Recon 180mm @ IRI 12 2021 4.269 5.775
N6 Kashinathpur‐Natore‐Rajshahi‐Nawabganj‐Baliadighi Km 175.22‐190.05 S 14.84 6866 National Overlay 50mm @ IRI 4‐7 2021 102.502 15.479
N603 Rajshahi Town By‐Pass Road Km 000.00‐000.03 L 0.03 4563 National Overlay 50mm @ IRI 5‐9 2021 0.450 3.001
N603 Rajshahi Town By‐Pass Road Km 000.00‐000.03 R 0.03 4563 National Overlay 50mm @ IRI 5‐9 2021 0.450 3.001
N603 Rajshahi Town By‐Pass Road Km 000.03‐010.50 S 10.47 4563 National DBST @ 25% Crk 2021 37.850 6.721
Page 182 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N603 Rajshahi Town By‐Pass Road Km 010.50‐010.60 S 0.10 4563 National Full Recon 150mm 2021 4.430 3.364
N603 Rajshahi Town By‐Pass Road Km 010.60‐013.66 S 3.06 4563 National Overlay 50mm @ IRI 5‐9 2021 23.478 9.582
N603 Rajshahi Town By‐Pass Road Km 013.76‐021.03 S 7.27 4563 National DBST @ Traff 4000‐6000 2021 26.217 8.586
N605 Rajshahi Greater Road  Km 002.00‐002.56 R 0.56 21883 National Overlay 80mm @ IRI 5‐9 2021 6.757 3.423
R681 Ujanpara‐Bijoynagar Road (Old Part) Km 000.00‐003.10 S 3.10 2672 Regional Overlay 50mm @ IRI 5‐7 2021 17.897 0.530
R681 Ujanpara‐Bijoynagar Road (Old Part) Km 003.10‐003.30 S 0.20 2672 Regional Overlay 50mm @ IRI 7‐9 2021 1.155 0.990
R681 Ujanpara‐Bijoynagar Road (Old Part) Km 004.20‐004.60 S 0.40 2672 Regional Overlay 50mm @ IRI 7‐9 2021 2.310 0.826
R685 Rajshahi‐Nawhata‐Chowmasia Road Km 020.90‐021.10 S 0.20 14890 Regional Rehab 150mm @ IRI 9‐12 2021 5.313 1.865
R685 Rajshahi‐Nawhata‐Chowmasia Road Km 021.10‐022.00 S 0.90 14890 Regional DBST @ Traff >6000 2021 2.445 1.993
R685 Rajshahi‐Nawhata‐Chowmasia Road Km 022.00‐022.10 S 0.10 14890 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 2.735
Z6005 Sahibpur ‐ Dirgapur ‐ Taherpur Road Km 004.80‐004.90 S 0.10 3886 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.551
Z6005 Sahibpur ‐ Dirgapur ‐ Taherpur Road Km 005.30‐005.40 S 0.10 3886 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.596
Z6005 Sahibpur ‐ Dirgapur ‐ Taherpur Road Km 018.92‐019.02 S 0.10 3886 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.320
Z6005 Sahibpur ‐ Dirgapur ‐ Taherpur Road Km 021.12‐021.22 S 0.10 3886 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.208
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 000.00‐003.13 S 3.13 4947 Zilla Overlay 40mm @ Traff >=2000 2021 12.364 1.981
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 004.10‐004.32 S 0.22 4947 Zilla Rehab 75mm @ IRI 9‐12 2021 2.481 1.359
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 005.39‐005.59 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 3.462
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 005.59‐005.79 S 0.20 3474 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 1.773
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 005.79‐005.89 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 3.396
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 006.29‐006.59 S 0.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 3.137
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 007.79‐007.89 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 3.339
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 008.69‐008.79 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 3.801
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 010.09‐010.29 S 0.20 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 3.439
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 011.69‐011.79 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 4.128
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 012.59‐012.69 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 4.175
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 014.49‐014.59 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 4.003
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 015.39‐015.89 S 0.50 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 2.960
Z6010 Rajshahi‐Hatgodagari‐Faliarbil‐Mohonganj Road Km 023.59‐023.69 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.110 4.072
Z6018 Sarda Bazar‐ Sadipur‐Salua Maleker More‐ Puthia Road Km 000.00‐000.20 S 0.20 244 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.672 0.156
Z6018 Sarda Bazar‐ Sadipur‐Salua Maleker More‐ Puthia Road Km 000.80‐007.50 S 6.70 244 Zilla Seal Coat 2021 6.245 0.402
Z6019 Puthia‐Arani‐Bagha Road Km 000.10‐000.60 S 0.50 2927 Zilla Rehab 75mm @ IRI 9‐12 2021 5.238 1.163
Z6019 Puthia‐Arani‐Bagha Road Km 010.00‐010.20 S 0.20 2927 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 0.987
Z6019 Puthia‐Arani‐Bagha Road Km 010.20‐011.03 S 0.83 2927 Zilla Overlay 40mm @ Traff >=2000 2021 3.444 0.025
Z6019 Puthia‐Arani‐Bagha Road Km 011.03‐011.23 S 0.20 2927 Zilla Rehab 75mm @ IRI 9‐12 2021 2.933 0.167
Z6019 Puthia‐Arani‐Bagha Road Km 013.83‐013.93 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.253
Z6019 Puthia‐Arani‐Bagha Road Km 014.63‐014.73 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.255
Z6019 Puthia‐Arani‐Bagha Road Km 014.73‐015.03 S 0.30 2927 Zilla Overlay 40mm @ Traff >=2000 2021 1.248 0.000
Z6019 Puthia‐Arani‐Bagha Road Km 015.03‐015.13 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.233
Z6019 Puthia‐Arani‐Bagha Road Km 015.13‐015.73 S 0.60 2927 Zilla Overlay 40mm @ Traff >=2000 2021 2.496 0.058
Z6019 Puthia‐Arani‐Bagha Road Km 015.73‐015.83 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.308
Z6019 Puthia‐Arani‐Bagha Road Km 016.23‐016.43 S 0.20 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.832 0.293
Z6019 Puthia‐Arani‐Bagha Road Km 017.33‐017.43 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.235
Z6019 Puthia‐Arani‐Bagha Road Km 017.43‐018.43 S 1.00 2927 Zilla Overlay 40mm @ Traff >=2000 2021 4.160 0.063
Page 183 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z6019 Puthia‐Arani‐Bagha Road Km 018.43‐018.53 S 0.10 2927 Zilla Overlay 40mm @ Traff >=2000 2021 0.416 0.271
Z6019 Puthia‐Arani‐Bagha Road Km 020.83‐021.13 S 0.30 2927 Zilla Rehab 75mm @ IRI 9‐12 2021 4.400 0.143
Z6019 Puthia‐Arani‐Bagha Road Km 021.13‐021.55 S 0.41 2927 Zilla Overlay 40mm @ Traff >=2000 2021 1.779 0.000
Z6020 Arani‐Bagatipara Road  Km 000.00‐000.10 S 0.10 1231 Zilla Seal Coat 2021 0.101 0.005
Z6020 Arani‐Bagatipara Road  Km 000.10‐000.70 S 0.60 1231 Zilla Overlay 40mm @ 1000‐2000 2021 2.038 0.000
Z6020 Arani‐Bagatipara Road  Km 000.70‐000.90 S 0.20 1231 Zilla Overlay 40mm @ 1000‐2000 2021 0.679 0.000
Z6020 Arani‐Bagatipara Road  Km 000.90‐001.20 S 0.30 1231 Zilla Overlay 40mm @ 1000‐2000 2021 0.960 0.000
Z6020 Arani‐Bagatipara Road  Km 001.20‐003.09 S 1.89 1231 Zilla Overlay 40mm @ 1000‐2000 2021 7.397 0.000
Z6809 Rajshahi‐Damkurahat‐Kakanhat‐Amnura Road Km 000.00‐012.03 S 12.02 9612 Zilla Overlay 50mm @ Cracking >25% 2021 55.808 3.324
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 000.00‐000.03 L 0.03 4386 Zilla Overlay 50mm @ Cracking >25% 2021 0.228 0.006
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 000.00‐000.03 R 0.03 4386 Zilla Overlay 40mm @ Traff >=2000 2021 0.233 0.092
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 000.03‐001.10 S 1.08 4386 Zilla Overlay 40mm @ Traff >=2000 2021 5.649 0.000
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 001.10‐001.30 S 0.20 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.582
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 001.30‐001.40 S 0.10 4386 Zilla Overlay 50mm @ Cracking >25% 2021 0.578 0.231
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 001.40‐001.50 S 0.10 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.825
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 001.50‐003.20 S 1.70 4386 Zilla Overlay 40mm @ Traff >=2000 2021 7.933 0.853
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 003.20‐003.40 S 0.20 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.553
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 003.40‐005.30 S 1.90 4386 Zilla Overlay 50mm @ Cracking >25% 2021 10.833 1.121
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 005.30‐005.40 S 0.10 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 2.050
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 005.40‐006.90 S 1.50 4386 Zilla Overlay 40mm @ Traff >=2000 2021 6.949 0.525
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 006.90‐007.15 S 0.25 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 4.148 1.687
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 007.15‐010.25 S 3.10 4386 Zilla Overlay 50mm @ Cracking >25% 2021 17.903 0.541
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 010.25‐010.45 S 0.20 4386 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.850
Z6813 Godagari‐Nachol‐Niamatpur Road  Km 010.45‐017.58 S 7.13 4386 Zilla Overlay 40mm @ Traff >=2000 2021 33.294 0.693
Z6851 Mohanpur‐Tanor Road Km 008.40‐008.80 S 0.40 2194 Zilla Seal Coat 2021 0.549 0.275
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 000.00‐010.80 S 10.80 317 Zilla Seal Coat 2021 9.713 0.541
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 010.80‐010.90 S 0.10 317 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.000
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 010.90‐013.20 S 2.30 317 Zilla Seal Coat 2021 2.116 1.280
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 013.20‐013.40 S 0.20 317 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.620 0.000
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 013.40‐013.90 S 0.50 317 Zilla Seal Coat 2021 0.460 1.306
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 013.90‐014.00 S 0.10 317 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.307 0.000
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 014.00‐014.40 S 0.40 317 Zilla Seal Coat 2021 0.368 2.006
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 014.40‐014.50 S 0.10 317 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.310 0.000
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 014.50‐028.17 S 13.67 317 Zilla Seal Coat 2021 13.471 0.544
Z6855 Bagshara‐Bildharampur‐Palashbari‐Gunigram Road Km 028.17‐028.91 S 0.74 317 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.274 0.000
Rajshahi Total 1043.860
Sirajganj Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 127.84‐130.77 S 2.93 10572 National Overlay 80mm @ IRI 4‐9 2021 35.840 11.420
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 131.57‐134.67 S 3.10 10572 National Overlay 80mm @ IRI 4‐9 2021 37.971 9.654
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 134.67‐135.27 S 0.60 10572 National Overlay 80mm @ IRI 4‐9 2021 7.339 9.985
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 135.27‐136.67 S 1.40 11145 National Overlay 80mm @ IRI 4‐9 2021 16.963 13.375
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 136.67‐136.77 S 0.10 11211 National Full Recon 195mm 2021 5.330 5.093
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 136.77‐138.77 S 2.00 11211 National Overlay 80mm @ IRI 4‐9 2021 24.200 13.814
Page 184 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 138.77‐138.97 S 0.20 11211 National Full Recon 195mm 2021 10.659 4.954
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 139.00‐146.37 S 7.37 11211 National Overlay 80mm @ IRI 4‐9 2021 88.981 14.263
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 146.37‐146.47 S 0.10 11211 National Full Recon 195mm 2021 5.330 5.228
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 146.47‐146.77 S 0.30 11211 National Overlay 80mm @ IRI 4‐9 2021 3.620 13.408
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 146.77‐146.87 S 0.10 11211 National Full Recon 195mm 2021 5.330 5.245
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 146.87‐149.27 S 2.40 11211 National Overlay 80mm @ IRI 4‐9 2021 30.627 12.668
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 149.27‐149.37 S 0.10 11211 National Full Recon 195mm 2021 5.330 5.160
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 149.37‐149.47 S 0.10 11211 National Rehab 195mm @ IRI 9‐12 2021 4.427 5.616
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 149.47‐149.57 S 0.10 11211 National Full Recon 195mm 2021 5.330 4.882
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 149.57‐150.07 S 0.50 11211 National Overlay 80mm @ IRI 4‐9 2021 6.033 13.655
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 150.07‐150.17 S 0.10 11211 National Full Recon 195mm 2021 5.330 4.840
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 150.17‐162.47 S 12.30 12236 National Rehab 195mm @ IRI 9‐12 2021 552.691 8.925
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 162.47‐162.67 S 0.20 13281 National Full Recon 195mm @ IRI 12 2021 10.805 10.532
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 162.67‐164.17 S 1.50 13281 National Overlay 80mm @ IRI 4‐9 2021 18.348 23.003
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 164.17‐164.37 S 0.20 13281 National Full Recon 195mm @ IRI 12 2021 10.805 10.532
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 164.37‐165.25 S 0.88 13281 National Rehab 195mm @ IRI 9‐12 2021 39.469 11.688
N507 Hatikamrul‐Banpara Road Km 000.00‐000.70 S 0.70 10494 National Overlay 80mm @ IRI 5‐9 2021 13.839 12.599
N507 Hatikamrul‐Banpara Road Km 000.70‐000.80 S 0.10 10494 National Full Recon 195mm 2021 8.396 4.510
N507 Hatikamrul‐Banpara Road Km 000.80‐025.17 S 24.37 9724 National DBST @ 25% Crk 2021 138.469 10.594
N520 Ullapara Town Link Road Km 000.00‐002.60 S 2.60 3368 National Overlay 50mm @ IRI 5‐9 2021 15.294 0.905
R450 Jamuna Bridge (Saidabad)‐Sirajganj Road Km 007.40‐008.99 S 1.59 7416 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.958 7.711
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 000.00‐000.20 S 0.20 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.698 0.200
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 000.20‐000.40 S 0.20 3904 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 000.40‐001.30 S 0.90 3904 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 0.384
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 001.30‐002.10 S 0.80 3904 Zilla Overlay 40mm @ Traff >=2000 2021 3.731 0.021
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 002.10‐002.50 S 0.40 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.468
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 002.50‐002.70 S 0.20 3904 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 002.70‐003.10 S 0.40 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.468
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 003.10‐003.70 S 0.60 3904 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.079
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 003.70‐004.00 S 0.30 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.502
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 004.00‐007.30 S 3.30 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 54.290 0.313
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 007.30‐007.40 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.437
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 007.40‐007.70 S 0.30 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.133
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 007.70‐007.90 S 0.20 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.340
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 007.90‐008.00 S 0.10 3904 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 008.00‐009.00 S 1.00 3904 Zilla Overlay 40mm @ Traff >=2000 2021 4.670 0.532
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 009.00‐009.80 S 0.80 3904 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.021
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 009.80‐009.90 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.465
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 009.90‐010.30 S 0.40 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.863 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 010.30‐011.20 S 0.90 3904 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 0.547
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 011.20‐011.60 S 0.40 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.011
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 011.60‐011.70 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.397
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 011.70‐012.00 S 0.30 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Page 185 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 012.00‐012.20 S 0.20 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.433
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 012.20‐013.80 S 1.60 3904 Zilla Overlay 40mm @ Traff >=2000 2021 7.471 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 013.80‐014.30 S 0.50 3904 Zilla Overlay 40mm @ Traff >=2000 2021 2.330 0.547
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 014.30‐014.60 S 0.30 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 014.60‐014.70 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.580
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 015.00‐015.80 S 0.80 3904 Zilla Overlay 40mm @ Traff >=2000 2021 3.717 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 015.80‐015.90 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.514
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 015.90‐016.20 S 0.30 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 016.20‐017.40 S 1.20 3904 Zilla Overlay 40mm @ Traff >=2000 2021 5.603 0.454
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 017.40‐018.20 S 0.80 3904 Zilla Overlay 40mm @ Traff >=2000 2021 3.731 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 018.20‐018.30 S 0.10 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.487
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 018.30‐018.80 S 0.50 3904 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.035
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 018.80‐019.10 S 0.30 3904 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.449
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 019.10‐019.90 S 0.80 3904 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.073
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 019.90‐020.10 S 0.20 3904 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.303
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 020.10‐020.20 S 0.10 3904 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 020.20‐020.50 S 0.30 3904 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.394
Z5042 Sirajganj‐Raiganj (Chandaikona) Road Km 020.50‐021.43 S 0.94 3904 Zilla Overlay 40mm @ Traff >=2000 2021 4.366 0.021
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 000.10‐000.40 S 0.30 3368 Zilla Full Recon 75mm @ IRI>12 2021 4.825 0.413
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 000.40‐003.50 S 3.10 3368 Zilla Overlay 40mm @ Traff >=2000 2021 9.738 0.337
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 007.10‐009.40 S 2.30 3368 Zilla Overlay 40mm @ Traff >=2000 2021 7.225 0.537
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 009.40‐009.50 S 0.10 3368 Zilla Full Recon 75mm @ IRI>12 2021 1.608 0.610
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 019.30‐019.40 S 0.10 1708 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.099
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 019.40‐021.80 S 2.40 1708 Zilla Overlay 40mm @ 1000‐2000 2021 7.539 0.000
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 024.50‐024.70 S 0.20 1708 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 024.70‐025.20 S 0.50 1708 Zilla Overlay 40mm @ 1000‐2000 2021 1.571 0.182
Z5046 Ullahpara‐Purnimagati‐Taras Road Km 025.20‐025.30 S 0.10 1708 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.107
Z5047 Shahazadpur‐Kaizuri‐Chauhali Road Km 000.70‐000.90 S 0.20 4591 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.832
Z5047 Shahazadpur‐Kaizuri‐Chauhali Road Km 001.70‐001.80 S 0.10 4591 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.219
Z5047 Shahazadpur‐Kaizuri‐Chauhali Road Km 002.20‐002.40 S 0.20 4591 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.386
Z5047 Shahazadpur‐Kaizuri‐Chauhali Road Km 005.00‐005.70 S 0.70 4591 Zilla Overlay 50mm @ IRI 6‐9 2021 2.720 0.870
Z5048 Ullapara‐Lahiri Mohonpur‐Bhangura Road Km 021.10‐021.50 S 0.40 4283 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 1.753
Z5048 Ullapara‐Lahiri Mohonpur‐Bhangura Road Km 021.50‐021.67 S 0.17 4283 Zilla Overlay 50mm @ IRI 6‐9 2021 0.542 2.680
Z5058 Ullahpara‐Belkuchi Road Km 002.40‐002.90 S 0.50 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 2.399 1.411
Z5058 Ullahpara‐Belkuchi Road Km 002.90‐004.50 S 1.60 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 25.572 0.389
Z5058 Ullahpara‐Belkuchi Road Km 005.29‐005.59 S 0.30 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 1.446 2.171
Z5058 Ullahpara‐Belkuchi Road Km 005.59‐005.79 S 0.20 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.842
Z5058 Ullahpara‐Belkuchi Road Km 005.79‐005.89 S 0.10 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.509
Z5058 Ullahpara‐Belkuchi Road Km 006.59‐007.89 S 1.30 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 7.507 1.096
Z5058 Ullahpara‐Belkuchi Road Km 010.09‐010.19 S 0.10 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.103
Z5058 Ullahpara‐Belkuchi Road Km 010.19‐010.99 S 0.80 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 4.620 0.404
Z5058 Ullahpara‐Belkuchi Road Km 011.79‐012.39 S 0.60 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 0.445
Z5058 Ullahpara‐Belkuchi Road Km 012.39‐012.69 S 0.30 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 0.726
Page 186 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5058 Ullahpara‐Belkuchi Road Km 012.69‐013.69 S 1.00 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 5.775 0.649
Z5058 Ullahpara‐Belkuchi Road Km 013.69‐013.79 S 0.10 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.016
Z5058 Ullahpara‐Belkuchi Road Km 013.79‐013.99 S 0.20 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 0.424
Z5058 Ullahpara‐Belkuchi Road Km 013.99‐014.09 S 0.10 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.071
Z5058 Ullahpara‐Belkuchi Road Km 014.09‐014.29 S 0.20 4248 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 1.108
Z5058 Ullahpara‐Belkuchi Road Km 015.99‐016.31 S 0.32 4248 Zilla Rehab 75mm @ IRI 9‐12 2021 5.235 0.796
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 000.00‐000.20 S 0.20 2683 Zilla Overlay 40mm @ Traff >=2000 2021 0.543 0.163
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 000.20‐002.00 S 1.80 2683 Zilla Overlay 40mm @ Traff >=2000 2021 6.033 0.628
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 002.00‐003.70 S 1.70 2683 Zilla Overlay 40mm @ Traff >=2000 2021 5.282 0.431
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 003.70‐006.75 S 3.05 4080 Zilla Overlay 50mm @ IRI 6‐9 2021 11.717 1.827
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 006.75‐009.85 S 3.10 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 11.913 1.936
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 009.85‐010.35 S 0.50 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 1.922 2.868
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 010.35‐010.85 S 0.50 4123 Zilla Rehab 75mm @ IRI 9‐12 2021 5.477 1.300
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 010.85‐011.55 S 0.70 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 2.690 1.394
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 011.55‐013.35 S 1.80 4123 Zilla Rehab 75mm @ IRI 9‐12 2021 19.718 0.916
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 013.35‐013.55 S 0.20 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 1.597
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 013.55‐014.95 S 1.40 4123 Zilla Rehab 75mm @ IRI 9‐12 2021 15.336 1.114
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 014.95‐015.25 S 0.30 4123 Zilla Overlay 40mm @ Traff >=2000 2021 0.932 0.953
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 015.25‐015.35 S 0.10 4123 Zilla Rehab 75mm @ IRI 9‐12 2021 1.063 2.050
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 016.31‐016.61 S 0.30 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 1.153 2.093
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 016.61‐016.81 S 0.20 4123 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 1.240
Z5403 Kaliakandapara‐Kamarkhanda‐Ullahpara  Km 016.81‐017.21 S 0.40 4123 Zilla Overlay 50mm @ IRI 6‐9 2021 1.537 1.431
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 000.00‐000.30 S 0.30 4397 Zilla Overlay 50mm @ IRI 6‐9 2021 1.811 0.325
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 000.30‐003.60 S 3.30 4397 Zilla Overlay 40mm @ Traff >=2000 2021 15.405 0.805
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 003.60‐009.76 S 6.16 4397 Zilla Overlay 40mm @ Traff >=2000 2021 24.492 1.473
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 009.76‐010.86 S 1.10 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 12.050 0.714
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 011.00‐011.66 S 0.66 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 7.263 0.668
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 011.66‐012.96 S 1.30 4397 Zilla Overlay 40mm @ Traff >=2000 2021 4.040 0.827
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 012.96‐013.06 S 0.10 4397 Zilla Overlay 50mm @ IRI 6‐9 2021 0.384 0.590
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 013.06‐013.56 S 0.50 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 5.444 0.769
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 013.76‐013.86 S 0.11 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 1.183 1.039
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 013.86‐013.96 S 0.10 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 1.213
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 013.96‐014.26 S 0.30 4397 Zilla Overlay 50mm @ IRI 6‐9 2021 1.153 0.927
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 014.26‐015.26 S 1.00 4397 Zilla Rehab 75mm @ IRI 9‐12 2021 10.954 0.518
Z5406 Porabari‐Kamarkhanda (Jamtoil)‐Nalka Road Km 015.36‐016.82 S 1.46 4397 Zilla Overlay 50mm @ IRI 6‐9 2021 5.599 2.026
Z5408 Kadda‐Khamarkhand‐Belkuchi (Tamai) Road Km 004.90‐005.10 S 0.20 3818 Zilla Overlay 40mm @ Traff >=2000 2021 0.621 0.000
Z5408 Kadda‐Khamarkhand‐Belkuchi (Tamai) Road Km 005.10‐005.20 S 0.10 3818 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 0.803
Z5408 Kadda‐Khamarkhand‐Belkuchi (Tamai) Road Km 005.20‐005.90 S 0.70 3818 Zilla Overlay 40mm @ Traff >=2000 2021 2.175 0.034
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 000.00‐000.80 S 0.80 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 13.409 0.495
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 000.80‐001.10 S 0.30 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 1.764 0.574
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 001.10‐001.60 S 0.50 4898 Zilla Overlay 40mm @ Traff >=2000 2021 2.377 0.889
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 001.60‐002.10 S 0.50 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 2.934 1.065
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 002.10‐002.50 S 0.40 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 6.704 0.517
Page 187 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 002.50‐004.30 S 1.80 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 10.584 0.502
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 004.30‐004.70 S 0.40 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 2.352 1.353
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 004.70‐007.20 S 2.50 4898 Zilla Overlay 40mm @ Traff >=2000 2021 11.881 0.000
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 007.20‐007.40 S 0.20 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 0.497
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 007.40‐008.10 S 0.70 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 4.116 0.593
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 008.10‐008.80 S 0.70 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 11.733 0.482
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 008.80‐009.20 S 0.40 4898 Zilla Overlay 40mm @ Traff >=2000 2021 1.902 0.024
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 009.20‐009.40 S 0.20 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 0.620
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 009.40‐009.90 S 0.50 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 2.940 0.545
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 009.90‐010.80 S 0.90 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 5.220 1.231
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 010.80‐011.00 S 0.20 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 0.899
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 011.00‐012.40 S 1.40 4898 Zilla Overlay 40mm @ Traff >=2000 2021 6.537 1.161
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 012.40‐012.90 S 0.50 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 0.854
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 012.90‐013.00 S 0.10 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.976
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 013.00‐013.10 S 0.10 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 0.634
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 013.10‐013.20 S 0.10 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.392
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 013.20‐015.00 S 1.80 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 10.389 1.024
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 015.00‐015.10 S 0.10 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.405
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 015.10‐015.90 S 0.80 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 4.620 0.730
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 015.90‐016.70 S 0.80 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 4.620 1.476
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 016.70‐017.20 S 0.50 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 0.670
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 017.20‐017.30 S 0.10 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.395
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 017.30‐017.40 S 0.10 4898 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 017.40‐017.80 S 0.40 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.724
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 017.80‐018.50 S 0.70 4898 Zilla Overlay 40mm @ Traff >=2000 2021 3.264 0.000
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 018.90‐019.00 S 0.10 4898 Zilla Overlay 50mm @ IRI 6‐9 2021 0.578 1.354
Z5409 Saidabad‐Yunis Ali Medical College Hospital Road Km 019.00‐019.63 S 0.63 4898 Zilla Rehab 75mm @ IRI 9‐12 2021 9.485 1.223
Z5410 Enayetpur‐Shahazadpur Road Km 000.00‐001.10 S 1.10 4883 Zilla Overlay 50mm @ Cracking >25% 2021 4.227 0.342
Z5410 Enayetpur‐Shahazadpur Road Km 001.10‐001.80 S 0.70 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 7.668 0.827
Z5410 Enayetpur‐Shahazadpur Road Km 001.80‐003.00 S 1.20 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 4.608 0.508
Z5410 Enayetpur‐Shahazadpur Road Km 003.00‐003.20 S 0.20 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 1.230
Z5410 Enayetpur‐Shahazadpur Road Km 003.20‐003.50 S 0.30 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 1.153 0.589
Z5410 Enayetpur‐Shahazadpur Road Km 003.50‐003.90 S 0.40 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 4.382 0.660
Z5410 Enayetpur‐Shahazadpur Road Km 003.90‐005.30 S 1.40 4883 Zilla Overlay 40mm @ Traff >=2000 2021 4.445 0.262
Z5410 Enayetpur‐Shahazadpur Road Km 005.30‐006.60 S 1.30 4883 Zilla Overlay 40mm @ Traff >=2000 2021 4.036 1.189
Z5410 Enayetpur‐Shahazadpur Road Km 006.60‐007.10 S 0.50 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 1.922 0.872
Z5410 Enayetpur‐Shahazadpur Road Km 007.10‐008.90 S 1.80 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 6.917 1.359
Z5410 Enayetpur‐Shahazadpur Road Km 008.90‐009.30 S 0.40 4883 Zilla Overlay 50mm @ Cracking >25% 2021 1.537 0.396
Z5410 Enayetpur‐Shahazadpur Road Km 009.30‐010.70 S 1.40 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 15.325 0.711
Z5410 Enayetpur‐Shahazadpur Road Km 010.70‐010.90 S 0.20 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 0.761
Z5410 Enayetpur‐Shahazadpur Road Km 010.90‐011.50 S 0.60 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 6.573 0.682
Z5410 Enayetpur‐Shahazadpur Road Km 011.50‐011.60 S 0.10 4883 Zilla Overlay 50mm @ Cracking >25% 2021 0.384 0.156
Z5410 Enayetpur‐Shahazadpur Road Km 011.60‐012.50 S 0.90 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 3.459 1.188
Page 188 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5410 Enayetpur‐Shahazadpur Road Km 012.50‐012.70 S 0.20 4883 Zilla Overlay 50mm @ Cracking >25% 2021 0.769 0.115
Z5410 Enayetpur‐Shahazadpur Road Km 012.70‐012.90 S 0.20 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 0.974
Z5410 Enayetpur‐Shahazadpur Road Km 012.90‐013.00 S 0.10 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 0.384 0.221
Z5410 Enayetpur‐Shahazadpur Road Km 013.00‐013.40 S 0.40 4883 Zilla Rehab 75mm @ IRI 9‐12 2021 4.382 0.761
Z5410 Enayetpur‐Shahazadpur Road Km 013.40‐013.90 S 0.50 4883 Zilla Overlay 50mm @ IRI 6‐9 2021 2.368 0.523
Z5410 Enayetpur‐Shahazadpur Road Km 013.90‐014.00 S 0.10 5026 Zilla Overlay 40mm @ Traff >=2000 2021 0.614 0.343
Z5410 Enayetpur‐Shahazadpur Road Km 014.00‐015.00 S 1.00 5026 Zilla Overlay 50mm @ IRI 6‐9 2021 7.665 0.047
Z5410 Enayetpur‐Shahazadpur Road Km 015.00‐015.20 S 0.20 5026 Zilla Overlay 40mm @ Traff >=2000 2021 1.240 0.265
Z5410 Enayetpur‐Shahazadpur Road Km 015.20‐015.30 S 0.10 5026 Zilla Overlay 50mm @ Cracking >25% 2021 0.711 0.125
Z5410 Enayetpur‐Shahazadpur Road Km 015.30‐015.80 S 0.50 5026 Zilla Overlay 40mm @ Traff >=2000 2021 2.377 0.500
Z5410 Enayetpur‐Shahazadpur Road Km 015.80‐016.00 S 0.20 5026 Zilla Overlay 50mm @ Cracking >25% 2021 1.200 0.039
Z6032 Taras‐Hamkuria Road Km 000.00‐000.40 S 0.40 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.362 0.181
Z6032 Taras‐Hamkuria Road Km 000.40‐000.60 S 0.20 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.543 0.000
Z6032 Taras‐Hamkuria Road Km 000.60‐001.30 S 0.70 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.902 0.000
Z6032 Taras‐Hamkuria Road Km 001.30‐001.50 S 0.20 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.543 0.000
Z6032 Taras‐Hamkuria Road Km 001.50‐002.20 S 0.70 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.899 0.000
Z6032 Taras‐Hamkuria Road Km 002.20‐002.90 S 0.70 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.902 0.000
Z6032 Taras‐Hamkuria Road Km 002.90‐003.00 S 0.10 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 0.272 0.000
Z6032 Taras‐Hamkuria Road Km 003.00‐003.80 S 0.80 426 Zilla Overlay 40mm @ Traff 100‐1000 2021 2.173 0.000
Sirajganj Total 1816.431
Rajshahi Zone Total 7917.877

Rangpur Zone
Bogura Division
N510 Bogura Station Road Km 000.50‐001.00 L 0.50 23253 National Rehab 195mm @ IRI 9‐12 2021 22.134 2.791
N510 Bogura Station Road Km 000.50‐001.00 R 0.50 23253 National Rehab 195mm @ IRI 9‐12 2021 21.830 2.844
N510 Bogura Station Road Km 002.70‐002.70 L 0.00 23253 National Rehab 195mm @ IRI 9‐12 2021 0.044 2.468
N510 Bogura Station Road Km 002.70‐002.70 R 0.00 23253 National Rehab 195mm @ IRI 9‐12 2021 0.044 2.518
N510 Bogura Station Road Km 002.70‐002.78 S 0.08 23253 National DBST @ Traff >6000 2021 0.788 1.625
N514 Bogura (Banani)‐Matidali Road Km 000.00‐000.20 R 0.20 11344 National Overlay 80mm @ IRI 5‐9 2021 2.380 5.292
N514 Bogura (Banani)‐Matidali Road Km 000.20‐000.60 L 0.40 11617 National Rehab 195mm @ IRI 9‐12 2021 17.707 2.281
N514 Bogura (Banani)‐Matidali Road Km 000.20‐000.60 R 0.40 11344 National Rehab 195mm @ IRI 9‐12 2021 17.464 2.936
N515 Bogura 2nd Town By‐Pass Road Km 000.00‐009.04 S 9.04 9490 National Overlay 50mm @ IRI 5‐7 2021 72.424 12.809
N515 Bogura 2nd Town By‐Pass Road Km 009.04‐009.08 L 0.04 3927 National Overlay 50mm @ IRI 5‐9 2021 0.143 9.169
N515 Bogura 2nd Town By‐Pass Road Km 009.04‐009.08 R 0.04 3927 National DBST @ Traff 2000‐4000 2021 0.069 3.579
N515 Bogura 2nd Town By‐Pass Road Km 009.08‐010.42 S 1.34 9490 National Overlay 50mm @ IRI 5‐7 2021 10.286 13.499
N515 Bogura 2nd Town By‐Pass Road Km 010.42‐010.52 S 0.10 9490 National Full Recon 180mm 2021 5.109 4.311
N515 Bogura 2nd Town By‐Pass Road Km 010.52‐011.02 S 0.50 9490 National DBST @ 25% Crk 2021 1.803 10.630
N515 Bogura 2nd Town By‐Pass Road Km 011.02‐011.22 S 0.20 9490 National Full Recon 180mm 2021 10.219 4.552
N515 Bogura 2nd Town By‐Pass Road Km 011.22‐012.82 S 1.60 9490 National Overlay 50mm @ IRI 5‐7 2021 12.264 13.638
N515 Bogura 2nd Town By‐Pass Road Km 012.82‐012.92 S 0.10 9490 National Full Recon 180mm 2021 5.109 4.547
N515 Bogura 2nd Town By‐Pass Road Km 012.92‐013.12 S 0.20 9490 National Rehab 180mm @ IRI 9‐12 2021 8.413 4.990
N515 Bogura 2nd Town By‐Pass Road Km 013.12‐013.22 S 0.10 9490 National Full Recon 180mm 2021 5.109 4.376

Page 189 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 042.17‐042.81 S 0.64 4142 Regional Overlay 60mm @ IRI 7‐9 2021 4.383 7.239
R546 Railgate‐Shantahar Road Km 000.00‐000.80 S 0.80 11637 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.785 2.166
R546 Railgate‐Shantahar Road Km 000.80‐001.00 S 0.20 11637 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.151 4.765
R546 Railgate‐Shantahar Road Km 002.00‐002.20 S 0.20 11637 Regional Rehab 150mm @ IRI 9‐12 2021 5.023 1.401
R546 Railgate‐Shantahar Road Km 002.20‐003.20 S 1.00 11637 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.881 2.482
R546 Railgate‐Shantahar Road Km 003.20‐003.46 S 0.26 11637 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.796 4.281
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 003.20‐003.50 S 0.30 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.703
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 007.38‐007.58 S 0.20 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.844
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 012.00‐015.08 S 3.08 3765 Zilla Overlay 40mm @ Traff >=2000 2021 9.927 1.572
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 015.08‐015.28 S 0.20 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.231
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 015.58‐015.88 S 0.30 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.257
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 015.88‐016.08 S 0.20 3765 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.733
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 016.08‐016.48 S 0.40 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 1.011
Z5034 Sherpur‐Kaigari‐Nandigram Road Km 016.68‐016.87 S 0.19 3765 Zilla Rehab 75mm @ IRI 9‐12 2021 2.195 1.554
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 000.90‐001.40 S 0.50 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 1.513
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 001.40‐001.60 S 0.20 6912 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 1.272
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 001.60‐001.70 S 0.10 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.121
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 001.70‐001.90 S 0.20 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 2.024
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 001.90‐002.00 S 0.10 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 1.630 1.794
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 002.00‐003.60 S 1.60 6912 Zilla Overlay 50mm @ Cracking >25% 2021 9.240 1.988
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 003.60‐003.90 S 0.30 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.657
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 003.90‐004.20 S 0.30 6912 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 1.339
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 004.20‐004.60 S 0.40 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 1.494
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 004.60‐007.10 S 2.50 6912 Zilla Overlay 40mm @ Traff >=2000 2021 11.669 1.484
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 007.10‐007.20 S 0.10 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.820
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 007.20‐009.00 S 1.80 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 10.395 2.181
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 009.00‐009.40 S 0.40 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 2.310 2.611
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 009.40‐009.80 S 0.40 6912 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 1.343
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 009.80‐010.00 S 0.20 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 3.276 1.690
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 010.00‐010.30 S 0.30 6912 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 1.266
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 010.30‐010.70 S 0.40 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 1.603
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 010.70‐010.90 S 0.20 6912 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 1.428
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 010.90‐011.20 S 0.30 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 1.956
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 011.30‐011.50 S 0.20 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 3.812
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 011.50‐012.20 S 0.70 6912 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 1.391
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 012.20‐012.40 S 0.20 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.315
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 014.60‐014.70 S 0.10 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.080
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 014.70‐014.90 S 0.20 5086 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.106
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 015.10‐015.20 S 0.10 5086 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 015.20‐015.50 S 0.30 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.351
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 017.60‐017.90 S 0.30 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 1.733 2.610
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 017.90‐018.40 S 0.50 6912 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 3.225
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 018.80‐019.40 S 0.60 6912 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 1.491
Page 190 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 019.40‐019.50 S 0.10 6912 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 2.037
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 019.50‐020.56 S 1.07 5086 Zilla Overlay 50mm @ IRI 6‐9 2021 4.276 0.948
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 020.56‐020.86 S 0.30 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.282
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 020.86‐021.26 S 0.40 5086 Zilla Overlay 50mm @ IRI 6‐9 2021 1.596 1.160
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 021.26‐021.36 S 0.10 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.610
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 021.36‐022.16 S 0.80 5086 Zilla Overlay 50mm @ IRI 6‐9 2021 3.192 1.164
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 022.16‐022.36 S 0.20 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.132
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 022.36‐022.76 S 0.40 5086 Zilla Overlay 40mm @ Traff >=2000 2021 1.281 0.439
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 000.00‐004.80 S 4.80 5563 Zilla Overlay 50mm @ IRI 6‐9 2021 27.261 2.932
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 004.80‐005.00 S 0.20 5563 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.022
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 005.60‐005.90 S 0.30 5563 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 2.467
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 005.90‐006.50 S 0.60 5563 Zilla Overlay 50mm @ IRI 6‐9 2021 3.459 3.574
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 006.50‐006.70 S 0.20 5563 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.070
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 007.86‐007.96 S 0.10 5563 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 3.322
Z5040 Sultanganj‐Madla‐Bagbari‐Gabtali Road Km 007.96‐015.94 S 7.98 4616 Zilla Overlay 40mm @ Traff >=2000 2021 27.175 1.352
Z5049 Taras‐Raniraht‐Sherpur Road Km 023.69‐023.99 S 0.30 1206 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5049 Taras‐Raniraht‐Sherpur Road Km 023.99‐024.19 S 0.20 1206 Zilla Overlay 40mm @ 1000‐2000 2021 0.628 0.000
Z5049 Taras‐Raniraht‐Sherpur Road Km 024.79‐024.89 S 0.10 1206 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.026
Z5049 Taras‐Raniraht‐Sherpur Road Km 024.99‐025.39 S 0.40 1206 Zilla Overlay 40mm @ 1000‐2000 2021 1.257 0.000
Z5049 Taras‐Raniraht‐Sherpur Road Km 025.39‐025.75 S 0.36 1206 Zilla Overlay 40mm @ 1000‐2000 2021 1.118 0.000
Z5050 Bagbari‐Nanglu Road Km 000.00‐000.10 S 0.10 1251 Zilla Overlay 40mm @ 1000‐2000 2021 0.468 0.000
Z5050 Bagbari‐Nanglu Road Km 000.10‐000.60 S 0.50 1251 Zilla Overlay 40mm @ 1000‐2000 2021 2.335 0.000
Z5051 Baiguni‐Durgahata‐Poradah Road Km 000.00‐001.10 S 1.10 1534 Zilla Overlay 40mm @ 1000‐2000 2021 3.596 0.000
Z5051 Baiguni‐Durgahata‐Poradah Road Km 002.10‐003.00 S 0.90 1534 Zilla Overlay 40mm @ 1000‐2000 2021 2.827 0.000
Z5051 Baiguni‐Durgahata‐Poradah Road Km 003.40‐003.70 S 0.30 1534 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5051 Baiguni‐Durgahata‐Poradah Road Km 003.70‐005.20 S 1.50 1534 Zilla Overlay 40mm @ 1000‐2000 2021 4.712 0.000
Z5053 Kahalu Thana Connecting Road Km 000.00‐001.30 S 1.30 5132 Zilla Overlay 40mm @ Traff >=2000 2021 5.298 1.097
Z5053 Kahalu Thana Connecting Road Km 001.30‐001.60 S 0.30 5132 Zilla Overlay 50mm @ IRI 6‐9 2021 1.512 1.872
Z5053 Kahalu Thana Connecting Road Km 001.60‐003.90 S 2.30 5132 Zilla Overlay 50mm @ IRI 6‐9 2021 11.852 1.651
Z5053 Kahalu Thana Connecting Road Km 006.50‐006.80 S 0.30 5132 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.189
Z5053 Kahalu Thana Connecting Road Km 008.00‐008.20 S 0.20 5132 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.575
Z5053 Kahalu Thana Connecting Road Km 009.90‐010.20 S 0.30 5132 Zilla Rehab 75mm @ IRI 9‐12 2021 4.331 0.821
Z5053 Kahalu Thana Connecting Road Km 010.20‐010.40 S 0.20 5132 Zilla Overlay 50mm @ IRI 6‐9 2021 1.092 2.145
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 019.00‐022.50 S 3.50 902 Zilla Overlay 40mm @ Traff 100‐1000 2021 10.995 0.000
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 027.50‐030.50 S 3.00 2728 Zilla Overlay 40mm @ Traff >=2000 2021 9.424 0.108
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 030.50‐030.60 S 0.10 2728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.297
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 030.80‐031.20 S 0.40 2728 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.530
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 031.20‐032.50 S 1.30 2728 Zilla Overlay 40mm @ Traff >=2000 2021 4.084 0.000
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 032.50‐032.60 S 0.10 2728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.316
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 032.60‐033.80 S 1.20 2728 Zilla Overlay 40mm @ Traff >=2000 2021 3.984 0.174
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 036.30‐036.70 S 0.40 2728 Zilla Overlay 40mm @ Traff >=2000 2021 1.868 0.000
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 036.70‐037.20 S 0.50 2728 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.084
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 039.80‐040.10 S 0.30 2728 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.098
Page 191 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 040.10‐040.90 S 0.80 2728 Zilla Overlay 40mm @ Traff >=2000 2021 3.736 0.062
Z5072 Dhunot‐Baliadighi‐Poradah‐Mokamtala Road Km 051.10‐051.20 S 0.10 2728 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z5207 Nandigram (Katham)‐Kaliganj‐Raninagar Road Km 008.00‐009.92 S 1.92 326 Zilla Overlay 40mm @ Traff 100‐1000 2021 6.419 0.000
Z5207 Nandigram (Katham)‐Kaliganj‐Raninagar Road Km 013.08‐014.25 S 1.17 326 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.867 0.170
Z5467 Raikali‐Tilokpur Road Km 000.00‐006.40 S 6.40 1941 Zilla Overlay 40mm @ 1000‐2000 2021 21.245 0.000
Z5467 Raikali‐Tilokpur Road Km 006.40‐007.99 S 1.59 1941 Zilla Overlay 40mm @ 1000‐2000 2021 5.302 0.000
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 000.00‐001.10 S 1.10 3587 Zilla Overlay 40mm @ Cracks >25% 2021 3.485 0.047
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 001.10‐001.20 S 0.10 3587 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.714
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 001.20‐001.40 S 0.20 3587 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.000
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 001.40‐001.50 S 0.10 3587 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.869
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 001.50‐008.30 S 6.80 3587 Zilla Overlay 40mm @ Cracks >25% 2021 21.152 0.209
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 008.30‐008.50 S 0.20 3587 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.387
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 008.50‐010.97 S 2.47 3587 Zilla Overlay 40mm @ Traff >=2000 2021 7.969 0.029
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 010.97‐011.17 S 0.20 3587 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.512
Z5471 Kahalu‐Choumohoni‐Adamdighi Road Km 013.07‐016.17 S 3.10 3587 Zilla Overlay 40mm @ Cracks >25% 2021 9.072 0.147
Z5472 Adamdighi‐Santahar Sailo‐Raninagar Road Km 000.00‐003.20 S 3.20 2465 Zilla Overlay 40mm @ Traff >=2000 2021 10.049 0.096
Z5472 Adamdighi‐Santahar Sailo‐Raninagar Road Km 003.20‐004.20 S 1.00 2465 Zilla Overlay 40mm @ Traff >=2000 2021 3.141 0.068
Z5472 Adamdighi‐Santahar Sailo‐Raninagar Road Km 004.20‐004.30 S 0.10 2465 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 0.715
Z5472 Adamdighi‐Santahar Sailo‐Raninagar Road Km 004.30‐012.21 S 7.91 2465 Zilla Overlay 40mm @ Traff >=2000 2021 26.396 0.019
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 000.00‐002.80 S 2.80 8152 Zilla Overlay 50mm @ IRI 6‐9 2021 16.194 6.790
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 003.00‐003.30 S 0.30 8152 Zilla Overlay 50mm @ IRI 6‐9 2021 1.727 5.318
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 003.30‐003.60 S 0.30 8152 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 3.253
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 005.00‐005.40 S 0.40 8152 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 4.125
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 005.40‐005.90 S 0.50 8152 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 4.582
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 006.00‐007.70 S 1.70 8152 Zilla Overlay 50mm @ IRI 6‐9 2021 9.806 7.265
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 009.20‐009.34 S 0.14 8152 Zilla Rehab 75mm @ IRI 9‐12 2021 2.338 4.741
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 009.34‐009.41 L 0.07 8152 Zilla Rehab 75mm @ IRI 9‐12 2021 2.442 1.186
Z5505 Mahastangarh‐Shibganj‐Amtoli Road Km 009.34‐009.41 R 0.07 8152 Zilla Rehab 75mm @ IRI 9‐12 2021 3.663 0.367
Bogura Total 726.789
Dinajpur Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 372.57‐372.87 S 0.30 6536 National Overlay 60mm @ IRI 7‐9 2021 2.682 10.224
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 372.87‐372.97 S 0.10 6536 National Full Recon 180mm 2021 4.969 3.662
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 372.97‐373.47 S 0.50 6536 National Overlay 60mm @ IRI 7‐9 2021 4.441 10.601
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 373.47‐373.67 S 0.20 6536 National Full Recon 180mm 2021 9.889 3.578
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 373.67‐374.07 S 0.40 6536 National Overlay 50mm @ IRI 4‐7 2021 2.982 9.174
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 374.07‐374.17 S 0.10 6536 National Full Recon 180mm 2021 4.969 3.662
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 374.17‐375.47 S 1.30 6536 National DBST @ 25% Crk 2021 4.560 7.936
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 375.47‐375.67 S 0.20 6536 National Full Recon 180mm 2021 9.939 3.632
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 375.67‐376.37 S 0.70 6536 National Overlay 50mm @ IRI 4‐7 2021 4.873 10.451
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 376.37‐377.07 S 0.70 6536 National Rehab 180mm @ IRI 9‐12 2021 28.400 4.546
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 377.07‐377.27 S 0.20 6536 National Overlay 50mm @ IRI 4‐7 2021 1.260 12.425
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 377.27‐377.57 S 0.30 6536 National Rehab 180mm @ IRI 9‐12 2021 12.131 4.668
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 377.57‐377.64 S 0.07 6536 National Overlay 50mm @ IRI 4‐7 2021 0.428 13.750
Page 192 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 377.64‐377.94 S 0.30 6536 National Rehab 180mm @ IRI 9‐12 2021 12.172 4.773
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 377.94‐378.54 S 0.60 6536 National Overlay 60mm @ IRI 7‐9 2021 4.504 12.624
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 378.54‐378.84 S 0.30 6536 National Rehab 180mm @ IRI 9‐12 2021 12.172 4.529
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 378.84‐379.04 S 0.20 6536 National Overlay 60mm @ IRI 7‐9 2021 1.501 13.538
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 379.04‐379.14 S 0.10 6536 National Full Recon 180mm 2021 4.199 4.715
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 379.14‐393.31 S 14.17 6536 National Overlay 50mm @ IRI 4‐7 2021 90.332 11.910
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 393.31‐393.51 S 0.20 6536 National Overlay 60mm @ IRI 7‐9 2021 1.526 13.394
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 393.51‐394.21 S 0.70 6536 National Overlay 50mm @ IRI 4‐7 2021 4.484 11.668
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 394.21‐394.31 S 0.10 6536 National Rehab 180mm @ IRI 9‐12 2021 4.125 4.850
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 396.71‐397.01 S 0.30 6536 National Rehab 180mm @ IRI 9‐12 2021 11.969 4.897
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 397.01‐397.61 S 0.60 6536 National Overlay 50mm @ IRI 4‐7 2021 3.717 12.634
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 397.61‐397.71 S 0.10 6536 National Rehab 180mm @ IRI 9‐12 2021 3.990 5.363
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 399.51‐399.81 S 0.30 6536 National Overlay 60mm @ IRI 7‐9 2021 2.214 13.373
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 402.21‐402.37 S 0.16 6536 National Rehab 180mm @ IRI 9‐12 2021 6.304 5.015
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 403.07‐403.17 S 0.10 6536 National Rehab 180mm @ IRI 9‐12 2021 3.990 5.285
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 403.17‐406.43 S 3.27 6536 National Overlay 50mm @ IRI 4‐7 2021 20.336 12.100
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 044.50‐044.80 S 0.30 3669 Regional Overlay 50mm @ IRI 7‐9 2021 1.455 3.447
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 044.80‐045.20 S 0.40 3669 Regional DBST @ 25% Crk 2021 1.087 1.615
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 063.41‐063.51 S 0.10 3669 Regional Rehab 135mm @ IRI 9‐12 2021 1.811 2.243
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 063.51‐065.81 S 2.30 3669 Regional Overlay 50mm @ IRI 5‐7 2021 12.486 3.897
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 065.81‐066.01 S 0.20 3669 Regional Overlay 50mm @ IRI 7‐9 2021 1.176 3.075
R557 Madhypara‐Badarganj Road Km 003.63‐012.94 S 9.31 2593 Regional DBST @ 25% Crk 2021 25.349 0.400
R558 Maheshpur at R556 to Barapukuria Road Km 005.00‐005.08 S 0.08 2649 Regional Overlay 50mm @ IRI 7‐9 2021 0.476 4.176
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 000.00‐000.20 S 0.20 22734 Regional Rehab 150mm @ IRI 9‐12 2021 7.757 5.383
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 000.20‐000.50 S 0.30 22734 Regional DBST @ Traff >6000 2021 1.008 14.764
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 000.50‐000.60 S 0.10 22734 Regional Full Recon 150mm @ IRI 12 2021 4.126 6.320
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 000.60‐001.10 S 0.50 22734 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.253 16.077
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 001.10‐001.20 S 0.10 22734 Regional Full Recon 150mm @ IRI 12 2021 4.126 6.550
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 001.20‐001.80 S 0.60 22734 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.104 16.347
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 001.80‐002.00 S 0.20 22734 Regional Full Recon 150mm @ IRI 12 2021 8.211 5.946
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 002.00‐002.10 S 0.10 22734 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.851 17.245
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 002.10‐002.30 S 0.20 22734 Regional Rehab 150mm @ IRI 9‐12 2021 6.569 6.792
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 002.30‐002.90 S 0.60 22734 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.584 14.163
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 002.90‐003.00 S 0.10 22734 Regional Rehab 150mm @ IRI 9‐12 2021 3.284 7.415
R586 Fulbari Bus Stand‐Dinajpur Govt. College  Km 003.00‐003.27 S 0.27 22734 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.271 16.795
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 000.00‐000.70 S 0.70 17114 Zilla Overlay 50mm @ IRI 6‐9 2021 4.043 3.504
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 000.70‐000.90 S 0.20 17114 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.447
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 000.90‐002.70 S 1.80 17114 Zilla Overlay 50mm @ IRI 6‐9 2021 10.408 3.373
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 002.70‐002.90 S 0.20 17114 Zilla Full Recon 75mm @ IRI>12 2021 4.782 2.426
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 002.90‐003.30 S 0.40 17114 Zilla Overlay 50mm @ Cracking >25% 2021 2.310 2.901
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 003.30‐003.40 S 0.10 17114 Zilla Full Recon 75mm @ IRI>12 2021 2.391 3.050
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 003.40‐003.90 S 0.50 17114 Zilla Overlay 50mm @ Cracking >25% 2021 2.888 2.746
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 003.90‐004.10 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.538
Page 193 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 004.10‐004.70 S 0.60 17114 Zilla Overlay 50mm @ Cracking >25% 2021 3.465 2.642
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 004.70‐005.00 S 0.30 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 2.877
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 005.00‐005.60 S 0.60 17114 Zilla Overlay 50mm @ Cracking >25% 2021 3.465 3.354
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 005.60‐005.80 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.636
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 005.80‐007.94 S 2.14 17114 Zilla Overlay 50mm @ Cracking >25% 2021 12.347 3.079
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 007.94‐008.14 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.673
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 008.14‐011.34 S 3.20 17114 Zilla Overlay 40mm @ Traff >=2000 2021 14.942 2.028
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 011.34‐011.64 S 0.30 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 3.135
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 013.14‐013.34 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 2.936
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 013.34‐014.04 S 0.70 17114 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 2.342
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 014.04‐014.44 S 0.40 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 2.957
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 014.44‐014.64 S 0.20 17114 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 3.588
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 014.64‐014.74 S 0.10 17114 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.875
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 014.74‐017.74 S 3.00 17114 Zilla Overlay 40mm @ Traff >=2000 2021 14.009 2.192
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 017.74‐018.17 S 0.43 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 7.128 3.233
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 018.17‐018.77 S 0.60 17114 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 2.356
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 018.77‐018.97 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.081
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 018.97‐019.57 S 0.60 17114 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 1.849
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 019.57‐019.67 S 0.10 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 4.181
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 019.67‐019.97 S 0.30 17114 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 1.726
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 019.97‐020.07 S 0.10 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 4.320
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 020.07‐023.87 S 3.80 17114 Zilla Overlay 50mm @ Cracking >25% 2021 21.945 2.813
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 023.87‐024.07 S 0.20 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 3.523
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 024.07‐024.47 S 0.40 17114 Zilla Overlay 50mm @ Cracking >25% 2021 2.310 2.430
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 024.47‐024.57 S 0.10 17114 Zilla Full Recon 75mm @ IRI>12 2021 2.391 2.928
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 024.57‐025.17 S 0.60 17114 Zilla Overlay 50mm @ IRI 6‐9 2021 3.465 3.622
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 025.17‐025.67 S 0.50 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 8.231 2.770
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 025.67‐027.07 S 1.40 17114 Zilla Overlay 40mm @ Traff >=2000 2021 6.537 2.066
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 027.07‐027.37 S 0.30 17114 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 3.075
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 027.37‐030.37 S 3.00 5704 Zilla Overlay 50mm @ Cracking >25% 2021 12.128 0.532
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 030.37‐030.67 S 0.30 5704 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 1.740
Z5006 Dinajpur‐Bochaganj‐Bakultala Road Km 030.67‐034.44 S 3.77 5704 Zilla Overlay 50mm @ Cracking >25% 2021 15.042 1.334
Z5011 Sayedpur‐Parbatipur Road Km 011.39‐011.49 S 0.10 5320 Zilla Rehab 75mm @ IRI 9‐12 2021 2.335 1.072
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 037.45‐038.60 S 1.15 3288 Zilla Overlay 40mm @ Traff >=2000 2021 3.119 1.690
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 038.60‐038.70 S 0.10 3288 Zilla Rehab 75mm @ IRI 9‐12 2021 0.958 2.391
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 038.70‐043.10 S 4.40 3288 Zilla Overlay 40mm @ Traff >=2000 2021 11.954 1.934
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 043.10‐044.15 S 1.05 3288 Zilla Rehab 75mm @ IRI 9‐12 2021 11.376 1.056
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 000.00‐000.40 S 0.40 1322 Zilla Overlay 40mm @ 1000‐2000 2021 1.335 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 000.40‐001.00 S 0.60 1322 Zilla Overlay 40mm @ 1000‐2000 2021 1.936 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 001.00‐001.50 S 0.50 1322 Zilla Overlay 40mm @ 1000‐2000 2021 1.626 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 001.50‐001.60 S 0.10 1322 Zilla Overlay 40mm @ 1000‐2000 2021 0.340 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 001.60‐001.90 S 0.30 1322 Zilla Overlay 40mm @ 1000‐2000 2021 1.019 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 009.56‐009.66 S 0.10 1322 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.086
Page 194 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 009.66‐011.06 S 1.40 1322 Zilla Overlay 40mm @ 1000‐2000 2021 4.517 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 011.06‐011.26 S 0.20 1322 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 011.26‐012.26 S 1.00 1322 Zilla Overlay 40mm @ 1000‐2000 2021 3.226 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 012.26‐012.46 S 0.20 1322 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.046
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 012.46‐013.16 S 0.70 1322 Zilla Overlay 40mm @ 1000‐2000 2021 2.258 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 013.16‐013.26 S 0.10 1322 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.085
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 013.26‐016.56 S 3.30 1322 Zilla Overlay 40mm @ 1000‐2000 2021 11.487 0.000
Z5561 Madhayapara‐Aftabganj‐Nawabganj Road Km 016.56‐017.35 S 0.79 1322 Zilla Overlay 40mm @ 1000‐2000 2021 3.904 0.000
Z5801 Kholahati Cantonment Road Km 000.00‐000.30 S 0.30 2292 Zilla Overlay 40mm @ Traff >=2000 2021 2.338 0.000
Z5802 Dinajpur‐Khanpur Road Km 000.00‐000.50 S 0.50 6823 Zilla Overlay 50mm @ IRI 6‐9 2021 4.988 0.169
Z5802 Dinajpur‐Khanpur Road Km 000.50‐000.60 S 0.10 6823 Zilla Overlay 40mm @ Traff >=2000 2021 0.807 0.130
Z5802 Dinajpur‐Khanpur Road Km 000.60‐010.00 S 9.40 6823 Zilla Overlay 40mm @ Traff >=2000 2021 45.161 0.000
Z5802 Dinajpur‐Khanpur Road Km 010.00‐010.50 S 0.50 5912 Zilla Overlay 50mm @ IRI 6‐9 2021 1.838 1.130
Z5802 Dinajpur‐Khanpur Road Km 010.50‐013.24 S 2.74 5912 Zilla Overlay 40mm @ Traff >=2000 2021 9.079 0.000
Z5803 Dinajpur‐Birol Road Km 010.00‐010.23 S 0.24 5923 Zilla Rehab 75mm @ IRI 9‐12 2021 2.472 1.712
Z5851 Birampur‐Nawabganj‐Bhaduria Road Km 006.20‐006.40 S 0.20 5819 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.104
Z5851 Birampur‐Nawabganj‐Bhaduria Road Km 007.30‐007.50 S 0.20 5819 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.404
Z5851 Birampur‐Nawabganj‐Bhaduria Road Km 007.50‐008.40 S 0.90 5819 Zilla Overlay 50mm @ Cracking >25% 2021 3.308 0.052
Z5851 Birampur‐Nawabganj‐Bhaduria Road Km 008.40‐008.60 S 0.20 5819 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.228
Z5854 Birampur (Bijon)‐Hakimpur Road Km 000.00‐000.20 S 0.20 5123 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 3.048
Z5854 Birampur (Bijon)‐Hakimpur Road Km 002.80‐002.90 S 0.10 5123 Zilla Full Recon 75mm @ IRI>12 2021 2.347 2.174
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 016.97‐017.67 S 0.70 3728 Zilla Overlay 40mm @ Traff >=2000 2021 2.026 0.467
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 017.97‐018.07 S 0.10 3728 Zilla Overlay 40mm @ Traff >=2000 2021 0.289 0.000
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 018.07‐018.17 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.018 1.507
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 018.17‐018.27 S 0.10 3728 Zilla Overlay 40mm @ Cracks >25% 2021 0.268 0.260
Z5857 Fulbari‐Parbatipur Road Km 000.00‐003.50 S 3.50 5746 Zilla Overlay 50mm @ IRI 6‐9 2021 20.170 3.133
Z5857 Fulbari‐Parbatipur Road Km 003.50‐004.00 S 0.50 5746 Zilla Rehab 75mm @ IRI 9‐12 2021 8.081 2.389
Z5857 Fulbari‐Parbatipur Road Km 004.00‐004.30 S 0.30 5746 Zilla Overlay 50mm @ IRI 6‐9 2021 1.701 3.850
Z5857 Fulbari‐Parbatipur Road Km 004.30‐004.40 S 0.10 5746 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 3.150
Z5857 Fulbari‐Parbatipur Road Km 004.40‐005.40 S 1.00 5746 Zilla Overlay 50mm @ IRI 6‐9 2021 5.670 3.718
Z5857 Fulbari‐Parbatipur Road Km 005.40‐005.60 S 0.20 5746 Zilla Rehab 75mm @ IRI 9‐12 2021 3.232 2.651
Z5857 Fulbari‐Parbatipur Road Km 005.60‐006.00 S 0.40 5746 Zilla Overlay 50mm @ IRI 6‐9 2021 2.262 3.599
Z5857 Fulbari‐Parbatipur Road Km 006.00‐006.10 S 0.10 5746 Zilla Full Recon 75mm @ IRI>12 2021 2.473 1.840
Z5857 Fulbari‐Parbatipur Road Km 006.10‐021.73 S 15.63 5746 Zilla Overlay 40mm @ Traff >=2000 2021 107.234 0.022
Z5858 Phulbari Parbatipur Link Road (Habra Bazar Road) Km 000.00‐000.30 S 0.30 5746 Zilla Full Recon 75mm @ IRI>12 2021 7.173 1.856
Dinajpur Total 908.496
Gaibanda Division
R559 Gaibandha‐Balashighat Road Km 000.00‐003.10 S 3.10 3168 Regional Overlay 50mm @ IRI 5‐7 2021 15.912 1.993
R559 Gaibandha‐Balashighat Road Km 003.10‐004.70 S 1.60 3168 Regional Overlay 50mm @ IRI 5‐7 2021 5.880 2.302
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 000.10‐000.40 S 0.30 5161 Zilla Rehab 75mm @ IRI 9‐12 2021 3.771 1.831
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 000.50‐000.60 S 0.10 5161 Zilla Rehab 75mm @ IRI 9‐12 2021 1.257 2.545
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 002.40‐002.80 S 0.40 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 4.070 1.060
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 002.80‐005.70 S 2.90 5081 Zilla Overlay 40mm @ Traff >=2000 2021 8.617 0.175
Page 195 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 005.70‐006.00 S 0.30 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 3.043 1.166
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 007.30‐007.40 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 1.920
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 009.00‐009.20 S 0.20 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 2.335 0.822
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 009.50‐009.60 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.776
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 010.29‐010.49 S 0.20 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 2.335 1.265
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 012.39‐012.49 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.649
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 013.49‐013.89 S 0.40 5081 Zilla Overlay 50mm @ IRI 6‐9 2021 1.638 1.038
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 015.29‐015.39 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.919
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 016.69‐016.79 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.830
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 016.79‐016.80 S 0.01 5081 Zilla Overlay 40mm @ Traff >=2000 2021 0.050 0.000
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 016.80‐017.50 S 0.70 5081 Zilla Overlay 50mm @ IRI 6‐9 2021 2.867 1.583
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 018.57‐018.67 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.950
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 018.67‐018.87 S 0.20 5081 Zilla Overlay 50mm @ IRI 6‐9 2021 0.819 1.137
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 018.87‐018.97 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.167 1.903
Z5552 Gaibandha‐Varathkhali‐Saghata Road Km 027.27‐027.37 S 0.10 5081 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.947
Z5553 Gaibandha‐Sadullahpur Road Km 003.10‐009.50 S 6.40 2543 Zilla Overlay 40mm @ Traff >=2000 2021 21.025 0.107
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 000.00‐009.40 S 9.40 4066 Zilla Overlay 40mm @ Traff >=2000 2021 33.678 0.000
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 009.40‐009.50 S 0.10 4066 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.065
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 009.50‐019.10 S 9.60 4066 Zilla Overlay 40mm @ Traff >=2000 2021 31.135 0.000
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 019.10‐019.20 S 0.10 4066 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 0.751
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 019.20‐019.30 S 0.10 4066 Zilla Overlay 40mm @ Traff >=2000 2021 0.340 0.000
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 019.30‐019.80 S 0.50 4066 Zilla Overlay 40mm @ Traff >=2000 2021 1.562 0.847
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 021.90‐022.20 S 0.30 4066 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 0.732
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 022.20‐023.60 S 1.40 4066 Zilla Overlay 50mm @ IRI 6‐9 2021 5.586 0.281
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 023.60‐024.10 S 0.50 4066 Zilla Overlay 50mm @ IRI 6‐9 2021 1.995 0.701
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 024.10‐025.70 S 1.60 4066 Zilla Overlay 40mm @ Traff >=2000 2021 5.678 0.000
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 025.70‐026.00 S 0.30 4066 Zilla Overlay 50mm @ IRI 6‐9 2021 1.638 0.498
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 026.00‐027.80 S 1.80 4066 Zilla Overlay 40mm @ Traff >=2000 2021 7.947 0.000
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 027.80‐028.00 S 0.20 4066 Zilla Overlay 40mm @ Traff >=2000 2021 0.883 0.435
Z5554 Gaibandha‐Nakaihat‐Gobindaganj Road Km 028.00‐029.46 S 1.46 4066 Zilla Overlay 50mm @ IRI 6‐9 2021 19.990 0.067
Z5558 Gaibandha City By‐Pass Road Km 000.00‐001.95 S 1.95 308 Zilla Overlay 40mm @ Traff 100‐1000 2021 5.253 0.000
Z5559 Balashighat‐Sayedpur Road Km 000.00‐001.20 S 1.20 494 Zilla Overlay 40mm @ Traff 100‐1000 2021 3.128 0.034
Z5613 Gaibandah‐Pirgachha Road Km 003.40‐003.50 S 0.10 5615 Zilla Rehab 75mm @ IRI 9‐12 2021 1.706 0.906
Z5613 Gaibandah‐Pirgachha Road Km 019.40‐019.91 S 0.51 5615 Zilla Overlay 50mm @ IRI 6‐9 2021 3.030 0.769
Z5852 Palashbari‐Ghoraghat Road Km 000.70‐009.04 S 8.34 2703 Zilla Overlay 40mm @ Traff >=2000 2021 28.889 0.404
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 018.67‐019.13 S 0.46 2861 Zilla Overlay 40mm @ Traff >=2000 2021 1.478 0.000
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 019.13‐019.43 S 0.30 2861 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.534
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 019.43‐020.53 S 1.10 2861 Zilla Overlay 40mm @ Traff >=2000 2021 3.549 0.063
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 020.53‐020.63 S 0.10 2861 Zilla Rehab 75mm @ IRI 9‐12 2021 1.146 0.512
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 020.63‐021.43 S 0.80 2861 Zilla Overlay 40mm @ Traff >=2000 2021 2.649 0.040
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 021.43‐021.73 S 0.30 2861 Zilla Overlay 40mm @ Traff >=2000 2021 0.993 0.489
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 021.73‐023.83 S 2.10 2861 Zilla Overlay 40mm @ Traff >=2000 2021 6.953 0.081
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 023.83‐024.13 S 0.30 2861 Zilla Overlay 40mm @ Traff >=2000 2021 0.993 0.449
Page 196 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 024.13‐028.33 S 4.20 2861 Zilla Overlay 40mm @ Traff >=2000 2021 13.907 0.086
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 028.33‐030.07 S 1.74 2861 Zilla Overlay 40mm @ Traff >=2000 2021 6.700 0.008
Gaibanda Total 278.141
Joypurhat Division
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 111.61‐116.49 S 4.88 3684 Regional DBST @ Traff 2000‐4000 2021 13.267 3.465
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 116.49‐116.59 S 0.10 3684 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 2.022
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 116.59‐117.19 S 0.60 3684 Regional Overlay 50mm @ IRI 5‐7 2021 3.465 4.498
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 117.19‐117.69 S 0.50 3684 Regional DBST @ Traff 2000‐4000 2021 1.359 3.632
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 117.69‐119.39 S 1.70 3684 Regional DBST @ Traff 2000‐4000 2021 4.619 3.374
R545 Bogura‐Naogaon‐Dhamoirhat‐Joypurhat Km 119.39‐119.69 S 0.30 3684 Regional Rehab 135mm @ IRI 9‐12 2021 7.471 1.626
R549 Badalgachhi‐Joypurhat Road Km 014.18‐014.50 S 0.32 2017 Regional DBST @ Traff 2000‐4000 2021 0.814 1.236
R549 Badalgachhi‐Joypurhat Road Km 014.50‐014.60 S 0.10 2017 Regional DBST @ 25% Crk 2021 0.257 0.931
R549 Badalgachhi‐Joypurhat Road Km 014.60‐014.70 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.257 0.331
R549 Badalgachhi‐Joypurhat Road Km 014.70‐016.70 S 2.00 2017 Regional DBST @ 25% Crk 2021 5.335 0.420
R549 Badalgachhi‐Joypurhat Road Km 016.70‐016.90 S 0.20 2017 Regional DBST @ Traff 2000‐4000 2021 0.543 0.132
R549 Badalgachhi‐Joypurhat Road Km 016.90‐017.00 S 0.10 2017 Regional DBST @ 25% Crk 2021 0.272 0.694
R549 Badalgachhi‐Joypurhat Road Km 017.00‐017.10 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.272 0.299
R549 Badalgachhi‐Joypurhat Road Km 017.10‐017.30 S 0.20 2017 Regional DBST @ 25% Crk 2021 0.543 0.558
R549 Badalgachhi‐Joypurhat Road Km 017.30‐017.40 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.272 0.248
R549 Badalgachhi‐Joypurhat Road Km 017.40‐018.30 S 0.90 2017 Regional DBST @ 25% Crk 2021 2.445 0.547
R549 Badalgachhi‐Joypurhat Road Km 018.30‐018.70 S 0.40 2017 Regional DBST @ Traff 2000‐4000 2021 1.087 1.037
R549 Badalgachhi‐Joypurhat Road Km 018.70‐019.40 S 0.70 2017 Regional DBST @ 25% Crk 2021 1.902 0.456
R549 Badalgachhi‐Joypurhat Road Km 019.40‐019.50 S 0.10 2017 Regional DBST @ Traff 2000‐4000 2021 0.272 0.162
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 022.76‐023.66 S 0.90 5086 Zilla Overlay 40mm @ Traff >=2000 2021 2.860 0.449
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 023.66‐023.86 S 0.20 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.290
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 023.86‐025.96 S 2.10 5086 Zilla Overlay 50mm @ Cracking >25% 2021 8.158 0.357
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 025.96‐026.26 S 0.30 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 3.322 1.128
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 026.26‐028.46 S 2.20 5086 Zilla Overlay 50mm @ Cracking >25% 2021 8.547 0.586
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 028.46‐028.96 S 0.50 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 1.306
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 028.96‐029.26 S 0.30 5086 Zilla Overlay 50mm @ IRI 6‐9 2021 1.166 1.309
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 029.26‐029.36 S 0.10 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.997
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 029.36‐030.26 S 0.90 5086 Zilla Overlay 50mm @ Cracking >25% 2021 3.497 0.997
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 030.26‐030.36 S 0.10 5086 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 2.373
Z5039 Bogura (Jhapgari)‐Khetlal Road Km 030.36‐030.65 S 0.29 5086 Zilla Overlay 40mm @ Traff >=2000 2021 0.902 0.206
Z5501 Joypurhat‐Khetlal Road Km 000.00‐000.20 S 0.20 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 0.004
Z5501 Joypurhat‐Khetlal Road Km 000.20‐001.70 S 1.50 2218 Zilla Overlay 40mm @ Traff >=2000 2021 7.004 0.000
Z5501 Joypurhat‐Khetlal Road Km 001.70‐001.80 S 0.10 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.346
Z5501 Joypurhat‐Khetlal Road Km 001.80‐002.30 S 0.50 2218 Zilla Overlay 40mm @ Traff >=2000 2021 2.330 0.000
Z5501 Joypurhat‐Khetlal Road Km 002.30‐002.50 S 0.20 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.272
Z5501 Joypurhat‐Khetlal Road Km 002.50‐005.00 S 2.50 2218 Zilla Overlay 40mm @ Traff >=2000 2021 11.674 0.000
Z5501 Joypurhat‐Khetlal Road Km 005.00‐005.10 S 0.10 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.418
Z5501 Joypurhat‐Khetlal Road Km 005.10‐005.70 S 0.60 2218 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.000
Z5501 Joypurhat‐Khetlal Road Km 005.70‐005.90 S 0.20 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.327
Page 197 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5501 Joypurhat‐Khetlal Road Km 005.90‐006.71 S 0.81 2218 Zilla Overlay 40mm @ Traff >=2000 2021 3.806 0.000
Z5501 Joypurhat‐Khetlal Road Km 006.71‐006.81 S 0.10 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.423
Z5501 Joypurhat‐Khetlal Road Km 006.81‐007.01 S 0.20 2218 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z5501 Joypurhat‐Khetlal Road Km 007.01‐007.21 S 0.20 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.294
Z5501 Joypurhat‐Khetlal Road Km 007.21‐010.61 S 3.40 2218 Zilla Overlay 40mm @ Traff >=2000 2021 12.066 0.000
Z5501 Joypurhat‐Khetlal Road Km 010.61‐010.81 S 0.20 2218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.131
Z5501 Joypurhat‐Khetlal Road Km 010.81‐012.47 S 1.65 2218 Zilla Overlay 40mm @ Traff >=2000 2021 7.714 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 000.00‐000.20 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.951 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 000.20‐000.80 S 0.60 1804 Zilla Overlay 40mm @ 1000‐2000 2021 2.853 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 000.80‐000.90 S 0.10 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.475 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 002.10‐002.30 S 0.20 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.070
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 002.30‐003.20 S 0.90 1804 Zilla Overlay 40mm @ 1000‐2000 2021 2.904 0.190
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 003.20‐003.30 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.240
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 003.30‐005.10 S 1.80 1804 Zilla Overlay 40mm @ 1000‐2000 2021 5.807 0.144
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 005.10‐005.30 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 005.30‐005.70 S 0.40 1804 Zilla Overlay 40mm @ 1000‐2000 2021 1.290 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 005.70‐005.80 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.199
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 005.80‐006.50 S 0.70 1804 Zilla Overlay 40mm @ 1000‐2000 2021 2.255 0.124
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 006.50‐006.80 S 0.30 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 006.80‐006.90 S 0.10 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.390
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 006.90‐007.00 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.116
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 007.00‐007.20 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 007.20‐007.30 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.213
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 007.30‐007.80 S 0.50 1804 Zilla Overlay 40mm @ 1000‐2000 2021 1.620 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 007.80‐008.00 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 008.00‐008.20 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.289
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 008.20‐008.30 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.251
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 008.30‐008.60 S 0.30 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.188
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 008.60‐008.80 S 0.20 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 008.80‐009.40 S 0.60 1804 Zilla Overlay 40mm @ 1000‐2000 2021 1.936 0.179
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 009.40‐009.50 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.217
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 009.50‐010.80 S 1.30 1804 Zilla Overlay 40mm @ 1000‐2000 2021 4.194 0.037
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 010.80‐010.90 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.248
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 010.90‐011.70 S 0.80 1804 Zilla Overlay 40mm @ 1000‐2000 2021 2.581 0.161
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 011.70‐011.80 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.233
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 011.80‐012.10 S 0.30 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.220
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 012.10‐012.20 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.159
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 012.20‐012.30 S 0.10 1804 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.429
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 012.30‐012.40 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.243
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 012.40‐012.90 S 0.50 1804 Zilla Overlay 40mm @ 1000‐2000 2021 1.613 0.193
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 012.90‐013.00 S 0.10 1804 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.260
Z5508 Khetlal‐Gopinathpur‐Akkelpur Road Km 013.00‐018.25 S 5.24 1804 Zilla Overlay 40mm @ 1000‐2000 2021 19.059 0.143
Z5509 Hili‐Shalaipur‐Kalai Road Km 000.00‐000.50 S 0.50 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.426 0.000
Page 198 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5509 Hili‐Shalaipur‐Kalai Road Km 000.50‐001.20 S 0.70 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.902 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 001.20‐001.30 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.272 0.081
Z5509 Hili‐Shalaipur‐Kalai Road Km 001.30‐002.40 S 1.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 3.004 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 002.40‐002.50 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.280 0.029
Z5509 Hili‐Shalaipur‐Kalai Road Km 002.50‐002.90 S 0.40 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.121 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 002.90‐003.60 S 0.70 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.961 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 003.60‐003.80 S 0.20 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.560 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 003.80‐003.90 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.280 0.027
Z5509 Hili‐Shalaipur‐Kalai Road Km 003.90‐005.50 S 1.60 1321 Zilla Overlay 40mm @ 1000‐2000 2021 4.483 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 005.50‐005.90 S 0.40 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.121 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 005.90‐005.96 S 0.06 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.165 0.054
Z5509 Hili‐Shalaipur‐Kalai Road Km 005.96‐006.26 S 0.30 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.841 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 006.26‐007.26 S 1.00 1321 Zilla Overlay 40mm @ 1000‐2000 2021 2.802 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 007.26‐007.36 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.280 0.063
Z5509 Hili‐Shalaipur‐Kalai Road Km 007.36‐009.06 S 1.70 1321 Zilla Overlay 40mm @ 1000‐2000 2021 4.763 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 009.06‐009.16 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.280 0.006
Z5509 Hili‐Shalaipur‐Kalai Road Km 009.76‐009.96 S 0.20 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.594 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 010.36‐010.46 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.297 0.024
Z5509 Hili‐Shalaipur‐Kalai Road Km 011.16‐011.76 S 0.60 1321 Zilla Overlay 40mm @ 1000‐2000 2021 1.783 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 011.76‐012.46 S 0.70 1321 Zilla Overlay 40mm @ 1000‐2000 2021 2.080 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 014.16‐014.26 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 014.26‐014.56 S 0.30 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.942 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 014.56‐014.66 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 014.66‐015.96 S 1.30 1321 Zilla Overlay 40mm @ 1000‐2000 2021 4.084 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 015.96‐015.99 S 0.03 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.085 0.420
Z5509 Hili‐Shalaipur‐Kalai Road Km 015.99‐016.09 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 016.09‐016.29 S 0.20 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.839 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 016.29‐018.69 S 2.40 1321 Zilla Overlay 40mm @ 1000‐2000 2021 11.207 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 018.69‐018.79 S 0.10 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.442 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 018.79‐019.59 S 0.80 1321 Zilla Overlay 40mm @ 1000‐2000 2021 3.396 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 028.09‐028.29 S 0.20 1321 Zilla Overlay 40mm @ 1000‐2000 2021 0.866 0.000
Z5509 Hili‐Shalaipur‐Kalai Road Km 028.29‐029.59 S 1.30 1321 Zilla Overlay 40mm @ 1000‐2000 2021 5.805 0.144
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 000.00‐000.70 S 0.70 2861 Zilla Overlay 40mm @ Traff >=2000 2021 2.258 0.618
Z5855 Joypurhat‐Rajabirat‐Gobindaganj Road Km 000.70‐018.67 S 17.97 2861 Zilla Overlay 40mm @ Traff >=2000 2021 59.348 0.151
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 003.20‐003.30 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.337
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 003.30‐003.50 S 0.20 3728 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.679
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 003.50‐003.60 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.392
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 003.60‐004.20 S 0.60 3728 Zilla Overlay 40mm @ Cracks >25% 2021 1.785 0.865
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 004.20‐004.40 S 0.20 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.737
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 004.40‐006.60 S 2.20 3728 Zilla Overlay 40mm @ Traff >=2000 2021 7.169 0.452
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 006.60‐006.80 S 0.20 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.957
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 006.80‐006.90 S 0.10 3728 Zilla Overlay 40mm @ Cracks >25% 2021 0.297 0.019
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 006.90‐007.10 S 0.20 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.747
Page 199 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 007.10‐008.67 S 1.57 3728 Zilla Overlay 40mm @ Traff >=2000 2021 4.944 0.385
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 008.67‐009.17 S 0.50 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 0.803
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 009.17‐011.17 S 2.00 3728 Zilla Overlay 40mm @ Cracks >25% 2021 6.110 0.791
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 011.17‐011.27 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.430
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 011.27‐011.47 S 0.20 3728 Zilla Overlay 40mm @ Cracks >25% 2021 0.595 0.588
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 011.87‐014.17 S 2.30 3728 Zilla Overlay 40mm @ Cracks >25% 2021 6.842 1.027
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.17‐014.37 S 0.20 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 0.854
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.37‐014.47 S 0.10 3728 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.47‐014.57 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.323
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.57‐014.67 S 0.10 3728 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.67‐014.77 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.411
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.77‐014.97 S 0.20 3728 Zilla Overlay 40mm @ Cracks >25% 2021 0.595 0.176
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 014.97‐015.07 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.391
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 016.27‐016.37 S 0.10 3728 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 1.137
Z5856 Panchbibi‐Dugdugi‐Ghoraghat Road Km 016.37‐016.97 S 0.60 3728 Zilla Overlay 40mm @ Traff >=2000 2021 1.797 0.425
Joypurhat Total 399.494
Kurigram Division
N506 Rangpur‐Barobari‐Kurigram Road Km 037.47‐040.79 S 3.32 5144 National DBST @ 25% Crk 2021 9.144 3.269
N506 Rangpur‐Barobari‐Kurigram Road Km 040.79‐043.79 S 3.00 5144 National Overlay 50mm @ IRI 5‐9 2021 22.523 4.075
N506 Rangpur‐Barobari‐Kurigram Road Km 044.59‐044.69 S 0.10 5144 National Rehab 150mm @ IRI 9‐12 2021 3.526 1.080
N506 Rangpur‐Barobari‐Kurigram Road Km 045.69‐045.99 S 0.30 5144 National Overlay 50mm @ IRI 5‐9 2021 2.300 3.582
N506 Rangpur‐Barobari‐Kurigram Road Km 048.89‐049.29 S 0.40 5144 National Overlay 50mm @ IRI 5‐9 2021 3.541 2.840
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.05‐000.13 L 0.08 9904 National DBST @ 25% Crk 2021 0.285 2.387
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.05‐000.13 R 0.08 9904 National DBST @ 25% Crk 2021 0.285 2.303
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.13‐000.20 S 0.07 9904 National DBST @ 25% Crk 2021 0.394 0.832
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.20‐000.50 S 0.30 9904 National DBST @ Traff >6000 2021 1.008 5.316
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.50‐000.70 S 0.20 9904 National DBST @ Traff >6000 2021 0.672 3.385
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 000.70‐000.90 S 0.20 9904 National Rehab 180mm @ IRI 9‐12 2021 6.672 2.437
N512 Kurigram‐Nageswari‐Bhurungamari‐Sonahat Landport Road Km 025.00‐039.52 S 14.52 9904 National DBST @ 25% Crk 2021 39.663 3.181
R562 Kurigram‐Ulipur‐Chillmari Road Km 003.30‐005.90 S 2.60 6734 Regional DBST @ Traff >6000 2021 7.064 1.281
R562 Kurigram‐Ulipur‐Chillmari Road Km 005.90‐006.00 S 0.10 6734 Regional Rehab 150mm @ IRI 9‐12 2021 2.630 1.364
R562 Kurigram‐Ulipur‐Chillmari Road Km 006.00‐007.00 S 1.00 6734 Regional DBST @ Traff >6000 2021 2.717 1.383
R562 Kurigram‐Ulipur‐Chillmari Road Km 007.00‐007.10 S 0.10 6734 Regional Rehab 150mm @ IRI 9‐12 2021 2.657 1.502
R562 Kurigram‐Ulipur‐Chillmari Road Km 007.10‐008.50 S 1.40 6734 Regional DBST @ 25% Crk 2021 3.804 1.575
R562 Kurigram‐Ulipur‐Chillmari Road Km 008.50‐008.80 S 0.30 6734 Regional DBST @ Traff >6000 2021 0.815 3.088
R562 Kurigram‐Ulipur‐Chillmari Road Km 010.39‐014.19 S 3.80 6734 Regional DBST @ 25% Crk 2021 10.625 1.372
R562 Kurigram‐Ulipur‐Chillmari Road Km 014.19‐014.29 S 0.10 6734 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.713 4.401
R562 Kurigram‐Ulipur‐Chillmari Road Km 015.00‐016.99 S 1.99 6734 Regional DBST @ 25% Crk 2021 5.592 1.196
R562 Kurigram‐Ulipur‐Chillmari Road Km 017.02‐029.98 S 12.97 6734 Regional DBST @ 25% Crk 2021 34.457 1.352
R563 Kurigram‐Rajarhat‐Teesta Road Km 000.10‐000.60 S 0.50 6494 Regional DBST @ Traff >6000 2021 1.334 2.303
R563 Kurigram‐Rajarhat‐Teesta Road Km 000.70‐000.90 S 0.20 6005 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.051 2.374
R563 Kurigram‐Rajarhat‐Teesta Road Km 001.90‐002.00 S 0.10 6005 Regional Rehab 150mm @ IRI 9‐12 2021 1.865 1.497
R563 Kurigram‐Rajarhat‐Teesta Road Km 005.20‐005.30 S 0.10 6494 Regional Rehab 150mm @ IRI 9‐12 2021 2.512 1.326
Page 200 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R563 Kurigram‐Rajarhat‐Teesta Road Km 005.30‐006.20 S 0.90 6494 Regional DBST @ 25% Crk 2021 2.309 1.076
R563 Kurigram‐Rajarhat‐Teesta Road Km 006.20‐006.30 S 0.10 6494 Regional Rehab 150mm @ IRI 9‐12 2021 2.512 1.275
R563 Kurigram‐Rajarhat‐Teesta Road Km 006.30‐007.48 S 1.18 6494 Regional DBST @ 25% Crk 2021 3.083 1.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 000.00‐000.20 S 0.20 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.195
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 000.20‐000.40 S 0.20 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 000.40‐000.50 S 0.10 1046 Zilla Seal Coat 2021 0.096 0.352
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 000.50‐000.80 S 0.30 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 000.80‐001.00 S 0.20 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.191
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 001.00‐001.30 S 0.30 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 001.30‐003.80 S 2.50 1046 Zilla Overlay 40mm @ 1000‐2000 2021 8.062 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 003.80‐003.90 S 0.10 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 003.90‐004.20 S 0.30 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.121
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 004.20‐004.60 S 0.40 1046 Zilla Overlay 40mm @ 1000‐2000 2021 1.290 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 004.60‐005.00 S 0.40 1046 Zilla Overlay 40mm @ 1000‐2000 2021 1.290 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 005.00‐005.10 S 0.10 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.323 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 005.10‐008.20 S 3.10 1046 Zilla Overlay 40mm @ 1000‐2000 2021 10.261 0.058
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 008.20‐009.10 S 0.90 1046 Zilla Overlay 40mm @ 1000‐2000 2021 2.919 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 009.10‐009.30 S 0.20 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.645 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 009.30‐009.90 S 0.60 1046 Zilla Overlay 40mm @ 1000‐2000 2021 1.936 0.047
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 009.90‐010.00 S 0.10 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.319 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 010.00‐010.02 S 0.02 1046 Zilla Seal Coat 2021 0.023 1.359
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 010.02‐010.32 S 0.30 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 010.32‐010.72 S 0.40 1046 Zilla Overlay 40mm @ 1000‐2000 2021 1.290 0.101
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 010.72‐011.12 S 0.40 1046 Zilla Overlay 40mm @ 1000‐2000 2021 1.290 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 011.12‐011.92 S 0.80 1046 Zilla Overlay 40mm @ 1000‐2000 2021 2.690 0.075
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 011.92‐012.02 S 0.10 1046 Zilla Overlay 40mm @ 1000‐2000 2021 0.314 0.000
Z5616 Nageswari‐Kularhat‐Kashipur‐Lalmonirhat Road Km 015.92‐016.82 S 0.90 1046 Zilla Overlay 40mm @ 1000‐2000 2021 2.827 0.013
Z5623 Ulipur‐Bojra‐Chillmari Road Km 013.77‐014.07 S 0.30 1750 Zilla Overlay 40mm @ 1000‐2000 2021 0.968 0.000
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 000.60‐002.50 S 1.90 2986 Zilla Overlay 40mm @ Traff >=2000 2021 6.127 0.424
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 002.50‐002.60 S 0.10 2986 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.802
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 002.60‐003.80 S 1.20 2986 Zilla Overlay 40mm @ Traff >=2000 2021 3.871 0.727
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 003.80‐003.90 S 0.10 2986 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.015
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 003.90‐005.50 S 1.60 2986 Zilla Overlay 40mm @ Traff >=2000 2021 5.162 0.443
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 005.50‐005.60 S 0.10 2986 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.950
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 005.60‐005.90 S 0.30 2986 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.222
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 010.11‐010.51 S 0.40 2986 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 0.868
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 020.91‐030.90 S 9.99 2986 Zilla Rehab 75mm @ IRI 9‐12 2021 112.413 0.555
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 037.70‐037.80 S 0.10 2401 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.000
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 037.80‐038.00 S 0.20 2401 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.000
Z5624 Bhurungamari‐Madarganj‐Nageswari Road Km 038.00‐038.50 S 0.50 2401 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.000
Kurigram Total 358.664
Lalmonirhat Division
N506 Rangpur‐Barobari‐Kurigram Road Km 021.46‐022.59 S 1.13 8385 National Overlay 50mm @ IRI 5‐7 2021 9.077 13.589
Page 201 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N506 Rangpur‐Barobari‐Kurigram Road Km 022.59‐022.69 S 0.10 8385 National Full Recon 180mm 2021 3.849 5.084
N506 Rangpur‐Barobari‐Kurigram Road Km 022.69‐032.69 S 10.00 8385 National DBST @ Traff >6000 2021 28.356 11.046
N506 Rangpur‐Barobari‐Kurigram Road Km 032.69‐032.89 S 0.20 8385 National Full Recon 180mm 2021 10.359 4.446
N506 Rangpur‐Barobari‐Kurigram Road Km 033.19‐033.39 S 0.20 5144 National Rehab 150mm @ IRI 9‐12 2021 7.148 1.079
N506 Rangpur‐Barobari‐Kurigram Road Km 036.49‐036.59 S 0.10 5144 National Rehab 150mm @ IRI 9‐12 2021 2.657 2.347
N506 Rangpur‐Barobari‐Kurigram Road Km 036.59‐037.47 S 0.88 5144 National Overlay 50mm @ IRI 5‐9 2021 5.065 4.502
N509 Barabari‐Lalmonirhat‐Burimary Road Km 000.40‐000.70 S 0.30 3701 National DBST @ Traff 2000‐4000 2021 0.842 1.619
N509 Barabari‐Lalmonirhat‐Burimary Road Km 000.70‐004.30 S 3.60 3701 National Overlay 50mm @ IRI 5‐9 2021 20.784 1.804
N509 Barabari‐Lalmonirhat‐Burimary Road Km 004.30‐007.40 S 3.10 3701 National Overlay 50mm @ IRI 5‐9 2021 17.897 1.582
N509 Barabari‐Lalmonirhat‐Burimary Road Km 007.60‐007.80 S 0.20 3701 National DBST @ Traff 2000‐4000 2021 0.543 2.291
N509 Barabari‐Lalmonirhat‐Burimary Road Km 008.20‐008.70 S 0.50 3701 National Overlay 50mm @ IRI 5‐9 2021 2.888 2.685
N509 Barabari‐Lalmonirhat‐Burimary Road Km 013.69‐013.89 S 0.20 5452 National Rehab 150mm @ IRI 9‐12 2021 5.313 2.667
N509 Barabari‐Lalmonirhat‐Burimary Road Km 013.89‐015.79 S 1.90 7727 National DBST @ Traff >6000 2021 5.162 8.343
N509 Barabari‐Lalmonirhat‐Burimary Road Km 015.79‐015.99 S 0.20 7727 National Rehab 180mm @ IRI 9‐12 2021 6.338 3.816
N509 Barabari‐Lalmonirhat‐Burimary Road Km 015.99‐017.26 S 1.27 7727 National Overlay 50mm @ IRI 5‐7 2021 7.323 8.732
N509 Barabari‐Lalmonirhat‐Burimary Road Km 017.26‐017.36 S 0.10 7727 National Rehab 180mm @ IRI 9‐12 2021 3.169 4.150
N509 Barabari‐Lalmonirhat‐Burimary Road Km 017.36‐018.96 S 1.60 7727 National DBST @ Traff >6000 2021 4.347 8.309
N509 Barabari‐Lalmonirhat‐Burimary Road Km 018.96‐019.06 S 0.10 7727 National Full Recon 180mm 2021 3.849 3.640
N509 Barabari‐Lalmonirhat‐Burimary Road Km 019.06‐021.06 S 2.00 7727 National DBST @ Traff >6000 2021 5.414 7.511
N509 Barabari‐Lalmonirhat‐Burimary Road Km 021.06‐021.36 S 0.30 7727 National Rehab 180mm @ IRI 9‐12 2021 9.334 3.669
N509 Barabari‐Lalmonirhat‐Burimary Road Km 021.36‐024.56 S 3.20 7727 National Overlay 50mm @ IRI 5‐7 2021 18.144 8.900
N509 Barabari‐Lalmonirhat‐Burimary Road Km 024.56‐024.86 S 0.30 7727 National Full Recon 180mm @ IRI 12 2021 11.338 3.390
N509 Barabari‐Lalmonirhat‐Burimary Road Km 024.86‐026.76 S 1.90 7727 National Overlay 50mm @ IRI 5‐7 2021 10.773 8.894
N509 Barabari‐Lalmonirhat‐Burimary Road Km 026.76‐027.03 S 0.26 7727 National Full Recon 180mm @ IRI 12 2021 10.016 3.245
N509 Barabari‐Lalmonirhat‐Burimary Road Km 027.03‐027.23 S 0.20 7727 National DBST @ Traff >6000 2021 0.534 7.740
N509 Barabari‐Lalmonirhat‐Burimary Road Km 027.23‐027.33 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.683
N509 Barabari‐Lalmonirhat‐Burimary Road Km 027.33‐028.53 S 1.20 7727 National DBST @ Traff >6000 2021 3.201 7.719
N509 Barabari‐Lalmonirhat‐Burimary Road Km 028.53‐028.63 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.556
N509 Barabari‐Lalmonirhat‐Burimary Road Km 028.63‐029.13 S 0.50 7727 National DBST @ 25% Crk 2021 1.334 8.654
N509 Barabari‐Lalmonirhat‐Burimary Road Km 029.13‐029.23 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.890
N509 Barabari‐Lalmonirhat‐Burimary Road Km 029.23‐029.43 S 0.20 7727 National Overlay 60mm @ IRI 7‐9 2021 1.351 9.753
N509 Barabari‐Lalmonirhat‐Burimary Road Km 029.43‐029.63 S 0.20 7727 National Full Recon 180mm @ IRI 12 2021 7.559 3.398
N509 Barabari‐Lalmonirhat‐Burimary Road Km 047.08‐047.18 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.605
N509 Barabari‐Lalmonirhat‐Burimary Road Km 047.18‐051.48 S 4.30 7727 National Overlay 50mm @ IRI 5‐7 2021 24.375 8.829
N509 Barabari‐Lalmonirhat‐Burimary Road Km 051.48‐051.58 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.604
N509 Barabari‐Lalmonirhat‐Burimary Road Km 063.91‐066.11 S 2.20 7727 National Overlay 50mm @ IRI 5‐7 2021 12.474 8.889
N509 Barabari‐Lalmonirhat‐Burimary Road Km 066.11‐066.21 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.555
N509 Barabari‐Lalmonirhat‐Burimary Road Km 066.21‐070.41 S 4.20 7727 National DBST @ Traff >6000 2021 11.204 8.307
N509 Barabari‐Lalmonirhat‐Burimary Road Km 070.41‐070.51 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.577
N509 Barabari‐Lalmonirhat‐Burimary Road Km 070.51‐070.71 S 0.20 7727 National Overlay 50mm @ IRI 5‐7 2021 1.134 9.192
N509 Barabari‐Lalmonirhat‐Burimary Road Km 070.71‐070.91 S 0.20 7727 National Rehab 180mm @ IRI 9‐12 2021 6.223 3.924
N509 Barabari‐Lalmonirhat‐Burimary Road Km 071.11‐071.71 S 0.60 7727 National Rehab 180mm @ IRI 9‐12 2021 18.669 3.481
N509 Barabari‐Lalmonirhat‐Burimary Road Km 071.71‐072.31 S 0.61 7727 National Overlay 50mm @ IRI 5‐7 2021 3.442 9.062
Page 202 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N509 Barabari‐Lalmonirhat‐Burimary Road Km 072.31‐072.41 S 0.10 7727 National Full Recon 180mm @ IRI 12 2021 3.779 3.545
N509 Barabari‐Lalmonirhat‐Burimary Road Km 072.41‐082.32 S 9.90 7727 National DBST @ Traff >6000 2021 26.420 7.544
N509 Barabari‐Lalmonirhat‐Burimary Road Km 082.32‐082.52 S 0.20 7727 National Rehab 180mm @ IRI 9‐12 2021 6.223 3.820
N509 Barabari‐Lalmonirhat‐Burimary Road Km 082.52‐089.92 S 7.40 7727 National Overlay 50mm @ IRI 5‐7 2021 41.958 8.779
N509 Barabari‐Lalmonirhat‐Burimary Road Km 089.92‐090.32 S 0.40 7727 National Rehab 180mm @ IRI 9‐12 2021 12.446 3.786
N509 Barabari‐Lalmonirhat‐Burimary Road Km 090.32‐091.07 S 0.75 7727 National Overlay 50mm @ IRI 5‐7 2021 4.281 9.149
N509 Barabari‐Lalmonirhat‐Burimary Road Km 091.07‐091.97 S 0.90 7727 National Rehab 180mm @ IRI 9‐12 2021 28.107 3.498
N509 Barabari‐Lalmonirhat‐Burimary Road Km 091.97‐092.57 S 0.60 7727 National Overlay 50mm @ IRI 5‐7 2021 3.490 10.377
N509 Barabari‐Lalmonirhat‐Burimary Road Km 092.57‐092.77 S 0.20 7727 National Rehab 180mm @ IRI 9‐12 2021 6.338 3.808
N509 Barabari‐Lalmonirhat‐Burimary Road Km 092.77‐093.71 S 0.94 7727 National Overlay 50mm @ IRI 5‐7 2021 5.411 8.846
N509 Barabari‐Lalmonirhat‐Burimary Road Km 093.71‐100.17 S 6.46 4302 National DBST @ Traff 4000‐6000 2021 17.368 7.468
N509 Barabari‐Lalmonirhat‐Burimary Road Km 100.17‐103.17 S 3.00 4302 National Rehab 150mm @ IRI 9‐12 2021 78.246 3.596
N509 Barabari‐Lalmonirhat‐Burimary Road Km 103.17‐103.47 S 0.30 4302 National Rehab 150mm @ IRI 9‐12 2021 7.825 3.830
N509 Barabari‐Lalmonirhat‐Burimary Road Km 103.47‐104.69 S 1.22 4302 National Overlay 50mm @ IRI 5‐9 2021 6.900 9.972
Z5902 Lalmonirhat‐Haragachha Road Km 000.00‐000.20 S 0.20 2299 Zilla Overlay 40mm @ Traff >=2000 2021 0.920 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 000.00‐000.90 S 0.90 2455 Zilla Overlay 40mm @ Traff >=2000 2021 4.203 0.015
Z5903 Patgram‐Angarpota Sit Mohal Road Km 000.90‐001.10 S 0.20 2455 Zilla Rehab 75mm @ IRI 9‐12 2021 2.508 0.160
Z5903 Patgram‐Angarpota Sit Mohal Road Km 001.10‐002.50 S 1.40 2455 Zilla Overlay 40mm @ Traff >=2000 2021 4.647 0.221
Z5903 Patgram‐Angarpota Sit Mohal Road Km 002.50‐002.80 S 0.30 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.427
Z5903 Patgram‐Angarpota Sit Mohal Road Km 002.80‐004.40 S 1.60 2455 Zilla Overlay 40mm @ Traff >=2000 2021 5.162 0.034
Z5903 Patgram‐Angarpota Sit Mohal Road Km 004.40‐004.60 S 0.20 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.542
Z5903 Patgram‐Angarpota Sit Mohal Road Km 004.60‐005.50 S 0.90 2455 Zilla Overlay 40mm @ Traff >=2000 2021 2.904 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 005.50‐005.60 S 0.10 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.745
Z5903 Patgram‐Angarpota Sit Mohal Road Km 005.60‐007.10 S 1.50 2455 Zilla Overlay 40mm @ Traff >=2000 2021 4.839 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 007.10‐007.20 S 0.10 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.735
Z5903 Patgram‐Angarpota Sit Mohal Road Km 007.20‐007.90 S 0.70 2455 Zilla Overlay 40mm @ Traff >=2000 2021 2.258 0.289
Z5903 Patgram‐Angarpota Sit Mohal Road Km 007.90‐008.20 S 0.30 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.460
Z5903 Patgram‐Angarpota Sit Mohal Road Km 008.20‐009.40 S 1.20 2455 Zilla Overlay 40mm @ Traff >=2000 2021 3.871 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 009.40‐009.80 S 0.40 2455 Zilla Overlay 40mm @ Traff >=2000 2021 1.290 0.418
Z5903 Patgram‐Angarpota Sit Mohal Road Km 009.80‐010.10 S 0.30 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 010.10‐010.20 S 0.10 2455 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.670
Z5903 Patgram‐Angarpota Sit Mohal Road Km 010.20‐011.10 S 0.90 2455 Zilla Overlay 40mm @ Traff >=2000 2021 2.904 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 011.10‐011.40 S 0.30 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.453
Z5903 Patgram‐Angarpota Sit Mohal Road Km 011.40‐013.20 S 1.80 2455 Zilla Overlay 40mm @ Traff >=2000 2021 5.807 0.000
Z5903 Patgram‐Angarpota Sit Mohal Road Km 013.20‐013.30 S 0.10 2455 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.834
Z5903 Patgram‐Angarpota Sit Mohal Road Km 013.30‐016.90 S 3.60 2455 Zilla Overlay 40mm @ Traff >=2000 2021 11.614 0.032
Z5903 Patgram‐Angarpota Sit Mohal Road Km 016.90‐017.00 S 0.10 2455 Zilla Overlay 40mm @ Traff >=2000 2021 0.323 0.781
Z5903 Patgram‐Angarpota Sit Mohal Road Km 017.00‐018.10 S 1.10 2455 Zilla Overlay 40mm @ Traff >=2000 2021 3.297 0.451
Z5904 Patgram By‐Pass Road Km 000.00‐000.90 S 0.90 2501 Zilla Overlay 40mm @ Traff >=2000 2021 4.760 0.000
Z5904 Patgram By‐Pass Road Km 000.90‐001.20 S 0.30 2501 Zilla Rehab 75mm @ IRI 9‐12 2021 5.387 1.496
Z5904 Patgram By‐Pass Road Km 001.70‐001.90 S 0.20 2501 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 1.903
Lalmonirhat Total 654.457
Nilphamari Division
Page 203 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 359.85‐359.95 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.761
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 359.95‐360.25 S 0.30 6189 National Overlay 50mm @ IRI 4‐7 2021 2.300 8.922
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 360.25‐360.45 S 0.20 6189 National Rehab 180mm @ IRI 9‐12 2021 9.873 3.516
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 360.75‐360.85 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.815
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 361.55‐361.75 S 0.20 6189 National Rehab 180mm @ IRI 9‐12 2021 9.873 3.673
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 361.75‐361.85 S 0.10 6189 National Overlay 50mm @ IRI 4‐7 2021 0.767 8.622
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 361.85‐362.05 S 0.20 6189 National DBST @ Traff >6000 2021 0.721 9.466
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 365.65‐365.85 S 0.20 6189 National DBST @ Traff >6000 2021 0.692 9.954
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 365.85‐366.65 S 0.80 6189 National Overlay 50mm @ IRI 4‐7 2021 5.880 8.949
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 366.65‐366.75 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.733 3.973
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 367.55‐367.67 S 0.12 6189 National Rehab 180mm @ IRI 9‐12 2021 5.491 3.913
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 370.97‐371.17 S 0.20 6536 National Rehab 180mm @ IRI 9‐12 2021 9.602 3.777
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 371.17‐372.57 S 1.40 6536 National Overlay 50mm @ IRI 4‐7 2021 10.422 9.582
N518 Sayedpur Town Old Section  Km 000.00‐000.20 S 0.20 12324 National DBST @ Traff >6000 2021 1.412 1.006
N518 Sayedpur Town Old Section  Km 002.10‐002.30 S 0.20 12324 National Overlay 80mm @ IRI 5‐9 2021 1.984 7.228
R560 Paglapir‐Dalia‐Tista Barrage Road Km 018.40‐018.60 S 0.20 6810 Regional Rehab 150mm @ IRI 9‐12 2021 5.410 3.659
R560 Paglapir‐Dalia‐Tista Barrage Road Km 020.60‐020.70 S 0.10 6810 Regional Rehab 150mm @ IRI 9‐12 2021 2.705 4.108
R560 Paglapir‐Dalia‐Tista Barrage Road Km 027.80‐029.16 S 1.36 6810 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.858 7.260
R560 Paglapir‐Dalia‐Tista Barrage Road Km 030.70‐030.80 S 0.10 3600 Regional DBST @ Traff 2000‐4000 2021 0.277 2.379
R560 Paglapir‐Dalia‐Tista Barrage Road Km 031.60‐031.70 S 0.10 3600 Regional Rehab 135mm @ IRI 9‐12 2021 2.536 1.095
Z5008 Birganj‐Khansama‐Darwani Road Km 020.59‐024.26 S 3.67 3474 Zilla Overlay 40mm @ Cracks >25% 2021 11.203 2.043
Z5008 Birganj‐Khansama‐Darwani Road Km 024.26‐024.36 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 3.110
Z5008 Birganj‐Khansama‐Darwani Road Km 024.36‐027.16 S 2.80 3474 Zilla Overlay 40mm @ Cracks >25% 2021 8.555 2.130
Z5008 Birganj‐Khansama‐Darwani Road Km 027.16‐027.26 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 3.012
Z5009 Darwani Rail Station Connecting Road Km 000.00‐000.90 S 0.90 5037 Zilla Overlay 40mm @ Traff >=2000 2021 3.202 0.000
Z5009 Darwani Rail Station Connecting Road Km 000.90‐001.00 S 0.10 5037 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 2.702
Z5011 Sayedpur‐Parbatipur Road Km 000.00‐004.35 S 4.34 5320 Zilla Overlay 50mm @ Cracking >25% 2021 29.928 0.180
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 018.68‐024.82 S 6.14 2183 Zilla Overlay 40mm @ Traff >=2000 2021 20.761 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 024.82‐025.72 S 0.90 2183 Zilla Overlay 40mm @ Traff >=2000 2021 3.286 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 025.75‐027.75 S 2.00 2183 Zilla Overlay 40mm @ Traff >=2000 2021 8.796 0.000
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 019.93‐020.03 S 0.10 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 1.257 1.305
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 020.83‐020.93 S 0.10 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 1.257 1.798
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 020.93‐021.13 S 0.20 4537 Zilla Overlay 40mm @ Traff >=2000 2021 0.713 0.022
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 021.13‐021.23 S 0.10 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 1.257 0.992
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 021.60‐022.20 S 0.60 4537 Zilla Overlay 50mm @ IRI 6‐9 2021 2.646 1.608
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 022.20‐029.48 S 7.28 4537 Zilla Overlay 40mm @ Traff >=2000 2021 25.963 0.193
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 000.10‐000.30 S 0.20 2489 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 0.660
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 000.30‐005.30 S 5.00 2489 Zilla Overlay 40mm @ Traff >=2000 2021 17.146 0.000
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 005.30‐005.50 S 0.20 2489 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 0.535
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 005.50‐007.90 S 2.40 2489 Zilla Overlay 40mm @ Traff >=2000 2021 7.943 0.493
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 007.90‐008.00 S 0.10 2489 Zilla Rehab 75mm @ IRI 9‐12 2021 1.143 0.914
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 008.00‐008.30 S 0.30 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 008.30‐008.40 S 0.10 2489 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.089
Page 204 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 008.40‐008.90 S 0.50 2489 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.000
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 008.90‐009.20 S 0.30 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.401 0.000
Z5022 Nilphamari (Tengonmari)‐Kishoreganj Road Km 009.20‐009.61 S 0.41 2489 Zilla Overlay 40mm @ Traff >=2000 2021 1.914 0.000
Z5054 Boragarihat‐Khoksharhat‐Dimla Road Km 003.50‐004.00 S 0.50 265 Zilla Overlay 40mm @ Traff 100‐1000 2021 1.783 0.000
Z5054 Boragarihat‐Khoksharhat‐Dimla Road Km 010.00‐010.10 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.107 3.869
Z5701 Nilphamari‐Jaldhaka Road Km 000.00‐010.08 S 10.07 5921 Zilla Overlay 50mm @ Cracking >25% 2021 42.632 0.111
Z5701 Nilphamari‐Jaldhaka Road Km 010.08‐010.18 S 0.10 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 2.958
Z5701 Nilphamari‐Jaldhaka Road Km 011.58‐011.68 S 0.10 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 2.972
Z5701 Nilphamari‐Jaldhaka Road Km 011.68‐012.38 S 0.70 5921 Zilla Overlay 40mm @ Traff >=2000 2021 2.258 0.656
Z5701 Nilphamari‐Jaldhaka Road Km 012.38‐012.68 S 0.30 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 4.139 1.218
Z5701 Nilphamari‐Jaldhaka Road Km 012.68‐012.98 S 0.30 8469 Zilla Overlay 40mm @ Traff >=2000 2021 1.426 1.706
Z5701 Nilphamari‐Jaldhaka Road Km 012.98‐013.18 S 0.20 8469 Zilla Rehab 75mm @ IRI 9‐12 2021 3.352 1.979
Z5701 Nilphamari‐Jaldhaka Road Km 013.18‐013.58 S 0.40 8469 Zilla Overlay 40mm @ Traff >=2000 2021 1.786 1.889
Z5701 Nilphamari‐Jaldhaka Road Km 013.58‐014.18 S 0.60 5921 Zilla Overlay 50mm @ IRI 6‐9 2021 2.520 1.977
Z5701 Nilphamari‐Jaldhaka Road Km 014.98‐015.18 S 0.20 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 1.755
Z5701 Nilphamari‐Jaldhaka Road Km 015.18‐015.38 S 0.20 5921 Zilla Overlay 50mm @ IRI 6‐9 2021 0.840 1.831
Z5701 Nilphamari‐Jaldhaka Road Km 015.38‐015.48 S 0.10 5921 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.587
Z5701 Nilphamari‐Jaldhaka Road Km 015.48‐016.38 S 0.90 5921 Zilla Overlay 50mm @ Cracking >25% 2021 3.780 0.606
Z5701 Nilphamari‐Jaldhaka Road Km 016.38‐016.58 S 0.20 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 2.394 2.132
Z5701 Nilphamari‐Jaldhaka Road Km 016.58‐016.98 S 0.40 5921 Zilla Overlay 50mm @ Cracking >25% 2021 1.680 0.576
Z5701 Nilphamari‐Jaldhaka Road Km 016.98‐017.08 S 0.10 5921 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 2.906
Z5701 Nilphamari‐Jaldhaka Road Km 017.08‐021.02 S 3.94 5921 Zilla Overlay 50mm @ Cracking >25% 2021 16.569 1.358
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 012.20‐017.50 S 5.30 2834 Zilla Overlay 40mm @ Traff >=2000 2021 17.999 1.859
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 017.50‐017.60 S 0.10 2834 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.561
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 018.70‐018.80 S 0.10 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 2.418
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 018.80‐020.00 S 1.20 2834 Zilla Overlay 40mm @ Traff >=2000 2021 4.075 1.868
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 020.00‐020.20 S 0.20 2834 Zilla Full Recon 75mm @ IRI>12 2021 5.025 0.637
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 020.20‐020.30 S 0.10 2834 Zilla Overlay 40mm @ Traff >=2000 2021 0.492 0.000
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 020.30‐020.60 S 0.30 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 5.208 0.722
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 020.60‐021.00 S 0.40 2834 Zilla Overlay 40mm @ Traff >=2000 2021 1.970 0.000
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 021.00‐021.20 S 0.20 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 3.472 0.858
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 021.20‐022.70 S 1.50 2834 Zilla Overlay 40mm @ Traff >=2000 2021 7.386 0.000
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 022.70‐023.00 S 0.30 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 5.208 0.378
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 023.00‐023.80 S 0.80 2834 Zilla Overlay 40mm @ Traff >=2000 2021 3.301 0.000
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 023.80‐024.10 S 0.30 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 3.771 1.984
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 024.10‐024.20 S 0.10 2834 Zilla Overlay 40mm @ Traff >=2000 2021 0.357 1.145
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 024.20‐024.40 S 0.20 2834 Zilla Full Recon 75mm @ IRI>12 2021 3.651 1.339
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 024.40‐025.10 S 0.70 2834 Zilla Overlay 40mm @ Traff >=2000 2021 2.496 0.822
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 025.10‐025.20 S 0.10 2834 Zilla Full Recon 75mm @ IRI>12 2021 1.826 1.562
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 025.20‐025.60 S 0.40 2834 Zilla Overlay 40mm @ Traff >=2000 2021 1.426 0.890
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 025.60‐025.80 S 0.20 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 2.514 1.868
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 026.30‐026.40 S 0.10 2834 Zilla Full Recon 75mm @ IRI>12 2021 1.826 1.594
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 026.40‐026.60 S 0.20 2834 Zilla Overlay 40mm @ Traff >=2000 2021 0.713 0.858
Page 205 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 026.60‐026.80 S 0.20 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 2.514 2.109
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 026.80‐027.10 S 0.30 2834 Zilla Overlay 40mm @ Traff >=2000 2021 1.070 0.753
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 027.10‐027.20 S 0.10 2834 Zilla Rehab 75mm @ IRI 9‐12 2021 1.257 2.429
Z5703 Jaldhaka ‐Dimla‐Tunirhat Road Km 027.20‐028.86 S 1.66 2834 Zilla Overlay 40mm @ Traff >=2000 2021 5.926 0.921
Z5707 Nilphamari‐Domar Road Km 019.80‐019.90 S 0.10 6555 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.960
Z5709 Nilphamari By‐Pass Road Km 000.00‐000.40 S 0.40 1419 Zilla Overlay 40mm @ 1000‐2000 2021 1.321 0.000
Z5709 Nilphamari By‐Pass Road Km 000.40‐001.40 S 1.00 1419 Zilla Overlay 40mm @ 1000‐2000 2021 3.311 0.000
Z5709 Nilphamari By‐Pass Road Km 001.40‐001.50 S 0.10 1419 Zilla Overlay 40mm @ 1000‐2000 2021 0.340 0.000
Z5709 Nilphamari By‐Pass Road Km 001.50‐003.00 S 1.50 1419 Zilla Overlay 40mm @ 1000‐2000 2021 5.091 0.000
Z5709 Nilphamari By‐Pass Road Km 003.00‐003.10 S 0.10 1419 Zilla Overlay 40mm @ 1000‐2000 2021 0.340 0.000
Z5709 Nilphamari By‐Pass Road Km 003.10‐003.21 S 0.11 1419 Zilla Seal Coat 2021 0.110 0.403
Z5709 Nilphamari By‐Pass Road Km 003.21‐003.51 S 0.30 1419 Zilla Overlay 40mm @ 1000‐2000 2021 1.075 0.000
Z5709 Nilphamari By‐Pass Road Km 003.51‐003.71 S 0.20 1419 Zilla Overlay 40mm @ 1000‐2000 2021 0.679 0.000
Z5709 Nilphamari By‐Pass Road Km 003.71‐003.91 S 0.20 1419 Zilla Overlay 40mm @ 1000‐2000 2021 0.679 0.000
Z5709 Nilphamari By‐Pass Road Km 003.91‐004.81 S 0.90 1419 Zilla Overlay 40mm @ 1000‐2000 2021 3.056 0.000
Z5709 Nilphamari By‐Pass Road Km 004.81‐004.91 S 0.10 1419 Zilla Overlay 40mm @ 1000‐2000 2021 0.340 0.000
Z5709 Nilphamari By‐Pass Road Km 004.91‐006.81 S 1.90 1419 Zilla Overlay 40mm @ 1000‐2000 2021 7.533 0.131
Nilphamari Total 464.203
Panchgarh Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 473.26‐473.46 S 0.20 7855 National Rehab 180mm @ IRI 9‐12 2021 8.114 7.259
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 488.47‐488.52 S 0.05 7855 National Rehab 180mm @ IRI 9‐12 2021 2.517 5.677
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 000.00‐000.70 S 0.70 6095 Zilla Rehab 75mm @ IRI 9‐12 2021 14.666 0.363
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 000.80‐001.00 S 0.20 6095 Zilla Rehab 75mm @ IRI 9‐12 2021 4.190 0.341
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 007.70‐007.80 S 0.10 6095 Zilla Overlay 50mm @ IRI 6‐9 2021 0.389 1.793
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 007.93‐010.00 S 2.07 6095 Zilla Overlay 40mm @ Traff >=2000 2021 8.143 1.865
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 010.00‐010.35 S 0.35 6095 Zilla Rehab 75mm @ IRI 9‐12 2021 5.745 1.448
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 024.73‐024.83 S 0.10 6095 Zilla Rehab 75mm @ IRI 9‐12 2021 1.048 3.120
Z5001 Panchagarh‐Goalpara‐Ruhea Road Km 026.83‐026.93 S 0.10 6095 Zilla Rehab 75mm @ IRI 9‐12 2021 1.048 3.141
Z5003 Boda‐Debiganj‐Domar (Rail Gate) Road Km 024.34‐024.44 S 0.10 4617 Zilla Rehab 75mm @ IRI 9‐12 2021 2.544 1.247
Z5003 Boda‐Debiganj‐Domar (Rail Gate) Road Km 024.84‐024.94 S 0.10 4617 Zilla Rehab 75mm @ IRI 9‐12 2021 2.544 1.190
Z5003 Boda‐Debiganj‐Domar (Rail Gate) Road Km 027.94‐028.00 S 0.06 4617 Zilla Overlay 50mm @ IRI 6‐9 2021 0.370 2.538
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 000.00‐000.10 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.211
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 012.24‐012.34 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.080
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 012.34‐012.94 S 0.60 2568 Zilla Overlay 40mm @ Traff >=2000 2021 1.936 0.824
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 013.14‐014.94 S 1.80 2568 Zilla Overlay 40mm @ Traff >=2000 2021 5.807 0.881
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 014.94‐015.04 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.122
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 015.04‐018.24 S 3.20 2568 Zilla Overlay 40mm @ Traff >=2000 2021 10.324 0.899
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 018.24‐018.64 S 0.40 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 0.762
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 018.64‐019.34 S 0.70 2568 Zilla Overlay 40mm @ Traff >=2000 2021 2.752 0.000
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 019.34‐019.44 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.191
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 019.44‐020.04 S 0.60 2568 Zilla Overlay 40mm @ Traff >=2000 2021 2.802 0.003
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 020.04‐020.56 S 0.51 2568 Zilla Overlay 40mm @ Traff >=2000 2021 2.395 0.000
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 021.76‐021.86 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.092
Page 206 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 024.36‐024.76 S 0.40 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 4.549 0.677
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 027.36‐027.46 S 0.10 2568 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.223
Z5021 Panchagarh Sugarmill‐Saldanga‐Debiganj Road Km 027.46‐031.87 S 4.41 2568 Zilla Overlay 40mm @ Traff >=2000 2021 14.228 0.989
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 009.90‐010.00 S 0.10 2949 Zilla Rehab 75mm @ IRI 9‐12 2021 1.048 1.563
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 010.00‐010.10 S 0.10 2949 Zilla Seal Coat 2021 0.088 0.446
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 010.10‐010.60 S 0.50 2949 Zilla Rehab 75mm @ IRI 9‐12 2021 5.238 0.999
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 010.60‐012.40 S 1.80 2949 Zilla Overlay 40mm @ Traff >=2000 2021 5.349 1.309
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 012.40‐012.60 S 0.20 2949 Zilla Rehab 75mm @ IRI 9‐12 2021 2.095 1.023
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 012.60‐013.70 S 1.10 2949 Zilla Overlay 40mm @ Traff >=2000 2021 3.269 1.509
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 013.70‐014.00 S 0.30 2949 Zilla Rehab 75mm @ IRI 9‐12 2021 3.143 1.205
Z5060 Bhajanpur‐Atarkhari‐Mainaguri‐Mirganj Road Km 015.80‐015.90 S 0.10 2949 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 0.453
Z5080 Tetulia Upazilla Headquarter Link Road Km 001.70‐001.90 S 0.20 3743 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.968
Z5080 Tetulia Upazilla Headquarter Link Road Km 001.90‐005.80 S 3.90 3743 Zilla Overlay 40mm @ Cracks >25% 2021 15.517 0.400
Z5301 Boda Upazilla Headquarter Connecting Road Km 000.00‐000.50 S 0.50 5396 Zilla Rehab 75mm @ IRI 9‐12 2021 6.121 0.972
Panchgarh Total 152.947
Rangpur Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 323.29‐323.49 L 0.20 11587 National Full Recon 195mm @ IRI 12 2021 12.558 6.748
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 323.29‐323.49 R 0.20 11587 National Overlay 80mm @ IRI 4‐9 2021 2.843 18.787
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 323.80‐325.39 L 1.59 11587 National Rehab 195mm @ IRI 9‐12 2021 82.815 7.573
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 323.80‐325.39 R 1.59 11587 National Overlay 80mm @ IRI 4‐9 2021 22.575 18.232
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 325.39‐325.59 L 0.20 11587 National Full Recon 195mm 2021 12.558 7.136
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 325.39‐325.59 R 0.20 11587 National Full Recon 195mm 2021 12.558 7.144
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 325.59‐326.49 L 0.90 11587 National Rehab 195mm @ IRI 9‐12 2021 46.935 7.484
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 325.59‐326.49 R 0.90 11587 National Rehab 195mm @ IRI 9‐12 2021 46.935 7.478
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.49‐326.59 L 0.10 11587 National Full Recon 195mm 2021 6.279 7.189
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.49‐326.59 R 0.10 11587 National Full Recon 195mm 2021 6.279 7.189
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.59‐326.69 L 0.10 11587 National Rehab 195mm @ IRI 9‐12 2021 5.215 7.510
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.59‐326.69 R 0.10 11587 National Rehab 195mm @ IRI 9‐12 2021 5.215 7.510
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.75‐326.79 L 0.04 13128 National Full Recon 195mm 2021 2.386 3.464
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.75‐326.79 R 0.04 13014 National Full Recon 195mm 2021 2.386 4.124
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.79‐326.99 L 0.20 13128 National Overlay 80mm @ IRI 4‐9 2021 2.843 10.120
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.79‐326.99 R 0.20 13014 National DBST @ Traff >6000 2021 0.850 10.704
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.99‐327.24 L 0.25 13128 National Rehab 195mm @ IRI 9‐12 2021 13.194 3.622
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 326.99‐327.24 R 0.25 13014 National Rehab 195mm @ IRI 9‐12 2021 13.194 4.424
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.24‐327.34 L 0.10 13128 National Overlay 80mm @ IRI 4‐9 2021 1.422 9.183
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.24‐327.34 R 0.10 13014 National Overlay 80mm @ IRI 4‐9 2021 1.422 11.163
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.34‐327.54 L 0.20 13128 National Rehab 195mm @ IRI 9‐12 2021 10.430 3.798
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.34‐327.54 R 0.20 13014 National Rehab 195mm @ IRI 9‐12 2021 10.430 4.612
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.54‐327.74 L 0.20 13128 National Overlay 80mm @ IRI 4‐9 2021 2.843 8.244
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.54‐327.74 R 0.20 13014 National Overlay 80mm @ IRI 4‐9 2021 2.843 9.833
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.74‐327.94 L 0.20 13128 National Rehab 195mm @ IRI 9‐12 2021 10.430 3.798
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.74‐327.94 R 0.20 13014 National Rehab 195mm @ IRI 9‐12 2021 10.430 4.612
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.94‐328.04 L 0.10 13128 National Overlay 80mm @ IRI 4‐9 2021 1.422 8.676
Page 207 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 327.94‐328.04 R 0.10 13014 National Overlay 80mm @ IRI 4‐9 2021 1.422 10.370
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.04‐328.54 L 0.50 13128 National Rehab 195mm @ IRI 9‐12 2021 26.075 3.647
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.04‐328.54 R 0.50 13014 National Rehab 195mm @ IRI 9‐12 2021 26.075 4.420
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.54‐328.64 L 0.10 13128 National Overlay 80mm @ IRI 4‐9 2021 1.422 8.974
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.54‐328.64 R 0.10 13014 National Overlay 80mm @ IRI 4‐9 2021 1.422 10.671
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.64‐329.14 L 0.50 13128 National Rehab 195mm @ IRI 9‐12 2021 26.075 3.623
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 328.64‐329.14 R 0.50 13014 National Rehab 195mm @ IRI 9‐12 2021 26.075 4.378
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.14‐329.54 L 0.40 13128 National Overlay 80mm @ IRI 4‐9 2021 5.686 8.805
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.14‐329.54 R 0.40 13090 National Overlay 80mm @ IRI 4‐9 2021 5.686 9.250
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.54‐329.74 L 0.20 13128 National Rehab 195mm @ IRI 9‐12 2021 10.430 4.083
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.54‐329.74 R 0.20 13128 National Rehab 195mm @ IRI 9‐12 2021 10.430 4.082
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.94‐330.04 L 0.10 13128 National Rehab 195mm @ IRI 9‐12 2021 5.215 4.088
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 329.94‐330.04 R 0.10 13128 National Rehab 195mm @ IRI 9‐12 2021 5.215 4.088
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 330.64‐330.84 L 0.20 13128 National DBST @ Traff >6000 2021 0.850 9.279
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 330.64‐330.84 R 0.20 13128 National DBST @ Traff >6000 2021 0.850 9.279
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 331.14‐331.15 L 0.01 13128 National Rehab 195mm @ IRI 9‐12 2021 0.469 4.094
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 331.14‐331.15 R 0.01 13128 National Rehab 195mm @ IRI 9‐12 2021 0.469 4.094
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 331.15‐331.54 S 0.39 13128 National Rehab 195mm @ IRI 9‐12 2021 17.546 4.626
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 331.54‐332.24 S 0.70 13128 National Overlay 80mm @ IRI 4‐9 2021 8.505 9.820
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 332.24‐332.34 S 0.10 13128 National Rehab 195mm @ IRI 9‐12 2021 4.427 4.910
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 332.34‐335.19 S 2.84 13128 National Overlay 80mm @ IRI 4‐9 2021 34.318 10.403
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 335.19‐338.55 S 3.37 6189 National Overlay 50mm @ IRI 4‐7 2021 25.793 9.059
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 338.55‐338.65 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.431
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 345.45‐345.55 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.761
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 345.55‐347.45 S 1.90 6189 National Overlay 50mm @ IRI 4‐7 2021 14.556 8.921
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 347.45‐347.55 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.929 3.607
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 351.25‐351.35 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.795
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 351.55‐352.05 S 0.50 6189 National Rehab 180mm @ IRI 9‐12 2021 24.681 3.536
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 352.95‐353.05 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.727
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 353.65‐353.75 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.748
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 356.55‐356.65 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.743
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 357.55‐357.65 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.795
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 357.65‐357.85 S 0.20 6189 National Overlay 50mm @ IRI 4‐7 2021 1.533 9.501
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 357.85‐357.95 S 0.10 6189 National Rehab 180mm @ IRI 9‐12 2021 4.936 3.759
N506 Rangpur‐Barobari‐Kurigram Road Km 000.00‐000.20 S 0.20 9732 National Overlay 50mm @ IRI 5‐7 2021 1.651 12.150
N506 Rangpur‐Barobari‐Kurigram Road Km 000.20‐000.60 S 0.40 9732 National Rehab 180mm @ IRI 9‐12 2021 16.825 5.455
N506 Rangpur‐Barobari‐Kurigram Road Km 000.60‐001.60 S 1.00 9732 National DBST @ Traff >6000 2021 2.816 9.794
N506 Rangpur‐Barobari‐Kurigram Road Km 001.60‐001.70 S 0.10 9732 National Full Recon 180mm 2021 5.179 4.673
N506 Rangpur‐Barobari‐Kurigram Road Km 001.70‐003.20 S 1.50 9732 National Overlay 60mm @ IRI 7‐9 2021 12.058 15.677
N506 Rangpur‐Barobari‐Kurigram Road Km 003.20‐003.80 S 0.60 8481 National Rehab 180mm @ IRI 9‐12 2021 19.499 6.945
N506 Rangpur‐Barobari‐Kurigram Road Km 003.80‐004.60 S 0.80 8385 National Overlay 60mm @ IRI 7‐9 2021 5.504 12.616
N506 Rangpur‐Barobari‐Kurigram Road Km 004.60‐004.70 S 0.10 8385 National Full Recon 180mm 2021 3.849 5.079
N506 Rangpur‐Barobari‐Kurigram Road Km 004.70‐007.80 S 3.10 8385 National Overlay 60mm @ IRI 7‐9 2021 21.633 12.463
Page 208 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N506 Rangpur‐Barobari‐Kurigram Road Km 007.80‐011.46 S 3.66 8385 National Overlay 60mm @ IRI 7‐9 2021 25.263 12.534
N506 Rangpur‐Barobari‐Kurigram Road Km 011.46‐018.46 S 7.00 8385 National Overlay 60mm @ IRI 7‐9 2021 48.426 12.458
N506 Rangpur‐Barobari‐Kurigram Road Km 018.46‐021.46 S 3.00 8385 National Overlay 60mm @ IRI 7‐9 2021 26.582 14.420
N517 Rangpur Town Old Section Km 000.00‐000.27 S 0.27 15825 National Overlay 50mm @ IRI 5 2021 2.373 2.448
N517 Rangpur Town Old Section Km 000.60‐000.70 L 0.10 4991 National Rehab 150mm @ IRI 9‐12 2021 1.546 1.636
N517 Rangpur Town Old Section Km 000.60‐000.70 R 0.10 4991 National Rehab 150mm @ IRI 9‐12 2021 1.546 1.636
N517 Rangpur Town Old Section Km 000.81‐001.76 L 0.95 4991 National Overlay 50mm @ IRI 5‐9 2021 3.209 1.760
N517 Rangpur Town Old Section Km 000.81‐001.76 R 0.95 4991 National Overlay 50mm @ IRI 5‐9 2021 3.209 1.760
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 000.00‐000.03 S 0.03 12762 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.407 1.991
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 009.29‐009.49 S 0.20 12762 Regional Rehab 150mm @ IRI 9‐12 2021 7.245 2.863
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 013.29‐013.39 S 0.10 12762 Regional Rehab 150mm @ IRI 9‐12 2021 2.729 4.691
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 029.99‐030.39 S 0.40 3669 Regional Overlay 50mm @ IRI 7‐9 2021 2.314 2.919
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 031.49‐031.59 S 0.10 3669 Regional Rehab 135mm @ IRI 9‐12 2021 2.490 0.973
R554 Rangpur‐Badarganj‐Parbatipur‐Dinajpur Road Km 031.59‐031.74 S 0.15 3669 Regional DBST @ 25% Crk 2021 0.418 2.354
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 000.00‐000.02 L 0.02 1964 Zilla Seal Coat 2021 0.026 2.173
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 000.80‐001.50 S 0.70 1964 Zilla Overlay 40mm @ 1000‐2000 2021 3.132 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 001.50‐001.70 S 0.20 1964 Zilla Overlay 40mm @ 1000‐2000 2021 0.798 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 001.70‐002.20 S 0.50 1964 Zilla Overlay 40mm @ 1000‐2000 2021 1.991 0.138
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 002.20‐002.60 S 0.40 1964 Zilla Overlay 40mm @ 1000‐2000 2021 1.596 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 002.60‐003.20 S 0.60 1964 Zilla Overlay 40mm @ 1000‐2000 2021 2.394 0.128
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 004.00‐004.10 S 0.10 1964 Zilla Overlay 40mm @ 1000‐2000 2021 0.399 0.237
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 004.10‐004.20 S 0.10 1964 Zilla Overlay 40mm @ 1000‐2000 2021 0.399 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 004.20‐004.40 S 0.20 1964 Zilla Overlay 40mm @ 1000‐2000 2021 0.798 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 004.40‐004.50 S 0.10 1964 Zilla Overlay 40mm @ 1000‐2000 2021 0.399 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 006.14‐006.64 S 0.50 1964 Zilla Overlay 40mm @ 1000‐2000 2021 1.613 0.024
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 006.64‐010.62 S 3.98 1964 Zilla Overlay 40mm @ 1000‐2000 2021 13.083 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 010.80‐011.10 S 0.30 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 6.483 0.830
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 011.10‐011.60 S 0.50 5721 Zilla Overlay 40mm @ Traff >=2000 2021 2.887 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 011.60‐011.90 S 0.30 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 5.405 0.259
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 011.90‐012.40 S 0.50 5721 Zilla Overlay 50mm @ Cracking >25% 2021 2.835 1.648
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 012.40‐012.70 S 0.30 5721 Zilla Overlay 50mm @ IRI 6‐9 2021 1.701 2.509
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 012.70‐013.10 S 0.40 5721 Zilla Overlay 50mm @ Cracking >25% 2021 2.302 0.284
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 013.10‐013.20 S 0.10 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.386
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 013.20‐014.60 S 1.40 5721 Zilla Overlay 50mm @ Cracking >25% 2021 8.232 0.306
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 014.60‐014.70 S 0.10 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.453
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 014.70‐015.90 S 1.20 5721 Zilla Overlay 50mm @ Cracking >25% 2021 7.081 0.167
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 015.90‐016.10 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.532 1.198
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 016.30‐016.40 S 0.10 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 1.766 0.539
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 016.40‐016.60 S 0.20 5721 Zilla Overlay 40mm @ Traff >=2000 2021 1.002 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 016.60‐016.70 S 0.10 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 1.766 0.824
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 018.70‐020.10 S 1.39 5721 Zilla Overlay 50mm @ Cracking >25% 2021 8.630 0.006
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 020.10‐020.30 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.532 0.600
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 020.30‐020.70 S 0.40 5721 Zilla Overlay 50mm @ Cracking >25% 2021 2.478 0.114
Page 209 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 020.70‐020.90 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.532 0.291
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 020.90‐021.10 S 0.20 5721 Zilla Overlay 50mm @ Cracking >25% 2021 1.239 0.076
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 021.10‐021.40 S 0.30 5721 Zilla Overlay 50mm @ IRI 6‐9 2021 1.859 0.642
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 021.40‐022.40 S 1.00 5721 Zilla Overlay 40mm @ Traff >=2000 2021 5.009 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 022.40‐022.60 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.532 0.573
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 022.60‐024.70 S 2.10 5721 Zilla Overlay 40mm @ Traff >=2000 2021 10.466 0.000
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 024.70‐024.90 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.983
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 026.30‐026.50 S 0.20 5721 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.577
Z5010 Rangpur‐Shahebganj‐Pirgachha Road Km 026.50‐028.86 S 2.37 5721 Zilla Overlay 50mm @ Cracking >25% 2021 12.744 1.922
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 000.00‐000.10 S 0.10 2183 Zilla Seal Coat 2021 0.102 0.149
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 000.10‐000.30 S 0.20 2183 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.532
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 000.30‐008.70 S 8.40 2183 Zilla Overlay 40mm @ Traff >=2000 2021 27.094 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 008.70‐008.90 S 0.20 2183 Zilla Overlay 40mm @ Traff >=2000 2021 0.645 0.235
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 008.90‐010.91 S 2.01 2183 Zilla Overlay 40mm @ Traff >=2000 2021 6.478 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 010.91‐011.01 S 0.10 2183 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.816
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 011.01‐012.81 S 1.80 2183 Zilla Overlay 40mm @ Traff >=2000 2021 5.807 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 012.81‐013.01 S 0.20 2183 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.414
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 013.01‐015.51 S 2.50 2183 Zilla Overlay 40mm @ Traff >=2000 2021 8.066 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 015.51‐015.61 S 0.10 2183 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.360
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 015.61‐016.41 S 0.80 2183 Zilla Overlay 40mm @ Traff >=2000 2021 2.581 0.000
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 016.41‐016.51 S 0.10 2183 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.575
Z5015 Taxerhat‐Laldighi‐Taraganj‐Kishoreganj Road Km 016.51‐018.68 S 2.17 2183 Zilla Overlay 40mm @ Traff >=2000 2021 7.291 0.000
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 004.30‐004.50 S 0.20 4537 Zilla Overlay 50mm @ IRI 6‐9 2021 1.155 0.456
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 004.90‐005.00 S 0.10 4537 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.201
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 005.00‐005.20 S 0.20 4537 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 0.001
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 005.20‐005.30 S 0.10 4537 Zilla Overlay 40mm @ Traff >=2000 2021 0.467 0.178
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 008.60‐008.70 S 0.10 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.879
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 008.70‐009.30 S 0.60 4537 Zilla Overlay 40mm @ Traff >=2000 2021 1.936 0.000
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 010.40‐010.60 S 0.20 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.003
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 010.60‐010.61 S 0.01 4537 Zilla Overlay 40mm @ Traff >=2000 2021 0.042 0.000
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 011.13‐011.43 S 0.30 4537 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 1.022
Z5018 Gangachhara‐Monthanahat‐Garagram‐Nilphamari  Km 012.73‐012.83 S 0.10 4537 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.897
Z5019 Police Line‐ Jalkar‐ Sothapir‐ Pakkar Matha Road Km 002.60‐002.90 S 0.30 5184 Zilla Overlay 50mm @ IRI 6‐9 2021 1.197 1.730
Z5019 Police Line‐ Jalkar‐ Sothapir‐ Pakkar Matha Road Km 002.90‐003.81 S 0.91 5184 Zilla Overlay 40mm @ Traff >=2000 2021 3.635 0.000
Z5020 Hazirhat‐Betgari‐Langalerhat‐Gangachhara Road Km 003.10‐013.25 S 10.15 1351 Zilla Overlay 40mm @ 1000‐2000 2021 35.349 0.000
Z5020 Hazirhat‐Betgari‐Langalerhat‐Gangachhara Road Km 013.25‐013.35 S 0.10 1351 Zilla Overlay 40mm @ 1000‐2000 2021 0.340 0.000
Z5020 Hazirhat‐Betgari‐Langalerhat‐Gangachhara Road Km 013.35‐016.35 S 3.00 1351 Zilla Overlay 40mm @ 1000‐2000 2021 10.188 0.000
Z5023 Rangapur‐Gangachhara Road Km 000.00‐000.30 S 0.30 14822 Zilla Overlay 50mm @ IRI 6‐9 2021 2.214 3.329
Z5023 Rangapur‐Gangachhara Road Km 000.30‐000.80 S 0.50 14822 Zilla Overlay 50mm @ IRI 6‐9 2021 3.360 5.706
Z5023 Rangapur‐Gangachhara Road Km 000.80‐009.00 S 8.20 14822 Zilla Overlay 40mm @ Traff >=2000 2021 41.761 3.176
Z5023 Rangapur‐Gangachhara Road Km 009.00‐009.10 S 0.10 14822 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 4.872
Z5023 Rangapur‐Gangachhara Road Km 009.10‐010.47 S 1.38 14822 Zilla Overlay 40mm @ Traff >=2000 2021 6.542 3.429
Z5023 Rangapur‐Gangachhara Road Km 010.47‐010.57 S 0.10 14822 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 5.026
Page 210 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5023 Rangapur‐Gangachhara Road Km 010.57‐011.17 S 0.60 14822 Zilla Overlay 50mm @ Cracking >25% 2021 3.509 4.376
Z5023 Rangapur‐Gangachhara Road Km 011.17‐013.15 S 1.98 14822 Zilla Rehab 75mm @ IRI 9‐12 2021 24.840 3.840
Z5024 Modhupur‐Shampur Road Km 000.00‐003.50 S 3.50 2109 Zilla Overlay 40mm @ Traff >=2000 2021 11.288 0.002
Z5074 Dhaka‐Rangpur Highway N5 to Pirganj Road Km 000.00‐000.60 S 0.60 2235 Zilla Overlay 40mm @ Traff >=2000 2021 1.976 0.000
Z5074 Dhaka‐Rangpur Highway N5 to Pirganj Road Km 000.60‐000.80 S 0.20 2235 Zilla Overlay 40mm @ Traff >=2000 2021 0.611 0.247
Z5074 Dhaka‐Rangpur Highway N5 to Pirganj Road Km 000.80‐000.90 S 0.10 2235 Zilla Overlay 40mm @ Traff >=2000 2021 0.306 0.000
Z5074 Dhaka‐Rangpur Highway N5 to Pirganj Road Km 000.90‐001.10 S 0.20 2235 Zilla Overlay 40mm @ Traff >=2000 2021 0.679 0.000
Z5074 Dhaka‐Rangpur Highway N5 to Pirganj Road Km 001.10‐001.50 S 0.40 2235 Zilla Overlay 40mm @ Traff >=2000 2021 1.358 0.000
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 009.60‐011.50 S 1.90 2365 Zilla Overlay 40mm @ Traff >=2000 2021 7.389 0.050
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 011.50‐011.70 S 0.20 2365 Zilla Overlay 40mm @ Traff >=2000 2021 0.674 0.283
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 011.70‐012.90 S 1.20 2365 Zilla Overlay 40mm @ Traff >=2000 2021 4.218 0.000
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 012.90‐013.00 S 0.10 2365 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 0.491
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 013.00‐016.80 S 3.80 2365 Zilla Overlay 40mm @ Traff >=2000 2021 12.711 0.000
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 016.80‐017.20 S 0.40 2788 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 0.082
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 017.40‐017.50 S 0.10 3288 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.528
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 017.50‐017.80 S 0.30 3288 Zilla Overlay 40mm @ Traff >=2000 2021 1.426 0.000
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 017.80‐017.90 S 0.10 3288 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.325
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 017.90‐033.20 S 15.30 3288 Zilla Overlay 40mm @ Cracks >25% 2021 56.339 1.048
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 033.20‐033.40 S 0.20 3288 Zilla Full Recon 75mm @ IRI>12 2021 3.478 0.790
Z5075 Sadullahpur ‐Pirganj‐Nawabganj  Road Km 033.40‐037.45 S 4.05 3288 Zilla Overlay 40mm @ Traff >=2000 2021 17.786 0.731
Z5612 Shahebganj‐Haragachha Road Km 000.00‐000.20 S 0.20 5025 Zilla Overlay 40mm @ Traff >=2000 2021 0.936 0.000
Z5612 Shahebganj‐Haragachha Road Km 000.20‐000.40 S 0.20 5025 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.434
Z5612 Shahebganj‐Haragachha Road Km 000.40‐000.90 S 0.50 5025 Zilla Overlay 40mm @ Traff >=2000 2021 2.335 0.000
Z5612 Shahebganj‐Haragachha Road Km 000.90‐001.10 S 0.20 5025 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 0.440
Z5612 Shahebganj‐Haragachha Road Km 001.10‐009.25 S 8.15 5025 Zilla Overlay 40mm @ Traff >=2000 2021 33.213 0.501
Z5613 Gaibandah‐Pirgachha Road Km 050.80‐053.30 S 2.50 2096 Zilla Overlay 40mm @ Traff >=2000 2021 12.098 0.143
Z5613 Gaibandah‐Pirgachha Road Km 053.30‐053.50 S 0.20 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.968 0.000
Z5613 Gaibandah‐Pirgachha Road Km 053.50‐056.60 S 3.10 2096 Zilla Overlay 40mm @ Traff >=2000 2021 15.002 0.065
Z5613 Gaibandah‐Pirgachha Road Km 056.60‐056.70 S 0.10 2096 Zilla Overlay 40mm @ Traff >=2000 2021 0.484 0.000
Z5613 Gaibandah‐Pirgachha Road Km 056.70‐059.15 S 2.45 2096 Zilla Overlay 40mm @ Traff >=2000 2021 11.837 0.064
Rangpur Total 1458.109
Thakurgaon Division
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 425.55‐425.75 S 0.20 8799 National Overlay 60mm @ IRI 7‐9 2021 1.501 10.541
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 425.75‐426.05 S 0.30 8799 National Overlay 50mm @ IRI 4‐7 2021 1.890 8.937
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 426.05‐426.15 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 4.057 4.706
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 426.95‐427.05 S 0.10 8799 National Full Recon 180mm @ IRI 12 2021 4.199 4.011
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 431.55‐434.63 S 3.08 8799 National Overlay 50mm @ IRI 4‐7 2021 19.165 9.710
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 434.63‐434.73 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 4.057 4.817
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 442.53‐442.71 S 0.18 8799 National Rehab 180mm @ IRI 9‐12 2021 7.261 4.332
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 445.21‐445.31 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.990 4.869
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 445.41‐445.51 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.990 4.827
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 449.21‐449.31 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.990 4.812
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 449.31‐449.71 S 0.40 8799 National Overlay 50mm @ IRI 4‐7 2021 2.478 9.093
Page 211 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 449.71‐449.81 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.990 4.780
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 450.81‐451.01 S 0.20 8799 National Rehab 180mm @ IRI 9‐12 2021 7.844 4.360
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 451.01‐451.61 S 0.60 8799 National Overlay 50mm @ IRI 4‐7 2021 3.654 9.344
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 451.61‐451.71 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.922 4.884
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 452.68‐452.78 S 0.10 8799 National Rehab 180mm @ IRI 9‐12 2021 3.922 4.917
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 452.78‐453.08 S 0.30 8799 National Overlay 50mm @ IRI 4‐7 2021 1.827 9.542
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 453.08‐453.28 S 0.20 8799 National Rehab 180mm @ IRI 9‐12 2021 7.844 4.154
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 453.38‐453.88 S 0.50 8799 National DBST @ Traff >6000 2021 1.433 9.498
N5 Dhaka (Mirpur)‐ Bogura‐Rangpur‐ Banglabandh Km 453.88‐454.77 S 0.89 8799 National Overlay 50mm @ IRI 4‐7 2021 5.414 9.270
R587 Thakurgaon Town Old Section  Km 000.10‐000.40 L 0.30 26134 Regional Rehab 150mm @ IRI 9‐12 2021 13.621 3.186
R587 Thakurgaon Town Old Section  Km 000.10‐000.40 R 0.30 26134 Regional Rehab 150mm @ IRI 9‐12 2021 11.882 3.828
R587 Thakurgaon Town Old Section  Km 000.40‐001.70 L 1.30 26134 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.815 6.515
R587 Thakurgaon Town Old Section  Km 000.40‐001.70 R 1.30 26134 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.506 8.526
R587 Thakurgaon Town Old Section  Km 005.40‐006.14 S 0.74 26134 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.276 11.372
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 000.00‐000.20 S 0.20 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 4.478 1.233
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 000.30‐000.40 S 0.10 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 2.185 1.379
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 002.79‐002.80 S 0.01 12631 Zilla Overlay 40mm @ Traff >=2000 2021 0.052 2.295
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 002.80‐003.00 S 0.20 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 4.316 0.796
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 010.08‐010.38 S 0.30 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 6.285 1.456
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 021.12‐021.32 S 0.20 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 4.070 1.145
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 026.76‐027.68 S 0.92 12631 Zilla Overlay 50mm @ IRI 6‐9 2021 11.000 1.282
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 030.88‐030.98 S 0.10 12631 Zilla Rehab 75mm @ IRI 9‐12 2021 2.035 2.375
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 033.88‐034.28 S 0.40 12631 Zilla Overlay 50mm @ IRI 6‐9 2021 2.856 2.016
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 052.52‐052.72 S 0.20 3305 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 0.907
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 052.72‐052.92 S 0.20 3305 Zilla Overlay 40mm @ Cracks >25% 2021 0.611 0.712
Z5002 Thakurgaon‐Nekmand‐Pirganj‐Birganj Road Km 052.92‐053.02 S 0.10 3305 Zilla Rehab 75mm @ IRI 9‐12 2021 1.137 1.327
Z5004 Ranishankoil‐Haripur Road Km 000.00‐000.50 S 0.50 5015 Zilla Overlay 40mm @ Traff >=2000 2021 2.887 0.402
Z5004 Ranishankoil‐Haripur Road Km 000.50‐000.60 S 0.10 5015 Zilla Overlay 40mm @ Traff >=2000 2021 0.577 0.078
Z5004 Ranishankoil‐Haripur Road Km 000.60‐000.70 S 0.10 5015 Zilla Rehab 75mm @ IRI 9‐12 2021 2.035 0.244
Z5004 Ranishankoil‐Haripur Road Km 010.10‐010.21 S 0.11 5015 Zilla Rehab 75mm @ IRI 9‐12 2021 1.329 1.869
Z5004 Ranishankoil‐Haripur Road Km 016.98‐017.82 S 0.83 5015 Zilla Overlay 50mm @ IRI 6‐9 2021 4.822 1.237
Z5029 Nekmand‐Dharmagarh Road Km 000.00‐000.20 S 0.20 3878 Zilla Overlay 40mm @ Cracks >25% 2021 0.611 0.172
Z5029 Nekmand‐Dharmagarh Road Km 000.20‐000.50 S 0.30 3878 Zilla Rehab 75mm @ IRI 9‐12 2021 3.412 0.514
Z5029 Nekmand‐Dharmagarh Road Km 000.50‐010.50 S 10.00 3878 Zilla Overlay 40mm @ Cracks >25% 2021 30.784 0.304
Z5055 Thakurgaon‐Pirganj Road Km 000.00‐009.80 S 9.80 7674 Zilla Overlay 40mm @ Traff >=2000 2021 49.911 0.028
Z5055 Thakurgaon‐Pirganj Road Km 009.80‐012.86 S 3.06 7674 Zilla Overlay 50mm @ IRI 6‐9 2021 19.265 0.323
Z5059 Thakurgaon‐Ruhea Road Km 000.00‐000.10 S 0.10 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.431
Z5059 Thakurgaon‐Ruhea Road Km 000.10‐001.20 S 1.10 6046 Zilla Overlay 40mm @ Traff >=2000 2021 5.230 0.358
Z5059 Thakurgaon‐Ruhea Road Km 001.20‐001.30 S 0.10 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 1.355
Z5059 Thakurgaon‐Ruhea Road Km 007.60‐007.70 S 0.10 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.676 0.917
Z5059 Thakurgaon‐Ruhea Road Km 008.03‐010.10 S 2.07 5630 Zilla Overlay 50mm @ Cracking >25% 2021 9.020 1.030
Z5059 Thakurgaon‐Ruhea Road Km 010.10‐010.30 S 0.20 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 3.292 1.359
Z5059 Thakurgaon‐Ruhea Road Km 010.30‐012.60 S 2.30 6046 Zilla Overlay 40mm @ Traff >=2000 2021 10.740 1.621
Page 212 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z5059 Thakurgaon‐Ruhea Road Km 012.60‐012.70 S 0.10 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.891
Z5059 Thakurgaon‐Ruhea Road Km 012.70‐014.30 S 1.60 5630 Zilla Overlay 40mm @ Traff >=2000 2021 6.819 0.542
Z5059 Thakurgaon‐Ruhea Road Km 014.30‐014.70 S 0.40 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 6.585 1.617
Z5059 Thakurgaon‐Ruhea Road Km 014.70‐014.90 S 0.20 6046 Zilla Overlay 40mm @ Traff >=2000 2021 0.934 1.357
Z5059 Thakurgaon‐Ruhea Road Km 014.90‐015.00 S 0.10 6046 Zilla Rehab 75mm @ IRI 9‐12 2021 1.646 1.945
Z5059 Thakurgaon‐Ruhea Road Km 015.10‐016.22 S 1.12 6046 Zilla Overlay 50mm @ IRI 6‐9 2021 6.456 2.813
Thakurgaon Total 367.857
Rangpur Zone Total 5769.157

Sylhet Zone
Habiganj Division
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 107.61‐107.71 S 0.10 13187 National Overlay 80mm @ IRI 4‐9 2021 1.211 22.922
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 107.74‐108.14 L 0.40 13187 National Overlay 80mm @ IRI 4‐9 2021 7.934 16.057
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 107.74‐108.14 R 0.40 13187 National Overlay 80mm @ IRI 4‐9 2021 5.951 19.421
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 108.14‐108.17 L 0.03 13187 National Full Recon 195mm 2021 2.716 6.194
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 108.14‐108.17 R 0.03 13187 National Full Recon 195mm 2021 2.037 7.665
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 108.17‐108.34 S 0.17 13187 National Full Recon 195mm 2021 9.131 9.441
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 108.34‐114.63 S 6.30 13187 National Overlay 80mm @ IRI 4‐9 2021 77.038 23.778
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 114.63‐114.73 S 0.10 13187 National Full Recon 195mm 2021 5.403 9.413
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 114.73‐116.13 S 1.39 13187 National Overlay 80mm @ IRI 4‐9 2021 17.039 23.037
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 116.13‐116.42 L 0.28 11926 National Overlay 80mm @ IRI 4‐9 2021 3.041 26.148
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 116.13‐116.42 R 0.28 11926 National Overlay 80mm @ IRI 4‐9 2021 3.041 26.148
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 116.42‐116.52 L 0.10 10420 National Overlay 80mm @ IRI 4‐9 2021 1.074 26.794
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 116.42‐116.52 R 0.10 10420 National Overlay 80mm @ IRI 4‐9 2021 1.074 26.794
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 116.52‐121.23 S 4.72 10420 National Overlay 80mm @ IRI 4‐9 2021 57.687 23.012
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 121.23‐121.33 S 0.10 10420 National Full Recon 195mm @ IRI 12 2021 5.403 9.216
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 121.33‐124.43 S 3.10 10420 National Overlay 80mm @ IRI 4‐9 2021 37.908 23.008
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 124.43‐124.59 S 0.16 10420 National Rehab 195mm @ IRI 9‐12 2021 7.135 10.300
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 124.59‐128.09 S 3.50 10420 National Overlay 80mm @ IRI 4‐9 2021 42.800 22.832
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.09‐128.19 S 0.10 10420 National Rehab 195mm @ IRI 9‐12 2021 4.487 9.999
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.19‐128.29 S 0.10 10420 National Full Recon 195mm @ IRI 12 2021 5.403 9.216
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.29‐128.49 S 0.20 10420 National Rehab 195mm @ IRI 9‐12 2021 8.975 9.974
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.49‐128.89 S 0.40 10420 National Full Recon 195mm @ IRI 12 2021 21.611 8.446
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.89‐128.99 S 0.10 10420 National Overlay 80mm @ IRI 4‐9 2021 1.223 24.042
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 128.99‐129.39 S 0.40 10420 National Full Recon 195mm @ IRI 12 2021 21.611 8.063
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 129.39‐131.14 S 1.75 10420 National Overlay 80mm @ IRI 4‐9 2021 21.370 23.234
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 131.14‐131.24 L 0.10 2971 National Overlay 50mm @ IRI 4‐9 2021 0.420 8.878
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 131.14‐131.24 R 0.10 2971 National Overlay 50mm @ IRI 4‐9 2021 0.420 8.878
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 133.39‐133.49 S 0.10 10420 National Full Recon 195mm @ IRI 12 2021 5.403 9.172
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 133.49‐136.19 S 2.70 10420 National Overlay 80mm @ IRI 4‐9 2021 33.282 22.489
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 136.19‐136.29 S 0.10 10420 National Full Recon 195mm @ IRI 12 2021 5.476 9.085
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 136.29‐139.19 S 2.90 10420 National Overlay 80mm @ IRI 4‐9 2021 35.940 22.249
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 139.19‐139.29 S 0.10 10420 National Full Recon 195mm @ IRI 12 2021 5.476 9.085
Page 213 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 139.29‐139.59 S 0.30 10420 National Rehab 195mm @ IRI 9‐12 2021 13.644 10.002
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 139.59‐139.79 S 0.20 10420 National Full Recon 195mm @ IRI 12 2021 10.952 8.980
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 139.79‐141.18 S 1.39 10420 National Overlay 80mm @ IRI 4‐9 2021 17.295 22.684
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 141.19‐141.43 L 0.25 10600 National Overlay 80mm @ IRI 4‐9 2021 3.240 20.647
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 141.19‐141.43 R 0.25 10600 National Overlay 80mm @ IRI 4‐9 2021 3.240 20.647
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 141.43‐144.09 S 2.65 10996 National Overlay 80mm @ IRI 4‐9 2021 32.464 20.902
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 144.09‐144.39 S 0.30 10996 National Full Recon 195mm @ IRI 12 2021 16.208 8.546
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 144.39‐145.84 S 1.46 10996 National Overlay 80mm @ IRI 4‐9 2021 17.810 21.004
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 146.08‐148.08 S 2.00 9638 National DBST @ Traff >6000 2021 7.322 16.056
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 148.08‐148.38 S 0.30 9638 National Full Recon 180mm 2021 15.538 7.152
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 148.38‐151.88 S 3.50 9638 National DBST @ Traff >6000 2021 12.791 15.920
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 151.88‐151.98 S 0.10 9638 National Rehab 180mm @ IRI 9‐12 2021 5.004 7.673
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 151.98‐152.18 S 0.20 9638 National Full Recon 180mm 2021 10.359 7.279
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 160.78‐160.88 S 0.10 9638 National Full Recon 180mm 2021 5.179 7.162
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 179.41‐179.60 L 0.18 9599 National Overlay 50mm @ IRI 4‐7 2021 0.950 14.874
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 179.41‐179.60 R 0.18 9599 National Overlay 50mm @ IRI 4‐7 2021 0.950 14.874
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 179.60‐179.81 S 0.22 9638 National DBST @ Traff >6000 2021 0.801 16.027
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 179.81‐179.91 S 0.10 9638 National Full Recon 180mm 2021 5.179 7.051
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 179.91‐181.58 S 1.67 9638 National DBST @ Traff >6000 2021 6.090 16.027
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 181.73‐182.21 S 0.48 9638 National DBST @ Traff >6000 2021 1.769 15.820
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 182.21‐182.31 S 0.10 9638 National Full Recon 180mm 2021 5.179 7.304
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 182.31‐183.17 S 0.85 9638 National Overlay 60mm @ IRI 7‐9 2021 7.897 18.383
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 183.17‐183.27 S 0.10 9638 National Full Recon 180mm 2021 5.179 7.305
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 183.27‐187.87 S 4.60 9570 National DBST @ Traff >6000 2021 16.812 18.025
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 187.87‐188.27 S 0.40 9515 National Rehab 180mm @ IRI 9‐12 2021 20.016 10.278
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 188.27‐188.37 S 0.10 9515 National Full Recon 180mm 2021 5.179 9.147
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 188.37‐189.07 S 0.70 9515 National Overlay 50mm @ IRI 4‐7 2021 5.431 18.754
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 189.07‐189.21 S 0.14 9515 National Full Recon 180mm 2021 7.510 9.147
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 000.00‐000.03 L 0.03 8494 National Overlay 50mm @ IRI 5‐7 2021 0.311 1.180
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 000.00‐000.03 R 0.03 8494 National Overlay 50mm @ IRI 5‐7 2021 0.319 1.135
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 000.03‐002.20 S 2.17 8494 National Overlay 50mm @ IRI 5‐7 2021 11.946 2.358
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 002.20‐002.50 S 0.30 8494 National Full Recon 180mm 2021 10.897 1.246
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 002.50‐005.00 S 2.50 8494 National Overlay 50mm @ IRI 5‐7 2021 13.755 2.729
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 005.00‐005.20 S 0.20 8494 National Full Recon 180mm 2021 7.391 1.418
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 006.50‐006.60 S 0.10 8494 National Rehab 180mm @ IRI 9‐12 2021 3.071 1.632
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 010.50‐010.60 S 0.10 8494 National Full Recon 180mm 2021 3.688 1.831
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 011.10‐011.20 S 0.10 8494 National Full Recon 180mm 2021 3.688 2.180
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 011.20‐011.30 S 0.10 8494 National DBST @ Traff >6000 2021 0.260 3.042
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 011.30‐011.40 S 0.10 8494 National Rehab 180mm @ IRI 9‐12 2021 3.019 1.925
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 011.40‐013.30 S 1.90 8494 National Overlay 50mm @ IRI 5‐7 2021 10.474 2.835
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 013.30‐013.60 S 0.30 8494 National Rehab 180mm @ IRI 9‐12 2021 9.110 1.222
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 015.20‐015.40 S 0.20 8494 National Rehab 180mm @ IRI 9‐12 2021 6.039 1.454
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 019.70‐019.90 S 0.20 8494 National Rehab 180mm @ IRI 9‐12 2021 6.085 1.518
Page 214 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 020.60‐020.80 S 0.20 8494 National Full Recon 180mm 2021 7.559 1.252
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 021.30‐021.50 S 0.20 8494 National Full Recon 180mm 2021 7.559 1.548
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 021.90‐022.29 S 0.40 8494 National DBST @ Traff >6000 2021 1.076 3.466
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 023.49‐023.69 S 0.20 8494 National Overlay 60mm @ IRI 7‐9 2021 1.366 4.256
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 023.89‐024.09 S 0.20 8494 National Overlay 60mm @ IRI 7‐9 2021 1.366 4.195
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 024.49‐024.59 S 0.10 8494 National Rehab 180mm @ IRI 9‐12 2021 3.146 1.699
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 025.39‐025.89 S 0.50 8494 National Overlay 60mm @ IRI 7‐9 2021 4.047 3.682
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 027.29‐027.39 S 0.10 8494 National Full Recon 180mm 2021 3.786 1.768
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 027.39‐028.39 S 1.00 8494 National Overlay 50mm @ IRI 5‐7 2021 5.691 2.830
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 028.39‐028.49 S 0.10 8494 National Full Recon 180mm 2021 3.793 1.889
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 028.49‐029.29 S 0.80 8494 National Overlay 50mm @ IRI 5‐7 2021 4.553 2.831
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 029.29‐029.39 S 0.10 8494 National Full Recon 180mm 2021 3.779 2.012
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 029.39‐031.59 S 2.20 8494 National Overlay 50mm @ IRI 5‐7 2021 12.445 2.743
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 031.59‐031.69 S 0.10 8494 National Full Recon 180mm 2021 3.793 2.062
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 031.89‐031.99 S 0.10 8494 National Rehab 180mm @ IRI 9‐12 2021 3.123 2.129
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 034.33‐034.42 L 0.10 8494 National Overlay 50mm @ IRI 5‐7 2021 0.605 4.546
N204 Jagadishpur‐Chunarughat‐Shaistaganj Km 034.33‐034.42 R 0.10 8494 National Overlay 50mm @ IRI 5‐7 2021 0.605 4.546
R221 Kamarpur, Habiganj to Nasratpur Km 000.00‐000.30 S 0.30 6227 Regional DBST @ 25% Crk 2021 0.889 0.973
R221 Kamarpur, Habiganj to Nasratpur Km 000.30‐001.10 S 0.80 6227 Regional Rehab 150mm @ IRI 9‐12 2021 23.145 0.622
R221 Kamarpur, Habiganj to Nasratpur Km 001.10‐002.10 S 1.00 6227 Regional DBST @ Traff >6000 2021 2.759 1.530
R221 Kamarpur, Habiganj to Nasratpur Km 002.10‐002.30 S 0.20 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 3.670
R221 Kamarpur, Habiganj to Nasratpur Km 002.30‐002.90 S 0.60 6227 Regional DBST @ 25% Crk 2021 1.660 1.651
R221 Kamarpur, Habiganj to Nasratpur Km 002.90‐004.00 S 1.10 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.720 2.860
R221 Kamarpur, Habiganj to Nasratpur Km 004.00‐004.10 S 0.10 6227 Regional DBST @ Traff >6000 2021 0.277 3.737
R221 Kamarpur, Habiganj to Nasratpur Km 004.10‐004.40 S 0.30 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.098 2.097
R221 Kamarpur, Habiganj to Nasratpur Km 004.40‐005.10 S 0.70 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.886 2.966
R221 Kamarpur, Habiganj to Nasratpur Km 005.10‐006.20 S 1.10 6227 Regional DBST @ Traff >6000 2021 3.029 1.513
R221 Kamarpur, Habiganj to Nasratpur Km 006.20‐006.30 S 0.10 6227 Regional DBST @ Traff >6000 2021 0.277 3.707
R221 Kamarpur, Habiganj to Nasratpur Km 006.30‐007.50 S 1.20 6227 Regional DBST @ Traff >6000 2021 3.320 1.561
R221 Kamarpur, Habiganj to Nasratpur Km 007.50‐007.80 S 0.30 6227 Regional DBST @ Traff >6000 2021 0.830 2.964
R221 Kamarpur, Habiganj to Nasratpur Km 007.80‐009.30 S 1.50 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.696 1.960
R221 Kamarpur, Habiganj to Nasratpur Km 009.30‐009.60 S 0.30 6227 Regional DBST @ Traff >6000 2021 0.885 2.266
R221 Kamarpur, Habiganj to Nasratpur Km 009.60‐010.10 S 0.50 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.727 1.507
R221 Kamarpur, Habiganj to Nasratpur Km 010.10‐010.30 S 0.20 6227 Regional Rehab 150mm @ IRI 9‐12 2021 5.767 0.773
R221 Kamarpur, Habiganj to Nasratpur Km 010.30‐011.90 S 1.60 6227 Regional DBST @ Traff >6000 2021 4.418 1.465
R221 Kamarpur, Habiganj to Nasratpur Km 011.90‐012.10 S 0.20 6227 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.404 3.661
R221 Kamarpur, Habiganj to Nasratpur Km 012.10‐013.20 S 1.10 6227 Regional DBST @ Traff >6000 2021 3.048 1.476
R221 Kamarpur, Habiganj to Nasratpur Km 013.20‐013.30 S 0.10 6227 Regional Rehab 150mm @ IRI 9‐12 2021 2.714 1.232
R221 Kamarpur, Habiganj to Nasratpur Km 013.30‐014.44 S 1.14 6227 Regional DBST @ Traff >6000 2021 3.179 1.551
R222 Shaestaganj‐Laskarpur Railgate link Road Km 000.00‐000.10 S 0.10 10842 Regional DBST @ 25% Crk 2021 0.276 4.268
R222 Shaestaganj‐Laskarpur Railgate link Road Km 000.10‐000.50 S 0.40 10842 Regional Full Recon 150mm @ IRI 12 2021 13.228 1.265
R222 Shaestaganj‐Laskarpur Railgate link Road Km 000.50‐000.98 S 0.48 10842 Regional DBST @ 25% Crk 2021 1.292 1.809
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 000.30‐000.60 S 0.30 10842 Regional Full Recon 150mm @ IRI 12 2021 16.202 0.959
Page 215 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 001.00‐001.40 S 0.40 10842 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.762 4.957
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 004.90‐005.10 S 0.20 10842 Regional Full Recon 150mm @ IRI 12 2021 6.711 2.251
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 007.00‐007.10 S 0.10 10842 Regional Full Recon 195mm 2021 4.037 2.746
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 007.10‐008.20 S 1.10 10842 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.610 3.771
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 008.20‐008.30 S 0.10 10842 Regional Full Recon 195mm 2021 4.030 2.529
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 008.30‐009.90 S 1.60 10842 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.069 3.725
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 009.90‐010.00 S 0.10 10842 Regional Rehab 150mm @ IRI 9‐12 2021 2.644 2.836
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 010.00‐010.10 S 0.10 10842 Regional DBST @ Traff >6000 2021 0.273 4.363
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 010.10‐010.30 S 0.20 10842 Regional Rehab 150mm @ IRI 9‐12 2021 5.332 2.432
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 010.30‐012.00 S 1.70 10842 Regional DBST @ Traff >6000 2021 4.636 2.650
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 012.00‐012.10 S 0.10 10842 Regional Rehab 150mm @ IRI 9‐12 2021 2.671 2.855
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 012.10‐013.40 S 1.30 10842 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.384 2.527
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 013.40‐013.50 S 0.10 10842 Regional Full Recon 150mm @ IRI 12 2021 7.445 0.511
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 013.50‐013.53 S 0.03 10842 Regional DBST @ Traff >6000 2021 0.212 0.393
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 014.50‐014.90 L 0.40 10842 Regional DBST @ Traff >6000 2021 1.461 1.429
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 017.10‐017.30 L 0.20 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.651 2.641
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 017.10‐017.30 R 0.20 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.676 2.477
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 017.30‐017.40 L 0.10 6787 Regional Full Recon 150mm @ IRI 12 2021 4.165 1.099
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 017.30‐017.40 R 0.10 6787 Regional Rehab 150mm @ IRI 9‐12 2021 3.366 1.425
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 017.40‐020.90 S 3.49 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 24.397 2.843
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 021.20‐021.30 S 0.10 6787 Regional Full Recon 150mm @ IRI 12 2021 3.404 2.347
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 021.30‐021.70 S 0.40 6787 Regional DBST @ 25% Crk 2021 1.109 2.360
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 021.70‐021.90 S 0.20 6787 Regional Rehab 150mm @ IRI 9‐12 2021 5.419 1.707
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 021.90‐025.09 S 3.20 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.291 2.702
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 025.09‐027.19 S 2.10 6787 Regional DBST @ 25% Crk 2021 5.734 2.196
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 027.19‐027.59 S 0.40 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.702 5.199
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 027.59‐030.09 S 2.50 6787 Regional DBST @ 25% Crk 2021 6.740 2.900
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 030.09‐030.19 S 0.10 6787 Regional Full Recon 150mm @ IRI 12 2021 3.350 1.920
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 030.19‐035.29 S 5.10 6787 Regional DBST @ 25% Crk 2021 13.904 2.819
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 035.29‐035.39 S 0.10 6787 Regional Full Recon 150mm @ IRI 12 2021 3.331 1.949
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 035.39‐040.19 S 4.80 6787 Regional DBST @ 25% Crk 2021 13.052 2.268
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 040.29‐040.39 L 0.10 6787 Regional DBST @ 25% Crk 2021 0.257 4.329
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 040.29‐040.39 R 0.10 6787 Regional DBST @ 25% Crk 2021 0.282 4.005
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 040.39‐041.39 S 1.00 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.946 3.244
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 041.39‐041.49 S 0.10 6787 Regional Rehab 150mm @ IRI 9‐12 2021 2.671 1.931
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 041.49‐041.69 S 0.20 6787 Regional DBST @ Traff >6000 2021 0.546 2.621
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 041.69‐041.79 S 0.10 6787 Regional Full Recon 150mm @ IRI 12 2021 3.356 2.043
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 041.79‐043.69 S 1.90 6787 Regional DBST @ Traff >6000 2021 5.160 1.733
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 043.69‐043.99 S 0.30 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.090 4.921
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 043.99‐045.29 S 1.30 6787 Regional DBST @ 25% Crk 2021 3.603 2.237
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 045.29‐045.69 S 0.40 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.802 4.909
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 045.69‐045.99 S 0.30 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.095 3.749
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 045.99‐046.49 S 0.50 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.503 5.298
Page 216 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 046.49‐046.69 S 0.20 6787 Regional DBST @ Traff >6000 2021 0.553 4.984
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 046.69‐047.69 S 1.00 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 7.031 4.163
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 047.69‐048.09 S 0.40 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.837 4.609
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 048.09‐048.39 S 0.30 6787 Regional DBST @ 25% Crk 2021 0.840 2.856
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 048.39‐048.59 S 0.20 6787 Regional Rehab 150mm @ IRI 9‐12 2021 5.477 1.723
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 048.59‐048.99 S 0.40 6787 Regional DBST @ 25% Crk 2021 1.120 2.477
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 048.99‐049.19 S 0.20 6787 Regional Full Recon 150mm @ IRI 12 2021 6.796 1.522
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 049.19‐049.55 S 0.36 6787 Regional DBST @ 25% Crk 2021 1.025 2.375
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 049.55‐049.90 L 0.35 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.627 3.415
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 049.55‐049.90 R 0.35 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.627 3.336
R240 Shaistaganj‐Habiganj‐Sherpur Road Km 049.90‐050.67 S 0.77 6787 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.491 4.215
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 000.10‐000.30 S 0.20 1023 Regional DBST Traff All 2021 0.544 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 000.40‐000.70 S 0.30 1023 Regional DBST Traff All 2021 0.817 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 001.20‐001.30 S 0.10 1023 Regional DBST Traff All 2021 0.272 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 002.10‐002.50 S 0.40 1023 Regional DBST @ Traff 100‐2000 2021 1.089 0.386
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 002.70‐003.20 S 0.50 1023 Regional Overlay 50mm @ IRI 7‐9 2021 2.867 0.512
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 003.20‐003.90 S 0.70 1023 Regional DBST @ Traff 100‐2000 2021 1.888 0.141
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 003.90‐004.00 S 0.10 1023 Regional DBST Traff All 2021 0.275 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 004.00‐005.60 S 1.60 1023 Regional DBST @ Traff 100‐2000 2021 4.395 0.398
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 005.60‐006.00 S 0.40 1023 Regional DBST Traff All 2021 1.080 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 006.00‐006.30 S 0.30 1023 Regional DBST @ 25% Crk 2021 0.812 0.156
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 006.30‐006.50 S 0.20 1023 Regional DBST Traff All 2021 0.541 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 008.80‐009.80 S 1.00 1023 Regional DBST 2021 2.707 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 009.80‐009.90 S 0.10 1023 Regional Overlay 50mm @ IRI 7‐9 2021 0.588 0.540
Z2008 Chunarughat‐Satuajuri‐Natunbazar Road Km 012.30‐012.50 S 0.20 5798 Zilla Full Recon 75mm @ IRI>12 2021 4.886 0.734
Z2009 Shaistaganj Puranbazar‐Kalimnagar Road Km 000.00‐000.20 S 0.20 4551 Zilla Full Recon 75mm @ IRI>12 2021 4.869 1.345
Z2009 Shaistaganj Puranbazar‐Kalimnagar Road Km 000.20‐002.30 S 2.10 4551 Zilla Overlay 50mm @ Cracking >25% 2021 12.474 0.388
Z2009 Shaistaganj Puranbazar‐Kalimnagar Road Km 002.30‐002.40 S 0.10 4551 Zilla Full Recon 75mm @ IRI>12 2021 2.478 1.859
Z2009 Shaistaganj Puranbazar‐Kalimnagar Road Km 002.40‐002.90 S 0.50 4551 Zilla Overlay 50mm @ IRI 6‐9 2021 2.993 0.495
Z2009 Shaistaganj Puranbazar‐Kalimnagar Road Km 002.90‐002.91 S 0.01 4551 Zilla Full Recon 75mm @ IRI>12 2021 0.149 5.632
Z2010 Murarbandh Dargahsharif Road Km 000.00‐002.38 S 2.38 939 Zilla Overlay 40mm @ Traff 100‐1000 2021 7.375 0.001
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 000.10‐000.40 L 0.30 4546 Zilla Full Recon 75mm @ IRI>12 2021 8.737 0.354
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 000.10‐000.40 R 0.30 4546 Zilla Full Recon 75mm @ IRI>12 2021 8.737 0.354
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 000.40‐000.47 R 0.07 4546 Zilla Overlay 40mm @ Traff >=2000 2021 0.398 0.077
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 001.10‐001.80 S 0.70 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 4.116 0.511
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 001.80‐002.20 S 0.40 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 2.344 0.921
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 002.50‐004.20 S 1.70 4546 Zilla Rehab 75mm @ IRI 9‐12 2021 28.442 0.628
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 004.20‐004.90 S 0.70 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 4.123 0.499
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 004.90‐005.50 S 0.60 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 3.515 1.747
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 005.50‐006.80 S 1.30 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 7.617 0.859
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 006.80‐007.40 S 0.60 4546 Zilla Rehab 75mm @ IRI 9‐12 2021 10.003 0.958
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 008.10‐008.30 S 0.20 4546 Zilla Full Recon 75mm @ IRI>12 2021 4.869 0.564
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 008.30‐009.10 S 0.80 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 4.704 0.765
Page 217 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 009.10‐009.60 S 0.50 4546 Zilla Overlay 40mm @ Traff >=2000 2021 2.377 0.764
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 011.70‐011.90 S 0.20 4546 Zilla Rehab 75mm @ IRI 9‐12 2021 3.340 0.582
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 011.90‐012.70 S 0.80 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 4.670 0.775
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 012.70‐013.70 S 1.00 4546 Zilla Rehab 75mm @ IRI 9‐12 2021 16.671 0.844
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 013.70‐014.20 S 0.50 4546 Zilla Overlay 50mm @ IRI 6‐9 2021 2.935 1.000
Z2403 Habiganj‐Baniyachang‐Ajmiriganj‐Sullah Road Km 014.20‐019.38 S 5.18 4546 Zilla Rehab 75mm @ IRI 9‐12 2021 86.821 0.734
Z2405 Baniachaung‐Nabiganj Road Km 000.00‐001.60 S 1.60 1302 Zilla Overlay 40mm @ IRI>12 2021 4.917 0.000
Z2405 Baniachaung‐Nabiganj Road Km 005.90‐006.90 S 1.00 1302 Zilla Overlay 40mm @ 1000‐2000 2021 3.070 0.000
Z2405 Baniachaung‐Nabiganj Road Km 006.90‐007.20 S 0.30 1302 Zilla Overlay 40mm @ 1000‐2000 2021 0.922 0.000
Z2405 Baniachaung‐Nabiganj Road Km 007.20‐007.30 S 0.10 1302 Zilla Overlay 40mm @ IRI>12 2021 0.307 0.000
Z2405 Baniachaung‐Nabiganj Road Km 007.80‐009.40 S 1.60 1302 Zilla Overlay 40mm @ 1000‐2000 2021 4.999 0.000
Z2405 Baniachaung‐Nabiganj Road Km 009.70‐010.10 S 0.40 1302 Zilla Overlay 40mm @ IRI>12 2021 1.233 0.000
Z2405 Baniachaung‐Nabiganj Road Km 010.10‐010.90 S 0.80 1302 Zilla Overlay 40mm @ 1000‐2000 2021 2.465 0.000
Z2405 Baniachaung‐Nabiganj Road Km 010.90‐013.40 S 2.50 1302 Zilla Overlay 40mm @ IRI>12 2021 7.683 0.000
Z2405 Baniachaung‐Nabiganj Road Km 013.40‐013.70 S 0.30 1302 Zilla Overlay 40mm @ 1000‐2000 2021 0.919 0.000
Z2405 Baniachaung‐Nabiganj Road Km 013.70‐015.80 S 2.10 1302 Zilla Overlay 40mm @ 1000‐2000 2021 6.041 0.000
Z2405 Baniachaung‐Nabiganj Road Km 015.80‐016.76 S 0.96 1302 Zilla Overlay 40mm @ 1000‐2000 2021 4.010 0.000
Habiganj Total 1548.574
Moulavi Bazar Division
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 189.21‐189.37 S 0.16 9515 National Full Recon 180mm 2021 8.028 9.101
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 189.37‐190.82 S 1.46 9515 National DBST @ Traff >6000 2021 5.319 19.369
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 190.97‐191.21 S 0.24 9515 National DBST @ Traff >6000 2021 0.948 17.772
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 013.20‐013.30 S 0.10 9017 National Full Recon 180mm 2021 5.599 3.737
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 013.30‐013.70 S 0.40 9017 National Rehab 180mm @ IRI 9‐12 2021 18.116 3.712
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 013.70‐013.80 S 0.10 9017 National Full Recon 180mm 2021 5.179 4.113
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 015.87‐019.70 S 3.83 9017 National Overlay 50mm @ IRI 5‐7 2021 30.000 11.562
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 019.71‐021.90 S 2.18 9017 National Overlay 50mm @ IRI 5‐7 2021 17.322 11.396
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 021.90‐021.99 S 0.10 9017 National Full Recon 180mm 2021 5.301 3.840
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 021.99‐022.19 S 0.20 9017 National Overlay 50mm @ IRI 5‐7 2021 1.607 11.226
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 022.19‐023.19 S 1.00 9017 National Rehab 180mm @ IRI 9‐12 2021 42.985 4.063
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.36‐043.46 L 0.10 5481 National Overlay 50mm @ IRI 5‐9 2021 0.578 8.558
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.36‐043.46 R 0.10 5481 National Overlay 50mm @ IRI 5‐9 2021 0.578 8.122
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.46‐043.60 L 0.14 5481 National Rehab 150mm @ IRI 9‐12 2021 3.666 2.540
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.46‐043.60 R 0.14 5481 National DBST @ Traff 4000‐6000 2021 0.375 6.054
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.61‐044.72 L 1.12 5481 National Overlay 50mm @ IRI 5‐9 2021 6.182 6.917
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 043.61‐044.72 R 1.12 5481 National Overlay 50mm @ IRI 5‐9 2021 6.182 6.729
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 044.72‐044.94 S 0.22 5481 National Overlay 50mm @ IRI 5‐9 2021 3.049 0.658
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 044.96‐045.46 L 0.50 5481 National Overlay 50mm @ IRI 5‐9 2021 2.793 7.247
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 044.96‐045.46 R 0.50 5481 National Overlay 50mm @ IRI 5‐9 2021 2.767 7.000
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 045.46‐046.16 L 0.70 5481 National Rehab 150mm @ IRI 9‐12 2021 18.359 2.555
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 045.46‐046.16 R 0.70 5481 National Rehab 150mm @ IRI 9‐12 2021 18.224 2.583
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 046.16‐046.90 L 0.74 5481 National Overlay 50mm @ IRI 5‐9 2021 5.121 3.979
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 046.16‐046.90 R 0.74 5481 National Overlay 50mm @ IRI 5‐9 2021 5.121 4.275
Page 218 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 047.86‐047.96 S 0.10 5481 National Full Recon 150mm 2021 7.524 0.078
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 049.66‐049.76 S 0.10 5481 National Full Recon 150mm 2021 3.398 3.277
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 049.76‐053.36 S 3.60 5481 National Overlay 50mm @ IRI 5‐9 2021 21.275 4.765
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 053.36‐053.96 S 0.60 5481 National Overlay 50mm @ IRI 5‐9 2021 3.591 5.749
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 053.99‐056.96 S 2.97 5481 National Overlay 50mm @ IRI 5‐9 2021 17.232 6.222
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 056.96‐057.16 S 0.20 5481 National Full Recon 150mm @ IRI 12 2021 6.675 2.531
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 057.16‐058.46 S 1.30 5481 National Overlay 50mm @ IRI 5‐9 2021 7.644 5.908
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 058.46‐058.56 S 0.10 5481 National Full Recon 150mm 2021 3.398 3.091
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 058.86‐058.96 S 0.10 5481 National Rehab 150mm @ IRI 9‐12 2021 2.705 3.050
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 060.06‐060.86 S 0.80 5481 National DBST @ Traff 4000‐6000 2021 2.191 6.023
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 060.86‐061.56 S 0.70 5481 National Overlay 50mm @ IRI 5‐9 2021 4.087 5.136
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 061.63‐061.66 S 0.03 5481 National Full Recon 150mm 2021 0.921 5.047
N207 Mirpur‐Srimongal‐Moulvibazar‐Sherpur Road Km 067.66‐067.99 L 0.33 5481 National Overlay 50mm @ IRI 5‐9 2021 4.297 1.078
N211 Beripar‐Moulvibazar Court Road Km 000.60‐001.15 S 0.55 4261 National Overlay 50mm @ IRI 5‐9 2021 4.258 5.921
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 011.90‐012.20 S 0.30 5089 Regional Full Recon 150mm 2021 10.922 2.638
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 015.80‐017.20 S 1.40 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.545 7.394
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 017.28‐020.30 S 3.02 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 23.802 7.004
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 020.50‐021.00 S 0.50 5089 Regional Rehab 150mm @ IRI 9‐12 2021 19.368 0.858
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 021.00‐022.09 S 1.10 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.050 3.473
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 022.39‐022.49 S 0.10 5089 Regional Full Recon 150mm 2021 3.331 2.904
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 022.49‐023.09 S 0.60 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.121 7.041
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 023.59‐023.99 S 0.40 5089 Regional Rehab 150mm @ IRI 9‐12 2021 10.452 2.487
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 025.69‐025.99 S 0.30 5089 Regional Full Recon 150mm 2021 9.943 2.508
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 025.99‐027.59 S 1.60 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.909 7.364
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 027.59‐027.69 S 0.10 5089 Regional Full Recon 150mm 2021 3.301 3.094
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 027.69‐029.69 S 2.00 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 13.711 6.709
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 029.69‐029.79 S 0.10 5089 Regional Full Recon 150mm 2021 3.325 3.263
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 029.79‐031.69 S 1.90 5089 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.995 6.647
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 031.69‐032.39 S 0.70 5089 Regional Full Recon 150mm 2021 23.107 1.921
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 032.97‐034.27 S 1.30 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 8.815 4.032
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 034.31‐034.47 S 0.17 6078 Regional DBST @ Traff >6000 2021 0.444 2.487
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 034.47‐034.87 S 0.40 6078 Regional DBST @ Traff >6000 2021 1.069 3.641
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 035.17‐035.27 S 0.10 6078 Regional Rehab 150mm @ IRI 9‐12 2021 2.613 1.771
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 035.37‐036.07 S 0.70 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.764 3.946
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 036.11‐037.47 S 1.37 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 9.296 2.830
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 037.47‐037.57 S 0.10 6078 Regional Full Recon 150mm @ IRI 12 2021 3.301 1.804
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 037.57‐038.57 S 1.00 6078 Regional DBST @ 25% Crk 2021 2.685 2.128
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 038.57‐038.67 S 0.10 6078 Regional Full Recon 150mm @ IRI 12 2021 3.289 1.448
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 039.27‐039.47 S 0.20 6078 Regional Rehab 150mm @ IRI 9‐12 2021 5.236 1.436
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 040.27‐047.20 S 6.93 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 47.595 3.520
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 047.57‐047.67 S 0.10 6078 Regional DBST @ Traff >6000 2021 0.445 0.114
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 047.77‐047.99 S 0.22 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.514 1.167
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 048.09‐048.19 S 0.10 6078 Regional DBST @ Traff >6000 2021 0.445 0.079
Page 219 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 049.39‐049.49 S 0.10 6078 Regional DBST @ Traff >6000 2021 0.273 4.404
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 049.49‐050.09 S 0.60 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.136 2.906
R282 Juri‐Lathitila Road Km 000.20‐000.30 S 0.10 9968 Regional Full Recon 180mm 2021 3.793 2.166
R282 Juri‐Lathitila Road Km 001.20‐001.60 S 0.40 9968 Regional Full Recon 150mm @ IRI 12 2021 17.476 1.025
R282 Juri‐Lathitila Road Km 001.60‐001.80 S 0.20 9968 Regional DBST @ Traff >6000 2021 0.551 2.835
R282 Juri‐Lathitila Road Km 001.80‐002.10 S 0.30 9968 Regional DBST @ Traff >6000 2021 0.798 4.459
R282 Juri‐Lathitila Road Km 002.60‐004.40 S 1.80 9968 Regional Overlay 60mm @ IRI 5.5‐9 2021 12.205 4.452
R282 Juri‐Lathitila Road Km 006.00‐006.10 S 0.10 4956 Regional Rehab 150mm @ IRI 9‐12 2021 1.729 1.208
R282 Juri‐Lathitila Road Km 006.80‐006.90 S 0.10 4956 Regional Rehab 150mm @ IRI 9‐12 2021 1.729 1.127
Z2002 Moulvibazar‐Shamshernagar Road Km 016.40‐016.50 S 0.10 12364 Zilla Overlay 50mm @ IRI 6‐9 2021 0.575 2.035
Z2002 Moulvibazar‐Shamshernagar Road Km 016.50‐016.70 S 0.20 12364 Zilla Rehab 75mm @ IRI 9‐12 2021 3.280 3.547
Z2002 Moulvibazar‐Shamshernagar Road Km 016.70‐016.90 S 0.20 12364 Zilla Overlay 50mm @ IRI 6‐9 2021 1.172 5.919
Z2002 Moulvibazar‐Shamshernagar Road Km 016.90‐018.70 S 1.80 12364 Zilla Full Recon 75mm @ IRI>12 2021 43.481 3.163
Z2002 Moulvibazar‐Shamshernagar Road Km 029.90‐033.09 S 3.19 12364 Zilla Rehab 75mm @ IRI 9‐12 2021 52.687 3.709
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 000.90‐001.00 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.658 2.173
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 001.00‐002.10 S 1.10 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 4.200 1.917
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 002.10‐002.40 S 0.30 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 3.232 1.779
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 002.40‐002.60 S 0.20 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 0.754 2.658
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 002.60‐002.80 S 0.20 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 2.143 2.247
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 002.80‐003.90 S 1.10 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 4.505 2.771
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 003.90‐004.10 S 0.20 4625 Zilla Full Recon 75mm @ IRI>12 2021 3.130 1.284
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 004.10‐004.20 S 0.10 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 0.378 1.079
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 004.20‐004.80 S 0.60 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 6.465 1.477
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 004.80‐005.30 S 0.50 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 1.885 1.539
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 005.30‐005.50 S 0.20 4625 Zilla Full Recon 75mm @ IRI>12 2021 3.121 1.281
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 005.50‐008.60 S 3.10 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 14.285 1.263
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 008.60‐008.70 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.610 1.772
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 008.70‐009.00 S 0.30 5431 Zilla Overlay 50mm @ IRI 6‐9 2021 1.695 2.068
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 009.00‐009.60 S 0.60 5431 Zilla Full Recon 75mm @ IRI>12 2021 11.972 1.370
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 009.60‐009.90 S 0.30 4625 Zilla Overlay 50mm @ Cracking >25% 2021 1.134 1.333
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 009.90‐010.10 S 0.20 4625 Zilla Full Recon 75mm @ IRI>12 2021 3.114 1.299
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 010.10‐010.40 S 0.30 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 3.232 1.507
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 010.40‐010.60 S 0.20 4625 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.956
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 010.60‐011.20 S 0.60 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 2.829 1.113
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 011.20‐013.10 S 1.90 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 22.861 0.553
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 014.16‐014.50 S 0.33 4625 Zilla Overlay 40mm @ Traff >=2000 2021 1.021 0.912
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 014.50‐014.60 S 0.10 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 2.475
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 014.60‐015.00 S 0.40 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 1.512 1.430
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 015.00‐015.10 S 0.10 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 2.291
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 015.10‐015.60 S 0.50 4625 Zilla Overlay 50mm @ IRI 6‐9 2021 1.901 2.608
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 015.60‐015.70 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.622 1.888
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 016.40‐016.60 S 0.20 4625 Zilla Rehab 75mm @ IRI 9‐12 2021 2.167 1.680
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 018.80‐019.00 S 0.20 5431 Zilla Overlay 50mm @ IRI 6‐9 2021 1.128 2.555
Page 220 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 019.00‐020.20 S 1.20 5431 Zilla Overlay 50mm @ Cracking >25% 2021 6.754 2.054
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 020.20‐020.30 S 0.10 5431 Zilla Full Recon 75mm @ IRI>12 2021 2.330 1.421
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 023.79‐023.99 S 0.20 5431 Zilla Full Recon 75mm @ IRI>12 2021 4.703 1.033
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 023.99‐024.69 S 0.70 5431 Zilla Overlay 40mm @ Traff >=2000 2021 3.215 1.429
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 024.76‐024.99 S 0.23 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 3.782 2.023
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 024.99‐025.09 S 0.10 5431 Zilla Overlay 50mm @ Cracking >25% 2021 0.567 1.238
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 025.09‐025.19 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 1.699
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 026.99‐027.09 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.607 1.823
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 029.59‐029.69 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.610 1.808
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 029.69‐030.99 S 1.30 5431 Zilla Overlay 50mm @ IRI 6‐9 2021 7.338 3.256
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 030.99‐031.09 S 0.10 5431 Zilla Full Recon 75mm @ IRI>12 2021 2.343 1.579
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 033.29‐033.39 S 0.10 5431 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 1.874
Z2003 Kulaura‐Shamshernagar‐Srimangal Road Km 040.09‐040.49 S 0.40 5431 Zilla Full Recon 75mm @ IRI>12 2021 12.954 0.326
Z2822 Kulaura‐Prithmipasha‐Hazipur‐Sharifpur Road Km 019.49‐024.00 S 4.51 5023 Zilla Rehab 75mm @ IRI 9‐12 2021 48.751 0.762
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 000.00‐000.10 S 0.10 2989 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 1.718
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 000.40‐002.90 S 2.50 2989 Zilla Rehab 75mm @ IRI 9‐12 2021 27.225 0.940
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 003.90‐004.40 S 0.50 2989 Zilla Full Recon 75mm @ IRI>12 2021 7.955 0.494
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 004.50‐005.40 S 0.90 2989 Zilla Full Recon 75mm @ IRI>12 2021 14.319 0.455
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 006.10‐006.30 S 0.20 2989 Zilla Full Recon 75mm @ IRI>12 2021 3.182 0.713
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 007.10‐007.20 S 0.10 2989 Zilla Full Recon 75mm @ IRI>12 2021 1.578 0.934
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 007.30‐007.40 S 0.10 2989 Zilla Full Recon 75mm @ IRI>12 2021 1.578 1.117
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 010.60‐011.50 S 0.90 2989 Zilla Full Recon 75mm @ IRI>12 2021 14.358 0.415
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 011.70‐013.70 S 2.00 2989 Zilla Full Recon 75mm @ IRI>12 2021 31.994 0.389
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 013.90‐014.20 S 0.30 2989 Zilla Full Recon 75mm @ IRI>12 2021 4.731 0.691
Z2824 Juri (Klipdon)‐Kulaura(Gazipur) Km 014.20‐015.18 S 0.99 2989 Zilla Overlay 40mm @ Traff >=2000 2021 3.053 0.726
Moulavi Bazar Total 1026.961
Sunamganj Division
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 012.20‐012.60 S 0.40 1023 Regional DBST Traff All 2021 1.111 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 013.20‐013.30 S 0.10 1023 Regional DBST Traff All 2021 0.279 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 016.81‐017.11 S 0.30 1023 Regional DBST Traff All 2021 0.914 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 017.51‐017.81 S 0.30 1023 Regional DBST @ Traff 100‐2000 2021 0.805 0.483
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 018.21‐018.41 S 0.20 1023 Regional DBST Traff All 2021 0.535 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 021.41‐021.51 S 0.10 1023 Regional DBST Traff All 2021 0.273 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 021.51‐021.91 S 0.40 1023 Regional Overlay 50mm @ IRI 5‐7 2021 2.323 0.256
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 022.40‐022.50 S 0.10 1023 Regional DBST Traff All 2021 0.273 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 023.50‐023.60 S 0.10 1023 Regional DBST Traff All 2021 0.268 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 023.70‐024.00 S 0.30 1023 Regional DBST Traff All 2021 0.803 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 024.70‐024.80 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 027.80‐027.90 S 0.10 1023 Regional DBST Traff All 2021 0.278 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 028.10‐028.30 S 0.20 1023 Regional Overlay 50mm @ IRI 7‐9 2021 1.180 0.446
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 028.30‐028.40 S 0.10 1023 Regional DBST @ 25% Crk 2021 0.278 0.006
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 030.20‐030.30 S 0.10 1023 Regional DBST Traff All 2021 0.271 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 030.30‐030.40 S 0.10 1023 Regional DBST @ 25% Crk 2021 0.268 0.045
Page 221 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 030.40‐030.60 S 0.20 1023 Regional DBST Traff All 2021 0.541 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 032.50‐032.60 S 0.10 1023 Regional DBST Traff All 2021 0.272 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 033.00‐033.10 S 0.10 1023 Regional DBST Traff All 2021 0.272 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 033.70‐033.80 S 0.10 1023 Regional DBST Traff All 2021 0.268 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 033.80‐033.90 S 0.10 1023 Regional Overlay 50mm @ IRI 5‐7 2021 0.570 0.450
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 033.90‐034.00 S 0.10 1023 Regional DBST Traff All 2021 0.268 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 035.20‐035.30 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 038.60‐038.70 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 039.10‐039.20 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 041.30‐041.40 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 041.70‐041.90 S 0.20 1023 Regional DBST Traff All 2021 0.540 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 042.20‐042.30 S 0.10 1023 Regional DBST Traff All 2021 0.270 0.000
R241 Auskandi‐Raniganj‐Jagannathpur‐Pagla Road Km 043.70‐043.90 S 0.20 1023 Regional DBST Traff All 2021 0.518 0.000
R280 Sylhet‐Sunamganj Road Km 019.54‐020.50 S 0.96 12133 Regional DBST @ Traff >6000 2021 2.660 11.613
R280 Sylhet‐Sunamganj Road Km 024.15‐024.25 S 0.10 3696 Regional Overlay 50mm @ IRI 5‐7 2021 0.587 6.332
R280 Sylhet‐Sunamganj Road Km 024.25‐024.35 S 0.10 3696 Regional Full Recon 135mm 2021 3.049 2.794
R280 Sylhet‐Sunamganj Road Km 025.45‐025.65 S 0.20 3696 Regional Full Recon 135mm 2021 6.098 2.774
R280 Sylhet‐Sunamganj Road Km 028.25‐028.35 S 0.10 3696 Regional Full Recon 135mm 2021 3.043 2.092
R280 Sylhet‐Sunamganj Road Km 033.74‐033.84 S 0.10 3696 Regional Full Recon 135mm 2021 3.065 3.344
R280 Sylhet‐Sunamganj Road Km 033.84‐034.14 S 0.30 3696 Regional DBST @ 25% Crk 2021 0.829 2.470
R280 Sylhet‐Sunamganj Road Km 034.14‐034.24 S 0.10 3696 Regional Full Recon 135mm 2021 3.065 2.865
R280 Sylhet‐Sunamganj Road Km 034.24‐034.34 S 0.10 3696 Regional DBST @ Traff 2000‐4000 2021 0.277 1.948
R280 Sylhet‐Sunamganj Road Km 034.34‐034.64 S 0.30 3696 Regional Full Recon 135mm 2021 9.196 2.366
R280 Sylhet‐Sunamganj Road Km 034.74‐034.84 S 0.10 3696 Regional Full Recon 135mm 2021 3.065 2.310
R280 Sylhet‐Sunamganj Road Km 034.84‐044.84 S 9.99 3696 Regional DBST @ 25% Crk 2021 27.694 1.895
R280 Sylhet‐Sunamganj Road Km 044.84‐045.24 S 0.40 3696 Regional Overlay 50mm @ IRI 7‐9 2021 2.352 4.807
R280 Sylhet‐Sunamganj Road Km 045.24‐046.14 S 0.90 3696 Regional DBST @ 25% Crk 2021 2.491 2.644
R280 Sylhet‐Sunamganj Road Km 046.14‐046.34 S 0.20 3696 Regional Full Recon 135mm 2021 6.142 2.644
R280 Sylhet‐Sunamganj Road Km 046.34‐048.94 S 2.60 3696 Regional DBST @ 25% Crk 2021 7.218 2.598
R280 Sylhet‐Sunamganj Road Km 048.94‐049.34 S 0.40 3696 Regional Full Recon 135mm 2021 12.283 2.458
R280 Sylhet‐Sunamganj Road Km 049.34‐049.93 S 0.60 3696 Regional DBST @ 25% Crk 2021 1.663 3.101
R280 Sylhet‐Sunamganj Road Km 049.93‐050.03 S 0.10 3696 Regional Full Recon 135mm 2021 3.071 3.300
R280 Sylhet‐Sunamganj Road Km 050.03‐051.83 S 1.80 3696 Regional DBST @ 25% Crk 2021 4.988 2.389
R280 Sylhet‐Sunamganj Road Km 051.83‐051.93 S 0.10 3696 Regional Full Recon 135mm 2021 3.060 2.801
R280 Sylhet‐Sunamganj Road Km 051.93‐053.63 S 1.70 3696 Regional DBST @ 25% Crk 2021 4.700 2.198
R280 Sylhet‐Sunamganj Road Km 053.63‐053.83 S 0.20 3696 Regional Full Recon 135mm 2021 6.087 2.299
R280 Sylhet‐Sunamganj Road Km 055.33‐055.53 S 0.20 3696 Regional Full Recon 135mm 2021 6.076 2.226
R280 Sylhet‐Sunamganj Road Km 056.63‐056.83 S 0.20 3696 Regional Full Recon 135mm 2021 6.087 2.555
R280 Sylhet‐Sunamganj Road Km 057.73‐057.83 S 0.10 3696 Regional Full Recon 135mm 2021 3.054 2.585
R280 Sylhet‐Sunamganj Road Km 058.43‐058.53 S 0.10 3696 Regional Full Recon 135mm 2021 3.054 3.048
R280 Sylhet‐Sunamganj Road Km 058.93‐059.13 S 0.20 3696 Regional Rehab 135mm @ IRI 9‐12 2021 5.080 1.981
R280 Sylhet‐Sunamganj Road Km 059.93‐060.03 S 0.10 3696 Regional Full Recon 135mm 2021 3.076 3.159
R280 Sylhet‐Sunamganj Road Km 060.33‐060.43 S 0.10 3696 Regional Full Recon 135mm 2021 3.076 3.177
Page 222 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R280 Sylhet‐Sunamganj Road Km 060.43‐061.03 S 0.60 3696 Regional DBST @ 25% Crk 2021 1.666 2.461
R280 Sylhet‐Sunamganj Road Km 061.03‐061.13 S 0.10 3696 Regional Rehab 135mm @ IRI 9‐12 2021 2.545 2.435
R280 Sylhet‐Sunamganj Road Km 061.43‐061.53 S 0.10 3696 Regional Full Recon 135mm 2021 3.071 3.145
R280 Sylhet‐Sunamganj Road Km 061.53‐062.33 S 0.80 3696 Regional DBST @ 25% Crk 2021 2.221 2.679
R280 Sylhet‐Sunamganj Road Km 062.33‐062.43 S 0.10 3696 Regional Full Recon 135mm 2021 3.076 3.117
R280 Sylhet‐Sunamganj Road Km 062.63‐063.83 S 1.20 3696 Regional DBST @ Traff 2000‐4000 2021 5.217 2.333
R280 Sylhet‐Sunamganj Road Km 063.93‐064.03 S 0.10 3696 Regional Full Recon 135mm 2021 4.863 0.933
R280 Sylhet‐Sunamganj Road Km 064.03‐064.53 S 0.50 3696 Regional Overlay 50mm @ IRI 7‐9 2021 5.156 2.119
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 073.92‐074.12 S 0.20 5041 Regional DBST @ Traff 4000‐6000 2021 0.372 2.817
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 074.62‐075.23 S 0.62 5665 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.161 5.645
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 075.23‐078.32 S 3.08 2318 Regional Overlay 50mm @ IRI 7‐9 2021 17.616 0.834
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 080.12‐080.46 S 0.34 2318 Regional Overlay 50mm @ IRI 7‐9 2021 1.969 0.904
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 081.94‐082.25 S 0.31 2318 Regional Overlay 50mm @ IRI 7‐9 2021 1.741 1.005
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 113.11‐113.51 S 0.40 2318 Regional Overlay 50mm @ IRI 5‐7 2021 2.268 0.818
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 113.51‐113.71 S 0.20 2318 Regional DBST Traff All 2021 0.534 0.000
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 113.71‐114.31 S 0.60 2318 Regional Overlay 50mm @ IRI 5‐7 2021 3.402 0.756
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 114.31‐114.61 S 0.30 2318 Regional DBST Traff All 2021 0.800 0.000
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 115.10‐115.20 S 0.10 2318 Regional Full Recon 135mm @ IRI 12 2021 2.951 0.297
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 115.60‐115.70 S 0.10 2318 Regional Full Recon 135mm @ IRI 12 2021 2.951 0.203
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 115.70‐117.10 S 1.40 2318 Regional Overlay 50mm @ IRI 7‐9 2021 7.938 0.837
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 117.10‐117.60 S 0.50 2318 Regional DBST Traff All 2021 1.334 0.000
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 117.60‐118.00 S 0.40 2318 Regional Overlay 50mm @ IRI 5‐7 2021 2.268 0.858
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 118.00‐118.20 S 0.20 2318 Regional DBST @ Traff 2000‐4000 2021 0.534 0.049
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 118.20‐118.40 S 0.20 3001 Regional DBST @ 25% Crk 2021 0.534 0.670
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 118.40‐118.60 S 0.20 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.351 2.202
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 118.60‐119.00 S 0.40 5336 Regional Full Recon 150mm 2021 10.605 0.088
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 119.00‐119.20 S 0.20 5336 Regional DBST @ Traff 4000‐6000 2021 0.361 1.402
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 119.20‐119.40 S 0.20 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.913 2.588
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 119.40‐120.60 S 1.20 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.479 1.480
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 120.60‐120.90 S 0.30 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.370 2.229
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 120.90‐121.10 S 0.20 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.913 2.102
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 121.10‐121.70 S 0.60 5336 Regional DBST @ Traff 4000‐6000 2021 1.082 1.581
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 121.70‐121.90 S 0.20 5336 Regional DBST @ Traff 4000‐6000 2021 0.361 1.432
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 121.90‐122.10 S 0.20 5336 Regional Rehab 150mm @ IRI 9‐12 2021 3.526 0.725
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 122.10‐122.20 S 0.10 5336 Regional DBST @ 25% Crk 2021 0.180 1.573
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 122.20‐122.50 S 0.30 5336 Regional Rehab 150mm @ IRI 9‐12 2021 5.303 0.697
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 122.50‐122.90 S 0.40 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.827 1.406
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 122.90‐124.40 S 1.50 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.868 1.680
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 127.60‐128.10 S 0.50 5336 Regional Rehab 150mm @ IRI 9‐12 2021 8.718 0.488
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 128.10‐128.90 S 0.80 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.613 1.343
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 128.90‐129.60 S 0.70 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.161 1.868
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 129.60‐129.80 S 0.20 5336 Regional DBST @ 25% Crk 2021 0.357 0.833
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 129.80‐129.90 S 0.10 5336 Regional Rehab 150mm @ IRI 9‐12 2021 1.744 1.137
Page 223 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 129.90‐130.30 S 0.40 5336 Regional DBST @ 25% Crk 2021 0.713 0.537
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 130.30‐130.40 S 0.10 5336 Regional Rehab 150mm @ IRI 9‐12 2021 1.744 1.154
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 130.40‐130.70 S 0.30 5336 Regional DBST @ Traff 4000‐6000 2021 0.535 1.119
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 130.70‐130.90 S 0.20 5336 Regional Full Recon 150mm 2021 4.359 0.665
R370 Mymensingh‐Netrokona‐Mohonganj‐Sunamganj Road Km 130.90‐131.00 S 0.10 5336 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.452 3.801
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 000.00‐000.90 S 0.90 5352 Zilla Overlay 50mm @ IRI 6‐9 2021 5.576 1.914
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 000.90‐001.10 S 0.20 5352 Zilla Full Recon 75mm @ IRI>12 2021 5.129 1.034
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 001.10‐001.60 S 0.50 5352 Zilla Overlay 50mm @ Cracking >25% 2021 2.951 0.778
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 001.60‐001.70 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.417 1.340
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 001.70‐003.50 S 1.80 5352 Zilla Overlay 50mm @ Cracking >25% 2021 10.508 0.584
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 003.50‐003.60 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.421 1.684
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 005.40‐005.60 S 0.20 5352 Zilla Full Recon 75mm @ IRI>12 2021 4.851 1.298
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 005.60‐006.10 S 0.50 5352 Zilla Overlay 50mm @ Cracking >25% 2021 2.940 1.004
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 006.10‐006.20 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.434 1.459
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 006.20‐006.70 S 0.50 5352 Zilla Overlay 50mm @ Cracking >25% 2021 2.940 0.505
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 006.70‐006.90 S 0.20 5352 Zilla Full Recon 75mm @ IRI>12 2021 4.869 1.182
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 006.90‐007.10 S 0.20 5352 Zilla Overlay 50mm @ Cracking >25% 2021 1.176 0.522
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 007.10‐007.20 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.439 1.683
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 007.40‐007.50 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.439 1.707
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 007.80‐007.90 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.439 1.698
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 007.90‐008.40 S 0.50 5352 Zilla Overlay 50mm @ Cracking >25% 2021 2.945 1.080
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 008.40‐008.50 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.439 1.349
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 008.60‐008.70 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.421 1.778
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 008.70‐010.10 S 1.40 5352 Zilla Overlay 40mm @ Traff >=2000 2021 6.621 0.173
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 010.10‐010.20 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.421 1.319
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 010.40‐010.50 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.421 1.457
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 010.50‐012.00 S 1.50 5352 Zilla Overlay 50mm @ Cracking >25% 2021 8.773 0.841
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 012.00‐012.10 S 0.10 5352 Zilla Full Recon 75mm @ IRI>12 2021 2.421 1.826
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 012.20‐012.30 S 0.10 4246 Zilla Full Recon 75mm @ IRI>12 2021 1.582 1.582
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 012.40‐012.50 S 0.10 4246 Zilla Full Recon 75mm @ IRI>12 2021 1.582 1.664
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 012.70‐013.70 S 1.00 4246 Zilla Full Recon 75mm @ IRI>12 2021 15.823 1.005
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 013.90‐014.30 S 0.40 4246 Zilla Full Recon 75mm @ IRI>12 2021 6.329 1.209
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 014.80‐015.10 S 0.30 4246 Zilla Full Recon 75mm @ IRI>12 2021 4.747 1.285
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 015.10‐016.10 S 1.00 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 3.818 1.721
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 016.10‐016.30 S 0.20 4246 Zilla Full Recon 75mm @ IRI>12 2021 3.165 1.211
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 016.40‐016.60 S 0.20 4246 Zilla Full Recon 75mm @ IRI>12 2021 3.165 1.156
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 017.70‐018.10 S 0.40 4246 Zilla Full Recon 75mm @ IRI>12 2021 6.312 0.969
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 018.30‐018.80 S 0.50 4246 Zilla Rehab 75mm @ IRI 9‐12 2021 5.432 1.764
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 018.80‐019.20 S 0.40 4246 Zilla Overlay 50mm @ Cracking >25% 2021 1.529 1.087
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 019.20‐019.90 S 0.70 4246 Zilla Rehab 75mm @ IRI 9‐12 2021 7.615 1.505
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 019.95‐020.40 S 0.45 4246 Zilla Full Recon 75mm @ IRI>12 2021 7.168 0.948
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 020.40‐020.60 S 0.20 4246 Zilla Overlay 40mm @ Traff >=2000 2021 0.616 0.626
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 020.60‐021.20 S 0.60 4246 Zilla Full Recon 75mm @ IRI>12 2021 9.468 0.876
Page 224 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 021.60‐021.80 S 0.20 4246 Zilla Full Recon 75mm @ IRI>12 2021 3.165 1.263
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 021.80‐022.10 S 0.30 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 1.147 3.013
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 022.10‐022.30 S 0.20 4246 Zilla Full Recon 75mm @ IRI>12 2021 3.165 1.119
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 022.30‐022.50 S 0.20 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 0.764 3.449
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 022.50‐022.60 S 0.10 4246 Zilla Rehab 75mm @ IRI 9‐12 2021 1.089 2.708
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 022.60‐023.00 S 0.40 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 1.529 3.321
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 023.00‐023.60 S 0.60 4246 Zilla Rehab 75mm @ IRI 9‐12 2021 6.544 1.536
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 023.60‐023.80 S 0.20 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 0.769 3.482
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 023.80‐023.90 S 0.10 4246 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.851
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 024.02‐024.10 S 0.08 4246 Zilla Rehab 75mm @ IRI 9‐12 2021 0.898 2.974
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 024.40‐024.80 S 0.40 4246 Zilla Full Recon 75mm @ IRI>12 2021 6.381 1.049
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 024.80‐025.10 S 0.30 4246 Zilla Overlay 50mm @ IRI 6‐9 2021 1.156 3.408
Z2802 Gobindaganj‐Chhatak‐Dwarabazar Road Km 025.10‐025.50 S 0.40 4246 Zilla Full Recon 75mm @ IRI>12 2021 6.381 1.010
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 000.00‐001.90 S 1.90 5336 Zilla Overlay 40mm @ Traff >=2000 2021 8.872 0.318
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 001.90‐002.00 S 0.10 5336 Zilla Full Recon 75mm @ IRI>12 2021 2.367 0.584
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 002.00‐005.00 S 3.00 5336 Zilla Overlay 50mm @ IRI 6‐9 2021 17.325 0.897
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 005.20‐005.50 S 0.30 5336 Zilla Rehab 75mm @ IRI 9‐12 2021 4.938 0.708
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 006.30‐006.40 S 0.10 5336 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.672
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 006.40‐006.90 S 0.50 5336 Zilla Overlay 50mm @ IRI 6‐9 2021 2.888 0.838
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 006.90‐007.40 S 0.50 5336 Zilla Overlay 50mm @ IRI 6‐9 2021 2.515 2.123
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 007.90‐008.10 S 0.20 5336 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 1.055
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 008.10‐010.20 S 2.10 5336 Zilla Overlay 40mm @ Traff >=2000 2021 6.594 0.147
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 010.20‐010.30 S 0.10 5336 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.590
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 010.60‐010.80 S 0.20 5336 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.917
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 010.80‐011.00 S 0.20 5336 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 011.00‐011.20 S 0.20 5336 Zilla Full Recon 75mm @ IRI>12 2021 3.217 1.070
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 011.20‐013.10 S 1.90 5336 Zilla Overlay 40mm @ Traff >=2000 2021 5.968 0.145
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 013.10‐013.30 S 0.20 5336 Zilla Full Recon 75mm @ IRI>12 2021 3.217 1.075
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 014.40‐014.50 S 0.10 5336 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.371
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 014.90‐015.10 S 0.20 5336 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.926
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 015.10‐015.40 S 0.30 5336 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 015.40‐015.50 S 0.10 5336 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.621
Z2804 Sunamganj‐Kanchirghat‐Bishambarpur Km 015.50‐016.14 S 0.64 5336 Zilla Overlay 50mm @ IRI 6‐9 2021 2.502 1.156
Z2806 Niamatpur‐Tahirpur Road Km 000.10‐000.30 S 0.20 697 Zilla Overlay 40mm @ IRI>12 2021 0.934 0.000
Z2806 Niamatpur‐Tahirpur Road Km 000.60‐000.70 S 0.10 697 Zilla Overlay 40mm @ IRI>12 2021 0.467 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 000.00‐000.60 S 0.60 2026 Zilla Overlay 40mm @ Traff >=2000 2021 4.075 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 000.60‐000.70 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.387 0.064
Z2807 Madanpur‐Dirai‐Sullah Road Km 000.70‐002.50 S 1.80 2026 Zilla Overlay 40mm @ Traff >=2000 2021 8.400 0.116
Z2807 Madanpur‐Dirai‐Sullah Road Km 002.50‐002.60 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.391 0.056
Z2807 Madanpur‐Dirai‐Sullah Road Km 002.60‐002.80 S 0.20 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.932 0.126
Z2807 Madanpur‐Dirai‐Sullah Road Km 002.80‐002.90 S 0.10 2026 Zilla Rehab 75mm @ IRI 9‐12 2021 1.640 0.115
Z2807 Madanpur‐Dirai‐Sullah Road Km 002.90‐003.10 S 0.20 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.931 0.140
Z2807 Madanpur‐Dirai‐Sullah Road Km 003.10‐003.30 S 0.20 2026 Zilla Full Recon 75mm @ IRI>12 2021 4.764 0.073
Page 225 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2807 Madanpur‐Dirai‐Sullah Road Km 003.30‐004.50 S 1.20 2026 Zilla Overlay 40mm @ Traff >=2000 2021 5.583 0.120
Z2807 Madanpur‐Dirai‐Sullah Road Km 004.50‐004.60 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.395 0.160
Z2807 Madanpur‐Dirai‐Sullah Road Km 004.60‐005.30 S 0.70 2026 Zilla Overlay 40mm @ Traff >=2000 2021 3.275 0.044
Z2807 Madanpur‐Dirai‐Sullah Road Km 005.30‐005.50 S 0.20 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.936 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 005.50‐006.00 S 0.50 2026 Zilla Overlay 40mm @ Traff >=2000 2021 2.330 0.054
Z2807 Madanpur‐Dirai‐Sullah Road Km 006.00‐006.10 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.387 0.136
Z2807 Madanpur‐Dirai‐Sullah Road Km 006.10‐007.10 S 1.00 2026 Zilla Overlay 40mm @ Traff >=2000 2021 4.661 0.116
Z2807 Madanpur‐Dirai‐Sullah Road Km 007.10‐007.30 S 0.20 2026 Zilla Full Recon 75mm @ IRI>12 2021 4.773 0.108
Z2807 Madanpur‐Dirai‐Sullah Road Km 007.30‐008.00 S 0.70 2026 Zilla Overlay 40mm @ Traff >=2000 2021 3.251 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 008.00‐008.10 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.378 0.175
Z2807 Madanpur‐Dirai‐Sullah Road Km 008.10‐008.20 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.464 0.163
Z2807 Madanpur‐Dirai‐Sullah Road Km 008.20‐008.30 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.378 0.187
Z2807 Madanpur‐Dirai‐Sullah Road Km 008.30‐009.70 S 1.40 2026 Zilla Overlay 40mm @ Traff >=2000 2021 6.502 0.109
Z2807 Madanpur‐Dirai‐Sullah Road Km 009.70‐009.90 S 0.20 2026 Zilla Full Recon 75mm @ IRI>12 2021 4.764 0.150
Z2807 Madanpur‐Dirai‐Sullah Road Km 009.90‐010.20 S 0.30 2026 Zilla Overlay 40mm @ Traff >=2000 2021 1.391 0.061
Z2807 Madanpur‐Dirai‐Sullah Road Km 010.20‐010.60 S 0.40 2026 Zilla Rehab 75mm @ IRI 9‐12 2021 6.597 0.055
Z2807 Madanpur‐Dirai‐Sullah Road Km 010.60‐011.20 S 0.60 2026 Zilla Overlay 40mm @ Traff >=2000 2021 2.807 0.041
Z2807 Madanpur‐Dirai‐Sullah Road Km 011.20‐011.30 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.395 0.252
Z2807 Madanpur‐Dirai‐Sullah Road Km 011.30‐011.70 S 0.40 2026 Zilla Overlay 40mm @ Traff >=2000 2021 1.871 0.040
Z2807 Madanpur‐Dirai‐Sullah Road Km 011.70‐011.80 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.468 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 011.80‐011.90 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.465 0.155
Z2807 Madanpur‐Dirai‐Sullah Road Km 011.90‐012.00 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.159
Z2807 Madanpur‐Dirai‐Sullah Road Km 012.00‐012.30 S 0.30 2026 Zilla Overlay 40mm @ Traff >=2000 2021 1.396 0.138
Z2807 Madanpur‐Dirai‐Sullah Road Km 012.30‐012.40 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.195
Z2807 Madanpur‐Dirai‐Sullah Road Km 012.40‐012.50 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.465 0.051
Z2807 Madanpur‐Dirai‐Sullah Road Km 012.50‐012.60 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.179
Z2807 Madanpur‐Dirai‐Sullah Road Km 012.60‐014.30 S 1.70 2026 Zilla Overlay 40mm @ Traff >=2000 2021 7.890 0.070
Z2807 Madanpur‐Dirai‐Sullah Road Km 014.30‐014.60 S 0.30 2026 Zilla Full Recon 75mm @ IRI>12 2021 7.133 0.159
Z2807 Madanpur‐Dirai‐Sullah Road Km 014.60‐014.80 S 0.20 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.929 0.025
Z2807 Madanpur‐Dirai‐Sullah Road Km 014.80‐015.00 S 0.20 2026 Zilla Rehab 75mm @ IRI 9‐12 2021 3.268 0.210
Z2807 Madanpur‐Dirai‐Sullah Road Km 015.00‐015.10 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.461 0.177
Z2807 Madanpur‐Dirai‐Sullah Road Km 015.30‐015.40 S 0.10 2026 Zilla Rehab 75mm @ IRI 9‐12 2021 1.625 0.375
Z2807 Madanpur‐Dirai‐Sullah Road Km 015.40‐016.30 S 0.90 2026 Zilla Overlay 40mm @ Traff >=2000 2021 4.149 0.110
Z2807 Madanpur‐Dirai‐Sullah Road Km 016.30‐016.50 S 0.20 2026 Zilla Full Recon 75mm @ IRI>12 2021 4.721 0.074
Z2807 Madanpur‐Dirai‐Sullah Road Km 016.50‐016.80 S 0.30 2026 Zilla Overlay 40mm @ Traff >=2000 2021 1.388 0.142
Z2807 Madanpur‐Dirai‐Sullah Road Km 016.80‐017.20 S 0.40 2026 Zilla Full Recon 75mm @ IRI>12 2021 9.511 0.078
Z2807 Madanpur‐Dirai‐Sullah Road Km 017.20‐019.10 S 1.90 2026 Zilla Overlay 40mm @ Traff >=2000 2021 8.819 0.111
Z2807 Madanpur‐Dirai‐Sullah Road Km 019.10‐019.20 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.378 0.251
Z2807 Madanpur‐Dirai‐Sullah Road Km 019.20‐020.10 S 0.90 2026 Zilla Overlay 40mm @ Traff >=2000 2021 4.187 0.115
Z2807 Madanpur‐Dirai‐Sullah Road Km 020.10‐020.40 S 0.30 2026 Zilla Overlay 40mm @ IRI>12 2021 1.396 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 020.40‐020.50 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.465 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 020.50‐020.60 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.070
Z2807 Madanpur‐Dirai‐Sullah Road Km 020.60‐021.10 S 0.50 2026 Zilla Overlay 40mm @ Traff >=2000 2021 2.326 0.069
Page 226 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2807 Madanpur‐Dirai‐Sullah Road Km 021.10‐021.20 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.191
Z2807 Madanpur‐Dirai‐Sullah Road Km 021.20‐022.59 S 1.40 2026 Zilla Overlay 40mm @ Traff >=2000 2021 6.509 0.095
Z2807 Madanpur‐Dirai‐Sullah Road Km 022.59‐022.69 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.382 0.205
Z2807 Madanpur‐Dirai‐Sullah Road Km 022.69‐023.29 S 0.60 2026 Zilla Overlay 40mm @ Traff >=2000 2021 2.792 0.117
Z2807 Madanpur‐Dirai‐Sullah Road Km 023.29‐023.49 S 0.20 2026 Zilla Full Recon 75mm @ IRI>12 2021 4.764 0.113
Z2807 Madanpur‐Dirai‐Sullah Road Km 023.49‐024.29 S 0.80 2026 Zilla Overlay 40mm @ Traff >=2000 2021 3.722 0.114
Z2807 Madanpur‐Dirai‐Sullah Road Km 024.29‐024.39 S 0.10 2026 Zilla Full Recon 75mm @ IRI>12 2021 2.378 0.278
Z2807 Madanpur‐Dirai‐Sullah Road Km 024.39‐024.79 S 0.40 2026 Zilla Overlay 40mm @ Traff >=2000 2021 1.854 0.124
Z2807 Madanpur‐Dirai‐Sullah Road Km 024.79‐025.09 S 0.30 2026 Zilla Full Recon 75mm @ IRI>12 2021 6.742 0.174
Z2807 Madanpur‐Dirai‐Sullah Road Km 025.09‐025.19 S 0.10 2026 Zilla Overlay 40mm @ Traff >=2000 2021 0.340 0.000
Z2807 Madanpur‐Dirai‐Sullah Road Km 025.19‐026.79 S 1.60 2026 Zilla Rehab 75mm @ IRI 9‐12 2021 25.843 0.111
Z2807 Madanpur‐Dirai‐Sullah Road Km 026.79‐027.49 S 0.70 2026 Zilla Overlay 40mm @ Traff >=2000 2021 3.209 0.092
Z2811 Dowarabazar‐Sunamganj Road Km 000.00‐000.65 S 0.64 3136 Zilla Overlay 40mm @ Traff >=2000 2021 1.424 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 000.65‐001.65 S 1.00 3136 Zilla Full Recon 75mm @ IRI>12 2021 12.302 0.234
Z2811 Dowarabazar‐Sunamganj Road Km 004.62‐005.34 S 0.72 3136 Zilla Overlay 40mm @ Cracks >25% 2021 2.130 0.055
Z2811 Dowarabazar‐Sunamganj Road Km 005.34‐005.44 S 0.10 3136 Zilla Rehab 75mm @ IRI 9‐12 2021 1.095 0.362
Z2811 Dowarabazar‐Sunamganj Road Km 005.44‐005.74 S 0.30 3136 Zilla Overlay 40mm @ Cracks >25% 2021 0.883 0.055
Z2811 Dowarabazar‐Sunamganj Road Km 005.74‐005.94 S 0.20 3136 Zilla Rehab 75mm @ IRI 9‐12 2021 2.191 0.346
Z2811 Dowarabazar‐Sunamganj Road Km 005.94‐007.34 S 1.40 3136 Zilla Overlay 40mm @ Cracks >25% 2021 4.117 0.048
Z2811 Dowarabazar‐Sunamganj Road Km 007.34‐007.54 S 0.20 3136 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.138
Z2811 Dowarabazar‐Sunamganj Road Km 007.54‐007.84 S 0.30 3136 Zilla Overlay 40mm @ Cracks >25% 2021 0.880 0.055
Z2811 Dowarabazar‐Sunamganj Road Km 007.84‐008.04 S 0.20 3136 Zilla Full Recon 75mm @ IRI>12 2021 3.173 0.216
Z2811 Dowarabazar‐Sunamganj Road Km 008.04‐008.44 S 0.40 3136 Zilla Overlay 40mm @ Cracks >25% 2021 1.174 0.055
Z2811 Dowarabazar‐Sunamganj Road Km 008.44‐008.54 S 0.10 3136 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 0.538
Z2811 Dowarabazar‐Sunamganj Road Km 008.54‐009.84 S 1.30 3136 Zilla Overlay 40mm @ Cracks >25% 2021 3.825 0.044
Z2811 Dowarabazar‐Sunamganj Road Km 009.84‐010.04 S 0.20 3136 Zilla Rehab 75mm @ IRI 9‐12 2021 2.203 0.392
Z2811 Dowarabazar‐Sunamganj Road Km 010.04‐010.74 S 0.70 3136 Zilla Overlay 40mm @ Traff >=2000 2021 2.184 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 010.74‐011.04 S 0.30 3136 Zilla Rehab 75mm @ IRI 9‐12 2021 3.304 0.370
Z2811 Dowarabazar‐Sunamganj Road Km 012.64‐012.94 S 0.30 3136 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.481
Z2811 Dowarabazar‐Sunamganj Road Km 012.94‐013.34 S 0.40 3136 Zilla Overlay 40mm @ Traff >=2000 2021 1.257 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 013.54‐013.84 S 0.30 3136 Zilla Overlay 40mm @ Traff >=2000 2021 0.942 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 013.84‐014.34 S 0.50 3136 Zilla Overlay 40mm @ Traff >=2000 2021 1.571 0.392
Z2811 Dowarabazar‐Sunamganj Road Km 014.34‐014.64 S 0.30 3136 Zilla Overlay 40mm @ Traff >=2000 2021 0.929 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 014.64‐014.84 S 0.20 3136 Zilla Full Recon 75mm @ IRI>12 2021 3.130 0.363
Z2811 Dowarabazar‐Sunamganj Road Km 014.84‐016.24 S 1.40 3136 Zilla Overlay 40mm @ Traff >=2000 2021 4.279 0.000
Z2811 Dowarabazar‐Sunamganj Road Km 016.24‐016.34 S 0.10 3136 Zilla Full Recon 75mm @ IRI>12 2021 1.565 0.642
Sunamganj Total 864.668
Sylhet Division
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 223.95‐224.22 L 0.28 11175 National Overlay 80mm @ IRI 4‐9 2021 2.281 12.837
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 223.95‐224.22 R 0.28 11175 National Overlay 80mm @ IRI 4‐9 2021 2.281 12.845
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 225.37‐225.53 L 0.16 22881 National Overlay 80mm @ IRI 4‐9 2021 2.050 20.678
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 225.37‐225.53 R 0.16 22881 National Overlay 80mm @ IRI 4‐9 2021 2.050 20.678
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 228.85‐229.15 L 0.30 22881 National Overlay 80mm @ IRI 4‐9 2021 4.794 24.213
Page 227 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 228.85‐229.15 R 0.30 22881 National Overlay 80mm @ IRI 4‐9 2021 3.707 21.977
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 229.15‐229.15 L 0.00 22881 National Full Recon 195mm @ IRI 12 2021 0.354 9.192
N2 Dhaka‐Bhairab‐Sylhet‐Tamabil Km 229.15‐229.15 R 0.00 22881 National Full Recon 195mm 2021 0.274 8.467
N205 Chandipool‐Keean Bridge Road Km 000.00‐000.70 S 0.70 23757 National Overlay 80mm @ IRI 5‐9 2021 9.037 5.295
N206 Keean Bridge‐Nayarpool Road Km 001.20‐001.60 L 0.40 23757 National Rehab 195mm @ IRI 9‐12 2021 15.524 3.295
N206 Keean Bridge‐Nayarpool Road Km 001.20‐001.60 R 0.40 23757 National Rehab 195mm @ IRI 9‐12 2021 14.554 3.579
N206 Keean Bridge‐Nayarpool Road Km 001.60‐001.70 S 0.10 23757 National Full Recon 195mm 2021 11.536 0.508
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 034.44‐034.64 S 0.20 8212 National DBST @ Traff >6000 2021 0.555 8.277
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 035.44‐035.74 S 0.30 8212 National Full Recon 180mm 2021 17.428 1.562
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 038.49‐038.59 S 0.10 8212 National Rehab 180mm @ IRI 9‐12 2021 3.227 3.752
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 040.59‐040.89 S 0.30 8212 National DBST @ Traff >6000 2021 0.830 8.024
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 047.39‐047.59 S 0.20 8212 National Full Recon 180mm @ IRI 12 2021 7.839 3.369
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 047.59‐047.69 S 0.10 8212 National Overlay 60mm @ IRI 7‐9 2021 0.701 10.579
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 047.69‐047.79 S 0.10 8212 National Full Recon 180mm @ IRI 12 2021 3.880 3.662
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 047.79‐048.39 S 0.60 8212 National Overlay 60mm @ IRI 7‐9 2021 4.203 8.982
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 048.39‐048.49 S 0.10 8212 National Full Recon 180mm @ IRI 12 2021 3.919 3.847
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 048.49‐048.79 S 0.30 8212 National DBST @ 25% Crk 2021 0.830 4.915
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 048.79‐049.59 S 0.80 8212 National Rehab 180mm @ IRI 9‐12 2021 25.814 3.582
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 049.59‐050.29 S 0.70 8212 National Overlay 60mm @ IRI 7‐9 2021 4.904 9.718
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 050.29‐050.49 S 0.20 8212 National Full Recon 180mm @ IRI 12 2021 7.839 3.279
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 050.49‐052.19 S 1.70 8212 National DBST @ 25% Crk 2021 4.700 5.682
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 052.19‐052.69 S 0.50 8212 National Overlay 60mm @ IRI 7‐9 2021 3.503 9.497
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 052.69‐052.99 S 0.30 8212 National Overlay 60mm @ IRI 7‐9 2021 2.102 8.964
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 052.99‐053.19 S 0.20 8212 National Rehab 180mm @ IRI 9‐12 2021 6.453 4.077
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 053.19‐053.39 S 0.20 10616 National Overlay 80mm @ IRI 5‐9 2021 1.937 13.875
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 053.39‐054.09 S 0.70 11943 National Rehab 195mm @ IRI 9‐12 2021 34.043 4.193
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 054.09‐054.29 S 0.20 11943 National Overlay 80mm @ IRI 5‐9 2021 2.678 11.396
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 054.29‐054.39 S 0.10 11943 National Full Recon 195mm 2021 5.914 4.243
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 054.39‐056.09 S 1.70 11943 National Overlay 80mm @ IRI 5‐9 2021 22.608 11.849
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 056.09‐056.19 S 0.10 11943 National Full Recon 195mm 2021 5.841 4.309
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 056.19‐056.39 S 0.20 11943 National Overlay 80mm @ IRI 5‐9 2021 2.671 12.631
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 056.39‐056.59 S 0.20 11943 National Full Recon 195mm 2021 11.828 3.868
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 056.59‐056.99 S 0.40 11943 National Overlay 80mm @ IRI 5‐9 2021 5.356 12.690
N208 Moulvibazar‐Rajnagar‐Fenchuganj‐Sylhet Road Km 056.99‐057.09 S 0.10 11943 National Full Recon 195mm 2021 5.914 4.268
N209 Sylhet Railway Station Town By‐Pass Road Km 000.00‐000.30 S 0.30 27444 National Overlay 80mm @ IRI 5‐9 2021 4.056 11.515
N209 Sylhet Railway Station Town By‐Pass Road Km 000.30‐000.40 S 0.10 27444 National Rehab 195mm @ IRI 9‐12 2021 7.762 4.710
N209 Sylhet Railway Station Town By‐Pass Road Km 000.50‐001.00 S 0.50 27444 National Full Recon 195mm 2021 39.571 2.036
N209 Sylhet Railway Station Town By‐Pass Road Km 001.20‐001.33 S 0.13 27444 National Full Recon 195mm 2021 8.352 4.052
N210 Sylhet Town Bypass Road Km 005.45‐005.75 S 0.30 4261 National Overlay 50mm @ IRI 5‐9 2021 2.306 6.571
N210 Sylhet Town Bypass Road Km 006.20‐006.39 S 0.19 4261 National Full Recon 150mm 2021 8.528 1.938
N210 Sylhet Town Bypass Road Km 006.40‐006.56 L 0.16 4261 National Full Recon 150mm 2021 7.078 1.995
N210 Sylhet Town Bypass Road Km 006.40‐006.56 R 0.16 4261 National Full Recon 150mm 2021 7.127 1.974
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.10‐000.20 S 0.10 33711 Regional Full Recon 150mm @ IRI 12 2021 6.675 5.875
Page 228 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.20‐000.40 S 0.20 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.752 12.887
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.40‐000.60 S 0.20 31818 Regional Full Recon 150mm @ IRI 12 2021 11.286 3.196
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.60‐000.70 S 0.10 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.246 14.033
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.70‐000.80 S 0.10 33711 Regional Full Recon 150mm @ IRI 12 2021 6.044 6.740
R247 Shahi Eidgaon ‐ Kumarpara  Road Km 000.80‐001.19 S 0.39 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.834 14.701
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 000.30‐001.20 S 0.90 31818 Regional Full Recon 150mm @ IRI 12 2021 50.079 2.548
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 001.20‐001.50 S 0.30 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.466 8.612
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 001.50‐001.70 S 0.20 33711 Regional DBST @ Traff >6000 2021 1.067 13.520
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 001.80‐002.00 S 0.20 33711 Regional Full Recon 150mm @ IRI 12 2021 13.041 6.139
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 002.00‐002.20 S 0.20 33711 Regional DBST @ 25% Crk 2021 1.067 10.571
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 002.20‐002.80 S 0.60 33711 Regional Rehab 150mm @ IRI 9‐12 2021 31.414 6.416
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 002.80‐003.70 S 0.90 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 11.282 13.608
R248 Ambarkhana ‐ Shahi Eidgaon ‐Tilagar Road Km 003.70‐003.90 S 0.20 33711 Regional Full Recon 150mm @ IRI 12 2021 13.131 5.912
R249 Chowhatta ‐ Kumarpara ‐ Naiorpul Road Km 000.00‐000.80 S 0.80 31818 Regional Rehab 150mm @ IRI 9‐12 2021 35.317 3.953
R249 Chowhatta ‐ Kumarpara ‐ Naiorpul Road Km 000.80‐000.90 S 0.10 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.401 13.968
R249 Chowhatta ‐ Kumarpara ‐ Naiorpul Road Km 000.90‐001.30 S 0.40 33711 Regional Rehab 150mm @ IRI 9‐12 2021 21.271 5.851
R249 Chowhatta ‐ Kumarpara ‐ Naiorpul Road Km 001.30‐001.71 S 0.41 33711 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.670 15.030
R280 Sylhet‐Sunamganj Road Km 000.60‐001.30 L 0.70 12133 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.139 11.497
R280 Sylhet‐Sunamganj Road Km 001.30‐001.70 L 0.40 12133 Regional Rehab 150mm @ IRI 9‐12 2021 13.717 4.183
R280 Sylhet‐Sunamganj Road Km 001.70‐002.10 L 0.40 12133 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.634 11.010
R280 Sylhet‐Sunamganj Road Km 002.10‐002.20 L 0.10 12133 Regional Rehab 150mm @ IRI 9‐12 2021 3.864 3.841
R280 Sylhet‐Sunamganj Road Km 002.20‐002.40 L 0.20 12133 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.002 9.760
R280 Sylhet‐Sunamganj Road Km 002.40‐003.00 L 0.60 12133 Regional Rehab 150mm @ IRI 9‐12 2021 22.952 4.021
R280 Sylhet‐Sunamganj Road Km 003.00‐003.30 L 0.30 12133 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.965 8.593
R280 Sylhet‐Sunamganj Road Km 003.30‐003.50 L 0.20 12133 Regional Full Recon 150mm @ IRI 12 2021 9.587 3.504
R280 Sylhet‐Sunamganj Road Km 003.50‐004.56 L 1.06 12133 Regional Overlay 60mm @ IRI 5.5‐9 2021 10.393 8.576
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 058.09‐058.19 S 0.10 6078 Regional DBST @ Traff >6000 2021 0.275 4.287
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 058.20‐061.39 S 3.19 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 22.214 3.531
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 061.39‐061.49 S 0.10 6078 Regional Full Recon 150mm @ IRI 12 2021 3.386 1.505
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 061.49‐061.79 S 0.30 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.094 3.485
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 061.79‐062.49 S 0.70 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.871 3.595
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 062.49‐062.89 S 0.40 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.787 3.531
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 062.90‐063.19 S 0.29 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 2.057 3.637
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 063.19‐063.29 S 0.10 6078 Regional DBST @ Traff >6000 2021 0.291 4.100
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 066.19‐066.39 L 0.20 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.426 4.204
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 066.19‐066.39 R 0.20 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 1.414 4.283
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 066.39‐067.09 L 0.70 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 5.044 2.944
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 066.39‐067.09 R 0.70 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 4.921 3.071
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 067.09‐067.50 L 0.41 6078 Regional DBST @ Traff >6000 2021 1.156 3.459
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 067.09‐067.50 R 0.41 6078 Regional DBST @ Traff >6000 2021 1.145 3.528
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 067.79‐068.09 S 0.30 6078 Regional DBST Traff All 2021 1.398 0.000
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 068.25‐068.75 S 0.50 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 3.459 3.514
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 068.93‐071.95 S 3.03 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 21.137 3.425
Page 229 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 071.95‐072.05 S 0.10 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.697 4.858
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 072.05‐072.25 S 0.20 6078 Regional Full Recon 150mm @ IRI 12 2021 6.760 1.214
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 072.25‐073.15 S 0.90 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 6.271 3.556
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 073.15‐073.25 S 0.10 6078 Regional Full Recon 150mm @ IRI 12 2021 3.386 1.539
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 080.58‐080.68 S 0.10 6078 Regional Full Recon 150mm @ IRI 12 2021 3.386 1.650
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 082.80‐082.87 L 0.07 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.569 3.238
R281 Rajnagar‐Kulaura‐Bianibazar‐Charkhai Road Km 082.80‐082.87 R 0.07 6078 Regional Overlay 60mm @ IRI 5.5‐9 2021 0.578 2.707
R283 Sylhet‐Sunamganj Bypass Road  Km 000.00‐000.10 S 0.10 5096 Regional DBST @ Traff 4000‐6000 2021 1.338 0.078
R283 Sylhet‐Sunamganj Bypass Road  Km 000.10‐003.60 S 3.50 5096 Regional DBST @ 25% Crk 2021 12.791 6.904
R283 Sylhet‐Sunamganj Bypass Road  Km 003.60‐003.70 S 0.10 5096 Regional Full Recon 150mm 2021 4.502 2.837
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 000.30‐000.40 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.521 1.095
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 000.50‐000.80 S 0.30 5325 Zilla Full Recon 75mm @ IRI>12 2021 7.564 0.819
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 001.10‐001.30 S 0.20 5325 Zilla Full Recon 75mm @ IRI>12 2021 5.043 0.959
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 001.70‐001.80 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.314
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 002.50‐002.60 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.478 1.192
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 003.00‐003.10 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.559
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 003.50‐004.00 S 0.50 4269 Zilla Full Recon 75mm @ IRI>12 2021 8.259 0.851
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 005.00‐005.10 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.652 1.171
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 006.40‐006.60 S 0.20 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.709
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 006.90‐007.00 S 0.10 5325 Zilla Rehab 75mm @ IRI 9‐12 2021 1.796 1.650
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 007.00‐007.30 S 0.30 5325 Zilla Overlay 50mm @ IRI 6‐9 2021 1.890 1.286
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 007.30‐007.40 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.608 1.018
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 007.40‐007.90 S 0.50 5325 Zilla Overlay 50mm @ IRI 6‐9 2021 3.150 1.256
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 007.90‐008.00 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.608 0.789
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 008.10‐008.30 S 0.20 5325 Zilla Rehab 75mm @ IRI 9‐12 2021 3.592 1.422
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 009.70‐010.20 S 0.50 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 5.317 1.599
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 010.50‐010.60 S 0.10 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 1.077 2.430
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 010.90‐011.00 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.660
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 011.00‐011.10 S 0.10 4269 Zilla Overlay 50mm @ IRI 6‐9 2021 0.448 0.888
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 011.10‐011.20 S 0.10 5325 Zilla Rehab 75mm @ IRI 9‐12 2021 1.616 1.979
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 012.30‐012.40 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.347 1.649
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 013.10‐013.20 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.565 1.625
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 014.70‐014.90 S 0.20 5325 Zilla Full Recon 75mm @ IRI>12 2021 4.695 1.289
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 015.10‐015.30 S 0.20 5325 Zilla Overlay 50mm @ IRI 6‐9 2021 1.103 3.534
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 016.30‐016.40 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.521 1.563
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 016.50‐016.60 S 0.10 5325 Zilla Full Recon 75mm @ IRI>12 2021 2.382 1.272
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 019.80‐020.00 S 0.20 5325 Zilla Full Recon 75mm @ IRI>12 2021 5.216 0.961
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 020.40‐020.60 S 0.20 4269 Zilla Full Recon 75mm @ IRI>12 2021 3.782 0.779
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 020.60‐020.80 S 0.20 4269 Zilla Overlay 50mm @ IRI 6‐9 2021 0.840 1.094
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 020.80‐020.90 S 0.10 4269 Zilla Full Recon 75mm @ IRI>12 2021 1.739 1.096
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 020.90‐021.20 S 0.30 4269 Zilla Overlay 50mm @ IRI 6‐9 2021 1.260 2.541
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 021.20‐021.70 S 0.50 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 5.986 1.368
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 022.19‐022.29 S 0.10 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 1.197 2.194
Page 230 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 023.29‐023.49 S 0.20 4269 Zilla Rehab 75mm @ IRI 9‐12 2021 2.275 1.781
Z2011 Darbast‐Kanaighat‐Shahbag Road Km 023.99‐024.70 S 0.71 4269 Zilla Overlay 50mm @ IRI 6‐9 2021 2.829 2.810
Z2014 Seola‐Sutarkandi Road Km 000.00‐003.10 S 3.10 2007 Zilla Overlay 40mm @ Traff >=2000 2021 14.760 0.000
Z2014 Seola‐Sutarkandi Road Km 003.10‐003.40 S 0.30 2007 Zilla Overlay 40mm @ Traff >=2000 2021 1.513 0.000
Z2014 Seola‐Sutarkandi Road Km 003.40‐003.60 S 0.20 2007 Zilla Overlay 40mm @ IRI>12 2021 1.375 0.000
Z2014 Seola‐Sutarkandi Road Km 003.60‐004.16 S 0.56 2007 Zilla Overlay 40mm @ Traff >=2000 2021 3.837 0.110
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 001.20‐001.40 S 0.20 6986 Zilla Rehab 75mm @ IRI 9‐12 2021 3.232 3.639
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 002.10‐002.40 S 0.30 6986 Zilla Rehab 75mm @ IRI 9‐12 2021 4.849 3.418
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 003.30‐003.60 S 0.30 6986 Zilla Rehab 75mm @ IRI 9‐12 2021 4.849 3.653
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 004.00‐004.40 S 0.40 6986 Zilla Rehab 75mm @ IRI 9‐12 2021 6.740 3.179
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 005.90‐006.20 S 0.30 6986 Zilla Full Recon 75mm @ IRI>12 2021 6.759 2.194
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 006.20‐006.50 S 0.30 6986 Zilla Overlay 40mm @ Traff >=2000 2021 1.324 2.297
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 006.50‐006.70 S 0.20 6986 Zilla Full Recon 75mm @ IRI>12 2021 4.521 2.339
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 007.60‐007.70 S 0.10 6986 Zilla Full Recon 75mm @ IRI>12 2021 2.260 3.202
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 007.70‐008.30 S 0.60 6986 Zilla Overlay 50mm @ IRI 6‐9 2021 3.276 4.213
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 008.30‐008.40 S 0.10 6986 Zilla Full Recon 75mm @ IRI>12 2021 2.260 2.846
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 008.40‐008.80 S 0.40 6986 Zilla Overlay 50mm @ Cracking >25% 2021 2.239 2.715
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 008.80‐009.10 S 0.30 6986 Zilla Full Recon 75mm @ IRI>12 2021 7.042 1.930
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 009.10‐009.80 S 0.70 6986 Zilla Overlay 50mm @ IRI 6‐9 2021 3.969 3.664
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 009.80‐010.00 S 0.20 6986 Zilla Full Recon 75mm @ IRI>12 2021 4.671 2.278
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 010.00‐010.10 S 0.10 6986 Zilla Overlay 50mm @ Cracking >25% 2021 0.567 2.615
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 010.10‐010.20 S 0.10 6986 Zilla Full Recon 75mm @ IRI>12 2021 2.347 2.620
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 010.20‐011.00 S 0.80 6986 Zilla Overlay 50mm @ IRI 6‐9 2021 4.536 3.867
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 011.00‐011.20 S 0.20 6986 Zilla Full Recon 75mm @ IRI>12 2021 4.695 2.197
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 011.20‐011.90 S 0.70 6986 Zilla Overlay 50mm @ IRI 6‐9 2021 3.969 3.816
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 011.90‐012.20 S 0.30 6986 Zilla Rehab 75mm @ IRI 9‐12 2021 4.849 2.861
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 012.20‐015.10 S 2.90 6986 Zilla Overlay 50mm @ Cracking >25% 2021 16.437 2.805
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 015.10‐015.20 S 0.10 6986 Zilla Full Recon 75mm @ IRI>12 2021 2.347 3.075
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 015.20‐015.30 S 0.10 6986 Zilla Overlay 50mm @ Cracking >25% 2021 0.567 2.413
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 015.30‐015.60 S 0.30 6986 Zilla Full Recon 75mm @ IRI>12 2021 7.042 2.129
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 015.60‐016.50 S 0.90 6986 Zilla Overlay 50mm @ IRI 6‐9 2021 5.103 5.724
Z2016 Rashidpur‐Biswanath‐Lama Kazi Road Km 016.50‐016.60 S 0.10 6986 Zilla Full Recon 75mm @ IRI>12 2021 2.347 2.514
Z2808 Badaghat‐Biman Bandar Road Km 000.10‐000.80 S 0.70 903 Zilla Overlay 40mm @ IRI>12 2021 3.298 0.000
Z2808 Badaghat‐Biman Bandar Road Km 001.40‐001.50 S 0.10 903 Zilla Overlay 40mm @ IRI>12 2021 0.472 0.000
Z2808 Badaghat‐Biman Bandar Road Km 002.90‐003.80 S 0.90 903 Zilla Overlay 40mm @ IRI>12 2021 4.248 0.000
Z2808 Badaghat‐Biman Bandar Road Km 004.20‐004.50 S 0.30 903 Zilla Overlay 40mm @ IRI>12 2021 1.426 0.000
Z2808 Badaghat‐Biman Bandar Road Km 004.60‐005.40 S 0.80 903 Zilla Overlay 40mm @ IRI>12 2021 3.804 0.000
Z2808 Badaghat‐Biman Bandar Road Km 007.76‐012.50 S 4.74 3474 Zilla Overlay 40mm @ IRI>12 2021 22.133 0.000
Z2809 Osmani Biman Bandar Road Km 000.00‐000.40 S 0.40 13064 Zilla Overlay 50mm @ IRI 6‐9 2021 5.607 3.412
Z2809 Osmani Biman Bandar Road Km 000.40‐000.70 S 0.30 13064 Zilla Full Recon 75mm @ IRI>12 2021 17.410 1.193
Z2809 Osmani Biman Bandar Road Km 001.70‐001.84 L 0.14 13064 Zilla Overlay 40mm @ Traff >=2000 2021 0.737 7.085
Z2809 Osmani Biman Bandar Road Km 001.70‐001.84 R 0.14 13064 Zilla Overlay 40mm @ Traff >=2000 2021 0.749 7.042
Z2809 Osmani Biman Bandar Road Km 006.90‐007.00 S 0.10 13064 Zilla Rehab 75mm @ IRI 9‐12 2021 2.200 6.061
Page 231 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2809 Osmani Biman Bandar Road Km 007.10‐007.30 S 0.20 13064 Zilla Full Recon 75mm @ IRI>12 2021 6.390 4.532
Z2809 Osmani Biman Bandar Road Km 007.80‐007.90 S 0.10 13064 Zilla Full Recon 75mm @ IRI>12 2021 3.195 3.958
Z2810 Companiganj‐Chhatak Road Km 000.00‐011.97 S 11.97 453 Zilla Overlay 40mm @ IRI>12 2021 34.869 0.000
Z2812 Beanibazar‐Budbaribazar‐Golapganj‐Fenchuganj Km 000.40‐000.50 S 0.10 1103 Zilla Overlay 40mm @ IRI>12 2021 0.255 0.000
Z2812 Beanibazar‐Budbaribazar‐Golapganj‐Fenchuganj Km 002.33‐002.83 S 0.50 1103 Zilla Overlay 40mm @ IRI>12 2021 1.274 0.000
Z2812 Beanibazar‐Budbaribazar‐Golapganj‐Fenchuganj Km 002.83‐005.10 S 2.27 1103 Zilla Overlay 40mm @ 1000‐2000 2021 5.792 0.000
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 000.00‐000.20 S 0.20 2862 Zilla Overlay 40mm @ Traff >=2000 2021 0.628 0.000
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 000.20‐000.40 S 0.20 2862 Zilla Full Recon 75mm @ IRI>12 2021 3.217 0.272
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 000.40‐000.50 S 0.10 2862 Zilla Overlay 40mm @ Traff >=2000 2021 0.314 0.000
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 000.50‐001.40 S 0.90 2862 Zilla Overlay 40mm @ Traff >=2000 2021 2.820 0.639
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 001.40‐002.50 S 1.10 2862 Zilla Overlay 40mm @ Traff >=2000 2021 3.427 0.667
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 002.50‐003.00 S 0.50 2862 Zilla Full Recon 75mm @ IRI>12 2021 7.955 0.234
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 003.70‐004.10 S 0.40 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 4.358 3.053
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 004.50‐005.30 S 0.80 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 8.716 2.378
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 005.30‐005.80 S 0.50 3474 Zilla Overlay 40mm @ Traff >=2000 2021 1.545 2.164
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 005.80‐005.90 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.092 3.714
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 006.30‐006.40 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 1.587 2.774
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 006.70‐006.90 S 0.20 3474 Zilla Full Recon 75mm @ IRI>12 2021 3.173 2.047
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 007.50‐008.80 S 1.30 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 14.241 2.676
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 009.40‐009.50 S 0.10 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 1.098 3.746
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 009.70‐009.80 S 0.10 3474 Zilla Full Recon 75mm @ IRI>12 2021 1.595 2.146
Z2831 Vadeshwar‐Mirganj‐Manikona‐Fenchuganj Road Km 010.20‐010.90 S 0.70 3474 Zilla Rehab 75mm @ IRI 9‐12 2021 7.689 2.704
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 000.00‐000.10 S 0.10 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 0.389 1.682
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 000.10‐000.30 S 0.20 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 2.215 1.783
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 001.20‐001.30 S 0.10 4218 Zilla Full Recon 75mm @ IRI>12 2021 1.591 1.362
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 002.00‐002.30 S 0.30 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.286 1.623
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 002.30‐002.90 S 0.60 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 2.306 1.729
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 002.90‐003.20 S 0.30 4218 Zilla Full Recon 75mm @ IRI>12 2021 4.773 0.681
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 003.40‐003.80 S 0.40 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 1.277 2.717
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 004.00‐004.30 S 0.30 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 2.694 1.397
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 005.20‐005.70 S 0.50 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 4.490 1.708
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 006.40‐006.70 S 0.30 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 3.295 1.717
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 006.80‐006.90 S 0.10 4218 Zilla Full Recon 75mm @ IRI>12 2021 1.595 1.444
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 006.90‐007.30 S 0.40 4218 Zilla Overlay 40mm @ Traff >=2000 2021 1.246 0.023
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 007.30‐007.50 S 0.20 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 2.197 1.209
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 007.50‐007.80 S 0.30 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 1.156 1.249
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 007.80‐009.00 S 1.20 4218 Zilla Overlay 50mm @ Cracking >25% 2021 4.637 0.688
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 009.00‐009.50 S 0.50 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 5.537 1.249
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 009.50‐009.70 S 0.20 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 0.777 0.571
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 009.70‐009.80 S 0.10 4218 Zilla Full Recon 75mm @ IRI>12 2021 1.608 1.522
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 009.80‐010.70 S 0.90 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 3.493 0.813
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 010.70‐010.90 S 0.20 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 2.197 1.856
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 011.00‐011.10 S 0.10 4218 Zilla Full Recon 75mm @ IRI>12 2021 1.595 1.776
Page 232 of 233
Appendix‐A
Annual Needs Report
2021‐2022
ROAD  LENGTH  ROAD  FIN COST
ROAD NAME CHAINAGE CWAY AADT WORK NAME YEAR NPV/COST
NO (km) CLASS (Mill. Tk)
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 011.80‐012.00 S 0.20 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 2.197 1.559
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 012.20‐012.30 S 0.10 4218 Zilla Rehab 75mm @ IRI 9‐12 2021 1.101 2.368
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 012.30‐012.80 S 0.50 4218 Zilla Overlay 40mm @ Traff >=2000 2021 1.562 0.040
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 012.80‐013.10 S 0.30 4218 Zilla Full Recon 75mm @ IRI>12 2021 4.799 0.677
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 013.10‐014.20 S 1.10 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 4.247 1.320
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 014.20‐014.60 S 0.40 4218 Zilla Full Recon 75mm @ IRI>12 2021 6.399 0.857
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 014.80‐014.90 S 0.10 4218 Zilla Full Recon 75mm @ IRI>12 2021 1.600 1.746
Z2832 Daudabad‐Daudpur‐Vadeswar Road Km 014.90‐015.84 S 0.94 4218 Zilla Overlay 50mm @ IRI 6‐9 2021 3.640 0.803
Sylhet Division Total 1254.471
Sylhet Zone Total 4694.674
Grand Total 72999.138

Page 233 of 233
Appendix B
Recurrent Cost of Zone & Division
Crack Edge Prep. Edge Grand
Zone Division Patching Prep. Patching Routine
Sealing repair Repair Total
Barishal Barguna 0.039 3.404 5.740 0.003 7.315 16.501
Barishal 0.277 13.547 0.016 33.601 0.025 23.054 70.521
Bhola 0.570 5.203 0.005 15.999 0.019 6.718 28.513
Jhalokati 0.005 8.867 0.008 16.285 0.018 11.367 36.550
Patuakhali 0.000 12.941 0.001 27.776 0.004 14.968 55.689
Pirojpur 0.795 18.257 0.032 13.655 0.021 17.546 50.306
Barisal Total 1.686 62.220 0.062 113.055 0.089 80.968 258.080
Chattogram Bandarban 0.204 9.962 0.007 6.770 0.012 22.449 39.403
Chattogram 0.045 16.016 0.010 15.272 0.027 23.570 54.938
Cox's Bazar 0.103 6.757 0.003 12.860 0.008 17.573 37.304
Dohazari 0.009 18.482 0.000 14.228 0.013 13.610 46.341
Khagrachari 0.286 27.357 0.016 56.006 0.017 27.252 110.935
Rangamati 0.867 1.915 3.041 0.004 11.345 17.171
Chittagong Total 1.514 80.488 0.036 108.177 0.080 115.799 306.093
Cumilla Brahmanbaria 1.454 20.068 0.004 24.503 0.011 16.231 62.271
Chandpur 0.136 20.385 0.013 151.833 0.035 24.103 196.505
Cumilla 1.182 38.885 0.024 126.215 0.067 42.563 208.936
Feni 0.350 59.245 0.007 55.555 0.030 15.928 131.115
Laxmipur 0.661 9.277 49.008 0.009 14.506 73.461
Noakhali 0.034 9.027 0.004 22.221 0.012 14.468 45.766
Cumilla Total 3.818 156.887 0.052 429.335 0.164 127.799 718.055
Dhaka Dhaka 0.344 18.233 0.000 33.377 0.007 12.308 64.269
Gazipur 0.639 12.042 0.002 46.628 0.010 19.787 79.108
Manikganj 0.654 3.440 9.941 0.005 8.172 22.211
Munshiganj 0.607 8.032 0.001 61.847 0.035 9.821 80.343
Narayanganj 0.581 12.709 0.012 53.493 0.032 15.634 82.460
Narsingdi 1.221 13.235 0.015 49.845 0.034 25.458 89.808
Dhaka Total 4.045 67.692 0.029 255.131 0.122 91.180 418.200
Crack Edge Prep. Edge Grand
Zone Division Patching Prep. Patching Routine
Sealing repair Repair Total
Gopalganj Faridpur 0.283 49.750 0.129 8.902 0.003 18.879 77.947
Gopalganj 0.106 5.976 21.398 0.008 20.524 48.013
Madaripur 0.355 20.503 0.006 9.801 0.001 9.345 40.011
Rajbari 0.000 2.065 2.734 0.002 2.709 7.511
Sariatpur 0.791 1.137 0.006 20.979 0.015 9.048 31.975
Gopalganj Total 1.536 79.432 0.141 63.814 0.028 60.506 205.457
Khulna Bagerhat 1.568 63.116 0.028 26.199 0.016 24.088 115.016
Chuadanga 0.171 3.024 6.495 0.002 8.416 18.108
Jashore 0.236 22.456 0.011 18.314 0.031 12.383 53.431
Jhenaidah 2.055 23.230 0.061 27.710 0.035 26.640 79.731
Khulna 1.620 24.063 0.001 24.166 0.013 17.478 67.341
Kushtia 1.603 37.743 0.012 47.319 0.017 16.335 103.028
Magura 0.000 1.797 0.008 4.715 0.006 9.780 16.306
Meherpur 0.342 3.218 0.003 10.318 0.017 10.231 24.129
Narail 0.193 6.786 0.003 2.208 0.002 7.189 16.381
Satkhira 0.000 11.617 0.005 20.283 0.023 15.926 47.855
Khulna Total 7.787 197.050 0.133 187.727 0.163 148.467 541.326
Mymensingh Jamalpur 2.443 38.839 0.021 11.429 0.002 9.283 62.015
Kishoreganj 0.655 33.217 0.041 37.785 0.038 19.370 91.105
Mymensingh 0.000 9.522 0.027 15.978 0.034 21.813 47.374
Netrokona 0.034 6.077 0.021 21.577 0.006 10.854 38.569
Sherpur 0.094 18.347 0.015 4.068 0.000 10.278 32.801
Tangail 0.061 0.890 0.000 25.925 0.024 18.821 45.721
Mymensingh
Total 3.286 106.890 0.124 116.762 0.105 90.419 317.586
Rajshahi Naogaon 2.044 50.978 0.000 29.991 0.025 32.719 115.759
Natore 1.006 10.405 0.016 20.671 0.033 16.076 48.208
Nawabganj 0.081 25.090 0.024 11.562 0.026 17.113 53.896
Crack Edge Prep. Edge Grand
Zone Division Patching Prep. Patching Routine
Sealing repair Repair Total
Pabna 3.380 38.223 0.017 42.924 0.028 33.844 118.416
Rajshahi 0.524 46.339 0.010 9.906 0.014 24.842 81.635
Sirajganj 0.052 22.949 0.001 35.180 0.024 19.500 77.707
Rajshahi Total 7.087 193.985 0.068 150.234 0.150 144.095 495.620
Rangpur Bogura 1.984 24.184 0.019 29.514 0.020 20.386 76.108
Dinajpur 1.116 34.046 0.007 43.372 0.007 19.963 98.511
Gaibanda 0.213 31.708 0.015 12.596 0.004 13.037 57.573
Joypurhat 0.185 1.850 0.000 16.303 0.016 9.684 28.038
Kurigram 0.174 16.391 0.013 9.022 0.015 10.238 35.853
Lalmonirhat 0.269 5.097 0.003 18.214 0.002 10.951 34.537
Nilphamari 3.056 14.739 0.001 16.791 0.014 12.559 47.160
Panchgarh 0.049 31.232 0.008 4.150 0.000 13.160 48.599
Rangpur 1.753 33.456 0.001 23.023 0.008 24.198 82.440
Thakurgaon 1.685 28.562 0.000 8.989 0.001 11.380 50.617
Rangpur Total 10.484 221.264 0.067 181.974 0.088 145.558 559.436
Sylhet Habiganj 0.294 22.658 0.000 39.573 0.006 17.435 79.965
Moulavi
Bazar 2.210 25.359 0.022 23.573 0.007 14.540 65.711
Sunamganj 1.952 18.018 0.002 38.753 0.033 21.866 80.624
Sylhet 0.681 27.670 0.013 34.182 0.021 16.422 78.990
Sylhet Total 5.137 93.706 0.037 136.081 0.067 70.263 305.290
Appendix C
RAMS Map
1 of 65
2 of 65
3 of 65
4 of 65
5 of 65
6 of 65
7 of 65
8 of 65
9 of 65
10 of 65
11 of 65
12 of 65
13 of 65
14 of 65
15 of 65
16 of 65
17 of 65
18 of 65
19 of 65
20 of 65
21 of 65
22 of 65
23 of 65
24 of 65
25 of 65
26 of 65
27 of 65
28 of 65
29 of 65
30 of 65
31 of 65
32 of 65
33 of 65
34 of 65
35 of 65
36 of 65
37 of 65
38 of 65
39 of 65
40 of 65
41 of 65
42 of 65
43 of 65
44 of 65
45 of 65
46 of 65
47 of 65
48 of 65
49 of 65
50 of 65
51 of 65
52 of 65
53 of 65
54 of 65
55 of 65
56 of 65
57 of 65
58 of 65
59 of 65
60 of 65
61 of 65
62 of 65
63 of 65
64 of 65
65 of 65
Appendix D
Zone & Division wise Road Length
Field Validation of HDM-4 Analysis
Srl Road Road Name Chainage Observations HDM-4 Comments
No No (km) Recommendati
ons
1 R881 Amtali-Khepupara-Kuakata 033.20- Wide cracks, lots of Rehab 150mm HDM analysis result
035.20 potholes noticed. seems acceptable
2 N106 Chattogram-Hathazari- 002.10- Some narrow and Overlay 80 mm Rehabilitation/Overlay
Rangamati 005.60 wide crack observed. could be sufficient
No potholes &
Undulation noticed.
3 N1 Dhaka-Cumilla-Chattogram- 279.62- Significant no of Rehab 195mm HDM analysis result
Teknaf 297.44 potholes & seems acceptable
depression at some
places noticed.
4 Z1050 Kaliapara-Kachua 000.10- No depressions Full Recon 75 Overlay would be
002.70 noticed but wide mm enough
cracks & large no of
potholes found
5 R852 Gouranadi-Paisarhat- 026.70- Damaged road with Rehab 150mm HDM analysis result
Kotalipara-Gopalganj 039.30 wide cracks & lots of seems acceptable
potholes and
depression at some
places noticed.
6 N805 Bhanga-Mollahhat-Fakirhat- 084.35- Some narrow and Overlay 80 mm HDM analysis result
Noapara 094.32 wide crack observed. seems acceptable
7 N7 Dauladia-Faridpur-Jhenaidah- 142.22- Wide cracks & lots of Rehab 180mm HDM analysis result
Jashore-Khulna-Mongla 147.34 potholes noticed. seems acceptable
Depression at some
place
8 N704 Jhenaidah-Kushtia-Paksey 015.90- Some narrow and Overlay 80 mm HDM analysis result
Ferry-Dasuria 018.80 wide crack observed. seems acceptable
Some potholes &
Undulation noticed.

9 Z4016 Kalihati-Ratanganj-Shakipur 004.10- Depression at some Full Recon 75 HDM analysis result
007.70 place with wide mm seems acceptable
cracks found

10 R545 Bogura-Naogaon-Dhamoirhat- 070.96- Damaged road with Rehab 150 mm Design verification
Joypurhat 073.87 lots of potholes & needed
wide cracks, Some
place undulation
found
11 Z2824 Juri ( Klipdon )- 011.70- Depression at some Full Recon 75 HDM analysis result
Kulaura(Gazipur) 013.70 place along with mm seems acceptable
large potholes
noticed.
12 R142 Begamganj-Sonaimuri- 032.15- Damaged road with Rehab 150mm Overlay would be
Ramganj 034.65 lots of potholes & enough
wide cracks, Some
place undulation
found
13 R113 Madanpur-Madanganj- 005.40- Significant edge Rehab 150mm HDM analysis result
Sayedpur 008.20 breaks noticed. seems acceptable
Depression observed
along the edge. Few
potholes noticed.
14 Z2037 Gorashal-Daladia-Palash- 005.08- Some narrow and Rehab 75 mm HDM analysis result
Fulbaria-Charsindur 012.11 wide cracks seems acceptable
observed on the
road undulation
found .
15 Z1005 Chiringa-Lama-Alikadam 008.18- Occasional Overlay 40mm HDM analysis result
011.90 depression found seems acceptable
wide cracks and
potholes
Appendix E
Field Validation
Zone/ Division National Regional Zilla Grand Total
Barishal 127.942 290.088 1185.914 1603.944
Barguna 26.528 146.156 172.684
Barishal 90.776 20.313 242.176 353.265
Bhola 16.47 109.4 155.091 280.961
Jhalokati 7.322 38.811 205.346 251.479
Patuakhali 13.374 69.846 173.963 257.183
Pirojpur 25.19 263.182 288.372
Chattogram 459.461 457.386 1749.507 2666.354
Bandarban 22.541 30.45 499.559 552.55
Chattogram 142.573 137.929 289.975 570.477
Cox's Bazar 173.799 41.162 348.261 563.222
Dohazari 84.108 72.72 209.706 366.534
Khagrachari 104.732 284.025 388.757
Rangamati 36.44 70.393 117.981 224.814
Cumilla 388.148 368.015 1839.099 2595.262
Brahmanbaria 99.642 83.045 107.129 289.816
Chandpur 71.66 290.657 362.317
Cumilla 198.811 67.441 603.426 869.678
Feni 49.235 6.556 239.702 295.493
Laxmipur 10.03 56.262 191.062 257.354
Noakhali 30.43 83.051 407.123 520.604
Dhaka 467.128 689.562 711.475 1868.165
Dhaka 100.442 70.69 105.478 276.61
Gazipur 103.073 211.183 97.872 412.128
Manikganj 73.327 80.86 85.3 239.487
Munshiganj 38.574 103.178 182.983 324.735
Narayanganj 89.1 88.238 74.57 251.908
Narsingdi 62.612 135.413 165.272 363.297
Gopalganj 263.794 256.016 626.759 1146.569
Faridpur 90.603 240.092 330.695
Gopalganj 66.882 74.88 158.335 300.097
Madaripur 86.66 50.385 79.69 216.735
Rajbari 19.649 54.812 82.189 156.65
Sariatpur 75.939 66.453 142.392
Khulna 478.771 643.479 1712.835 2835.085
Bagerhat 61.121 114.409 264.764 440.294
Chuadanga 118.712 24.078 142.79
Jashore 146.503 54.372 137.685 338.56
Jhenaidah 74.99 48.839 271.81 395.639
Khulna 61.037 42.378 309.763 413.178
Kushtia 48.648 73.817 146.355 268.82
Magura 46.266 56.34 129.104 231.71
Meherpur 66.574 67.269 133.843
Narail 30.981 16.08 141.541 188.602
Satkhira 9.225 51.958 220.466 281.649
Mymensingh 285.826 579.115 1745.176 2610.117
Jamalpur 19.733 165.673 163.038 348.444
Kishoreganj 3.269 137.489 286.067 426.825
Mymensingh 101.905 92.767 374.609 569.281
Netrokona 52.643 316.185 368.828
Sherpur 28 63.28 228.561 319.841
Tangail 132.919 67.263 376.716 576.898
Rajshahi 493.929 593.547 1375.909 2463.385
Naogaon 262.438 212.906 475.344
Natore 109.319 39.763 208.514 357.596
Nawabganj 42.19 23.005 165.922 231.117
Pabna 155.043 168.969 207.008 531.02
Rajshahi 100.22 75.942 250.345 426.507
Sirajganj 87.157 23.43 331.214 441.801
Rangpur 667.352 542.487 1810.696 3020.535
Bogura 126.347 59.511 338.684 524.542
Dinajpur 96.075 161.107 267.781 524.963
Gaibanda 32.845 42.369 208.683 283.897
Joypurhat 39.035 151.947 190.982
Kurigram 63.3 99.3 113.438 276.038
Lalmonirhat 120.697 16.879 42.536 180.112
Nilphamari 17.47 55.585 204.85 277.905
Panchgarh 71.268 111.477 182.745
Rangpur 108.752 62.561 215.6 386.913
Thakurgaon 30.598 6.14 155.7 192.438
Sylhet 356.897 478.013 784.128 1619.038
Habiganj 128.024 103.326 107.425 338.775
Moulavi Bazar 89.733 74.223 216.688 380.644
Sunamganj 138.457 206.981 345.438
Sylhet 139.14 162.007 253.034 554.181
Grand Total 3989.248 4897.708 13541.498 22428.454