Professional Documents
Culture Documents
1. Installation of ducting, blowers and Air-Acetylene pipes for the two AAS machines.
2. Hauling of two AAS machines.
3. Construction of fume testing platform at the acid scrubber
4. Installation of fire bricks in the acid fume hood
5. Installation of exhaust pipes from acid fume hood to acid scrubber
Complete Installation of hauled AAS machine from the CIP assay lab to main assay lab
Installation of fire bricks in the acid scrubber and exhaust pipe going to the acid scrubber
Also, we are still waiting for the fabrication to finish the modification of blower for the acid
scrubber.
Before After
Installation of sprocket
3.0) Adsorption Tank 3 repairs
Due to the leaks found during the hydro test, Mill Maintenance team asked help to eliminate the
leaks by doing following:
1. Weld bent 8” by 3/8 “MS steel plate at the bottom of the tank
2. Weld 10 mm MS plate flooring
3. Skinned corroded manhole
4. Applied brushable ceramic coating on the welded joints