PEB Structure Requirements

1) Nature of Work: Designing, Fabrication and Erection of Pre Engineered Building (PEB) Structure on
Turnkey Basis for establishing a small scale Millets Processing Centre (MPC)

2) Location: Survey No. 117-3, Rega (V), L Kota Mandal of Vizianagaram District in Andhra Pradesh

3) Factory Shed Dimensions: 24 X 15 X Clear Height 5 Mtrs.

4) Partitions:

1 Millets Cleaning Section 15.0 x 05.4 Mtrs.

2 Rava, Flour, Flakes etc., Section 15.0 x 05.4 Mtrs

3 Biscuit Making Section 15.0 x 05.4 Mtrs

4 Male Change Room 05.5 x 02.8 Mtrs.

4) Structural Design Parameters (to be indicated by fabricator)

PEB structure to commence after 1.3 Mtr. high Brick construction all around from plinth level.

Sl. No. Building Parameter Details and Specifications

1 Structural Design

1.1 Type of structural frame

1.2 Lean-to Rafters

1.3 Column Canopy Rafters

1.4 Interior Columns

1.5 Bearing Frame Rafters

1.6 Corner Columns

1.7 End wall Wind Columns

1.8 Base Plates

1.9 Anchor Bolts

2 Building Dimensions

2.1 Length (Mtrs.)

2.2 Width (Mtrs.)

Page 1 of 3
Sl. No. Building Parameter Details and Specifications

2.3 Eave Height (Mtrs.)

2.4 Eave Strut

2.5 Bay Spacing

2.6 Roof Slope

2.7 End Wall Column Spacing

2.8 End Wall Bearing Frame

3 Design Loads (in accordance with IBC


specifications)

3.1 Dead Load

3.2 Moving Load

3.3 Wind Load

3.4 Seismic Load

3.5 Impact Load

3.6 Auxiliary Load

4 Roofing

4.1 Sheeting

4.2 Panelling

4.3 False Ceiling

4.4 Expansion Joints

5 Walls

5.1 Sheeting (including height of sheeting


on all four sides)

5.2 Panelling

5.3 Fascia

6 Accessories

6.1 Personnel Doors

6.2 Windows with Fly-proof screen

Page 2 of 3
Sl. No. Building Parameter Details and Specifications

6.3 Industrial Louvers

6.4 Ventilators

6.5 External Manually operate Rolling


Shutters

6.6 Flashing, Trims, Closures

6.7 Eave Gutter and Down Spouts

7 Provision for Lighting

7.1 Ceiling Lights

7.2 Fans & Exhaust Fans

8 Ventilation

9 Fire Protection

Page 3 of 3
ENTRY RAMP
A

MILLET PROCESSING CENTER - FLOOR PLAN

DISPOSALS STOCKING AREA


UTENSILS WASHING &

FOOTING EXCAVATION UP TO HARD


UTENSILS WASHING &

STRATA
DISPOSALS STOCKING AREA

R.S

PEB STRUCTURAL
PROCESSING AREA -3

RCC 1:1.5:3
PROVISION FOR SS TROLLEYS, PALLETS, METAL

W
(BISCUIT SECTION) DETECTORS, INKJET PRINTERS ETC.

SHED

PCC 1:3:6
15.00M X 5.40M
PACKING MACHINE & LABELLING

225MM THK BRICK WALL


PROVISION FOR DUST COLLECTION AND OTHER EQUIPMENT RESTING PLATFORM
W
PLANETARY BISCUIT MIXTURE PLC CONTROLLER COOKIES MIXTURE OVEN

PROCESSING AREA -2

W
(RAVA OR FLOUR & FLAKES,VERMICELLI SECTION)
15.00M X 5.40M

PANELL WORKS.
3.00M TO 3.60M HT SPAN COVERED WITH
VERMICELLI FLAKES LINE POPPING LINE OVEN DEPOSITOR

W
ROASTING LINE PULVERIZED RAVA RIBBON BLENDER VIBRO SIFER PACKING MACHINE

SECTION AT-AA'
PROPOSED COLD STORAGE (RM) PACKING MACHINE ELEVATOR-4 No.s MICRO PULVERIZER TRAY DRYER

22.54M X 23.00M

W
PROCESSING AREA -1
(WHOLE CLEANED MILLETS SECTION)

W
15.00M X 5.40M ASPIRATOR GRADER DE HULLER POLISHER
DE STONER

R.S/ AIR CURTAIN

DISINFECTION D MALE DRESS MALE DRESS

LOCKERS
HAND WASH AREA CHANGE ROOM & LOCKERS CHANGE ROOM & LOCKERS
5.45M X 2.77M 5.45M X 2.77M
D2

GENTS TOILET D1 LOCKERS LOCKERS

D2
JANITOR

LOCKERS
D FEMALE DRESS CHANGE ROOM FEMALE DRESS CHANGE ROOM
LADIES TOILET
& LOCKERS & LOCKERS
D1
D2 D2 D2 5.45M X 2.77M 5.45M X 2.77M
TOILET
1.20M X 1.08M
TOILET
1.20M X 1.08M
TOILET
1.20M X 1.08M
5.00m
LOCKERS LOCKERS

R.S

CM(1:6)
WALL
BRICK
WORKING PLATFORM ENTRANCE RAMP WORKING PLATFORM
A'

NOTES :
1) THE STRUCTURE WILL HAVE 1.35M HEIGHT 225mm THICK BRICK WALL
PLAN PROCESSING AREA
ALL-AROUND
2) PANELLING TO START ABOVE THE BRICK WORK.
15.00M X 24.00M
3) PROVISION FOR FLYPROOF UPVC WINDOWS IN PANELLING REQUIRED.
4) INTERNAL PARTITIONS OF 100mm THICK 0.90M HEIGHT - FOR 3 DIFFERENT
PROCESSING SECTIONS.
DATED : 25-06-2020