GVI/NDT Inspection Report of 10 Inch (C.

6 to CV-32) GALI JAGEER TO FATEHJUNG Natural


Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

TECHNICAL REPORT

GVI/NDT Inspection Report of Pipeline


OF
10 INCH (C.6 TO CV-32) NATURAL GAS BURIED
PIPELINE
SUI NORTHERN GAS PIPELINES LIMITED (SNGPL)
WAH
VELOSI REPORT #: VISP-L-18-247-1
VELOSI PROJECT #: VISP-L-18-247

DATE OF
REV. DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
ISSUANCE

MUHAMMAD HAFIZ
YASER
VISUAL/NDT JAMSHAID AKHTER
QAYYUM
A INSPECTION 28-MARCH-2019 AFZAL HUSSAIN
REPORT

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |1


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

TABLE OF CONTENTS

1. INTRODUCTION
1.1 Objective
1.2 Scope
1.3 References6
2. INSPECTION SUMMARY6
3. INSPECTION FINDINGS AND RECOMMENDATIONS11
4. GENERAL RECOMMENDATIONS161
5. ATTACHMENTS162
Appendix A ................................................................................................................(NDT Reports)
Appendix B ................................................................................(Sketch of line with CML marking)

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |2


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

1. +INTRODUCTION
M/S SNGPL has contracted M/S Velosi to perform the Integrity Assessment of their
assets which include buried pipeline of high pressure transmission pipeline of SNGPL at
downstream of 10” dia C.6 to CV-32 GALIJAGEER TO FATEHJUNG of SNGPL WAH
region. Inspection was conducted b/w Section C.6 TO CV-32 assembly. The report consists
of inspection findings / observations and recommendations (Checklists and Photographs)
and also refer to appendix A (NDT Reports) and appendix B (Sketch of line with CML
markings) for more details.
Total 12 no. of different Bell Hole locations were selected on buried pipeline for
assessment. The selection of Bell Holes was made in accordance to Velosi Bell Hole
Selection Criteria which is already submitted to SNGPL. However, inspection
activities were performed on 12 different Bell Hole locations.
For reference see Table # 01 (Bell Holes Status) below.
Table # 01 (BELL HOLES STATUS)
Sr. Bell-
Description of
No Hole Chainage Remarks Techniques for Inspection
Pipeline Segment
. Number
10 inch (C.6 to CV.32) GVI, , UT(TMLs & Corrosion mapping),
01 BH # 01 MP-165.40+748m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

0 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


02 BH # 02 MP-165.97+14m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


03 BH # 03 MP-166.82+4 m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, TOFD of welding joint , UT(TMLs


04 BH # 04 MP-167.40+420m GALIJAGEER TO Buried pipeline
& Corrosion mapping), MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


05 BH # 05 MP-167.72+1237m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


06 BH # 06 MP-167.72+1718m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, TOFD of welding joint , UT(TMLs


07 BH # 07 MP-169.03+784m GALIJAGEER TO Buried pipeline
& Corrosion mapping), MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


08 BH # 08 MP-169.70+302m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

09 BH # 09 MP171.13+634m 10 inch (C.6 to CV.32) Buried pipeline GVI, TOFD of welding joint , UT(TMLs
GALIJAGEER TO & Corrosion mapping), MPI

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |3


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


10 BH # 10 MP-174.03+780m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


11 BH # 11 MP-177.55+746m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 inch (C.6 to CV.32) GVI, UT(TMLs & Corrosion mapping),


12 BH # 12 MP-178.18+843m GALIJAGEER TO Buried pipeline
MPI
FATEHJUNG

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |4


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

1.1 Objective
The objective of this inspection is to assess the integrity of on-stream SNGPL ‘Buried
10 inch Dia Pipeline of Section C.6 TO CV-32 GALI JAGEER TO FATEHJUNG.
1.2 Scope
The scope of inspection consists of General Visual Inspection (GVI) & Non
Destructive Testing (NDT) inspection. This Inspection Plan covered the followings:
 External General Visual Inspection (GVI)
 Time of Flight Diffraction (TOFD)
 Ultrasonic Thickness Gauging (UTG)
 Corrosion Mapping/Scanning (UTC)
 Magnetic Particle Inspection (MPI)
 Long Range Ultrasonic Testing (LRUT)
1.3 References
 API 570 Inspection, Repair, Alteration, and Re-rating of In-service Process Piping
 API RP 571 Damage Mechanisms Affecting Fixed Equipment in the Refining
Industry
 API RP 580 Risk Based Inspection second edition-2009
 API 579-1 / ASME FFS-1, June 2016
 API RP 581 Risk Based Inspection Technology second edition-2008
 ASME B31.8 Gas Transmission and Distribution Piping Systems
 ASME B31.8S Managing System Integrity of Gas Pipelines
 ASME B31G Manual for Determining the Remaining Strength of Corroded
Pipelines
 RP-0502 Pipeline External Corrosion Direct Assessment Methodology
 SP-0210 Pipeline External Corrosion Confirmatory Direct Assessment
 RP-0204 Stress Corrosion Cracking Direct Assessment
 Velosi Section Division Drawing
 Velosi Inspection Drawing

2.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |5


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

3. INSPECTION SUMMARY
In this report inspection findings after performing non‐destructive testing including
Ultrasonic Thickness Gauging (UTG), Corrosion Mapping, Magnetic Particle
Inspection (MPI), Time-of-Flight Diffraction (TOFD)(if applicable) and in‐situ
Metallography(if applicable) on high pressure transmission pipelines of segments
10” inch Dia Pipeline of Section C-8 TO CV-32 of SNGPL WAH region. The report
consists of inspection findings / observations and recommendations (Checklists and
Photographs) and also refer to appendix A (NDT Reports) and appendix B (Sketch of
line with CML markings) for more details.
In bell hole #7 the welded spilt full encirclement sleeve was found hence the pipe
surface after sand blasting also observed general pitted and maximum depth of pit
was observed 1.52 mm. Therefore it is highly recommended to perform DCVG
survey of pipeline adjustment to the bell hole # 7 location (MP 169.03+784) and
verify the integrity of coating and CP, also de-coat the damaged coating and perform
GVI bare pipe after de-coating.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |6


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

3.1 FFS Assessment as per API 579-1/ FFS-1


FFS Level-1 assessment was carried out according to 6.4.2 API 579 for each section
of bell-hole separately.
BELL HOLE NUMBER 1:
For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 7.54 mm
Future Corrosion allowance (FCA) = 2.02mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.52 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 7.54 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.00 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1872.21
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |7


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 2:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 7.56 mm
Future Corrosion allowance (FCA) = 2.02mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.54 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 7.56 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.54 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.00 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1875.60
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |8


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 3:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.40 mm
Future Corrosion allowance (FCA) = 0.88mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.47 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.4 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.99 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1863.71
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline Page |9


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 4:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.40 mm
Future Corrosion allowance (FCA) = 0.88mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.47 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.4 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.99 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1863.71
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 10


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 5:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.30 mm
Future Corrosion allowance (FCA) = 0.78mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.57 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.3 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.99 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1880.67
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 11


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 6:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.34 mm
Future Corrosion allowance (FCA) = 0.82mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.53 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.34 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.84mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1873.91
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 12


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 7:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.14 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.22 mm
Future Corrosion allowance (FCA) = 0.69mm
Max. Pit depth (Wmax) = 1.52mm
Pit diameter d = 05 mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.52 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 4.69 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 4.00 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.72 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1872.21
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 13


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 8:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.21 mm
Future Corrosion allowance (FCA) = 0.69 mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.66 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.21 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 0.99 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1895.81
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 14


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 9:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 7.31 mm
Future Corrosion allowance (FCA) = 1.79mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 4.56 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 7.31 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.21 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1701.64
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 15


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 10:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.38 mm
Future Corrosion allowance (FCA) = 0.86mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.49 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.38 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.00 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1867.12
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 16


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 11:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.38 mm
Future Corrosion allowance (FCA) = 0.86mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.49 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.38 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.00 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1867.12
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 17


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

BELL HOLE NUMBER 12:


For 10" ⌀ M/L C‐6 to CV-32, segment
Nominal thickness (t nom) = 6.35 mm
LOSS in 10" ⌀ M/L CV.6 to CV-32 segment (Uniform loss in inspection) (max.) =0.00 mm
Uniform thickness away from damage area established by thickness measurements (T rd) = 6.36 mm
Future Corrosion allowance (FCA) = 0.84mm
Future corroded wall thickness away from the damage area tc = tnom − LOSS – FCA
tc = 5.51 mm
Minimum measured thickness for the pit with maximum depth tmm = Trd -wmax
tmm = 6.4 mm
As Pitting & corrosion damage are acting on opposite sides: Criteria as per API 579 is
tmm – FCA ≥ 1.30 mm (for piping)
By calculating, tmm – FCA = 5.52 mm (criteria satisfied)
Average remaining wall thickness ratio Rwt = tmm - FCA / tc as per API 579 should be Rwt > 0.2
Rwt = tmm - FCA / tc = 1.00 mm (criteria satisfied)
As per API 579 Level 1 Criteria d ≤ Q √ D⋅tc, if this criteria is not satisfied for an individual pit, then
the pit should be evaluated as a local thin area using the Level 2 assessment procedure.
For Individual pit, Maximum Diameter of pit (d) = 05.00 mm
Where Q is Factor used to determine length for thickness averaging based on an allowable
Remaining Strength Factor (RSFa) and the Remaining Thickness Ratio (Rwt) (Part 4, Table 4.8
API 579)
Rwt = RSF = 0.931, for the pitting corrosion extensive case
We know that recommended value of RSFa as per Annex 2F API 579 = 0.90
Rt is basically Rwt. Using Rt and RSFa in Table 4.8 API 579 the value of Q = 50
Inside dia of 10" pipeline (D) = 254 mm (API 574 Table-1
Q √ D⋅tc = 1870.52
Hence, Criteria d ≤ Q √ D⋅tc satisfied
Hence, RSF ≥ RSFa, the pitting corrosion is acceptable for operation at the MAWP
subjected to current operating conditions. Therefore, the inspected pipeline is Fit-For-
Service until next integrity inspection subjected to current operating conditions.
4.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 18


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5. INSPECTION FINDINGS AND RECOMMENDATIONS


Following are details of inspection findings / observations and recommendations.
5.1 `Bell Hole-1 (BH-1)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-01

INSPECTION DATE: 18-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


BELL HOLE LOCATION W.R.T
METER
N/A CROSSING I.E. U/S OR D/S N/A
(AS PER VAIL SECTION OF CROSSING:
DIVISION DRAWING) :
BELL HOLE ID: 01 BELL HOLE LOCATION (MP)
:
LONGITUDE LATITUDE ELEVATION
BELL HOLE LOCATION Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:
- - - - - -
ACTUAL/SITE LOCATION
PROPOSED LOCATION (KP): REMARKS:
VARIATION (±) B/W PROPOSED & (±KP):
ACTUAL BELL HOLE LOCATION :
MP-165.40+748 M

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 19


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard/Rocky
Collect the soil sample adjacent from pipe √
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2 Poor
around.
Check for any void / air entrap in the √
2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √ No Defects Found
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 20


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

3.4 Weld Joints surface appearance (if exposed) √


Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

Figure 1: GENERAL VIEW OF BELL HOLE # 1 Figure 2: Roots observed at pipe coating

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 21


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 3: Pipe surface after De coating and before sand


Figure 4: After Sandblasting general view of pipe
blasting

Recommendations

The following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 22


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.2 Bell Hole-2 (BH-2)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-02

INSPECTION DATE: 20-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T
(AS PER VAIL SECTION
N/A CROSSING I.E. U/S OR D/S N/A
OF CROSSING:
DIVISION DRAWING) :

BELL HOLE LOCATION (MP)


BELL HOLE ID: 02 :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION Proposed Actual/site Proposed Actual/site Proposed Actual/site


CO-ORDINATES:

- - - - - -
ACTUAL/SITE LOCATION
PROPOSED LOCATION (KP): REMARKS:
VARIATION (±) B/W PROPOSED & (±KP):
ACTUAL BELL HOLE LOCATION :
MP-165.97+14

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard/Rocky/Wet
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5 Water Found
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2 Coating disbandment was observed
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 23


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 24


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1: General view of Bell Hole # 2 Figure 2: General view of pipe coating

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 25


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 3: Pipe surface after De coating and before sand Figure 4: After Sand Blasting pipe surface observed in
blasting satisfactory condition.

Recommendations

The following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 26


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.3 Bell Hole-3 (BH-3)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-02

INSPECTION DATE: 20-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 03 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): Remarks:


VARIATION (±) B/W PROPOSED &
…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 166.82+4
…………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard/Rocky
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2 Coating found damage
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 27


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3 Void
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5 Some part of coating found damage
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √ Defects Found


Note If any looseness or sparks or signs √
of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √ No Defects Found
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 28


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view of Pipe with coating Figure 2 : Damaged coating at 4 O clock

Figure 3 : General view of Bell Hole # 4 after


Figure 4 : 6 o Clock view of Pipe after sand blasting
sandblasting

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 29


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.4 Bell Hole-4 (BH-4)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-04

INSPECTION DATE: 20-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 04 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 167.40+420 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3 Roots observed of grass
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 30


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent, Mechanical Damage was observed
3.1 √
abrasion) 1.06 mm
Check overall coating condition due to
3.2 √ No Defects Found
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 31


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view of Bell Hole # 4 Figure 2 : General view of Bell Hole # 4

Figure 3 : General view of Bell Hole # 4 after Figure 4 : General view of Bell Hole # 4 after
sandblasting sandblasting

Recommendations

Following are recommendations based on visual findings.

 Just coating was found unsatisfactory, Hence Moisture was also observed under the coating
surface at 4 O clock. Hence coated was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 32


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.5 Bell Hole-5 (BH-5)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-05

INSPECTION DATE: 22-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
N/A I.E. U/S OR D/S OF CROSSING:
N/A
(AS PER VAIL SECTION
DIVISION DRAWING) :

BELL HOLE ID: 05 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION


BELL HOLE LOCATION
Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:
- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 167.72+1237 MP …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection

1.1 Soil texture √ Hard/Rocky


Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3 Roots observed of grass
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2
around.
2.3 Check for any void / air entrap in the √

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 33


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √ No Defects Found
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 34


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view of Bell Hole # 5 Figure 2 : general view of pipe with coating at 6 o clock

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 35


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 36


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 3 : General view Bell Hole # 5 Figure 4 : General view of pipe after sand blasting

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 37


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.6 Bell Hole-6 (BH-6)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-06

INSPECTION DATE: 22-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
N/A I.E. U/S OR D/S OF CROSSING:
N/A
(AS PER VAIL SECTION
DIVISION DRAWING) :

BELL HOLE ID: 06 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 167.72+1718 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection

1.1 Soil texture √ Hard/Rocky


Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2 Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 38


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3 Void
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √ Some part of coating observed
2.5
degraded disbanded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10 Loose Fibers were observed
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √ Localized corrosion
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 39


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 2 : Loose fiber at 6 o clock with scaling under


Figure 1 : General view Bell Hole # 6
coating

Figure 3 : General view of pipe after sand blasting Figure 4 : localized scaling corrosion at 6 o clock

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 40


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.7 Bell Hole-7 (BH-7)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-07

INSPECTION DATE: 23-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh PROCESS PIPELINE: NATURAL GAS


Jung

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 07 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 169.03+784 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all √
2.2 Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 41


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √ Air trap observed hence water
2.3
coating trapping also found
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √ Some part of coating observed
2.5
degraded disbonded
Coating is completely missing or pipe √
2.6
surface is bare
√ Water observed b/w coating and
2.7 Presence of any liquid under the coating
pipe
2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √ General corrosion
corrosion
Check for Localized
3.6 √ Localized corrosion
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth. Welding Sleeve Found
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 42


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General View of Bell Hole 7 Figure 2 : Cut at 3 O’ Clock in Bell Hole # 7

Figure 4 : Maximum pitting depth found during


Figure 3 : Water found under the coating
inspection at bell hole # 7

Figure 6 : General view of surface pitting and


Figure 5 : Maximum depth of pitting observed 0.60 mm
preforming TOFD of welding joint

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 43


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Recommendations

Following are recommendations based on visual findings.

 Coating was found unsatisfactory, Hence Moisture was also observed under the coating surface at
5 O clock. Hence coating was recoated after inspection as per SNGPL standards.

 General pitting was observed on entire surface of exposed pipe in pit area hence the pitting may
be continued under the buried/unexposed area, maximum depth of pit found 0.60 mm near weld
seam/HAZ area. Therefore it is highly recommended to perform DCVG survey of pipeline near
BELLHOLE # 7 and exposed the pipeline for visual inspection of coating and bare pipe for serve
pitting and recoat the pipe line as per SNGPL standards.

 It is also advised to repair/buildup the pit near weld joint /HAZ area as per applicable
standard

 According to clause 9.9.3 API 570 (2016 edition), Welded repairs and full encirclement
sleeve repairs shall be made in accordance with 8.1 & 8.2.
 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 44


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.8 Bell Hole-8 (BH-8)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-08

INSPECTION DATE: 23-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh PROCESS PIPELINE: NATURAL GAS


Jung
PIPELINE SECTION / (KP TO KP) METER
BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION N/A I.E. U/S OR D/S OF CROSSING:
N/A
DIVISION DRAWING) :

BELL HOLE ID: 08 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 169.70+302 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection

1.1 Soil texture √ Hard Clay


Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all
2.2 √ Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 45


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 46


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view Bell Hole 08 Figure 2 : General view of pipe line with coating

Figure 3 : General view of pipe after sand blasting Figure 4 : General view of pipe after sand blasting

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 47


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.9 Bell Hole-09 (BH-09)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-09

INSPECTION DATE: 24-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh Jung PROCESS PIPELINE: NATURAL GAS

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 09 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 171.13+634 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Soft/wet
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all
2.2 √ Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 48


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3 Water and air entrap observed
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √ Moisture observed under coating

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √ Localized Corrosion
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 49


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : Coating found degraded in Bell Hole # 09 Figure 2 : Moisture observed b/w coating and pipe

Figure 3 : General View of after sand blasting Bell Hole Figure 4 : General View of after sand blasting Bell Hole
#9 #9

Recommendations

Following are recommendations based on visual findings.

 Just coating was found unsatisfactory, Hence Moisture was also observed under the coating
surface at 01 o clock. Hence coating was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 50


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.10 Bell Hole-10 (BH-10)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-10

INSPECTION DATE: 24-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh PROCESS PIPELINE: NATURAL GAS


Jung

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 10 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 174.03+780 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Hard/Rocky
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all
2.2 √ Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 51


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5 Disbonded
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √
2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √ Localized Corrosion
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 52


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view Bell Hole 10 Figure 2 : Coating observed damaged at 3 o clock S

Figure 3 : General View of after sand blasting Bell Hole Figure 4 : General View of after sand blasting Bell Hole
#9 #9

Recommendations

Following are recommendations based on visual findings.

 Just coating was found unsatisfactory, Hence Moisture was also observed under the coating
surface at 01 o clock. Hence damage coating was recoated after inspection as per SNGPL
standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 53


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.11 Bell Hole-11 (BH-11)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-11

INSPECTION DATE: 25-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh PROCESS PIPELINE: NATURAL GAS


Jung

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 11 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 177.55+746 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Soft/Moisture
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all
2.2 √ Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 54


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5 Disbonded
degraded
Coating is completely missing or pipe √ Pipe surface
2.6
surface is bare
2.7 Presence of any liquid under the coating √

2.8 Check for any wrinkle on the coating √

2.9 Check for any blisters on the coating √

Check for any pinhole or loose fiber of √


2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √ Localized Corrosion
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 55


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view Bell Hole 11 Figure 2 : General view Bell Hole 11

Figure 3 : General View of before sand blasting Bell Figure 4 : General View of before sand blasting Bell
Hole #11 Hole # 11

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 56


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

5.12 Bell Hole-12 (BH-12)

BURIED PIPELINE VISUAL INSPECTION CHECKLIST

SYSTEM DESCRIPTION SYSTEM NUMBER CHECKLIST

10 INCH (C.6 TO CV-32) NATURAL GAS PIPELINE VISP-L-18-247 GVI-10-BHI-12

INSPECTION DATE: 25-01-2020 LAST INSPECTION DATE:

PIPELINE SEGMENT: Gali Jageer to Fateh PROCESS PIPELINE: NATURAL GAS


Jung

PIPELINE SECTION / (KP TO KP)


METER BELL HOLE LOCATION W.R.T CROSSING
(AS PER VAIL SECTION
N/A I.E. U/S OR D/S OF CROSSING:
N/A

DIVISION DRAWING) :

BELL HOLE ID: 12 BELL HOLE LOCATION (MP) :

LONGITUDE LATITUDE ELEVATION

BELL HOLE LOCATION


Proposed Actual/site Proposed Actual/site Proposed Actual/site
CO-ORDINATES:

- - - - - -

PROPOSED LOCATION (MP): ACTUAL/SITE LOCATION (±MP): REMARKS:

VARIATION (±) B/W PROPOSED &


…………………………………
ACTUAL BELL HOLE LOCATION :
…………………………………
MP 178.18+843 …………………………………
………………………

SR. NO. DESCRIPTION YES NO N/A REMARKS

1 Soil sample collection


1.1 Soil texture √ Soft/Moisture
Collect the soil sample adjacent from pipe
1.2 √
for corrosion analysis.
Check for any microbiological activity in √
1.3
the soil adjacent to pipe.
Record any damage to the coating by √
1.4
excavation.
Check presence of water alongside the √
1.5
pipeline(if any)
If any soil is attached to pipe collect the √
1.6
sample of the soil
2 Coating Assessment
Type of main pipe coating and/or girth weld
2.1 √ Coal Tar Based Enamel
coating (mention in the remarks)
Check for coating bond with pipe all
2.2 √ Poor
around.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 57


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

SR. NO. DESCRIPTION YES NO N/A REMARKS

Check for any void / air entrap in the √


2.3
coating
Check coating is completely adhesive to the √
2.4
pipeline surface & between coating layers
Check either coating is disbonded or √
2.5
degraded
Coating is completely missing or pipe √
2.6
surface is bare
2.7 Presence of any liquid under the coating √
2.8 Check for any wrinkle on the coating √
2.9 Check for any blisters on the coating √
Check for any pinhole or loose fiber of √
2.10
coating
2.11 Check for any discoloration of the coating √

2.12 Note any damage/cuts on the coating √

Note If any looseness or sparks or signs √


of moisture at coating (at 6 O clock)
2.13 found, puncture the coating carefully
and collect the water entrapped for
analysis.
3 Visual Inspection of Pipeline After Coating Removal
Check for mechanical damage (dent,
3.1 √
abrasion)
Check overall coating condition due to
3.2 √
aging, corrosion or abrasion
Report, record & mark on drawing the
3.3 √
coating failure
3.4 Weld Joints surface appearance (if exposed) √
Check & report the pitting / general
3.5 √
corrosion
Check for Localized
3.6 √
corrosion/pitting(Location & Dimensions)
3.7 Localized pitting √
For pitting corrosion, record by plotting
3.8 √
grids
Map external corrosion by using external

corrosion mapping procedure.
Produce corrosion map with interacting

3.9 defect, length, width, depth.
*Write in remarks about dimensions
(Length & Width, depth and distance √
between defects per API 574 )
* Size and type of any damage shall be reported with the support of adequate description, photographs and
drawings/sketches.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 58


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Figure 1 : General view Bell Hole 12 Figure 2 : Coating observed damaged at 3 o clock

Figure 4 : General View of after sand blasting Bell Hole


Figure 3 : Coating observed damaged at 12 o clock
# 12

Recommendations

Following are recommendations based on visual findings.

 Just coating found unsatisfactory, which was recoated after inspection as per SNGPL standards.

 Condition of Bell Hole found satisfactory till next integrity inspection, general recommendations
are provided at the end.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 59


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

6. GENERAL RECOMMENDATIONS
6.1 CP system should be checked according to NACE SP 0169 section 10.
6.2 Pipe to soil potential survey should be conducted at the interval of three years (API
570 Section 9.8.2) for verification of continuous corrosion control of buried pipeline
segment (API 570 9.3.2 Pipe-to-soil Potential Survey). Although for above ground
visual survey SNGPL should, at approximately six month intervals survey the surface
conditions on and adjacent to buried piping path as per API 570 Section 9.2 (API 570
Section 9.8.1)
6.3 Strict adherence to SNGPL quality assurance/quality control procedures should be
ensured while carrying out any construction or maintenance activity on the pipeline.
6.4 In bell hole #7 the welded spilt full encirclement sleeve was found hence the pipe
surface after sand blasting also observed general pitted and maximum depth of pit was
observed 1.52 mm. Therefore it is highly recommended to perform repair work as per
API 570 section 8 or as per SNGPL standards and also conduct DCVG survey of
pipeline adjustment to the bell hole # 7 location (MP 169.03+784) and verify the
integrity of coating and CP, also de-coat the damaged coating and perform GVI bare
pipe after de-coating.
6.5 As per the observation on site it is highly recommended to conduct DCVG survey at
up and down stream adjacent to bell hole # 7(minimum 500 meters) to ensure the
coating condition of pipeline
6.6 According to clause 9.9.3 API 570 (2016 edition), Welded repairs and full
encirclement sleeve repairs shall be made in accordance with 8.1 & 8.2.
6.7 According to clause 9.9.1 API 570 (2016 edition), any coating removed for inspection
shall be renewed and inspected appropriately. In addition, coating repairs may be
tested using a high voltage holiday detector. The detector voltage shall be adjusted to
the appropriate value for the coating material and thickness. Any holidays found shall
be repaired and retested according to clause 9.9.1 API 570 (2016 edition), any coating
removed for inspection.

7.

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 60


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

8. ATTACHMENTS
Following are the attachments to this inspection report:

Appendix A (NDT Reports)


Appendix B (Sketch of line with CML markings)

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 61


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Appendix A
(NDT Reports)

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 62


GVI/NDT Inspection Report of 10 Inch (C.6 to CV-32) GALI JAGEER TO FATEHJUNG Natural
Gas Buried Pipeline
Velosi Project No. VISP-L-18-247 Date of Inspection: 18TH January 2020 to 25th January 2020

Appendix B
(Sketch of line with CML Markings)

10 Inch (C.6 to CV-32) (SNGPL) Natural Gas Buried Pipeline P a g e | 63