You are on page 1of 46

organized by: in collaboration with:

From 3D laser scan to BIM: Boosting sustainability for renovation


Michiel van Wijk, Ana Cunha Cribellier, Giuseppe Dibari
COURSE DESCRIPTION
• Introduction
• Why BIM?
• Integrating engineering consultancy with
BIM and 3D laser scan
• Boosting sustainability

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


2
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
LEARNING OBJECTIVES
• Understand the necessity of BIM
• Evaluate the potential of incorporating a 3D
laser scan into the renovation process
• Boosting sustainability with models
• Use BIM to improve the design, build,
operation and maintenance process

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


3
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Introduction

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


4
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Construction is € 2,6 trillion worldwide
• 30% of construction has design correction costs
• 40% of manpower used on construction sites is wasted
• At least 10% of materials are wasted
• Over 40% of projects are completed late or over budget,

“Rethinking Construction” by Sir John Egan – 1998

hundreds of billions € are wasted every year.

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


5
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Growing Complexity of Buildings
• More regulation
• + demanding Performance Targets
Ensure • Performance approach  result oriented
Global
• Multi-criteria approach
Comfort
• Goals: Environmental, Economic, Social

ANSWER TO EXPECTATIONS

Ensure  Of changing life styles


Safety
 Different stages of People’s
and Buildings’ life cycle

Need of adapted tools for efficient


renovation, faster, at lower costs and
Limit reducing investment risks
Operating Rating Schemes Save • Combine ambitious engineering with new
Costs / Sustainability Resources technologies

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


6
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Our building industry: Productivity Declined

Non-Farm industry
Building industry

US Labour Productivity Construction vs Non-Farm; Source Census Bureau, BLS

What is causing this decline in productivity compared to other industries...?

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


7
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Building life cycle fragmentation causes
significant productivity loss

Building Life Cycle


Fragmentation

Source: ClimateTechWiki

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


8
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Current Methods reach their Limit
• Information poverty
• Multiplication of
links
• Inconsistencies
• Input errors

during design, construction and operation


CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16
9
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Why BIM?

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


10
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Why using BIM to boost sustainability in
building renovation?
• Experience with over 100 certified
projects (LEED, BREEAM, HQE,
16%
DGNB,…)
Retail, Office,
30%
Health Care
Residential

• 23 Offices World wide 


experience with different
approaches for building renovation
13% 14% associated using BIM
Airports Data Centre

• But… how to enhance


sustainability through BIM
8% 8% and 3D scan technology?
Clean Technology Entertainment &
Leisure

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


11
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
A solution to increase Building Productivity
Reduce
Consistent Open
Waste, Energy Connect
Information Standards &
And Other Building Life
Handover
Resource Use Cycle Phases
Clash Reports
Predefined
Increase Enhance
Increased Model
Building Operations
Accuracy Structure
Performance

Environmental Reduction Reduction


Future Proof
Impact Failure Costs Lead Time

BIM - Building Information Modelling

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


12
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
But… What is BIM?

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


13
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
But … What is BIM?
A REPRESENTATION of the Building, a DIGITAL Model?
• It is a 2D or 3D virtual model of the Building
• Intelligent model with a graphical representation

An INFORMATION MANAGEMENT method?


• A process usable throughout the life-cycle of the
built environment with the aim to improve
information exchange and analyses

An intelligent building data-base?


• Centralised information platform
• Visualisation technique of all equipment,
products and applied solutions

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


14
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
But … What is BIM?
A COLLABORATIVE project approach?
 Standardised format of data exchange
 Receive data from others, avoiding reintroducing data;
Send your own data, with information automatically read
by other players’ software
 Immediate analysis of the impact of design choices

In Summary … BIM is :

• Graphical representation of the building


• A data-base of building components (features
and behaviour)
• A process of information exchange
Where each component is treated as an object
CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16
15
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Operational Excellence
with BIM

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


16
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Operational Excellence with BIM

‘every euro spent doing clash resolving during late design, the owner will save
rework costs during construction.’
CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16
17
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Operational Excellence with BIM
• Facilitates passing from conceptual design to detailed design (vice-
versa).
• Facilitates master planning and neighborhood design
Allows
parametrising
information blocks
that conform to
regulations, client
expectations or
certification
requirements
(LEED, HQE,
BREEAM, ... )

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


18
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Connecting the latest techniques to BIM… DIScover!

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


19
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Imagine…
- What Systems inside?
- What to refurbish?
- New Owner?
- What Data?
- What Risks?

?
CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16
20
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
The philosophy of integrating
technologies with BIM
• How to design, build, operate and maintain buildings  to rapidly solve
complex problems, based on accurate information and reliable analyses?
• No longer “why is reliable data important?” but rather “how can we
collect and use data effectively?”.
Traditional method DIScover

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


21
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Faster delivery with superior products

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


22
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
3D laser scanning
for an accurate building inventory

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


23
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Connecting the scans

The point cloud


CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16
24
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
A 3D virtual model
of the building and its components

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


25
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Visualising information in models

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


26
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Get your Building Information Model
A flexible and complete data-base

Bill of Quantities Virtual Reality

CAD Regulation & Legislation

Design & Sourcing & Construction


Procurement Management

Design & Simulations Facility Management

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


27
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
An example...

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


28
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
BIM = “Boost Information Management”
Value:
4D • Shorter project realisation
• Reduction planning related risks
3D - XYZ Time • Check end-result with design intention
• Faster design change management
Value: • Use of Prefab elements possible

Value:
• Transparent design 5D • more reliable BoQ
• Design choice Costs • Waste reduction
consequences • Material reduction

• Clash detection Value:


• Reduction failure costs 6D • Assess asset and compare sustainability
certification requirements
• Evaluation according to Sustainability • Test more high performance scenarios
regulations • LCA
• Audio-visual aids • Tenant satisfaction  tenant retention
Value:
• Consistent products
• Realistic expectation
7D • Reduction of resources demand (water,
energy,…)
management Operation & • Increase usage-efficiency
• Improved building performance and increased
Maintenance quality
• Integrated asset management

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


29
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
BIM = “Boost Information Management”
Value:
4D • Shorter project realisation
• Reduction planning related risks
3D - XYZ Time • Check end-result with design intention
• Faster design change management
Value: • Use of Prefab elements possible

Value:
• Transparent design 5D • more reliable BoQ
• Design choice Costs • Waste reduction
consequences • Material reduction

• Clash detection Value:


• Reduction failure costs 6D • Assess asset and compare sustainability
certification requirements
• Evaluation according to Sustainability • Test more high performance scenarios
regulations • LCA
• Audio-visual aids • Tenant satisfaction  tenant retention
Value:
• Consistent products
• Realistic expectation
7D • Reduction of resources demand (water,
energy,…)
management Operation & • Increase usage-efficiency
• Improved building performance and increased
Maintenance quality
• Integrated asset management

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


30
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Boosting
sustainability

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


31
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Once the building is scanned and modelled…
Design and Verification of the requirements of
Environmental Assessment Schemes
BIM becomes the tool allowing collaborative work, operational excellence, cost efficiency
and best quality delivery

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


32
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Certification Schemes Compliance &
Multi-Certification Verification

• BIM  Energy (Needs, TDS, consumption, CO2,…)

• Connection to
different  Site
software  Components (adaptability, choice of materials,…)
 Worksite (construction waste, consumptions, nuisances,…)
 Water (Consumption, rainwater, wastewater,…)
• Attribute  Waste (Recycling of operational waste,…)
properties to  Maintenance (Design for a simplified maintenance,…)
objects

• Coordinate  Spaces quality (Electromagnetic exposure, health features…)


different  Water quality (Design of the network, temperature,
performance  Air quality (Ventilation, VOC,…)
and results

• Ideal for multi-  Hygrothermal comfort (Heating, cooling comfort,…)


criteria  Acoustic comfort
approaches  Visual comfort (Natural and artificial lighting,…)
 Odor Comfort (Controlling the sources of discomfort)

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


33
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Building Performance
Energy

Energy Calculation:
• Areas and Volumes of the building.
• Homogeneous thermal parts
• Type of walls, surfaces, and internal / external
exchanges
• Orientation of walls; Shadings

Extracting data from BIM


Avoid recreating data; make more simulations; reduce
design time

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


34
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Source: MediaConstruct & Deerns France
Building Performance
Daylight analysis

21 Settembre Ore
09.00

Illuminamento
superiore a
250lux:

80.3% > 75%

21 Settembre Ore
15.00

Illuminamento
superiore a
250lux:

76.5% > 75%

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


35
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Building Performance
Glare control

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


36
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Building Performance
Thermal comfort

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


37
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Building Performance
Acoustic comfort

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


38
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Ex: Selection of Materials & their Properties

Texture, aspect,…

Source: CSTB

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


39
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Accurate design to optimise material use
Pneumatic Tube Systems
System Number Length (m) Angle Total

System 01 197.24 880°


System 02 474.57 7253°
System 03 219.69 2835°
System 04 464.04 5630°
System 05 251.68 2136°
System 06 198.59 939°
System 07 198.26 971°
System 08 233.68 2669°
System 09 68.73 1172°

2306.48 24485°

# PTT terminals 50
# PTT pumps 9
# PTT 3-ways units 28

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


40
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Ex: Materials, Equipment, Maintenance Optimisation

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


41
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
And talking about Materials… associating LCA to BIM!
Picking an example from France…

Associate the BIM objects to EPDs

EPDs from
Materials, Equipments,…

eveBIM: Interface Platform linking BIM and


Building Calculation Software

 Link to Simulation tools, share of Product Life Cycle data-base


data platform, …

 Automatically
ELODIE: Building Impact Calculation Tool extract EPD’s
from Product EPD
 LCA for Buildings calculating impact data-bases
indicators

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


42
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Reduce opex by improving building
Proposed
performance

Baseline

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


43
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Conclusion

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


44
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
BIM: Solution to increase building
productivity & boost sustainability
 Makes design process more transparent for
clients and design teams;

 Immediate understanding design decision


consequences, providing real-time insight of
design changes

 Provides complete virtual model before


construction

 Better coordination between design parties

 Significant reduction in failure costs

 It improves the planning of logistics


processes during the construction phase

 Linking models to sustainability checks

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


45
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY
Contact

Michiel van Wijk Ana Cunha Cribellier Giuseppe Dibari


BIM Manager Nederland Head of Real Estate France Head of Real Estate Italia
BIM Manager Group Communication Strategy Senior Sustainability Director
Advisor – Deerns Group,
M: +31 6 303 85 675 Deerns Spain, Deerns Brazil M: +39 346 04 89 312
michiel.van.wijk@deerns.com giuseppe.dibari@deerns.com
M: +32 471 25 04 95
ana.cunha@deerns.com

www.deerns.com

CONFERENCE : OCT. 14-16 | EXPO : OCT. 14-16


46
PALAZZO CONGRESSI VERONAFIERE | VERONA, ITALY

You might also like