HOLD 1- Dimensions are in cm, levels are in meter.
2- Concrete C30 (30MPa), Rebar S420 (420MPa)
+64.000
+64.000
+64.000
+64.000
+64.000
+64.000
+64.000
+65.316
+65.293
+65.270
+65.247
+65.224
+65.201
+65.179
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
+66.047
+66.065
+66.082
+66.100
+66.117
+66.100
+66.082
+66.065
+66.047
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
3 3- Concrete Cover 50mm
+ 65.916
+ 64.970
LEGEND
1- C.S.T.L. = CONCRETE SUPPORT TOP LEVEL
+ 64.716
2- - ASPHALT
+ 63.770
3- - RC SLAB
+65.051
+65.071
+65.091
+65.111
+65.131
+65.151
+65.171
+65.151
+65.131
+65.111
+65.091
+65.071
+65.051
4- - CONCRETE
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
+66.146
+66.168
+66.189
+66.211
+66.189
+66.168
+66.146
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
C.S.T.L.
3
A
KEY PLAN
A
P05 PIER CAP PLAN B SECTION A-A
B
B
B
SECTION B-B
P06 PIER CAP REINFORCEMENT DETAILS SECTION B-B
P05 PIER CAP REINFORCEMENT DETAILS
03 19.10.2021 AS SHOWN
02 29.04.2020 AS SHOWN
REVISIONS HISTORY
CLIENT
RECONSTRUCTION COMMITTEE
AL-NAJAF AL-ASHRAF
IRAQ
CONTRACTOR
40 40 14 40
40 14
125 25
27 83 16 25
DESCRIPTION
97 16
27 97 16 25
83 16
25 110 16 25
110 16
35 205
25 110 16 25
110 16 14
40 14
PIER P05-P06
30 210 16 30
210 16 40 14 40
40 40 14
210 16
80 210 16 80
125 35
20 130
DETAILS
25 110
70 85 85 70
147 110 16 25
25 110 16
1200
30 210 16 30
210 16
430 70 210 16
80 210 16 80
210 540
20 130
540 210
70 300 70
70 1130 70 85 147 85 70 CONCEPT FINAL CONCEPT PRELIMINARY DESIGN
1130 70
840
990 210
70 840 70
210 990 FINAL DESIGN DETAILED DESIGN R. F. CONSTRUCTION
180 840 180
NAME SIGNATURE
CHECKED BY -
APPROVED BY -