10 BP-C-BA-53-102 GT Building Ground Floor Slab & Equip. Foundation Partial Plan(1)
11 BP-C-BA-53-103 GT Building Ground Floor Slab & Equip. Foundation Partial Plan(2)
12 BP-C-BA-53-104 GT Building Ground Floor Slab & Equip. Foundation Sections & Details(1)
13 BP-C-BA-53-105 GT Building Ground Floor Slab & Equip. Foundation Sections & Details(2)
14 BP-C-BA-53-106 GT Building Ground Floor Slab & Equip. Foundation Sections & Details(3)
15 BP-C-BA-53-107 GT Building Ground Floor Slab & Equip. Foundation Sections & Details(4)
17 BP-C-BA-53-202 Fin Fan Cooler for GT Lobe Oil Foundation Plan, Section & Detail(1)
18 BP-C-BA-53-203 Fin Fan Cooler for GT Lobe Oil Foundation Plan, Section & Detail(2)
19 BP-C-BA-53-204 Fin Fan Cooler for GT Generator Foundation Plan, Section & Detail(1)
20 BP-C-BA-53-205 Fin Fan Cooler for GT Generator Foundation Plan, Section & Detail(2)
Page 1 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
61 BP-C-BA-53-501 Fin Fan Cooler For G/T Generator Foundation Reinforcing Plan
62 BP-C-BA-53-502 Fin Fan Cooler For G/T Lube Oil Foundation Reinforcing Plan
Page 2 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
89 BP-C-BB-53-004 ST Building Foundation Anchor Bolt, Base Plate & Block Out Details
98 BP-C-BB-53-102 ST Building Ground Floor & Equip. Foundation Plan, Section & Details(1)
99 BP-C-BB-53-103 ST Building Ground Floor & Equip. Foundation Plan, Section & Details(2)
100 BP-C-BB-53-104 ST Building Ground Floor & Equip. Foundation Plan, Section & Details(3)
101 BP-C-BB-53-105 ST Building Ground Floor & Equip. Foundation Section & Detail(4)
102 BP-C-BB-53-201 Steam Turbine Foundation F1, F2 Plan & Sections Re-bar
Page 3 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
109 BP-C-BB-53-208 Steam Turbine Foundation F3 Plan, Detail & Sections Re-bar(1)
110 BP-C-BB-53-209 Steam Turbine Foundation F3 Plan, Detail & Sections Re-bar(2)
129 BP-C-BB-53-301 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(1)
130 BP-C-BB-53-302 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(2)
131 BP-C-BB-53-303 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(3)
132 BP-C-BB-53-304 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(4)
133 BP-C-BB-53-305 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(5)
134 BP-C-BB-53-306 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(6)
135 BP-C-BB-53-307 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(7)
136 BP-C-BB-53-308 ST Building Ground Floor Slab & Equip. Foundation Re-bar & Schedule(8)
Page 4 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
162 BP-C-BB-54-026 ST Building Mezzanine Floor Deck Concrete Plan @ EL. +8.0
163 BP-C-BB-54-027 ST Building Operating Floor Deck Concrete Plan @ EL. +14.0
164 BP-C-BB-54-028 ST Building Deaerator Floor Deck Concrete Plan @ EL. +20.0
165 BP-C-BB-54-029 ST Building Deck Concrete Outline Sections & Details SH-1
166 BP-C-BB-54-030 ST Building Deck Concrete Outline Sections & Details SH-2
169 BP-C-BB-54-033 ST BUILDING MEZZANINE FLOOR BOTTOM REINF. PLAN @EL. 8.000
170 BP-C-BB-54-034 ST BUILDING MEZZANINE FLOOR TOP REINF. PLAN @EL. 8.000
171 BP-C-BB-54-035 ST BUILDING OPERATING FLOOR BOTTOM REINF. PLAN @EL. 14.000(1)
172 BP-C-BB-54-036 ST BUILDING OPERATING FLOOR BOTTOM REINF. PLAN @EL. 14.000(2)
173 BP-C-BB-54-037 ST BUILDING OPERATING FLOOR TOP REINF. PLAN @EL. 14.000(1)
174 BP-C-BB-54-038 ST BUILDING OPERATING FLOOR TOP REINF. PLAN @EL. 14.000(2)
178 BP-C-BB-73-002 Structural Calculation For Steam Turbine Building Steel Structure
179 BP-C-BB-73-003 Structural Calculation for Steam Turbine Building Ground Floor
Page 5 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
183 BP-C-BQ-53-101 Gas Receiving/Metering Station Foundation Reinf. Plan & Section(1)
184 BP-C-BQ-53-102 Gas Receiving/Metering Station Foundation Reinf. Plan & Sections(2)
185 BP-C-BQ-53-103 Gas Receiving/Metering Station Foundation Reinf. Plan & Section(3)
186 BP-C-BQ-53-104 Gas Receiving/Metering Station Foundation Reinf. Plan & Section(4)
188 BP-C-BQ-73-001 Structural Calculation for Gas Supply Station Area Foundation
Page 6 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
241 BP-C-CW-53-008 C.W. System Intake Structure Platform Plan & Sections
242 BP-C-CW-53-009 C.W. System Intake Structure Platform Details & Sections
243 BP-C-CW-53-201 C.W. System Intake & Discharge Pipe Layout Plan
244 BP-C-CW-53-202 C.W. System Intake & Discharge Pipe Partial Plan & Sections(1)
245 BP-C-CW-53-203 C.W. System Intake & Discharge Pipe Partial Plan & Sections(2)
246 BP-C-CW-53-204 C.W. System Intake & Discharge Pipe Partial Plan & Profile
247 BP-C-CW-53-205 C.W. System Intake & Discharge Pipe Excavation Plan & Sections(1)
248 BP-C-CW-53-206 C.W. System Intake & Discharge Pipe Excavation Plan & Sections(2)
249 BP-C-CW-53-207 C.W. System Intake & Discharge Pipe Isometric Drawing
Page 7 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
254 BP-C-CW-53-305 C.W. System Discharge Box Culvert Manhole Plan & Sections
255 BP-C-CW-53-306 C.W. System Discharge Box Culvert Manhole Sections and Details
256 BP-C-CW-53-307 C.W. System Discharge Box Culvert Plan & Profile(1)
257 BP-C-CW-53-308 C.W. System Discharge Box Culvert Plan & Profile(2)
260 BP-C-CW-53-311 C.W. System Discharge Structure Seal Well Plan & Section
261 BP-C-CW-53-312 C.W. System Discharge Structure Seal Well & Manhole Sections
262 BP-C-CW-53-401 C.W. System Discharge Outfall Structure Plan & Section
263 BP-C-CW-53-402 C.W. System Discharge Outfall Structure Sections & Details
Page 8 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
294 BP-C-FF-22-001 Fire Fighting Piping Arrangement DWG. Yard Area Index Drawing
299 BP-C-FF-22-006 Fire Fighting Piping Arrangement DWG. Yard Area Typical Detail
300 BP-C-FF-23-001 Piping Isometric DWG. For Fire Fighting Yard Area System
301 BP-C-FO-53-001 Drain Tank For Fuel Oil Forwarding Pump Station Plan & Section
302 BP-C-FO-53-011 Drain Tank For Fuel Oil Forwarding Pump Station Re-bar & Schedule
304 BP-C-FO-53-202 Fuel Oil Washing System Foundation Plan & Sections
305 BP-C-FO-73-001 Structural Calculation For Drain tank of Fuel Oil Forwarding Pump Station
306 BP-C-FO-73-003 Structural Calculation for Fuel Oil Washing System Foundation
309 BP-C-GB-54-001 GCB Support Steel Structure Plan, Sections & Details
311 BP-C-GB-54-003 GCB Support Steel Structure Girt, Sections & Details
Page 9 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
325 BP-C-GE-51-011 Civil Standard DWG - Insert Plate Schedules and Details
326 BP-C-GE-51-012 Civil Standard DWG - Typical Penetration Schedules and Details(1)
327 BP-C-GE-51-013 Civil Standard DWG - Typical Penetration Schedules and Details(2)
328 BP-C-GE-51-014 Civil Standard DWG - Typical Water stop Details & Pipe Line Excavation Sections
Page 10 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
373 BP-C-PK-53-027 G/T Make Up Water Pump Foundation Plan & Section
374 BP-C-PK-53-028 G/T Generalator Cooling Water Pump Foundation Plan & Section
378 BP-C-PK-53-032 Aux. Seawater Booster Pump FDN. Layout Plan & Sections
379 BP-C-PK-53-033 Aux. Seawater Booster Pump Area Pipe Support FDN. Plan & Sections
Page 11 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
398 BP-C-PK-54-006 Pipe Rack Steel Structure Elevation & Col. Sections(SH-1)
399 BP-C-PK-54-007 Pipe Rack Steel Structure Elevation & Col. Sections(SH-2)
400 BP-C-PK-54-008 Pipe Rack Steel Structure Elevation & Col. Sections(SH-3)
401 BP-C-PK-54-009 Pipe Rack Steel Structure Elevation & Col. Sections(SH-4)
402 BP-C-PK-54-010 Pipe Rack Steel Structure Elevation & Col. Sections(SH-5)
403 BP-C-PK-54-011 Pipe Rack Steel Structure Elevation & Col. Sections
418 BP-C-PK-54-113 HRSG Area Pipe Rack Base Plate, Anchor Bolt Detail
421 BP-C-PK-73-002 Structural Calculation For Yard Pipe Rack Steel Structure
422 BP-C-PK-73-003 Structural Calculation for HRSG Area Pipe Rack Steel Structure
425 BP-C-PK-73-006 Structural Calculation HRSG Area Pipe Support & Cooling Water/Make-Up Pump Foundation
428 BP-C-PK-73-009 Structure Calculation for Pump Foundation(Aux. Seawater Booster Pump)
Page 12 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
445 BP-C-SE-22-001 Sanitary & Waste Water Piping DWG. Yard Area Index DWG.
446 BP-C-SE-22-002 Sanitary & Waste Water Piping DWG. Yard Area-1
447 BP-C-SE-22-003 Sanitary & Waste Water Piping DWG. Yard Area-2
448 BP-C-SE-22-004 Sanitary & Waste Water Piping DWG. Yard Area-3
449 BP-C-SE-22-005 Sanitary & Waste Water Piping DWG. Sump Pit Section & Details
450 BP-C-SE-22-006 Sanitary & Waste Water Piping DWG. Sump Pit Schedule
451 BP-C-SE-22-007 Sanitary & Waste Water Piping DWG. Pipe Details
452 BP-C-SE-22-008 Sanitary & Waste Water Piping DWG. Pipe Bedding & Thrust Block Details
453 BP-C-SE-22-009 Sanitary Treatment System(5M3/Day) Foundation Plan, Detail & Sections
458 BP-C-SE-23-001 Piping Isometric DWG. For Sanitary & Waste Water Yard Area System
459 BP-C-SE-73-001 Structural Calculation For Sanitary & Waste Water Sump Foundation
463 BP-C-SI-53-003 Pipe Trench #31,32 HRSG Area Section & Details
Page 13 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
474 BP-C-ST-53-007 ST Generator Foundation Embedded Material Location Plan(1) & Schedule
475 BP-C-ST-53-008 ST Generator Foundation Embedded Material Location Plan(2) & Section
497 BP-C-ST-53-116 ST Generator Foundation Condenser Column Re-bar Details & Sections
504 BP-C-TB-53-101 By-pass Stack Foundation Top & Bottom Reif. Plan
Page 14 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
508 BP-C-TK-53-001 Cold Condensate Storage Tank Foundation Plan & Section
509 BP-C-TK-53-101 Fire Fighting Water Tank Foundation Plan & Section
510 BP-C-TK-53-601 Cold Condensate Storage Tank Foundation Re-bar Plan & Sections
511 BP-C-TK-53-602 Fire Fighting Water Tank Foundation Re-bar Plan & Sections
514 BP-C-TK-73-001 Structural Calculation for Cold Condensate Storage Tank Foundation
515 BP-C-TK-73-002 Structural Calculation for Fire Fighting Water Tank Foundation
Page 15 of 16
LIST OF AS-BUILT DRAWINGS (CIVIL)
Benghazi Combined Cycle Project
S/N DOC. / DWG. NO. DOC. / DWG. TITLE
Page 16 of 16