Professional Documents
Culture Documents
• All offices and agencies which provide government services are hereby mandated to
regularly undertake cost compliance analysis, time and motion studies, undergo
evaluation and improvement of their transaction systems and procedures and
reengineer the same if deemed necessary to reduce bureaucratic red tape and
processing time.
Section 3 of the Implementing Rules and Regulations (IRR) of R.A. 11032
• The reengineering process shall include an interagency review of key permitting and
licensing laws, rules, and issuances with the end in view of eliminating undue
regulatory burden from the transacting public
Background and Legal Bases
Section 3 of the IRR of R.A. 11032
IRR of RA 11032
Objective of the Manual
1. Discovery
2. Design
3. Delivery
4. Continuous Improvement
Phases and Milestones of the Manual
1 2 3 4
❏ Time and Motion Studies ❏ Improved processes ❏ Techniques to overcome ❏ Process performance
implemented in the designed resistance is monitored
critical path regularly for possible
❏ Improvement initiatives service failures
❏ Root causes identified prioritised
❏ Regular monitoring
of feedback and
customer satisfaction
Stakeholders and Roles
● ARTA, together with UK-BEIS and expert consultant Engr. Juan Talamayan,
recently conducted two batches of trainings aimed at capacitating selected
government agencies on the use of the WOG Reengineering Manual.
● The trained representatives are expected to cascade their learned
reengineering knowledge and concepts to their respective agencies.
S M AR T E R I N I T I AT I V E S . B E T T E R PH I L I P PI N E S
THANK YOU!
21 May 2021