You are on page 1of 1

CFP-FCD-ONC(ITDC04)-PMC-CI10040-Rev.

0A (26/10/2021)
27/10/21 Doc. FCD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

KEYPLAN
TRUE
NORTH TRUE
NORTH

PLANT

A
PREVAILING
NORTH WIND

A BILL OF QUANTITIES (APPROXIMATE) OPP-032-111 A


PLANT
PREVAILING
NORTH WIND
C
L OF P SR.NO. DESCRIPTION UNIT QUANTITY
EDE GUA
RD
RAI
L

STA
L
OPP-032-111 OPP-032-043

1 CONCRETE C28 CUM 2.9 0.8

N -2465.251
C
L OF P 2 LEAN CONCRETE C14 CUM 0.3 0.08
EDE
AT
TOC
STA A

5
L

280
EL+ 3 NON-SHRINK CEMENTITIOUS GROUT G2 CUM 0.02 0.001
108
.930

15o
B 4 ANCHOR BOLT HSL201 NOS. 8 - OPP-032-43 B

ANCHOR BOLT A161


FOR DETAILS REFER DWG. NO.
ANCHOR BOLT NOTES
1 R1118111-00000-CI-STD-16485
5 NOS. 8 4
HSA-F-M16X140
(TYP UNO)
STAL 1. ALL DIMENSIONS ARE IN MILLIMETERS, ALL
F1 PEDE 795
C OF +104. ELEVATIONS AND CO-ORDINATES ARE IN
L EL
OC METERS (UNO).
AT T
E -1362.820 2. FOR GENERAL NOTES FOR CIVIL WORKS REFER

0
DRAWING NO.R1118111-00000-CI-STD-00001

120
= =
FOR DETAILS REFER DWG. NO. & 00002.
P1 1 3. FOR ABBREVIATIONS AND SYMBOLS REFER
R1118111-00000-CI-STD-16485
C DRAWING NO.R1118111-00000-CI-STD-00003 C
120
0
L

(TYP UNO) & 00004.


STA

= = 4. BASE LINE ELEVATION +100.000


EDE

N -2413.603
C
L OF S WHICH CORRESPONDS TO +0.530M. ABOVE

-2413.522
TAI
R P
L OF P

AT EDE MEAN SEA LEVEL.


TOC STA
EL+ L 5. REBAR SHALL BE ADJUSTED TO AVOID CLASH
108
0

.930 WITH ANCHOR BOLTS.


670

4500
C

6. ALL THE EXISTING UNDERGROUND AND ABOVE


GROUND SERVICES ARE SHOWN IN THE
DRAWING FROM AVAILABLE DATA OF FEED

11o
D DRAWINGS AS WELL AS SITE VERIFICATION D
DATA, HOWEVER ANY UNDERGROUND SERVICES
229 FOUND DURING CONSTRUCTION, APPROPRIATE
5
STAL
CARE SHALL BE TAKEN TO PREVENT ANY
C
L OF P F PEDE 350
-1166.879
0

880 EDE C O 05. DAMAGE TO THE EXISTING SERVICES /


L+1
350

STA E -1167.295 L E
L OC 4.605 FACILITIES, AS PER THE APPLICABLE
AT T E L+10
OC CONSTRUCTION STATEMENT / SPECIFICATION. IF
& B
THE EXISTING SERVICES ARE FOUND TO BE
P2 REDUNDANT /ABANDONED THE SAME SHALL BE
2 REMOVED/DEMOLISHED. CONSTRUCTION TO
E C MAINTAIN A RECORD AND SEND THE REDLINE E
2 L OF L MARKUP OF THE NEW FINDING TO
ADD
F1 AT ER
TOC PED ENGINEERING OFFICE FOR REVISE AND
EL+ EST
109 AL REISSUE.
5

.070
157

7. FOR REINFORCEMENT DETAIL REFER DRAWING


FOUNDATION PLAN NO.R1118111-00000-CI-STD-00005.
8. FOR REINFORCEMENT DETAIL REFER DRAWING
OPP-032-043 NO.R1118111-00000-CI-STD-00005.
9. SUITABLE CONSTRUCTION SEQUENCE TO BE
P1
FOLLOWED AT SITE TO AVOID REWORK OR
UNDERMINING OF CASTED FOUNDATION.
F 10. ELECTRICAL EARTHING INSTALLATION DETAIL F
0
190

SHALL BE AS PER R1118111-00000-EL-DID-


00001-0046 AND R1118111-00000-EL-DID-
00001-0050.RRR
P2 11. IN CASE OF UNEVEN GROUND, FINISHED
GRADE LEVEL NEAR THE PEDESTALS IS TO BE
C
L OF P LOCALLY ADJUSTED TO MATCH THE FGL
C E
L OF S BOL DESTA ELEVATION MENTIONED IN THE DRAWING.
TAI TS L/
AT R P
TOC EDE
EL+ STA
& B L
OC 110
EL+ .
145
G 109 G

Under Revision-0A
.
400

FOUNDATION PLAN
LEGEND
OPP-032-111
FGL - FINISHED GROUND LEVEL

HOLD

H OF BOLT OF BOLT H
C
L OF PEDESTAL

(REFER PLAN)

L OF PEDESTAL
NON-SHRINK GROUT

4-HSL201
R1118111-03250-CS-DPF-17387 GA AND STRUCTURAL DETAILS FOR PLATFORM
ANCHOR BOLTS OPP-032-111 & OPP-032-043 WBS-E06STB35

J
A2 OF PEDESTAL/
R1118111-00000-CI-STD-00008
UNIT 03250

STANDARD DRAWING ANCHOR BOLTS J


C BOLT R1118111-03250-CI-PLO-10001 UNIT PLOT PLAN, UNIT 3250 CRUDE TANK AREA
-
R1118111-03250-CI-PLO-00001 OVERALL PLOT PLAN
C OF PEDESTAL/
L DWG. NO. TITLE
FOOTING REFERENCE DRAWINGS

OF PEDESTAL/PLATFORM
EL 109.325
T.O.C.
DETAILS OF PEDESTAL P1 TYPICAL DETAIL OF PEDESTAL-P2 - - - - - -

REV DESCRIPTION BY CHKD APVD DATE


(FOR ORIENTATION REFER LAYOUT) SCALE 1:20

Z:\JI-2044\Designing\Civil & Structural\To be Issued\2020.12.09\OPP-032-111 & 43_IFC\R1118111-03250-CI-LFN-17388.dwg, 12/9/2020 5:51 PM , BY: Sandhavi Patil
REVISIONS
EL 109.175 EARTHING BOSS SCALE 1:25
K (QTY.= 2 NOS.) REV - DATE - APPROVE - K
F.G.L. (REFER NOTE 11) ISSUED FOR AS BUILT

(FOR REINFORCEMENT DETAIL REFER DATE - - - - -

STANDARD DRAWING R1118111-00000-CI- BY - - - - -

DRAWN SURVEY CHECKED APPROVED APPROVED


STD-16485)
CONSTRUCTION JOINT CONFIDENTIAL
8-D20 THIS DOCUMENT IS MADE AVAILABLE SUBJECT TO THE CONDITION THAT THE RECIPIENT WILL

(TYP) NEITHER USE NOR DISCLOSE THE CONTENTS EXCEPT AS AGREED IN WRITING WITH THE OWNER.
(MAIN BARS) COPYRIGHT IS VESTED IN THAIOIL PUBLIC COMPANY LIMITED. NEITHER THE WHOLE NOR ANY
PART OF THIS DOCUMENT MAY BE REPRODUCED OR DISTRIBUTED IN ANY FORM OR BY ANY
MEANS (ELECTRONIC, MECHANICAL, REPROGRAPHIC, RECORDING OR OTHERWISE) WITHOUT PRIOR
WRITTEN CONSENT OF THE OWNER.
DEVELOPMENT
EL 107.965
LENGTH Thai Oil Public Company Limited
L B.O.C. L
LINKS
SRIRACHA THAILAND
2-D12
50 THK LEAN CONCRETE (TYP) (LINKS)

WELL COMPACTED SOIL


(REFER NOTE-12)
A2 SECTION
TITLE

SCALE 1:25 GA AND FOUNDATION DETAILS


-
A SECTION A SECTION FOR PLATFORM OPP-032-111 &
0 1m 2m 4m 6m 8m 10m OPP-032-043 WBS-E06STB35 UNIT 03250
SCALE 1:50 SCALE 1:25
M - - CLEAN FUEL PROJECT, SRIRACHA, THAILAND M
(REINFORCEMENT DETAIL)
SCALE 1:100 JOB NO. 2044

PROJECT DRAWING NO. SHEET REVISION

SCALE 1:100
R1118111 R1118111-03250-CI-LFN-17388

SIZE: A1 841x594 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
C.REV. DRAWN CHK APVD C.REV. DRAWN CHK APVD C.REV. DRAWN CHK APVD C.REV. DRAWN CHK APVD C.REV. DRAWN CHK APVD C.REV. DRAWN CHK APVD CONTRACTOR CONTRACTOR DRAWING NO. SHEET TOP REV. WBS DOC.CLASS

E06
REVISION
SIGN SIGN SIGN SIGN SIGN SIGN SRP VB/PP PB/SR/SN ISSUE FOR CONSTRUCTION
0 0 2044-CI-03250-119101 0001 0 B02 Z
DATE DATE DATE DATE DATE DATE 09.12.2020 09.12.2020 09.12.2020