NO EVALUATION KIT PERFOMANCE INDICATOR ACCEPTED PERFOMANCE
1 Safety Evaluation PPE Maitenance ,Wear & choice Overalls, Safety boots, Safety Goggle, Helmets, Chinstraps, Gloves, Safety clothing One Hour Attendance 1 once every one month Safety Observations 4 per head per month Accident/ Incident Reports All with formal report within 24 hours( near misses) Zero incidents records Tool box attendance 4 Toolbox attendance with , 4 SERs monthly Sign-in procedures All sign in and permit cansellations daily Documented health and safety manual Reviwed annually, records kept Use of appropriate permits All signed records kept, Tools in good working order and certified Must have inpection green tags safety violations 0% violation scores Adherence to Lafarge safety standards 5 Safety rules, standars, (WAH, Confined Space, Hot Works Energy Isolation, Stalk pile , Conveyor safety, ) Evidence GENERAL AUDIT EVALUATION KIT Item Desired Outc Required Service Performance Standard Acceptable Quality Level Monitoring Method 1 Achieve Zero HS&O Monthly safety perfomance Positive/ good practices Kept recorDS/Files Incidents reports safety reports Zero incidents of unsafe Evidence of Positive/ good practices workmanship (Stalking, Monthly safety perfomance safety reports Kept recordS/Files WAH, HOT WORKS… reports 100% Attendance of on site Evidence of monthy 100% 100% attendance Kept recordS/Files Monthy One hour trainings attendace kept 100% of safety observation re4 per person per month Minimum mandatory of Safety observation of all staffs on site 4 monthly Records Tool box talks and SERs Weekly safety perfomance Evidence of daily, weekly reports tool box records with 1 SERRecords and files 1 Safety /Health Weekly Evaluation PPE Compliance LafrgeHolcim Standards Evidence of daily Inspections Records and files Absentiseem/Behavioral 100% attendance Reports of Absentiseem Filed records Perfomance Incidents ,Accidents, nearmiss0% occurrence 0% occurrence with official Records/Investigations on site reports within 24 hours Root cause gaps closed Occupational illnesses/ IncideAnnual,pre/ post job MA's Annual assessments Records Zero bribary/child/forced Recruitment policy Updated staffs Documents Records and files Safety Violations Monthly safety perfomance Sanctions and rewards Records reports policy Use of appropriate permits Monthly safety perfomance Signed and authorised Record and files reports Permits, SWI, LSTs Sign-in procedures Monthly safety perfomance Daily Inspections Record and files reports of site, tools, Tools in good working order aMonthly safety perfomance Al tools inspected and Evidence of disposed reports tagged Maintened. New tools Documented health and safet Quartely safety perofmance Policies Records reports Completed LafargeHolcim Annual safety perfomance Signed induction records Records Orientations Reviews Item Desired Outc Required Service Performance Standard Acceptable Quality Level Monitoring Method Daily safety perfomance 0% product contamination Daily production Product Quality Records Records 2 Evaluation Materials as per Quality of Specified Records Zero quality incidents Client specification Materials Adherence to product MSDS Reports handling procedures Service delivery - Equipment inspections Equpiment inspection Pre -operation Zero cases of using faulty Acompanied with check- checklist 3 Evaluation Equipments list and corrective Zero cases of equipment Submission and records Actions operations with high faults of all checklist, trackings Timely repair of faulty and closure rates Equipments and tracking with 100% clausre rates Equipment working and highlEstablished period for All maintenance scheduled Records and files Service deliverreliable inspections and maintenance done and recorded 4 Maintenance Established maintenance & Submit perfomance summary Evaluation testing programe to ensure critReport progress after Submission of inspection Recors per equipment equipment parts are functionaMaintenance checklist High productivity to dose Achieve 100% subtitution Daily production records Production volume and suppliWithout hoppers cutting feed set feed rates Truck Turn Around (TTA) Proper stalking and timely clearing materials to facilitate Acieve supply truck TTA Security /Weighbridge offloading Records zero equipment down times Zero cases of equipment Safety and Equipment reliability after after maintenance downtimes mechanical reports maintenance 100% equipment availability Zero cases of equipment Safety and downtimes mechanical reports Adequate supervision for the No of workers to propotionateZero cases of staff un- Security amount of Workers work ratio engaged(property loss) Details Service deliverLevel of housekeeping No cases of incidents due to Safety records 5 Contract evaluaduring the job improper housekeeping, cables100% Safely house kept Reports, Safety tools, etc Site obseravtions Completion contracted Zero cases of late completion Item Desired Outc Required Service Performance Standard Acceptable Quality Level Monitoring Method work on time of contracted jobs ( minimum 100% job completion on timRecords Deduction Quality of contracted job Neat stacking and proper Provide full PPE and ensure housekeeping in storage locat condition and as per PPE in good standard to staff Inspection records 100% PPE compliance by all staff. 90% housekeeping score Records 100% use of competent workCertification filling certified and authorized by the Plant 100% AFR handling equipment inspections performed per shInspection records and file record Zero drier and VCM HGG drecords of all absentiseem due to lack of manpower, and sick offs Zero case of product contamProduction records