PROJECT 

WORK BREAKDOWN STRUCTURE (WBS) 
The Work Breakdown Structure (WBS) is used to decompose all the work of the project. It begins at the project level 
and  is  successively  broken  down  into  finer  levels  of  detail.  The  lowest  level  is  a  work  package.  A  work  package 
represents a discrete deliverable that can be decomposed into activities to produce the deliverable. The needs of the 
project will determine the way that the WBS is organized. The second level determines the organization of the WBS. 
 
WBS Code  WBS Name 

2344_PH  Sharjah International Airport Expansion Project 
      2344_PH‐2‐1 Preliminary Design Phase
      2344_PH‐2‐2  Schematic Design Phase 
      2344_PH‐2‐3  Design Development Phase (60%) 
      2344_PH‐2‐4  Detailed Design Phase (90%) 
      2344_PH‐2‐5  Tender Documentation Phase ‐ Enabling Works 
      2344_PH‐2‐6  Tender Documentation Phase ‐ Main Works 
 

 
 
 
 
 
 

Page 1 of 1 