WORK BREAKDOWN STRUCTURE (WBS)
The Work Breakdown Structure (WBS) is used to decompose all the work of the project. It begins at the project level
and is successively broken down into finer levels of detail. The lowest level is a work package. A work package
represents a discrete deliverable that can be decomposed into activities to produce the deliverable. The needs of the
project will determine the way that the WBS is organized. The second level determines the organization of the WBS.
WBS Code WBS Name
2344_PH Sharjah International Airport Expansion Project
2344_PH‐2‐1 Preliminary Design Phase
2344_PH‐2‐2 Schematic Design Phase
2344_PH‐2‐3 Design Development Phase (60%)
2344_PH‐2‐4 Detailed Design Phase (90%)
2344_PH‐2‐5 Tender Documentation Phase ‐ Enabling Works
2344_PH‐2‐6 Tender Documentation Phase ‐ Main Works
Page 1 of 1