DOCUMENTATION
Category Acceptance
ID Requirement Stakeholder Priority Validation Method
Power/interest Criteria
Acceptance of the deliverables
Meet target as per the
deliverable/Submission schedule (≤
100%).
Schedule Performance index > 1=
Adherence to Scope, schedule, H/H Getting Client Approval Ahead of schedule
Sharjah Airport Level 1
1 budget High Power/High interest Obtaining Completion Schedule Variance (SV) = Earned
Authority (SAA) Key Players/ Involve
certificate Value (EV) − Planned Value (PV)
positive SV indicates we are ahead of
schedule
Cost Performance Indicator(CPI) =
Earned Value / Actual Cost
Result >1.0 = Under Budget
Meeting requirements and
complying with Regulations:
Master plan including setbacks,
Urban Planning H/L Level 2 Obtain
2 heights, land use, access points Approval status
Authority High Power/low interest Keep Satisfied/consult Authority Approval
and area statement (GFA, no. of
parking, FAR, coverage
percentage, etc.)
complying with requirements:
Ministry of Interior ‐
Master plan and plans, Elevations, H/L Level 2 Obtain
3 Civil Defence Approval status
Sections and stair detail, Opening Department
High Power/low interest Keep Satisfied/ consult Authority Approval
schedules, Curtain wall details, etc.
Meeting requirements and Electrical Distribution H/L Level 2 Obtain
4 High Power/low interest
Approval status
complying with Regulations Company Authority Keep Satisfied/consult Authority Approval
Coordination with the L/H Level 3 Provide coordination
5 ABC Consultant
Low Power/ High interest
Design Review
infrastructure Consultant Keep Informed drawing & sections
Require clearly specs/ L/H Level 3
6 Suppliers
Low Power/ High interest
Product Specs Prequalification
requirements Keep Informed