REQUIREMENTS 

DOCUMENTATION 
Category  Acceptance 
ID  Requirement  Stakeholder  Priority  Validation Method 
Power/interest  Criteria 
 Acceptance of the deliverables 
 Meet  target  as  per  the 
deliverable/Submission  schedule  (≤ 
100%). 
 Schedule  Performance  index  >  1= 
Adherence  to  Scope,  schedule,  H/H   Getting Client Approval  Ahead of schedule 
Sharjah Airport  Level 1 
1  budget  High Power/High interest   Obtaining Completion  Schedule  Variance  (SV)  =  Earned 
Authority (SAA)    Key Players/ Involve 
certificate  Value (EV) − Planned Value (PV) 
 
positive SV indicates we are ahead of 
schedule 
 Cost  Performance  Indicator(CPI)  = 
Earned Value / Actual Cost         
Result >1.0 = Under Budget   
Meeting  requirements  and  
complying  with  Regulations: 
Master  plan  including  setbacks, 
Urban Planning  H/L  Level 2  Obtain 
2  heights,  land  use,  access  points  Approval status 
Authority   High Power/low interest  Keep Satisfied/consult  Authority Approval 
and  area  statement  (GFA,  no.  of 
parking,  FAR,  coverage 
percentage, etc.) 
complying  with  requirements: 
Ministry of Interior ‐ 
Master plan and plans, Elevations,  H/L  Level 2  Obtain 
3  Civil Defence  Approval status 
Sections  and  stair  detail,  Opening  Department 
High Power/low interest  Keep Satisfied/ consult  Authority Approval 
schedules, Curtain wall details, etc. 
Meeting  requirements  and   Electrical Distribution  H/L  Level 2  Obtain 
4  High Power/low interest 
Approval status 
complying with Regulations  Company Authority  Keep Satisfied/consult  Authority Approval 
Coordination  with  the   L/H  Level 3  Provide coordination 
5  ABC Consultant 
Low Power/ High interest 
Design Review 
infrastructure Consultant  Keep Informed  drawing & sections 
Require  clearly  specs/  L/H  Level 3 
6  Suppliers 
Low Power/ High interest 
Product Specs  Prequalification 
requirements  Keep Informed 
 

Page 1 of 1 