CMED CONSTRUCTION CO., LTD. RFP No.

HTBT/LSAWORKS/RFP-001

HATTHA BANK TOWER PROJECT Date Issued 10-May-22

REQUEST FOR PROPOSAL

Sub-Contractor/Supplier: Avata Design & Construction

Description of the Works; SUB-LABOR FOR MASONRY WORKS OF TOWER BUILDING AND PARKING BUILDING

Location of the Project: Hun Sen Blvd., Sangkat Chak Angre Leu, Khan Meanchey, Phnom Penh, Cambodia

Deadline of submission: 13 MAY 2022 on or before 12:00 PM.

Documents provided: 1. Follow or Refer to RFP checklist document

The Sub-Contractor/Supplier is hereby instructed to submit the following (those with the X mark only) in relation to the
above stated description:
X a. Quotation (detailed cost proposal) as follows;
(1) To carry out the work of SUB-LABOR OF SUPER STRUCTURE WORK - Supply of labour, tools, and
Machine to complete the job except the major materials such as concrete, rebar, tire wire,
aluminuim formwork and plastic formwork only.

X b. Company profile which includes the following informations;


► Organization Chart ► QA/QC Plan
► Completed Projects ► ESH Plan
► Manpower & Equipment List ► Others

c. Product catalogue/technical data

d. Sample

e. Method statement

X f. Detail Construction Schedule (for the work)

X g. Terms of Payment (Vendors to refer to Summary of the Gen.Terms & Conditons of the Sub-Contract Agreement)

X h. Others

► Letter of Tender and Tender Confidentiality Agreement


► Manpower Schedule Rates

If you have queries about the documents provided in relation to the description of works, kindly email it to us your
technical query in order for us to respond to your queries with urgency.

Due to its urgency, you are required to submit these documents on or before 12:00pm, 13/May/2022 after receipt of
this Instruction to Quote.

Signed by : …………………………………….. Name : Kelvin Chin Position : QS Manager

Acknowledgement:

Received by : …..……………………………. Name: ...………………………… Position : ………………………………


For External Circulation

CHECKLIST OF DOCUMENTS FOR RFP

PROJECT : HATTHA BANK TOWER PROJECT


RFP WORK PACKAGE : SUB-LABOUR FOR MASONRY WORKS OF TOWER BUILDING AND PARKING BUILDING
Date : May 10, 2022

REQUIRED DOCUMENTS
REMARKS/NOTES
YES N/A AVAILABILITY
PART 1 - DRAWINGS
Typical Drawing of Superstructure
[a] Structural Drawings √  Yes

[b] Architectural Drawings √  Not available

[c] MEP Drawings √  Not available

PART 2 - SPECIFICATIONS

[a] General Specifications √  Yes

[b] Particular Specifications √  Not available

PART 3 - Construction Schedule √  Yes

PART 4 - PROJECT REQUIREMENTS

[a] Site Policy / Project Execution Plan √  Not available

[b] Safety Policy/EHS Policy Plan √  Yes

[c] EHS Regulation and Penalty √  Yes

(d) Preliminary Plan/Work Process √  Not available

[e] Documentation Requirements √  Not available

[f] Scope of Works/ R. Matrix √  Yes

PART 5 - Contractual Documents

(a) Bill of Quantity √  Yes

(b) Summary of Gen.Terms and Conditon √  Yes


of the Sub-Contract Agreement

[c] Schedule of Unit Rates) √  Not available

[d] Sub-Contract Agreement (Specimen) √  Yes

NOTE : RFQ DATE : 10 May 2022


TENDER CLOSING DATE : 13 May 2022 on or before 12:00 PM

Issued By: Received By: (SC Name)


Date: ……../…….. / …….. Date: ……../…….. / ……..