You are on page 1of 6

ANNEXURE-A

Format for Project Planning

PROJECT PLANNING SHEETS


NAME OF THE CEIA study for The JSHEP envisages a run-of-the-river
PROJECT Jakhol Sankari scheme on the river Supin. The project shall
HEP, Uttarakhand harness the hydropower potential by utilizing
a maximum gross head of 445.80 m. It is
worthwhile to mention here that proposed
Jakhol Sankari HEP is only hydroelectric
project on Supin River, which is tributary of
Tons River. The JSHEP is located about 450
Kms North East (NE) of Delhi and 225 Kms
North (N) of state capital Dehradun and on
the Supin River in Uttarkashi district in the
state of Uttrakhand. The proposed project is
having installed capacity of 44 MW

CLIENT Satluj Jal Vidyut Nigam Limited (SJVNL)


REFERENCE Ref.No: DATE OF COMMENCEMENT:
WORK ORDER SJVN/CCD/JSHEP/EIA/2016- 18.11.2016
2242-47
VALUE OF Rs. 17.5 lakhs (incl. Taxes) DATE OF COMPLETION
WORK 30.04.2018
PROJECT Dr. Aman Sharma ED (GR, Envt)
COORDINATOR
SUPPORT Dr. S.K Tyagi, Chief (Ecology)
GROUP Mr. R.V.Ramana, ACE
(Name & Mr. S. M. Dixit, Dy. Chief Engineer
Designation) Mrs. Moumita M. Ghosh, Dy. Chief Engineer
Mr. Amit Sharma, Engineer
Mr. Dhaneesh V. V., Engineer

FORM :

ENGINEER/SR.ENGINEER PROJECT COORDINATOR


ANNEXURE-B

WAPCOS PROJECT PLANNING SHEETS


PRIMARY DATA COLLECTION
CENTREFORGR&ENVT.

NAME OF PROJECT CEIA study for Jakhol Sankari HEP, Uttarakhand

1. Hydrological 2. Environmenta 3. Geological/ 4. Other


& l Geo-Tech Investigation
Topographical s

 Ambient Air quality monitoring


 Soil quality monitoring
 Noise monitoring
 Water quality monitoring
 Ecological Survey

FORM :

ENGINEER/SR.ENGINEER PROJECT COORDINATOR


ANNEXURE-C

WAPCOS PROJECT PLANNING SHEETS


CENTREFORGR&ENV DETAILS OF ACTIVITY/ITEM OF WORK
T

Name of project CEIA study for Jakhol Sankari HEP, 2. Activities and
Uttarakhand Planning

ACTIVITY/ITEM OF * RESOURCE
WORK IN- EXPERTS CONSTITU INTER- SUB-
HOUSE ENTS DIVISION CONTRAC
TORS
 Ambient Air - - - - 
quality
monitoring
 Soil quality - - - - 
monitoring
 Noise monitoring  - - -
 Water quality - - - - 
monitoring
 Ecological  - - - -
Survey

FORM :

ENGINEER/SR.ENGINEER PROJECT COORDINATOR


ANNEXURE-D

WAPCOS
CENTREFORGR&ENVT. PROJECT PLANNING SHEETS
MANPOWER AND RESOURCE PLANNING
NAME OF PROJECT CEIA study for Jakhol Sankari HEP, 3.Activities and
Uttarakhand Planning

REQUIRED AVAILABLE REMARKS


Two Civil Engineer 
Three Environmental 
Engineer
One Socio-economic 
Expert
Two Ecological Expert 

FORM :

ENGINEER/SR.ENGINEER PROJECT COORDINATOR


ANNEXURE-E

WAPCOS PROJECT PLANNING SHEETS


CENTREFORGR&ENVT. INFRASTRUCTURE REQUIREMENTS
NAME OF PROJECT CEIA study for Jakhol Sankari 3. Infrastructure
HEP, Uttarakhand Planning

- Computer Hardware Requirements


* PC (P-IV) No additional infrastructure is required.
* Printer/Plotter
* Scanner
* Others

- Software Requirements Nil

- Printing and Documentation


* A0 size sheets Nil
* A1 size sheets - Nil * Colour Cartridge - one
* A2 size sheets - Nil * B/W Cartridge - Three
* A3 size sheets - 80 * B/Q Toner - Two
* A4 size sheets - 7000

- Technical Books & Literature


District Census Book
District Gazetter
- Reports
Forest Working Plan
Detailed Project Report
- Acquisition of any other equipment facility Nil

FORM :

ENGINEER/SR.ENGINEER PROJECT COORDINATOR


ANNEXURE-F

WAPCOS PROJECT PLANNING SHEETS


CENTREFORGR&ENVT. RECORDS

NAME OF PROJECT CEIA study for Jakhol Sankari HEP,


Uttarakhand
(PROJECT RELATED DOCUMENTS FOR RECORD e.g. PROCURED MATERIALS
AND EQUIPMENT, INSPECTION, SUB-CONTRACTOR, CONTRACT REVIEW,
DESIGN, DELIVERY ETC.)
DOCUMENTS FOR RECORD CATEGORY REMARKS

FORM:

ENGINEER/SR.ENGINEER PROJECT COORDINATOR

You might also like