You are on page 1of 60

OISD/DOC/2019/01

Page No. I

OISD - RP – 174
T h i r d Edition
April, 2016
For Restricted Circulation

te
Well Control

o ra
OISD – RP – 174

ct
Prepared by

ire
FUNCTIONAL COMMITTEE FOR REVIEW OF ‘WELL CONTROL’
t yD
fe
Sa
try
us
nd
lI

OIL INDUSTRY SAFETY DIRECTORATE


Oi

Government of India
Ministry of Petroleum & Natural Gas
8th Floor, OIDB Bhavan, Plot No. 2, Sector – 73, Noida – 201301 (U.P.)
Website: www.oisd.gov.in
Tele: 0120-2593800, Fax: 0120-2593802
OISD/DOC/2019/01

Page No. II

OISD-RP-174
Second Edition
July 2008
For Restricted Circulation

te
ra
WELL CONTROL

o
ct
ire
OISD – RP – 174
t yD
fe
Sa

Prepared by

FUNCTIONAL COMMITTEE FOR REVIEW OF ‘WELL CONTROL’


try
us
nd
lI
Oi

OIL INDUSTRY SAFETY DIRECTORATE


8th Floor, OIDB Bhavan,
Plot No. 2, Sector - 73
Noida – 201301 (U.P.)
OISD/DOC/2019/01

Page No. III

Preamble
Indian petroleum industry is the energy lifeline of the nation and its continuous performance is
essential for sovereignty and prosperity of the country. As the industry essentially deals with
inherently inflammable substances throughout its value chain – upstream, midstream and downstream
– Safety is of paramount importance to this industry as only safe performance at all times can ensure
optimum ROI of these national assets and resources including sustainability.

While statutory organizations were in place all along to oversee safety aspects of Indian petroleum
industry, Oil Industry Safety Directorate (OISD) was set up in 1986 Ministry of Petroleum and
Natural Gas, Government of India as a knowledge centre for formulation of constantly updated world-

te
scale standards for design, layout and operation of various equipment, facility and activities involved
in this industry. Moreover, OISD was also given responsibility of monitoring implementation status of

ra
these standards through safety audits.

o
In more than 25 years of its existence, OISD has developed a rigorous, multi-layer, iterative and

ct
participative process of development of standards – starting with research by in-house experts and
iterating through seeking & validating inputs from all stake-holders – operators, designers, national

ire
level knowledge authorities and public at large – with a feedback loop of constant updation based on
ground level experience obtained through audits, incident analysis and environment scanning.
yD
The participative process followed in standard formulation has resulted in excellent level of
compliance by the industry culminating in a safer environment in the industry. OISD – except in the
Upstream Petroleum Sector – is still a regulatory (and not a statutory) body but that has not affected
t
implementation of the OISD standards. It also goes to prove the old adage that self-regulation is the
fe

best regulation. The quality and relevance of OISD standards had been further endorsed by their
adoption in various statutory rules of the land.
Sa

Petroleum industry in India is significantly globalized at present in terms of technology content


requiring its operation to keep pace with the relevant world scale standards & practices. This matches
try

the OISD philosophy of continuous improvement keeping pace with the global developments in its
target environment. To this end, OISD keeps track of changes through participation as member in
us

large number of International and national level Knowledge Organizations – both in the field of
standard development and implementation & monitoring in addition to updation of internal
knowledge base through continuous research and application surveillance, thereby ensuring that this
nd

OISD Standard, along with all other extant ones, remains relevant, updated and effective on a real
time basis in the applicable areas.
lI

Together we strive to achieve NIL incidents in the entire Hydrocarbon Value Chain. This, besides
Oi

other issues, calls for total engagement from all levels of the stake holder organizations, which we, at
OISD, fervently look forward to.
Jai Hind!!!
Executive Director
Oil Industry Safety Directorate
OISD/DOC/2019/01

Page No. IV
FOREWORD

The Oil Industry in India is 100 years old. Because of various collaboration
agreements, a variety of international codes, standards and practices have been in
vogue. Standardization in design philosophies and operating and maintenance
practices at a national level was hardly in existence, this coupled with feedback
from some serious accidents that occurred in the recent past in India and abroad,
emphasized the need for the industry to review the existing state of art in designing,
operating and maintaining oil and gas installations.

With this in view, the Ministry of Petroleum and Natural Gas in 1986 constituted a
Safety Council assisted by the Oil Industry Safety Directorate (OISD) staffed from
within the industry in formulating and implementing a series of self-regulatory
measures aimed at removing obsolescence, standardizing and upgrading the

te
existing standards to ensure safe operations. Accordingly OISD c on s t i t ut ed a
number of functional committees of experts nominated from the industry to draw up

ra
standards and guidelines on various subjects.

o
The recommended practices for "Well Control" have been prepared by the Functional
Committee for revision of “Well Control". This document is based on the

ct
accumulated knowledge and experience of industry members and the various national /
international codes and practices.

ire
This document covers recommended practices for selection o f well control
yD
equipment, installation requirements of well control equipment, inspection and
maintenance of well control equipment, methods for well control and competence of
personnel. Well Control issues related to both onland and offshore operations have
t
been covered.
fe

Suggestions are invited from the users after it is put into practice to improve the
Sa

document further. Suggestions for amendments to this document should be


addressed
try

The Coordinator
us

Functional Committee on
“Well Control”,
nd

Oil Industry Safety Directorate,


lI

8th Floor, OIDB Bhavan,


Plot No. 2, Sector - 73
Oi

Noida – 201301 (U.P.)


OISD/DOC/2019/01

Page No. V

NOTE

OISD (Oil Industry Safety Directorate) publications are prepared for use in the Oil
and Gas Industry under Ministry of Petroleum & Natural Gas. These are the property of
Ministry of Petroleum & Natural Gas and shall not be reproduced or copied and loaned or
exhibited to others without written consent from OISD.

Though every effort has been made to assure the accuracy and reliability of the d at a
contained in the document, OISD hereby expressly disclaims any liability or responsibility

te
for loss or damage resulting from their use.

o ra
The document is intended to supplement rather than replace the prevailing statutory

ct
requirements.

ire
t yD
fe
Sa
try
us
nd
lI
Oi
OISD/DOC/2019/01

Page No. VI

COMMITTEE FOR PREPARING STANDARD ON


"WELL CONTROL"
1998

-----------------------------------------------------------------------------------------------------------------------------
Name Designation & Position in
Organisation Committee
----------------------------------------------------------------------------------------------------------------------------

te
1.S/Shri .A.K. Hazarika GM(D) Leader

ra
ONGC, Mumbai

o
2. ‘’ S.L. Arora GM(D) Member

ct
ONGC, Ahmedabad

ire
3. ‘’ A. Borbora Dy. CE(D) Member
OIL, Duliajan yD
4.’’ C.S. Verma Dy. CE(D) Member
Oil, Rajasthan
t
5.’’ A. Verma CE(P) Member
fe

ONGC, Mumbai
Sa

6.’’ V.P. Mahawar CE(D) Member


ONGC, Dehradun
try

7. ‘’ B.K. Baruah DGM(D) Member


ONGC, ERBC
us

8.’’ S.K. Ahuja SE(D) Member


ONGC, ERBC
nd

9.’’ P.K. Garg Addl. Director (E&P) Co-ordinator


lI

----------------------------------------------------------------------------------------------------------------------------
Oi
OISD/DOC/2019/01

Page No. VII

Functional Committee for Complete Review of OISD-STD-174,


2008

LEADER

Shri K. Satyanarayan Oil and Natural Gas Corporation Ltd., Ankleshwar.

te
ra
MEMBERS

o
Shri V.P. Mahawar Oil and Natural Gas Corporation Ltd., Ahmedabad.

ct
Shri R.K. Rajkhowa Oil India Ltd., Duliajan, Assam.

ire
Shri S.K. Ahuja Oil and Natural Gas Corporation Ltd., Mumbai.
yD
Shri B.S. Saini Oil and Natural Gas Corporation Ltd., Sibsagar, Assam.
Shri A.J. Phukan Oil India Ltd., Duliajan, Assam.
t
fe
Sa

MEMBER COORDINATOR
try

Shri H.C.Taneja Oil Industry Safety Directorate, New Delhi.


us
nd
lI
Oi
OISD/DOC/2019/01

Page No. VIII

Functional Committee for Complete Review of OISD-RP-174, 2016

LEADER
Shri Sunil Upadhyay, BGEPIL

MEMBERS

Shri Tarsem Singh, Oil Industry Safety Directorate


Shri Ajay Dixit, ONGC, Ahmedabad

te
Shri Sanjay Bhatt, ONGC, Mumbai

ra
Shri Krantijyoti Deka, Oil India Limited
Shri Jagannath Chetia, Oil India Limited

o
ct
ire
yD
COORDINATOR
t
Shri A K Jain, Oil Industry Safety Directorate
fe
Sa
try
us
nd
lI
Oi
OISD/DOC/2019/01

Page No. IX

Contents

Section Description Page


1.0 Introduction 1
2.0 Scope 1
3.0 Definitions 1
4.0 Planning for Well Control 6
4.1 Well Planning 6
5.0 Diverter Equipment and Control System 6
5.1 Procedures for Diverter Operations 7

6.0 Well Control Equipment & Control System 8

te
6.1 Selection 8
6.2 Periodic Inspection and Maintenance 8

ra
6.3 Surface Blow out Prevention Equipment 10
6.4 Subsea Blow out Prevention Equipment 12

o
6.5 Choke and Kill Lines 19
6.6 Wellhead, BOP Equipment and Choke & Kill Lines Installation 22

ct
6.7 Blow out Preventer Testing 23
6.8 Minimum Requirements for Well Control Equipment 25

ire
for Workover Operations (on land)

7.0 Procedures and Techniques for Well Control (Prevention 26


yD
and Control of Kick)
7.1 Cause of Kick 26
7.2 Cause of Reduction in Hydrostatic Head 26
t
7.3 Kick Indication 26
fe

7.4 Prevention and Control of Kick 26


7.5 Kick Control Procedure 29
Sa

8.0 Drills and Training 34


8.1 Pit Drill (On bottom) 35
try

8.2 Trip Drill (Drill Pipe in BOP) 35


8.3 Trip Drill (Collar in Blowout Preventer) 36
8.4 Trip Drill (String is out of Hole) 36
us

8.5 Well Control Training 36


nd

9.0 Monitoring System 36


9.1 Instrumentation Systems 36
9.2 Trip Tank System 37
lI

9.3 Mud Gas Separator (MGS) 37


9.4 Degasser 37
Oi

10.0 Under Balanced Drilling 37


10.1 Procedures for UBD 38

11.0 Well Control Equipment Arrangement for HTHP Wells 41


12.0 References 42
Abbreviations 43
Annexure – I to VIII 44-51
OISD/DOC/2019/01

OISD – RP – 174 Page No. 1


Well Control

Recommended Practices for Well Control

1.0 Introduction

Primary well control is by maintaining hydrostatic pressure in the wellbore at least equal to
(preferably more than) the formation pressure to prevent the flow of formation fluids. During
drilling and workover operations flow of formation fluids into the wellbore is considered as
kick. If not controlled, a kick may result in a blowout. For safety of personnel, equipment and
environment, it is of utmost importance to safely prevent or handle kicks.

This document provides guidance on selection, installation and testing of well control
equipment. The recommended practices also include procedures for preventing kicks while

te
drilling and tripping, safe closure of well on detection of kicks, procedures for well control
drills, during drilling and workover operations.

ra
Recommendations for the surface installations are applicable to sub-sea installations also
unless stated otherwise.

o
ct
All the sections / sub-sections of this document mentioning ‘drilling’ are relevant to ‘workover
operations’ also, wherever applicable. Terms like ‘drilling fluid’ means ‘workover fluid’ in the

ire
context of workover operations.
yD
2.0 Scope

This document covers selection, installation and testing of well control equipment both
t
surface and sub-sea, and recommended practices for kick prevention, and control and
fe

competence requirement (training and drills) for personnel, in drilling and workover
operations.
Sa

3.0 Definitions
try

3.1 Accumulator (BOP Control Unit)


A pressure vessel charged with nitrogen or other inert gas and used to store hydraulic fluid
under pressure for operation of blowout preventers and/or diverter system.
us

3.2 Annular Preventer


nd

A device, which can seal around different sizes & shapes object in the wellbore or seal an
open hole.
lI

3.3 Blowout
An uncontrolled flow of well fluids and/or formation fluids from the wellbore.
Oi

3.4 Blowout Preventer


A device attached to the casing head that allows the well to be sealed to confine the well fluids
to the wellbore.

3.5 Blowout Preventer Stack


The assembly of well control equipment including preventers, spools, valves, and nipples
connected to the top of the casing head.

3.6 Bottom hole Pressure (BHP)


Sum of all pressures that are being exerted at the bottom of the hole and can be written as:
BHP = static pressure + dynamic pressures

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 2


Well Control

Static pressure in a wellbore is due to mud column hydrostatic pressure and surface
pressure.
Dynamic pressures are exerted due to mud movement or the pipe movement in the wellbore.
BHP under various operating situations is:
Not circulating (static condition)
BHP = hydrostatic pressure due to mud column
While drilling (over balance)
BHP = Hydrostatic pressure of mud + annular pressure losses.
While drilling (MPD/UBD)
BHP = Hydrostatic pressure of mud + annular pressure losses + Surface annular pressure
While shut-in after taking kick
BHP = Hydrostatic pressure of mud + surface pressure

te
While killing a well
BHP = Hydrostatic pressure of mud + annular pressure losses + Surface pressure
Running pipe in the hole

ra
BHP = Hydrostatic pressure + surge pressure
Pulling pipe out of hole

o
BHP = Hydrostatic pressure - swab pressure.

ct
3.7 Choke manifold

ire
The assembly of valves, chokes, gauges, and piping to control flow from the annulus and
regulate pressures in the drill string / annulus flow, when the BOPs are closed.
yD
3.8 Connection gas
A distinct increase in gas above a normal background gas when bottoms up circulation occur
after a pipe connection.
t
fe

3.9 Degasser
A vessel which utilizes pressure reduction or inertia to separate entrained gases from the liquid
Sa

phases.

3.10 Diverter
A device attached to the wellhead or marine riser to close the vertical access and direct flow
try

into a line away from the rig.

3.11 ECD
us

ECD i.e. Equivalent Circulating Density is equal to Original drilling or completion fluid density plus
annular pressure losses.
nd

3.12 EMW
EMW i.e. Equivalent Mud Weight is equal to Original Mud weight + Annular pressure losses in
lI

EMW + weight of drilled cuttings existing in the annulus.


Oi

3.13 Fracture Pressure


The pressure required to initiate a fracture in a sub- surface formation (geologic strata).
Fracture pressure can be determined by Geo-physical methods; during drilling fracture
pressure can be determined by conducting a leak off test.

3.14 FOSV
Full Opening Safety Valve (FOSV) is a ball valve having ID equal to that of drill pipe /tubing
Designed for high pressure condition and it can hold pressure from both directions. It is
Installed into the top joint of drill pipe or tubing at the rig floor and closed quickly when well
kicks.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 3


Well Control

3.15 Gate Valve


A valve that employs a sliding gate to open or close the flow passage. The valve may or may not
be full opening.

3.16 Hydrostatic Pressure


Pressure exerted by the fluid column at the depth of interest is termed as hydrostatic
pressure. The magnitude of hydrostatic pressure depends upon the density and the vertical
height of liquid column. Hydrostatic pressure can be calculated by the following formula.
Hyd. pressure (psi) = 0.052 x mud wt.(ppg) x TVD (feet)
Hyd. pressure (kg/cm2) = Mud
wt.( gm/cc) x TVD (mtrs)/10

te
where TVD = True vertical depth.

ra
3.17 Influx
The flow of fluids from the formation into the wellbore.

o
3.18 IBOP

ct
Internal Blow out Preventer (IBOP) is a device that can be installed in the drilling string /
tubing string and acts as a check valve allowing drilling fluid to be circulated down the string

ire
but prevents back flow.

3.19 Kick
yD
A kick is intrusion of unwanted formation fluids into wellbore, when hydrostatic head of
drilling fluid column is / becomes less than the formation pressure. Kick can lead to blowout, if
timely corrective measures are not taken.
t
fe

3.20 Kill Rate


Reduced circulating rate (kill rate) is required when circulating kicks so that additional
Sa

pressure to prevent formation flow can be added without exceeding pump liner rating. Kill rate
is normally half of the normal circulating rate. For subsea stacks in deep water, kill rates less
than half of the normal circulating rate may be required to avoid excessive back pressure in
try

the choke flow line.

3.21 Kill Rate Pressure


us

The circulating pressure measured at the drill pipe gauge when the mud pumps are operating
at the kill rate.
nd

3.22 Kill Manifold


Kill manifold is an arrangement of high pressure valves, pipelines; check valves which
provide a means of pumping fluid into the wellbore when normal circulation down the
lI

drill string through Kelly or drill pipe cannot be established.


Oi

3.23 Kelly Cock


A high pressure valve installed immediately below and above the Kelly that can be
closed to confine pressures inside the drill string. It works as a check valve when
engaged.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 4


Well Control

3.24 Leak Off Test


Leak off test is a procedure used to determine the pressure required to initiate a fracture in
the open or exposed formation.

3.25 LMRP
LMRP (Lower Marine Riser Package) is the upper section of Subsea BOP stack consisting of
a hydraulic connector, annular BOP, ball / flex joint, riser adapter, jumper hoses for choke,
kill and auxiliary lines and subsea control pods. This interfaces with lower BOP stack.

3.26 Marine riser system


The extension of the wellbore from the subsea BOP stack to the floating drilling vessel which

te
provides for fluid returns to the drilling vessel supports the choke, kill, and control lines,
guides tools into the well, and serves as a running string for the BOP stack.

ra
3.27 Maximum Allowable Annular Surface Pressure (MAASP)
It is maximum allowable annular surface pressure during well control; any pressure above this

o
may damage formation / casing / surface equipment.

ct
3.28 Mud Gas Separator

ire
A device that removes gas from the drilling fluid returns, when a kick is being circulated out.
Mud gas separator is also known as gas buster or poor-boy degasser.
yD
3.29 Pipe-light
‘Pipe-light’ occurs at the point where the formation pressure across the pipe cross-section
creates an upward force sufficient to overcome the downward force created by the pipe’s
weight- a potentially disastrous scenario.
t
fe

3.30 Pore Pressure


Pressure at which formation fluid is trapped in the pore (void) spaces of the rock is termed as
Sa

formation pressure or pore pressure. It can be expressed in various ways like:


In term of pressure - psi or kg/cm2
In term of pressure gradient - psi /ft or kg/cm2/meter.
try

In term of equivalent mud wt. - ppg or gm/cc

3.31 Riser Margin


us

Riser Margin is the mud weight increase below the mud line to compensate bottom hole
pressure in case of an accident, disconnect or a failure in the marine riser close to the BOP
stack at sea bed.
nd

3.32 Shell
lI

The word ‘shall’ is used to indicate that the provision is mandatory.


Oi

3.33 Should
The word ‘should’ is used to indicate that the provision is recommendatory as per sound
engineering practice.

3.34 Trip Gas


Trip gas is the accumulated gas which enters the wellbore when the mud pumps are shut and
trip is being made.

3.35 Trip Margin


Trip margin is the small amount of drilling fluid weight carried over that needed to balance
formation pressure to overcome the pressure reduction effects caused by swabbing during
tripping operations.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 5


Well Control

3.36 Umbilical
Umbilical is a bundle of helically of sinusoidal wound small diameter flexible hoses, steel
tubes, optical fiber cables or electrical cables. These are connective medium between surface
installations and subsea installations and generally provide hydraulic / electrical power, fluid
injection and or communication services.

3.37 Underbalanced Drilling (UBD)


Drilling operation, when the hydrostatic head of a drilling fluid is intentionally (naturally or

te
induced by adding natural gas, nitrogen, or air to the drilling fluid) kept lower than the
pressure of the formation being drilled with the intention of bringing formation fluids to the
surface.

o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 6


Well Control

4.0 Planning for well control

4.1 Well Planning

I. Well planning should include conditions anticipated to be encountered during drilling /


working over of the well, the well control equipment to be used, and the well control
procedures to be followed.

II. For effective well control the following elements of well planning should be considered:

a. Casing design,Kick tolerance, pore pressure, formation fracture pressure, down hole

te
temperature prediction for the well.
b. Cementation details.

ra
c. Drilling fluid type and density.
d. Drilling fluid monitoring equipment.
e. Blowout prevention equipment selection.

o
f. Contingency plans with actions to be taken if the maximum allowable casing pressure

ct
is reached.
g. Hydrogen sulphide environment, if expected.

ire
III. During well planning shallow gas hazard should also be considered. Well plan should include
mitigating measures considering the following:
yD
a. Pilot hole drilling,
b. Use of diverter.
t
c. Riser less drilling (with floater)
fe

5.0 Diverter E q u i p m e n t and Control System


Sa

A diverter system is used during top-hole drilling; it allows routing of the flow away from the rig
to protect persons and equipment. Components of diverter system include – annular sealing
device, vent outlet(s), vent line(s), valve(s), control system.
try

Diverter system is mandatory for:


us

 Subsea wells
nd

 Exploratory wells onshore as well as offshore.

 Development wells where shallow gas pockets are expected.


lI
Oi

Recommended practices for diverter system:

I. The friction loss should not exceed the diverter system rated working pressure, place undue
pressure on the wellbore and /or exceed other equipment’s design pressure, etc., e.g. marine
riser. The diverter system should be accordingly designed.

II. To minimize back pressure (as much as practical) on the wellbore while diverting well fluids,
diverter piping should be adequately sized.

III. Vent lines should be 10” or above for offshore and 8” or above for onshore.

IV. The diverter and Mud return (flow line) lines should be separate lines.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 7


Well Control

V. Diverter lines should be straight as far as possible, properly anchored and sloping down to
avoid blockage of the lines with cuttings etc.

VI. Diverter valves should be full opening type either pneumatic or hydraulic with automatic
sequencing / manual sequencing.

VII. The diverter control system may be self-contained or an integral part of the blowout preventer
control system. It should be located in safe area.

VIII. The diverter control system should be capable of operating the diverter system from two or
more locations - one to be located near the driller's console.

te
IX. When a surface diverter system and a sub-sea BOP stack are used, two separate control /

ra
accumulator systems are required. This will allow the BOPs to be operated and the riser
disconnected in case the diverter control system gets damaged.

o
X. Size of the hydraulic control lines should be as per manufacturer’s recommendations.

ct
XI. Control systems of diverter should be capable of closing the diverter within maximum 45

ire
seconds and simultaneously opening the valves in the diverter lines.

XII. Telescopic/slip joints (in case of floating rigs) should be incorporated with double seals, to
yD
improve the sealing capability when gas has to be circulated out of the marine riser.

XIII. Alternate means to operate diverter system (in case primary system fails) should be provided.
t
fe

5.1 Procedures for Diverter Operations


Sa

Following procedure is recommended for use of diverter:

I. Stop drilling
try

II. Pick up Kelly until tool joint is above rotary.

III. Open vent line towards downward wind direction, close diverter packer and close shale
us

shaker inlet valve.


nd

IIIA. In Offshore installation vent line selector valve is to be kept in downward wind
direction, close diverter packer and close shale shaker inlet valve.
lI

IV. Stop pump and check for flow through open vent line.
Oi

V. If flow is positive, pump water or drilling fluid as required moderating the flow.

VI. Monitor and adjust packer pressure as and when required.

VII. Alert the personnel on the rig.

VIII. Take all precautions to prevent fire by putting off all naked flames and unnecessary electrical
systems.

Additionally following are applicable in case of subsea wells:

I. Monitor and adjust slip joint packer pressure as and when required.
II. Watch for gas bubbles in the vicinity of drilling vessel.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 8


Well Control

6.0 Well Control Equipment & C o n t r o l System

6.1 Selection

I. All the equipment including ram preventers, lines, valves and flow fittings shall be selected to
withstand the maximum anticipated surface pressures. Annular preventer can have one step
lower rating than ram BOP. (Maximum anticipated surface pressure = Maximum anticipated
formation pressure).

II. Welded, flanged or hub end connections are only recommended on all pressure systems above
3000 psi.

te
III. In sour gas areas H2S trim (refer NACE MR0175 / ISO 15156) equipment should be used.

ra
IV. Kill lines should be of minimum 2” nominal size and choke line should be of minimum 3”
nominal size.

o
ct
V. Size of choke line and choke manifold should be same. Minimum nominal inside diameter (ID)
for downstream of chokes shall be equal to or greater than the nominal connection size of the

ire
choke inlet and out let.

VI. The BOP control system shall be capable of


yD
A) Closing each Ram BOP in 30 seconds or less than 30 seconds
t
B) Closing annular preventers smaller than 18 3/4 in 30 seconds or less and for annular
fe

preventers of 18 3/4 in. and larger size, in 45 seconds or less than 45 seconds.
Sa

C) Closing and opening of choke & kill valves shall not exceed the minimum observed ram
close response time.
try

VII. Closing systems of sub-sea BOPs should be capable of closing each ram preventer within 45
seconds and annular preventer within 60 seconds.
us

VIII. Ram type subsea preventers should be equipped with an integral or remotely operated locking
system. Surface ram preventer should be equipped with mechanical / hydraulic ram locks.
nd

6.2 Periodic Inspection and Maintenance


lI

I. The organization should establish inspection and maintenance procedures for well control
equipment’s. Inspections and maintenance procedures should take into consideration the
Oi

OEM’s recommendations and / or relevant API / OISD standards.

II. Inspection recommendations, where applicable, may include:

a. Verification of instrument accuracy


b. Relief valve settings
c. Pressure control switch settings
d. Nitrogen precharge pressure in accumulators
e. Pump systems
f. Fluid Levels
g. Lubrication Points

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 9


Well Control

General condition of
a. Piping systems
b. Hoses
c. Electric conduit/Cords
d. Mechanical components
e. Structural components
f. Filters/Strainers
g. Safety covers/devices
h. Control system adequacy
i. Battery condition

III. Inspection between wells: after each well the well control equipment should be cleaned,

te
visually inspected, preventive maintenance performed before installation at the next well. The
inspection should include the seal area of the connectors (Choke and kill lines) for any damage.

ra
IV. Major inspection shell be carried out after every 5 years. Th e B O P s t ac k , choke manifold,
control unit, diverter assembly shell be disassembled, and inspected in accordance with the

o
OEM’s guidelines. The recertification of well control equipment after five yearly major

ct
inspections should preferably be carried out by OEM or OEM authorized repair facility or by

ire
A) An API 16A approved facility having 16A certification for specific type of BOP.
Recertification procedure for BOP shall be as per Annexture B (Requirement for repair
and remanufacture of BOP) of API 16A, 2004 edition and for Flange/Hub connection it will
yD
be as per API 6A.

B) An API 16C & 6A approved facility for choke manifold & its accessories (Refer Product
t
nd
specification clause 4.2 of API 16C, 2 edition March 2015 and Annexure J of API 6A
fe

th
20 edition 2010 for repair and remanufacture requirement)
Sa

C) An API 16D approved agency for control unit as per clause number 6 (Periodic
maintenance and inspection procedure) of API 16D edition 2004.
try

V. Spare parts requirement as per OEM should be considered. However, minimum spare parts as
listed below should be readily available:
us

i) A complete set of ram seals for each size and type of ram BOP in use.
ii) A complete set of bonnet or door seals for each size and type of ram BOP in use.
iii) Ring gaskets to fit end connections.
nd

iv) A spare annular BOP packing element and a complete set of seals.
lI

VI. During storage of BOP metal parts and related equipment, they should be coated with a
protective coating to prevent rust. Storage of elastomer parts should be in accordance with
manufacturer’s recommendations.
Oi

VII. Rubber / elastomer parts, having limited shelf life should be stored in air condition Environment.
Elastomers exposed to drilling / completion fluid shall be compatible to fluid in use while drilling
and completion operations.

VIII. Separate maintenance history / log book of e a c h of all the BOPs, Choke manifold and
Control unit should be maintained.

IX. All pressure gauges and relief valves on the BOP control unit and remote panel should be
calibrated at least once in a year.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 10


Well Control

6.3 Surface Blow out Prevention Equipment

Surface blow out prevention equipment is used on land operations and offshore operations
where the wellhead is above the water level.

I. Well control equipment can be classified under the following categories based on pressure
rating:
a) 2000 psi WP
b) 3000 psi WP
c) 5000 psi WP
d) 10000 psi WP
e) 15000 psi WP, and

te
f) 20,000 psi WP

ra
II. Refer Annexure-I for recommended 2000 psi BOP stack.One single ram type preventers
with blind or blind cum shear ram and one annular BOP or one double ram BOP of which
one ram should be equipped with correct size pipe rams and the other with blind or blind

o
shear rams. For Offshore rigs one annular BOP and one double ram BOP of which one

ct
ram should be equipped with correct size pipe rams and the other with blind or blind
shear ram should be used. The Blind cum shear ram shall be capable of shearing drill

ire
pipe of any size and grade in the well bore and seal it under maximum anticipated surface
pressure. Preferably one Annular preventer and one blind ram preventer should be
yD
considered for the following advantages

a) It can close on any shape or size of tubular or non-cylindrical objects with minimum
response time
t
fe

b) Drill pipe / tool joint can be slipped through it by means of careful control of the
hydraulic closing pressure
Sa

A minimum of one set of blind rams or blind shear rams (BSRs) shall be installed when
ram type preventers are to be installed. This requirement shall also apply to 2K or lesser
try

rated working pressure systems and a minimum 2 BOP stack arrangement. A


documented risk assessment shall be performed by the operator for all classes of BOP
arrangements to identify ram placements and configurations to be installed. This
us

assessment shall include tapered strings, casings completion equipment, test tools.

III. Refer Annexure-II for recommended 3000/5000 psi BOP stack. The stack comprises of,
nd

besides annular BOP, one double, or two single ram type preventers - one of which should be
equipped with correct size pipe rams and the other with blind or blind-shear rams.
lI

IV. Refer Annexure-III for recommended 10000 / 15000 / 20000 psi BOP stack. The stack
Oi

comprises of, besides annular BOP, three single, or one double and one single ram type
preventers one of which should be equipped with blind or blind-shear rams (For Of f s hore
and Ons hore gas w ells Blind shear ram is mandatory in 10 K and above rated BOP
stack) and the other two to be fitted with correct size of pipe ram and variable ram to close
against pipe if multiple size of string is in use.

V. When the bottom ram preventer is equipped with proper size side outlets, the kill and choke
lines may be connected to the side outlets of the bottom preventer. In that case the drilling
spool may be dispensed with.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 11


Well Control

VI. In spite of the above, a drilling spool use may be considered for the following two advantages:

A) Stack outlets at drilling spool localizes possible erosion in less expensive drilling spool.

B) It allows additional space between preventers to facilitate stripping, hang off, and / or
shear operations.

VII. A fill up line should be provided above the uppermost preventer.

VIII. Prior to commencing operations with tapered drill string, the BOP stack should be provided
with one set of variable pipe rams capable of sealing around both the sizes of drill pipes.

te
IX. Full opening safety valve of drill string size and matching thread connection of rated
working pressure should always be available at derrick floor. It should be kept ready in

ra
'open' position. Operating wrench to operate FOSV is to be kept in designated place.

o
X. A non-return valve known as check valve of drill string size and matching thread connection of

ct
rated working pressure also is to be kept on rig floor in open position and is called IBOP.

ire
6.3.1 Control System for Surface BOP Stacks (Onshore and Bottom-supported Offshore
Installations)
yD
I. Control systems are typically simple closed hydraulic control systems consisting of a reservoir
for storing hydraulic fluid, pump equipment for pressurizing the hydraulic fluid, accumulator
banks for storing power fluid, manifolding, piping and control valves for transmission of control
t
fluid for the BOP stack functions.
fe

II. A suitable control fluid should be selected as the system operating medium based on the
Sa

control system operating requirements, environmental requirements and user preference.

III. Two (primary and secondary) or more pump systems should be used having independent
try

power sources. Electrical and air (pneumatic) supply for powering pumps should be
available at all times such that the pumps will automatically start when the system pressure has
decreased to approximately ninety percent of the system working pressure and automatically
us

stop within plus zero or minus 100 psi of the system design working pressure.
nd

IV. With the accumulators isolated, the pump system should be capable of closing annular BOP on
the drill string being used, open HCR valve on choke line and achieve the operating pressure
level of annular BOP to effect a seal on the annular space within 2 minutes.
lI

V. Each pump system should be protected from over pressurization by a minimum of two devices.
Oi

One device should limit the pump discharge pressure so that it will not exceed the design
working pressure of a BOP Control System. The second device normally a relief valve, should
be sized to relieve at a flow rate of at least equal to the design flow rate of the pump systems,
and should be set to relieve at not more than ten percent over the design pressure.

VI. The combined output of all pumps should be capable of charging the entire accumulator
system from precharge pressure to the maximum rated working pressure within 15 minutes.

VII. The hydraulic fluid reservoir should have a capacity equal to at least twice the useable
hydraulic fluid capacity of the accumulator system.

VIII. In the field, the precharge pressure should be adjusted within 100 psi of the recommended
precharge pressure during installation and at start of drilling (interval not to exceed 60 days).

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 12


Well Control

IX. The BOP control system should have a minimum stored hydraulic fluid volume, with pumps
inoperative, to satisfy the greater of the following two requirements:

a) Close from a full open position at zero wellbore pressure, all of the BOPs in the BOP
stack, HCR valves plus 50 % reserve.

b) The pressure of the remaining stored accumulator volume after closing all of the BOPs
should exceed the minimum calculated (using the BOP closing ratio) operating pressure
required to close any ram BOP (excluding the shear rams) at the maximum rated
wellbore pressure of the stack.

X. All rigid or flexible lines between the control system and BOP stack should be fire resistant

te
including end connections, and should have a working pressure equal to the design working
pressure of the BOP control system. All control system interconnect piping, tubing hose,
linkages etc. should be protected from damage from drilling operations, drilling equipment

ra
movement and day to day personnel operations.

o
XI. The control unit should be installed in a location away from the drill floor and easily accessible
to the persons during an emergency.

ct
XII. A minimum of one remote control panel accessible to the driller to operate all system functions

ire
during drilling operations should be installed at onshore rigs. In offshore, one control panel shall
be available at a non- h a z a r d o u s area preferably tool pusher office the one near the
driller.
yD
XIII. Remote control panels should have light indicators to show open/close/block position of each
BOPS and Hydraulically operated choke and kill valves. For onshore it is optional and for
t
offshore unit it is must.
fe

XIV. A. The hydraulic lines system (from control unit to BOP stack) to be pressure tested at
Sa

maximum operating pressure on installation.

B. Accumulator relief valve and manifold relief valve to be tested six-monthly.


try

6.4 Subsea Blow out Prevention Equipment


us

Subsea BOP stack arrangements should provide means to:


nd

I. Close in on the drill string and on the casing or liner and allow circulation.

II. Close and seal on open hole and allow volumetric well control operations.
lI

III. Strip the drill string using the annular BOP(s).


Oi

IV. Hang off the drill pipe on a ram BOP and control the wellbore.

V. Shear logging cable or the drill pipe and seal the wellbore.

VI. Disconnect the riser from the BOP stack.

VII. Circulate the well after drill pipe disconnect.

VIII. Circulate across the BOP stack to remove trapped gas.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 13


Well Control

6.4.1 Subsea BOP Stack

Subsea blow out prevention equipment is used on subsea wellhead.

I. Well control equipment can be classified in following categories based on pressure rating.

a) 2000 psi WP
b) 3000 psi WP
c) 5000 psi WP
d) 10000 psi WP
e) 15000 psi WP and

te
f) 20,000 psi WP

ra
II. Arrangements for subsea BOP stack at Annexure – IV and V should be referred.

o
III. Annular BOPs are designated as lower annular and upper annular. Annular BOP may have a
lower rated working pressure than the ram BOPs.

ct
IV. Arrangement of choke and kill m a n i f o l d s h o u l d b e such that each can be used for

ire
either purpose. The identifying labels for the choke and kill lines are arbitrary. When a
circulating line is connected to an outlet below the bottom ram BOP, this circulating line is
generally designated as kill line. When kill line is connected below the lowermost BOP, it is
yD
preferable to have one choke line and one kill line connection above the bottom ram BOP.
When this bottom connection does not exist, either or both of the two circulating lines may
alternately be labeled as a choke line.
t
V. Some differences as compared to surface BOP systems are:
fe

a. Choke and kill lines are normally connected to ram preventer body outlets to reduce stack
Sa

height and weight, and to reduce the number of stack connections.

b. Spools may be used to space preventers for shearing tubulars, hanging off drill pipe, or
try

stripping operations.

c. Blind-shear rams are used in place of blind rams. The blind shear ram shell be capable of
us

shearing drill pipe of any size and grade in the hole and seal the well bore under
Maximum Anticipated Surface pressure.
nd

d. Ram preventers should be equipped with an integral or remotely operated locking system.
lI

6.4.2 Control System for Subsea BOP Stack


Oi

For subsea operations, BOP operating and control equipment should include:

I. Floating drilling rigs experience vessel motion, which necessitates placement of the BOP stack
on the sea floor. The control systems used on floating rigs are usually open-ended hydraulic
systems (spent hydraulic fluid vents to sea) and therefore employ water-based hydraulic control
fluids.

II. An independent automatic accumulator unit for subsea BOP control system complete with an
automatic mixing system to maintain mixed fluid ratios and levels of mixed hydraulic fluids.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 14


Well Control

III. The accumulator capacity should be sufficient for closing, and opening all ram type preventers,
annular preventers and fail-safe-close valves without recharging accumulator bottles, and the
remaining pressure should be either 200 psi above recommended precharge pressure or value
based on the closing ratio of ram preventer in use, whichever is more.

IV. The unit should be equipped with two or more pump system driven by independent power
source. Capacity of the pumps should meet following:

a. With accumulator isolated, each pump system should be capable of closing annular
preventer and opening fail-safe-close valve of choke within 2 minutes time.

te
b. Combined output of all the pumps should be capable of charging accumulator to the rated
pressure within 15 minutes.

ra
V. Accumulators should be installed on the BOP stack for quicker response of the functions, and

o
its precharge pressure should be compensated for water gradient.

ct
VI. Two full function remote control panels to operate BOP stack functions should be available, out
of which one should be accessible to driller on the rig floor. A flow meter for indicating control

ire
fluid flow should be located on each remote control panel.

VII. The remote panels should be connected to the control manifold in such a way that all functions
yD
can be operated independently from each panel.

VIII. The Subsea BOP stack shall have two fully redundant control pods. Each control pod should
t
contain all necessary valves and regulators to operate BOP stack and LMRP functions. The
fe

control pods may be retrievable or non-retrievable. To isolate the pods from one another, each
control pod shall be connected to a shuttle valve that is connected to each operable function.
Sa

IX. If one of the two PODS fails, the operations should be stopped, well secured and the faulty
POD should be made operational prior to resume the further operations.
try

IXA. Umbilical and Reels


us

a. There should be two or more means of surface to subsea power fluid supply. The rigid
conduit(s) are attached to the riser and provide the primary hydraulic supply to the subsea
control pods.
nd

b. The hot line hose supplies power fluid from the surface to subsea control pods mounted on
lI

the LMRP. The hot line is run, retrieved and stored on the hose reel.
Oi

c. The hot line(s) and MUX cable(s) should be secured to the riser by clamps to prevent
corrosion and damage. The outer sheath of the hot line and MUX cable should be inspected
visually for damage on retrieval.

d. The hot lines should be tested at MWP of the system once a year.

e. Re-terminations, repairs of Hot line and MUX cable should be tested at the RWP of the hose.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 15


Well Control

f. The MUX electrical cables supplies power and communication for control of the subsea pod
functions. The MUX cable should be run, retrieved and stored on a cable reel.

g. All underwater electrical umbilical cable terminations should be sealed to prevent water
migration into the cable in the event of connector failure or leakage and also to prevent water
migration from the cable into the subsea connector termination in the event of water intrusion
into the cable.

h. Individual connector terminations should be physically isolated so that sea water intrusion
does not cause electrical short circuiting.

te
i. The hose / MUX cable reel should be equipped with a brake, mechanical lock and guard.

ra
X. The BOP control system should be capable of closing each ram BOPs and opening or closing
fail-safe-close valves within 45 seconds. For annular preventer, closing time should not exceed

o
60 seconds. Time to unlatch the LMRP should be less than 45 seconds.

ct
XI. Secondary control system:

ire
ROV (Remotely operated vehicle) intervention: yD
a. The BOP stack should be equipped with ROV intervention equipment that at a minimum
allows the operation of critical functions i.e. shear ram, one pipe ram, ram locks and
unlatching of LMRP connector.
t
fe

b. The Hydraulic fluid can be supplied by the ROV, accumulators mounted on BOP stack or
an external hydraulic power source maintained at the well site.
Sa

c. All critical functions shall be fitted with single port docking receptacle designed in line
with the requirements of API - 17H. If a multiple receptacle type is used, the receptacle
try

and the functions should have positive identification.

Acoustic control system:


us

a) The acoustic control system is an optional control system designed to operate


designated BOP stack and LMRP functions. It may be used when the primary control
nd

system fails to operate.


lI

b) The hydraulic accumulator system may be used for both the acoustic system as well as
emergency control system.
Oi

c) The acoustic accumulators shall be capable of being completely discharged subsea prior
to recovering the BOP to surface.

XII. Precharge pressure of accumulator bottle in case of 3000 psi WP unit should be 1000 +/- 100
psi and in case 5000 psi WP unit should be 1500+/- 100 psi. Only Nitrogen should be used for
precharge.

XIII. Separate diverter control panel should be available at rig floor to operate all diverter control
functions. Second control panel should be provided in the safe and approachable area away
from rig floor.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 16


Well Control

XIV. If diverter control system is not self- contained, hydraulic power may be supplied from BOP
control system.

XV. The diverter control system should be designed to prohibit closing the diverter packer unless
diverting lines have been opened.

XVI. Air storage backup system should be provided with capability to operate all the pneumatic
functions at least twice in the event of loss of rig air pressure.

XVII. The drilling BOP shall have two annular preventers. One or both of the annular preventers

te
shall be part of the LMRP. It should be possible to bleed off gas trapped between the
preventers in a controlled way.

o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 17


Well Control

6.4.3 Deep Water Drilling Operations

For Deep water drilling operations following additional requirements should be met:

I. If two or more different size strings are run, blind-shear ram should be able to shear all sizes of
string.

II. Use of two blind-shear rams is preferred for ensuring the backup seal in case of unplanned
disconnect.

III. In addition to choke and kill lines, a dedicated boost line shall be provided for riser cleaning with

te
necessary boost line valves above the BOP stack.

ra
IV. In the event of full or partial evacuation of mud from the riser, to combat riser collapse, an anti-
collapse valve should be provided in the riser system allowing automatic entry of seawater.

o
V. ROV should be able to perform following functions:

ct
i. LMRP and wellhead connector unlatch.

ire
ii. LMRP and wellhead ring gasket release.
iii. Methanol / Glycol injection.
iv. Opening and closing of pipe rams and blind-shear rams.
yD
v. LMRP and Accumulator Dump.

VI. The need to utilize a multiplex BOP control system to meet the closing time requirements
t
should be evaluated for application, if required.
fe

VII. The kill-/choke line ID should be verified vis-à-vis acceptable pressure loss, to allow killing of
the well at predefined kill rates. The kill-/choke line should not be less than 88.9 mm (3½
Sa

inches).

VIII. It should be possible to monitor the shut-in casing pressure through the kill line when
try

circulating out an influx by means of the work string / test tubing / tubing.

IX. It should be possible to monitor BOP pressure and temperature at surface, through appropriate
us

means.

X. It should be possible to flush wellhead connector with antifreeze liquid solution by using the
nd

BOP accumulator bottles or with a ROV system or other methods.

XI. Detailed riser verification analysis should be performed with actual environment and well data
lI

(i.e. weather data, current profiles, rig characteristics etc.) and should be verified by a 3rd. party.
Oi

XII. A simulated riser disconnect test should be conducted considering manageable emergency
weather / operational scenarios.

XIII. The riser should have the following:


 current meter
 riser inclination measurement devices along the riser
 riser tensioning system with an anti-recoil system to prevent riser damage during
disconnection

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 18


Well Control

 Flex joint wear bushing to reduce excessive flex joint wear


 Riser fill-up valve

XIV. Parameters that affect the stress situation of the riser should be systematically and frequently
collected and assessed to provide an optimum rig position that minimizes the effects of static
and dynamic loads.

XV. Wellhead and riser connector should be equipped with hydrate seal.

XVI. During drilling operations, to avoid any damage to drilling equipment in the event of station
keeping failure, there should be prescribed emergency disconnect procedures, clearly
indicating the point at which disconnect action is to be started.

te
XVII. In general, preparation for disconnect should begin at a distance with reference to well mouth,
when it is 2.5 % of water depth and disconnect should be initiated at 5.5 % of water depth.

ra
XVIIA. An Emergency Disconnect Sequence (EDS) shall be available on all subsea stacks of

o
Dynamically positioned drilling rigs. It is optional for moored drilling rigs.

ct
a. The EDS is a programmed sequence of events that operates the functions to leave the

ire
stack and control the desired state and disconnect the LMRP from the lower stack.
b. The number of sequence, timing and functions of EDS are specific to the rig, equipment
and location.
yD
c. There shall be a minimum of two separate locations from where the EDS can be
activated.
t
XVIII. Emergency disconnect should include the following:
fe

i. Hang up of the drill pipes on pipe rams.


Sa

ii. Shearing the drill pipe.


iii. Effect seal on the wellbore.
iv. Disconnect the LMRP.
try

v. Clear the BOP with LMRP.


vi. Safely capture the riser.
us

XIX. For monitoring riser angles, flex joint angle reading should be available at the driller console
on a real time basis and connected to an alarm on derrick floor.
nd

XX. In variance to 0.5 ppg kick margin normally considered, for deep water a variance of upto 0 .2
ppg for conductor casing interval and 0.3 ppg for surface casing interval can be considered.
lI

XXI. When using tapered drill pipe string there should be pipe rams to fit each pipe size. Variable
Oi

bore rams should have sufficient hang off load capacity.

XXII. Bending loads on the BOP flanges and connector shall be verified to withstand maximum
bending loads (e.g. highest allowable riser angle and highest expected drilling fluid density).

XXIII. The Dynamically positioned offshore Deep water drillings should be provided with emergency
BOP control system i.e. Autoshear” and “Deadman”.

a. The ‘Autoshear’ is a safety system designed to automatically shut in the well bore in the event
of an untended disconnect of LMRP. The ‘Autoshear’ system should be armed while latching
the BOP stack on to the wellhead.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 19


Well Control

b. The ‘Deadman’ is a safety system designed to automatically shut in the wellbore in the event
of a simultaneous failure of hydraulic supply and electrical supply of the drilling rig. The
‘Deadman’ system should be armed while latching the BOP stack on to well head.

c. The dedicated emergency accumulator system may be used for both the ‘Autoshear’ and
‘Deadman’ systems.

6.5 Choke and Kill Lines

6.5.1 Choke Lines and Choke Manifold Installation with Surface BOP

te
I. The choke manifold consists of high pressure pipe, fittings, flanges, valves, and manual

ra
and/or hydraulic operated adjustable chokes. This manifold may bleed off wellbore pressure
at a controlled rate or may stop fluid flow from the wellbore completely, as required.

o
II. For working pressure of 3000 psi and above, flanged, welded or clamped connections should

ct
be used on the component subjected to well pressure.

ire
III. Choke line from BOP to choke manifold and bleeding line should be of minimum 3 inches
nominal diameter. yD
IV. In downs tream of choke line alternate flow and flare routes should be provided so that
eroded / plugged or malfunctioning parts can be isolated for repair without interrupting flow
control.
t
fe

V. When buffer tanks are employed in downstream of chokes, provision should be made to
isolate a failure or malfunctioning without interrupting flow.
Sa

VI. The choke manifold should be placed in a readily accessible location, preferably outside of
the rig structure for Onshore rigs.
try

VII. All the choke manifold valves should be full opening and designed to operate in high pressure
gas and drilling fluid service.
us

VIII. All the connections and valves in the upstream of choke should have a working pressure at
least equal to the rated working pressure of ram preventer in use.
nd

IX. Choke manifold should be pressure tested as per the schedule as fixed for blowout preventer
lI

stack in use.
Oi

X. The spare parts for equipment subject to wear or damage should be readily available.

XI. Pressure gauges and sensors compatible to drilling fluid should be installed so that drill pipe
and annular pressures may be accurately monitored and readily observed at the station
where well control operations are to be conducted. These should be tested / calibrated as per
documented schedule.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 20


Well Control

XII. Preventive maintenance of the choke assembly and controls should be performed regularly,
checking particularly for corrosion, wear and plugged or damaged lines.

XIII. Spare parts requirement as per OEM should be considered. However, minimum spare parts
as listed below should be readily available:

i. One complete valve for each size installed.


ii. Two repair kits for each valve size installed.
iii. Parts for manually adjustable chokes, such as flow tips, seat and gate, inserts, packing,
gaskets, O-rings, disc assemblies, and wear sleeves.

te
iv. Parts for remotely controlled choke(s).
v. Miscellaneous items such as hose, flexible tubing, electrical cable, pressure gauges,
small control line valves, fittings and electrical components.

ra
XIV. The following are the recommendations for choke installation up to 5000 psi WP rating:

o
ct
i. Use two manually operated adjustable chokes (out of two chokes, use of one remotely
operated choke is optional).

ire
ii. At least one valve should be installed in upstream of each choke in the manifold.

XV. The following are the recommendations for choke installation of 10000 psi WP and above
rating:
yD
i. One manually operated adjustable choke and at least one remotely operated choke
should be installed. If prolonged use of this choke is anticipated, a second remotely
t
operated choke should be used.
fe

ii. Two valves should be installed in upstream of each choke in the manifold.
iii. The remotely operated choke should be equipped with an emergency backup system
Sa

such as a manual pump or nitrogen for use in the event rig air becomes unavailable.
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 21


Well Control

6.5.2 Kill Lines and Kill Manifold Installation with Surface BOP

I. The kill line system provides a means of pumping into the wellbore when the normal method
of circulating down through the Kelly or drill pipe cannot be employed. The kill line connects
the drilling fluid pumps to a side outlet on the BOP stack.

II. All lines valves, check valves and flow fittings should have a working pressure at least equal
to the rated working pressure of the ram BOPs in use. The equipment should be tested on
installation and periodic operation, inspection; testing and maintenance should be performed
as per the schedule fixed for the BOP stack in use, unless OEM’s recommendations dictate
otherwise.

te
III. Line size should be minimum 2 inches nominal diameter.

IV. Two full bore valves (manual / HCR) should be installed for up to 3000 psi manifold. Use of

ra
check valve is optional.

o
V. Two full bore manual valves and a check valve or one full bore manual and one HCR valve
should be used in kill line in 5000 psi and above pressure rating manifold.

ct
VI. Spare parts requirement as per OEM should be considered. However, minimum spare parts

ire
as listed below should be readily available:

i. One complete valve for each size installed.


yD
ii. Two repair kits for each valve size utilised.
iii. Miscellaneous items such as hose, flexible tubing, electrical cable, pressure gauges
etc.
t
fe

6.5.3 Choke and Kill Lines Installation with Subsea BOP Stack
Sa

I. Subsea BOP choke and kill lines are connected through choke manifold to permit pumping or
flowing through either line.
try

II. Choke and kill line should be of minimum three inches nominal diameter.

III. One kill / choke line should be connected to lower most side outlet of BOP.
us

IV. There should be minimum one choke line and one kill line connection above lower ram BOP.
nd

V. The ram BOP outlet connected to choke or kill line should have two full opening hydraulically
operated fail-safe-close valves adjacent to preventer.
lI

VI. Connector pressure sealing elements should be inspected, changed as required, and tested
Oi

before being placed in service. Periodic pressure testing is recommended during installation.
Pressure rating of all lines and sealing elements should be at least equal to the rating of ram
BOP.

VII. Periodic flushing of choke and kill line should be carried out to avoid plugging since they are
normally closed.

VIII. Flexible connections required for choke and kill lines should have pressure rating at least
equal to the rated working pressure of ram BOP.

IX. Spare parts requirement as per OEM should be considered. However, minimum spare parts
as listed below should be readily available:

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 22


Well Control

i. One complete valve of each size installed.


ii. Two repair kits for each valve size in use.
iii. Sealing elements for choke and kill lines.

6.6 Wellhead, BOP Equipment and Choke & Kill Lines Installation

I. Wellhead equipment should withstand anticipated surface pressures and allow for future
remedial operations. Wellhead should be tested on installation.

II. Prior to drilling out the casing shoe, the casing should be pressure tested. Pressure test of all
casing strings including production casing / liner should be done to ensure integrity of casing.

te
III. When the well head and BOP stack used are of higher working pressure than the required as
per design of the specific well, the equipment may not be tested to its rated pressure.

ra
IV. When ram type preventers are installed the side outlets should be below the rams.

o
V. All connections, valves, fittings, piping etc. exposed to well pressure, should be flanged or

ct
clamped or welded and must have a minimum working pressure equal to the rated working
pressure of the preventers.

ire
VI. Always install new and clean API ring gaskets. Check for any damage in the ring as well as
grooves before use.
yD
VII. Correct size bolts/nuts and fittings should be used and tightened to the recommended torque.
All connections should be pressure tested before drilling is resumed.
t
fe

VIII. All manually operated valves should be equipped with hand wheels, and always be kept
ready for use.
Sa

IX. Ram type preventers should have locking arrangement manual or auto lock.

X. Wellhead side-outlets should not be used for killing purpose, except in case of emergencies.
try

XI. Kill lines should not be used for routine fill up operations.
us

XII. All sharp bends in high pressure lines should be of targeted type.
nd

XIII. All choke and kill lines should be as straight as practicable and firmly anchored to prevent
excessive whip or vibration. Choke and Kill manifolds should also be anchored.
lI

XIV. All control valves of BOP control unit be either in the fully close or open position as required
and should not be left in block or neutral position during operations.
Oi

XV. Control valve of blind / blind–shear ram should be protected to avoid unintentional operation
from the remote panel.

XVI. Recommended oil level should be maintained in the control unit reservoir.

XVII. Outlets of all sections of well head should have at least one gate valve.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 23


Well Control

6.7 Blowout Preventer Testing

6.7.1 Function Test

I. All operational components of the BOP equipment systems and diverter (if in use) should be
function tested at least once a week to verify the components’ intended operations.

II. BOP stack should be function tested for “CLOSE’ and “OPEN” functions separately.

III. The test should be preferably conducted when the drill string is inside casing except blind shear ram.

IV. Both pneumatic and electric pump of accumulator unit should be turned off after recording initial

te
Accumulator pressure.

ra
V. All the blowout preventers and hydraulically operated remote valve (HCR) in choke / kill line
should be function tested. Closing time of rams and opening time of HCR should be recorded.

o
VI. For surface BOP stack closing time should not exceed 30 seconds for each ram preventers and

ct
annular preventers smaller than 18¾" and 45 seconds for annular preventer of 18¾" and larger
size. For sub-sea BOP stack closing time should not exceed 45 seconds for all ram preventers

ire
and 60 seconds for annular preventers.

VII. Operating response time for choke and kill valves (either open or close) should not exceed the
yD
minimum observed ram BOP close response time.

VIII. Function test should be carried out alternately from main control unit / rig floor panel / auxiliary
t
panel.
fe

IX. Record the accumulator pressures dr op after each “Close” or “Open” function (with
Sa

charging pump shut). The final accumulator pressures after all the functions should not be
less than 200 psi above the recommended precharge pressure of accumulator bottles.
try

X. All the gate valves and blow out preventers should be returned to their original position before
resuming operations.
us

XI. All the results should be recorded in the prescribed format (Annexure-VII).
nd

6.7.2 Pressure Test

I. All blowout prevention components that may be exposed to well pressure should be tested first
lI

to a low pressure and then to a high pressure. These include blowout preventer stack, all
choke manifold components upstream of choke, kill manifold / valves, kelly valves, Top-drive
Oi

safety valves drill pipe and tubing safety valves and drilling spools (if in use). Pressure test
(both low and high) on each component should be of minimum 5 minutes duration, each.
All the results should be recorded in the format. (Annexure - VIII)

II. Test BOP using cup tester or test plug (Preferably).

III. Before pressure testing of BOP stack, choke and kill manifold should be flushed with clean
water.

IV. Clean water should be used as test fluid. However for high pressure gas wells, use of inert gas
such as N2 (nitrogen) as test fluid is desirable.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 24


Well Control

V. High pressure testing unit with pressure chart recorder be used for pressure testing.

VI. Use test stump for sub-sea BOP stack pressure testing.

VII. Well control equipment should be pressure tested:

a. When installed.
b. After setting each casing string.
c. Following repairs that require breaking a pressure connection.
d. But not less than once every 21 days.

VIII. Low pressure test should be carried out at 200-300 psi.

te
IX. Once the equipment passes the low pressure test, it should be tested to high pressure.

ra
X. Initial pressure test of blowout preventer stack, manifold, valves etc., should be carried out at
the rated working pressure of the preventer stack or well- head whichever is lower. Initial

o
pressure test is defined as those tests that should be performed on location before the well is
spudded or before the equipment is put into operational service.

ct
XI. Subsequent high pressure tests should be carried out at a pressure greater than maximum

ire
anticipated surface pressure. Exception is the annular preventer which should be tested to
70% of its rated pressure or maximum anticipated surface pressure whichever is lower.
yD
XII. The pipe used for testing should be of sufficient weight and grade to safely withstand tensile,
yield, collapse, or internal pressures.
t
XIII. Precaution should be taken not to expose the casing to pressures in excess of its rated
fe

strength. A means should be provided to prevent pressure build up on the casing in the event
the test tool leaks (wellhead valve should be kept open when pressure testing with test plug).
Sa

XIV. Pressure should be applied from the direction in which all the BOPs choke and kill manifold,
FOSV / Kelly cock, Top drive safety valve etc. would experience pressure during kick.
try

XV. FOSV, IBOP, Upper & Lower Kelly cock, Top drive safety Valves, HCR and Manual
Valves, Choke & Kill line manifold shall also be pressure tested along with the BOP Stack
at the same pressure.
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 25


Well Control

6.8 Minimum Requirements for Well Control Equipment for Workover operations (on land)

For workover operations:

I. Stack arrangement for workover rigs should be same as per clause number 6.3

II. Kill line should be of minimum 2 inch size.

III. One independent automatic accumulator unit with a control manifold, clearly showing open and
closed positions, for preventer(s) to be provided. The accumulator capacity should be

te
adequate for closing all the preventers without recharging accumulators. Unit should be
located at safe easily accessible place.

ra
IV. The BOP stack should have remote control panel clearly showing open and closed positions for
each preventer. This Control Panel should be located near to the driller’s position.

o
ct
V. Trip tank should be installed on workover rig deployed for servicing of wells. (It is must for the
wells having gas in the formation fluid and oil wells where formation pressure is

ire
hydrostatic or more) f o r continuous fill up and monitoring the hole during round trips.
Indicator to monitor tank level can be either mechanical or digital and clearly visible to driller.
The minimum capacity of trip tank in work-over rigs should be 30 bbls.
yD
VI. Full opening safety valve of drill string / tubing size and matching thread connection should
always be available at derrick floor during well servicing. It should be kept ready in 'open'
position for use with operating wrench. Operating wrench(s) should be kept at a designated
t
fe

place.
Sa

VII. Sufficient volume of the workover fluid should be available in reserve during workover
operations.
try

VIII. During conventional production testing, well should be perforated with adequate overbalance.

IX. After release of the packer the string should be reciprocated, to ensure complete retraction of
us

packer elements, prior to pull out of string. It should be ensured that there is no swabbing
action.
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 26


Well Control

7.0 Procedures and Techniques for Well Control (Prevention and Control of Kick)

7.1 Cause of Kick

Kick may be caused due to

I. Encountering higher than anticipated pore pressure


II. Reduction in hydrostatic pressure in the well bore

7.2 Cause of Reduction in Hydrostatic Head

I Failure to keep the hole full of drilling fluid


II. Swabbing

te
III. Loss of circulation
IV. Insufficient drilling fluid density

ra
V. Gas cut drilling fluid
VI. Loss of riser drilling fluid column

o
7.3 Kick Indications

ct
Primary Indications of kick:

ire
I. Increase in drilling fluid return rate
II. Pit gain or loss
yD
Secondary Indication of kick:
t
I. Changes in flow line temperature
fe

II. Drilling breaks


III. Pump pressure decease and pump stroke increase
Sa

IV. Drilling fluid density reduction


V. Oil & Gas show
VI. Change in shape & size of drilled cuttings
try

7.4 Prevention and Control of Kick


us

In case of overbalance drilling:

I. The planned drilling safety margin is difference between planned drilling fluid weight and
nd

estimated pore pressure.

II. To maintain primary well control, drilling personnel should ensure that the hydrostatic
lI

pressure in the wellbore is always greater than the formation pressure by safety margin.
Oi

III. The use of trip margin (which is in addition to safety margin) is encouraged to offset the
effects of swabbing and equivalent circulating density (ECD). The additional hydrostatic
pressure will permit some degree of swabbing without losing primary well control.

IV. Successful well control (Blowout prevention programme) includes following elements:

a. Training of personnel and drills.


b. Monitoring and maintaining drilling fluid system.
c. Selection of appropriate well control equipment.
d. Installation, maintenance and testing of well control equipment.
e. Adoption of established well control procedures.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 27


Well Control

7.4.1 Precautions before Tripping Out

I. Conditioning of drilling fluid prior to tripping out should be ensured. This should include:

a. No indication of influx of formation fluids.


b. The drilling fluid density in and out should not differ more than 0.024 gm/cc (0.2 ppg.) in
open hole. In cased hole there should not be any difference.
II. A trip tank shall be lined up and function tested. Trip sheet shall be ready to be filled during
tripping out to monitor the well behavior during pulling out operation (Annexure-VI).

III. Full opening safety valve(s) with suitable working pressure and with proper connections and

te
size, to fit all drill string connections, must be available on the rig floor. They should be kept
ready in 'open' position for use with operating wrench. Operating wrench(s) should be kept at

ra
a designated place.

o
IV. An inside BOP, drill pipe float valve or drop in check valve should be available for use
whenever stripping is required to be done.

ct
V. As far as possible tripping out should be dry. If tripping out is wet, proper mud bucket should

ire
be used enabling mud to flow back to the return channel.

7.4.2 Precautions during Tripping Out


yD
I. Well should be checked for swabbing during pulling out. If positive, suitable corrective
measures such as change in tripping speed, tripping out with pump on, change in drilling fluid
t
properties like yield point, gel strength should be taken.
fe

II. Trip tank volume should be monitored and same should be recorded in the trip sheet
Sa

(Annexure -VI).

III. If hole is not taking proper amount of mud (as per trip sheet), stop tripping and conduct flow
check to ensure whether the well is self-flowing. If positive, shut the well, record the pressures
try

and circulate out the kick by suitable well control method. If no self-flow is observed, run back
to the bottom and circulate and condition the drilling fluid.
us

IV. Flow checks should be carried out:


nd

i. Prior to all trips out of the hole.


ii. During first 10 stands.
iii. At the casing shoes.
lI

iv. Prior to tripping out of drill collars through BOP stack.


Oi

V. Any time a trip is interrupted, safety valve should be installed on the drill string. The drill string
should be on elevators during waiting.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 28


Well Control

7.4.3 Precautions during Tripping In

I. Regular flow checks and monitoring of level in annulus should be done. Where situation
requires trip tank may be used to monitor drilling fluid loss/gain.

II. Circulation should be given to break gelation of mud as per requirements especially in deep
wells and where heavy mud is used.

III. With a float valve in the string, drill pipe should be filled up intermittently.

7.4.4 Precautions during Casing Lowering

te
I. Regular flow checks and monitoring of level in annulus should be done and fill up schedule of
casing pipe / liner should be followed as per the plan and use clean mud for
casing/liner filling.

ra
II. Running in speed of casing/liner should be maintained considering allowable surge pressure.

o
ct
7.4.5 Pre-kick Planning

ire
I. A plan detailing what actions are to be taken should a kick occur must be available. Plan
should consider equipment limitations, casing setting depths, maximum fluid density,
pressures that may be encountered, fracture gradients and expected hazards.
yD
II. This should also include roles responsibilities of the personnel during kick.
t
III. The following information should be pre-recorded for use in kill sheet preparation: casing data,
fe

s af e working pressure limit for surface BOP equipment, wellhead, casing string. maximum
allowable casing pressure, contingency plan, pump rate (SCR), system pressure losses,
capacities-displacement, mud pump data, drilling fluid mixing capability, trip margin, water
Sa

depth (offshore), well profile and shut-in method to be used (soft / hard shut in).

IV. Record slow circulating rates at 1/3 and 1/2 the pump speed of drilling SPM at:
try

a. the beginning of every shift


b. any time the mud weight is changed
c. after drilling 500 feet/150 mtrs. of new hole
us

d. after bit change


e. after pump repairs
f. after each trip due to change in BHA, bit nozzle.
nd

V. LOT / PIT after each casing should be known. Whenever LOT / PIT is to be carried out, 2-3
lI

meters of fresh formation should be drilled.


Oi

VI. Distance from rotary table to blowout preventer (s) be noted and sketch displayed in dog
house and Toolpusher's office.

VII. Based on the risk assessment of the well and depending upon the situation, well control
method to be used should be selected. Plan and procedures for special situations such as
casing pressure reaching maximum allowable annular surface pressure (MAASP) should be
available at the installation (contingency plan).

VIII. Shut in method to be used should also be pre-selected in the kill sheet.

IX. Sufficient quantity of drilling fluid weighting materials and chemicals must be stored to meet
any kick situation.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 29


Well Control

7.5 Kick Control Procedures

Following are recommended well control procedures for surface stack and sub-sea.

7.5.1 Surface Stack

For onshore and bottom-supported offshore installations:

A. During Drilling

te
I. Stop drilling
II. Pick up Kelly to position tool joint

ra
III. Stop mud pump.
IV. Check for self-flow.
V. If positive, proceed further to close the well by any one of the following procedures (Refer

o
Table-1).

ct
 Soft shut in

ire
 Hard shut in

TABLE - 1
t yD
Sl. No. Soft Shut – in Hard Shut – in
fe

1. Open hydraulic control valve Close Blow out Preventer.


(HCR valve) / manual valve on (Preferably Annular Preventer)
Sa

choke line.
2. Close Blowout Preventer. Open HCR/Manual valve on choke line
when choke is in fully closed position.
try

3. Gradually close adjustable Allow pressure to stabilise and record


/remotely operated choke, SIDPP, SICP and Pit Gain.
monitoring casing pressure.
us

4. Allow the pressure to stabilize and


record SIDPP, SICP and Pit gain. -------------
nd

VI. Monitor the casing pressure. If the casing pressure is about to exceed MAASP, follow
lI

the contingency plan.


Oi

VII. Calculate the drilling fluid density required to kill the kick.

VIII. Initiate the approved / selected well kill method.

IX. Check rig crew duties and stations.

X. Review and update the well control worksheet.

XI. Check pressures of all annuli of the well.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 30


Well Control

B. During Tripping

During tripping whenever flow is observed:

I. Position tool joint above rotary table and set pipe on slips.

II. Install Full Opening Safety Valve (FOSV) in open position on the drill p i p e and close it.

III. Close the well following any one of the procedures as per above table. (table - 1)

te
IV. Monitor the casing pressure. If the casing pressure is about to exceed MAASP, follow the
contingency plan.

ra
V. Calculate the drilling fluid density required to kill the kick.

o
VI. Initiate the approved / selected well kill method.

ct
VII. Check rig crew duties and stations.

ire
VIII. Review and update the well control worksheet. yD
IX. Check pressures of all annuli of the well.

C. When String is out of Hole


t
fe

I. Close blind / blind-shear ram.


Sa

II. Record shut in pressure.

III. Monitor the casing pressure. If the casing pressure is about to exceed maximum allowed
try

(MAASP), follow the contingency plan.

IV. Calculate the drilling fluid density to kill the kick.


us

V. Initiate the approved /selected well kill method.


nd

VI. Check rig crew duties and stations.


lI

VII. Review and update the well control worksheet.


Oi

VIII. Check pressures on all annuli of the well.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage
resulting from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 31


Well Control

7.5.2 Floating Installations (Sub Sea)

A. During Drilling

I. Stop drilling

II. Position the tool joint for the BOP’s operation.

III. Shut down the drilling fluid pump(s).

te
IV. Check the well for flow – if it is flowing, follow shut in procedure.

ra
V. If the soft shut-in procedure has been selected: open the choke line, close Annular BOP and
close the choke.

o
VI. If the hard shut-in procedure has been selected: close Annular BOP and open the choke line

ct
with the choke in closed position.

ire
VII. Observe the casing pressure, if it exceeds MAASP, follow the contingency plan.

VIII. Check for trapped gas pressure.


yD
IX. For release of trapped gas, close the uppermost rams below the choke line and close the
diverter, open the annular preventer to allow trapped gas to rise, displace riser with kill fluid
t
and close the annular preventer, reopen the ram preventer.
fe

X. Adjust the closing pressure on the annular preventer to allow stripping of tool joints.
Sa

XI. Hang off the drill pipe as follows:


try

With a motion compensator:


I. Position a tool joint above the hang-off rams leaving the lower Kelly cock high enough
above the floor to be accessible during the maximum expected heave and tide when the
us

selected tool joint rests on the hang-off rams.

II. Close the hang-off rams.


nd

III. Carefully lower the drill string until the tool joint rests on the hang-off rams.
lI

IV. Reduce support pressure on the motion compensator to support about half of the weight
Oi

of drill string above the BOPs plus some overpull to provide drill string tension to assist
shearing, if required.

Without a motion compensator:

i. Set the slips on the top joint of drill pipe.

ii. Close the lower Kelly cock.

iii. Break the Kelly/top drive connection above the lower Kelly cock and put it in the rat hole.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 32


Well Control

iv. Pick up the assembled space-out joint, safety valve, and circulating head with the safety
valve closed. Make up the space-out joint on the closed lower Kelly cock.

v. Open the lower Kelly cock, remove the slips, and position tool joint above the hang-off
rams leaving the safety valve high enough above the floor to be accessible during the
maximum expected heave and tide when the selected joint rests on the hang-off rams.

vi. Close the hang-off rams.

vii. Carefully lower the drill string until the tool joint lands on the closed hang-off rams. Slack
off the entire weight of drill string while holding tension on the circulating head with a
tension device.

te
viii. Connect the circulating head to the standpipe, open the safety valve.

ra
ix. Allow the shut-in pressure to stabilize and record pressures.

o
x. Determine the volume of the kick.

ct
xi. Calculate the drilling fluid density required to kill the kick.

ire
xii. Select a kill method. yD
xiii. Check rig crew duties and stations.

xiv. Review and update well control worksheet.


t
fe

xv. Inspect the BOP stack with television, if feasible


Sa

B. During Tripping
try

I. Install safety valve.

II. Position the tool joint for the BOP’s operation.


us

III. Check the well for flow – if it is flowing, follow shut in procedure.
nd

IV. If the soft shut-in procedure has been selected: open the choke line, close Annular BOP and
close the choke.
lI

V. If the hard shut-in procedure has been selected: close Annular BOP and open the choke line
with the choke in closed position.
Oi

VI. Observe the casing pressure, if it exceeds MAASP, follow the contingency plan.

VII. Check for trapped gas pressure.


VIII. For release of trapped gas, close the uppermost rams below the choke line and close the
diverter, open the annular preventer to allow trapped gas to rise, displace riser with kill fluid
and close the annular preventer, reopen the ram preventer.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 33


Well Control

IX. Adjust the closing pressure on the annular preventer to allow stripping of tool joints.

X. Hang off the drill pipe as follows:

a. With a motion compensator:

i. Position a tool joint above the hang-off rams leaving the safety valve high enough above
the floor to be accessible during the maximum expected heave and tide when the
selected tool joint rests on the hang-off rams.

ii. Close the hang-off rams.

te
iii. Carefully lower the drill string until the tool joint rests on the hang-off rams.

ra
iv. Reduce support pressure on the motion compensator to support about half of the weight
of drill string above the BOPs plus some overpull to provide drill string tension to assist

o
shearing, if required.

ct
b. Without a motion compensator:

ire
i. Pick up the assembled space-out joint, safety valve, and circulating head with the safety
valve closed. Make up the space-out joint on the string.
ii. Open the safety valve, remove the slips, and position tool joint above the hang-off rams
yD
leaving the safety valve high enough above the floor to be accessible during the
maximum expected heave and tide when the selected joint rests on the hang-off rams.
t
iii. Close the hang-off rams.
fe

iv. Carefully lower the drill string until the tool joint lands on the closed hang-off rams. Slack
Sa

off the entire weight of drill string while holding tension on the circulating head with a
tension device.

v. Connect the circulating head to the standpipe, open the safety valve.
try

vi. Allow the shut-in pressure to stablise and record pressures.


us

vii. Determine the volume of the kick.


nd

viii. Calculate the drilling fluid density required to kill the kick.

ix. Select a kill method.


lI

x. Check rig crew duties and stations.


Oi

xi. Review and update well control worksheet.

xii. Inspect the BOP stack with television, if feasible

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 34


Well Control

C. When String is Out of Hole

I. At the first indication of the well flowing, close the blind / blind-shear rams.

II. Open the gate valve on the subsea BOP stack to open the choke line, close the choke line at
the surface.

III. Record shut-in pressures. Wt. (specific gravity) of fluid in the choke line should be considered
for calculating shut-in casing pressure.

IV. Record the kick volume.

V. Run the drill string in the hole to the top of the BOPs with NRV.

te
VI. Add the hydrostatic pressure of the fluid in the choke line to the surface pressure to determine

ra
the pressure below the blind rams.

VII. Determine if the pressure below the blind rams can be overbalanced by hydrostatic pressure

o
of the drilling fluid that can be safely contained by the riser. If so, adjust the riser tensioners to

ct
support the additional drilling fluid weight and displace the drilling fluid in the riser with drilling
fluid of the required density.

ire
VIII. Close the diverter. Open the BOPs and watch for flow. If the well does not flow, open the
diverter and trip in the hole.
yD
IX. If the well starts to flow, close the blind ram preventer, displace the choke and kill lines with
heavy drilling fluid, and circulate until the riser contains drilling fluid of the desired density.
t
X. Continue going in the hole. Stop periodically, close the pipe rams, and circulate the riser by
fe

pumping down the kill line to maintain the required drilling fluid density in the riser.
Sa

After well killing and before resuming normal operations, density of drilling fluid should be
reviewed to include trip margin above kill mud weight.
try

8.0 Drills and Training

I. The competence with which drilling personnel respond to well control situations and follow
us

correct procedures can be improved by carrying out emergency drills. All the key operational
personnel should have valid well control training certificate from IWCF/IADC accredited well
control training centre.
nd

II. While drilling in H2S / sour gas prone area, detectors shall be installed and breathing apparatus
in sufficient quantity and cascade system shall be made available. Crew shall be trained to
lI

handle situations in this environment.


Oi

III. Organization should assign specific responsibilities to the identified / designated persons, for
actions required during an emergency related to well control, which would be part of rig ERP.

a. Following drills should be performed.


1 Pit drill
2 Trip drill

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 35


Well Control

b. To conduct a drill, a kick should be simulated by manipulating primary kick indicator such as
the pit level indicator or the flow line indicator by raising its float gradually and checking for the
alarm.

c. The reaction time from float raising to the designated crew member's readiness to start the
closing procedure should be recorded and response time should not be more than 60
seconds.

d. Total time taken to complete the drill should be recorded and it should not be more than 2
minutes.

e. Drill should be initiated without prior warning during routine operation.

te
f. Drill should be conducted once a week with each crew.

ra
g. Drill should be initiated at unscheduled times when operations and hole condition permits.

o
ct
8.1 Pit Drill (On bottom)

ire
I. Raise alarm by raising mud tank float -automatic or oral.

II. Stop drilling / other operation in progress.


yD
III. Position tool joint for BOPs’ ram closing.
t
IV. Stop mud pump
fe

V. Secure brake
Sa

VI. During / after the above steps, as applicable, designated crew should move to assigned
positions
try

VII. Check for self-flow


us

VIII. Record the response time.

Trip Drill (Drill Pipe in BOP)


nd

I. Give signal by raising alarm.


lI

II. Position tool joint above rotary and set the pipe on slips
Oi

III. Install full opening safety valve in open position.

IV. Close FOSV after installation

V. Designated crew members should move to assigned position, during / after the above steps, as
applicable.

VI. Close BOP

VII. Record response time.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 36


Well Control

Note: Trip drill should be carried out preferably when bit is inside the casing. A full opening safety
valve for each size and type of connection in the string shall be available on derrick floor, in open
position. Safety valves may be clearly marked for size and connection.

Trip Drill (Collar in Blowout Preventer)

I. Give signal by raising alarm.

II. Position upper drill collar box at rotary table and set it on slips.

III. Connect a drill pipe joint or stand of drill pipe on drill collar tool joint with change over sub and

te
position drill pipe in BOP.

ra
IV. Install FOSV in open position.

o
V. Close FOSV.

ct
VI. Close BOP.

ire
VII. Record response time.

Note: Under actual kick conditions (other than drills) if only one stand of drill collar remains in the
yD
hole it would be probably faster to simply pull the last stand and close the blind ram. If
numbers of drill collar stands are more and well condition does not permit step III than install
FOSV with change over sub on drill collar, close it and close annular preventer.
t
Preparation for step III above should be done in advance prior to starting pull out of drill collar
fe

- make one single / stand of drill pipe with drill collar change over sub.
Sa

Trip Drill (String is out of Hole)

I. Give signal by raising alarm.


try

II. Close blind/ blind-shear ram.


us

III. Record response time.

Well Control Training


nd

Asstt. Shift Incharge / Asstt. Driller, supervisor and all the key operational personnel should have valid
lI

well control training certificate (of appropriate level) from IWCF/IADC accredited well control training
center.
Oi

At least one trained person should always be present on derrick floor to observe well for any activity
even during shutdown period

9.0 Monitoring System

9.1 Instrumentation Systems

I. Driller's console should have gauges and meters including drillo-meter, SPM meters, pump
pressure gauge, rotary torque. The Record-o-graph should record parameters like weight,
SPM, pump pressure, rotary torque, rate of penetration. Drillers console should be positioned
in such a way that driller can see all the gauges without any obstruction.

II. Flow rate sensor should be installed for monitoring return mud flow with high / low alarms.
“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 37


Well Control

III. Mud / pit volume totalizer should be installed for all the reserve and active mud tanks to detect
mud tank level's deviation with an accuracy of + one barrel. Mud volume totalizer should have
high / low alarm (visual or audible setting).

IV. Gas detector should always be available. Gas measurement should be carried out near the
point where the mud from the well mouth surfaces (Shale shaker and rig sub structure).

9.2 Trip Tank System

I. On a drilling rig, the trip tank shall always be in operation during tripping operation, particularly
during pulling out operation, for early detection of a kick.

II. The primary purpose of the trip tank is to measure the amount of drilling fluid required to fill the

te
hole while pulling pipe to determine if the drilling fluid volume matches pipe displacement.

ra
III. A trip tank is a low-volume calibrated tank which can be isolated from the remainder of the
surface drilling fluid system and used to accurately monitor the amount of fluid going into or

o
coming out from the well. A trip tank should be calibrated accurately and should have means
for reading the volume contained in the tank at any liquid level. The readout may be direct or

ct
remote, preferably both. The size of the tank and readout arrangement should be such that
volume changes in the order of can be easily detected.

ire
9.3 Mud Gas Separator (MGS) yD
Atmospheric Mud Gas Separator should be installed. Liquid seal should be maintained to
prevent gas blow through shale shaker. Vent line should be away from derrick floor. The rig
maintenance and inspection schedule should provide for periodic non-destructive examination
t
of the mud gas separator to verify pressure integrity. This examination may be performed by
fe

hydrostatic, ultrasonic, or other examination methods.


Sa

9.4 Degasser

A degasser should be used to remove entrained gas bubbles in the drilling fluid that are too
try

small to be removed by the mud gas separator. Most degassers use some degree of vacuum
to assist in removing the entrained gas.
us

All flare lines should be as long as practical with provision of flaring during varying wind
directions. Flare lines should be straight as far as possible and should be securely anchored.
nd

Degasser should be function tested at least once a week.


lI

10.0 Under Balanced Drilling


Oi

Primary well control during Under Balanced Drilling (UBD) is maintained by flow and pressure
control. The bottom hole pressure and the reservoir influx is monitored and controlled by
means of a closed loop surface system. This system includes rotating control device (RCD),
flowline, emergency shutdown valve (ESDV), choke manifold and surface separation system.

The following are the recommended equipment for UBD operations:

I. The RCD shall be installed above the drilling BOP and shall be capable of sealing the
maximum expected wellhead circulating pressure against the rotating work string and
containing the maximum expected shut-in wellhead pressure against a stationary work string.
The RCD is a drill through device with a rotating seal that is designed to contact and seal

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 38


Well Control

against the work string (drill string, casing, completion string, etc.) for the purpose of
controlling the pressure and fluid flow to surface. Its function is to contain fluids in the wellbore
and divert flow from the wellbore to the surface fluids handling equipment during
underbalanced operations (drilling, tripping and running completion equipment).

II. The return flow line shall have two valves, one of which shall be remotely operated and fail-
safe-close (ESDV). The flow line and the valves shall have a working pressure equal to or
greater than the anticipated shut-in wellhead pressure. At least one valve should be installed
in the diverter/flow line immediately adjacent to the BOP stack.

III. A dedicated UBD choke manifold shall be used to control the flow rate and wellbore pressure,
and reduce the pressure at surface to acceptable levels before entering the separation
equipment. The choke manifold shall have a working pressure equal to or greater than the

te
anticipated shut-in wellhead pressure. The choke manifold should have two chokes and
isolation valves for each choke and flow path. Applied surface backpressure should be kept to
a minimum to reduce erosion of chokes and other surface equipment.

ra
IV. A surface separation system shall be selected and dimensioned to handle the anticipated

o
fluid/solids in the return flow. Plugging, erosion or wash-outs of surface equipment should not

ct
impact the ability to maintain primary well control.

ire
V. The drill pipe and casing should be designed for exposure to hydrogen sulphide (H2S) gas.

VI. The BOP stack, flow / diverter line, and bleed off and kill lines should be designed for
yD
exposure to H2S in accordance with NACE (MR 075) / ISO 15156 specifications.

VII. Blind-shear rams should be considered for underbalanced drilling of wells with high Hydrogen
Sulphide (H2S) potential.
t
fe

VIII. A stab-in safety valve for the string in use should be available on the rig floor.
Sa

10.1 Procedures for UBD

I. Procedures for UBD operations should be developed based on risk analysis and risk
try

assessments. These procedures should include:


i. Kicking of the well
ii. Making connections
us

iii. Live well tripping


iv. Trapped pressure in equipment.
nd

II. When running a work string under balanced, two NRVs shall be installed in the string as deep
a n d as close together as possible. Installation of additional NRVs should be considered
depending on the nature of the operation (i.e. high-pressure gas). The NRV should have a
lI

minimum working pressure rating equal to the maximum expected BHP.


Oi

III. Snubbing facilities should be used or the well should be killed with a kill weight fluid prior to
tripping pipe, if the shut-in or flowing wellhead pressure can produce a pipe light condition and
a down hole isolation valve (DIV), a retrievable packer system or similar shut-in device, is not in
use or is not functioning as designed. The DIV is a full-opening drill through valve, installed
down-hole as an integral part of a casing / liner string, at a depth either below the maximum
pipe light depth for the work string being tripped in the underbalanced operation (drill string,
casing, completion string, etc.) or at a depth that allows the maximum length of BHA, slotted
liner or sand screen required to be safely deployed, without having to snub in or kill the well
prior to deployment. DIV should have working pressure rating of more than maximum expected
differential pressure after closure.

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 39


Well Control

IV. Sufficient kill fluid of required density should be available on site at any time to enable killing of
the well in an emergency.

V. While still in the design stage, a meeting including all key personnel should be held to discuss
the proposed operation so that everyone clearly understands their responsibilities with respect
to safety. A key element in planning a safe operation is the site layout. The following
considerations should be made when designing the well-site layout:
i. Prevailing winds
ii. Access to fluids handling equipment
iii. Equipment placement
iv. High pressure line placement

te
VI. At no time the well should be left open to the rig floor when the well is live.

VII. Trapped gas below the float should be removed safely before removing the float from the drill

ra
string during pulling out.

o
VIII. If a well is killed prior to tripping, traditional tripping procedures including the completion of trip

ct
sheets should be followed.

ire
IX. Round the clock supervision by competent persons should be ensured. All personnel involved
in operations should be trained in UBD operations, and training should be documented.
yD
X. The Well Site Supervisor should have valid accredited well control certificate for underbalanced
drilling and well intervention operations.
t
XI. Appropriate PPE should be used by all personnel on the site.
fe

XII. A site-specific emergency contingency plan should be prepared to a level of complexity that the
Sa

operation warrants, prior to any underbalanced drilling taking place.

XIII. The following table describes incident scenarios for which well control action procedures
should be available (as applicable) to deal with the incidents should they occur (This list is not
try

exhaustive; additional scenarios may be applied based on the actual planned activity):

i. Bottomhole or surface pressure and / or flow rates detected which could lead to the
us

pressure rating of the rotating control device (static or dynamic) or the capacity of the
surface separation equipment being exceeded.
nd

ii. NRV failure, influx into work string during making connection or tripping in live well.
lI

iii. Leaking connection below drilling BOP.


Oi

iv. Leaking rotating control device or flow line before ESDV, seal elements, connection to
flow line, drilling BOP or high pressure riser.

v. Erosion or wash out of choke. Consider the case where isolation for repair of the choke
cannot be achieved.

vi. Failure of surface equipment after RCD. This can be leaks or plugged equipment and
lines.

vii. Work string failure.

viii. Emergency shut-in.


“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 40


Well Control

ix. Emergency well kill.


x. Lost circulation.
xi. H2S in the well.

XIV. When hydrocarbons are being produced or when they are used in the drilling fluid,
supplementary fire fighting equipment should be considered. This may require as little as
additional hand-held fire extinguishers to as much as having a fire fighting vehicle on-site.

XV. Regardless of the concentration of H2S, no sour gas may be released to atmosphere at any
time.

XVI. Produced fluids containing H2S or drilling fluids contaminated with H2S should not be stored in

te
open tanks.

ra
XVII. The flare stack shall be as per regulatory requirements.

XVIII. If H2S is expected to be encountered in the well, a monitoring program shall be in place. As a

o
minimum, monitoring stations should include the rig floor, inside the rig substructure adjacent to

ct
the BOPs, and near separation vessels and storage or circulating tanks.

ire
XIX. A pressurized tank or a tank truck equipped with a functional H2S scrubber should be used for
the transportation of sour fluids off location. yD
XX. Adequate provision should be made for the safe storage and / or disposal of produced fluids
and drill cuttings. Reservoir liquids should not be stored in an earthen pit. Refer to MOEF
guidelines for handling of drilling fluids and drill cuttings (OISD-RP-201)
t
XXI. Explosive potential monitoring should be conducted at all the points where there is a potential
fe

of release of combustible vapours to atmosphere.


Sa

XXII. For wells which contain H2S, drill cuttings should be held in tanks equipped with vapour
control. Vapour shall either be vented to a flare stack or through an H2S scrubbing system.
try

Another related technique of UBD is Managed Pressure Drilling (MPD). While UBD is mostly focused
on maximizing the performance of the reservoir, MPD is more focused on successfully drilling the
well, while minimizing the time and money spent on non-productive time (NPT), in addition to not
us

damaging the formation in the process.

While MPD utilizes some of the same surface equipment used in UBD; MPD, particularly in offshore
nd

environments, is not intended to produce hydrocarbons while drilling but rather to more precisely
manage wellbore pressure and annulus returns while drilling through sections with very narrow
margins between reservoir pore pressure and fracture pressure gradients. Any influx incidental to the
lI

operation is safely contained using an appropriate process.


Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 41


Well Control

11.0 Well Control Equipment Arrangement for HTHP Wells

I. The installation should be equipped with:

a. A fail-safe-open, remotely operated valve in the overboard line.

b. A cement line pressure gauge in the choke panel, a remote camera in the shaker house,
with display in the driller's house.

c. A choke / kill line glycol injection system.

te
d. High pressure and / or high temperature resistant seals should be installed in choke and
kill lines, including flexible line hoses and the choke and kill manifold, packing in the kelly

ra
cock / internal BOP, packing / seal in the marine riser.
I. Flexible kill-/choke line hoses should be inspected and pressure tested to maximum well design

o
pressure prior to HPHT mode.

ct
II. Specification and qualification criteria for equipment and fluids to be used or installed in a
HPHT well should be established, with particular emphasis on deterioration of elastomer seals

ire
and component as function of temperature/pressure, exposure time and well bore fluids.
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 42


Well Control

12.0 References

1. Alberta Energy and Utilities Board- ID 94-3: Under Balanced Drilling

2. API-RP 16E: Recommended Practices for Design of Control Systems for Drilling
Well Control Equipment

3. API-RP 53: Recommended Practices for Blowout Prevention Equipment Systems


for Drilling Wells

te
4. API-RP 59: Recommended Practices for Well Control Operations

ra
5. API-RP 64: Recommended Practices for Diverter Systems Equipment and
Operations

o
6. API-SPEC 16C: Specifications for Choke and Kill Systems

ct
ire
7. API-SPEC 16D: Specifications for Control Systems for Drilling Well Control Equipment

8. API-SPEC 16R: Specification for Marine Drilling Riser Couplings


yD
9. HSE-OTH 512: HPHT Wells: Perspective on Drilling and Completion from the Field
t
10. IADC: IADC Deepwater Well Control Guidelines
fe

11. IADC: UBD and MPD Operations - HSE Planning Guidelines


Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 43


Well Control

Abbreviations

BOP – Blowout preventer

LOT – Leak off test

LMRP – Lower marine riser package

NRV – Non return valve

te
OEM – Original equipment manufacturer

ra
PIT – Pressure integrity test

o
ct
SCR – Slow circulating rate

ire
UBD – Underbalanced drilling

WP – Rated working pressure


t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 44


Well Control

Annexure-I

te
o ra
ct
ire
t yD
fe
Sa
try
us
nd

Arrangements for 2000 psi Surface BOP Stack


lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 45


Well Control

Annexure-II

te
o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

Arrangements for 3000 psi and 5000 psi Surface BOP Stack

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 46


Well Control

te
o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 47


Well Control

te
o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 48


Well Control

te
o ra
ct
ire
t yD
fe
Sa
try
us
nd
lI
Oi

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 49


Well Control

Annexure-VI

TRIP SHEET

Rig----------------------------------------------- Location / Well -----------------------------------

te
Date and time--------------------------------- Depth------------------- Sp. Gr. of DF-------------

ra
DP Size & Displacement-------------------------DC Size & Displacement-------------------

o
Name of shift incharge / Driller --------------------------------------------------------------------------

ct
Reason for trip----------------------------------------------------------------------------------------

ire
Drill pipe Theoretical Volume Displacement /
yD Discrepancy Remarks
stand Volume filled in
No. of Per _Stand Total Per _Stand Total
stand
t
fe

1 2 3 4 5 6 7
Sa
try
us
nd
lI
Oi

Note –
• Column 5 - Actual vol. of drilling fluid taken by hole (diff. of trip tank reading )
• Column 6 – Diff. of column 3 and 5

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 50


Well Control

Annexure-VII

BOP FUNCTION TEST REPORT AND ACCUMULATOR DRILL


RIG : DATE :
WELL :
BOP STACK DETAIL (as applicable):
1. Annular BOP -
2. Single / Double / Triple ram type BOP -
3. Upper pipe ram size -
4. Lower pipe ram size -

te
S.NO. DESCRIPTION FUNCTION TIME ACCUM- ACCUM- REMARKS

ra
CLOSED/ Seco ULATOR ULATOR
OPEN nds INITIAL FINAL

o
PRESSURE PRESSURE
psi Psi

ct
01. Annular preventer

ire
02. Lower pipe ram
03. Upper pipe ram
yD
04. Blind/shear ram
t
05. Hyd. Valve on choke line
fe

06. Hyd. Valve on kill line


Sa

01. Conduct BOP function test/accumulator drill once in a week


02. a) Record initial accumulator pressure
try

b) Turn off both electric and pneumatic pumps


c) Close annular and pipe rams one by one and record time to close each preventer
d) Open the hydraulic Valve on choke line and kill line
us

e) Open pipe ram to compensate for blind ram close


f) Record the final accumulator pressure after each operations
nd

g) Turn on electrical/ pneumatic pump and open all the preventer. Record the opening
time.
03. Carry out function test alternatively from rig floor panel / auxiliary panel / main control unit.
lI

4. Final accumulator pressure should be not less than 1200 psi or 200 psi above precharge pressure of
accumulator bottles.
Oi

Special attention needed to address the following:

SIGNATURE : SIGNATURE :

NAME : NAME :
SHIFT INCHARGE/ : DIC/TOOL PUSHER :
DRILLER

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”
OISD/DOC/2019/01

OISD – RP – 174 Page No. 51


Well Control

Annexure-VIII

BOP PRESSURE TEST REPORT

RIG : WELL NO. :

DATE : TEST FLUID:

TESTING EQUIPMENT- TEST PUMP/CEMENTING UNIT:

S.NO. TYPE OF BOP TEST PRESSURE & DURATION REMARKS

te
LOW DURATION HIGH DURATION
PRESSURE minutes PRESSURE minutes

ra
psi psi
01. Annular BOP

o
02. Upper pipe ram (size…..)
03. Lower pipe ram (size….)

ct
04. Blind ram/shear ram

ire
05. Choke manifold
06. Kill manifold
07. Hyd. Valve on choke line
yD
08. Hyd. Valve on kill line
09. HP valves on choke &
kill manifold
t
10. Upper Kelly cock
fe

11. Lower Kelly cock


12. FOSV
Sa

13. Inside BOP

N.B.
try

1. Keep annulus valve open on wellhead when test plug is used during test & check for any
leakage during BOP testing.
us

2. Testing line should be flushed with clean water before pressurisation.


nd

Special attention needed to address the following:


lI
Oi

SIGNATURE : SIGNATURE :
NAME : NAME :

SHIFT INCHARGE/ DIC/TOOL PUSHER :


DRILLER :

“OISD hereby expressly disclaims any liability or responsibility for loss or damage resulting
from the use of OISD Standards/Guidelines.”