NUBERG ENGINEERING LIMITED


MATERIAL RECEIPT AND INSPECTION REPORT
Name of the Project : 500 TPD Sulphuric Acid Plant with 5.0 MW Power Generations,EGYPT
REPORT NO:
Client : SPREA MISR
EPC Contractor : NUBERG ENGINEERING LIMITED DATE:
Quantity
SI No. Material Description P O . No./Date Reference Invoice No./Challan No. MTC No. Heat/Batch No. Date of Receipt Remarks
UOM Received Accepted

1.Quantity verified and found in order 2. Material condition appears to be good 3.Heat/Batch/Tag No. mentioned on the material
4.Color coding done as applicable 5. Site identification marks on material 6.Correlation w.r.t. IRN/MTC/Lab Tests report
7.TC verification w.r.t. IRN/Spec/QAP,etc.
Sign :
Name:
Date:
SUBCONTRACTOR NBEL SPREA MISR

Page 1 of 1