Professional Documents
Culture Documents
reviewer4@nptel.iitm.ac.in ▼
Unit 3 - Module 1 -
Introduction
Register for
Certification exam Module 1 Assignment
The due date for submitting this assignment has passed.
Course As per our records you have not submitted this Due on 2019-02-13, 23:59 IST.
outline
assignment.
How to access 1) Which of the following layouts is used for high volume low variety 1 point
the portal manufacturing?
Funded by
contemporary measures
Powered by of performance, such as cost, quality,
Module 8 -
Scheduling, service and speed.
Flowshops
Flexible Manufacturing System
Module 9 - Job
Just In Time
shop
scheduling, Line Business Process Reengineering
Balancing
No, the answer is incorrect.
Module 10 - Line Score: 0
balancing, Accepted Answers:
Location, Layout
Business Process Reengineering
Text Transcripts 6) Which among the following are not wastes according to JIT? 1 point
Assignment Over-processing
Solutions
Over-production
Interaction Transportation
Session
Waiting time
None