SITE OBSERVATION REPORT (SOR)
CONTRACT No.
MAHSR - C7 Package
[Testing and Commissioning on Design Build Lump Sum Price
lbasis for Double Line High Speed Ralway involving Atmedabad
station, Sabarmati Staton, Viaduct & Bridges, Crossing Bridges
excluding fabsication and transportation of steel russ ginders)and| so We.c7/S0RI00
Associates works between MAHSR Km, 489.467 and MAHSR Km,
FeRval 5:61.41, 474) seanay2022
[DESCRIPTION OF S.0.R.: SHE non-compliances _: Location - Ahmedabad LG2 (ch: 499+680)
proper access and egret test pes location
Excavation areas no protected fom slpingshoring
P.tnadequate sf poser
ls teproperhariading (Excavation snot protected agains fling ofa person)
Js. etod Statement no avaiable athe ste
“Training elated to excavation say has no een given to engineer and abouts
fhe pecstrans wally were nt define
Lem mer OL ener
pre 8(Os-\ 2020 are: AB|SSTRAS., one
usa eget cogs upenate:RE-A0.7 Peas
HONZOMFGRWANCE CLOSURE BY CONTRACTOR
ORRECINE ACTON TREE reine :
POSITION:
— DIE nn
POsmon:
| Jaccerren wir comments |CommeNrs:
[resecte [REASON FOR REJECTION: