You are on page 1of 1

LEVEL 12 NOTES:

LEVEL 11 LEGEND:

LEVEL 10

LEVEL 9

PIN NO : 662004430
LEVEL 8 BP# 128542

LEVEL 7

LEVEL 6

REFERENCE DRAWINGS
LEVEL 5 Drawing No. Title

LEVEL 4 REV. DESCRIPTION Date


DWN
(ACC)
CHKD
(ACC)
APD
(ACC)
APD
FOR CONTINUATION REFER TO DRAWING-

FOR CONTINUATION REFER TO DRAWING-


CONTRACTOR'S REVIEW & COORDINATION
CHECKED/COORDINATED
DISCIPLINE
DATE SIGNATURE

AR - ARCHITECTURAL
LEVEL 3
CV - CIVIL

EL - ELECTRICAL

ME - MECHANICAL
P382-Q16044-SD-MP-PK4-6018

P382-Q16044-SD-MP-PK4-6020
ST - STRUCTURAL

LS - LANDSCAPE

ID - INTERIOR DESIGN

OT - OTHERS

CONSULTANT'S STAMP APPROVAL


MATCH LINE

LEVEL 2

MATCH LINE
WT-5
14

CW
TO TOILET
WELLNESS CENTER
CW

LEVEL 1
UNITED DEVELOPMENT COMPANY
MASTER PLAN DEVELOPER OF THE PEARL - QATAR

CW CW CW

CW

PLUNGE POOL(P10) TO EXTERNAL AREA


FOUNTAIN(F13) Construction Development Company LLC
TO TO POOL Building No. 29, Al Rawabi Street, Street No. 840, Al Muntazah
TO SURGE TANKS SERVE SERVICE P.O.Box 8388, Doha - Qatar
POOL (6) KITCHEN TEL. +974 40371712, 40371714, 40371718 (Ext. 101)
CW CW FAX. +974 40375751
CW
WOMENS TOILET [T1-B1]

ABLUTION [T2-B1] MEN TOILET [T1-B1]

KEY PLAN:
H
RT
NO

LA
IB
WT-1 WT-1 WT-1 WT-1

Q
GROUND LVL EXHAUST AIR FAN ROOM MECHANICAL ROOM GARBAGE ROOM PARKING

WT-1 PROJECT:
FIVE STAR HOTEL & RESIDENCE AT MARSA ARABIA
POOLS (P05-1,P05-2,P05-3,P06,P07 & P08) THE PEARL - QATAR
PUMP ROOM
BASEMENT LVL DRAWING
TITLE: SCHEMATIC RISER DIAGRAM - WATER
PLUMBING
THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY
CAD File Name: P382-Q16044-SD-MP-PK4-6019 Scale: 1:100 Original Drawing Size: A0 Rev.
Drawing Number: P382-Q16044-SD-MP-PK4-6019 00

You might also like