4 Heating time using external Heat exchanger & Non Isothermal Heating Medium
5 Heating time using external Heat exchanger & Isothermal Heating Medium
Revision History
6 Cooling time using external Heat exchanger & Non Isothermal Cooling Medium
Rev. 0 Issued to Downloads s
7 Cooling time using external Heat exchanger & Isothermal Cooling Medium
Heating Fluid
Inlet temp T1 230 °F
Sp.Heat Cw 1.2 Btu/ lb °F
Flow rate W 18000 lb/hr
ln T1 - t1 = WCw x K-1 xt
T1 - t2 MCm K
K = e(UA/WC)
K 3.4903
Time reqd = 6.42 hrs
Home
Isothermal Heating
Reactor Contents
Mass M 50000 lb
Initial temp t1 68 °F
Final temp t2 257 °F
Sp.Heat Cm 0.5 Btu/ lb °F
Area A 100 ft2
HTC U 150 BTU/hr ft2 °F
Heating Fluid
Inlet temp T1 320 °F
ln T1 - t1 = U A time
T1 - t2 MC
Cooling Fluid
Inlet temp t1 72 °F
Sp.Heat Cw 1 Btu/ lb °F
Flow rate W 15500 lb/hr
ln T1 - t1 = WCw x K-1 xt
T2 - t2 MCm K
K = e(UA/WC)
K 2.8994
Time reqd = 19.11 hrs
= 1146.78 min
Home
Non Isothermal Heating
Reactor Contents
Mass M 72500 lb
Mass Flow rate w 20000 lb/hr
Initial temp t1 82 °F
Final temp t2 200 °F
Sp.Heat c 1.05 Btu/ lb °F
Area A 150 ft2
HTC U 210 BTU/hr ft2 °F
Heating Fluid
Inlet temp T1 230 °F
Sp.Heat C 1.2 Btu/ lb °F
Flow rate W 15500 lb/hr
ln T1 - t1 = wWC x K3-1 xt
T1 - t2 (K3wc-WC) M
K3 = eUA*(1/WC-1/wc)
K3 1.213548
Time reqd = 10.03 hrs
Home
Isothermal Heating
Reactor Contents
Mass M 72500 lb
Mass Flow rate w 20000 lb/hr
Initial temp t1 82 °F
Final temp t2 200 °F
Sp.Heat c 1.05 Btu/ lb °F
Area A 150 ft2
HTC U 210 BTU/hr ft2 °F
Heating Fluid
Inlet temp T1 230 °F
ln T1 - t1 = wc x K2-1 xt
T1 - t2 Mc K2
K2 = eUA/wc
K2 4.481689
Time reqd = 7.45 hrs
Home
Non Isothermal cooling
Mass M 72500 lb
Batch flow rate W 20000 lb/hr
Initial temp T1 200 °F
Final temp T2 82 °F
Sp.Heat C 1.05 Btu/ lb °F
Area A 150 ft2
HTC U 180 BTU/hr ft2 °F
Cooling Fluid
Inlet temp t1 72 °F
Sp.Heat c 1 Btu/ lb °F
Flow rate w 15500 lb/hr
ln T1 - t1 = Wcw x K4-1 xt
T2 - t1 (K4wc-WC) M
K4 = eUA*(1/WC-1/wc)
K4 0.6337
Time reqd = 18.19 hrs
= 1091.62 min
Home
Isothermal cooling
Mass M 72500 lb
Batch flow rate W 20000 lb/hr
Initial temp T1 200 °F
Final temp T2 82 °F
Sp.Heat C 1.05 Btu/ lb °F
Area A 150 ft2
HTC U 180 BTU/hr ft2 °F
Cooling Fluid
Inlet temp t1 72 °F
Sp.Heat c 1 Btu/ lb °F
Flow rate w 15500 lb/hr
ln T1 - t1 = WC K1-1 xt
T2 - t1 MC K1
K1 = eUA/WC
K1 3.6173
Time reqd = 12.77 hrs
= 766.37 min
Home
NRe = 113650.5
NPr = 10.58
For cooling
A1 = 0.0243
b = 0.3
Q 147840 kcal / hr
V1
N2 1.44 rps 86.2 rpm
Np 5 (Assume)
Da2 0.433614 m
Dt2 1.084035 m
V2 1000.00 L
Nre 351.0687
Example
Total System Volume V = 350 ft3
System Evacuation to Pi = 2 in Hg Abs
Final Pressure Pf = 3 in Hg Abs
Drop test period t = 10 min
Desired operating pressure Po = 1 in Hg Abs
Q = 35 CFM
Q = 120.9 ACFM
Once the pump size is selected, we must recalculate the evacuation time by using that pump's average
capacity.
at pump's average
0.4 atm
5 m3
296.9 K
5.18 lb/hr
or service can be obtained
0.394737 atm
5 m3
313.0 K
4.91 lb/hr
Home
Affinity Laws
Q, Flow Proportional N
H, Head Proportional N2
P , Power Proportional N3
Example
Data
Initial RPM N1 1500 rpm
Initial flow Q1 400 m3/hr
Initial Head H1 25 m
Power P1 49.4 hp
By adjusting
Final RPM N2 1400 rpm
Result
Final flow Q2 373 m3/hr
Final Head H2 21.8 m
Final Power P2 40.1 hp
Data
Density ℓ 1000 kg/m3
Viscosity µ 0.8275 cp 0.00083 kg/m sec
Flow rate Q 500 m3/hr 0.13889 m3/sec
Pipe Dia D 10 in 0.254
Acceleration, g 9.8 m/s2
Calculation
Area A 0.05 m2
Velocity V 2.74 m/s
Reynolds Number NRe 841775.2
0.15 60
0.10 40
Equations Used
Equation of Continuity:
Q_A = Q_a + Q_b + Q_c
Target Cell
This cell is to have the value of Q, in
such a way that the constraints 1,2,
and 3 are zero.
Home
A 35o API distillate is being transferred from a storage tank at 1 atm absolute pressure to
a pressure vessel at 50 psig by means of the piping arrangements shown in figure.
The liquid flows at the rate of 23100 lb/hr through 3 inch Schedule 40 steel pipe; the
length of the straight pipe is 450 feet. Calculate the minimum horsepower input to the
pump having an efficiency of 60 percent.
The properties of the distillate are: viscosity = 3.4 cP, density = 52 lb/ft3.
The following are the data for the pipe and fittings:
For 3 inch Schedule 40 Nominal pipe, OD = 3.5 inch; Thickness = 0.216 inch
Flow coefficients for the fittings (K) are:
Gate valve = 0.25; 90o elbow = 0.9; Check valve = 10
Friction factor can be calculated from Blasius equation. Account for entry and exit losses
also.
Conversion Factors
1 feet 0.3048 m
1 lb 0.454 kg
1 inch 0.0254 m
1 centipoise 0.001 kg/m.sec
1 atm 14.7 psi
1 atm 1.01E+05 N/m2
g 9.812 m/sec2
hf of pipe 1.3985 m
v2/2g 0.02735 m
hf of Gate valve 0.00684 m
hf of 2 number of elbows 0.04923 m
hf of Check valve 0.27351 m
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.
One or more cells in this workbook contain data validation rules which refer to 1
values on other worksheets. These data validation rules will not be saved.
8'!D8:E8
Some formulas in this workbook are linked to other workbooks that are 1
closed. When these formulas are recalculated in earlier versions of Excel Defined Names
without opening the linked workbooks, characters beyond the 255-character
limit cannot be returned.
Some cells or styles in this workbook contain formatting that is not supported 3