689335 m3/hr
Flow
496814 Nm3/hr
Heat Flow 13.82 MKCal
5.7 MKCal
Tempt 547.0 C
Draf -28 mmwg
180864 m3/hr
Flow
58315 Nm3/hr
Heat Flow 16.03 MKCal
BANGUR CEMENT UNIT
16800 16800
Shree Cement Ltd., UP Grinding Unit, Bulandshahar
Basis
1232652
Total heat output 36252806
Total/
Average
%
100.00
3.39
69.01
Air Balance
Details m3/hr kg/hr
Bag House fan 942994 824463
Hot gas from HAG 150000 60000
False air (17%) 132019 148541
Recirculation 693215 606080
Stack exhaust 226958 218382
sh
Heat
%
15.25
1.36
36.95
25.95
3.89
16.17 Water spray KL/hr
0.44 4.00
100.0
Minimum heat required
18.76 Total feed heating 1279200
Feed moisture
24.46 8867926
evaporation
46.72 System exit gas 2560000
Water spray
7.06 1931026.81887831
evaporation
Minimum heat
3.00 14638153
required
Minimum Coal
0.00 1.1406847833
required per hour
Minimum cost per 11977.1902246966
hour
100.00 Cost Per MT 30
8.2685245299407E-05
r Balance
Temp, Deg C Density (kg/m3)
95 0.87
580 0.40
40 1.13
92 0.90
93 0.96