This document contains survey data from a road construction project including elevation points, cut and fill volumes, and areas. Elevation, cut, and fill data is provided for 0.02 mile increments along the road from station 0+000 to 0+480. Cut and fill volumes are calculated between each station and areas of cut and fill are also noted.
This document contains survey data from a road construction project including elevation points, cut and fill volumes, and areas. Elevation, cut, and fill data is provided for 0.02 mile increments along the road from station 0+000 to 0+480. Cut and fill volumes are calculated between each station and areas of cut and fill are also noted.
This document contains survey data from a road construction project including elevation points, cut and fill volumes, and areas. Elevation, cut, and fill data is provided for 0.02 mile increments along the road from station 0+000 to 0+480. Cut and fill volumes are calculated between each station and areas of cut and fill are also noted.
DIACOSTA, DEA DEE PANTOJAN, LOUIE GARCIA, KRENZ PATRICK PIQUERO, MARIA GWENDELYN ENGR. DENVER O. REGIDOR LOFRANCO MARY JOY SINOY, JOAN INSTRUCTOR OCON, BENCH SMITH SUSANO, RANDY
COURSE AND YEAR: BSCE-3 DATE SUBMITTED: JULY 18,2022