L

L1 L3
D1 .X D2 .X D3.XX L1 .X L2 .X L3 .X L .X T .X
L2
R5 T 305.00 260.00 32.00 85.0 50.0 90.0 250.0 23.00

293.50 275.00 32.00 85.0 100.0 120.0 250.0 9.60


R5
DOCUMENT/
DRAWING REVIEW STATUS

FINAL DOCUMENT ACCEPTED


** A

REVISED AND RE-ISSUE


B
WORK MAY PROCEED

D1
D2

FURTHER REVIEW NOT REQUIRED


D3

C
INCORPORATE COMMENTS & PROCEED

REJECTED
D
REVISE AND RESUBMIT
CONSENT TO PROCEED DOES NOT RELIEVE
THE CONTRACTOR ON ANY OF HIS
105° OBLIGATIONS AND RESPONSIBILITIES UNDER
HIS CONTRACT
REVIEWED BY: CHECKED BY :
DATE : 03/08/2022 DATE : 03/08/2022
M. Saradhi, D.Nandhakumar
Pipeline Engineer Pipeline Engineer
5 CHAMFER **Although the provided dwg is vendor proprietary document, only reviwed mating stub end dimsional requirements
R10

1 24/07/22 IK JM ISSUED FOR CONSTRUCTION


REV DATE DRAW CHKD APPRVD DESCRIPTION
N
ITS TECNODUE INDIA PVT LTD
CLIENT: PETROLEUM DEVELOPMENT OMAN
TOLERANCES NOTES TITLE: CONTRACTOR:
.X M i n ALL
HDPE PULLHEADS AL TURKI ENTERPRISES
.XX + 1.0 MM : DIMENSIONS ARE IN MILLIMETERS
HDPE MATERIAL: GRADE PE100 DRG SIZE REV
SCALE SKETCH
RESIN MAKE: BOROUGE HE3490LS (BLACK RESIN WITH 2% CARBON) N.T.S AUTOCAD DRAWING PH-ATE-080722-02