L1 L3
D1 .X D2 .X D3.XX L1 .X L2 .X L3 .X L .X T .X
L2
R5 T 305.00 260.00 32.00 85.0 50.0 90.0 250.0 23.00
D1
D2
C
INCORPORATE COMMENTS & PROCEED
REJECTED
D
REVISE AND RESUBMIT
CONSENT TO PROCEED DOES NOT RELIEVE
THE CONTRACTOR ON ANY OF HIS
105° OBLIGATIONS AND RESPONSIBILITIES UNDER
HIS CONTRACT
REVIEWED BY: CHECKED BY :
DATE : 03/08/2022 DATE : 03/08/2022
M. Saradhi, D.Nandhakumar
Pipeline Engineer Pipeline Engineer
5 CHAMFER **Although the provided dwg is vendor proprietary document, only reviwed mating stub end dimsional requirements
R10