You are on page 1of 2
Oakland - SF Bay Bridge/East: E Approach ‘Caltrans Bridge No. 34-0006 (04-Ala-80-1.6) CSMIP Station No. 58603 SENSOR LOCATI ‘Skyway Structure (cour Sta. 58001] Onkland Approach 828.61 ED Lin ree ST ar HHL] Hinge E: Inge F jl on abut Pier B20 Pler Bat but 823 H @ @@ @ Foundation Pi ‘oundation Plan 4 p Fg Page 1 of 2 IONS - Oakland Approach Structure Precast Concrete th Cast-in-place Concrete Hox Ginder Box Cinder Sensors 69-73 of Binke Pipe Skyway Structure jean (CSMIP Statfon 58601) é w/e KN 6 wastbomd — 3 N Siwy land Approach Structige Structure C Binge Deck Plan at Hinge E (Eastbound) ar + Fister este tT BL 13.522, c= ig cha “ICED rr. Section A-A' at Hinge E (Eastbound) Geotechnical Array 'SMIP Station 58204) Installed: 2/11/2014 Diagram: 7/20/2014 Oakland - SF Bay Bridge/East: E Approach Caltrans Bridge No. 34-0006 (04-Als-80- Page 2 of 2 CSMPSialon Na 60000 SENSOR LOCATIONS - Oatlan Approach Structure ate _ Concrete + 9.335 ——firn —- — 8.255 —F I 8.6 = om i | EL. 12.175m 20fn JL] LS +m} N/S Section at Midspan between Piers E17 and E18 (Eastbound) ene goes, stmt tate pl “ripe ess _p ok oy. inssm oto Ae concrete: Poo Approx. Saas | Mt * Pedestal +—F 1.8m diameter * EL -7m ae pm dim Ld N/S Section at Pier E18 (Eastbound) ! BL 10.45m Sette "Pipe eye a uy ju Grade Concrete C Column] {| | tf ap deter bee ea ae fa (oie “PSM TY Approx. BL 15m, N/S Section at Pier Et E19 (Eastbound) Frame 1 one etm} —een Cable Resteainers | {6, 1324m) AI ! ite Sad |! Spherical ‘ ge | mee oe fj Oe | n cy Cable Restrainers (6, 13.240) TJ fe Binge F 0.156-0.184m ps,! poy Deck Plan at Hinge F (Eastbound) Installed: 2/11/2014 Diagram: e920

You might also like