TIME AND WORK

1. A and B can complete a work in 30 days and 20 days respectively. In how many days they together
complete the work.

v
A rFkk B fdlh dke dks Øe'k% 30 rFkk 20 fnu esa iwjk dj ldrs gSa] rks nksuksa ,d lkFk ml dke dks fdrus fnuksa esa iwjk djssaxs\
(a) 12 days (b) 5 days (c) 15 days (d) 10 days

da
2. A, B and C can complete a work in 12 days, 15 days and 20 days respectively. In how much time they
together complete the whole work.

Ya
A, B o C ,d dke dks 12, 15 o 20 fnu esa iwjk dke dj ldrs gSaA rks feydj iwjk dke fdrus le; esa djsaxs\
(a) 12 days (b) 5 days (c) 15 days (d) 10 days
3. A can do a work in 2 hrs B do the three times of this work in 8 hrs and C in 8 hrs, if they work together then
in how many days the work will be complete

sh
A fdlh dke dks 2 ?kaVs esa iwjk dj ldrk gS] B blh dke dk rhu xquk dke 8 ?kaVks esa rFkk C mlh dke dks 8 ?kaVs esa iwjk dj ldrk gS
;fn os ,d lkFk feydj dke djuk 'kq: djrs gSa] rks dke fdrus le; esa iwjk gksxk \
(a) 1 hr
ke
(b) 2 hr (c) 3 hr (d) 4 hr
4. A can do any work in 20 days and B in 5 days. If C takes as much time as A and B together takes Then
in how many days they can complete the whole work?
Ra
A fdlh dke dks djus esa 20 fnu vkSj B, 5 fnu ysrk gSA ;fn C dks dk;Z djus esa mruk le; yxrk gS ftruk A vkSj B dks lkFk feydj
djus esa yxrk gSA rc os rhuksa feydj fdrus le; esa ml dke dks lekIr dj yasxs\
(a) 2 days (b) 4 days (c) 3 days (d) 6 days
by

5. A & B can complete a piece of work in 10 and 12 days respectively. A and B start work together and after
3 days A left the work then calculate in how many days work will be completed ?
A rFkk B fdlh dke dks Øe'k% 10 rFkk 12 fnu esa iwjk djrs gSaA nksuksa mlh dke dks ,d lkFk 'kq: djrs gSa rFkk 3 fnu ckn A dke NksM+dj
pyk tkrk gS] rks dke fdrus fnuksa esa iwjk gksxk\
hs

2
(a) 8 days (b) 5 days (c) 15 days (d) 10 days
5
at

6. A & B complete a piece of work in 10 and 15 days respectively. A and B start work together and after 2
days A left the work then calculate in how many days work will be completed ?
M

A rFkk B fdlh dke dks Øe'k% 10 rFkk 15 fnu esa iwjk djrs gSaA nksuksa mlh dke dks ,d lkFk 'kq: djrs gSa rFkk 2 fnu ckn A dke NksM+dj
pyk tkrk gS] rks dke fdrus fnuksa esa iwjk gksxk\
(a) 12 days (b) 5 days (c) 15 days (d) 10 days
7. A and B can complete a work in 10 days and 15 days respectively. A and B started working together but
after some time A left the work and the whole work will complete in 9 days. Then calculate after how
much time A left the work?
A rFkk B fdlh dke dks ,d lkFk 'kq: djrs gSaA fdUrq dqN le; ckn A dke NksM+ nsrk gS vkSj iwjk dke 9 fnuksa esa lekIr gks tkrk gSA A
us dke dks fdrus fnu ckn NksM+k\ ;fn A rFkk B Øe'k% ,d dke dks 10 fnu rFkk 15 fnu esa iwjk djrs gksaA
(a) 12 days (b) 4 days (c) 15 days (d) 10 days
8. A and B can complete a work in 20 days and 30 days respectively. A and B started working together but
after some time B left the work and the whole work will complete in 16 days. Then calculate after how
much time B left the work?

1
A rFkk B Øe'k% ,d dke dks 20 fnu rFkk 30 fnu esa iwjk djrs gSA A rFkk B dke dks ,d lkFk 'kq: djrs gSaA fdUrq dqN le; ckn B
dke NksM+ nsrk gS vkSj iwjk dke 16 fnuksa esa lekIr gks tkrk gSA B us dke dks fdrus fnu ckn NksM+k\
(a) 12 days (b) 5 days (c) 6 days (d) 10 days
9. A and B can complete a work in 20 days and 30 days respectively. A and B started working together but
after some time. B left the work and the rest work will be completed by A in next 10 days. Then
calculate after how much time B left the work
A rFkk B Øe'k% ,d dke dks 20 fnu rFkk 30 fnu esa iwjk djrs gSA A rFkk B dke dks ,d lkFk 'kq: djrs gSAa fdUrq dqN le; ckn B dke
NksM+ nsrk gS vkSj 'ks"k dke dks A vxys 10 fnuksa esa lekIr dj nsrk gS] rks B us dke dks fdrus fnu ckn NksMk+
(a) 15 days (b) 5 days (c) 6 days (d) 10 days
10. 2 men can build a wall in 15 & 20 hrs respectively but if they work together they use 280 less bricks per

v
hour & build a wall in 12 hrs. Find the no. of bricks in the wall.

da
nks vkneh ,d nhokj dks Øe'k% 15 rFkk 20 ?k.Vs esa cuk ldrs gSaA ysfdu tc og nkssuksa lkFk dke djrs gSa] rks 280 b±V izfr ?k.Vk de yxkrs
gSa vkSj nhokj dks 12 ?k.Vs esa cuk nsrs gSaSA nhokj cukus esa dqy b±Vksa dh la[;k Kkr djsa\
(a) 4500 (b) 3500 (c) 9,000 (d) 8400

Ya
11. 2 men can build a wall in 9 hrs and 10 hrs respectively. But if they work together then they use 10 less
bricks per hours and build a wall in 5 hrs. Then find the no. of bricks to build the wall?
nks vkneh ,d nhokj dks Øe'k% 9 rFkk 10 ?k.Vs esa cuk ldrs gSaA ysfdu tc og nksuksa lkFk dke djrs gSa] rks 10 bZaV izfr ?k.Vk de yxkrs

sh
gSa vkSj nhokj dks 5 ?k.Vs esa cuk nsrs gSaSA nhokj cukus esa dqy bZaVksa dh la[;k Kkr djsa\
(a) 4500 (b) 3500 (c) 900 (d) 8400
12. Two candles of same height burns completely in 4 hours and 6 hours respectively. If both start burning
ke
together at same time with their respective constant speed, then calculate after how much time the
ratio of their height will become 2 : 3
Ra
leku mQ¡pkbZ dh nks eksecfÙk;k¡ Øe'k% 4 rFkk 6 ?k.Vs esa iwjh ty tkrh gSA ;fn nksuksa dks ,d lkFk Øe'k% leku xfr ls tyk;k tk;s] rks
fdrus le; ckn mudh mQ¡pkbZ dk vuqikr 2 : 3 jg tk,xk\
(a) 2h 24 min. (b) 3h 37 min. (c) 5h 24 min. (d) 4h 35min
13. Two candles of same height can burn completely in 12 hours and 20 hours respectively. If both start
by

burning together at same time with their respective constant speed, then calculate after how much
time the ratio of their height will become 3 : 5
leku mQ¡pkbZ dh nks eksecfÙk;k¡ Øe'k% 12 rFkk 20 ?k.Vs esa iwjh ty tkrh gSA ;fn nksuksa dks ,d lkFk Øe'k% leku xfr ls tyk;k tk;s] rks
fdrus le; ckn mudh mQ¡pkbZ dk vuqikr 3 : 5 jg tk,xk\
hs

(a) 7 hrs. 30 min (b) 8 hrs. 30 min (c) 10 hrs. 15 min (d) 9 hrs. 30 min
14. Three men A, B and C can complete a work in 10, 12 and 15 days respectively, then give the answer of
at

the following questions.


3 vkneh A, B rFkk C fdlh dke dks Øe'k% 10] 12 rFkk 15 fnu esa iwjk dj ldrs gSa] rks fuEu dk mÙkj nsaA
M

(i) If A, B and C starts work together but after 2 days A left the work and next after 2 days C also left the
work. Then in how much time the whole work will complete.
;fn rhuksa ,d lkFk dke 'kq: djrs gSa rFkk 2 fnu ckn A dke NksM+ nsrk gS o mlls vxys 2 fnu ckn C Hkh dke NksM+ nsrk gS] rks iwjk
dke fdrus le; esa iwjk gksxk\
2
(a) 8 days (b) 6 days (c) 5 days (d) 6 days
5
(ii)If A, B and C starts work together but after 3 days C left the work and next after 1 day A also left the
work. Then in how much time the whole work will complete.
;fn rhuksa ,d lkFk dke 'kq: djrs gSa rFkk 3 fnu ckn C dke NksM+ nsrk gS o mlls vxys 1 fnu ckn A Hkh dke NksM+ nsrk gS] rks iwjk
dke fdrus le; esa iwjk gksxk\

2
4
(a) 8 days (b) 7 days (c) 4 days (d) 6 days
5
(iii)A, B, and C start work together but after 3 days A left the work and B left the work 1 day before the
complete of work then in how much time the whole work will complete
rhuksa ,d lkFk dke 'kq: djrs gSa rFkk A 3 fnu ckn dke NksM+ nsrk gS o B dke iwjk gksus ls 1 fnu igys dke NksM+ nsrk gS] rks iwjk
dke fdrus le; esa gksxk\
4 2
(a) 8 days (b) 7 days (c) 4 days (d) 5 days
5 9
(iv)A, B, and C start work together but after 3 days A left the work and B left the work 4 day before the

v
complete of work then in how much time the whole work will complete

da
rhuksa ,d lkFk dke 'kq: djrs gSa rFkk A 3 fnu ckn dke NksM+ nsrk gS o B dke iwjk gksus ls 4 fnu igys dke NksM+ nsrk gS] rks iwjk
dke fdrus le; esa gksxk\

Ya
8 4 2
(a) 8 days (b) 6
days (c) 4 days (d) 5 days
9 5 9
(v) A, B and C starts works together A left the work 2 day before the completion of work and B left the
work 3 days before the completion of work.

sh
Then in how much time the whole work will complete?
A,B RkFkk C ,d lkFk dke 'kq: djrs gSa] A dke iwjk gksus ls 2 fnu igys dke NksM+ nsrk gS] rFkk B dke iwjk gksus ls 3 fnu igys dke
ke
NksM+ nsrk gS] rks dke fdrus fnuksa esa iwjk gksxk\
8 4 2
(a) 8 days (b) 6 days (c) 5 days (d) 5 days
9 5 9
Ra
15. A+B, B+C and C+A can complete a work in 12, 15 and 20 days respectively in how much time they
together complete the whole work.
A+B, B+C rFkk C+A fdlh dke dks 12] 15 o 20 fnu esa iwjk dj ldrs gSA rks Kkr djsa fd os feydj iwjk dke fdrus le; esa djsxa Aas
by

8 4 2
(a) 10 days (b) 6 days (c) 4 days (d) 5 days
9 5 9
16. A+B, B+C and C+A can complete a work in 10, 12 and 20 days respectively in how much time they alone
complete the whole work.
hs

A+B, B+C rFkk C+A fdlh dke dks 10] 12 o 20 fnu esa iwjk dj ldrs gSA rks Kkr djsa fd os vyx&vyx iwjk dke fdrus le; esa
djsaxasA
at

(a) 30,15,60 (b) 40,15,60 (c) 30,20,30 (d) 35,15,60


17. A+B, B+C and C+A can complete a work in 12, 8 and 10 days respectively in how much time they alone
M

complete the whole work.


A+B, B+C rFkk C+A fdlh dke dks 12] 8 o 10 fnu esa iwjk dj ldrs gSA rks Kkr djsa fd os vyx&vyx iwjk dke fdrus le; esa djsaxasA
(a) 240/7 , 240/13 , 240/17 (b) 250/3 , 220/14 , 250/18
(c) 210/4 , 222/15 , 260/19 (d) 215/5 , 223/16 , 270/20
18. A + B and B + C can do a work in 12 days and 16 days respectively. If A work for 5 days and B work for 7 days
on that work then C complete the remaining work in next 13 days. Then calculate in how much time C
would complete the whole work?
A rFkk B vkSj B rFkk C fdlh dke dks Øe'k% 12 rFkk 16 fnuksa esa iwjk dj ldrs gSAa ;fn A bl dke ij 5 fnu dke djs rFkk B bl dke
ij 7 fnu dke djs] rks cps gq, dke dks C vxys 13 fnuksa esa iwjk dj ysxkA rks C vdsyk ml dke dks fdrus fnuksa esa iwjk djsxk\
4 2
(a) 10 days (b) 24 days (c) 4 days (d) 5 days
5 9

3
19. A, B and C can do any work in 6 days. While B alone can do this work in 16 days and B + C in 10
days. Find in how many days A + B can complete the whole work?
A, B vkSj C fdlh dke dks 6 fnuksa esa dj ldrs gSaA tcfd B vdsyk 16 fnuksa esa rFkk B vkSj C feydj 10 fnuksa esa dj ldrs gSaA
Kkr dhft, A vkSj B nksuksa feydj dke dks fdrus fnuksa esa iwjk dj ysaxs\
240 242 241
(a) (b) (c) (d) None of these
31 31 31

2
20. A+B can do a work in 12 days while B+C can do the same work 6 days. The same work is completed by
3
A, B and C by working 3, 4 & 7 days respectively, then calculate in how many days A alone would

v
complete the same work.

da
2
A rFkk B vkSj B rFkk C fdlh dke dks Øe'k% 12 rFkk 6 fnuksa esa iwjk dj ldrs gSAa ;fn A bl dke ij 3 fnu dke djs rFkk B bl dke
3
ij 4 fnu dke djs] rks cps gq, dke dks C vxys 7 fnuksa esa iwjk dj ysrk gSA rks A vdsyk ml dke dks fdrus fnuksa esa iwjk djsxk\

Ya
2
(a) 10 days (b) 24 days (c) 30 days (d) 5 days
9
21. 3 men A, B and C complete a work is such a way that A works for all the days, B works for 1st and 2nd day

sh
and C works for 3rd, 4th and 5th day. If B+C can do as much work in 2 days as A alone does is 3 days. In
how many days A, B, C alone do the work if B + C can complete the whole work without the help of A in
6 days.
ke
3 vkneh A, B rFkk C fdlh dke dks bl rjg iwjk djrs gS fd A iwjs le; dke djsa] B igys rFkk nwljs fnu dke djsa o C rhljs] pkSFks
rFkk ikapos fnu dke djsaA A 3 fnu esa ftruk dke djrk gS mruk dke B + C 2 fnuksa esa djrs gSA os rhuks vyx&vyx ml dke dks fdrus
Ra
le; esa lekIr djsaxs ;fn B + C fcuk fdlh lgk;rk ds ml dke dks 6 fnu esa lekIr djrs gSaA
(a) 9,18,9 days (b) 10,10,12 days (c) 8,6,10 days (d) 8,10,14 days
22. A and B together can complete a work in 8 days. B and C together then complete the same work in 12 days. A
and B starts together and works for 4 days then A leaves this work, B works for next two days and he also leaves
by

now remaining work is completed by C in 8 days. Find how many days are taken by C
A vkSj B feydj] ,d dk;Z dks 8 fnu esa iwjk dj ldrs gSAa B vkSj C nksuksa feydj dke djds mlh dk;Z dks 12 fnu esa iwjk dj ldrs gSAa A
vkSj B dk;Z 'kq: djrs gSAa vkSj 4 fnu rd djrs jgrs gSAa blds ckn A dk;Z NksM+ nsrk gSA B, 2 fnu vkSj dk;Z djrk jgrk gS vkSj fiQj og Hkh
hs

NksM+ nsrk gS vkSj ckdh dk;Z C, 8 fnu esa iwjk dj nsrk gSA C dks fdrus fnu yxs\
(a) 10 days (b) 24 days (c) 30 days (d) 18 days
at

23. 1 man + 3 women + 4 child can complete a work in 96 hrs while 2 men + 8 children can complete the
same work in 80 hrs, while 2 m + 3 women can complete the same work in 120 hrs then find 5 men +
16 children can do the same work in how much time?
M

1 vkneh $3 vkSjr $ 4 cPps fdlh dke dks 96 ?kaVs esa iwjk dj ldrs gSAa tcfd 2 vkneh $ 8 cPps blh dke dks 80 ?k.Vs esa iwjk dj ldrs gSAa
2 vkneh $ 3 vkSjrsa mlh dke dks 120 ?k.Vs esa iwjk djrs gS]a rks 5 vkneh $ 16 cPps mlh dke dks fdrus le; esa iwjk djsx
a \s
12
(a) 36 hrs (b) 40 hrs (c) 36 hrs (d) 45 hrs
13
24. A man has 3 sons the 1st one and 2nd one can complete a work in 24 days and 36 days respectively. In how
many days the 3rd son will complete the whole work alone, If the man could alone complete the whole work
3
in 3 days. The man can do double the work in same time in which all his sons together can complete
11
the work.

4
3
,d vkneh ds rhu iq=k gSaA igyk rFkk nwljk iq=k fdlh dke dks Øe'k% 24 rFkk 36 fnuksa esa iwjk dj ldrs gSaA og vkneh mlh dke dks 3
11
fnuksa esa iwjk dj ldrk gSA ftrus le; esa mlds rhuksa iq=k ml dke dks iwjk djrs gSa] mrus gh le; esa og mlls nqxquk dke djrk gS] rks rhljk
iq=k ml dke dks fdrus fnuksa esa iwjk djsxk\
(a) 12 days (b) 15 days (c) 20 days (d) 18 days
25. A is 40% more efficient than B they together complete the whole work in 15 days. In how much time
they alone do the work?
A dh dk;Z{kerk B ls 40% vf/d gSA os feydj iwjk dke 15 fnu esa dj ldrs gSAa rks vyx&vyx iwjk dke fdrus le; esa djsaxs\
5 5

v
(a) 25 , 36 days (b) 15,20 days (c) 20,25 days (d) 20,15 days
7 7

da
26. A is 50% more efficient than B. Then in how much time they together complete the whole work if A
alone complete the whole work in 25 days.
A dh dk;Z{kerk B ls 50% vf/d gSA rc os iwjk dke feydj fdrus fnuksa esa iwjk dj ldrs gSa] ;fn A vdsyk iwjs dke dks 25 fnuksa esa

Ya
iwjk dj ldrk gS\
(a) 12 days (b) 15 days (c) 20 days (d) 18 days
27. A is 200% more efficient than B. While A takes 30 days less to complete a work then B. In how much time

sh
they together complete the whole work?
A dhdk;Z{kerk B ls 200% vf/d gSA tcfd A fdlh dke dks djus esa B lss 30 fnu de le; ysrk gSA rks feydj os iwjk dke fdrus
ke
le; esa djsaxs\
1
(a) 12 days (b) 15 days (c) 20 days (d) 11 days
Ra
4
28. A takes as much time as B+C take to finish a job, A +B finish the job in 10 days while C can alone do the
same job in 15 days in how many days B alone can complete the whole job.
A fdlh dke dks djus esa mruk le; ysrk gS ftruk B rFkk C ,d lkFk dke djus esa le; ysrs gSaA A rFkk B ml dke dks 10 fnu esa iwjk
by

djrs gSa tcfd C vdsyk mlh dke dks 15 fnu esa iwjk djrk gS] rks crkb, B ml dke dks fdrus fnuksa iwjk djsxk\
(a) 12 days (b) 15 days (c) 20 days (d) 60 days
29. A, B and C can do a work in 36 days. A and B together can do two times of C's work, A and C together can
do 3 times of B 's work. find in how many days C alone can complete this work
hs

A,B rFkk C rhu O;fDr fdlh dke dks 36 fnu esa iwjk dj ldrs gSaA A vkSj B lkFk feydj] C dk nqxquk dke dj ldrs gSa rFkk A vkSj
C lkFk feydj B dk frxquk dke dj ldrs gSaA rks Kkr dhft, vdsyk C fdrus fnuksa esa dke dks iwjk djsxk\
at

(a) 90 (b) 108 (c) 100 (d) 112


30. A is two times efficient than B. C and D together do equal work in that time A and B together do. If C and
M

D can alone do same work in 20 and 30 days then find how many days A alone can complete the whole
work.
A dh dk;Z{kerk B dh dk;Z{kerk ls nqxquh gSA C rFkk D feydj fdlh dke dks ftrus le; esa iwjk djrs gSa] mrus gh le; esa A
vkSj B feydj djrs gSaA ;fn C rFkk D vyx&vyx mlh dke dks Øe'k% 20 rFkk 30 fnu esa iwjk dj ldrs gSa] rks vdsyk A dke
dks fdrus fnu esa iwjk djsxk\
(a) 12 days (b) 18 days (c) 24 days (d) 30 days