You are on page 1of 3

SURVEY LEAST SQUARES CALCULATION

Project: {E2C0A7A6-DB01-4382-A500-0FA63851DCFA}
Input File: C:\USERS\PUBLIC\DOCUMENTS\AUTODESK\CIVIL 3D PROJECTS\{E2C0A7A6-DB01-
4382-A500-0FA63851DCFA}\MAPCHECK 1\MAPCHECK 1.LSI

Total # of Unknown Points: 14


Total # of Points : 15
Total # of Observations : 30
Degrees of Freedom : 2
Confidence Level : 95%
Number of Iterations : 2
Chi Square Value : 2.63909
Goodness of Fit Test : Passes at the 5% Level

Standard Deviation of Unit Weight: 1.14871

************************************************************************
OBSERVATIONS
************************************************************************

Type Pnt1 Pnt2 Pnt3 Measured StdDev Adjusted Resid


____ _____ _____ _____ _____________ ______ _____________ ______
DIST 15 1 386.1020 0.005 386.1037 0.0017
AZ 15 1 136-18-05.5000 10.000 136-18-00.9793 -4.52
DIST 2 3 46.3370 0.005 46.3380 0.0010
AZ 2 3 64-55-01.5000 10.000 64-55-02.5709 1.07
DIST 1 2 121.1460 0.005 121.1472 0.0012
AZ 1 2 75-16-40.5000 10.000 75-16-42.8153 2.32
DIST 4 5 84.4810 0.005 84.4811 0.0001
AZ 4 5 25-46-11.5000 10.000 25-46-14.0883 2.59
DIST 6 7 126.4470 0.005 126.4478 0.0008
AZ 6 7 55-30-54.5000 10.000 55-30-57.7990 3.30
DIST 5 6 117.0030 0.005 117.0023 -0.0007
AZ 5 6 355-56-52.5000 10.000 355-56-55.6699 3.17
DIST 3 4 58.6260 0.005 58.6268 0.0008
AZ 3 4 56-13-59.5000 10.000 56-14-01.0176 1.52
DIST 8 9 302.4820 0.005 302.4803 -0.0017
AZ 8 9 306-11-31.5000 10.000 306-11-33.4827 1.98
DIST 10 11 58.0200 0.005 58.0187 -0.0013
AZ 10 11 258-05-43.5000 10.000 258-05-42.4609 -1.04
DIST 9 10 172.1130 0.005 172.1116 -0.0014
AZ 9 10 265-04-48.5000 10.000 265-04-45.9610 -2.54
DIST 12 13 105.0730 0.005 105.0720 -0.0010
AZ 12 13 244-32-14.5000 10.000 244-32-12.0577 -2.44
DIST 14 15 209.3540 0.005 209.3551 0.0011
AZ 14 15 164-06-00.5000 10.000 164-05-55.5656 -4.93
DIST 13 14 213.6430 0.005 213.6431 0.0001
AZ 13 14 201-11-45.5000 10.000 201-11-38.9578 -6.54
DIST 11 12 65.7070 0.005 65.7057 -0.0013
AZ 11 12 258-53-24.5000 10.000 258-53-23.3460 -1.15
DIST 7 8 242.3110 0.005 242.3106 -0.0004
AZ 7 8 10-31-21.5000 10.000 10-31-28.7281 7.23
************************************************************************
ADJUSTED COORDINATES
************************************************************************

Std Deviations are at 95% Confidence Level

Point Northing Easting StdDevNth StdDevEst


______ _____________ _____________ _________ _________
2 8540217.5879 478335.9103 0.0400255401 0.0352049684
3 8540237.2318 478377.8785 0.0446488506 0.0471700960
4 8540269.8170 478426.6157 0.0506714831 0.0555721922
5 8540345.8958 478463.3454 0.0592030321 0.0620016760
6 8540462.6057 478455.0794 0.0663845744 0.0711619953
7 8540534.1973 478559.3085 0.0736894050 0.0776284655
8 8540772.4314 478603.5685 0.0777949047 0.0943710140
9 8540951.0466 478359.4560 0.0919668925 0.1029395494
10 8540936.2838 478187.9787 0.0905367485 0.1033833872
11 8540924.3153 478131.2079 0.0902100345 0.1035806485
12 8540911.6541 478066.7336 0.0896552373 0.1034142093
13 8540866.4801 477971.8683 0.0875901586 0.1027669458
14 8540667.2877 477894.6300 0.0814997175 0.0944203293
15 8540465.9436 477951.9891 0.0780784678 0.0818880756

************************************************************************
2D LEAST SQUARES ERROR ANALYSIS
************************************************************************

Semi-Axes are at 95% Confidence Level

Point Semi-Major Axis Semi-Minor Axis NE-Axis Azimuth


______ _______________ _______________ ____________
2 0.0402721167 0.0349152409 167-07-54
3 0.0490933931 0.0425282922 56-19-47
4 0.0592400186 0.0463317356 56-14-01
5 0.0668900563 0.0536180730 51-07-20
6 0.0751688644 0.0618105792 55-31-12
7 0.0809819068 0.0699845922 55-31-35
8 0.0956655409 0.0761921571 74-15-08
9 0.1119334295 0.0807723167 55-25-54
10 0.1127717898 0.0785407988 56-10-46
11 0.1132094632 0.0777887403 56-15-35
12 0.1133882312 0.0766606525 56-11-02
13 0.1132649429 0.0735044726 56-26-47
14 0.1120258957 0.0548386270 51-53-20
15 0.1068724456 0.0371590876 46-44-21

************************************************************************
Blunder Detection/Analysis
************************************************************************

Reliability Tests
Type Pnt1 Pnt2 Pnt3 Adjusted Resid Redun Estimate Marg Ext
____ _____ _____ _____ ______________ ________ _____ _________ ____ ____
DIST 15 1 386.104 0.002 0.055 -0.031 P P
AZ 15 1 136-18-00.9793 -4.521 0.350 12.918 P P
DIST 2 3 46.338 0.001 0.025 -0.042 P P
AZ 2 3 64-55-02.5709 1.071 0.010 -111.901 P P
DIST 1 2 121.147 0.001 0.027 -0.046 P P
AZ 1 2 75-16-42.8153 2.315 0.063 -37.012 P P
DIST 4 5 84.481 0.000 0.030 -0.002 P P
AZ 4 5 25-46-14.0883 2.588 0.028 -91.411 P P
DIST 6 7 126.448 0.001 0.024 -0.034 P P
AZ 6 7 55-30-57.7990 3.299 0.072 -45.688 P P
DIST 5 6 117.002 -0.001 0.042 0.018 P P
AZ 5 6 355-56-55.6699 3.170 0.039 -80.950 P P
DIST 3 4 58.627 0.001 0.024 -0.035 P P
AZ 3 4 56-14-01.0176 1.518 0.016 -97.780 P P
DIST 8 9 302.480 -0.002 0.049 0.034 P P
AZ 8 9 306-11-33.4827 1.983 0.232 -8.550 P P
DIST 10 11 58.019 -0.001 0.028 0.046 P P
AZ 10 11 258-05-42.4609 -1.039 0.014 73.701 P P
DIST 9 10 172.112 -0.001 0.031 0.046 P P
AZ 9 10 265-04-45.9610 -2.539 0.118 21.563 P P
DIST 12 13 105.072 -0.001 0.025 0.041 P P
AZ 12 13 244-32-12.0577 -2.442 0.049 49.582 P P
DIST 14 15 209.355 0.001 0.047 -0.022 P P
AZ 14 15 164-05-55.5656 -4.934 0.110 44.753 P P
DIST 13 14 213.643 0.000 0.033 -0.002 P P
AZ 13 14 201-11-38.9578 -6.542 0.174 37.645 P P
DIST 11 12 65.706 -0.001 0.028 0.046 P P
AZ 11 12 258-53-23.3460 -1.154 0.018 64.158 P P
DIST 7 8 242.311 -0.000 0.038 0.010 P P
AZ 7 8 10-31-28.7281 7.228 0.200 -36.181 P P

Redundancy is the observation's contribution to the degree of freedom.


(From 0 to 1 with 1 being best)
Estimate is used to estimate the blunder which might cause large residuals.
Marg is a reliability test for a single blunder (Type II error).
Ext is an external reliability test for an observation
P = PASS FAIL = FAIL

You might also like