You are on page 1of 5

Subject Area no.

22 Risk assessment & management


Principle:. The company has a programme to assess, prioritise and manage operating risks to prevent harm to people, damage to the
environment and to achieve operational effectiveness.
Level Expectations Targets Suggested objective evidence
Basic The safety management system (SMS) There is a documented risk Evidence of risk assessment process,
includes procedures to carry out risk management process to conduct risk quality of risk assessments,
assessments (RA's) for shipboard assessments which includes competence of team, consistent use of
operations. methodology, risk matrix, scope, risk the process.
The company has a process to ensure register or applicable process, Documented procedures, checklists
familiarisation of personnel with its risk adequate level of team composition and and templates providing guidelines to
assessment procedures. approval at appropriate levels the risk assessment process.
consistent with risk
Risk assessment covers new, non- The Company has a documented risk
management process which should Evidence of previous risk assessments
routine and unplanned tasks cover generic and specific operations. carried out for generic and non-
There is a documented process in standard tasks.
People, who conduct risk assessments, place that addresses training
are trained to do so. requirements for risk assessors. There
could be various levels of risk Documented process for training of risk
assessment training. assessors
Risk assessments are communicated Risk assessment should be Documented training records
communicated and cascaded to all
to vessel staff and are implemented crew and a process should be in place
aboard to ensure it is understood
Prevention and mitigation measures
should be practical and validated with
crew

©Dry Bulk Management Standard 2020


Subject Area no. 22 Risk assessment & management
Level Expectations Targets Suggested objective evidence
Intermediate Control measures from risk Risk assessments cover the entire Evidence that risk assessment covers
assessments are effectively range of operations deemed to have all activities with risks including but
implemented during operations. risk associated with the activity not limited to health, safety, security,
There is a process in place to ensure environment, regulatory, etc.
risk assessments are used as a living
document i.e. discussed at tool-box
meetings, safety meetings, etc.
Risk severity ratings are consistent
with the foreseeable hazards.
Training is conducted as per Training of risk assessors meets
procedures. industry standards
Internal competency requirements
have been established

©Dry Bulk Management Standard 2020


Subject Area no. 22 Risk assessment & management
Level Expectations Targets Suggested objective evidence
Advanced Risk assessment are reviewed at There is a documented process that Evidence of periodic risk assessments
periodic intervals. requires periodic review of risk and risk registers including
assessments and updates to risk implementation of any changes
registers as appropriate. The reviews proposed.
should include appropriate office and - evidence of review requirements
vessel personnel with approval from found in Document Control Procedure
line management. - risk assessments linked or cross-
The company has a process in place to There is a documented process to referenced to procedures and work
verify risk control measures during verify risk control measures are in instructions.
vessel operations place and is being used correctly ( i.e.
risk control verifications, active
monitoring, etc.)
The training and competence of risk Process in place to refresh risk
assessors is refreshed periodically assessment training Evidence of refresher in risk
assessment training

©Dry Bulk Management Standard 2020


Subject Area no. 21 Bridge procedures & standards
Level Expectations Targets Suggested objective evidence
Excellence Appropriate levels of management There is a process to define various Evidence of defined risk levels with
approve risks consistent with severity levels of risk. Higher risks are appropriate levels of management
of the risk reviewed and signed off by sign off. RA's linked or cross
appropriate levels of management. referenced to Procedures and Work
Vessel crew have operations and Process in place for key personnel on Instructions.
support level personnel who are crew to lead a risk assessment (i.e. Evidence of risk assessment leader
trained to lead risk assessments formal risk assessment training, training on vessel crew
experience in leading and
participating in risk assessment,
competence verification, etc.).
Annual/periodic review of risk There is an audit process in place to Annual/periodic review of risk
reduction/control measures and conduct periodic review of risk assessments
implementation. reduction control measures. Results Evidence of review of findings.
from audits are reviewed by Senior Evidence of procedure or work
Management instruction revisions carried out due
risk assessment findings.

©Dry Bulk Management Standard 2020


Notes:

©Dry Bulk Management Standard 2020