Statement of Arbitration Cases (2022-23) As on 7/28/2022

Name of Date of
the Appointment of Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Remarks/Current status
Agency AT/ Pres. Arb. & Arbitrator Hearings award.
(M/s) Extns.
All P. Ways works related to GC from MG to BG line in
DELHI 24.05.2012 P. K. Sharma
1 Rewari-Ringus-Phulera-Ajmer Section of NW Rly (CA IRCON Arbitration Award challenged in Delhi High Copurt NA
PED (STR.) [OLD A&C ACT] CE/NR
No. RVNL/JP/2006/002 dt 07.04.2006).
Doubling of Lakhana (Excl) - ARAND (incl) section IVRCL- 13.05.2015
RAIPUR S.M. Singla,
2 (68.936Kms) part of Raipur-Titlagarh Doubling in MRT (JV) by IPWE Insolvency proceedings against IVRCL. Hence matter is pending. NA
CPM-II Retd MS
Sambalpur division of East Coast Railway - Pkg-2 Pkg-2 [OLD A&C ACT]
C/o of Roadbed, Major and Minor Bridges, track linking
(excl. supply of rails, ordinary track sleepers, thick web
switches), outdoor Signalling and Electrical (General) IVRCL- 23.10.2017/ Justice
3 RAIPUR works for Doubling of Titlagarh (Excl.) - Lakhna(Incl.) MRT (JV) Insolvency proceedings against IVRCL. Hence matter is pending. NA
(Retd.) J.D Kapoor
CPM-II (72.948Kms) section part of related to Raipur-Titlagarh Pkg 1
doubling [Pkg 1]
C/o Major Bridge in Connection with doubling of
Railway Line between Barang-Rajatgarh (25Km), HCIL-
Justice (R)
BHUBANESWAR Cuttack - Barang (12Km) and 3rd line between Barang- Adhikarya- 16.01.2018
4 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV ARSS (JV) [OLD A&C ACT]
Khurda Road (35Km) in Orissa [BRIDGES] (SC Order 16.1.18)
(Bridges)

C/o Roadbed in connection with doubling of Railway


Line Between Barang-Rajatgarh (25Km), Cuttack - HCIL-
Justice (R)
BHUBANESWAR Barang (12Km) and 3rd line between Barang - Khurda Adhikarya- 16.01.2018
5 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV ARSS (JV) [OLD A&C ACT]
Road (35Km) in Orissa (ROADBED) (SC Order 16.1.18)
(Road Bed)

C/o Viaduct for 5.4 KM length excluding station areas 29.08.2018 / 27/28.1.22,
from Ch. 18630.00 to Ch 25102.00 between CBD-1 to 29.08.2019/ 17.2.22,
KOLKATA RabindraTirtha in New Garia-Airport Metro Corridor L&T 29.02.2020 / Justice 23.2.22, Pleading complete, matter was listed for argument. Next dt. of hearing is 24th to
6 CPM-II (Package ANV-4). NA
(ANV-4) 28.02.2021/ (Retd.) D.K. Jain 14/15.3.22, 30th Aug. 2022, 5th to 7th Sept. 2022
20.04.2022 6.4.22,
11.4.22
C/o Viaduct (4.748 Km) excl. station areas from Ch.(- 28.12.2018 /
)1250.00 to 4128.00 between Joka to Behala Simplex 28.12.2019 /
KOLKATA Chowrasta incl. Depot Approach at Joka-BBD Bag Infra
28.06.2020/ Justice (Retd.) Not hearing
7 CPM-II corridor (Pkg JMV-1) structures Matter reserved for Arbitration Award expected 2-3 months
31.10.2020/ GS Singhvi 2022
Ltd
30.04.2021/
(JMV-1)
31.01.2022
C/o of Roadbed, Major and Minor Bridges, Track
Linking (excl supply of rails, sleepers, TO sleepers and 13.11.2019 /
Justice (R) Madan 6.1.22, 4th,
29.01.2021
BHUBANESWAR TWS),incl S&T and OHE & general electrical works for McML-ECI B. Lokur, Sole. 24th, 23rd, Argument by both the parties. Next date of hearing 7th, 8th, 18th, 19th July 2022
8 20.04.2022 NA
CPM-I [Jena] 3rd line between Jakhapura - Haridaspur (25.0 Km) on (JV) (THC Order 25th April at 2.00 PM to 4.00 PM
Khurda Road division of East Coast Railway in Orissa 25.04.2022
13.11.19) 2022

1/2
Statement of Arbitration Cases (2022-23) As on 7/28/2022

Name of Date of
the Appointment of Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Remarks/Current status
Agency AT/ Pres. Arb. & Arbitrator Hearings award.
(M/s) Extns.
Earthwork in formation, bridges, road under bridges,
station building, staff quarter, general electrical work
including power line crossing from KM.00 to KM 17 BVSR- Justice (R) A.K.
9 CHENNAI between Obulavaripalle to Nethavaripalle 21.02.2020 Sikri, Sole (DHC Stay by Supreme Court
KVR (JV)
Order 12.2.20)

C/o road bed, supply of ballast, major and minor


RAIPUR bridges, residential and service buildings & general
CPM-III electrical works etc., for Dallirajhara – Keoti section (42
[NK Malviya, Km) in connection with a new rail link between SMS Ltd Justice (Retd) A.K.
10 28.01.2020 Stay by Supreme Court
DGM]/ Dallirajhara and Rowghat in Raipur Division of South Sikri
BG Patil, East Central Railway in the State of Chhattisgarh
AGM/Pune