Railway Arbitration Updates

1) The document lists 8 ongoing arbitration cases related to railway infrastructure projects. 2) Several cases have been delayed due to insolvency proceedings against contractors like IVRCL and stays ordered by higher courts. 3) For most cases, hearings have been held in 2022 and arguments are complete. Awards are expected in the next few months for some cases, while others may continue hearings in July/August 2022.

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views2 pages

Railway Arbitration Updates

1) The document lists 8 ongoing arbitration cases related to railway infrastructure projects. 2) Several cases have been delayed due to insolvency proceedings against contractors like IVRCL and stays ordered by higher courts. 3) For most cases, hearings have been held in 2022 and arguments are complete. Awards are expected in the next few months for some cases, while others may continue hearings in July/August 2022.

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Statement of Arbitration Cases (2022-23) As on 7/28/2022

Name of Date of
the Appointment of Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Remarks/Current status
Agency AT/ Pres. Arb. & Arbitrator Hearings award.
(M/s) Extns.
All P. Ways works related to GC from MG to BG line in
DELHI 24.05.2012 P. K. Sharma
1 Rewari-Ringus-Phulera-Ajmer Section of NW Rly (CA IRCON Arbitration Award challenged in Delhi High Copurt NA
PED (STR.) [OLD A&C ACT] CE/NR
No. RVNL/JP/2006/002 dt 07.04.2006).
Doubling of Lakhana (Excl) - ARAND (incl) section IVRCL- 13.05.2015
RAIPUR S.M. Singla,
2 (68.936Kms) part of Raipur-Titlagarh Doubling in MRT (JV) by IPWE Insolvency proceedings against IVRCL. Hence matter is pending. NA
CPM-II Retd MS
Sambalpur division of East Coast Railway - Pkg-2 Pkg-2 [OLD A&C ACT]
C/o of Roadbed, Major and Minor Bridges, track linking
(excl. supply of rails, ordinary track sleepers, thick web
switches), outdoor Signalling and Electrical (General) IVRCL- 23.10.2017/ Justice
3 RAIPUR works for Doubling of Titlagarh (Excl.) - Lakhna(Incl.) MRT (JV) Insolvency proceedings against IVRCL. Hence matter is pending. NA
(Retd.) J.D Kapoor
CPM-II (72.948Kms) section part of related to Raipur-Titlagarh Pkg 1
doubling [Pkg 1]
C/o Major Bridge in Connection with doubling of
Railway Line between Barang-Rajatgarh (25Km), HCIL-
Justice (R)
BHUBANESWAR Cuttack - Barang (12Km) and 3rd line between Barang- Adhikarya- 16.01.2018
4 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV ARSS (JV) [OLD A&C ACT]
Khurda Road (35Km) in Orissa [BRIDGES] (SC Order 16.1.18)
(Bridges)

C/o Roadbed in connection with doubling of Railway


Line Between Barang-Rajatgarh (25Km), Cuttack - HCIL-
Justice (R)
BHUBANESWAR Barang (12Km) and 3rd line between Barang - Khurda Adhikarya- 16.01.2018
5 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV ARSS (JV) [OLD A&C ACT]
Road (35Km) in Orissa (ROADBED) (SC Order 16.1.18)
(Road Bed)

C/o Viaduct for 5.4 KM length excluding station areas 29.08.2018 / 27/28.1.22,
from Ch. 18630.00 to Ch 25102.00 between CBD-1 to 29.08.2019/ 17.2.22,
KOLKATA RabindraTirtha in New Garia-Airport Metro Corridor L&T 29.02.2020 / Justice 23.2.22, Pleading complete, matter was listed for argument. Next dt. of hearing is 24th to
6 CPM-II (Package ANV-4). NA
(ANV-4) 28.02.2021/ (Retd.) D.K. Jain 14/15.3.22, 30th Aug. 2022, 5th to 7th Sept. 2022
20.04.2022 6.4.22,
11.4.22
C/o Viaduct (4.748 Km) excl. station areas from Ch.(- 28.12.2018 /
)1250.00 to 4128.00 between Joka to Behala Simplex 28.12.2019 /
KOLKATA Chowrasta incl. Depot Approach at Joka-BBD Bag Infra
28.06.2020/ Justice (Retd.) Not hearing
7 CPM-II corridor (Pkg JMV-1) structures Matter reserved for Arbitration Award expected 2-3 months
31.10.2020/ GS Singhvi 2022
Ltd
30.04.2021/
(JMV-1)
31.01.2022
C/o of Roadbed, Major and Minor Bridges, Track
Linking (excl supply of rails, sleepers, TO sleepers and 13.11.2019 /
Justice (R) Madan 6.1.22, 4th,
29.01.2021
BHUBANESWAR TWS),incl S&T and OHE & general electrical works for McML-ECI B. Lokur, Sole. 24th, 23rd, Argument by both the parties. Next date of hearing 7th, 8th, 18th, 19th July 2022
8 20.04.2022 NA
CPM-I [Jena] 3rd line between Jakhapura - Haridaspur (25.0 Km) on (JV) (THC Order 25th April at 2.00 PM to 4.00 PM
Khurda Road division of East Coast Railway in Orissa 25.04.2022
13.11.19) 2022

1/2
Statement of Arbitration Cases (2022-23) As on 7/28/2022

Name of Date of
the Appointment of Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Remarks/Current status
Agency AT/ Pres. Arb. & Arbitrator Hearings award.
(M/s) Extns.
Earthwork in formation, bridges, road under bridges,
station building, staff quarter, general electrical work
including power line crossing from KM.00 to KM 17 BVSR- Justice (R) A.K.
9 CHENNAI between Obulavaripalle to Nethavaripalle 21.02.2020 Sikri, Sole (DHC Stay by Supreme Court
KVR (JV)
Order 12.2.20)

C/o road bed, supply of ballast, major and minor


RAIPUR bridges, residential and service buildings & general
CPM-III electrical works etc., for Dallirajhara – Keoti section (42
[NK Malviya, Km) in connection with a new rail link between SMS Ltd Justice (Retd) A.K.
10 28.01.2020 Stay by Supreme Court
DGM]/ Dallirajhara and Rowghat in Raipur Division of South Sikri
BG Patil, East Central Railway in the State of Chhattisgarh
AGM/Pune

2/2