Arbitration Cases Overview 2022-23

This document lists 10 ongoing arbitration cases related to railway infrastructure projects. It provides details of each case such as the project name, the involved agency, date of appointment of the arbitrator, presiding arbitrator's name, number of hearings held so far, and current status and expected date of award. Most cases are pending final arbitration awards, with some facing issues like legal challenges or insolvency proceedings of involved agencies.

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views3 pages

Arbitration Cases Overview 2022-23

This document lists 10 ongoing arbitration cases related to railway infrastructure projects. It provides details of each case such as the project name, the involved agency, date of appointment of the arbitrator, presiding arbitrator's name, number of hearings held so far, and current status and expected date of award. Most cases are pending final arbitration awards, with some facing issues like legal challenges or insolvency proceedings of involved agencies.

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Count of SN (All)

10
Statement of Arbitration Cases (2022-23) As on 08/17/2022

Name of the Date of


Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Agency Appointment of AT/ Remarks/Current status
Arbitrator Hearings award.
(M/s) Pres. Arb. & Extns.

All P. Ways works related to GC from MG to BG line in


DELHI Rewari-Ringus-Phulera-Ajmer Section of NW Rly (CA 24.05.2012 P. K. Sharma
1 No. RVNL/JP/2006/002 dt 07.04.2006). IRCON Arbitration Award challenged in Delhi High Copurt NA
PED (STR.) [OLD A&C ACT] CE/NR

Doubling of Lakhana (Excl) - ARAND (incl) section


RAIPUR (68.936Kms) part of Raipur-Titlagarh Doubling in IVRCL- 13.05.2015
S.M. Singla,
2 Sambalpur division of East Coast Railway - Pkg-2 MRT (JV) by IPWE Insolvency proceedings against IVRCL. Hence matter is pending. NA
CPM-II Retd MS
Pkg-2 [OLD A&C ACT]

C/o of Roadbed, Major and Minor Bridges, track linking


(excl. supply of rails, ordinary track sleepers, thick web
switches), outdoor Signalling and Electrical (General)
IVRCL-
works for Doubling of Titlagarh (Excl.) - Lakhna(Incl.) 23.10.2017/ Justice
3 RAIPUR MRT (JV) Insolvency proceedings against IVRCL. Hence matter is pending. NA
(72.948Kms) section part of related to Raipur-Titlagarh (Retd.) J.D Kapoor
CPM-II Pkg 1
doubling [Pkg 1]

C/o Major Bridge in Connection with doubling of


Railway Line between Barang-Rajatgarh (25Km), HCIL-
Justice (R)
BHUBANESWAR Cuttack - Barang (12Km) and 3rd line between Adhikarya- 16.01.2018
4 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV Barang-Khurda Road (35Km) in Orissa [BRIDGES] ARSS (JV) [OLD A&C ACT]
(SC Order 16.1.18)
(Bridges)

C/o Roadbed in connection with doubling of Railway


Line Between Barang-Rajatgarh (25Km), Cuttack - HCIL-
Justice (R)
BHUBANESWAR Barang (12Km) and 3rd line between Barang - Khurda Adhikarya- 16.01.2018
5 Vikramjit Sen, Sole Stay by Supreme Court NA
CPM-IV Road (35Km) in Orissa (ROADBED) ARSS (JV) [OLD A&C ACT]
(SC Order 16.1.18)
(Road Bed)

C/o Viaduct for 5.4 KM length excluding station areas 29.08.2018 / 27/28.1.22,
from Ch. 18630.00 to Ch 25102.00 between CBD-1 to 29.08.2019/ 17.2.22,
KOLKATA RabindraTirtha in New Garia-Airport Metro Corridor L&T 29.02.2020 / Justice 23.2.22, Pleading complete, matter was listed for argument. Next dt. of hearing is 24th to
6 CPM-II (Package ANV-4). NA
(ANV-4) 28.02.2021/ (Retd.) D.K. Jain 14/15.3.22, 30th Aug. 2022, 5th to 7th Sept. 2022
20.04.2022 6.4.22,
11.4.22
C/o Viaduct (4.748 Km) excl. station areas from Ch. 28.12.2018 /
(-)1250.00 to 4128.00 between Joka to Behala Simplex 28.12.2019 /
KOLKATA Chowrasta incl. Depot Approach at Joka-BBD Bag Infra
28.06.2020/ Justice (Retd.) Not hearing
7 CPM-II corridor (Pkg JMV-1) structures Matter reserved for Arbitration Award expected 2-3 months
31.10.2020/ GS Singhvi 2022
Ltd
30.04.2021/
(JMV-1)
31.01.2022
C/o of Roadbed, Major and Minor Bridges, Track
Linking (excl supply of rails, sleepers, TO sleepers and 13.11.2019 /
Justice (R) Madan 6.1.22, 4th,
29.01.2021
BHUBANESWAR TWS),incl S&T and OHE & general electrical works for McML-ECI B. Lokur, Sole. 24th, 23rd, Argument by both the parties. Next date of hearing 7th, 8th, 18th, 19th July 2022
8 20.04.2022 NA
CPM-I [Jena] 3rd line between Jakhapura - Haridaspur (25.0 Km) on (JV) (THC Order 25th April at 2.00 PM to 4.00 PM
Khurda Road division of East Coast Railway in Orissa 25.04.2022
13.11.19) 2022

2/3
Statement of Arbitration Cases (2022-23) As on 08/17/2022

Name of the Date of


Presiding / Sole No. of Expected Date of
SN PIU Name of the Project Agency Appointment of AT/ Remarks/Current status
Arbitrator Hearings award.
(M/s) Pres. Arb. & Extns.

Earthwork in formation, bridges, road under bridges,


station building, staff quarter, general electrical work
including power line crossing from KM.00 to KM 17 BVSR-KVR Justice (R) A.K.
9 CHENNAI between Obulavaripalle to Nethavaripalle 21.02.2020 Sikri, Sole (DHC Stay by Supreme Court
(JV)
Order 12.2.20)

C/o road bed, supply of ballast, major and minor


RAIPUR bridges, residential and service buildings & general
CPM-III electrical works etc., for Dallirajhara – Keoti section (42
[NK Malviya, Km) in connection with a new rail link between Justice (Retd) A.K.
10 SMS Ltd 28.01.2020 Stay by Supreme Court
DGM]/ Dallirajhara and Rowghat in Raipur Division of South Sikri
BG Patil, East Central Railway in the State of Chhattisgarh
AGM/Pune

3/3