10
Statement of Arbitration Cases (2022-23) As on 08/17/2022
C/o Viaduct for 5.4 KM length excluding station areas 29.08.2018 / 27/28.1.22,
from Ch. 18630.00 to Ch 25102.00 between CBD-1 to 29.08.2019/ 17.2.22,
KOLKATA RabindraTirtha in New Garia-Airport Metro Corridor L&T 29.02.2020 / Justice 23.2.22, Pleading complete, matter was listed for argument. Next dt. of hearing is 24th to
6 CPM-II (Package ANV-4). NA
(ANV-4) 28.02.2021/ (Retd.) D.K. Jain 14/15.3.22, 30th Aug. 2022, 5th to 7th Sept. 2022
20.04.2022 6.4.22,
11.4.22
C/o Viaduct (4.748 Km) excl. station areas from Ch. 28.12.2018 /
(-)1250.00 to 4128.00 between Joka to Behala Simplex 28.12.2019 /
KOLKATA Chowrasta incl. Depot Approach at Joka-BBD Bag Infra
28.06.2020/ Justice (Retd.) Not hearing
7 CPM-II corridor (Pkg JMV-1) structures Matter reserved for Arbitration Award expected 2-3 months
31.10.2020/ GS Singhvi 2022
Ltd
30.04.2021/
(JMV-1)
31.01.2022
C/o of Roadbed, Major and Minor Bridges, Track
Linking (excl supply of rails, sleepers, TO sleepers and 13.11.2019 /
Justice (R) Madan 6.1.22, 4th,
29.01.2021
BHUBANESWAR TWS),incl S&T and OHE & general electrical works for McML-ECI B. Lokur, Sole. 24th, 23rd, Argument by both the parties. Next date of hearing 7th, 8th, 18th, 19th July 2022
8 20.04.2022 NA
CPM-I [Jena] 3rd line between Jakhapura - Haridaspur (25.0 Km) on (JV) (THC Order 25th April at 2.00 PM to 4.00 PM
Khurda Road division of East Coast Railway in Orissa 25.04.2022
13.11.19) 2022
2/3
Statement of Arbitration Cases (2022-23) As on 08/17/2022
3/3