The document provides a status update on ongoing transmission line works across various circles in Haryana. Key ongoing works include the creation of 132 KV lines in Rohtak, Gurugram, and Hisar circles. Progress has been slow on some projects due to issues like inadequate resources, land disputes, and delays in material supply. Officials have been following up with contractors through meetings and correspondence to ensure timely completion of transmission line works.
The document provides a status update on ongoing transmission line works across various circles in Haryana. Key ongoing works include the creation of 132 KV lines in Rohtak, Gurugram, and Hisar circles. Progress has been slow on some projects due to issues like inadequate resources, land disputes, and delays in material supply. Officials have been following up with contractors through meetings and correspondence to ensure timely completion of transmission line works.
The document provides a status update on ongoing transmission line works across various circles in Haryana. Key ongoing works include the creation of 132 KV lines in Rohtak, Gurugram, and Hisar circles. Progress has been slow on some projects due to issues like inadequate resources, land disputes, and delays in material supply. Officials have been following up with contractors through meetings and correspondence to ensure timely completion of transmission line works.
No Transmission Line award / completion Contractual completion date TS CIRCLE PANCHKULA NIL TS CIRCLE KARNAL NIL TS CIRCLE ROHTAK 1. Creation of 132 KV 2 08.10.18 / 04.02.19 Stub setting: 5/7 No. phase line on D/C 04.02.19 Tower erection: 5/7 No. towers from 132 KV Stringing: 0/ 1.566 KM S/Stn. GSS Chandi to Route of the work approved 132 KV S/Stn. TSS by the competent authority Kharanti. Stub setting of TL No 3, 4, W.O. No: 65/218 dated 08.10.2018 5, 6 and 7 Completed. Contractor: M/s Erection work of TL No 3, 4, Himani Enterprises. 5, 6 and 7 Completed Dist: Rohtak Work at TL No 1 and 2 was Funding: Deposit work started with the help of Police & Distt Administration but has been stopped by land Owner and Kisan Union in lieu of demand of higher compensation. Naib Tasildar Meham is appointed as Duty magistrate by DC Rohtak. TS CIRCLE FARIDABAD NIL TS CIRCLE GURUGRAM 2. 132 kV S/C line from 17.06.16/ 31.03.2019 Progress: 220 kV S/Stn. Lula 16.07.17 Foundation- 47/47 Ahir to 132 kV TSS on Erection-41/47. D/C towers at Stringing- 0.03/10.64 KM. Jatusana (Between gantry and TL-1) Turnkey contractor: M/s Arcon Engicon Impediment: Ltd. Inadequate manpower & Contract awarded on: resources with the firm. 17.06.2016 In spite of several Funding agency: correspondences from REC-150 Xen/SE/CE TS & meetings, Length of line: 10.625 the progress has been Km. dismally slow. No of location: 47 MOM: Director Projects Nos. (24.11.2016), CE TS Cost (In Lacs): 520.00 (09.08.2016, 4.01.2017, Planning Code 18.03.2017, 31.03.2017, 1D2181* 13.1.2019), CE/TS & CE/MM (17.12.2018).
Part /short material about
10% is balance. TS CIRCLE HISAR 3. Construction of 2 07.09.16/ 31.03.2019 Stub setting:- 90/118 phase 132 kV S/C line 06.06.17 Tower erection:- 53/118 on D/C towers with 0.4 Stringing: Nil Sq ACSR conductor Work allocated to M/s Fedders from 132 kV S/Stn., Lioyd Ltd. vide contract No – Kalanaur to 132 kV HDP-2145 & 2146/ REC-159 / TSS Manheru. XEN / Project (TL) dated Funding : REC-159 26.08.2016. District: Bhiwani Contractor: M/S Work progress remained Fedders Lloyd Ltd. intermittent and remained Line length – 30 Km stopped for 3 to 4 months and Total Location – 126 work was restarted by the firm Cost (In Rs. Lacs): on dated 24.04.2018. Work is 1090 slow on part of M/s Fedders for Planning Code want of construction material 1D2832* and labour issues. Presently the work is totally held up from last 3 months. M/s Fedder in meeting dated 17.12.2018 has assured to restart the work in 1st week of Jan 2019 but firm yet not start the work. Case has been sent by the field office for termination of work. 4. LILO of 132kV line 04.05.18/ 15.02.2019 Stub setting:- 07 / 07 No from 220kV BBMB 03.02.19 Tower erection:- 0 / 07 No Hisar – 132kV Hansi Stringing: 0 / 1.2 KM Ckt - 1 at 132kV TSS (conductor) Satrod and raising 0/ 1.8 KM (Cable) and shifting of 132kV BBMB Hisar – Hansi Work is very slow on part of the Ckt – 2. Contractor. Being perused Funding : Deposit regularly for timely completion work of RVNL (REC- as per schedule. 204) District : Hisar Contractor : M/s Aquarian Enterprises Line length – 3.237 KM Cost(In Rs. Lacs) : 503.00
5. LILO of 132kV Bhuna 15.05.18/ 31.03.2019 The route of laying
– Ukala line at 132kV 14.02.19 underground cable re- TSS Uklana. submitted by the contractor on Funding : Deposit 12.12.2018 and same has been work of Railway approved on dated 21.12.2018 (REC-201) & sent for consent of Railways District : Fatehabad and same has been consented Contractor : M/s by Railway authorities and Raychem RPG received on dated 23.01.2019. Line length – 1.40 + Further, it was intimated by the 0.77KM firm that 50% material of Cost(In Rs. Lacs) : Gantry tower & stub has been 161.00 received at site, left out material and cables will be supplied by 15.02.2019. Supply through solid T-OFF has been given to Railways on dated 29.08.2018.