0% found this document useful (0 votes)
97 views2 pages

List of Ongoing Arbitration Cases (As On 03.08.2022)

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views2 pages

List of Ongoing Arbitration Cases (As On 03.08.2022)

Uploaded by

shamim ahmad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

LIST OF ONGOING ARBITRATION CASES (As on 03.08.

2022)
Name of Arbitrators Amount of Remarks
Date of Appointment Amount of Claim
Name of the Counter Claim
S.No. PIU Name of the Project of AT/ Pres. Arb. & Presiding / Sole Contractor RVNL Nominee by Contractor
Agency (M/s) by RVNL Award challenged in the court.
Extns. Arbitrator Nominee Arbitrator ₹

All P. Ways works related to GC from MG to BG line in Rewari-Ringus-
DELHI Phulera-Ajmer Section of NW Rly (CA No. RVNL/JP/2006/002 dt 24.05.2012 P. K. Sharma P. K. Singh M.P. Singh
1 IRCON 285,126,898 - As it is.
PED (STR.) 07.04.2006). [OLD A&C ACT] CE/NR PED/RVNL ED/Works

Doubling of Lakhana (Excl) - ARAND (incl) section (68.936Kms) part of IVRCL-MRT 13.05.2015 S. Sadasiva
RAIPUR Raipur-Titlagarh Doubling in Sambalpur division of East Coast Railway - S.M. Singla, S.P.S Jain,
2 (JV) by IPWE Reddy 450,022,912 726,840,744 As it is.
CPM-II Pkg-2 Retd MS Retd ME
Pkg-2 [OLD A&C ACT] Advocate
C/o Viaduct (5.75Km) excl. station areas Ch. 247 to 6400 between Kavi 09.12.2017 /
Subhas (New Garia) to VIP Bazar, in New Garia - Airport Corridor of AFCONS Justice
KOLKATA 03-06-2020/ Justice (Retd) R. Rajamani,
3 Kolkata Metro (Pkg ANV-1) Infrastructure Ltd (Retd.) A.K. 1,603,042,444 - As it is.
CPM-I 04.06.2021/ KS Radhakrishnan Retd. CCRS
(ANV-1) Patnaik
01.04.2022
C/o Viaduct for 5.16Km length excl. station areas from Ch. 12570 to 31.07.2017 /
KOLKATA 18630 between NICCO Park to CBD-1, in New Garia - Airport Corridor AFCONS Justice Justice
04-04-2019/ Ramesh Chandra, Last hearing held on 16.11.2021.Next date
4 CPM-II of Kolkata Metro (Pkg ANV-3) Infrastructure Ltd (Retd.) KS (Retd.) A.K. 1,744,897,027 4,000,000
31.03.2021/ Retd DG/CPWD not yet fixed by Ld. Tribunal.
(ANV-3) Radhakrishnan Patnaik
01.04.2022
C/o of Roadbed, Major and Minor Bridges, track linking (excl. supply of
rails, ordinary track sleepers, thick web switches), outdoor Signalling IVRCL-MRT Justice
and Electrical (General) works for Doubling of Titlagarh (Excl.) - 23.10.2017/ Justice Shyam Kumar
5 RAIPUR (JV) (Retd.) Ms.Usha 532,588,172 192,513,260 As it is.
Lakhna(Incl.) (72.948Kms) section part of related to Raipur-Titlagarh (Retd.) J.D Kapoor Retd GM/ER
CPM-II Pkg 1 Mehra
doubling [Pkg 1]
C/o Major Bridge in Connection with doubling of Railway Line between
HCIL-Adhikarya- Justice (R) Vikramjit
BHUBANESWAR Barang-Rajatgarh (25Km), Cuttack - Barang (12Km) and 3rd line 16.01.2018 Matter is pending before the Hon'ble Supreme
6 between Barang-Khurda Road (35Km) in Orissa [BRIDGES] ARSS (JV) Sen, Sole (SC Order - - 1,502,288,258 215,956,092
CPM-IV [OLD A&C ACT] court of India.
(Bridges) 16.1.18)

C/o Roadbed in connection with doubling of Railway Line Between


HCIL-Adhikarya- Justice (R) Vikramjit
BHUBANESWAR Barang-Rajatgarh (25Km), Cuttack - Barang (12Km) and 3rd line 16.01.2018 Matter is pending before the Hon'ble Supreme
7 between Barang - Khurda Road (35Km) in Orissa (ROADBED) ARSS (JV) Sen, Sole (SC Order - - 5,064,662,262 326,525,186
CPM-IV [OLD A&C ACT] court of India.
(Road Bed) 16.1.18)

C/o doubling between Salka Road-Khongsara (25.8kM) and Khodri- 31.03.2018 /


RAIPUR Anuppur (61.6kM) on Bilaspur Divison of South East Central Railway in DSCL-BCEPL Justice (Retd.) R.C S.K. Vij S.P.S Jain
8 31.03.2019 / 1,601,778,302 4,533,444,394 Next date- 05.08.2022
CPM-I Chattisgarh (JV) Chopra Retd ME Retd. ME
31.03.2020
MMTS Phase-II Corridors- Doubling between Medchal- Bolarum & 20.04.2018/
Falaknuma – Umdanagar in Secunderabad and Hyderabad Division of GMR-
19.04.2019/
SEC'BAD South Center Railway, Andhra Pradesh, India In 3 (three) Packages- KALINDEE- TPL Justice (Retd.) Rekha S.K. Vij R. Rajamani
9 19.10.2019/ 440,547,162 657,735,621 As it is.
CPM(West) Prolongation Cost Claim Package 3 (JV) Sharma Retd. ME Retd.CCRS
18.05.2020/
(Pkg-3)
16.09.2021
C/o 7 stns i/c related works from Kavi Subhash (New Garia) to Ritwik ITD 27.04.2018/
Ghatak, in New Garia-Airport corridor of Kolkata Metro (Pkg ANS-1) Usha Mathur
KOLKATA Cementation 27.10.2019/ Justice (Retd.) Anil R. Rajamani
10 Retd.Secy./ 646,929,308 - As it is.
CPM-I India Ltd 27.04.2020/ Dev Singh Retd. CCRS
Parlia. Affairs
(ANS-1) 30.04.2021
C/o Viaduct for 5.4 KM length excluding station areas from Ch. 29.08.2018 /
18630.00 to Ch 25102.00 between CBD-1 to RabindraTirtha in New Last D.O.H of hearing on 20.05.2022.Next
KOLKATA 29.08.2019/ Justice
Garia-Airport Metro Corridor (Package ANV-4). L&T Justice Sudhir Mathur, date ;24.08.2022 to 30.08.2022(4nos.)-RVNL
11 CPM-II 29.02.2020 / (Retd.) Mukul 1,715,223,236 20,000,000
(ANV-4) (Retd.) D.K. Jain Retd Dir/IRCON Arguments.Next date;05.09.2022 to
28.02.2021/ Mudgal 07.09.2022.(Rejoinder arguments)
20.04.2022

1/2
LIST OF ONGOING ARBITRATION CASES (As on 03.08.2022)
Name of Arbitrators Amount of Remarks
Date of Appointment Amount of Claim
Name of the Counter Claim
S.No. PIU Name of the Project of AT/ Pres. Arb. & Presiding / Sole Contractor RVNL Nominee by Contractor
Agency (M/s) by RVNL Award challenged in the court.
Extns. Arbitrator Nominee Arbitrator ₹

C/o Viaduct (4.748 Km) excl. station areas from Ch.(-)1250.00 to 28.12.2018 /
4128.00 between Joka to Behala Chowrasta incl. Depot Approach at 28.12.2019 / Final Award still awaited,However presiding
KOLKATA Joka-BBD Bag corridor (Pkg JMV-1) Simplex Infra Justice (Retd.)
28.06.2020/ Justice (Retd.) Raghvendra arbitrator decided to convence a meeting on
12 CPM-II structures Ltd Swatanter Kumar 1,092,551,980 -
31.10.2020/ GS Singhvi Govind Kulkarni 28.07.2022. to ascertain the view of all on the
(JMV-1) by DHC desirebility of making an award...
30.04.2021/
31.01.2022
D/S/E/T/C of 25kV, 50HZ, single phase, traction OHE, switching stns,
traction sub-stations, SCADA, Gen Elec work along with Civil Engg Cobra 04.09.2019/ Justice (Retd.) Justice (Retd.) D K Saini
PUNE
13 work, i.e. Service Bldgs, Quarters, T/W siding, TSS cross track between lnstalaciones y 04.09.2020/ S K Agarwal S N Dhingra Dir(P&P)/DMRC 361,482,597 - Draft copy of affadavit submitted by claimaint.
CPM-RE
Amla (incl.) - Chhindwara (incl.) for 115 RKM/ 145 TKM of Nagpur Servicios, S.A. 04.03.2021 04-09-2019 21-08-2019 21-08-2019
Division
C/o of Roadbed, Major and Minor Bridges, Track Linking (excl supply of 13.11.2019 /
rails, sleepers, TO sleepers and TWS),incl S&T and OHE & general Cross examination completed , Next hearing
29.01.2021 Justice (R) Madan B.
BHUBANESWAR electrical works for 3rd line between Jakhapura - Haridaspur (25.0 Km) date not fixed,SLP©no. 15484/2021
14 McML-ECI (JV) 20.04.2022 Lokur, Sole. (THC - - 184,194,227 148,273,307 challenging AT.Appoinment is not listed till
CPM-I on Khurda Road division of East Coast Railway in Orissa 25.04.2022 Order 13.11.19) date.

Earthwork in formation, bridges, road under bridges, station building, Justice (R) A.K. Sikri,
15 CHENNAI staff quarter, general electrical work including power line crossing from BVSR-KVR (JV) 21.02.2020 Sole (DHC Order - - 448,723,154 0 As it is.
KM.00 to KM 17 between Obulavaripalle to Nethavaripalle 12.2.20)
C/o road bed, supply of ballast, major and minor bridges, residential and
service buildings & general electrical works etc., for Dallirajhara – Keoti Justice (Retd.) A.K. Justice
RAIPUR section (42 Km) in connection with a new rail link between Dallirajhara Justice (Retd) A.K. Patnaik (Retd.) D.K. Jain
16 SMS Ltd 28.01.2020 1,073,976,029 0 As it is.
CPM-III and Rowghat in Raipur Division of South East Central Railway in the Sikri by DHC Order dt by DHC Order dt
State of Chhattisgarh 14012020 14012020

Track Gauge Conversion between Lucknow-Sitapur - C/o Roadbed,


bridges, supply of ballast, dismantling and removal of existing Meter
LUCKNOW Gauge track, Installation of BG track (excl. supply of rails & PSC L&T R.P. Gupta, Retd
17 04.07.2021 Chander Parkash B K Makhija 1,410,884,519 0 As it is.
CPM-I sleepers), Electrical (Gen. Electrifn), S&T works Package-1 Pkg-1 AM(W)/RB

Track Gauge Conversion between Mailani-Pilibhit - C/o Roadbed,


bridges, supply of ballast, dismantling and removal of existing Meter Admission denial on documents submitted by
LUCKNOW L&T R.P. Gupta, Retd
18 Gauge track, Installation of BG track (excl. supply of rails & PSC 06.07.2021 Chander Parkash B K Makhija 1,562,064,229 0 L&T along with its SOC Submitted on
CPM-I Pkg-3 AM(W)/RB 24.06.2022.
sleepers), Electrical (Gen. Electrifn), S&T works Package-3
Construction of 7 Stations from Sub CBD-1 to Titumir in New Garia Justice (Retd) R C
KOLKATA Airport Corridor of Kolkata Metro railway Line ANS-3 IL&FS Justice (Retd) G B Last date of hearing on 28.06.2022.and Next
19 07.08.2021 Lahoti (Expired on SPS Jain 1,238,569,056 1,599,814,476
CPM-II ANS-3 Pattanaik DOH IS 22.08.2022.
23.02.2022)