01 System complies with latest AFC P&ID’S and isometric drawings. Y N n/a
03 All field weld inspection and NDE, Traceability and History records complete and Y N n/a
accepted.
05 Correct bolts and gaskets are installed at all mechanical joints and torqued Y N n/a
correctly.
06 All vents and drains are installed, including vents and drains for testing and are Y N n/a
of correct pressure rating.
09 Check Valve Materials - (Use spec ref. in piping material specification, tags and Y N n/a
nameplates.
13 Correct direction of flow through filters and strainers traps, check valves, globe Y N n/a
valves and control valves.
14 All instrument connections installed and any delicate instruments are isolated / Y N n/a
removed from test.
15 All Relief valves, Bursting disks, and specified control valves have been Y N n/a
removed.
16 Check Orifice valve tap orientation correct, taps and plugs have been seal Y N n/a
welded and unused. Tapped holes are plugged and welded.
17 Check Orifice flanges have required upstream and downstream clearances, Y N n/a
which bores have been ground and orifice plates have been removed.
Rev.01A *P1/3*
MECHANICAL COMPLETION CHECK SHEET Piping
Piping Installation P002A
Sheet 2 of 3
21 Check that system is adequately supported such that no spring in pipework Y N n/a
causes stress on pumps or vessel nozzles.
23 Check (where applicable) that Piping Bellows are correctly installed Y N n/a