Zubair New Degassing Project Task Method Statement

Company DR .concrete Ref:


Work Produce water tank A Start Date: 14/09/2017
location Start Time: 06:00
Description Scaffolding dismantling inside the tank End Date:30/09/2017
of the task End Time: 17:00
Personnel Name Position Tel
SECL
Issuing Authority

SUBCON Naveed Ahmed QC manager 07825539725


Performing
Authority
Tools and Scaffolding materials /Hand Tools ,pulley rope
equipment
Sequence of Work Sequence;
operations
(specifying •Conduct to TBM before start the job.
method of
working, tools
•All person should be wear proper PPE at work site.
materials and
equipment
•Barricade the all work area.
utilized) •Wear full body harness while working at height 1.80 or above then.
•Put red tag on the scaffold during dismantling.
•Fixing pulling on the steel structure suitable and put the rope 16mm
inside of that.
•Starting to remove the hand rail from 2nd level (up to down) then
fixing that material properly by using clamps &rope.
•Take down the materials by using pulley and rope (16mm)
•Remove board wood from platform &then take down on the ground
level by rope
•Before start dismantling should be inform to scaffolding inspector.
•All scaffolding should be barricaded well.
•After finish the dismantling all material should be remove from work
site.
•Housekeeping should be done before and after the job.
PPE

Safety Boots Gloves Eye Protection Respiratory Hard Hats Hearing PPE Face Shield
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No

Other PPE
Emergency

Procedures

First Aid (e.g. first aid box or clinic) First (24 x 7) – 078.0648.7625
Facilities Aider:

Tel No:

All work will be undertaken by qualified competent persons with experience of the type of work described above, and in all cases in
full accordance with safety procedures specified in the SECL Health and Safety Policy.

1
Prepared by: Naveed Ahmed Reviewed by: SECL
Position QC manager Position (SECL):
Signed: Signed: