PROPOSED LINED CANAL @ LS PROPOSED LINED CANAL @ BS
STA. 033+481.35 - STA. 033+490.00 STA. 033+490.00 - STA. 033+650.00
PI-33-6
3
3-
3.72
-3
PI PI
-3
9
3-
3+4
8
A.3
33+300
1
24.5
=ST
3+3
A.3
PC
PC T
PCC
C S
=ST C= .01
PC
C=S
6 T. = 24
33+ STA. 033+650.00 - STA. 033+668.65
A.3
500
= 8
10 °34'1
PT=
400
3+2
STA
PCC=S
6
.3
3+4
TA.33+
28.2
PROPOSED LINED CANAL @ LS
6
33
578.86
+2
33-
PI-33-7
2
PI-
33-
5 7.82
PT=STA.33+66
0
STA.033+700.0
MATCHLINE
BEG. OF PROJECT P L A N
SCALE: 1:1000 M.
STA.033+220.00
SUPERELEVATION e= +7.10% PCC e= +8.00% PCC e= +8.00% PCC e= +8.00% PT PC e= +8.00% PCC e= +6.50% PCC e= +8.00% PT
e= -7.10% e= -8.00% e= -8.00% e= -8.00% e= -8.00% e= -6.50% e= -8.00%
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VIRGO I. AUSTRIA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS "FY -2022" DATA CONTROLLER I SEE COVER SHEET SEE COVER SHEET
REGION IV-B PLAN FOR THE GERALD A. DPWH
CONSTRUCTION OF MISSING GAPS OF KWIN JUVY U. CRUZ GENE RYAN A. ALTEA MELQUIADES H. STO DOMINGO ROADS
PLAN PREPARED: PACANAN, CESO III FY - 2022
VICTORIA - SABLAYAN ROAD
OFFICE OF THE REGIONAL DIRECTOR (MINDORO CROSS ISLAND ROAD) GODOFREDO S. DAGDAG,Jr.
ENGINEER III OIC- CHIEF, PLANNING AND DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
R-IV-B
14 58
EDSA, DILIMAN QUEZON CITY DATE: DATE: DATE: DATE:
SABLAYAN,OCCIDENTAL MINDORO ENGINEER III