You are on page 1of 1

ELEMENTS OF CURVE

KM.

BENCH MARK NO.


KILOMETER POST
PIPE CULVERT CUT SLOPE
BOX CULVERT EMBANKMENT
ELEV.
DIRECTION OF FLOW ELEV.
CONTOURS
GROUTED RIPRAP LINED CANAL
CONCRETE SHOULDER GUARDRAIL
TELCO POST ELECTRICAL POST

* TO BE VERIFIED AND CORRECTED TO MINIMUM DESIGN


REQUIREMENT. PRIOR TO CONSTRUCTION.

PROPOSED LINED CANAL @ BS


STA. 033+220.00 - STA. 033+470.00

PI-3
3-4
PROPOSED LINED CANAL @ LS PROPOSED LINED CANAL @ BS
STA. 033+481.35 - STA. 033+490.00 STA. 033+490.00 - STA. 033+650.00
PI-33-6
3
3-

3.72
-3
PI PI
-3

9
3-

3+4
8

A.3
33+300
1
24.5

=ST
3+3
A.3
PC

PC T

PCC
C S
=ST C= .01
PC
C=S

A.3 373 PROPOSED LINED CANAL @ LS


3 +23 AZ .33+
7.9 DIS IM. STA
PT=
T

6 T. = 24
33+ STA. 033+650.00 - STA. 033+668.65
A.3

500
= 8
10 °34'1

PT=
400
3+2

4.0 33+ 33+6


1 m 4" 00
73.7

STA

PCC=S
6

.3
3+4

TA.33+
28.2
PROPOSED LINED CANAL @ LS

6
33

578.86
+2

STA. 033+470.00 - STA. 033+478.65


PI-
00

33-

PI-33-7
2

PI-
33-
5 7.82
PT=STA.33+66

0
STA.033+700.0
MATCHLINE
BEG. OF PROJECT P L A N
SCALE: 1:1000 M.
STA.033+220.00

STATION STA.033+200 STA.033+300 STA.033+400 STA.033+500 STA.033+600 STA.033+700

PI-33-2 PI-33-5 PI-33-7


WIDENING W=0.90 M. W=0.90 M. W=0.90 M.

PI-33-3 PI-33-4 PI-33-6 PI-33-8


W=0.90 M. W=0.90 M. W=0.90 M. W=0.90 M.

SUPERELEVATION e= +7.10% PCC e= +8.00% PCC e= +8.00% PCC e= +8.00% PT PC e= +8.00% PCC e= +6.50% PCC e= +8.00% PT
e= -7.10% e= -8.00% e= -8.00% e= -8.00% e= -8.00% e= -6.50% e= -8.00%

PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VIRGO I. AUSTRIA
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS "FY -2022" DATA CONTROLLER I SEE COVER SHEET SEE COVER SHEET
REGION IV-B PLAN FOR THE GERALD A. DPWH
CONSTRUCTION OF MISSING GAPS OF KWIN JUVY U. CRUZ GENE RYAN A. ALTEA MELQUIADES H. STO DOMINGO ROADS
PLAN PREPARED: PACANAN, CESO III FY - 2022
VICTORIA - SABLAYAN ROAD
OFFICE OF THE REGIONAL DIRECTOR (MINDORO CROSS ISLAND ROAD) GODOFREDO S. DAGDAG,Jr.
ENGINEER III OIC- CHIEF, PLANNING AND DESIGN DIVISION OIC, ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
R-IV-B
14 58
EDSA, DILIMAN QUEZON CITY DATE: DATE: DATE: DATE:
SABLAYAN,OCCIDENTAL MINDORO ENGINEER III